Technical Support Document, Permit Number: 01300098-101 Page 1 of 19
Technical Support Document For
Draft Air Emission Permit No. 01300098-101
This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that have been set forth by the federal and state regulations (40 CFR § 70.7(a)(5) and Minn. R. 7007.0850, subp. 1). The purpose of this document is to provide the legal and factual justification for each applicable requirement or policy decision considered in the preliminary determination to issue the draft permit.
1. General information
1.1 Applicant and stationary source location:
Table 1. Applicant and source address
Applicant/Address Stationary source/Address (SIC Code: 4911)
Mankato Energy Center LLC/Mankato Energy Center II LLC (owners) 500 Delaware Avenue Suite 600 Wilmington, Delaware 19801 Calpine Operating Services Company, Inc. (operator) Calpine Corporation (owner) 717 Texas Avenue Suite 1000 Houston, Texas 77002
Mankato Energy Center LLC 1 Fazio Lane Mankato, Blue Earth County, Minnesota 56001
Contact: Heidi Whidden Phone: 713-570-4829
1.2 Facility description Mankato Energy Center, LLC (MEC I) owns an electric generating plant with a capacity of 375 MW at winter conditions, which is a 1X1 Siemens-Westinghouse combined cycle power block consisting of one combustion turbine, one heat recovery steam generator (HRSG), and one steam turbine. This turbine is fired primarily by natural gas with distillate fuel oil as backup. The combustion turbine exhausts to a separate HRSG with supplementary duct firing capacity of 800 mmBtu/hr. Steam generated in the HRSG exhausts into the steam turbine. Mankato Energy Center II, LLC (MEC II) will install a new combustion turbine/HRSG train converting the facility to a 2X1 combined cycle power block. The new CT/HRSG train will generate an additional 345 megawatts for a total of 720 megawatts of electricity at winter conditions. The new combustion turbine will be fired with natural gas only and exhaust to the new HRSG having a supplementary duct firing capacity of 824 mmBtu/hr. The duct burners will also fire with natural gas. The steam generated by the new HRSG will also exhaust to the existing steam turbine. Calpine Operating Services Company, Inc. (COSCI) is the operator for the entire facility. All entities are wholly owned indirect subsidiaries of Calpine Corporation. The facility is subject to the requirements of federal Prevention of Significant Deterioration (PSD) at 40 CFR Section 52.21 for PM, PM10, PM2.5 (MEC II), SO2, NOX, CO, VOC, GHG (MEC II) and H2SO4. The facility uses Best Available Control Technology (BACT) to control emissions. The facility is also subject to hazardous air pollutant (HAP) limits to avoid being a major source under 40 CFR Section 63.2. The facility also has an auxiliary boiler, fire pump engine, fuel oil storage tank for the CTG and for the fire pump, cooling tower, bath heater and a diesel fired emergency generator.
1.3 Description of the activities allowed by this permit action This permit action is a major amendment. With this permit action MPCA is authorizing construction for Calpine to install a new combustion turbine (CT) (EQUI 16)/HRSG train. This proposed expansion project will
Technical Support Document, Permit Number: 01300098-101 Page 2 of 19
be owned by MEC II and operated by COSCI. The new turbine will generate approximately 200 MW at 6 degrees F and be natural gas-fired. This will bring the total electric output capacity of the facility to 720 MW at 6 degrees F. The combustion turbine will exhaust to a new HRSG having supplementary duct firing capacity of 824 mmBtu/hr. The duct burners (EQUI 17) will also be natural gas-fired. Steam generated by the new HRSG will exhaust to the existing steam turbine. This expansion project will trigger a major modification under PSD for PM, PM10, PM2.5, NOX, VOC, CO and GHG. The Permittee will install selective catalytic reduction (SCR) (TREA 11) and combustion turbine dry low NOX burners to reduce NOX emissions and catalyst oxidation (TREA 12) to control CO and VOC emissions from the turbine. The HRSG duct burner exhaust will be controlled by SCR, catalyst oxidation and low NOX duct burners. The new combustion turbine will be an F-Class turbine with similar characteristics to the existing turbine. The new HRSG will be designed to produce steam conditions matching the existing equipment. Four new cells will be added to the existing cooling tower (FUGI 1) to provide additional cooling capacity to the expanded facility, bringing the total number of cells in the cooling tower to twelve (12). The cooling tower will continue to operate within the existing drift rate BACT limit of 0.0005%, but will be expanded to include PM2.5 emissions. An anhydrous ammonia tank will be installed to provide reagent to the new SCR. The facility also will add a water tank, condensate tank (insignificant activity, ACTV), a small diesel tank (EQUI 23) for the proposed diesel emergency generator, natural gas piping (FUGI 2) and electrical equipment insulated with sulfur hexafluoride (SF6) (FUGI 3). The facility has an existing bath heater (EQUI 19) that is included in this permit action. The facility will add a diesel fired emergency generator (EQUI 18). The emergency generator will be limited to 100 hours of non-emergency operation per year and operated and maintained in accordance with the manufacturer’s specifications. Natural gas fugitives (FUGI 2) and breaker fugitives (FUGI 3) for EQUI 16 and EQUI 17 are both new fugitive emissions sources at the facility.
1.4 Description of notifications and applications included in this action Table 2. Notifications and applications included in this action
Date received Application/notification type and description 11/03/2015 Major Amendment
1.5 Facility emissions: Table 3. Title I emissions summary
Pollutant
Emissions increase from the modification (tpy)
Limited emissions increase from the modification (tpy)
Net emissions increase (tpy)
NSR/112(g) Significant thresholds for major sources (tpy)
NSR/ 112(g) review required? (yes/no)
PM 68.00 68.00 68.00** 25 Yes PM10 54.83 54.83 54.83** 15 Yes PM2.5 52.15 52.15 52.15** 10 Yes NOx 1199.43 167.44 167.44 40 Yes SO2 30.46 30.46 30.46 40 No CO 1288.76 768.64 768.64 100 Yes Ozone (VOC) 425.54 382.58 382.58 40 Yes Lead 6.61E-03 6.61E-03 6.61E-03 0.6 No CO2e* 1,585,055 1,585,055 1,585,055 75,000 Yes Beryllium 4.24E-05 4.24E-05 4.24E-05 0.004 No Mercury 9.20E-04 9.20E-04 9.20E-04 0.1 No Total HAPs 3.17 3.17 3.17 10/25 No
* Carbon dioxide equivalents as defined in Minn. R. 7007.0100.
Technical Support Document, Permit Number: 01300098-101 Page 3 of 19
** Facility is not taking credit for past actual emissions from FUGI 1
Table 4. Total facility potential to emit summary
PM tpy
PM10 tpy
PM2.5 tpy
SO2 tpy
NOx tpy
CO Tpy
CO2e tpy
VOC tpy
Single HAP tpy
All HAPs tpy
Total Facility Limited Potential Emissions
189.1
175.9
173.2
98.58
354.0
1266
3,100,582
647.0
9.0*
22.5*
* Permit limit (Single HAP limits for Formaldehyde and Hexane)
Table 5. Facility classification
Classification Major Synthetic minor/area Minor/area PSD X Part 70 Permit Program X Part 63 NESHAP X
2. Regulatory and/or statutory basis
2.1 New source review (NSR)
The facility is an existing major source under New Source Review regulations. This permit action is for a major modification under NSR/PSD. See discussion in Section 3 of this TSD. An Endangered Species Assessment (ESA) was required for this project. A consultation letter was sent from the facility to EPA Region 5 on June 12, 2015. An email response to the consultant was received May 17, 2016 stating that for the proposed project, a response from a threatened or endangered species to an environmental stressor is unlikely and no further consultation is necessary under Section 7 of the Endangered Species Act (See Attachment 7). A National Historic Preservation Act (NHPA) submittal was required for this project. A consultation letter was sent from the facility to EPA Region 5 on June 12, 2015. An email response to the consultant was received May 17, 2016 stating for this proposed project, U.S. EPA had determined the project is not likely to affect historic properties and no further action is required under Section 106 of the National Historic Preservation Act (See Attachment 7).
2.2 Part 70 permit program The facility is a major source under the Part 70 permit program.
2.3 New source performance standards (NSPS) The proposed diesel emergency engine (EQUI 18) is subject to 40 CFR pt. 60, subp. IIII, Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. The emergency engine is manufactured after April 1, 2006, and is not a fire pump engine. The new combustion turbine #1 (EQUI 16) and duct burners for CT #1 (EQUI 17) are subject to 40 CFR pt. 60, subp. KKKK, Standards of Performance for Stationary Combustion Turbines. The new CT #1 (EQUI 16) and duct burners (EQUI 17) are also subject to 40 CFR pt. 60, subp. TTTT, Standards of Performance for Greenhouse Gas Emissions for Electric Generating Units.
2.4 National emission standards for hazardous air pollutants (NESHAP)
The facility has accepted limits on single (hexane and formaldehyde) and total HAP emissions to qualify as an area source under 40 CFR § 63.2. Thus, no major source NESHAPs apply. That status does not change with this permit action.
Technical Support Document, Permit Number: 01300098-101 Page 4 of 19
The fire pump engine (EQUI 11) and proposed diesel emergency engine (EQUI 18) are both subject to 40 CFR pt. 63, subp. ZZZZ, which applies to both major and area sources of HAP. The emergency engine (EQUI 18) complies with 40 CFR pt. 63, subp. ZZZZ by meeting the requirements of 40 CFR pt. 60, subp. IIII for compression ignition engines. The combustion turbines (EQUI 5, EQUI 16) are not subject to 40 CFR pt. 63, subp. YYYY, National Emission Standards for Hazardous Air Pollutants for Stationary Combustion Turbines because the facility is not a major source of HAP emissions. The existing (EQUI 6) and proposed (EQUI 17) duct burners are classified as Electric Utility Steam Generating Units (EUSGU) under 40 CFR pt. 63, subp. UUUUU. The EUSGU source category definition includes coal-fired and oil-fired EUSGUs. Since the duct burners EQUI 6 and EQUI 17 burn natural gas, 40 CFR pt. 63, subp. UUUUU does not apply to these units.
2.5 Acid rain program
The combustion turbines #2 and #1 (EQUI 5 and EQUI 16) and duct burner systems (EQUI 6 and EQUI 17) are new utility units subject to the Acid Rain Program requirements. As such, the Permittee is required to hold SO2 allowances, and monitor and report emissions of SO2, NOX and CO2. EQUI 5 qualifies as a gas-fired and diesel-fired utility unit whereas EQUI 16 is a gas-fired utility unit, and therefore opacity monitoring for both units is not required as allowed by 40 CFR Section 75.14(c) and (d). The Acid Rain Permit Application is included in Appendix C to the permit.
2.6 Clean Air Interstate Rule (CAIR) and the Transport Rule (TR)/Cross-State Air Pollution Rule (CSAPR) Mankato Energy Center was subject to CAIR when initially promulgated in 2005. MEC submitted their CAIR application on June 26, 2008. On November 3, 2009, the U.S. Environmental Protection Agency (EPA) published a final rule administratively staying the effectiveness of CAIR in Minnesota, as of December 3, 2009. MPCA returned MEC’s CAIR application on March 8, 2011. CAIR was replaced by TR/CSAPR in 2011, but TR/CSAPR was stayed by the D.C. Circuit, and EPA was told to go back to CAIR. The Supreme Court reversed the decision in 2014 and requested the D.C. Circuit to lift the stay. The D.C. Circuit court did this with an extension of the original compliance dates by three years. Minnesota is subject to 40 CFR pt. 97, subp. AAAAA, TR NOx Annual Trading Program and 40 CFR pt. 97, subp. DDDDD, TR SO2 Group 2 Trading Program. The applicable CSAPR requirements from 40 CFR pt. 97, subps. AAAAA and DDDDD are added to EQUI 5, EQUI 6, EQUI 16 and EQUI 17 in the permit. These are the two combustion turbines and duct burners at the facility. The TR Trading Program Title V Requirements describing the TR monitoring provisions are included in Appendix D to the permit.
2.7 State implementation plan (SIP)
There are no SIP conditions applicable to this facility. 2.8 Compliance assurance monitoring (CAM)
The table below lists the sources which are subject to CAM, whether the source is a large pollutant specific emission unit (PSEU), and the monitoring for the applicable pollutants. Table 6. CAM summary
Unit Control CAM applicability Pollutant Monitoring EQUI 16, 17 TREA 11 SCR Large NOx NOx CEMS EQUI 16, 17 TREA 12 Oxidation
Catalyst Large CO/VOC CO CEMS
For large pollutant specific emission units, records of the monitored parameter must be made at a minimum of four times per hour, or once every 15 minutes. See Attachment 4 to this document for the CAM Plan submitted by the applicant.
Technical Support Document, Permit Number: 01300098-101 Page 5 of 19
SCR (TREA 11) reduces NOX emissions from EQUI 16 and EQUI 17. EQUI 16 and 17 are subject to post-April 15, 1990 NSPS promulgated standards exempting them from CAM for the NSPS limits. However, EQUI 16 and 17 are also subject to a BACT limit that is subject to CAM. MEC II will install a NOX CEMS (EQUI 21) to demonstrate compliance with the proposed NOX BACT limit. The oxidation catalyst (TREA 12) reduces CO and VOC emissions. MEC II will install a CO CEMS (EQUI 22) to demonstrate compliance with the EQUI 16 and 17 CO BACT limit. The CAM rule indicates that use of a CEMS meets the requirements of the CAM rule. The CO CEMS is also proposed as a surrogate for VOC emissions.
2.8 Environmental Review This project is subject to Environmental Review and conducted an air emissions risk analysis (AERA). Calpine applied to the Minnesota Public Utilities Commission for a Site Permit in accordance with the Minnesota Power Plant Siting Act (Minn. Stat. 216E and Minn. R. ch. 7850) on August 5, 2015. The Site Permit application contains environmental information as specified by Minn. R. 7850.1900, subp. 3. Data and other information on air impacts is one area that is covered in the Site Permit application.
2.9 Air Emissions Risk Analysis (AERA) The purpose of the AERA is to assess the potential health risk attributed to air emissions from a given source. An AERA includes quantitative and qualitative analyses. In the quantitative portion of the analysis, the potential increment cancer risks and non-cancer hazard indices are estimated using procedures outlined in MPCA guidance. The qualitative portion of the analysis identifies and discusses items of potential interest that cannot be easily quantified. The AERA was triggered due to emissions increases of CO and VOC greater than 250 tpy as shown in Table 3.
2.10 Minnesota state rules Portions of the facility are subject to the following Minnesota Standards of Performance:
· Minn. R. 7011.0515 Standards of Performance for New Indirect Heating Equipment · Minn. R. 7011.0715 Standards of Performance for Post-1969 Industrial Process Equipment · Minn. R. 7011.1505, subp. 3 Standards of Performance for Post-June 11, 1973 Storage Vessels · Minn. R. 7011.2300 Standards of Performance for Stationary Internal Combustion Engines
Table 7. Regulatory overview of units affected by the modification/permit amendment
Subject item*
Applicable regulations Rationale
COMG 5 (HAPs Limits)
Title I limit to avoid major source under 40 CFR 63.2
National Emission Standards for Hazardous Air Pollutants. Limit set on HAPs emissions to avoid major source classification under 40 CFR Part 63.
STRU 14 (CT/DB #2 Stack)
Title I Condition: 40 CFR § 52.21(j)(BACT) & Minn. R. 7007.3000 Minn. R. 7007.0800, subp. 2
Prevention of Significant Deterioration (PSD). Existing requirements for Startup and Shutdown Operating Mode and Control Equipment Operation During Startup and Shutdown were changed to Title I Conditions for BACT for STRU 14. Limits for PM2.5 for natural gas and fuel oil use.
Technical Support Document, Permit Number: 01300098-101 Page 6 of 19
Subject item*
Applicable regulations Rationale
STRU 20 (CT/DB #1 Stack)
Title I Condition: 40 CFR § 52.21(j)(BACT) & Minn. R. 7007.3000 40 CFR pt. 60, subp. KKKK 40 CFR pt. 60, subp. TTTT
PSD BACT limits set for NOX, CO, VOC, PM, PM10, PM2.5, and CO2e. Startup/Shutdown BACT limits set for NOX, CO and VOC. Standards of Performance for Stationary Combustion Turbines · CT with heat input at peak load greater than or equal to 10
mmBtu/hr based on HHV; and · The unit was constructed after February 18, 2005. Standards of Performance for Greenhouse Gas Emissions for Electric Generating Units · the unit was constructed after January 8, 2014; · the unit has a base load rating greater than 250 mmBtu/hr of
fossil fuel; and · the unit serves a generator capable of selling greater than 25 MW
of electricity to a utility power distribution system. EQUI 5 (CT #2), EQUI 6 (Duct Burners CT #2), EQUI 16 (CT #1), EQUI 17 (Duct Burners CT #1)
40 CFR pt. 97, subp. AAAAA 40 CFR pt. 97, subp. DDDDD
Transport Rule (TR) NOX Annual Trading Program · CT serving after January 1, 2005, a generator with nameplate
capacity of more than 25 MWe producing electricity for sale. TR SO2 Group 2 Trading Program · CT serving after January 1, 2005, a generator with nameplate
capacity of more than 25 MWe producing electricity for sale.
EQUI 5 (CT #2), EQUI 16 (CT #1)
Minn. R. 7011.2300 Standards of Performance for Stationary Internal Combustion Engines
EQUI 18 (Emergency Generator)
40 CFR pt. 60, subp. IIII 40 CFR pt. 63, subp. ZZZZ Minn. R. 7011.2300
Standards of Performance for Stationary Compression Ignition Internal Combustion Engines National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines Standards of Performance for Stationary Internal Combustion Engines
EQUI 19 (Bath Heater)
Minn. R. 7011.0515 Standards of Performance for New Indirect Heating Equipment · Construction commenced after January 31, 1977.
EQUI 21 (CT #1 NOX CEMS)
40 CFR pt. 75 CEMS CEMS Certification and Operation via 40 CFR pt. 75
EQUI 22 (CT #1 CO CEMS)
40 CFR pt. 60 CEMS CEMS Certification and Operation via 40 CFR pt. 60
EQUI 23, 24 (Tanks)
Title I Condition: 40 CFR § 52.21(j)(BACT) & Minn. R. 7007.3000 Minn. R. 7011.1505, subp. 3.B
Title I BACT limits to install a fixed roof tank and maintain the tank in good working condition (EQUI 23, diesel emergency generator tank) and maintain the tank in good working condition (EQUI 24, natural gas condensate tank - plant) Standards of Performance for Post-June 11, 1973 Storage Vessels
FUGI 1 (Cooling Towers)
Minn. R. 7011.0715/0735 Standards of Performance for Post-1969 Industrial Process Equipment
FUGI 2 (NG fugitives) FUGI 3 (breaker fugitives)
Title I Condition: 40 CFR § 52.21(j)(BACT) & Minn. R. 7007.3000
FUGI 2 BACT limit to conduct quarterly audio/visual/olfactory inspections. FUGI 3 BACT limit to use state-of-the-art enclosed-pressure SF6 circuit breakers with leak detection and monthly pressure inspections.
*Location of the requirement in the permit (e.g., EQUI 1, STRU 2,etc.).
Technical Support Document, Permit Number: 01300098-101 Page 7 of 19
3. Technical information 3.1 Combustion Turbine/HRSG train with Duct Burners
The two combustion turbine/HRSG trains will provide steam to an existing steam turbine generator. The current (EQUI 5) and proposed (EQUI 16) combustion turbines are F-Class models utilizing compressed air and fuel to produce electricity and high temperature exhaust gas. The proposed combustion turbine will fire natural gas only. The HRSG recovers the waste heat from the combustion turbine and is used to produce steam, creating additional power generation in combination with the steam turbine. The exhaust heat from the combustion turbine is taken by the HRSG to heat water and convert it to steam. The steam turbine then receives the steam from the two HRSGs and as the steam expands it causes the steam turbine shaft to rotate. This drives the generator and produces electrical power. Pollution control equipment for the new combustion turbine includes selective catalytic reduction (SCR) (TREA 11) to control NOX emissions, and a catalytic oxidizer (TREA 12) to control CO and VOC emissions. The proposed HRSG low-NOX duct burners (EQUI 17) will also be controlled by SCR (TREA 11) and the catalytic oxidizer (TREA 12). Combustion of natural gas produces low amounts of particulate and SO2 emissions so no pollution control equipment is proposed for either of these pollutants. Dry low-NOX (DLN) burners limit NOX production by premixing compressed air with natural gas before being injected into staged lean combustors. This results in a cooler combustion zone. Typically, the higher the combustion temperature, the more NOX produced. The SCR control uses anhydrous ammonia and a catalyst converting NOX to elemental nitrogen and water. The combustion turbines (new and existing) have the ability to operate with or without duct burners. The duct burners take excess oxygen in the exhaust gas to combust additional natural gas, thus increasing steam production. As mentioned above the duct burners will add 824 mmBtu/hr of heat input. The new CT/DB system will operate in parallel to the existing CT/DB system and both will provide steam to the existing steam turbine.
3.2 Additional Equipment
The facility will also add a diesel emergency generator (EQUI 18). This generator will be subject to New Source Performance Standards for Stationary Compression Ignition Internal Combustion Engines (40 CFR pt. 60, subp. IIII). EQUI 18 will also be subject to 40 CFR pt. 63, subp. ZZZZ for Stationary Reciprocating Internal Combustion Engines at area sources of HAP. It will comply with 40 CFR pt. 63, subp. ZZZZ by complying with the applicable requirements of 40 CFR pt. 60, subp. IIII. The emergency engine will also be subject to Minnesota Standards of Performance for Stationary Internal Combustion Engines at Minn. R. 7011.2300. The engine will be limited to less than or equal to 100 hours per year. This limitation will be a BACT limit to minimize emissions of NOX, CO, VOC, PM, PM10 and PM2.5. The facility has a bath heater (EQUI 19) that is being added to the permit as an EQUI. The emissions from EQUI 19 exceed the NOX threshold listed at Minn. R. 7007.1300, subp. 3(I). The bath heater is subject to state standards of performance for new indirect heating equipment and will perform daily visible emissions inspections during daylight hours. The facility also plans to add four additional cells to the existing cooling tower (FUGI 1) to accommodate the additional cooling capacity needed with the addition of the new CT/DB unit. This will bring the number of cells in the cooling tower to 12. New natural gas piping (FUGI 2) and electrical equipment (FUGI 3) insulated with sulfur hexafluoride (SF6) will also be added. An anhydrous ammonia tank, water tank, condensate tank and small diesel tank for the proposed diesel emergency generator will also be added.
3.3 Best Available Control Technology
This modification is subject to PSD for NOX, CO, VOC, PM, PM10, PM2.5 and GHG. The facility is required to complete a case-by-case best available control technology (BACT) analysis for each piece of equipment associated with the project. BACT is determined using U.S. EPA’s five step top-down approach. Following this approach, control technologies are analyzed until a level of control considered BACT is reached based on environmental, energy and economic impacts. The five steps included are: 1 Identify applicable options; 2 Eliminate technically infeasible options;
Technical Support Document, Permit Number: 01300098-101 Page 8 of 19
3 Rank remaining alternatives by control effectiveness; 4 Evaluate most effective controls; and 5 Select BACT In determining BACT, information from the following sources was evaluated: on-line EPA RACT/BACT/LAER Clearinghouse (RBLC) system and other state BACT control technology databases, EPA/state/local air quality permits and applications, control technology vendors, AP-42 Section 3.1 stationary gas turbines for electricity generation, and alternative control techniques document NOX emissions from stationary gas turbines EPA-453/R-93-007.
3.3.1 Control of NOX Emissions
The following technologies were identified as potentially able to control NOX emissions from stationary combined cycle combustion turbines: DLN burner technology; Wet controls (water and steam injection); Rich/Quench/Lean (RQL) combustion; Selective Catalytic Reduction (SCR); Selective Non-Catalytic Reduction (SNCR); EMx, formerly SCONOXTM catalytic oxidation/absorption; and Catalytic combustion XONONTM
The control alternatives listed above were reviewed for technical feasibility in controlling NOX emissions from EQUI 16/EQUI 17. Combustion control utilizing DLN burners based on lean premix combustion control and SCR is deemed the highest ranking control technology (i.e. BACT). NOX BACT for EQUI 16/EQUI17 is proposed as 3.0 ppmvd based on a 3-hr rolling average at 15% O2 for natural gas combustion using DLN burners and SCR technology. This limit does not apply during startup, shutdown, malfunction, tuning and combustion turbine shakedown.
3.3.2 Control of CO Emissions
Review of the RBLC resulted in two types of CO control technologies available for combined cycle applications. Those two technologies are: Combustion control; and Catalytic oxidizer Both available control alternatives will be applied to the CT/HRSG train. The most effective CO control will be from the catalytic oxidizer. Since catalytic oxidation for CO control is most effective, no further analysis is needed in a top down BACT analysis. The facility proposes installation of a catalytic oxidizer to decrease CO emissions. The proposed CO BACT limits are 4.0 ppmvd based on a 3-hr rolling average at 15% O2 (operating at normal base load capacity) and 4.7 ppmvd based on a 3-hr rolling average at 15% O2 (operating at conditions below base load capacity) for natural gas combustion with DLN burner technology, low NOX duct burners and catalytic oxidizer. This limit does not apply during startup, shutdown, malfunction, tuning and combustion turbine shakedown. Base load operation for the turbine is > 90% of capacity for ambient conditions. Less than base load is > 60% and < 90% of rated capacity for ambient conditions.
3.3.3 Control of VOC Emissions
Similar to CO control, a review of the RBLC resulted in two control technologies available for combined cycle applications of VOC control. Once again the two control technologies are combustion control and catalytic oxidizer. Again, both available control technologies will be applied to the CT/HRSG train. And again, since catalytic oxidation for VOC control is most effective, no further analysis is needed in a top down BACT analysis. The facility proposes installation of a catalytic oxidizer to decrease VOC emissions. The proposed VOC BACT limit is 3.4 ppmvd based on a 3-hr block average at 15% O2 for natural gas combustion with DLN burner technology, low NOX duct burners and catalytic oxidizer. This limit does not apply during startup, shutdown, malfunction, tuning and combustion turbine shakedown. The permit includes separate NOX, CO and VOC BACT limits that apply during startup and shutdown operation.
Technical Support Document, Permit Number: 01300098-101 Page 9 of 19
3.3.4 Control of PM/PM10/PM2.5 Emissions
A review of the RBLC for PM/PM10/PM2.5 resulted in the following control technologies available to control particulate emissions from combined cycle applications: Fuel specifications; clean burning fuel; Good combustion practices/combustion control; and Low-sulfur fuel MEC II proposes to burn pipeline-quality natural gas, maintain the turbine/HRSG in good working order and implement good combustion practices with DLN burner technology. The proposed BACT limits are based on vendor data and operating experience at MEC and other units in Calpine’s fleet. Add-on control for PM, PM10 and PM2.5 are technically and economically infeasible due to high flow rates and low particulate concentrations. The proposed BACT limit for PM, PM10 and PM2.5 is 11.9 lb/hr on a 3-hr block average for natural gas combustion. This limit will apply at all times including startup, shutdown and malfunction. The limit will not apply prior to combustion turbine shakedown. The existing turbine’s PM/PM10 BACT limits are written in units of lb/hr and lb/mmBtu. The PM/PM10/PM2.5 BACT limits for the proposed turbine will also include a lb/mmBtu component. Combustion turbine vendors do not provide emission guarantees in lb/mmBtu because particulate emissions do not vary proportionately with heat input. Vendors have little data for particulate emissions at reduced load (i.e. 50-60%) because particulate testing is rarely done below base load. Contributions to particulate emissions include combustion turbine combustion, duct burners and ammonium bisulfate formation downstream of the SCR. Duct burner and ammonium bisulfate particulate emissions increase proportionally with increased heat input. Combustion turbine particulate emissions however, do not increase with increased heat input. When the combined emissions from the turbine, duct burner and ammonium bisulfate are added together and converted to lb/mmBtu the highest emission rates correspond with the lowest heat input values. Calpine proposes a PM/PM10/PM2.5 lb/mmBtu emission rate limit of 0.0098 lb/mmBtu.
0.0098 lb/mmBtu = 11.9 lb/hr * 1/1218 mmBtu/hr
The lb/mmBtu emission rate limits on the existing turbine was calculated using the same methodology. 1218 mmBtu/hr is approximately 60% of the rated capacity of the proposed turbine at 92 degrees F.
3.3.5 Control of Greenhouse Gas (GHG) Emissions
MEC II proposes the following energy efficiency processes, practices and designs for the combined cycle turbine: Use of combined cycle power generation technology;
Combustion turbine energy efficiency processes, practices and designs: efficient turbine design, turbine inlet air cooling, periodic turbine burner tuning, reduction in heat loss and instrumentation and controls; HRSG energy efficiency processes, practices and designs: efficient heat exchanger design, insulation of HRSG, minimizing fouling of heat exchange surfaces, minimizing vented steam and repair of steam leaks; Plant-wide energy efficiency processes practices and designs: fuel gas preheating, drain operation, multiple combustion turbine/HRSG trains and boiler feed pump fluid drive design.
To determine an appropriate heat rate for EQUI 16 (CT #1) in combined cycle operation without duct burning, the following compliance margins were added to the base heat rate value. A design margin of 3.3% reflecting the possibility the constructed facility will not be able to achieve the design heat rate. A performance margin of 6% reflecting efficiency losses due to equipment degradation prior to maintenance overhauls. A degradation margin of 3% reflecting the variability in operation of auxiliary plant equipment due to use over time. The result of these adjustments leads MEC II to propose a BACT maximum net heat rate of 7979 btu/kWh (HHV)(at EQUI 16 level) based on the conditions of ambient dry bulb temperature of 6 degrees F, ambient relative humidity of 59%, barometric pressure of 14.28 psia, fuel LHV of 21,500 btu/lb and fuel HHV/LHV ratio of 1.109. A GHG BACT limit of < 1000 lb CO2e/MWh on gross power production basis is proposed based on 1X1 combined cycle operation. This limit is also applicable via NSPS subp. TTTT. The facility will performance test 180 days after the first fire to verify compliance with the heat rate limit.
Technical Support Document, Permit Number: 01300098-101 Page 10 of 19
3.3.6 BACT for Diesel Engine Emergency Generator (EQUI 18)
The diesel engine emergency generator will be used for emergency situations. It will, however, be operated for a minimal period on a bi-weekly basis for testing. The proposed BACT for EQUI 18 is to maintain the emergency engine in good working order, operation according to the manufacturer’s specifications and limiting non-emergency operation to < 100 hours per year. This limits the annual emissions in tons per year of the following pollutants to: 0.66 tpy NOX; 0.66 tpy CO; 0.04 tpy VOC; 0.26 tpy SO2; 0.01 tpy PM/PM10/PM2.5; 208 tpy CO2e.
3.3.7 BACT for Cooling Tower (FUGI 1)
Four new cells will accommodate the additional cooling requirements at the facility. Cooling towers associated with combined cycle power plants are equipped with high efficiency mist eliminators. The existing and new cells to the cooling tower will incorporate a mist eliminator with 0.0005% tower drift rate. This limit is established in the current permit but will be expanded in this permit action to include PM2.5 emissions.
3.3.8 BACT for Diesel Fuel Storage Tank (EQUI 23)
The diesel engine emergency generator (EQUI 18) will have its own diesel storage tank (EQUI 23). The storage capacity will be approximately 5000 gallons. Due to low volatility of diesel fuel, potential emissions of VOC are expected to be negligible. BACT is proposed as using a fixed roof tank and maintaining the tank in good working condition.
3.3.9 BACT for Condensate Tank (EQUI 24)
MEC II will install a 6615 gallon condensate tank that will emit a small amount of VOC. Its usage will be on a batch cycle and minimal. BACT is proposed as maintaining the tank in good working condition.
3.3.10 BACT for Natural Gas Piping (FUGI 2) for GHG Emissions
Natural gas is delivered to the facility via pipeline. Gas will be metered and piped to the new combustion turbine (EQUI 16) and duct burner (EQUI 17). GHG fugitive emissions from the piping components will include emissions of methane and carbon dioxide. The following technologies were identified as potential control options for piping fugitive emissions: implementation of leak detection and repair (LDAR) using a hand held analyzer; implementation of alternative monitoring using a remote sensing technology such as infrared cameras; and implementation of audio/visual/olfactory (AVO) leak detection. LDAR and remote sensing technologies are both technically feasible. Since pipeline natural gas is odorized with small amounts of mercaptan, an AVO leak detection program is technically feasible. Uncontrolled CO2e emissions from FUGI 2 from EQUI 16/EQUI 17 represent approximately 0.01% of the facility’s total CO2e emissions. Any control techniques applied to FUGI 2 will provide minimal CO2e emission reductions. BACT for FUGI 2 (EQUI 16/EQUI 17) is proposed as quarterly AVO inspections.
3.3.11 BACT for Electrical Equipment Insulated with SF6 (FUGI 3)
The generator circuit breakers will be electrically insulated using sulfur hexafluoride (SF6) gas. The gas is used for electrical insulation, arc quenching and current interruption in high voltage electrical equipment. It is only used in safe, sealed systems which under normal circumstances do not leak gas. Two new SF6 breakers (FUGI 3) as part of EQUI 16 equipment will be installed with this amendment. The circuit breaker for EQUI 16 will contain approximately 35 lbs of SF6. Another circuit breaker between the CT generator step-up transformer and 115 kV transmission line will hold approximately 72 lbs of SF6. One available control technology is the use of state-of-the-art SF6 technology with leak detection to limit fugitive emissions. One alternative considered in this BACT analysis is to substitute with another non-greenhouse gas
Technical Support Document, Permit Number: 01300098-101 Page 11 of 19
substance for SF6 as the dielectric material in the circuit breakers. Potential alternatives to SF6 were addressed in the National Institute of Standards and Technology (NIST) Technical Note 1425, Gases for Electrical Insulation and Arc Interruption: Possible Present and Future Alternatives to Pure SF6. NIST Technical Note 1425 describes SF6 as a superior dielectric gas for nearly all high voltage applications. Due to the level of superiority as a dielectric gas for SF6, there are no current technically feasible alternatives to SF6. MEC II concluded that using state-of-the-art enclosed-pressure SF6 circuit breakers with leak detection is considered BACT. The circuit breakers will be designed to meet the latest of the American National Standards Institute (ANSI) C37.013 standard for high voltage circuit breakers. The proposed circuit breakers will have low pressure alarms and low pressure lockouts.
3.4 Environmental Review
In Minnesota no person may construct a large electric power generating plant greater than 50 MW without a Site permit from the Public Utilities Commission (PUC). Calpine filed an application for a Site permit for the proposed 345 MW expansion of the existing Mankato Energy Center with the PUC on August 5, 2015. The application was deemed complete by the PUC at a Board meeting in September 2015. A public information and scoping meeting was held in Mankato in October 2015 to determine the scope of the environmental assessment (EA) for the proposed expansion project. The Department of Commerce (DOC) completed the scoping of the EA in October 2015 and began work on the EA. The EA document was available for public review and comment in February 2016. A public hearing administered by an administrative law judge was held in Mankato in March 2016 to allow public comment and discussion on the Site permit application and the EA. The Findings of Fact on the adequacy of the Site permit process and the EA was published in April 2016. In May 2016, briefing papers were prepared by PUC staff and presented to the PUC Board for review stating that the factors of the Site permit process had been completed appropriately by Calpine and the EA had addressed the project and environmental issued identified during the scoping process. The PUC Board approved the EA as complete and authorized the issuance of the Site permit for the expansion project to Calpine at a meeting on June 2, 2016.
3.5 Air Emissions Risk Analysis (AERA) As mentioned above, an AERA was conducted for this project because there is an increase in emissions of CO and VOC by more than 250 tons per year. The AERA was prepared in accordance with MPCA AERA Guidance, updated April 27, 2015. The guidance includes use of a Risk Assessment Screening Spreadsheet (RASS) for quantitative analysis. The most recent version of the RASS was used for the analysis. It quantitatively assesses the potential human health effects from the proposed CT/DB system (STRU 20), the existing CT/DB system (STRU 14), the auxiliary boiler (STRU 17) and the bath heater (STRU 22). The AERA assesses the short-term and acute inhalation hazard and long-term chronic acute inhalation cumulative excess cancer risk and hazard. The results of the acute inhalation hazard and chronic multipathway hazard analysis were both less than 1.0. The chronic lifetime excess cancer risk estimate was less than the Minnesota Department of Health threshold of 10E-05, or one in 100,000. Thus, the AERA and RASS results indicate the addition of a second combustion turbine system at the facility will not adversely affect human health or the environment. The RASS is Attachment 5 to this TSD.
3.6 Environmental Justice Environmental Justice (EJ) is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation and enforcement of environmental laws, regulations and policies. EPA has this goal for all communities and persons across the country. It will be achieved when everyone enjoys the same degree of protection from environmental and health hazards and equal access to the decision-making process to have a healthy environment in which to live, learn and work. As part of the permitting process, the MPCA contacts U.S. EPA Region 5 staff to determine if there are any possible EJ issues for the facility location that need to be addressed in the permit action. For this project, MPCA staff contacted EPA Region 5 staff on February 17, 2016 and received no indication of concern for this facility’s location with regard to EJ.
3.7 BACT Limit Averaging Times
Technical Support Document, Permit Number: 01300098-101 Page 12 of 19
The Permittee asked the original permit author a question via phone call on July 18, 2006 about the averaging times for combined cycle BACT limits on the existing turbine. The question was whether the averaging time was a 3-hour rolling or block average. The concern by the Permittee was that permit no. 01300098-001 was silent on this issue. The answer given was for pollutants monitored by CEMS the average is 3-hr rolling (NOX and CO). For pollutants measured by a stack test, the averaging time is a 3-hr block. The proposed turbine for this permit action also has CEMS for NOX and CO. NOX was also modeled against National Ambient Air Quality Standards (NAAQS) for which there is a one-hour standard. For normal operation NOX BACT limits on the existing and proposed turbines and duct burners, the averaging time is 3-hr rolling. For CO BACT limits the averaging time is 3-hr rolling. For all other pollutants (except CO2e on the proposed turbine) the averaging time is a 3-hr block. Averaging times for the existing turbine/duct burner BACT limits will be updated in this permit action.
3.8 Combustion Turbine #2 PM2.5 Limits Permit no. 01300098-002 had performance test requirements for PM2.5 but no permit limit to test against. Limits for PM2.5 while burning natural gas and fuel oil will be added during this permit action and be the same numerical limits as those for PM and PM10. As PM2.5 was not a regulated pollutant during permit action -001, PM2.5 was not part of the original BACT analysis for combustion turbine #2 (EQUI 5). Therefore, the citation for these PM2.5 limits will be Minn. R. 7007.0800, subp. 2. These limits are placed at the STRU 14 level.
3.9 Calculations of potential to emit
Attachment 1 to this TSD contains PTE spreadsheets, which summarizes the PTE of the Facility, and provides detailed emissions analyses for the modification prepared by the MPCA and the Permittee. The spreadsheet includes the new Tempo nomenclature for equipment at the Facility as they are different from the previous Delta nomenclature. The old Delta names for equipment are also included for reference.
4. Dispersion modeling
The facility conducted modeling for the installation of a combined cycle combustion turbine and associated HRSG. The initial NOx modeling report resulted in non-attainment (189.69 ug/m3); however, Mankato Energy Center demonstrated compliance with the one-hour NO2 NAAQS (0.00014 ug/m3). From reviewing the modeling demonstration it was determined that the emissions from CHS-Mankato were the primary contributor to modeled non-attainment. Upon further review it was discovered that the CHS-Mankato emission rates were not current for that facility. The MPCA adjusted the relevant CHS-Mankato emissions and re-ran the model which resulted in modeled attainment with a maximum value of 158.53 ug/m3. MPCA reviewed the significant impact level (SIL) modeling evaluation for CO, PM10 and PM2.5. The modeled values based on MPCA verification runs agree with reported values and no further refined modeling for these pollutants was necessary. MPCA also reviewed the modeling files submitted for PM2.5 increment screening and agree that no further increment evaluation is needed for this project. With the final NO2 modeled concentration of 158.53 ug/m3 this is 84.3% of the 1-hr NO2 primary NAAQS standard (188 ug/m3). This result qualifies NO2 modeling for tier 2 remodeling requirements (75%-90% of the NAAQS standard). Mankato Energy Center had previously modeled NO2 during permit action -001 and the previous result was also tier 2. Updated PSD Tier 2 remodeling requirements are being placed in the permit with this amendment.
5. Monitoring
In accordance with the Clean Air Act, it is the responsibility of the owner or operator of a facility to have sufficient knowledge of the facility to certify that the facility is in compliance with all applicable requirements.
For CAM, the Permittee submitted a CAM proposal as required by 40 CFR § 64.3. It can be found in Attachment 4 to this TSD. Further discussion of decisions about CAM can be found in Table 8.
In evaluating the monitoring included in the permit, the MPCA considered the following:
· The likelihood of the facility violating the applicable requirements. · Whether add-on controls are necessary to meet the emission limits. · The variability of emissions over time.
Technical Support Document, Permit Number: 01300098-101 Page 13 of 19
· The type of monitoring, process, maintenance, or control equipment data already available for the emission unit.
· The technical and economic feasibility of possible periodic monitoring methods. · The kind of monitoring found on similar units elsewhere.
The table below summarizes the monitoring requirements associated with this amendment.
Table 8. Monitoring
Subject item* Requirement (rule basis)
Monitoring Discussion
COMG 5 (HAPs Limits)
Formaldehyde ≤ 9.0 tons per year, on a 12 month rolling sum
Hexane < 9.0 tons per year, on a 12 month rolling sum
Total HAPs < 22.5 tons per year, on a 12 month rolling sum
(limit to avoid major source under 40 CFR 63.2 & Minn. R. 7011.7000)
Recordkeeping: For EQUI 5, 6 records of daily heat input during operation and hours of operation during NG & FO operation with monthly calculations of HAPs emissions at STRU 14. For EQUI 16, 17 the same records as above during NG operation with monthly calculations at STRU20. For EQUI 7, 11, 18, 19 records of monthly heat input with monthly calculations of HAPs emissions, 12-month rolling sum calculations done by the 15 of the month for the previous month located at COMG 5
HAP emissions monitoring for formaldehyde, hexane, other single HAPs and total HAPs can be determined by daily heat input records, daily operating hours and applicable emission factors as specified in the permit at STRU 14 for natural gas (NG) and fuel oil (FO) and at STRU 20 for NG. HAP emissions monitoring for EQUI 7, 11, 18 and 19 is located at COMG 5. Monthly calculations of HAP emissions are located at STRU 14 and STRU 20. The Hexane limit is revised to < 9.0 tpy, previously < 8.5 tpy. HAP emissions monitoring for EQUI 7, 11, 18, 19 located at COMG 5. Option to use monthly PTE for EQUI 7, 11, 18, 19 in lieu of monthly recordkeeping at COMG 5.
STRU 14 (CT/DB #2 Stack)
PM2.5: < 0.009 lb/ mmbtu not to exceed 22.0 lb/hr 3-hr block avg NG
PM2.5: < 0.057 lb/ mmbtu not to exceed 72.8 lb/hr FO
(Minn. R. 7007.0800, subp. 2)
Performance testing on a 60 month schedule
Permit contained PM2.5 performance testing but no limits. Limits are equivalent to existing limits for PM and PM10 while burning natural gas (NG) or fuel oil (FO). PM2.5 was not a regulated PSD pollutant during permit no. 01300098-001 and not part of the original BACT analysis. Thus, these limits are cited under Minn. R.
Technical Support Document, Permit Number: 01300098-101 Page 14 of 19
Subject item* Requirement (rule basis)
Monitoring Discussion
STRU 20 (CT/DB #1 Stack)
NOX: ≤ 3.0 ppm, on 3-hr rolling avg. by vol. dry
CO: < 4.0 ppm, on 3-hr rolling avg. by vol. dry at full load
CO: < 4.7 ppm, on 3-hr rolling avg. by vol. dry at less than full load
VOC: < 3.4 ppm, on 3-hr block avg. by vol. dry
PM/PM10/PM2.5: < 0.0098 lb/mmBtu not to exceed 11.9 lb/hr, on 3-hr block avg.
CO2e: < 1000 lb/MWh (gross)
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
NOX: < 15 ppm @ 15% O2 30 day rolling avg. by vol.
NOX: < 96 ppm @ 15% O2 30 day rolling avg. by vol.
SO2: < 0.060 lb/ mmBtu
(40 CFR 60.4320 (a) & 40 CFR 60.4330(a)(2))
CO2: < 1000 lb/MWh 12 mo. rolling avg. (gross)
(40 CFR 60.5520 (a))
Monitoring: NOX & CO CEMS to monitor NOX, CO and VOC (indirectly from CO CEMS) emissions
Initial performance tests and test frequency plans for PM, PM10, PM2.5, VOC, CO2e, formaldehyde & hexane
NOX, CO and VOC BACT limits do not apply during startup, shutdown, malfunction or tuning. (See SUSD BACT limits in next row.) PM, PM10, PM2.5 and CO2e BACT limits apply at all times. All normal operation BACT limits do not apply until after the shakedown period ends. NOX CEMS required by Acid Rain Program. CO CEMS for directly monitoring CO emissions and indirectly monitoring VOC emissions. NOX and SO2 limits from 40 CFR pt. 60, subp. KKKK apply to both the CT #1 (EQUI 16) and duct burners for CT #1 (EQUI 17). 15 ppm NOX limit applies when the turbine operates at or above 75 percent load and ambient temp is 0 deg F or above. 96 ppm NOX limit applies when the turbine operates below 75 percent load or ambient temp is less than 0 deg F.
Technical Support Document, Permit Number: 01300098-101 Page 15 of 19
Subject item* Requirement (rule basis)
Monitoring Discussion
STRU 20 (CT/DB #1 Stack)
SUSD BACT limits
NOX: < 41.9 tpy 12 mo. rolling sum & 414 lb/event cold SU, 220 lb/event warm SU, 27 lb/ event SD
CO: < 666.63 tpy 12 mo. rolling sum & 5919 lb/event cold SU, 3788 lb/event warm SU, 301 lb/ event SD
VOC: < 333.32 tpy 12 mo. rolling sum & 2959.5 lb/event cold SU, 1894.0 lb/event warm SU, 150.5 lb/event SD
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
Recordkeeping: monitoring of cold or warm startups & shutdowns in a calendar year, calculation of annual SUSD emissions
Startup (SU)/Shutdown (SD) BACT limits for times when CT/DB #1 is not in normal operating mode (see row above). Limits do not apply until after the shakedown period ends.
EQUI 7 (Auxiliary Boiler)
PM/PM10: < 0.008 lb/mmBtu
SO2: < 0.001 lb/mmBtu
CO: < 0.06 lb/mmBtu
VOC: < 0.007 lb/mmBtu
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
Initial Performance tests due 180 days after permit issuance, test frequency plan
Existing BACT limits on EQUI 7 that did not contain adequate monitoring or compliance. Initial performance tests and test frequency plan requirements are being added with this permit action.
Technical Support Document, Permit Number: 01300098-101 Page 16 of 19
Subject item* Requirement (rule basis)
Monitoring Discussion
EQUI 16 (CT #1)
SO2: ≤ 0.50 lb/mmBtu
Opacity: < 20 %
(Minn. R. 7011.2300, subps. 1-2)
Maximum net heat rate: 7979 btu/kWh (HHV)
Fuel type: natural gas only
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
Performance test to verify maximum net heat rate 180 days after first firing Recordkeeping: fuel type usage
EQUI 16 limited to burn natural gas as defined at 40 CFR 72.2 with total sulfur content not to exceed 0.8 gr/100 scf. Natural gas must be obtained from a supplier through a pipeline. Fuel restriction is a BACT limit. EQUI 16 must also demonstrate a net heat rate (HHV) of 7979 btu/kWh at base load without duct firing and will perform a heat rate test to demonstrate compliance with this value 180 days after first firing and again prior to obtaining a new permit.
EQUI 17 (Duct Burners CT #1)
Fuel type: natural gas only
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
None EQUI 17 limited to burn natural gas as defined at 40 CFR 72.2 with total sulfur content not to exceed 0.8 gr/100 scf. Natural gas must be obtained from a supplier through a pipeline. Fuel restriction is a BACT limit. No monitoring is needed, only fuel certifications kept to meet the sulfur content limit of natural gas.
EQUI 18 (Emergency Generator)
Operating Hours: < 100 hr/yr 12 mo. rolling sum
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
SO2: ≤ 0.50 lb/mmBtu
Opacity: < 20 %
(Minn. R. 7011.2300, subps. 1-2)
Recordkeeping: daily records of hours of operation, monthly calculation of hours
Daily records of hours of operation can be recorded based on hour meter. Monthly and 12 month rolling sums can be calculated using the daily hours of operation records.
EQUI 19 (Bath Heater)
PM: < 0.40 lb/mmBtu 3-hr avg.
Opacity: < 20 % with exceptions
(Minn. R. 7011.0515, subps. 1-2)
None None
EQUI 23 (Diesel Generator Tank) EQUI 24 (Natural Gas Condensate Tank - Plant)
Equip the tank with a permanent submerged fill pipe
(Minn. R. 7011.1505, subp. 3.B)
None Both storage vessels are greater than 2000 gal capacity and constructed after June 11, 1973. BACT requirement for EQUI 23 to be a fixed roof tank and maintain it in good working condition. BACT requirement for EQUI 24 to be maintained in good working condition.
Technical Support Document, Permit Number: 01300098-101 Page 17 of 19
Subject item* Requirement (rule basis)
Monitoring Discussion
FUGI 1 (Cooling Tower)
Drift Rate: < 0.0005%
(Title I Condition: 40 CFR § 52.21(j) (BACT) & Minn. R. 7007.3000)
PM: < 0.020 gr/dscf
Opacity: < 20%
(Minn. R. 7011.0715, subps. 1-2)
None Drift rate BACT limit already existed in permit 01300098-002 but will be expanded to include PM2.5. The drift rate is a design based requirement, therefore no ongoing monitoring is needed.
*Location of the requirement in the permit (e.g., EQUI 1, STRU 2,etc.). 6. Insignificant activities
Mankato Energy Center LLC has several operations which are classified as insignificant activities under the MPCA’s permitting rules. These are listed in Appendix A to the permit. The following insignificant activities are included in this modification: a fuel tank for the diesel fire pump, and two natural gas condensate tanks for CT #1 and CT #2.
The permit is required to include periodic monitoring for all emissions units, including insignificant activities, per EPA guidance. The insignificant activities at this Facility are only subject to general applicable requirements. Using the criteria outlined earlier in this TSD, the following table documents the justification why no additional periodic monitoring is necessary for the insignificant activities affected by this modification. As previously mentioned, the bath heater (EQUI 19) no longer qualifies as an insignificant activity under Minn. R. 7007.1300, subp. 4. See Attachment 1 of this TSD for PTE information for the insignificant activities.
Table 9. Insignificant activities
Insignificant activity General applicable emission limit Discussion
Storage tanks meeting the criteria in Minn. R. 7007.1300, subp. 3(E): Fire Pump Diesel Fuel Tank (360 gal); Natural Gas Condensate Tank - CT1 (45 gal); Natural Gas Condensate Tank CT2 (45 gal)
Minn. R. 7011.1505, subp. 3.A
Minn. R. 7011.1505, subp. 3.A contains tank design requirements for which no monitoring is applicable (< 2000 gal).
The facility’s No. 2 Distillate Oil Storage Tank with 350,000 gallon storage capacity originally qualified as an insignificant activity under Minn. R. 7007.1300, subp. 4.B. The PTE of this storage tank is 0.16 tpy VOC. This allows the storage tank to qualify as an insignificant activity under Minn. R. 7007.1300, subp. 3(I). The maximum vapor pressure as calculated during permit no 01300098-001 is 0.0047 psia which is below the pressure thresholds listed at Minn. R. 7011.1505, subp. 3.C (1) and (2). Minn. R. 7011.1505, subp. 3.C applies due to the storage capacity of the tank, but the facility is not required to comply with paragraphs (1) and (2) due to the vapor pressure. Also, monitoring from Minn. R. 7011.1510 subp. 1.A applies. Since the vapor pressure of the tank is low enough, Minn. R. 7011.1510, subp. 1.B does not apply. Subsequently, Minn. R. 7011.1510, subps. 2 and 3 also do not apply. 40 CFR pt. 60, subp. Kb also does not apply to this tank due to the vapor pressure being below the threshold.
7. Permit organization
Technical Support Document, Permit Number: 01300098-101 Page 18 of 19
In general, the permit meets the MPCA Tempo Guidance for ordering and grouping of requirements. One area where this permit deviates slightly from Tempo guidance is in the use of appendices. While appendices are fully enforceable parts of the permit, in general, any requirement that the MPCA thinks should be electronically tracked (e.g., limits, submittals, etc.), should be in the Requirements table in Tempo. The main reason is that the appendices are word processing sections and are not part of the electronic tracking system. Violation of the appendices can be enforced, but the computer system will not automatically generate the necessary enforcement notices or documents. Staff must generate these. This permit uses an appendix for listing insignificant activities, parameters used in modeling, an Acid Rain Permit application and TR Trading Program Title V requirements.
8. Comments received
This section will be completed after the public notice and EPA review periods.
Public Notice Period: [start date] – [end date] EPA Review Period: [start date] – [end date]
Comments were [not] received from the public during the public notice period. [The comments received did [not] include adverse comments on any applicable requirements of the permit. Changes to the permit were [not] made as a result of the comments.
The revised permit was sent to EPA for their 45-day review on [date]. Comments were [not] received from EPA during their review period. Changes to the permit were [not] made as a result of the comments.
9. Permit fee assessment
Attachment 3 to this TSD contains the MPCA’s assessment of Application and Additional Points used to determine the permit application fee for this permit action as required by Minn. R. 7002.0019. The permit action includes a major amendment application received after the effective date of the rule (July 1, 2009). The action includes PSD modeling (15 points), BACT review for PM, PM10, PM2.5, CO, NOX, VOC and GHG (105 points), CSAPR (formerly CAIR) and Pt 75 CEM analysis (10 points), NSPS review of subparts IIII, KKKK and TTTT (30 points), NESHAP review of subpart ZZZZ for area sources (10 points), revised limit for hexane to avoid NESHAP major source (10 points), and an AERA review (15 points). There was an Environmental Assessment Worksheet (EAW) done for this project, but it followed Minn. R. 7850.1900, subp. 3 for a Site Permit. The RGU was the Public Utilities Commission and not the PCA so no additional points were charged for EAW review.
10. Conclusion Based on the information provided by Mankato Energy Center LLC the MPCA has reasonable assurance that the proposed operation of the emission facility, as described in the Air Emission Permit No. 01300098-101 and this TSD, will not cause or contribute to a violation of applicable federal regulations and Minnesota Rules. Staff members on permit team: Tarik Hanafy (permit engineer) Sarah Sevcik (peer reviewer) Curt Stock (compliance) Jenna Ness (enforcement) Karen Kromar (environmental review) Jim Sullivan (modeling) Monika Vadali (AERA) Anne Jackson (mercury)
Beckie Olson (permit writing assistant) Laurie O’Brien (administrative support)
TEMPO360 Activities: Major Amendment (IND20150001), Pre-Application (PRE20130001)
Technical Support Document, Permit Number: 01300098-101 Page 19 of 19
AI: 95792
Attachments: 1. Calculation Spreadsheets 2. Requirements Development Report 3. Subject Item Inventory/Details 4. CAM Plans 5. Risk Assessment Screening Spreadsheet 6. MPCA Mercury Risk Estimation Method Spreadsheet 7. ESA/NHPA Response Email from U.S. EPA Region 5 8. BACT Analysis 9. Points calculator
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
Description: Formaldehyde, n‐Hexane, and Total HAPs Description: Combined Cycle‐ Combustion Turbine #2 & Duct Burner Description: Combustion Turbine #2 Description: Duct Burners (Combustion Turbine #2)Delta ID No.: GP 004 Delta ID No.: SV 002 Delta ID No.: EU 002 Delta ID No.: EU 004
Tempo ID No.: COMG 5 Tempo ID No.: STRU 14 Tempo ID No.: EQUI 5 Tempo ID No.: EQUI 6Delta SV ID No: ‐ Delta SV ID No: 002 Delta SV ID No: 002 Delta SV ID No: 002
PollutantCAS #
(if applicable) Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
PM ‐ ‐ ‐ ‐ ‐ 72.6 317.99 118.5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐PM10 ‐ ‐ ‐ ‐ ‐ 72.6 317.99 118.5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐PM2.5 ‐ ‐ ‐ ‐ ‐ 72.6 317.99 118.5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐SO2 7446‐09‐5 ‐ ‐ ‐ ‐ 96.77 423.86 67.8 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐NOx ‐ ‐ ‐ ‐ ‐ 63.12 1,672.64 174.13 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐VOC ‐ ‐ ‐ ‐ ‐ 25.4 185.39 262.0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐CO 630‐08‐0 ‐ ‐ ‐ ‐ 26.15 1,145.18 477.94 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ 0.03 0.14 0.02 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
H2SO4 ‐ ‐ ‐ ‐ ‐ 14.69 64.34 10.29 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐CO2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 365,726 1,601,880 1,066,724 ‐ 93,581 409,884 409,884 ‐CH4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 14.83 64.98 20.1 ‐ 1.76 7.72 7.72 ‐N2O ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.97 13.0 2.01 ‐ 0.18 0.77 0.77 ‐SF6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐CO2e ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 366,981 1,607,377 1,067,825 ‐ 93,678 410,307 410,307 ‐
Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8.33E‐02 3.65E‐01 3.65E‐01 ‐ ‐ ‐ ‐ ‐Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.33E‐02 5.84E‐02 5.84E‐02 ‐ ‐ ‐ ‐ ‐Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.47E‐02 1.08E‐01 1.08E‐02 ‐ 1.57E‐04 6.87E‐04 6.87E‐04 ‐Benzene 71‐43‐2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.23E‐01 5.40E‐01 1.52E‐01 ‐ 1.65E‐03 7.21E‐03 7.21E‐03 ‐
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.59E‐02 1.57E‐01 1.92E‐02 ‐ ‐ ‐ ‐ ‐Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.95E‐04 3.05E‐03 3.04E‐04 ‐ 9.41E‐06 4.12E‐05 4.12E‐05 ‐Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.08E‐02 4.72E‐02 4.71E‐03 ‐ 8.63E‐04 3.78E‐03 3.78E‐03 ‐Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.47E‐02 1.08E‐01 1.08E‐02 ‐ 1.10E‐03 4.81E‐03 4.81E‐03 ‐
Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.59E‐05 2.89E‐04 2.89E‐04 ‐Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 9.41E‐04 4.12E‐03 4.12E‐03 ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.66E‐02 2.92E‐01 2.92E‐01 ‐ ‐ ‐ ‐ ‐Formaldehyde 50‐00‐0 see GP 004 units see GP 004 units 9.0 ‐ 8.04 35.22 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Hexane 110‐54‐3 see GP 004 units see GP 004 units 9.0 ‐ 0.98 4.29 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.77 7.76 0.78 ‐ 2.98E‐04 1.31E‐03 1.31E‐03 ‐
Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.69E‐03 1.18E‐02 1.18E‐03 ‐ 2.04E‐04 8.93E‐04 8.93E‐04 ‐Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7.85E‐02 3.44E‐01 4.50E‐02 ‐ 4.78E‐04 2.10E‐03 2.10E‐03 ‐
Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.03E‐02 4.52E‐02 4.51E‐03 ‐ 1.65E‐03 7.21E‐03 7.21E‐03 ‐PAH ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8.97E‐02 3.93E‐01 5.73E‐02 ‐ ‐ ‐ ‐ ‐POM ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.48E‐04 2.40E‐03 2.40E‐03 ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.04E‐02 2.64E‐01 2.64E‐01 ‐ ‐ ‐ ‐ ‐Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.61E‐02 2.46E‐01 2.45E‐02 ‐ 1.88E‐05 8.24E‐05 8.24E‐05 ‐Toluene 108‐88‐3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.27 1.19 1.19 ‐ 2.67E‐03 1.17E‐02 1.17E‐02 ‐Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.13 0.58 0.58 ‐ ‐ ‐ ‐ ‐
Total HAPs ‐ ‐ ‐ 22.5 ‐ 9.05 39.65 see GP 004 ‐ 2.78 12.17 see GP 004 ‐ 0.01 0.04 see GP 004 ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐ see GP 004 units see GP 004 units 9.0 ‐ 8.04 35.22 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Description: Combined Cycle‐ Combustion Turbine #1 & Duct Burner Description: Combustion Turbine #1 Description: Duct Burners (Combustion Turbine #1)Delta ID No.: SV 007 Delta ID No.: EU 008 Delta ID No.: EU 009
Tempo ID No.: STRU 20 Tempo ID No.: EQUI 16 Tempo ID No.: EQUI 17Delta SV ID No: 007 Delta SV ID No: 007 Delta SV ID No: 007
Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
11.9 52.12 52.12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐11.9 52.12 52.12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐11.9 52.12 52.12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐6.9 30.2 30.2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
34.05 1,045.67 166.78 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐13.42 425.54 382.54 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐27.64 1,288.13 767.98 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
1.51E‐03 6.61E‐03 6.61E‐03 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐1.05 4.58 4.58 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ 263,582 1,154,490 1,154,490 ‐ 96,353 422,027 422,027 ‐‐ ‐ ‐ ‐ 4.97 21.76 21.76 ‐ 1.82 7.95 7.95 ‐‐ ‐ ‐ ‐ 0.5 2.18 2.18 ‐ 0.18 0.8 0.8 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ 263,854 1,155,682 1,155,682 ‐ 96,453 422,463 422,463 ‐‐ ‐ ‐ ‐ 9.01E‐02 3.95E‐01 3.95E‐01 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ 1.44E‐02 6.32E‐02 6.32E‐02 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.62E‐04 7.07E‐04 7.07E‐04 ‐‐ ‐ ‐ ‐ 2.70E‐02 1.18E‐01 1.18E‐01 ‐ 1.70E‐03 7.43E‐03 7.43E‐03 ‐‐ ‐ ‐ ‐ 9.67E‐04 4.23E‐03 4.23E‐03 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 9.69E‐06 4.24E‐05 4.24E‐05 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8.88E‐04 3.89E‐03 3.89E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.13E‐03 4.95E‐03 4.95E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.78E‐05 2.97E‐04 2.97E‐04 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 9.69E‐04 4.24E‐03 4.24E‐03 ‐‐ ‐ ‐ ‐ 7.21E‐02 3.16E‐01 3.16E‐01 ‐ ‐ ‐ ‐ ‐
8.58 37.6 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐1.05 4.58 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.07E‐04 1.34E‐03 1.34E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.10E‐04 9.20E‐04 9.20E‐04 ‐‐ ‐ ‐ ‐ 2.93E‐03 1.28E‐02 1.28E‐02 ‐ 4.93E‐04 2.16E‐03 2.16E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.70E‐03 7.43E‐03 7.43E‐03 ‐‐ ‐ ‐ ‐ 4.96E‐03 2.17E‐02 2.17E‐02 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.64E‐04 2.47E‐03 2.47E‐03 ‐‐ ‐ ‐ ‐ 6.53E‐02 2.86E‐01 2.86E‐01 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.94E‐05 8.49E‐05 8.49E‐05 ‐‐ ‐ ‐ ‐ 0.29 1.28 1.28 ‐ 2.75E‐03 1.20E‐02 1.20E‐02 ‐‐ ‐ ‐ ‐ 0.14 0.63 0.63 ‐ ‐ ‐ ‐ ‐
9.63 42.19 see GP 004 ‐ 0.71 3.12 see GP 004 ‐ 0.01 0.05 see GP 004 ‐
8.58 37.6 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Description: Auxiliary Boiler Description: Fire Pump Engine Description: Diesel Fired Emergency Generator Description: Bath HeaterDelta ID No.: EU 005 Delta ID No.: EU 007 Delta ID No.: EU 010 Delta ID No.: EU 011
Tempo ID No.: EQUI 7 Tempo ID No.: EQUI 11 Tempo ID No.: EQUI 18 Tempo ID No.: EQUI 19Delta SV ID No: 003 Delta SV ID No: 005 Delta SV ID No: 008 Delta SV ID No: 009
Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
0.56 2.45 2.45 ‐ 0.08 0.004 0.004 ‐ 0.15 0.04 0.01 ‐ 0.02 0.09 0.09 ‐0.56 2.45 2.45 ‐ 0.08 0.004 0.004 ‐ 0.15 0.04 0.01 ‐ 0.02 0.09 0.09 ‐0.56 2.45 2.45 ‐ 0.08 0.004 0.004 ‐ 0.15 0.04 0.01 ‐ 0.02 0.09 0.09 ‐0.07 0.31 0.31 ‐ 0.12 0.006 0.006 ‐ 5.13 1.28 0.26 ‐ 0.002 0.01 0.01 ‐2.52 11.04 11.04 ‐ 3.37 0.169 0.169 ‐ 13.27 3.32 0.66 ‐ 0.28 1.23 1.23 ‐0.49 2.15 2.15 ‐ 0.15 0.008 0.008 ‐ 0.72 0.18 0.04 ‐ 0.02 0.07 0.07 ‐4.2 18.4 18.4 ‐ 0.48 0.024 0.024 ‐ 13.27 3.32 0.66 ‐ 0.24 1.04 1.04 ‐
3.43E‐05 1.50E‐04 1.50E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.41E‐06 6.16E‐06 6.16E‐06 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
8,188 35,865 35,865 ‐ 399 20 20 ‐ 4,148 1,037 207 ‐ 336 1,470 1,470 ‐0.15 0.68 0.68 ‐ 1.62E‐02 8.10E‐04 8.10E‐04 ‐ 1.68E‐01 4.21E‐02 8.41E‐03 ‐ 6.33E‐03 2.77E‐02 2.77E‐02 ‐0.02 0.07 0.07 ‐ 3.24E‐03 1.62E‐04 1.62E‐04 ‐ 3.36E‐02 8.41E‐03 1.68E‐03 ‐ 6.33E‐04 2.77E‐03 2.77E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
8,197 35,902 35,902 ‐ 401 20 20 ‐ 4,162 1,040 208 ‐ 336 1,472 1,472 ‐‐ ‐ ‐ ‐ 1.88E‐03 9.40E‐05 9.40E‐05 ‐ 6.41E‐04 1.60E‐04 3.21E‐05 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ 2.27E‐04 1.13E‐05 1.13E‐05 ‐ 2.00E‐04 5.01E‐05 1.00E‐05 ‐ ‐ ‐ ‐ ‐
1.37E‐05 6.01E‐05 6.01E‐05 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.63E‐07 2.46E‐06 2.46E‐06 ‐1.44E‐04 6.31E‐04 6.31E‐04 ‐ 2.29E‐03 1.14E‐04 1.14E‐04 ‐ 1.97E‐02 4.93E‐03 9.87E‐04 ‐ 5.91E‐06 2.59E‐05 2.59E‐05 ‐
‐ ‐ ‐ ‐ 9.58E‐05 4.79E‐06 4.79E‐06 ‐ 9.95E‐04 2.49E‐04 4.97E‐05 ‐ ‐ ‐ ‐ ‐8.24E‐07 3.61E‐06 3.61E‐06 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.38E‐08 1.48E‐07 1.48E‐07 ‐7.55E‐05 3.31E‐04 3.31E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.10E‐06 1.36E‐05 1.36E‐05 ‐9.61E‐05 4.21E‐04 4.21E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.94E‐06 1.73E‐05 1.73E‐05 ‐5.76E‐06 2.52E‐05 2.52E‐05 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2.36E‐07 1.04E‐06 1.04E‐06 ‐8.24E‐05 3.61E‐04 3.61E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.38E‐06 1.48E‐05 1.48E‐05 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐5.15E‐03 2.25E‐02 see GP 004 ‐ 2.89E‐03 1.45E‐04 see GP 004 ‐ 2.01E‐03 5.02E‐04 see GP 004 ‐ 2.11E‐04 9.24E‐04 see GP 004 ‐0.12 0.54 see GP 004 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.06E‐03 2.22E‐02 see GP 004 ‐
2.61E‐05 1.14E‐04 1.14E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.07E‐06 4.68E‐06 4.68E‐06 ‐1.78E‐05 7.82E‐05 7.82E‐05 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7.32E‐07 3.20E‐06 3.20E‐06 ‐4.19E‐05 1.83E‐04 1.83E‐04 ‐ 2.08E‐04 1.04E‐05 1.04E‐05 ‐ 3.31E‐03 8.27E‐04 1.65E‐04 ‐ 1.72E‐06 7.52E‐06 7.52E‐06 ‐1.44E‐04 6.31E‐04 6.31E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.91E‐06 2.59E‐05 2.59E‐05 ‐
‐ ‐ ‐ ‐ 4.12E‐04 2.06E‐05 2.06E‐05 ‐ 5.39E‐03 1.35E‐03 2.70E‐04 ‐ ‐ ‐ ‐ ‐4.79E‐05 2.10E‐04 2.10E‐04 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1.96E‐06 8.60E‐06 8.60E‐06 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐1.65E‐06 7.21E‐06 7.21E‐06 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6.75E‐08 2.96E‐07 2.96E‐07 ‐2.33E‐04 1.02E‐03 1.02E‐03 ‐ 1.00E‐03 5.01E‐05 5.01E‐05 ‐ 7.15E‐03 1.79E‐03 3.57E‐04 ‐ 9.57E‐06 4.19E‐05 4.19E‐05 ‐
‐ ‐ ‐ ‐ 6.98E‐04 3.49E‐05 3.49E‐05 ‐ 4.91E‐03 1.23E‐03 2.45E‐04 ‐ ‐ ‐ ‐ ‐1.30E‐01 5.68E‐01 see GP 004 ‐ 9.49E‐03 4.75E‐04 see GP 004 ‐ 4.10E‐02 1.03E‐02 see GP 004 ‐ 5.31E‐03 2.33E‐02 see GP 004 ‐
0.01 0.02 see GP 004 ‐ 2.89E‐03 1.45E‐04 see GP 004 ‐ 2.01E‐03 5.02E‐04 see GP 004 ‐ 2.11E‐04 9.24E‐04 see GP 004 ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Description: Cooling Tower Description: Natural Gas Fugitives Description: Breaker FugitivesDelta ID No.: FS 001 Delta ID No.: FS 002 Delta ID No.: FS 003
Tempo ID No.: FUGI 1 Tempo ID No.: FUGI 2 Tempo ID No.: FUGI 3Delta SV ID No: NA Delta SV ID No: NA Delta SV ID No: NA
Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
3.62 15.87 15.87 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐0.62 2.7 2.7 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0.004836 0.02 0.02 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ 6.39E‐01 2.80E+00 2.80E+00 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ 60.88 266.65 266.65 ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3.27E‐04 1.43E‐03 1.43E‐03 ‐‐ ‐ ‐ ‐ 1,522.63 6,669 6,669 ‐ 7.46 32.66 32.66 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Description: Fuel Oil Storage Tank Description: Fire Pump Fuel Tank Description: Emergency Generator Diesel Fuel Tank Description: Natural Gas Condensate Tank ‐ PlantDelta ID No.: TK 001 Delta ID No.: TK NA, Insignificant Activity Delta ID No.: TK NA, Insignificant Activity Delta ID No.: TK NA, Insignificant Activity
Tempo ID No.: NA, Insignificant Activity Tempo ID No.: NA, Insignificant Activity Tempo ID No.: EQUI 23 Tempo ID No.: EQUI 24Delta SV ID No: NA Delta SV ID No: NA Delta SV ID No: NA Delta SV ID No: NA
Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0.04 0.16 0.16 ‐ 5.71E‐06 2.50E‐05 2.50E‐05 ‐ 6.28E‐05 2.75E‐04 2.75E‐04 ‐ 0.01 0.05 0.05 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Description: Natural Gas Condensate Tank ‐ CT1 Description: Natural Gas Condensate Tank ‐ CT2Delta ID No.: TK NA, Insignificant Activity Delta ID No.: TK NA, Insignificant Activity
Tempo ID No.: NA, Insignificant Activity Tempo ID No.: NA, Insignificant Activity
Delta SV ID No: NA Delta SV ID No: NA
Max rate (lb/hr)Uncontrolled
tpyLimited tpy
Actual tpy Max rate (lb/hr)
Uncontrolled tpy
Limited tpy
Actual tpy
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3.76E‐04 1.65E‐03 1.65E‐03 ‐ 3.76E‐04 1.65E‐03 1.65E‐03 ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Mankato Energy CenterFacility ID: 01300098Agency Interest No: 957922015 Air Permit ApplicationEmissions Summary
PollutantCAS #
(if applicable)
PM ‐PM10 ‐PM2.5 ‐SO2 7446‐09‐5NOx ‐VOC ‐CO 630‐08‐0Pb 7439‐92‐1
H2SO4 ‐CO2 ‐CH4 ‐N2O ‐SF6 ‐CO2e ‐
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 7440‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Total HAPs ‐Highest Facility Single HAP: ‐
Formaldehyde 50‐00‐0
Highest Single HAP Emissions ‐
Facility Total EmissionsUncontrolled
tpyLimited tpy
Actual tpy
388.57 189.05 ‐375.40 175.88 ‐372.72 173.20 ‐455.66 98.58 ‐
2,734.06 354.01 ‐613.54 647.01 ‐
2,456.09 1,266.03 ‐0.15 0.026 ‐
68.92 14.88 ‐
3,626,677 3,090,690 ‐369.81 324.91 ‐16.82 5.83 ‐
1.43E‐03 1.43E‐03 ‐3,640,966 3,100,582 ‐7.60E‐01 7.60E‐01 ‐1.22E‐01 1.22E‐01 ‐1.10E‐01 1.23E‐02 ‐6.79E‐01 2.87E‐01 ‐1.62E‐01 2.35E‐02 ‐3.13E‐03 3.92E‐04 ‐5.52E‐02 1.27E‐02 ‐1.18E‐01 2.10E‐02 ‐6.12E‐04 6.12E‐04 ‐8.74E‐03 8.74E‐03 ‐6.08E‐01 6.08E‐01 ‐
72.84 9.00 ‐9.44 9.00 ‐7.76 0.78 ‐
1.37E‐02 3.07E‐03 ‐3.62E‐01 6.25E‐02 ‐6.05E‐02 1.98E‐02 ‐4.16E‐01 7.93E‐02 ‐5.09E‐03 5.09E‐03 ‐5.51E‐01 5.51E‐01 ‐2.46E‐01 2.47E‐02 ‐
2.50 2.49 ‐1.22 1.22 ‐
97.82 22.50 ‐
72.84 9.00 ‐
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emissions Summary]
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 1/6
3a) Delta ID No.: GP 004 3a) Delta ID No.: SV 002 3a) Delta ID No.: EU 002
3b) Tempo SI ID No.: COMG 5 3b) Tempo SI ID No.: STRU 14 3b) Tempo SI ID No.: EQUI 53c) 3d) 3f) 3c) 3d) 3f) 3c) 3d) 3f)
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy
PM ‐ ‐ ‐ ‐ ‐ PM ‐ 72.6 317.99 118.5 ‐ PM ‐ ‐ ‐ ‐ ‐PM10 ‐ ‐ ‐ ‐ ‐ PM10 ‐ 72.6 317.99 118.5 ‐ PM10 ‐ ‐ ‐ ‐ ‐PM2.5 ‐ ‐ ‐ ‐ ‐ PM2.5 ‐ 72.6 317.99 118.5 ‐ PM2.5 ‐ ‐ ‐ ‐ ‐SO2 7446‐09‐5 ‐ ‐ ‐ ‐ SO2 7446‐09‐5 96.77 423.86 67.8 ‐ SO2 7446‐09‐5 ‐ ‐ ‐ ‐NOx ‐ ‐ ‐ ‐ ‐ NOx ‐ 63.12 1,672.64 174.13 ‐ NOx ‐ ‐ ‐ ‐ ‐VOC ‐ ‐ ‐ ‐ ‐ VOC ‐ 25.4 185.39 262.0 ‐ VOC ‐ ‐ ‐ ‐ ‐CO 630‐08‐0 ‐ ‐ ‐ ‐ CO 630‐08‐0 26.15 1,145.18 477.94 ‐ CO 630‐08‐0 ‐ ‐ ‐ ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 3.18E‐02 1.39E‐01 1.95E‐02 ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ 14.69 64.34 10.29 ‐ H2SO4 ‐ ‐ ‐ ‐ ‐CO2 ‐ ‐ ‐ ‐ ‐ CO2 ‐ ‐ ‐ ‐ ‐ CO2 ‐ 365,726 1,601,880 1,066,724 ‐CH4 ‐ ‐ ‐ ‐ ‐ CH4 ‐ ‐ ‐ ‐ ‐ CH4 ‐ 14.83 64.98 20.1 ‐N2O ‐ ‐ ‐ ‐ ‐ N2O ‐ ‐ ‐ ‐ ‐ N2O ‐ 2.97 13.0 2.01 ‐SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐CO2e ‐ ‐ ‐ ‐ ‐ CO2e ‐ ‐ ‐ ‐ ‐ CO2e ‐ 366,981 1,607,377 1,067,825 ‐
Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 8.33E‐02 3.65E‐01 3.65E‐01 ‐Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 1.33E‐02 5.84E‐02 5.84E‐02 ‐Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 2.47E‐02 1.08E‐01 1.08E‐02 ‐Benzene 71‐43‐2 ‐ ‐ ‐ ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐ Benzene 71‐43‐2 1.23E‐01 5.40E‐01 1.52E‐01 ‐
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 3.59E‐02 1.57E‐01 1.92E‐02 ‐Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 6.95E‐04 3.05E‐03 3.04E‐04 ‐Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 1.08E‐02 4.72E‐02 4.71E‐03 ‐Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 2.47E‐02 1.08E‐01 1.08E‐02 ‐
Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 6.66E‐02 2.92E‐01 2.92E‐01 ‐Formaldehyde 50‐00‐0 see GP 004 units see GP 004 units 9.00E+00 ‐ Formaldehyde 50‐00‐0 8.04E+00 3.52E+01 see GP 004 ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐
Hexane 110‐54‐3 see GP 004 units see GP 004 units 9.00E+00 ‐ Hexane 110‐54‐3 9.80E‐01 4.29E+00 see GP 004 ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 1.77E+00 7.76E+00 7.75E‐01 ‐
Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 2.69E‐03 1.18E‐02 1.18E‐03 ‐Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ Naphthalene 91‐20‐3 7.85E‐02 3.44E‐01 4.50E‐02 ‐
Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 1.03E‐02 4.52E‐02 4.51E‐03 ‐PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ 8.97E‐02 3.93E‐01 5.73E‐02 ‐POM ‐ ‐ ‐ ‐ ‐ POM ‐ ‐ ‐ ‐ ‐ POM ‐ ‐ ‐ ‐ ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 6.04E‐02 2.64E‐01 2.64E‐01 ‐Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 5.61E‐02 2.46E‐01 2.45E‐02 ‐Toluene 108‐88‐3 ‐ ‐ ‐ ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐ Toluene 108‐88‐3 2.71E‐01 1.19E+00 1.19E+00 ‐Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 1.33E‐01 5.84E‐01 5.84E‐01 ‐
Total HAPs ‐ ‐ ‐ 2.25E+01 ‐ Total HAPs ‐ 9.05E+00 3.96E+01 see GP 004 ‐ Total HAPs ‐ 2.78E+00 1.22E+01 see GP 004 ‐
5)
1a) AQ Facility ID No.:
3e) Potential 3e) Potential 3e) Potential
Application is being submitted on paper, and editable calculation spreadsheet(s) are included on an enclosed CD.
Application is being submitted on a compact disc (CD), and the editable calculation spreadsheet(s) are included on the CD.
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 2/6
3a) Delta ID No.: EU 004 3a) Delta ID No.: SV 007 3a) Delta ID No.: EU 008
3b) Tempo SI ID No.: EQUI 6 3b) Tempo SI ID No.: STRU 20 3b) Tempo SI ID No.: EQUI 163c) 3d) 3f) 3c) 3d) 3f) 3c) 3d) 3f)
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy
PM ‐ ‐ ‐ ‐ ‐ PM ‐ 11.9 52.12 52.12 ‐ PM ‐ ‐ ‐ ‐ ‐PM10 ‐ ‐ ‐ ‐ ‐ PM10 ‐ 11.9 52.12 52.12 ‐ PM10 ‐ ‐ ‐ ‐ ‐PM2.5 ‐ ‐ ‐ ‐ ‐ PM2.5 ‐ 11.9 52.12 52.12 ‐ PM2.5 ‐ ‐ ‐ ‐ ‐SO2 7446‐09‐5 ‐ ‐ ‐ ‐ SO2 7446‐09‐5 6.9 30.2 30.2 ‐ SO2 7446‐09‐5 ‐ ‐ ‐ ‐NOx ‐ ‐ ‐ ‐ ‐ NOx ‐ 34.05 1,045.67 166.78 ‐ NOx ‐ ‐ ‐ ‐ ‐VOC ‐ ‐ ‐ ‐ ‐ VOC ‐ 13.42 425.54 382.54 ‐ VOC ‐ ‐ ‐ ‐ ‐CO 630‐08‐0 ‐ ‐ ‐ ‐ CO 630‐08‐0 27.635 1,288.13 767.98 ‐ CO 630‐08‐0 ‐ ‐ ‐ ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 1.51E‐03 6.61E‐03 6.61E‐03 ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ 1.05 4.58 4.58 ‐ H2SO4 ‐ ‐ ‐ ‐ ‐CO2 ‐ 93,581 409,884 409,884 ‐ CO2 ‐ ‐ ‐ ‐ ‐ CO2 ‐ 263,582 1,154,490 1,154,490 ‐CH4 ‐ 1.76 7.72 7.72 ‐ CH4 ‐ ‐ ‐ ‐ ‐ CH4 ‐ 4.97 21.76 21.76 ‐N2O ‐ 0.18 0.77 0.77 ‐ N2O ‐ ‐ ‐ ‐ ‐ N2O ‐ 0.5 2.18 2.18 ‐SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐CO2e ‐ 93,678 410,307 410,307 ‐ CO2e ‐ ‐ ‐ ‐ ‐ CO2e ‐ 263,854 1,155,682 1,155,682 ‐
Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 9.01E‐02 3.95E‐01 3.95E‐01 ‐Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 1.44E‐02 6.32E‐02 6.32E‐02 ‐Arsenic 7440‐38‐2 1.57E‐04 6.87E‐04 6.87E‐04 ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐Benzene 71‐43‐2 1.65E‐03 7.21E‐03 7.21E‐03 ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐ Benzene 71‐43‐2 2.70E‐02 1.18E‐01 1.18E‐01 ‐
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 9.67E‐04 4.23E‐03 4.23E‐03 ‐Beryllium 7440‐41‐7 9.41E‐06 4.12E‐05 4.12E‐05 ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐Cadmium 7440‐43‐9 8.63E‐04 3.78E‐03 3.78E‐03 ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐Chromium 7440‐47‐3 1.10E‐03 4.81E‐03 4.81E‐03 ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐
Cobalt 7440‐48‐4 6.59E‐05 2.89E‐04 2.89E‐04 ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐Dichlorobenzene 25321‐22‐6 9.41E‐04 4.12E‐03 4.12E‐03 ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 7.21E‐02 3.16E‐01 3.16E‐01 ‐Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ Formaldehyde 50‐00‐0 8.58E+00 3.76E+01 see GP 004 ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐
Hexane 110‐54‐3 ‐ ‐ ‐ ‐ Hexane 110‐54‐3 1.05E+00 4.58E+00 see GP 004 ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐Manganese 7439‐96‐5 2.98E‐04 1.31E‐03 1.31E‐03 ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐
Mercury 7439‐97‐6 2.04E‐04 8.93E‐04 8.93E‐04 ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐Naphthalene 91‐20‐3 4.78E‐04 2.10E‐03 2.10E‐03 ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ Naphthalene 91‐20‐3 2.93E‐03 1.28E‐02 1.28E‐02 ‐
Nickel 7440‐02‐0 1.65E‐03 7.21E‐03 7.21E‐03 ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ 4.96E‐03 2.17E‐02 2.17E‐02 ‐POM ‐ 5.48E‐04 2.40E‐03 2.40E‐03 ‐ POM ‐ ‐ ‐ ‐ ‐ POM ‐ ‐ ‐ ‐ ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 6.53E‐02 2.86E‐01 2.86E‐01 ‐Selenium 7782‐49‐2 1.88E‐05 8.24E‐05 8.24E‐05 ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐Toluene 108‐88‐3 2.67E‐03 1.17E‐02 1.17E‐02 ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐ Toluene 108‐88‐3 2.93E‐01 1.28E+00 1.28E+00 ‐Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 1.44E‐01 6.32E‐01 6.32E‐01 ‐
Total HAPs ‐ 1.02E‐02 4.45E‐02 see GP 004 ‐ Total HAPs ‐ 9.63E+00 4.22E+01 see GP 004 ‐ Total HAPs ‐ 7.12E‐01 3.12E+00 see GP 004 ‐
1a) AQ Facility ID No.:
3e) Potential 3e) Potential 3e) Potential
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 3/6
3a) Delta ID No.: EU 009 3a) Delta ID No.: EU 005 3a) Delta ID No.: EU 007
3b) Tempo SI ID No.: EQUI 17 3b) Tempo SI ID No.: EQUI 7 3b) Tempo SI ID No.: EQUI 113c) 3d) 3f) 3c) 3d) 3f) 3c) 3d) 3f)
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy
PM ‐ ‐ ‐ ‐ ‐ PM ‐ 0.56 2.45 2.45 ‐ PM ‐ 8.49E‐02 4.24E‐03 4.24E‐03 ‐PM10 ‐ ‐ ‐ ‐ ‐ PM10 ‐ 0.56 2.45 2.45 ‐ PM10 ‐ 8.49E‐02 4.24E‐03 4.24E‐03 ‐PM2.5 ‐ ‐ ‐ ‐ ‐ PM2.5 ‐ 0.56 2.45 2.45 ‐ PM2.5 ‐ 8.49E‐02 4.24E‐03 4.24E‐03 ‐SO2 7446‐09‐5 ‐ ‐ ‐ ‐ SO2 7446‐09‐5 0.07 0.31 0.31 ‐ SO2 7446‐09‐5 1.16E‐01 5.79E‐03 5.79E‐03 ‐NOx ‐ ‐ ‐ ‐ ‐ NOx ‐ 2.52 11.04 11.04 ‐ NOx ‐ 3.37 0.17 0.17 ‐VOC ‐ ‐ ‐ ‐ ‐ VOC ‐ 0.49 2.15 2.15 ‐ VOC ‐ 1.54E‐01 7.72E‐03 7.72E‐03 ‐CO 630‐08‐0 ‐ ‐ ‐ ‐ CO 630‐08‐0 4.2 18.4 18.4 ‐ CO 630‐08‐0 0.478 0.02 0.02 ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 3.43E‐05 1.50E‐04 1.50E‐04 ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐CO2 ‐ 96,353 422,027 422,027 ‐ CO2 ‐ 8,188 35,865 35,865 ‐ CO2 ‐ 399 20 20 ‐CH4 ‐ 1.82 7.95 7.95 ‐ CH4 ‐ 0.15 0.68 0.68 ‐ CH4 ‐ 1.62E‐02 8.10E‐04 8.10E‐04 ‐N2O ‐ 0.18 0.8 0.8 ‐ N2O ‐ 0.02 0.07 0.07 ‐ N2O ‐ 3.24E‐03 1.62E‐04 1.62E‐04 ‐SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐CO2e ‐ 96,453 422,463 422,463 ‐ CO2e ‐ 8,197 35,902 35,902 ‐ CO2e ‐ 401 20 20 ‐
Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 1.88E‐03 9.40E‐05 9.40E‐05 ‐Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 2.27E‐04 1.13E‐05 1.13E‐05 ‐Arsenic 7440‐38‐2 1.62E‐04 7.07E‐04 7.07E‐04 ‐ Arsenic 7440‐38‐2 1.37E‐05 6.01E‐05 6.01E‐05 ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐Benzene 71‐43‐2 1.70E‐03 7.43E‐03 7.43E‐03 ‐ Benzene 71‐43‐2 1.44E‐04 6.31E‐04 6.31E‐04 ‐ Benzene 71‐43‐2 2.29E‐03 1.14E‐04 1.14E‐04 ‐
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 9.58E‐05 4.79E‐06 4.79E‐06 ‐Beryllium 7440‐41‐7 9.69E‐06 4.24E‐05 4.24E‐05 ‐ Beryllium 7440‐41‐7 8.24E‐07 3.61E‐06 3.61E‐06 ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐Cadmium 7440‐43‐9 8.88E‐04 3.89E‐03 3.89E‐03 ‐ Cadmium 7440‐43‐9 7.55E‐05 3.31E‐04 3.31E‐04 ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐Chromium 7440‐47‐3 1.13E‐03 4.95E‐03 4.95E‐03 ‐ Chromium 7440‐47‐3 9.61E‐05 4.21E‐04 4.21E‐04 ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐
Cobalt 7440‐48‐4 6.78E‐05 2.97E‐04 2.97E‐04 ‐ Cobalt 7440‐48‐4 5.76E‐06 2.52E‐05 2.52E‐05 ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐Dichlorobenzene 25321‐22‐6 9.69E‐04 4.24E‐03 4.24E‐03 ‐ Dichlorobenzene 25321‐22‐6 8.24E‐05 3.61E‐04 3.61E‐04 ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ Formaldehyde 50‐00‐0 5.15E‐03 2.25E‐02 see GP 004 ‐ Formaldehyde 50‐00‐0 2.89E‐03 1.45E‐04 see GP 004 ‐
Hexane 110‐54‐3 ‐ ‐ ‐ ‐ Hexane 110‐54‐3 1.24E‐01 5.41E‐01 see GP 004 ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐Manganese 7439‐96‐5 3.07E‐04 1.34E‐03 1.34E‐03 ‐ Manganese 7439‐96‐5 2.61E‐05 1.14E‐04 1.14E‐04 ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐
Mercury 7439‐97‐6 2.10E‐04 9.20E‐04 9.20E‐04 ‐ Mercury 7439‐97‐6 1.78E‐05 7.82E‐05 7.82E‐05 ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐Naphthalene 91‐20‐3 4.93E‐04 2.16E‐03 2.16E‐03 ‐ Naphthalene 91‐20‐3 4.19E‐05 1.83E‐04 1.83E‐04 ‐ Naphthalene 91‐20‐3 2.08E‐04 1.04E‐05 1.04E‐05 ‐
Nickel 7440‐02‐0 1.70E‐03 7.43E‐03 7.43E‐03 ‐ Nickel 7440‐02‐0 1.44E‐04 6.31E‐04 6.31E‐04 ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ 4.12E‐04 2.06E‐05 2.06E‐05 ‐POM ‐ 5.64E‐04 2.47E‐03 2.47E‐03 ‐ POM ‐ 4.79E‐05 2.10E‐04 2.10E‐04 ‐ POM ‐ ‐ ‐ ‐ ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐Selenium 7782‐49‐2 1.94E‐05 8.49E‐05 8.49E‐05 ‐ Selenium 7782‐49‐2 1.65E‐06 7.21E‐06 7.21E‐06 ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐Toluene 108‐88‐3 2.75E‐03 1.20E‐02 1.20E‐02 ‐ Toluene 108‐88‐3 2.33E‐04 1.02E‐03 1.02E‐03 ‐ Toluene 108‐88‐3 1.00E‐03 5.01E‐05 5.01E‐05 ‐Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 6.98E‐04 3.49E‐05 3.49E‐05 ‐
Total HAPs ‐ 1.05E‐02 4.58E‐02 see GP 004 ‐ Total HAPs ‐ 1.30E‐01 5.68E‐01 see GP 004 ‐ Total HAPs ‐ 9.49E‐03 4.75E‐04 see GP 004 ‐
1a) AQ Facility ID No.:
3e) Potential 3e) Potential 3e) Potential
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 4/6
3a) Delta ID No.: EU 010 3a) Delta ID No.: EU 011 3a) Delta ID No.: FS 001
3b) Tempo SI ID No.: EQUI 18 3b) Tempo SI ID No.: EQUI 19 3b) Tempo SI ID No.: FUGI 13c) 3d) 3f) 3c) 3d) 3f) 3c) 3d) 3f)
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy
PM ‐ 0.15 0.04 0.01 ‐ PM ‐ 0.02 0.09 0.09 ‐ PM ‐ 3.62 15.87 15.87 ‐PM10 ‐ 0.15 0.04 0.01 ‐ PM10 ‐ 0.02 0.09 0.09 ‐ PM10 ‐ 0.62 2.7 2.7 ‐PM2.5 ‐ 0.15 0.04 0.01 ‐ PM2.5 ‐ 0.02 0.09 0.09 ‐ PM2.5 ‐ 4.84E‐03 2.12E‐02 2.12E‐02 ‐SO2 7446‐09‐5 5.13 1.28 0.26 ‐ SO2 7446‐09‐5 1.69E‐03 7.39E‐03 7.39E‐03 ‐ SO2 7446‐09‐5 ‐ ‐ ‐ ‐NOx ‐ 13.27 3.32 0.66 ‐ NOx ‐ 0.28 1.23 1.23 ‐ NOx ‐ ‐ ‐ ‐ ‐VOC ‐ 0.72 0.18 0.04 ‐ VOC ‐ 0.02 0.07 0.07 ‐ VOC ‐ ‐ ‐ ‐ ‐CO 630‐08‐0 13.27 3.32 0.66 ‐ CO 630‐08‐0 0.24 1.04 1.04 ‐ CO 630‐08‐0 ‐ ‐ ‐ ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 1.41E‐06 6.16E‐06 6.16E‐06 ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐CO2 ‐ 4,148 1,037 207 ‐ CO2 ‐ 336 1,470 1,470 ‐ CO2 ‐ ‐ ‐ ‐ ‐CH4 ‐ 1.68E‐01 4.21E‐02 8.41E‐03 ‐ CH4 ‐ 6.33E‐03 2.77E‐02 2.77E‐02 ‐ CH4 ‐ ‐ ‐ ‐ ‐N2O ‐ 3.36E‐02 8.41E‐03 1.68E‐03 ‐ N2O ‐ 6.33E‐04 2.77E‐03 2.77E‐03 ‐ N2O ‐ ‐ ‐ ‐ ‐SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ ‐ ‐ ‐ ‐CO2e ‐ 4,162 1,040 208 ‐ CO2e ‐ 336 1,472 1,472 ‐ CO2e ‐ ‐ ‐ ‐ ‐
Acetaldehyde 75‐07‐0 6.41E‐04 1.60E‐04 3.21E‐05 ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐Acrolein 107‐02‐8 2.00E‐04 5.01E‐05 1.00E‐05 ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 5.63E‐07 2.46E‐06 2.46E‐06 ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐Benzene 71‐43‐2 1.97E‐02 4.93E‐03 9.87E‐04 ‐ Benzene 71‐43‐2 5.91E‐06 2.59E‐05 2.59E‐05 ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐
1,3‐Butadiene 106‐99‐0 9.95E‐04 2.49E‐04 4.97E‐05 ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 3.38E‐08 1.48E‐07 1.48E‐07 ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 3.10E‐06 1.36E‐05 1.36E‐05 ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 3.94E‐06 1.73E‐05 1.73E‐05 ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐
Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 2.36E‐07 1.04E‐06 1.04E‐06 ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 3.38E‐06 1.48E‐05 1.48E‐05 ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐Formaldehyde 50‐00‐0 2.01E‐03 5.02E‐04 see GP 004 ‐ Formaldehyde 50‐00‐0 2.11E‐04 9.24E‐04 see GP 004 ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐
Hexane 110‐54‐3 ‐ ‐ ‐ ‐ Hexane 110‐54‐3 5.06E‐03 2.22E‐02 see GP 004 ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 1.07E‐06 4.68E‐06 4.68E‐06 ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐
Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 7.32E‐07 3.20E‐06 3.20E‐06 ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐Naphthalene 91‐20‐3 3.31E‐03 8.27E‐04 1.65E‐04 ‐ Naphthalene 91‐20‐3 1.72E‐06 7.52E‐06 7.52E‐06 ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐
Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 5.91E‐06 2.59E‐05 2.59E‐05 ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐PAH ‐ 5.39E‐03 1.35E‐03 2.70E‐04 ‐ PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐POM ‐ ‐ ‐ ‐ ‐ POM ‐ 1.96E‐06 8.60E‐06 8.60E‐06 ‐ POM ‐ ‐ ‐ ‐ ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 6.75E‐08 2.96E‐07 2.96E‐07 ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐Toluene 108‐88‐3 7.15E‐03 1.79E‐03 3.57E‐04 ‐ Toluene 108‐88‐3 9.57E‐06 4.19E‐05 4.19E‐05 ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐Xylenes 1330‐20‐7 4.91E‐03 1.23E‐03 2.45E‐04 ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐
Total HAPs ‐ 4.10E‐02 1.03E‐02 see GP 004 ‐ Total HAPs ‐ 5.31E‐03 2.33E‐02 see GP 004 ‐ Total HAPs ‐ ‐ ‐ ‐ ‐
1a) AQ Facility ID No.:
3e) Potential 3e) Potential 3e) Potential
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 5/6
3a) Delta ID No.: FS 002 3a) Delta ID No.: FS 003 3a) Delta ID No.: TK 001
3b) Tempo SI ID No.: FUGI 2 3b) Tempo SI ID No.: FUGI 3 3b) Tempo SI ID No.: NA, Insignificant Activity3c) 3d) 3f) 3c) 3d) 3f) 3c) 3d) 3f)
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy
PM ‐ ‐ ‐ ‐ ‐ PM ‐ ‐ ‐ ‐ ‐ PM ‐ ‐ ‐ ‐ ‐PM10 ‐ ‐ ‐ ‐ ‐ PM10 ‐ ‐ ‐ ‐ ‐ PM10 ‐ ‐ ‐ ‐ ‐PM2.5 ‐ ‐ ‐ ‐ ‐ PM2.5 ‐ ‐ ‐ ‐ ‐ PM2.5 ‐ ‐ ‐ ‐ ‐SO2 7446‐09‐5 ‐ ‐ ‐ ‐ SO2 7446‐09‐5 ‐ ‐ ‐ ‐ SO2 7446‐09‐5 ‐ ‐ ‐ ‐NOx ‐ ‐ ‐ ‐ ‐ NOx ‐ ‐ ‐ ‐ ‐ NOx ‐ ‐ ‐ ‐ ‐VOC ‐ ‐ ‐ ‐ ‐ VOC ‐ ‐ ‐ ‐ ‐ VOC ‐ 0.04 0.16 0.16 ‐CO 630‐08‐0 ‐ ‐ ‐ ‐ CO 630‐08‐0 ‐ ‐ ‐ ‐ CO 630‐08‐0 ‐ ‐ ‐ ‐Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐ Pb 7439‐92‐1 ‐ ‐ ‐ ‐H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐ H2SO4 ‐ ‐ ‐ ‐ ‐CO2 ‐ 0.6 2.8 2.8 ‐ CO2 ‐ ‐ ‐ ‐ ‐ CO2 ‐ ‐ ‐ ‐ ‐CH4 ‐ 60.9 266.7 266.7 ‐ CH4 ‐ ‐ ‐ ‐ ‐ CH4 ‐ ‐ ‐ ‐ ‐N2O ‐ ‐ ‐ ‐ ‐ N2O ‐ ‐ ‐ ‐ ‐ N2O ‐ ‐ ‐ ‐ ‐SF6 ‐ ‐ ‐ ‐ ‐ SF6 ‐ 3.27E‐04 1.43E‐03 1.43E‐03 ‐ SF6 ‐ ‐ ‐ ‐ ‐CO2e ‐ 1,523 6,669 6,669 ‐ CO2e ‐ 7 33 33 ‐ CO2e ‐ ‐ ‐ ‐ ‐
Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐Benzene 71‐43‐2 ‐ ‐ ‐ ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐
Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐ Cobalt 7440‐48‐4 ‐ ‐ ‐ ‐Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐
Hexane 110‐54‐3 ‐ ‐ ‐ ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐
Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐
Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐ PAH ‐ ‐ ‐ ‐ ‐POM ‐ ‐ ‐ ‐ ‐ POM ‐ ‐ ‐ ‐ ‐ POM ‐ ‐ ‐ ‐ ‐
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐Toluene 108‐88‐3 ‐ ‐ ‐ ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐
Total HAPs ‐ ‐ ‐ ‐ ‐ Total HAPs ‐ ‐ ‐ ‐ ‐ Total HAPs ‐ ‐ ‐ ‐ ‐
1a) AQ Facility ID No.:
3e) Potential 3e) Potential 3e) Potential
Alternate Format GI-07 SpreadsheetFacility Emissions Summary
Air Quality Permit ProgramDoc Type: Permit Application
01300098 1b) Agency Interest ID No.: 957922) Facility Name: Mankato Energy Center
Emissions by Source Table If multiple copies of these tables are used, indicate which number this page is over the total number of pages of these tables (e.g., 1/3): 6/6
3a) Delta ID No.: Emissions Summary Table3b) Tempo SI ID No.:
3c) 3d) 3f) 3c) 3d) 3f) 4a) 4c) Actual
Pollutant Name CAS #Lbs per
HrUnc tpy
Limited tpy
Actual tpy Pollutant Name CAS #
Lbs per Hr
Unc tpy
Limited tpy
Actual tpy Pollutant Name Unrestricted Limited tons/year
PM 388.57 189.05 ‐PM10 375.40 175.88 ‐PM2.5 372.72 173.20 ‐SO2 455.66 98.58 ‐NOx 2,734.06 354.01 ‐VOC 613.49 646.96 ‐CO 2,456.09 1,266.03 ‐Pb 0.15 0.026 ‐H2SO4 68.92 14.88 ‐CO2 3,626,677 3,090,690 ‐CH4 369.81 324.91 ‐N2O 16.82 5.83 ‐SF6 1.43E‐03 1.43E‐03 ‐CO2e 3,640,966 3,100,582 ‐
Acetaldehyde 7.60E‐01 7.60E‐01 ‐Acrolein 1.22E‐01 1.22E‐01 ‐Arsenic 1.10E‐01 1.23E‐02 ‐Benzene 6.79E‐01 2.87E‐01 ‐
1,3‐Butadiene 1.62E‐01 2.35E‐02 ‐Beryllium 3.13E‐03 3.92E‐04 ‐Cadmium 5.52E‐02 1.27E‐02 ‐Chromium 1.18E‐01 2.10E‐02 ‐
Cobalt 6.12E‐04 6.12E‐04 ‐Dichlorobenzene 8.74E‐03 8.74E‐03 ‐
Ethylbenzene 6.08E‐01 6.08E‐01 ‐Formaldehyde 72.84 9.00 ‐
Hexane 9.44 9.00 ‐Manganese 7.76 0.78 ‐
Mercury 1.37E‐02 3.07E‐03 ‐Naphthalene 3.62E‐01 6.25E‐02 ‐
Nickel 6.05E‐02 1.98E‐02 ‐PAH 4.16E‐01 7.93E‐02 ‐POM 5.09E‐03 5.09E‐03 ‐
Propylene Oxide 5.51E‐01 5.51E‐01 ‐Selenium 2.46E‐01 2.47E‐02 ‐Toluene 2.50 2.49 ‐Xylenes 1.22 1.22 ‐
Total HAPs 97.82 22.50 ‐
1a) AQ Facility ID No.:
3e) Potential 4b) Potential (tons/year)
3b) Tempo SI ID No.:
3a) Delta ID No.:
3e) Potential
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationHG‐01 Form Calculations
Increase from previous Permit amountUncontrolled
tpyUncontrolled
lb/yrLimitedtpy
Limitedlb/yr
Mercury 9.20E‐04 1.84 9.20E‐04 1.84
New amount Previous Amount Difference
Emission Source Description Stack/Vent IDEmission Unit
IDUncontrolled
tpyUncontrolled
lb/yrUncontrolled
tpyUncontrolled
lb/yrUncontrolled
tpyUncontrolled
lb/yrCombined Cycle System #2 002 ‐ ‐ 0.00E+00 0.00 ‐ ‐Combustion Turbine #2 002 002 1.18E‐02 23.58 1.18E‐02 23.58 0.00E+00 0.00
Duct Burners (Combustion Turbine #2) 002 004 8.93E‐04 1.79 8.93E‐04 1.79 0.00E+00 0.00
Auxiliary Boiler 003 005 7.82E‐05 0.16 7.82E‐05 0.16 0.00E+00 0.00
Combined Cycle System #1 007 ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine #1 007 008 0.00E+00 0.00 0.00E+00 0.00 0.00E+00 0.00
Duct Burners (Combustion Turbine #1) 007 009 9.20E‐04 1.84 0.00E+00 0.00 9.20E‐04 1.84
Diesel Fired Emergency Generator 008 010 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
Fire Pump Engine 005 007 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
Bath Heater 009 011 3.20E‐06 6.41E‐03 3.20E‐06 6.41E‐03 0.00E+00 0.00E+00
Cooling Tower NA 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
Natural Gas Fugitives NA 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
Breaker Fugitives NA 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
Fuel Oil Storage Tank NA 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[HG‐01]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCH‐04a Form Calculations
Modified
Emissions Source Pollutant
"Baseline"Uncontrolled Emissions
(tpy)
"Future Potential"
Uncontrolled Emissions
(tpy)Increase(tpy)
FS 001 PM 0.00 15.87 15.87
FS 001 PM10 0.00 2.70 2.70
FS 001 PM2.5 0.000 0.021 0.021
Note: Baseline emissions are set at zero to indicate not taking credit for past actual emissions.
New
EU 008 EU 009 EU 010 FS 002 FS 003 IA
Emergency Generator
Diesel Fuel Tank
IANatural Gas Condensate Tank - CT1
(New) (New + Modified)
Total Total Significant
Thresholds for major sources
Above Threshold?
(tpy) (tpy) (tpy)
PM 52.13 68.00 25 YesPM10 52.13 54.83 15 YesPM2.5 52.13 52.15 10 YesNOx 167.44 167.44 40 YesSO2 30.46 30.46 40 No
CO 768.64 768.64 100 YesOzone (VOC) 382.58 382.58 40 YesLead 6.61E-03 6.61E-03 0.6 No
Fluorides NA NA 3 NA
Sulfuric acid mist 4.58 4.58 7 No
Hydrogen Sulfide (H2S) NA NA 10 NA
Total Reduced Sulfur including H2S NA NA 10 NA
Total Reduced Sulfur Compounds including H2S
NA NA 10 NA
MWC Organics NA NA 0.0000035 NA
MWC Acid Gas NA NA 40 NA
MWC Metals NA NA 15 NA
MSW Landfill Gas NA NA 50 NA
CO2e 1,585,055 1,585,055 75,000 Yes
52.12 see EU 008 0.01 NA52.12 see EU 008 0.01 NA
Pollutant PTE (tpy) (PTE) (tpy) (PTE) (tpy) PTE (tpy)
52.12 see EU 008 0.01 NA
768.0 see EU 008 0.66 NA382.5 see EU 008 0.036 NA
166.8 see EU 008 0.66 NA30.2 see EU 008 0.26 NA
NA NA NA
6.61E-03 see EU 008 0.00E+00 NA
NA
NA NA NA NA
NA NA NA NA4.58 see EU 008 NA NANA NA
NA
NA NA NA NA
NANA
NA
1,155,682 422,463 208 6,669
NA NA NA NANA NA NA NANA NA NA NA
NA
NA1.65E-03
NANANANA
PTE (tpy)
NANANANANA
PTE (tpy)
NANANANANANANANA
32.66
NA
NA
NANA
NANANA
NA
NA
NANANANA
NANANA
NA
NA
NANANANANA
PTE (tpy)
NANANANANANA
2.75E-04NA
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CH‐04a]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCH‐04c Form Calculations
Table 1: Facility PTE before proposed changeEU 002 EU 004 EU 005 EU 007 EU 011
Total PTE (tpy)
CO2 1,513,963CH4 28.5N2O 2.9SF6 0.00E+00
CO2e 1,515,527
Mass Sum of GHGs (tpy): 1,513,994
Table 4: N/A, no modified equipment
Table 6: PTE of new units
EU 008 EU 009 EU 010 FS 002 FS 003 (New) (New + Modified)
Total Increase Total
Significant Thresholds for major sources
Above Threshold?
(tpy) (tpy) (tpy)
CO2 1,576,727 1,576,727 0 NA
CH4 296.4 296.4 0 NA
N2O 3.0 3.0 0 NA
SF6 1.43E-03 1.43E-03 0 NA
CO2e 1,585,055 1,585,055 75,000 Yes
PTE (tpy)Pollutant PTE (tpy) (PTE) (tpy) (PTE) (tpy) PTE (tpy)
1,154,490 422,027 207 2.80 0.00E+0021.76 7.95 8.41E-03 266.65 0.00E+002.18 0.8 1.68E-03 0.00E+00 0.00E+00
0.00E+00 0.00E+00 0.00E+00 0.00E+00 1.43E-031,155,682 422,463 208 6,669 32.66
Pollutant PTE (tpy) (PTE) (tpy) (PTE) (tpy) PTE (tpy) PTE (tpy)
1,066,724 409,884 35,865 20 1,47020.10 8 1 0 02.01 1 0 0 0
0.00E+00 0 0 0 0
1,067,825 410,307 35,902 20 1,472
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CH‐04c]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationGP 004: Formaldehyde, n‐Hexane, and Total HAPs
Group Information
Inidividual Units of GP 004Emission Source Description Stack/Vent ID EU CE CE CE CE
Combined Cycle System #2 002 ‐ see units see units see units see units Combustion Turbine #2 002 002 002 004 006 008
Combustion Turbine #2 Duct Burners 002 004 ‐ ‐ 006 008
Combined Cycle System #1 007 ‐ see units see units see units ‐ Combustion Turbine #1 007 008 010 011 012 ‐ Combustion Turbine #1 Duct Burners 007 009 ‐ 011 012 ‐Auxiliary Boiler 003 005 ‐ ‐ ‐ ‐Fire Pump Engine 005 007 ‐ ‐ ‐ ‐Diesel Fired Emergency Generator 008 010 ‐ ‐ ‐ ‐Bath Heater 009 011 ‐ ‐ ‐ ‐
HAPs
Unit Pollutant CAS #Emission Rate
(lb/hr)Uncontrolled Emissions
(tpy)Limited Emissions
(tpy)GP 004 Formaldehyde 50‐00‐0 * * 9.0
GP 004 Hexane 110‐54‐3 * * 9.0
GP 004 Total HAPs * * 22.5Notes:* See individual units of GP 004Limited emissions to be based on permit limits as described in the permit application forms.
The purpose of the proposed GP 004 is to establish limits on hexane (CAS# 110‐54‐3), formaldehyde (CAS# 50‐00‐0), and Total HAPs for the existing combustion turbine stack (SV 002), the proposed combustion turbine stack (SV 007), and other units that emit formaldehyde or hexane. The limits will be based on emissions from all units. Compliance with the limits will be met through recordkeeping as described in the permit application forms.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[GP 004]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #1: (Combustion Turbine #1 + Combustion Turbine #1 Duct Burners)
Unit Information
Combustion Turbine Duct BurnersDescription: Combustion Turbine #1 Description: Duct Burners (Combustion Turbine #1)Unit Delta ID: EU 008 Unit Delta ID: EU 009Stack Delta ID: SV 007 Stack Delta ID: SV 007Primary Fuel Natural Gas Primary Fuel Natural GasBackup Fuel ‐ Backup Fuel ‐
Primary Fuel Heat Input Capacity 2253.3 MMBtu/hr
Primary Fuel Heat Input Capacity 823.7 MMBtu/hr
Primary Fuel Heat Value 1020 Btu/scf Primary Fuel Heat Value 1020 Btu/scf
Primary Fuel Consumption Rate 2.21 MMscf/hr
Primary Fuel Consumption Rate 0.81 MMscf/hr
Hours Uncontrolled 8760 Hours Uncontrolled 8760
Hours Limited 8760 Hours Limited 8760
Unit Tempo ID: EQUI 16 Unit Tempo ID: EQUI 17Stack Tempo ID: STRU 20 Stack Tempo ID: STRU 20
Combustion Turbine & Duct BurnersCombined Heat Input: 3077.0 MMBtu/hr
SUSD Emissions
Pollutant FuelCold SU
(lb/event)Warm SU(lb/event)
SD(lb/event)
NOx Natural Gas 414 220 27
VOC Natural Gas 2959.5 1894.0 150.5
CO Natural Gas 5919 3788 301
SUSD lb/event values based on historical facility data and updated to reflect the worst case proposed combustion turbine.
SUSD Durations
Event Type Fuel Cold SU Warm SU SD Total SUSD HoursCalculated
Non‐SUSD HoursNumber of events per year Natural Gas 50 250 300
Hours per event Natural Gas 5.0 3.5 1.0
Total Event Hours Natural Gas 250 875 300 1425 7335SUSD events per year and hours per event estimated based on facility data and knowledge of proposed contract.These values are used to calculate annual SUSD emissions and are not operating limits. Facility is proposing an annual SUSD emission limit for NOx, CO and VOC for Combustion Turbine #1 and Combustion Turbine #2.
Annual SUSD Emissions
Pollutant Fuel typeCold SU (tpy)
Warm SU (tpy)
SD (tpy)
Total (tpy)
NOx Natural Gas 10.35 27.50 4.05 41.9VOC Natural Gas 73.99 236.75 22.58 333.3CO Natural Gas 147.98 473.50 45.15 666.6Calculated from lb/event values and number of events per year.
The maximum hourly natural gas heat input capacity is based on the combustion turbine's highest hourly operating scenario (combinations of load, ambient temperature) which is based on vendor data.
The duct burners have a maximum rated heat input capcity of 823.7 MMBtu/hr and fire natural gas only.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #1: (Combustion Turbine #1 + Combustion Turbine #1 Duct Burners)
Criteria Pollutants Includes SUSD Excludes SUSD Includes SUSD
PollutantCombustion Turbine Fuel
Emission Factor(lb/MMscf)
Emission Factor(lb/MMBtu)
Emission Rate(lb/hr)b
Uncontrolled Emissions(tpy)c
Uncontrolled Emissions(tpy)f
Control
Efficiencyd
Controlled Emissions(tpy)e
Limited Emissions(tpy) Reference
PM Natural Gas NA NAa 11.9 52.1 52.1 0.0% 52.1 52.1 CTDB1_1
PM10 Natural Gas NA NAa 11.9 52.1 52.1 0.0% 52.1 52.1 CTDB1_1
PM2.5 Natural Gas NA NAa 11.9 52.1 52.1 0.0% 52.1 52.1 CTDB1_2
SOx Natural Gas NA 2.2409E‐03 6.9 30.2 30.2 0.0% 30.2 30.2 CTDB1_3
NOx Natural Gas NA NAa 273.7 1198.8 1045.7 80.0% 149.1 166.8 CTDB1_1
VOC Natural Gas NA NAa 25.1 110.1 425.5 40.0% 58.8 382.5 CTDB1_1
CO Natural Gas NA NAa 169.5 742.2 1288.1 90.0% 121.0 768.0 CTDB1_1
Lead Natural Gas 0.0005 4.9E‐07 1.51E‐03 6.61E‐03 6.61E‐03 0.0% 6.61E‐03 6.61E‐03 CTDB1_4
H2SO4 Natural Gas NA NAa 1.05 4.58 4.58 0.0% 4.58 4.58 CTDB1_5
References:CTDB1_1
CTDB1_2
CTDB1_3
CTDB1_4
CTDB1_5
GHG
UnitCombustion Turbine Fuel
Duct Burner Fuel Pollutant GWP
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions(tpy)
Limited Emissions
(tpy)
Duct Burner ‐ Natural Gas CO2 1 116.98 96,353 422,027 0.00% 422,027 422,027
Duct Burner ‐ Natural Gas CH4 25 2.2E‐03 1.82 7.95 0.00% 7.95 7.95
Duct Burner ‐ Natural Gas N2O 298 2.2E‐04 0.18 0.80 0.00% 0.80 0.80
Duct Burner ‐ Natural Gas CO2e ‐ 117.10 96,453 422,463 0.00% 422,463 422,463
Combustion Turbine Natural Gas ‐ CO2 1 116.98 263,582 1,154,490 0.00% 1,154,490 1,154,490
Combustion Turbine Natural Gas ‐ CH4 25 2.2E‐03 4.97 21.76 0.00% 21.76 21.76
Combustion Turbine Natural Gas ‐ N2O 298 2.2E‐04 0.50 2.18 0.00% 2.18 2.18
Combustion Turbine Natural Gas ‐ CO2e ‐ 117.10 263,854 1,155,682 0.00% 1,155,682 1,155,682
References:GHG Table
cAnnual maximum uncontrolled emissions are conservatively estimated based on the maximum hourly emission rate and do not incorporate BACT limits.dThe NOx, CO, and VOC control efficiencies only represent a nominal control efficiency and are not used to calculate Controlled Emissions.
eThe turbine and the ductburners will both vent to a common stack. Therefore, the maximum controlled emissions represent the calculated maximum controlled emissions at ambient conditions for the combined cycle system, which includes both the combustion turbine & ductburners. Natural gas‐fired controlled emissions based on the following BACT limits: 3.0 ppmvd NOx @ 15% O2; 4.0 ppmvd CO @15% O2; 3.4 ppmvd VOC @15% O2.
See GHG Table, Natural Gas emission factors
fAfter discussion, MPCA on 4‐11‐16 requested a revision of the CO and VOC uncontrolled tpy emissions. All pollutants with separate SUSD emissions (CO, NOx, and VOC) required updates.
aThe hourly emission rates provided for the lb/hr Emission Rate are a worst‐case projected emissions for the combined cycle system, based on several different operating scenarios at varying heat input capacities for the combustion turbine. The emission rate also includes the duct burner natural gas combustion emissions. These lb/hr Emission Rates do not correlate directly to the maximum heat input capacity provided above. Therefore, a specific lb/MMBtu emission factor is not relevant to the combined cycle system emission rates provided on this form.
bThe combined cycle system maximum hourly emission rate is a worst case composite emission scenario that is based on the combustion turbine'shighest hourly emission operating scenario (combinations of load, ambient temperature) for each pollutant, which is based on combustion turbine vendor data. The emission rate also incorporates the maximum hourly duct burner emissions.
Potential PM, PM10, and PM2.5 emissions were based on vendor data, operating experience and stack tests from other similar Calpine facilities.PM2.5 emission factor assumed equal to PM emisison factor.Based on Permit 01300098‐002 emission limit.
No data for lead available in AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00) Table 3.1‐4; used natural gas lead emission factor from AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2.H2SO4 calculated as percentage of SO2 emission factor.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #1: (Combustion Turbine #1 + Combustion Turbine #1 Duct Burners)
HAPs
UnitCombustion Turbine Fuel
Duct Burner Fuel Pollutant CAS #
Emission Factor (lb/MMscf)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy) Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceDuct Burner ‐ Natural Gas Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas Arsenic 7440‐38‐2 2.00E‐04 1.96E‐07 1.62E‐04 7.07E‐04 0.00% 7.07E‐04 7.07E‐04 CTDB1_10
Duct Burner ‐ Natural Gas Benzene 71‐43‐2 2.10E‐03 2.06E‐06 1.70E‐03 7.43E‐03 0.00% 7.43E‐03 7.43E‐03 CTDB1_10
Duct Burner ‐ Natural Gas 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas Beryllium 7440‐41‐7 1.20E‐05 1.18E‐08 9.69E‐06 4.24E‐05 0.00% 4.24E‐05 4.24E‐05 CTDB1_10
Duct Burner ‐ Natural Gas Cadmium 7440‐43‐9 1.10E‐03 1.08E‐06 8.88E‐04 3.89E‐03 0.00% 3.89E‐03 3.89E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Chromium 7440‐47‐3 1.40E‐03 1.37E‐06 1.13E‐03 4.95E‐03 0.00% 4.95E‐03 4.95E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Cobalt 744‐48‐4 8.40E‐05 8.24E‐08 6.78E‐05 2.97E‐04 0.00% 2.97E‐04 2.97E‐04 CTDB1_10
Duct Burner ‐ Natural Gas Dichlorobenzene 25321‐22‐6 1.20E‐03 1.18E‐06 9.69E‐04 4.24E‐03 0.00% 4.24E‐03 4.24E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_9
Duct Burner ‐ Natural Gas Hexane 110‐54‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_9
Duct Burner ‐ Natural Gas Manganese 7439‐96‐5 3.80E‐04 3.73E‐07 3.07E‐04 1.34E‐03 0.00% 1.34E‐03 1.34E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Mercury 7439‐97‐6 2.60E‐04 2.55E‐07 2.10E‐04 9.20E‐04 0.00% 9.20E‐04 9.20E‐04 CTDB1_10
Duct Burner ‐ Natural Gas Naphthalene 91‐20‐3 6.10E‐04 5.98E‐07 4.93E‐04 2.16E‐03 0.00% 2.16E‐03 2.16E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Nickel 7440‐02‐0 2.10E‐03 2.06E‐06 1.70E‐03 7.43E‐03 0.00% 7.43E‐03 7.43E‐03 CTDB1_10
Duct Burner ‐ Natural Gas PAH ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas POM ‐ 6.98E‐04 6.85E‐07 5.64E‐04 2.47E‐03 0.00% 2.47E‐03 2.47E‐03 CTDB1_10
Duct Burner ‐ Natural Gas Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10
Duct Burner ‐ Natural Gas Selenium 7782‐49‐2 2.40E‐05 2.35E‐08 1.94E‐05 8.49E‐05 0.00% 8.49E‐05 8.49E‐05 CTDB1_10
Duct Burner ‐ Natural Gas Toluene 108‐88‐3 3.40E‐03 3.33E‐06 2.75E‐03 1.20E‐02 0.00% 1.20E‐02 1.20E‐02 CTDB1_10
Duct Burner ‐ Natural Gas Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_10Reference
Combustion Turbine Natural Gas ‐ Acetaldehyde 75‐07‐0 ‐ 4.00E‐05 9.01E‐02 3.95E‐01 0.00% 3.95E‐01 3.95E‐01 CTDB1_6
Combustion Turbine Natural Gas ‐ Acrolein 107‐02‐8 ‐ 6.40E‐06 1.44E‐02 6.32E‐02 0.00% 6.32E‐02 6.32E‐02 CTDB1_6
Combustion Turbine Natural Gas ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Benzene 71‐43‐2 ‐ 1.20E‐05 2.70E‐02 1.18E‐01 0.00% 1.18E‐01 1.18E‐01 CTDB1_6
Combustion Turbine Natural Gas ‐ 1,3‐Butadiene 106‐99‐0 ‐ 4.29E‐07 9.67E‐04 4.23E‐03 0.00% 4.23E‐03 4.23E‐03 CTDB1_6
Combustion Turbine Natural Gas ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Cobalt 744‐48‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Ethylbenzene 100‐41‐4 ‐ 3.20E‐05 7.21E‐02 3.16E‐01 0.00% 3.16E‐01 3.16E‐01 CTDB1_6
Combustion Turbine Natural Gas ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_9
Combustion Turbine Natural Gas ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_9
Combustion Turbine Natural Gas ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Naphthalene 91‐20‐3 ‐ 1.30E‐06 2.93E‐03 1.28E‐02 0.00% 1.28E‐02 1.28E‐02 CTDB1_6
Combustion Turbine Natural Gas ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ PAH ‐ ‐ 2.20E‐06 4.96E‐03 2.17E‐02 0.00% 2.17E‐02 2.17E‐02 CTDB1_6
Combustion Turbine Natural Gas ‐ POM ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Propylene Oxide 75‐56‐9 ‐ 2.90E‐05 6.53E‐02 2.86E‐01 0.00% 2.86E‐01 2.86E‐01 CTDB1_6
Combustion Turbine Natural Gas ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB1_6
Combustion Turbine Natural Gas ‐ Toluene 108‐88‐3 ‐ 1.30E‐04 2.93E‐01 1.28E+00 0.00% 1.28E+00 1.28E+00 CTDB1_6
Combustion Turbine Natural Gas ‐ Xylenes 1330‐20‐7 ‐ 6.40E‐05 1.44E‐01 6.32E‐01 0.00% 6.32E‐01 6.32E‐01 CTDB1_6Reference
Combined Turbine & DB Natural Gas Natural Gas Acetaldehyde 75‐07‐0 ‐ ‐ 9.01E‐02 3.95E‐01 0.00% 3.95E‐01 3.95E‐01 ‐Combined Turbine & DB Natural Gas Natural Gas Acrolein 107‐02‐8 ‐ ‐ 1.44E‐02 6.32E‐02 0.00% 6.32E‐02 6.32E‐02 ‐Combined Turbine & DB Natural Gas Natural Gas Arsenic 7440‐38‐2 ‐ ‐ 1.62E‐04 7.07E‐04 0.00% 7.07E‐04 7.07E‐04 ‐Combined Turbine & DB Natural Gas Natural Gas Benzene 71‐43‐2 ‐ ‐ 2.87E‐02 1.26E‐01 0.00% 1.26E‐01 1.26E‐01 ‐Combined Turbine & DB Natural Gas Natural Gas 1,3‐Butadiene 106‐99‐0 ‐ ‐ 9.67E‐04 4.23E‐03 0.00% 4.23E‐03 4.23E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Beryllium 7440‐41‐7 ‐ ‐ 9.69E‐06 4.24E‐05 0.00% 4.24E‐05 4.24E‐05 ‐Combined Turbine & DB Natural Gas Natural Gas Cadmium 7440‐43‐9 ‐ ‐ 8.88E‐04 3.89E‐03 0.00% 3.89E‐03 3.89E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Chromium 7440‐47‐3 ‐ ‐ 1.13E‐03 4.95E‐03 0.00% 4.95E‐03 4.95E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Cobalt 744‐48‐4 ‐ ‐ 6.78E‐05 2.97E‐04 0.00% 2.97E‐04 2.97E‐04 ‐Combined Turbine & DB Natural Gas Natural Gas Dichlorobenzene 25321‐22‐6 ‐ ‐ 9.69E‐04 4.24E‐03 0.00% 4.24E‐03 4.24E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Ethylbenzene 100‐41‐4 ‐ ‐ 7.21E‐02 3.16E‐01 0.00% 3.16E‐01 3.16E‐01 ‐Combined Turbine & DB Natural Gas Natural Gas Formaldehyde 50‐00‐0 ‐ ‐ ‐ 37.60 0.00% 37.60 see GP 004 see belowCombined Turbine & DB Natural Gas Natural Gas Hexane 110‐54‐3 ‐ ‐ ‐ 4.58 0.00% 4.58 see GP 004 see belowCombined Turbine & DB Natural Gas Natural Gas Manganese 7439‐96‐5 ‐ ‐ 3.07E‐04 1.34E‐03 0.00% 1.34E‐03 1.34E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Mercury 7439‐97‐6 ‐ ‐ 2.10E‐04 9.20E‐04 0.00% 9.20E‐04 9.20E‐04 ‐Combined Turbine & DB Natural Gas Natural Gas Naphthalene 91‐20‐3 ‐ ‐ 3.42E‐03 1.50E‐02 0.00% 1.50E‐02 1.50E‐02 ‐Combined Turbine & DB Natural Gas Natural Gas Nickel 7440‐02‐0 ‐ ‐ 1.70E‐03 7.43E‐03 0.00% 7.43E‐03 7.43E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas PAH ‐ ‐ ‐ 4.96E‐03 2.17E‐02 0.00% 2.17E‐02 2.17E‐02 ‐Combined Turbine & DB Natural Gas Natural Gas POM ‐ ‐ ‐ 5.64E‐04 2.47E‐03 0.00% 2.47E‐03 2.47E‐03 ‐Combined Turbine & DB Natural Gas Natural Gas Propylene Oxide 75‐56‐9 ‐ ‐ 6.53E‐02 2.86E‐01 0.00% 2.86E‐01 2.86E‐01 ‐Combined Turbine & DB Natural Gas Natural Gas Selenium 7782‐49‐2 ‐ ‐ 1.94E‐05 8.49E‐05 0.00% 8.49E‐05 8.49E‐05 ‐Combined Turbine & DB Natural Gas Natural Gas Toluene 108‐88‐3 ‐ ‐ 2.96E‐01 1.30E+00 0.00% 1.30E+00 1.30E+00 ‐Combined Turbine & DB Natural Gas Natural Gas Xylenes 1330‐20‐7 ‐ ‐ 1.44E‐01 6.32E‐01 0.00% 6.32E‐01 6.32E‐01 ‐Combined Turbine & DB Natural Gas Natural Gas Total HAPs ‐ ‐ ‐ 7.23E‐01 4.53E+01 ‐ 4.53E+01 3.16E+00
CTDB1_9
CTDB1_10
These pollutants are entirely accounted for in the combined CT and DB data.DB ‐ Emission factors from AP‐42, Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4. Total POM emission factor is equal to the sum of the individual emissions of POM compounds (including Naphthalene).
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #1: (Combustion Turbine #1 + Combustion Turbine #1 Duct Burners)
Event Type Fuel Cold SU Warm SU SD Total SUSD HoursCalculated
Non‐SUSD HoursTotal Event Hours Natural Gas 250 875 300 1425 7335
UnitCombustion Turbine Fuel
Duct Burner Fuel Pollutant CAS #
Heat Input (MMBtu/hr)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr) Limited Hours
Uncontrolled Emissions(tpy)
Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceCombined Turbine & DB Natural Gas Natural Gas Formaldehyde (< 60% Load) 50‐00‐0 3077.0 0.00279 8.58 1425 37.60 0.00% 37.60 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Formaldehyde (60 ‐ < 90% Load) 50‐00‐0 3077.0 0.00151 4.65 7335 20.35 0.00% 20.35 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Formaldehyde (>= 90% Load) 50‐00‐0 3077.0 0.00105 3.23 0 14.15 0.00% 14.15 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Hexane (Any Load) 110‐54‐3 3077.0 0.00034 1.05 8760 4.58 0.00% 4.58 see GP 004 CTDB1_8
References:CTDB1_7
CTDB1_8
Note: 0‐60% Load assumed to correspond to all SUSD Time; Conservatively assumed remaining time "Calculated Non‐SUSD Hours" is at 60‐90% load.
Formaldehyde and Hexane Totals:
UnitCombustion Turbine Fuel
Duct Burner Fuel Pollutant CAS #
Heat Input (MMBtu/hr)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr) Limited Hours
Uncontrolled Emissions(tpy)
Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)Combined Turbine & DB Natural Gas Natural Gas Formaldehyde total 50‐00‐0 Natural Gas ‐ ‐ 8760 37.60 0.00% 37.60 see GP 004Combined Turbine & DB Natural Gas Natural Gas Hexane Total 110‐54‐3 Natural Gas ‐ ‐ 8760 4.58 0.00% 4.58 see GP 004
Formaldehyde emission factors based on most recent stack test (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runsHexane emission factor based on most recent stack test at SV002 (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runs
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #1: (Combustion Turbine #1 + Combustion Turbine #1 Duct Burners)
Worst‐Case Emissions Summary
Combined Cycle (EU 008 and EU 009)Criteria Pollutants
Excludes SUSD Includes SUSD
Unit Pollutant
Uncontrolled Emissions
(tpy)
Controlled Emissions Before Operating Limits
(tpy)aLimited Emissions
(tpy)b
Emission Rate Based on Limited Emissions(lb/hr)
Combined Turbine & DB PM 52.1 52.1 52.12 11.9
Combined Turbine & DB PM10 52.1 52.1 52.12 11.9
Combined Turbine & DB PM2.5 52.1 52.1 52.12 11.9
Combined Turbine & DB SOx 30.2 30.2 30.20 6.9
Combined Turbine & DB NOx 1045.7 149.1 166.78 34.1
Combined Turbine & DB VOC 425.5 58.8 382.5 13.4
Combined Turbine & DB CO 1288.1 121.0 768.0 27.6
Combined Turbine & DB Lead 6.61E‐03 6.61E‐03 6.61E‐03 1.51E‐03Combined Turbine & DB H2SO4 4.6 4.6 4.58 1.0
EU 008 Combustion Turbine onlyGHG Pollutants
Unit PollutantEmission Rate
(lb/hr)Uncontrolled Emissions
(tpy)Limited Emissions
(tpy)
Combustion Turbine CO2 263,582 1,154,490 1,154,490
Combustion Turbine CH4 4.97 21.76 21.76
Combustion Turbine N2O 0.50 2.18 2.18
Combustion Turbine CO2e 263,854 1,155,682 1,155,682
EU 008 Combustion Turbine only, SV 007 for Formaldehyde and HexaneHAPs
Unit Pollutant CAS #Emission Rate
(lb/hr)Uncontrolled Emissions
(tpy)Limited Emissions
(tpy)Combustion Turbine Acetaldehyde 75‐07‐0 9.01E‐02 3.95E‐01 3.95E‐01Combustion Turbine Acrolein 107‐02‐8 1.44E‐02 6.32E‐02 6.32E‐02Combustion Turbine Arsenic 7440‐38‐2 ‐ ‐ ‐Combustion Turbine Benzene 71‐43‐2 2.70E‐02 1.18E‐01 1.18E‐01Combustion Turbine 1,3‐Butadiene 106‐99‐0 9.67E‐04 4.23E‐03 4.23E‐03Combustion Turbine Beryllium 7440‐41‐7 ‐ ‐ ‐Combustion Turbine Cadmium 7440‐43‐9 ‐ ‐ ‐Combustion Turbine Chromium 7440‐47‐3 ‐ ‐ ‐Combustion Turbine Cobalt 744‐48‐4 ‐ ‐ ‐Combustion Turbine Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐Combustion Turbine Ethylbenzene 100‐41‐4 7.21E‐02 3.16E‐01 3.16E‐01Combined Turbine & DB Formaldehyde 50‐00‐0 8.58 37.60 see GP 004Combined Turbine & DB Hexane 110‐54‐3 1.05 4.58 see GP 004Combustion Turbine Manganese 7439‐96‐5 ‐ ‐ ‐Combustion Turbine Mercury 7439‐97‐6 ‐ ‐ ‐Combustion Turbine Naphthalene 91‐20‐3 2.93E‐03 1.28E‐02 1.28E‐02Combustion Turbine Nickel 7440‐02‐0 ‐ ‐ ‐Combustion Turbine PAH ‐ 4.96E‐03 2.17E‐02 2.17E‐02Combustion Turbine POM ‐ ‐ ‐ ‐Combustion Turbine Propylene Oxide 75‐56‐9 6.53E‐02 2.86E‐01 2.86E‐01Combustion Turbine Selenium 7782‐49‐2 ‐ ‐ ‐Combustion Turbine Toluene 108‐88‐3 2.93E‐01 1.28E+00 1.28E+00
Combustion Turbine Xylenes 1330‐20‐7 1.44E‐01 6.32E‐01 6.32E‐01Combustion Turbine Total HAPs NA NA NANotes: Due to Formaldehyde and Hexane emissions being calculated at the stack level, Total HAPs for combustion turbine alone are not able to be meaningfully calculated.
b Limited emissions assume a worst‐case emission scenario for PM, PM10, SOx, NOx, VOC, CO, Lead, and H2SO4, where the turbine operates natural gas the entire year and includes the startup and shutdown emissions for NOx, VOC, and CO.
aRepresents the worst‐case annual controlled criteria pollutant emissions, which incorporated the proposed natural gas BACT limits.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
Unit Information
Combustion Turbine Duct BurnersDescription: Combustion Turbine #2 Description: Duct Burners (Combustion Turbine #2)Unit Delta ID: EU 002 Unit Delta ID: EU 004Stack Delta ID: SV 002 Stack Delta ID: SV 002Primary Fuel Natural Gas Primary Fuel Natural GasBackup Fuel Fuel Oil Backup Fuel ‐
Primary Fuel Heat Input Capacity 2082 MMBtu/hr
Primary Fuel Heat Input Capacity 800 MMBtu/hr
Secondary Fuel Heat Input Capacity 2243 MMBtu/hr
Primary Fuel Heat Value 1020 Btu/scf Primary Fuel Heat Value 1020 Btu/scf
Secondary Fuel Heat Value 140,000 Btu/gal
Primary Fuel Consumption Rate 2.04 MMscf/hr
Primary Fuel Consumption Rate 0.78 MMscf/hr
Hours Uncontrolled 8760 Hours Uncontrolled 8760
Hours Limited 8760 Hours Limited 8760
Unit Tempo ID: EQUI 5 Unit Tempo ID: EQUI 6Stack Tempo ID: STRU 14 Stack Tempo ID: STRU 14
Operating LimitsFuel Oil use 875 hr maximum
Combustion Turbine & Duct BurnersCombined Heat Input (CT Natural Gas): 2882 MMBtu/hr
Combined Heat Input (CT Fuel Oil): 3043 MMBtu/hr
SUSD Emissions
Pollutant FuelCold SU
(lb/event)Warm SU(lb/event)
SD(lb/event)
NOx Natural Gas 323.5 148.3 4.4
VOC Natural Gas 2693.8 1534.3 23.4
CO Natural Gas 5387.6 3068.6 46.8
NOx Fuel Oil 459.3 140.7 16.8
VOC Fuel Oil 749.1 272.9 154.7
CO Fuel Oil 1498.2 545.9 309.3
SUSD Durations
Event Type Fuel Cold SU Warm SU SD Total SUSD HoursCalculated
Non‐SUSD Hours
Calculated Non‐SUSD Hours with FO Limit
Total Hours with SUSD Excluded
Number of events per year Natural Gas 46 184 230
Hours per event Natural Gas 5.0 3.5 1.0
Total Event Hours Natural Gas 230 644 230 1104 7656 6781 7885Number of events per year Fuel Oil 6 24 30
Hours per event Fuel Oil 5.0 3.5 1.0
Total Event Hours Fuel Oil 30 84 30 144 731 731 875
Annual SUSD Emissions
Pollutant Fuel typeCold SU (tpy)
Warm SU (tpy)
SD (tpy)
Total (tpy)
NOx Natural Gas 7.44 13.64 0.51 21.6VOC Natural Gas 61.96 141.16 2.69 205.8CO Natural Gas 123.91 282.31 5.38 411.6NOx Fuel Oil 1.38 1.69 0.25 3.3VOC Fuel Oil 2.25 3.27 2.32 7.8CO Fuel Oil 4.49 6.55 4.64 15.7
Calculated from "SUSD Emissions" section lb/event values and "SUSD Durations" section number of events per year.
The maximum hourly natural gas heat input capacity is based on the combustion turbine's highest hourly operating scenario (combinations of load, ambient temperature) which is based on vendor data.
The ductburners have a maximum rated heat input capcity of 800 MMBtu/hr and fire natural gas only.
The maximum hourly fuel oil heat input capacity is based on the combustion turbine's highest hourly operating scenario (combinations of load, ambient temperature, and power/steam augmentation) which is based on vendor data.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
Criteria Pollutants Excludes SUSD Includes SUSD
PollutantCombustion Turbine Fuel
Emission Factor(lb/MMscf)
Emission Factor(lb/MMBtu)
Emission Rate(lb/hr)b
Uncontrolled Emissions(tpy)c Control Efficiencyd
Controlled Emissions(tpy)e
Limited Emissions(tpy)f Reference
PM Natural Gas NA NAa 22.00 96.4 0.0% 96.4 96.4 CTDB2_1
PM10 Natural Gas NA NAa 22.00 96.4 0.0% 96.4 96.4 CTDB2_1
PM2.5 Natural Gas NA NAa 22.00 96.4 0.0% 96.4 96.4 CTDB2_2
SOx Natural Gas NA 2.2409E‐03 6.458 28.3 0.0% 28.3 28.3 CTDB2_3
NOx Natural Gas NA NAa 255.98 1121.2 80.0% 163.0 164.0 CTDB2_1
VOC Natural Gas NA NAa 19.21 84.1 40.0% 50.5 249.9 CTDB2_1
CO Natural Gas NA NAa 119.12 521.7 90.0% 53.1 458.0 CTDB2_1
Lead Natural Gas 0.0005 4.9E‐07 0.001 6.19E‐03 0.0% 6.19E‐03 6.19E‐03 CTDB2_4
H2SO4 Natural Gas NA NAa0.98 4.29 0.0% 4.29 4.29 CTDB2_5
PM Fuel Oil NA NAc 72.6 318.0 0.0% 318.0 31.8 CTDB2_1
PM10 Fuel Oil NA NAa 72.6 318.0 0.0% 318.0 31.8 CTDB2_1
PM2.5 Fuel Oil NA NAa 72.6 318.0 0.0% 318.0 31.8 CTDB2_2
SOx Fuel Oil NA NAa 96.8 423.9 0.0% 423.9 42.3 CTDB2_1
NOx Fuel Oil NA NAa 381.9 1672.6 80.0% 276.5 26.4 CTDB2_1
VOC Fuel Oil NA NAa 42.3 185.4 40.0% 111.2 17.1 CTDB2_1
CO Fuel Oil NA NAa 261.5 1145.2 90.0% 114.5 25.2 CTDB2_1
Lead Fuel Oil NA 1.4E‐05 0.032 0.139 0.0% 0.139 0.014 CTDB2_9
H2SO4 Fuel Oil NA NAa14.69 64.34 0.0% 64.34 6.4 CTDB2_5
References:CTDB2_1
CTDB2_2
CTDB2_3
CTDB2_4
CTDB2_5
CTDB2_9
Notes:
GHG
UnitCombustion Turbine Fuel Duct Burner Fuel Pollutant GWP
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)
Duct Burner ‐ Natural Gas CO2 1 116.98 93,581 409,884 0.00% 409,884 409,884
Duct Burner ‐ Natural Gas CH4 25 2.2E‐03 1.76 7.72 0.00% 7.72 7.72
Duct Burner ‐ Natural Gas N2O 298 2.2E‐04 0.18 0.77 0.00% 0.77 0.77
Duct Burner ‐ Natural Gas CO2e ‐ 117.10 93,678 410,307 0.00% 410,307 410,307
Combustion Turbine Natural Gas ‐ CO2 1 116.98 243,544 1,066,724 0.00% 1,066,724 1,066,724
Combustion Turbine Natural Gas ‐ CH4 25 2.2E‐03 4.59 20.10 0.00% 20.10 20.10
Combustion Turbine Natural Gas ‐ N2O 298 2.2E‐04 0.46 2.01 0.00% 2.01 2.01
Combustion Turbine Natural Gas ‐ CO2e ‐ 117.10 243,796 1,067,825 0.00% 1,067,825 1,067,825
Combustion Turbine Fuel Oil ‐ CO2 1 163.05 365,726 1,601,880 0.00% 1,601,880 160,005
Combustion Turbine Fuel Oil ‐ CH4 25 6.6E‐03 14.83 64.98 0.00% 64.98 6.49
Combustion Turbine Fuel Oil ‐ N2O 298 1.3E‐03 2.97 13.00 0.00% 13.00 1.30
Combustion Turbine Fuel Oil ‐ CO2e ‐ 163.61 366,981 1,607,377 0.00% 1,607,377 160,554
Limited Emissions for Combustion Turbine:
Combustion Turbine Mix ‐ CO2 ‐ ‐ ‐ ‐ ‐ ‐ 1,120,178
Combustion Turbine Mix ‐ CH4 ‐ ‐ ‐ ‐ ‐ ‐ 24.59
Combustion Turbine Mix ‐ N2O ‐ ‐ ‐ ‐ ‐ ‐ 3.11
Combustion Turbine Mix ‐ CO2e ‐ ‐ ‐ ‐ ‐ ‐ 1,121,719
References:GHG Table
Notes:Limited emissions for Fuel Oil calculations based on fuel oil operating hours limit as described previously.
aThe hourly emission rates provided for the lb/hr Emission Rate are worst‐case projected emissions for the combined cycle system, based on several different operating scenarios at varying heat input capacities for the combustion turbine. The emission rate also includes the duct burner natural gas combustion emissions. These lb/hr Emission Rates do not correlate directly to the maximum heat input capacity provided above. Therefore, a specific lb/MMBtu emission factor is not relevant to the combined cycle system emission rates provided on this form.bThe combined cycle system maximum hourly emission rate is a worst‐case composite emission scenario that is based on the combustion turbine's highest hourly emission operating scenario (combinations of load, ambient temperature) for each pollutant, which is based on vendor data. The emission rate also incorporates the maximum hourly duct burner emissions.cAnnual maximum uncontrolled emissions are conservatively estimated based on the maximum hourly emission rate and do not incorporate the proposed combustion turbine fuel oil operating usage limit or BACT limits.
PM2.5 emission factor assumed equal to PM emisison factorBased on Permit 01300098‐002 emission limit
No data for lead available in AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00) Table 3.1‐4; used natural gas lead emission factor from AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2H2SO4 calculated as percentage of SO2 emission factor.Lead emission factor for Fuel oil from from AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐5
See "Worst Case Emissions CT1 CT2" sheet for emission factor selection and/or calculation, based on fuel type.
fThe combustion turbine will be limited to firing low sulfur distillate fuel oil (no greater than 0.05% sulfur by weight) and will meet the fuel oil operating hours limit as described previously.
dThe NOx, CO, and VOC control efficiencies only represent a nominal control efficiency and are not used to calculate Controlled Emissions.
eThe combustion turbine and the duct burners vent to a common stack. Therefore, the maximum controlled emissions represent the calculated maximum controlled emissions at ambient conditions for the combined cycle system, which includes both the combustion turbine and duct burners. Natural gas‐fired controlled emissions based on the following BACT limits: 3.0 ppmvd NOx @ 15% O2; 4.0 ppmvd CO @15% O2; 3.4 ppmvd VOC @15% O2. Fuel oil‐fired controlled emissions based on the following BACT limits: 5.5 ppmvd NOx @ 15% O2; 4.8 ppmvd CO @15% O2; 7.1 ppmvd VOC @15% O2.
See GHG Table, Natural Gas emission factors, Fuel Oil emission factors
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
HAPs
UnitCombustion Turbine Fuel Duct Burner Fuel Pollutant CAS #
Emission Factor (lb/MMscf)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceDuct Burner ‐ Natural Gas Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas Arsenic 7440‐38‐2 2.00E‐04 1.96E‐07 1.57E‐04 6.87E‐04 0.00% 6.87E‐04 6.87E‐04 CTDB2_13
Duct Burner ‐ Natural Gas Benzene 71‐43‐2 2.10E‐03 2.06E‐06 1.65E‐03 7.21E‐03 0.00% 7.21E‐03 7.21E‐03 CTDB2_13
Duct Burner ‐ Natural Gas 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas Beryllium 7440‐41‐7 1.20E‐05 1.18E‐08 9.41E‐06 4.12E‐05 0.00% 4.12E‐05 4.12E‐05 CTDB2_13
Duct Burner ‐ Natural Gas Cadmium 7440‐43‐9 1.10E‐03 1.08E‐06 8.63E‐04 3.78E‐03 0.00% 3.78E‐03 3.78E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Chromium 7440‐47‐3 1.40E‐03 1.37E‐06 1.10E‐03 4.81E‐03 0.00% 4.81E‐03 4.81E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Cobalt 744‐48‐4 8.40E‐05 8.24E‐08 6.59E‐05 2.89E‐04 0.00% 2.89E‐04 2.89E‐04 CTDB2_13
Duct Burner ‐ Natural Gas Dichlorobenzene 25321‐22‐6 1.20E‐03 1.18E‐06 9.41E‐04 4.12E‐03 0.00% 4.12E‐03 4.12E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Duct Burner ‐ Natural Gas Hexane 110‐54‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Duct Burner ‐ Natural Gas Manganese 7439‐96‐5 3.80E‐04 3.73E‐07 2.98E‐04 1.31E‐03 0.00% 1.31E‐03 1.31E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Mercury 7439‐97‐6 2.60E‐04 2.55E‐07 2.04E‐04 8.93E‐04 0.00% 8.93E‐04 8.93E‐04 CTDB2_13
Duct Burner ‐ Natural Gas Naphthalene 91‐20‐3 6.10E‐04 5.98E‐07 4.78E‐04 2.10E‐03 0.00% 2.10E‐03 2.10E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Nickel 7440‐02‐0 2.10E‐03 2.06E‐06 1.65E‐03 7.21E‐03 0.00% 7.21E‐03 7.21E‐03 CTDB2_13
Duct Burner ‐ Natural Gas PAH ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas POM ‐ 6.98E‐04 6.85E‐07 5.48E‐04 2.40E‐03 0.00% 2.40E‐03 2.40E‐03 CTDB2_13
Duct Burner ‐ Natural Gas Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13
Duct Burner ‐ Natural Gas Selenium 7782‐49‐2 2.40E‐05 2.35E‐08 1.88E‐05 8.24E‐05 0.00% 8.24E‐05 8.24E‐05 CTDB2_13
Duct Burner ‐ Natural Gas Toluene 108‐88‐3 3.40E‐03 3.33E‐06 2.67E‐03 1.17E‐02 0.00% 1.17E‐02 1.17E‐02 CTDB2_13
Duct Burner ‐ Natural Gas Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_13Reference
Combustion Turbine Natural Gas ‐ Acetaldehyde 75‐07‐0 ‐ 4.00E‐05 8.33E‐02 3.65E‐01 0.00% 3.65E‐01 3.65E‐01 CTDB2_6
Combustion Turbine Natural Gas ‐ Acrolein 107‐02‐8 ‐ 6.40E‐06 1.33E‐02 5.84E‐02 0.00% 5.84E‐02 5.84E‐02 CTDB2_6
Combustion Turbine Natural Gas ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Benzene 71‐43‐2 ‐ 1.20E‐05 2.50E‐02 1.09E‐01 0.00% 1.09E‐01 1.09E‐01 CTDB2_6
Combustion Turbine Natural Gas ‐ 1,3‐Butadiene 106‐99‐0 ‐ 4.29E‐07 8.93E‐04 3.91E‐03 0.00% 3.91E‐03 3.91E‐03 CTDB2_6
Combustion Turbine Natural Gas ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Cobalt 744‐48‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Ethylbenzene 100‐41‐4 ‐ 3.20E‐05 6.66E‐02 2.92E‐01 0.00% 2.92E‐01 2.92E‐01 CTDB2_6
Combustion Turbine Natural Gas ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Combustion Turbine Natural Gas ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Combustion Turbine Natural Gas ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Naphthalene 91‐20‐3 ‐ 1.30E‐06 2.71E‐03 1.19E‐02 0.00% 1.19E‐02 1.19E‐02 CTDB2_6
Combustion Turbine Natural Gas ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ PAH ‐ ‐ 2.20E‐06 4.58E‐03 2.01E‐02 0.00% 2.01E‐02 2.01E‐02 CTDB2_6
Combustion Turbine Natural Gas ‐ POM ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Propylene Oxide 75‐56‐9 ‐ 2.90E‐05 6.04E‐02 2.64E‐01 0.00% 2.64E‐01 2.64E‐01 CTDB2_6
Combustion Turbine Natural Gas ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_6
Combustion Turbine Natural Gas ‐ Toluene 108‐88‐3 ‐ 1.30E‐04 2.71E‐01 1.19E+00 0.00% 1.19E+00 1.19E+00 CTDB2_6
Combustion Turbine Natural Gas ‐ Xylenes 1330‐20‐7 ‐ 6.40E‐05 1.33E‐01 5.84E‐01 0.00% 5.84E‐01 5.84E‐01 CTDB2_6Reference
Combustion Turbine Fuel Oil ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Arsenic 7440‐38‐2 ‐ 1.10E‐05 2.47E‐02 1.08E‐01 0.00% 1.08E‐01 1.08E‐02 CTDB2_10
Combustion Turbine Fuel Oil ‐ Benzene 71‐43‐2 ‐ 5.50E‐05 1.23E‐01 5.40E‐01 0.00% 5.40E‐01 5.40E‐02 CTDB2_11
Combustion Turbine Fuel Oil ‐ 1,3‐Butadiene 106‐99‐0 ‐ 1.60E‐05 3.59E‐02 1.57E‐01 0.00% 1.57E‐01 1.57E‐02 CTDB2_11
Combustion Turbine Fuel Oil ‐ Beryllium 7440‐41‐7 ‐ 3.10E‐07 6.95E‐04 3.05E‐03 0.00% 3.05E‐03 3.04E‐04 CTDB2_10
Combustion Turbine Fuel Oil ‐ Cadmium 7440‐43‐9 ‐ 4.80E‐06 1.08E‐02 4.72E‐02 0.00% 4.72E‐02 4.71E‐03 CTDB2_10
Combustion Turbine Fuel Oil ‐ Chromium 7440‐47‐3 ‐ 1.10E‐05 2.47E‐02 1.08E‐01 0.00% 1.08E‐01 1.08E‐02 CTDB2_10
Combustion Turbine Fuel Oil ‐ Cobalt 744‐48‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_10
Combustion Turbine Fuel Oil ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Combustion Turbine Fuel Oil ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_12
Combustion Turbine Fuel Oil ‐ Manganese 7439‐96‐5 ‐ 7.90E‐04 1.77E+00 7.76E+00 0.00% 7.76E+00 7.75E‐01 CTDB2_10
Combustion Turbine Fuel Oil ‐ Mercury 7439‐97‐6 ‐ 1.20E‐06 2.69E‐03 1.18E‐02 0.00% 1.18E‐02 1.18E‐03 CTDB2_10
Combustion Turbine Fuel Oil ‐ Naphthalene 91‐20‐3 ‐ 3.50E‐05 7.85E‐02 3.44E‐01 0.00% 3.44E‐01 3.43E‐02 CTDB2_11
Combustion Turbine Fuel Oil ‐ Nickel 7440‐02‐0 ‐ 4.60E‐06 1.03E‐02 4.52E‐02 0.00% 4.52E‐02 4.51E‐03 CTDB2_10
Combustion Turbine Fuel Oil ‐ PAH ‐ ‐ 4.00E‐05 8.97E‐02 3.93E‐01 0.00% 3.93E‐01 3.93E‐02 CTDB2_11
Combustion Turbine Fuel Oil ‐ POM ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Selenium 7782‐49‐2 ‐ 2.50E‐05 5.61E‐02 2.46E‐01 0.00% 2.46E‐01 2.45E‐02 CTDB2_10
Combustion Turbine Fuel Oil ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
Combustion Turbine Fuel Oil ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ CTDB2_11
References:CTDB2_6
CTDB2_10
CTDB2_11
CTDB2_12
CTDB2_13
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐4
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00)AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐5
These pollutants are accounted for at the stack level in the combined CT and DB data.DB: AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
Limited Emissions for Combustion Turbine:
UnitCombustion Turbine Fuel Duct Burner Fuel Pollutant CAS #
Emission Factor (lb/MMscf)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceCombustion Turbine Mix ‐ Acetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ ‐ ‐ 3.28E‐01 ‐Combustion Turbine Mix ‐ Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ ‐ ‐ 5.25E‐02 ‐Combustion Turbine Mix ‐ Arsenic 7440‐38‐2 ‐ ‐ ‐ ‐ ‐ ‐ 1.08E‐02 ‐Combustion Turbine Mix ‐ Benzene 71‐43‐2 ‐ ‐ ‐ ‐ ‐ ‐ 1.52E‐01 ‐Combustion Turbine Mix ‐ 1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ ‐ ‐ 1.92E‐02 ‐Combustion Turbine Mix ‐ Beryllium 7440‐41‐7 ‐ ‐ ‐ ‐ ‐ ‐ 3.04E‐04 ‐Combustion Turbine Mix ‐ Cadmium 7440‐43‐9 ‐ ‐ ‐ ‐ ‐ ‐ 4.71E‐03 ‐Combustion Turbine Mix ‐ Chromium 7440‐47‐3 ‐ ‐ ‐ ‐ ‐ ‐ 1.08E‐02 ‐Combustion Turbine Mix ‐ Cobalt 744‐48‐4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Mix ‐ Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Mix ‐ Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ ‐ ‐ 2.63E‐01 ‐Combustion Turbine Mix ‐ Formaldehyde 50‐00‐0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Mix ‐ Hexane 110‐54‐3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Mix ‐ Manganese 7439‐96‐5 ‐ ‐ ‐ ‐ ‐ ‐ 7.75E‐01 ‐Combustion Turbine Mix ‐ Mercury 7439‐97‐6 ‐ ‐ ‐ ‐ ‐ ‐ 1.18E‐03 ‐Combustion Turbine Mix ‐ Naphthalene 91‐20‐3 ‐ ‐ ‐ ‐ ‐ ‐ 4.50E‐02 ‐Combustion Turbine Mix ‐ Nickel 7440‐02‐0 ‐ ‐ ‐ ‐ ‐ ‐ 4.51E‐03 ‐Combustion Turbine Mix ‐ PAH ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5.73E‐02 ‐Combustion Turbine Mix ‐ POM ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Mix ‐ Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ ‐ ‐ 2.38E‐01 ‐Combustion Turbine Mix ‐ Selenium 7782‐49‐2 ‐ ‐ ‐ ‐ ‐ ‐ 2.45E‐02 ‐Combustion Turbine Mix ‐ Toluene 108‐88‐3 ‐ ‐ ‐ ‐ ‐ ‐ 1.07E+00 ‐Combustion Turbine Mix ‐ Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ ‐ ‐ 5.25E‐01 ‐References:
CTDB2_6
Notes:Limited emissions for Fuel Oil calculations based on current fuel oil limit of 875 hours per year.
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐3
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
Formaldehyde and Hexane Emissions
Event Type Fuel Cold SU Warm SU SD Total SUSD HoursCalculated
Non‐SUSD Hours
Calculated Non‐SUSD Hours with FO Limit
Total Hours with SUSD Excluded
Total Event Hours Natural Gas 230 644 230 1104 7656 6781 7885Total Event Hours Fuel Oil 30 84 30 144 731 731 875
UnitCombustion Turbine Fuel Duct Burner Fuel Pollutant CAS #
Heat Input (MMBtu/hr)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr) Limited Hours
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceCombined Turbine & DB Natural Gas Natural Gas Formaldehyde (< 60% Load) 50‐00‐0 2882 0.00279 8.04 1104 35.22 0.00% 35.22 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Formaldehyde (60 ‐ < 90% Load) 50‐00‐0 2882 0.00151 4.35 7656 19.06 0.00% 19.06 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Formaldehyde (>= 90% Load) 50‐00‐0 2882 0.00105 3.03 0 13.25 0.00% 13.25 see GP 004 CTDB1_7
Combined Turbine & DB Natural Gas Natural Gas Hexane (Any Load) 110‐54‐3 2882 0.00034 0.98 8760 4.29 0.00% 4.29 see GP 004 CTDB1_8
Note: 0‐60% Load assumed to correspond to all SUSD Time; Conservatively assumed remaining time "Calculated Non‐SUSD Hours" is at 60‐90% load.Combined Turbine & DB Mix NG Natural Gas Formaldehyde (>= 90% Load) 50‐00‐0 2882 0.00105 3.03 6781 ‐ 0.00% ‐ see GP 004 CTDB1_7
Combined Turbine & DB Mix NG Natural Gas Hexane (Any Load) 110‐54‐3 2882 0.00034 0.98 7885 ‐ 0.00% ‐ see GP 004 CTDB1_8
Combustion Turbine Fuel Oil ‐ Formaldehyde (Any Load) 50‐00‐0 ‐ ‐ 2.28 875 9.99 0.00% 9.99 see GP 004 CTDB1_7
Combustion Turbine Fuel Oil ‐ Hexane (Any Load) 110‐54‐3 ‐ ‐ 0.04 875 0.18 0.00% 0.18 see GP 004 CTDB1_8
References:CTDB2_7
CTDB2_8
Formaldehyde and Hexane Totals:
UnitCombustion Turbine Fuel Duct Burner Fuel Pollutant CAS #
Heat Input (MMBtu/hr)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr) Limited Hours
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)Combined Turbine & DB Natural Gas Natural Gas Formaldehyde total 50‐00‐0 2882 ‐ ‐ 8760 35.22 0.00% 35.22 see GP 004Combined Turbine & DB Natural Gas Natural Gas Hexane Total 110‐54‐3 2882 ‐ ‐ 8760 4.29 0.00% 4.29 see GP 004Combined Turbine & DB Mix Natural Gas Formaldehyde total 50‐00‐0 ‐ ‐ ‐ 8760 ‐ ‐ ‐ see GP 004Combined Turbine & DB Mix Natural Gas Hexane Total 110‐54‐3 ‐ ‐ ‐ 8760 ‐ ‐ ‐ see GP 004
Formaldehyde emission factors based on most recent stack test (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runsHexane emission factor based on most recent stack test at SV002 (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runs
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCombined Cycle System #2: (Combustion Turbine #2 + Combustion Turbine #2 Duct Burners)
Worst‐Case Emissions SummaryCombined Cycle (EU 002 and EU 004)Worst‐Case Criteria Pollutants Excludes SUSD Includes SUSD
Unit Pollutant
Uncontrolled Emissions
(tpy)
Controlled Emissions Before Operating Limits
(tpy)aWorst‐Case Combustion
Turbine FuelLimited Emissions
(tpy)b
Worst‐Case Combustion Turbine
Fuel
Emission Rate Based on Limited
Emissions(lb/hr)
Combined Turbine & DB PM 318.0 318.0 Fuel Oil 118.50 Fuel Oil 72.6
Combined Turbine & DB PM10 318.0 318.0 Fuel Oil 118.50 Fuel Oil 72.6
Combined Turbine & DB PM2.5 318.0 318.0 Fuel Oil 118.50 Fuel Oil 72.6
Combined Turbine & DB SOx 423.9 423.9 Fuel Oil 67.80 Fuel Oil 96.8
Combined Turbine & DB NOx 1672.6 276.5 Fuel Oil 174.13 Fuel Oil 63.1
Combined Turbine & DB VOC 185.4 111.2 Fuel Oil 262.00 Fuel Oil 25.4
Combined Turbine & DB CO 1145.2 114.5 Fuel Oil 477.94 Fuel Oil 26.1
Combined Turbine & DB Lead 0.139 0.139 Fuel Oil 1.95E‐02 Fuel Oil 0.03
Combined Turbine & DB H2SO4 64.3 64.3 Fuel Oil 10.29 Fuel Oil 14.7
EU 002 Combustion Turbine onlyWorst‐Case GHG Pollutants
Unit Pollutant Combustion Turbine FuelEmission Rate
(lb/hr)Combustion Turbine Fuel
Uncontrolled Emissions
(tpy)Combustion Turbine Fuel
Limited Emissions
(tpy)
Combustion Turbine CO2 Fuel Oil 365,726 Fuel Oil 1,601,880 Natural Gas 1,066,724
Combustion Turbine CH4 Fuel Oil 14.83 Fuel Oil 64.98 Natural Gas 20.10
Combustion Turbine N2O Fuel Oil 2.97 Fuel Oil 13.00 Natural Gas 2.01
Combustion Turbine CO2e Fuel Oil 366,981 Fuel Oil 1,607,377 Natural Gas 1,067,825
EU 002 Combustion Turbine only, SV 002 for Formaldehyde and HexaneWorst‐Case HAPs
Unit Pollutant CAS # Combustion Turbine FuelEmission Rate
(lb/hr)Combustion Turbine Fuel
Uncontrolled Emissions
(tpy)Combustion Turbine Fuel
Limited Emissions
(tpy)Combustion Turbine Acetaldehyde 75‐07‐0 Natural Gas 8.33E‐02 Natural Gas 3.65E‐01 Natural Gas 3.65E‐01Combustion Turbine Acrolein 107‐02‐8 Natural Gas 1.33E‐02 Natural Gas 5.84E‐02 Natural Gas 5.84E‐02Combustion Turbine Arsenic 7440‐38‐2 Fuel Oil 2.47E‐02 Fuel Oil 1.08E‐01 Fuel Oil 1.08E‐02Combustion Turbine Benzene 71‐43‐2 Fuel Oil 1.23E‐01 Fuel Oil 5.40E‐01 Mix 1.52E‐01Combustion Turbine 1,3‐Butadiene 106‐99‐0 Fuel Oil 3.59E‐02 Fuel Oil 1.57E‐01 Mix 1.92E‐02Combustion Turbine Beryllium 7440‐41‐7 Fuel Oil 6.95E‐04 Fuel Oil 3.05E‐03 Fuel Oil 3.04E‐04Combustion Turbine Cadmium 7440‐43‐9 Fuel Oil 1.08E‐02 Fuel Oil 4.72E‐02 Fuel Oil 4.71E‐03Combustion Turbine Chromium 7440‐47‐3 Fuel Oil 2.47E‐02 Fuel Oil 1.08E‐01 Fuel Oil 1.08E‐02Combustion Turbine Cobalt 744‐48‐4 ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Ethylbenzene 100‐41‐4 Natural Gas 6.66E‐02 Natural Gas 2.92E‐01 Natural Gas 2.92E‐01Combined Turbine & DB Formaldehyde 50‐00‐0 Natural Gas 8.04 Natural Gas 35.22 Natural Gas see GP 004Combined Turbine & DB Hexane 110‐54‐3 Natural Gas 0.98 Natural Gas 4.29 Natural Gas see GP 004Combustion Turbine Manganese 7439‐96‐5 Fuel Oil 1.77E+00 Fuel Oil 7.76E+00 Fuel Oil 7.75E‐01Combustion Turbine Mercury 7439‐97‐6 Fuel Oil 2.69E‐03 Fuel Oil 1.18E‐02 Fuel Oil 1.18E‐03Combustion Turbine Naphthalene 91‐20‐3 Fuel Oil 7.85E‐02 Fuel Oil 3.44E‐01 Mix 4.50E‐02Combustion Turbine Nickel 7440‐02‐0 Fuel Oil 1.03E‐02 Fuel Oil 4.52E‐02 Fuel Oil 4.51E‐03Combustion Turbine PAH ‐ Fuel Oil 8.97E‐02 Fuel Oil 3.93E‐01 Mix 5.73E‐02Combustion Turbine POM ‐ ‐ ‐ ‐ ‐ ‐ ‐Combustion Turbine Propylene Oxide 75‐56‐9 Natural Gas 6.04E‐02 Natural Gas 2.64E‐01 Natural Gas 2.64E‐01Combustion Turbine Selenium 7782‐49‐2 Fuel Oil 5.61E‐02 Fuel Oil 2.46E‐01 Fuel Oil 2.45E‐02Combustion Turbine Toluene 108‐88‐3 Natural Gas 2.71E‐01 Natural Gas 1.19E+00 Natural Gas 1.19E+00
Combustion Turbine Xylenes 1330‐20‐7 Natural Gas 1.33E‐01 Natural Gas 5.84E‐01 Natural Gas 5.84E‐01Combustion Turbine Total HAPs ‐ NA ‐ NA ‐ NANotes:For Limited Emissions, "Mix" refers to the combustion turbine firing fuel oil up to the operating hour limit, and firing natural gas for the remainder of the hours in the year.Due to Formaldehyde and Hexane emissions being calculated at the stack level, Total HAPs for combustion turbine alone are not able to be meaningfully calculated.
aRepresents the worst case annual conctrolled criteria pollutant emissions, which incorporated the proposed natural gas and fuel oil BACT limits.b Limited emissions assume a worst‐case emission scenario for PM, PM10, SOx, NOx, VOC, CO, Lead, and H2SO4, where the turbine operates on fuel oil for 875 hours per year and the remainder of the year (7,885 hours) the turbine fires natural gas and includes the startup and shutdown emissions for NOx and CO.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit Application Auxiliary Boiler
Unit InformationDescription: Auxiliary BoilerUnit Delta ID: EU 005 Unit Tempo ID: EQUI 7Stack Delta ID: SV 003 Stack Tempo ID: STRU 17Fuel Natural GasHeat Input Capacity 70 MMBtu/hr
Fuel Heat Value 1020 Btu/scf
Fuel Consumption Rate 68,627.5 scf/hr
Hours Uncontrolled 8760
Hours Limited 8760
Criteria Pollutants
PollutantEmission Factor (lb/106 scf)
Emission Factor
(lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) Reference
PM ‐ 8.0E‐03 0.56 2.45 0.00% 2.45 2.45 AB1
PM10 ‐ 8.0E‐03 0.56 2.45 0.00% 2.45 2.45 AB1
PM2.5 ‐ 8.0E‐03 0.56 2.45 0.00% 2.45 2.45 AB3
SOx ‐ 1.0E‐03 0.070 0.31 0.00% 0.31 0.31 AB1
NOx ‐ 3.6E‐02 2.52 11.04 0.00% 11.04 11.04 AB1
VOC ‐ 7.0E‐03 0.49 2.15 0.00% 2.15 2.15 AB1
CO ‐ 6.0E‐02 4.20 18.40 0.00% 18.40 18.40 AB1
Lead 5.00E‐04 4.9E‐07 3.43E‐05 1.5E‐04 0.00% 1.5E‐04 1.5E‐04 AB2
References:AB1
AB2
AB3
GHG
Pollutant GWP
Emission Factor
(lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)CO2 1 116.98 8,188.3 35,864.9 0.00% 35,864.9 35,864.9
CH4 25 2.2E‐03 0.15 0.68 0.00% 0.68 0.68
N2O 298 2.2E‐04 0.015 0.07 0.00% 0.07 0.07
CO2e ‐ 117.10 8,196.8 35,901.9 0.00% 35,901.9 35,901.9
References:GHG Table
Based on Auxiliary Boiler emission limits in Permit 01300098‐002AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2PM2.5 emission rate assumed equal to total PM rate
See GHG Table, Natural Gas emission factors
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Aux Boiler]
Mankato Energy CenterFacility ID: 013000982015 Air Permit Application Auxiliary Boiler
HAPs
Pollutant CAS #
Emission Factor
(lb/106 scf)
Emission Factor
(lb/MMBtu)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceAcetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Arsenic 7440‐38‐2 2.00E‐04 1.96E‐07 1.37E‐05 6.01E‐05 0.00% 6.01E‐05 6.01E‐05 AB4
Benzene 71‐43‐2 2.10E‐03 2.06E‐06 1.44E‐04 6.31E‐04 0.00% 6.31E‐04 6.31E‐04 AB4
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Beryllium 7440‐41‐7 1.20E‐05 1.18E‐08 8.24E‐07 3.61E‐06 0.00% 3.61E‐06 3.61E‐06 AB4
Cadmium 7440‐43‐9 1.10E‐03 1.08E‐06 7.55E‐05 3.31E‐04 0.00% 3.31E‐04 3.31E‐04 AB4
Chromium 7440‐47‐3 1.40E‐03 1.37E‐06 9.61E‐05 4.21E‐04 0.00% 4.21E‐04 4.21E‐04 AB4
Cobalt 744‐48‐4 8.40E‐05 8.24E‐08 5.76E‐06 2.52E‐05 0.00% 2.52E‐05 2.52E‐05 AB4
Dichlorobenzene 25321‐22‐6 1.20E‐03 1.18E‐06 8.24E‐05 3.61E‐04 0.00% 3.61E‐04 3.61E‐04 AB4
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Formaldehyde 50‐00‐0 7.50E‐02 7.35E‐05 5.15E‐03 2.25E‐02 0.00% 2.25E‐02 2.25E‐02 AB4
Hexane 110‐54‐3 1.80E+00 1.76E‐03 1.24E‐01 5.41E‐01 0.00% 5.41E‐01 5.41E‐01 AB4
Manganese 7439‐96‐5 3.80E‐04 3.73E‐07 2.61E‐05 1.14E‐04 0.00% 1.14E‐04 1.14E‐04 AB4
Mercury 7439‐97‐6 2.60E‐04 2.55E‐07 1.78E‐05 7.82E‐05 0.00% 7.82E‐05 7.82E‐05 AB4
Naphthalene 91‐20‐3 6.10E‐04 5.98E‐07 4.19E‐05 1.83E‐04 0.00% 1.83E‐04 1.83E‐04 AB4
Nickel 7440‐02‐0 2.10E‐03 2.06E‐06 1.44E‐04 6.31E‐04 0.00% 6.31E‐04 6.31E‐04 AB4
PAH ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
POM ‐ 6.98E‐04 6.85E‐07 4.79E‐05 2.10E‐04 0.00% 2.10E‐04 2.10E‐04 AB5
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Selenium 7782‐49‐2 2.40E‐05 2.35E‐08 1.65E‐06 7.21E‐06 0.00% 7.21E‐06 7.21E‐06 AB4
Toluene 108‐88‐3 3.40E‐03 3.33E‐06 2.33E‐04 1.02E‐03 0.00% 1.02E‐03 1.02E‐03 AB4
Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ AB4
Total HAPs 1.30E‐01 5.67E‐01 5.67E‐01 5.67E‐01References:
AB4
AB5
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Aux Boiler]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationFire Pump
Unit InformationDescription: Fire Pump EngineUnit Delta ID: EU 007 Unit Tempo ID: EQUI 11Stack Delta ID: SV 005 Stack Tempo ID: STRU 18Fuel Diesel 0.05% SulfurHeat Input Capacity 350 HP Conversion SourceHeat Input Capacity 2.45 MMBtu/hr 0.007 MMBtu/hp‐hr AP‐42 Section 3.3 footnote
Fuel Heat Value 140,000 Btu/gal
Fuel Consumption Rate 17.5 gal/hr (maximum)
Hours Uncontrolled 100
Hours Limited 100
Note: This generator unit is only intended to be used for emergency purposes. The facility will limit the non‐emergency operation of this unit to 100 hours per year.
Criteria Pollutants
PollutantEmission Factor
(lb/hp‐hr)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) Reference
PM 2.4E‐04 0.08 0.004 0.00% 0.004 0.004 FP1
PM10 2.4E‐04 0.08 0.004 0.00% 0.004 0.004 FP1
PM2.5 2.4E‐04 0.08 0.004 0.00% 0.004 0.004 FP1
SOx 3.3E‐04 0.116 0.006 0.00% 0.006 0.006 FP1
NOx ‐ 3.37 0.169 0.00% 0.169 0.169 FP2
VOC 4.4E‐04 0.15 0.008 0.00% 0.008 0.008 FP1
CO 1.4E‐03 0.48 0.024 0.00% 0.024 0.024 FP1
Lead 0.0E+00 0.00E+00 0.0E+00 0.00% 0.0E+00 0.0E+00 FP3
References:FP1
FP2
FP3
GHG
Pollutant GWPEmission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)CO2 1 163.05 399.5 20.0 0.00% 20.0 20.0
CH4 25 6.6E‐03 1.62E‐02 8.10E‐04 0.00% 8.10E‐04 8.10E‐04N2O 298 1.3E‐03 3.24E‐03 1.62E‐04 0.00% 1.62E‐04 1.62E‐04CO2e ‐ 163.61 400.8 20.0 0.00% 20.0 20.0
References:GHG Table
Based on Vendor Data, at 350 braking hp (See Fire Pump data sheet)Based on Vendor Data, at 300 braking hp (See Fire Pump data sheet)
See GHG Table, Fuel Oil emission factors
No data for lead in AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); or in vendor data
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Fire Pump]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationFire Pump
HAPs
Pollutant CAS #Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceAcetaldehyde 75‐07‐0 7.67E‐04 1.88E‐03 9.40E‐05 0.00% 9.40E‐05 9.40E‐05 FP4
Acrolein 107‐02‐8 9.25E‐05 2.27E‐04 1.13E‐05 0.00% 1.13E‐05 1.13E‐05 FP4
Arsenic 7440‐38‐2 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Benzene 71‐43‐2 9.33E‐04 2.29E‐03 1.14E‐04 0.00% 1.14E‐04 1.14E‐04 FP4
1,3‐Butadiene 106‐99‐0 3.91E‐05 9.58E‐05 4.79E‐06 0.00% 4.79E‐06 4.79E‐06 FP4
Beryllium 7440‐41‐7 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Cadmium 7440‐43‐9 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Chromium 7440‐47‐3 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Cobalt 744‐48‐4 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Formaldehyde 50‐00‐0 1.18E‐03 2.89E‐03 1.45E‐04 0.00% 1.45E‐04 1.45E‐04 FP4
Hexane 110‐54‐3 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Manganese 7439‐96‐5 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Mercury 7439‐97‐6 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Naphthalene 91‐20‐3 8.48E‐05 2.08E‐04 1.04E‐05 0.00% 1.04E‐05 1.04E‐05 FP4
Nickel 7440‐02‐0 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
PAH ‐ 1.68E‐04 4.12E‐04 2.06E‐05 0.00% 2.06E‐05 2.06E‐05 FP5
POM ‐ ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Selenium 7782‐49‐2 ‐ ‐ ‐ 0.00% ‐ ‐ FP4
Toluene 108‐88‐3 4.09E‐04 1.00E‐03 5.01E‐05 0.00% 5.01E‐05 5.01E‐05 FP4
Xylenes 1330‐20‐7 2.85E‐04 6.98E‐04 3.49E‐05 0.00% 3.49E‐05 3.49E‐05 FP4
Total HAPs 9.49E‐03 4.75E‐04 4.75E‐04 4.75E‐04References:
FP4
FP5
AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2 AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2; Total PAH includes Naphthalene which is also separately counted
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Fire Pump]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationDiesel Fired Emergency Generator
Unit InformationDescription: Diesel Fired Emergency GeneratorUnit Delta ID: EU 010 Unit Tempo ID: EQUI 18Stack Delta ID: SV 008 Stack Tempo ID: STRU 21Fuel Diesel 0.05% SulfurHeat Input Capacity 2500 kW Conversion SourceHeat Input Capacity 3634 bHP 0.007 MMBtu/hp‐hr AP‐42 Section 3.4 footnoteHeat Input Capacity 25.44 MMBtu/hr
Fuel Heat ValueFuel Consumption RateHours Uncontrolled 500
Hours Limited 100
Note: This generator unit is only intended to be used for emergency purposes. The facility will limit the non‐emergency operation of this unit to 100 hours per year.
Criteria Pollutants
Pollutant
Emission Factor
(lb/hp‐hr)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) Reference
PM 6.1E‐05 0.15 0.04 0.00% 0.04 0.01 EG1
PM10 6.1E‐05 0.15 0.04 0.00% 0.04 0.01 EG1
PM2.5 6.1E‐05 0.15 0.04 0.00% 0.04 0.01 EG1
SOx 2.1E‐03 5.125 1.28 0.00% 1.28 0.26 EG3
NOx 5.3E‐03 13.27 3.32 0.00% 3.32 0.66 EG1
VOC 2.9E‐04 0.72 0.18 0.00% 0.18 0.04 EG1
CO 5.3E‐03 13.27 3.32 0.00% 3.32 0.66 EG2
Lead 0.0E+00 0.00E+00 0.0E+00 0.00% 0.0E+00 0.0E+00 EG3
References:EG1
EG2
EG3
GHG
Pollutant GWP
Emission Factor
(lb/MMBtu)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)
CO2 1 163.05 4,147.7 1,036.9 0.00% 1,036.9 207.4
CH4 25 6.6E‐03 1.68E‐01 4.21E‐02 0.00% 4.21E‐02 8.41E‐03N2O 298 1.3E‐03 3.36E‐02 8.41E‐03 0.00% 8.41E‐03 1.68E‐03CO2e ‐ 163.61 4,162.0 1,040.5 0.00% 1,040.5 208.1
References:GHG Table
No data for lead in AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); or in AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96)
See GHG Table, Fuel Oil emission factors
Based on Nonroad Compression‐Ignition Engines ‐‐ Exhaust Emission Standards (40 CFR 1039.101), for 2500 kW, converted from g/kW‐hr to lb/hp‐hr
Based on Vendor Data, at 3633 braking hp, converted from g/hp‐hr to lb/hp‐hr
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emerg Gen]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationDiesel Fired Emergency Generator
HAPs
Pollutant CAS #
Emission Factor
(lb/MMBtu)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceAcetaldehyde 75‐07‐0 2.52E‐05 6.41E‐04 1.60E‐04 0.00% 1.60E‐04 3.21E‐05 EG4
Acrolein 107‐02‐8 7.88E‐06 2.00E‐04 5.01E‐05 0.00% 5.01E‐05 1.00E‐05 EG4
Arsenic 7440‐38‐2 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Benzene 71‐43‐2 7.76E‐04 1.97E‐02 4.93E‐03 0.00% 4.93E‐03 9.87E‐04 EG4
1,3‐Butadiene 106‐99‐0 3.91E‐05 9.95E‐04 2.49E‐04 0.00% 2.49E‐04 4.97E‐05 EG5
Beryllium 7440‐41‐7 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Cadmium 7440‐43‐9 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Chromium 7440‐47‐3 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Cobalt 744‐48‐4 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Dichlorobenzene 25321‐22‐6 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Formaldehyde 50‐00‐0 7.89E‐05 2.01E‐03 5.02E‐04 0.00% 5.02E‐04 1.00E‐04 EG4
Hexane 110‐54‐3 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Manganese 7439‐96‐5 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Mercury 7439‐97‐6 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Naphthalene 91‐20‐3 1.30E‐04 3.31E‐03 8.27E‐04 0.00% 8.27E‐04 1.65E‐04 EG6
Nickel 7440‐02‐0 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
PAH ‐ 2.12E‐04 5.39E‐03 1.35E‐03 0.00% 1.35E‐03 2.70E‐04 EG6
POM ‐ ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Selenium 7782‐49‐2 ‐ ‐ ‐ 0.00% ‐ ‐ EG4
Toluene 108‐88‐3 2.81E‐04 7.15E‐03 1.79E‐03 0.00% 1.79E‐03 3.57E‐04 EG4
Xylenes 1330‐20‐7 1.93E‐04 4.91E‐03 1.23E‐03 0.00% 1.23E‐03 2.45E‐04 EG4
Total HAPs 4.10E‐02 1.03E‐02 1.03E‐02 2.05E‐03References:
EG4
EG5
EG6 AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); Table 3.4‐4; Total PAH includes Naphthalene which is also separately counted
AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2. (No data for 1,3‐Butadiene in AP‐42 Section 3.4)AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); Table 3.4‐3
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emerg Gen]
Mankato Energy CenterFacility ID: 013000982015 Air Permit Application Indirect Gas‐fired Water Bath Heater
Unit InformationDescription: Bath HeaterUnit Delta ID: EU 011 Unit Tempo ID: EQUI 19Stack Delta ID: SV 009 Stack Tempo ID: STRU 22Fuel Natural GasHeat Input Capacity 2.87 MMBtu/hr
Fuel Heat Value 1020 Btu/scf
Fuel Consumption Rate 2,813.7 scf/hr
Hours Uncontrolled 8760
Hours Limited 8760
Criteria Pollutants
PollutantEmission Factor (lb/106 scf)
Emission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)
MN Rule 7007.1300 Subp 3(I)lb/yr
MN Rule 7007.1300 Subp 3(I)
tpyAbove
Threshold?
MN Rule 7007.1300 Subp 4lb/hr
Above Threshold? Reference
PM 7.6 7.5E‐03 0.021 0.09 0.00% 0.09 0.09 2,000 1.0 No 2.28 No BH2
PM10 7.6 7.5E‐03 0.021 0.09 0.00% 0.09 0.09 2,000 1.0 No 2.28 No BH2
PM2.5 7.6 7.5E‐03 0.021 0.09 0.00% 0.09 0.09 ‐ ‐ ‐ ‐ ‐ BH2
SOx 0.6 5.9E‐04 0.0017 0.01 0.00% 0.01 0.01 2,000 1.0 No 2.28 No BH2
NOx 100 9.8E‐02 0.28 1.23 0.00% 1.23 1.23 2,000 1.0 Yes 2.28 No BH1
VOC 5.5 5.4E‐03 0.015 0.07 0.00% 0.07 0.07 2,000 1.0 No 2.28 No BH2
CO 84 8.2E‐02 0.236 1.04 0.00% 1.04 1.04 4,000 2.0 No 5.7 No BH1
Lead 0.0005 4.9E‐07 1.41E‐06 6.2E‐06 0.00% 6.2E‐06 6.2E‐06 ‐ ‐ ‐ ‐ ‐ BH2
References:BH1
BH2
GHG
Pollutant GWPEmission Factor (lb/MMBtu)
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)
MN Rule 7007.1300 Subp 3(I)
tpyAbove
Threshold?
MN Rule 7007.1300 Subp 4tpy
Above Threshold?
CO2 1 116.98 335.7 1,470.5 0.00% 1,470.5 1,470.5 ‐ ‐ ‐ ‐CH4 25 2.2E‐03 6.33E‐03 2.77E‐02 0.00% 2.77E‐02 2.77E‐02 ‐ ‐ ‐ ‐N2O 298 2.2E‐04 6.33E‐04 2.77E‐03 0.00% 2.77E‐03 2.77E‐03 ‐ ‐ ‐ ‐CO2e ‐ 117.10 336.1 1,472.0 0.00% 1,472.0 1,472.0 1,000 Yes 10,000 No
References:GHG Table
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐1; Small Boilers, UncontrolledAP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2
See GHG Table, Natural Gas emission factors
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Bath Heater]
Mankato Energy CenterFacility ID: 013000982015 Air Permit Application Indirect Gas‐fired Water Bath Heater
HAPs
Pollutant CAS #Emission Factor (lb/106 scf)
Emission Factor
(lb/MMBtu)Emission Rate
(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy) ReferenceAcetaldehyde 75‐07‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Acrolein 107‐02‐8 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Arsenic 7440‐38‐2 2.0E‐04 1.96E‐07 5.63E‐07 2.46E‐06 0.00% 2.46E‐06 2.46E‐06 BH3
Benzene 71‐43‐2 2.1E‐03 2.06E‐06 5.91E‐06 2.59E‐05 0.00% 2.59E‐05 2.59E‐05 BH3
1,3‐Butadiene 106‐99‐0 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Beryllium 7440‐41‐7 1.2E‐05 1.18E‐08 3.38E‐08 1.48E‐07 0.00% 1.48E‐07 1.48E‐07 BH3
Cadmium 7440‐43‐9 1.1E‐03 1.08E‐06 3.10E‐06 1.36E‐05 0.00% 1.36E‐05 1.36E‐05 BH3
Chromium 7440‐47‐3 1.4E‐03 1.37E‐06 3.94E‐06 1.73E‐05 0.00% 1.73E‐05 1.73E‐05 BH3
Cobalt 744‐48‐4 8.4E‐05 8.24E‐08 2.36E‐07 1.04E‐06 0.00% 1.04E‐06 1.04E‐06 BH3
Dichlorobenzene 25321‐22‐6 1.2E‐03 1.18E‐06 3.38E‐06 1.48E‐05 0.00% 1.48E‐05 1.48E‐05 BH3
Ethylbenzene 100‐41‐4 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Formaldehyde 50‐00‐0 7.5E‐02 7.35E‐05 2.11E‐04 9.24E‐04 0.00% 9.24E‐04 9.24E‐04 BH3
Hexane 110‐54‐3 1.8E+00 1.76E‐03 5.06E‐03 2.22E‐02 0.00% 2.22E‐02 2.22E‐02 BH3
Manganese 7439‐96‐5 3.8E‐04 3.73E‐07 1.07E‐06 4.68E‐06 0.00% 4.68E‐06 4.68E‐06 BH3
Mercury 7439‐97‐6 2.6E‐04 2.55E‐07 7.32E‐07 3.20E‐06 0.00% 3.20E‐06 3.20E‐06 BH3
Naphthalene 91‐20‐3 6.1E‐04 5.98E‐07 1.72E‐06 7.52E‐06 0.00% 7.52E‐06 7.52E‐06 BH3
Nickel 7440‐02‐0 2.1E‐03 2.06E‐06 5.91E‐06 2.59E‐05 0.00% 2.59E‐05 2.59E‐05 BH3
PAH ‐ ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
POM ‐ 7.0E‐04 6.85E‐07 1.96E‐06 8.60E‐06 0.00% 8.60E‐06 8.60E‐06 BH4
Propylene Oxide 75‐56‐9 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Selenium 7782‐49‐2 2.4E‐05 2.35E‐08 6.75E‐08 2.96E‐07 0.00% 2.96E‐07 2.96E‐07 BH3
Toluene 108‐88‐3 3.4E‐03 3.33E‐06 9.57E‐06 4.19E‐05 0.00% 4.19E‐05 4.19E‐05 BH3
Xylenes 1330‐20‐7 ‐ ‐ ‐ ‐ 0.00% ‐ ‐ BH3
Total HAPs 5.31E‐03 2.33E‐02 2.33E‐02 2.33E‐02References:
BH3
BH4
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Bath Heater]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCooling Tower
Unit InformationDescription: Cooling TowerUnit Delta ID: FS 001 Unit Tempo ID: FUGI 1Material Water
Drift Rate 0.0005%
Cycles 6
Make‐up Water TDS 1206 mg/L
Flow rate 200,000 gal/min
Control Equipment Mist eliminator
Hours Uncontrolled 8760
Hours Limited 8760
Make‐up Water TDS from correspondence 3‐13‐15.
PM emission factor is based on AP‐42 Section 13.4 "Wet Cooling Towers" (Rev 01/95) described procedures for estimating cooling tower water TDS.Emission Factor (lb/gal) = TDS * C * Dr * 3.785 L/gal * 1 g/1,000 mg * 1 lb/453.59 gwhere
TDS = Make‐up water TDS in mg/L
C = number of cyclesDr = drift rate
Emission Factor = 3.02E‐07 lb/gal
Particulate Matter
PollutantEmission Factor
(lb/gal)
Maximum Flow Rate(gal/min)
Wt % of PM emissions
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)
PM 3.02E‐07 200,000 100.0% 3.62 15.87 0.00% 15.87 15.87
PM10 ‐‐‐ ‐‐‐ 17.0% 0.62 2.70 0.00% 2.70 2.70
PM2.5 ‐‐‐ ‐‐‐ 0.133% 0.005 0.021 0.00% 0.021 0.021
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Cooling Tower]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationCooling Tower
EPRI Droplet Droplet Particle Solid Solid EPRI % Wt% PM10 Wt% PM2.5
Droplet Volume Mass Mass Particle Particle Mass in PM in PMDiameter (Solids) Volume Diameter Smaller Emissions Emissions(µm) (µm3) (µg) (µg) (µm3) (µm) (%) (%) (%)10 524 5.24E‐04 3.79E‐06 1.72 1.487 0.000
20 4189 4.19E‐03 3.03E‐05 13.78 2.974 0.196 0.13330 14137 1.41E‐02 1.02E‐04 46.50 4.461 0.226
40 33510 3.35E‐02 2.42E‐04 110.22 5.949 0.514
50 65450 6.54E‐02 4.74E‐04 215.27 7.436 1.816
60 113097 1.13E‐01 8.18E‐04 371.99 8.923 5.702
70 179594 1.80E‐01 1.30E‐03 590.70 10.410 21.348 17.03390 381704 3.82E‐01 2.76E‐03 1255.46 13.384 49.812
110 696910 6.97E‐01 5.04E‐03 2292.20 16.359 70.509
130 1150347 1.15E+00 8.32E‐03 3783.59 19.333 82.023
150 1767146 1.77E+00 1.28E‐02 5812.30 22.307 88.012
180 3053628 3.05E+00 2.21E‐02 10043.66 26.769 91.032
210 4849048 4.85E+00 3.51E‐02 15948.96 31.230 92.468
240 7238229 7.24E+00 5.24E‐02 23807.19 35.692 94.091
270 10305995 1.03E+01 7.46E‐02 33897.35 40.153 94.689
300 14137167 1.41E+01 1.02E‐01 46498.43 44.615 96.288
350 22449298 2.24E+01 1.62E‐01 73837.78 52.051 97.011
400 33510322 3.35E+01 2.42E‐01 110218.49 59.487 98.340
450 47712938 4.77E+01 3.45E‐01 156932.19 66.922 99.071
500 65449847 6.54E+01 4.74E‐01 215270.50 74.358 99.071
600 113097336 1.13E+02 8.18E‐01 371987.42 89.230 100.000
PM10 and PM2.5 calculated as fraction of PM emissions using emission calculation procedure in "Calculating Realistic PM10
Emissions from Cooling Towers" by Reisman and Frisbie, Environmental Progress, Vol. 21, No.2.Assumptions: Droplet TDS: 7236 mg/L
Droplet TDS: 0.007 g/mL
Droplet TDS: 7236 ppm
water density: 1.0 g/cm3
particle density: 2.2 g/cm3
No Pollutants other than PM in Cooling Tower emissions.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Cooling Tower]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationNatural Gas Fugitives Emissions
Fugitive Whole Gas Emissions Estimates for Natural Gas
FS 002 Density: 0.043 lb/scf Density of Natural gas. See Note 3 below.Conversion: 2.2046 lb/kg
Components serving CT/DB #1 CO2 Methane
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.02 0.098 2.13 9.33
1.69 (scf/hr/component) 0.073 (lb/hr/component)(3) 0.1264 0.554 12.04 52.74
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.0009 0.0038 0.08 0.36
26.13 (scf/hr/component) 1.124 (lb/hr/component)(3) 0.0940 0.4119 8.96 39.24
0.0150 (kg/hr/component) 0.033 (lb/hr/component) 0.0006 0.0027 0.06 0.26
Total: 0.24 1.07 23.27 101.92
Global Warming Potentials: 1 1 25 25
CO2e Emissions: 0.24 1.07 581.75 2548.08Total CO2e emissions: 582.00 2549.15
Components serving CT/DB #2 CO2 Methane
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.02 0.098 2.13 9.33
1.69 (scf/hr/component) 0.073 (lb/hr/component)(3) 0.1264 0.554 12.04 52.74
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.0009 0.0038 0.08 0.36
26.13 (scf/hr/component) 1.124 (lb/hr/component)(3) 0.0940 0.4119 8.96 39.24
0.0150 (kg/hr/component) 0.033 (lb/hr/component) 0.0006 0.0027 0.06 0.26
Total: 0.24 1.07 23.27 101.92
Global Warming Potentials: 1 1 25 25
CO2e Emissions: 0.24 1.07 581.75 2548.08Total CO2e emissions: 582.00 2549.15
Components serving Common Systems CO2 Methane
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.02 0.097 2.11 9.24
1.69 (scf/hr/component) 0.073 (lb/hr/component)(3) 0.0757 0.332 7.21 31.59
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.0004 0.0019 0.04 0.18
26.13 (scf/hr/component) 1.124 (lb/hr/component)(3) 0.0418 0.1831 3.98 17.44
0.0150 (kg/hr/component) 0.033 (lb/hr/component) 0.0105 0.0458 1.00 4.36
Total: 0.15 0.66 14.34 62.81
Global Warming Potentials: 1 1 25 25
CO2e Emissions: 0.15 0.66 358.48 1570.16Total CO2e emissions: 358.64 1570.82
Total Facility Fugitive Natural Gas CO2 Methane
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.07 0.29 6.37 27.89
1.69 (scf/hr/component) 0.073 (lb/hr/component)(3) 0.3285 1.439 31.29 137.06
0.27 (scf/hr/component) 0.012 (lb/hr/component)(3) 0.0022 0.0095 0.21 0.90
26.13 (scf/hr/component) 1.124 (lb/hr/component)(3) 0.2299 1.0069 21.90 95.93
0.0150 (kg/hr/component) 0.033 (lb/hr/component) 0.0117 0.0512 1.11 4.88
Total: 0.64 2.80 60.88 266.65
Global Warming Potentials: 1 1 25 25
CO2e Emissions: 0.64 2.80 1521.99 6666.33Total CO2e emissions: 1522.63 6669.12
Note 1: Emissions factors were obtained from 40 CFR Part 98 Subpart W "Mandatory Reporting of Greenhouse Gases: Petroleum and Natural Gas Systems; Final Rule" [77 FR 51494, Aug. 24, 2012]; Table W‐7, Default Methane Emission Factors for Natural Gas Distribution.Note 2: Emission factors were obtained from the kg/hr/component SOCMI emissions factors from "Protocol for Equipment Leak Emissions Estimates" (EPA‐453/R‐95‐017), Table 2‐1 (11/1995).Note 3: The density of natural gas was obtained from CFR 600.113‐93 (h) §538.7. Density of natural gas = 0.044 lb/cf (@60 F) = 0.043 lb/scf (@70 F).CO2 emissions based on mole % of CO2 in natural gas 0.93% from natural gas analysis 8/15/2014CH4 emissions based on mole % of CH4 in natural gas 88.60% from natural gas analysis 8/15/2014
Open‐Ended Lines(1) 22
34
Emission Factor Emission Factor
Emission Rate (lb/hr)
Emission Rate (tpy)
9
Sampling Connections (2)
20
Emission Rate (lb/hr) Emission Rate (tpy)
Emission Rate (lb/hr)
Valves(1) 207
Flanges/Connectors(1) 187
Relief Valves(1) 8
Open‐Ended Lines(1)
Component Type
Emission Rate (tpy)
Natural Gas
Valves(1) 619
Flanges/Connectors(1) 486
Relief Valves(1)
Service Component Type Component Count Emission Factor Emission Factor
Sampling Connections (2) 38
Emission Rate (lb/hr) Emission Rate (tpy)
Natural Gas
Valves(1) 205
Flanges/Connectors(1) 112
Relief Valves(1) 4
Open‐Ended Lines(1) 4
Sampling Connections (2)
Emission Rate (lb/hr) Emission Rate (tpy)
Open‐Ended Lines(1) 9
Sampling Connections (2) 2
Emission Rate (tpy)Component Count Emission Factor Emission Factor Emission Rate (lb/hr)
Service Component Type Component Count
2
Emission Rate (tpy)
Natural Gas
Service
Emission Rate (lb/hr) Emission Rate (tpy)
Natural Gas
Valves(1) 207
Flanges/Connectors(1) 187
Relief Valves(1) 8
Service Component Type Component Count Emission Factor Emission Factor Emission Rate (lb/hr)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[NG Fugitive]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationBreaker Fugitives Emissions
FS 003
Breaker TypeQuantity of SF6(lb/breaker) Potential Operating Time
Generator 35 8760 hr
HV ‐ 115kV 72
HV ‐ 345kV 324
Existing Breakers
Breaker TypeQuantity of SF6(lb/breaker)
Number of Breakers
Leakage Rate (per year)
SF6(lb/hr)
SF6(tpy)
Global Warming Potential
CO2e(lb/hr)
CO2e(tpy)
Generator 35 2 0.5% 4.00E‐05 1.75E‐04 22,800 0.9 4.0
HV ‐ 115kV 72 1 0.5% 4.11E‐05 1.80E‐04 22,800 0.9 4.1
HV ‐ 345kV 324 1 0.5% 1.85E‐04 8.10E‐04 22,800 4.2 18.5
Total SF6: 2.66E‐04 1.17E‐03 Total CO2e: 6.1 26.6
Breakers for Expansion
Breaker TypeQuantity of SF6(lb/breaker)
Number of Breakers
Leakage Rate (per year)
SF6(lb/hr)
SF6(tpy)
Global Warming Potential
CO2e(lb/hr)
CO2e(tpy)
Generator 35 1 0.5% 2.00E‐05 8.75E‐05 22,800 0.5 2.0
HV ‐ 115kV 72 1 0.5% 4.11E‐05 1.80E‐04 22,800 0.9 4.1
Total SF6: 6.11E‐05 2.68E‐04 Total CO2e: 1.4 6.1
FS 003 ‐ All Breakers
Breaker TypeQuantity of SF6(lb/breaker)
Number of Breakers
Leakage Rate (per year)
SF6(lb/hr)
SF6(tpy)
Global Warming Potential
CO2e(lb/hr)
CO2e(tpy)
Generator 35 3 0.5% 5.99E‐05 2.63E‐04 22,800 1.4 6.0
HV ‐ 115kV 72 2 0.5% 8.22E‐05 3.60E‐04 22,800 1.9 8.2
HV ‐ 345kV 324 1 0.5% 1.85E‐04 8.10E‐04 22,800 4.2 18.5
Total SF6: 3.27E‐04 1.43E‐03 Total CO2e: 7.5 32.7
Note: Leakage Rates assumed to be on an annual basis for the purposes of estimating potential emissions.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Breakers]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationFuel Tank
Unit InformationDescription: Fuel Oil Storage TankUnit Delta ID: TK 001 Unit Tempo ID: NA, Insignificant
Material Diesel Storage Potential Operating TimeCapacity 900,000 gal 8760 hr
Data obtained from TANKS 4.09d runDate of run: 10/23/2015
303.62 lb working loss18.09 lb breathing loss
321.71 lbs of VOC total
Emissions Summary
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)
Limited Emissions
(tpy)VOC 0.04 0.16 0% 0.16 0.16
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Fuel Tank]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationFire Pump Fuel Tank
Unit InformationDescription: Fire Pump Fuel TankUnit Delta ID: NA, Insignificant Activity Unit Tempo ID: NA, Insignificant Activity
Material Diesel Storage Potential Operating TimeCapacity 360 gal 8760 hr
Data obtained from TANKS 4.09d runDate of run: 10/23/2015
0.02 lb working loss0.03 lb breathing loss0.05 lbs of VOC total
Emissions Summary
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)Limited Emissions
(tpy)VOC 5.71E‐06 2.50E‐05 0% 2.50E‐05 2.50E‐05
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[FP Tank]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmergency Generator Diesel Fuel Tank
Unit InformationDescription: Emergency Generator Diesel Fuel TankUnit Delta ID: NA, Insignificant Activity Unit Tempo ID: EQUI 23
Material Diesel Storage Potential Operating TimeCapacity 5,000 gal 8760 hr
Data obtained from TANKS 4.09d runDate of run: 10/23/2015
0.09 lb working loss0.46 lb breathing loss0.55 lbs of VOC total
Emissions Summary
Emission Rate(lb/hr)
Uncontrolled Emissions
(tpy)Control Efficiency
Controlled Emissions
(tpy)Limited Emissions
(tpy)VOC 6.28E‐05 2.75E‐04 0% 2.75E‐04 2.75E‐04
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EG Tank]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationNatural Gas Condensate Tank ‐ Plant
Unit Information
Unit InformationDescription: Natural Gas Condensate Tank ‐ PlantUnit Delta ID: NA, Insignificant Activity Unit Tempo ID: EQUI 24
Material Natural Gas condensate Potential Operating TimeCapacity 6,615 gal 8760 hr
Condensate Tank Emissions
Pollutant Calculated Emissions
Avg. Hourly Emissions (lb/hr)
Maximum Hourly
Emissions (lb/hr) 1
Annual Emissions (TPY) 2
NOX
Assumptions: COHours per year of operation 8,760 VOC 0.05 tons/yr 0.01 0.01 0.05
PM10
PM2.5
Tank Volume, gallons 6615 From email correspondence 10/22/15 SO2
NotesAnnual Throughput, gallons 661.5 Estimate of 10% of Tank Volume
TANKS 4.09d Total Emissions Date of run: 10/23/2015Working Loss, pounds 0.74Breathing Loss, pounds 84.98Total Loss, lbs 85.72Total Loss, tons 0.04Flash Gas Quantification Using Vasquez‐Beggs Correlation
Value CommentsAPI = NG API Gravity 78 Default valueC1 = Vasquez‐Beggs constant 0.0178 If APIG > 30o, then C1 = 0.0178; else C1 = 0.0362C2 = Vasquez‐Beggs constant 1.187 If APIG > 30°, then C2 = 1.187; else C2 = 1.0937C3 = Vasquez‐Beggs constant 23.931 If APIG > 30°, then C3 = 23.931; else C3 = 25.724SG = Specific gravity of gas in separator, air = 1.0 0.9 From gas analysis obtained from upstream vessel
UVP = Upstream Vessel Pressure, psig 40 Vessel upstream of flash source (tanks)T = Upstream Temperature, °F 100 Default = 100°F (fluid temperature in upstream vessel)
TOC = TOC weight percent, wt.% of total stream 80 Removes gas constituents such as N2, CO2, H2S, etc.Pa = Atmospheric Pressure, psia 14.696 Default = 14.696Q = Throughput, bbls/yr 15.8
Mv = Vapor Molecular Weight, lb/lb‐mole 49 Default Crude = 50E = Control Efficiency, % reduction 0 Efficiency of any control device present (flare, VRU, etc.)
Me = Methane Weight Percent 0 Natural Gas SDS; EP Energy 8/1/2012Et = Ethane Weight Percent 60 Natural Gas SDS; EP Energy 8/1/2012
Calculated ParametersCSG = Corrected specific gravity 0.77 SG*(1.0+0.00005912*API*T*log[(UVP+Pa)/114.7]GOR = Gas to oil ratio 44.21 C1*CSG*(UVP+Pa)^C28exp[(C3*API)/(T+460)]LfTOT = Flash losses TOC, tons 0.04 GOR*Q*Mv/379*(100‐E)/100*TOC/100/2000
VOC Emissions, tons 0.01 (TOC‐Me‐Et)/TOC*LfTOTMethane Emissions, tons 0.00 (Me/TOC)*LfTOTEthane Emissions, tons 0.03 (Et/TOC)*LfTOT
1 Maximum hourly emissions are assumed to be the same as the hourly emissions.2 Annual emissions are based on 8760 hours per year of operation.3 Below IA threshold
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Cond TK plant]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationNatural Gas Condensate Tank ‐ CT1
Unit Information
Unit InformationDescription: Natural Gas Condensate Tank ‐ CT1Unit Delta ID: NA, Insignificant Activity Unit Tempo ID: NA, Insignificant Activity
Material Natural Gas condensate Potential Operating TimeCapacity 45 gal 8760 hr
Condensate Tank Emissions
Pollutant Calculated Emissions
Avg. Hourly Emissions (lb/hr)
Maximum Hourly
Emissions (lb/hr) 1
Annual Emissions (TPY) 2
NOX
Assumptions: COHours per year of operation 8,760 VOC 1.65E‐03 tons/yr 3.76E‐04 3.76E‐04 1.65E‐03
PM10
Tank Volume, bbls ‐ From Design Drawing PM2.5
Tank Volume, gallons 50 From Design Drawing SO2
NotesAnnual Throughput, gallons 5 Estimate of 10% of Tank Volume
TANKS 4.09d Total Emissions Date of run: 10/23/2015Working Loss, pounds 0.01Breathing Loss, pounds 3.15Total Loss, lbs 3.16Total Loss, tons 1.58E‐03Flash Gas Quantification Using Vasquez‐Beggs Correlation
Value CommentsAPI = NG API Gravity 78 Default valueC1 = Vasquez‐Beggs constant 0.0178 If APIG > 30o, then C1 = 0.0178; else C1 = 0.0362C2 = Vasquez‐Beggs constant 1.187 If APIG > 30°, then C2 = 1.187; else C2 = 1.0937C3 = Vasquez‐Beggs constant 23.931 If APIG > 30°, then C3 = 23.931; else C3 = 25.724SG = Specific gravity of gas in separator, air = 1.0 0.9 From gas analysis obtained from upstream vessel
UVP = Upstream Vessel Pressure, psig 40 Vessel upstream of flash source (tanks)T = Upstream Temperature, °F 100 Default = 100°F (fluid temperature in upstream vessel)
TOC = TOC weight percent, wt.% of total stream 80 Removes gas constituents such as N2, CO2, H2S, etc.Pa = Atmospheric Pressure, psia 14.696 Default = 14.696Q = Throughput, bbls/yr 0.1
Mv = Vapor Molecular Weight, lb/lb‐mole 49 Default Crude = 50E = Control Efficiency, % reduction 0 Efficiency of any control device present (flare, VRU, etc.)
Me = Methane Weight Percent 0 Natural Gas SDS; EP Energy 8/1/2012Et = Ethane Weight Percent 60 Natural Gas SDS; EP Energy 8/1/2012
Calculated ParametersCSG = Corrected specific gravity 0.77 SG*(1.0+0.00005912*API*T*log[(UVP+Pa)/114.7]GOR = Gas to oil ratio 44.21 C1*CSG*(UVP+Pa)^C28exp[(C3*API)/(T+460)]LfTOT = Flash losses TOC, tons 2.72E‐04 GOR*Q*Mv/379*(100‐E)/100*TOC/100/2000
VOC Emissions, tons 6.80E‐05 (TOC‐Me‐Et)/TOC*LfTOTMethane Emissions, tons 0.00E+00 (Me/TOC)*LfTOTEthane Emissions, tons 2.04E‐04 (Et/TOC)*LfTOT
1 Maximum hourly emissions are assumed to be the same as the hourly emissions.2 Annual emissions are based on 8760 hours per year of operation.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Cond TK CT1]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationNatural Gas Condensate Tank ‐ CT2
Unit Information
Unit InformationDescription: Natural Gas Condensate Tank ‐ CT2Unit Delta ID: NA, Insignificant Activity Unit Tempo ID: NA, Insignificant Activity
Material Natural Gas condensate Potential Operating TimeCapacity 45 gal 8760 hr
Condensate Tank Emissions
Pollutant Calculated Emissions
Avg. Hourly Emissions (lb/hr)
Maximum Hourly
Emissions (lb/hr) 1
Annual Emissions (TPY) 2
NOX
Assumptions: COHours per year of operation 8,760 VOC 1.65E‐03 tons/yr 3.76E‐04 3.76E‐04 1.65E‐03
PM10
Tank Volume, bbls ‐ From Design Drawing PM2.5
Tank Volume, gallons 50 From Design Drawing SO2
NotesAnnual Throughput, gallons 5 Estimate of 10% of Tank Volume
TANKS 4.09d Total Emissions Date of run: 10/23/2015Working Loss, pounds 0.01Breathing Loss, pounds 3.15Total Loss, lbs 3.16Total Loss, tons 1.58E‐03Flash Gas Quantification Using Vasquez‐Beggs Correlation
Value CommentsAPI = NG API Gravity 78 Default valueC1 = Vasquez‐Beggs constant 0.0178 If APIG > 30o, then C1 = 0.0178; else C1 = 0.0362C2 = Vasquez‐Beggs constant 1.187 If APIG > 30°, then C2 = 1.187; else C2 = 1.0937C3 = Vasquez‐Beggs constant 23.931 If APIG > 30°, then C3 = 23.931; else C3 = 25.724SG = Specific gravity of gas in separator, air = 1.0 0.9 From gas analysis obtained from upstream vessel
UVP = Upstream Vessel Pressure, psig 40 Vessel upstream of flash source (tanks)T = Upstream Temperature, °F 100 Default = 100°F (fluid temperature in upstream vessel)
TOC = TOC weight percent, wt.% of total stream 80 Removes gas constituents such as N2, CO2, H2S, etc.Pa = Atmospheric Pressure, psia 14.696 Default = 14.696Q = Throughput, bbls/yr 0.1
Mv = Vapor Molecular Weight, lb/lb‐mole 49 Default Crude = 50E = Control Efficiency, % reduction 0 Efficiency of any control device present (flare, VRU, etc.)
Me = Methane Weight Percent 0 Natural Gas SDS; EP Energy 8/1/2012Et = Ethane Weight Percent 60 Natural Gas SDS; EP Energy 8/1/2012
Calculated ParametersCSG = Corrected specific gravity 0.77 SG*(1.0+0.00005912*API*T*log[(UVP+Pa)/114.7]GOR = Gas to oil ratio 44.21 C1*CSG*(UVP+Pa)^C28exp[(C3*API)/(T+460)]LfTOT = Flash losses TOC, tons 2.72E‐04 GOR*Q*Mv/379*(100‐E)/100*TOC/100/2000
VOC Emissions, tons 6.80E‐05 (TOC‐Me‐Et)/TOC*LfTOTMethane Emissions, tons 0.00E+00 (Me/TOC)*LfTOTEthane Emissions, tons 2.04E‐04 (Et/TOC)*LfTOT
1 Maximum hourly emissions are assumed to be the same as the hourly emissions.2 Annual emissions are based on 8760 hours per year of operation.
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Cond TK CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationUnit General Information Sheet
DELTA info TEMPO info
Emission Source Description Stack/Vent ID EU FS TK(SV, BG)"STRU" ID
(EU, TK, MR, DAS)"EQUI" ID
(FS)"FUGI" ID
Combined Cycle System #2 002 ‐ ‐ ‐ STRU 14 ‐ ‐Combustion Turbine #2 002 002 ‐ ‐ STRU 14 EQUI 5 ‐Duct Burners (Combustion Turbine #2) 002 004 ‐ ‐ STRU 14 EQUI 6 ‐
Combined Cycle System #1 007 ‐ ‐ ‐ STRU 20 ‐ ‐ Combustion Turbine #1 007 008 ‐ ‐ STRU 20 EQUI 16 ‐Duct Burners (Combustion Turbine #1) 007 009 ‐ ‐ STRU 20 EQUI 17 ‐
Auxiliary Boiler 003 005 ‐ ‐ STRU 17 EQUI 7 ‐Fire Pump Engine 005 007 ‐ ‐ STRU 18 EQUI 11 ‐Diesel Fired Emergency Generator 008 010 ‐ ‐ STRU 21 EQUI 18 ‐Bath Heater 009 011 ‐ ‐ STRU 22 EQUI 19 ‐
‐ ‐ ‐ ‐ ‐ ‐Cooling Tower NA ‐ 001 ‐ NA ‐ FUGI 1Natural Gas Fugitives NA ‐ 002 ‐ NA ‐ FUGI 2Breaker Fugitives NA ‐ 003 ‐ NA ‐ FUGI 3Fuel Oil Storage Tank NA ‐ ‐ 001 NA IA ‐
Emission Units Fugitive Sources Tank Sources
DescriptionCombustion Turbine #2
Duct Burners (Combustion Turbine #2)
Combustion Turbine #1
Duct Burners (Combustion Turbine #1)
Auxiliary Boiler
Fire Pump Engine
Diesel Fired Emergency Generator Bath Heater Description
Cooling Tower
Natural Gas Fugitives
Breaker Fugitives Description Fuel Oil Storage Tank Fire Pump Fuel Tank
Emergency Generator Diesel
Fuel Tank
Natural Gas Condensate Tank ‐
Plant
Natural Gas Condensate Tank ‐
CT1
Natural Gas Condensate Tank ‐
CT2Delta ID No. (EU) 002 004 008 009 005 007 010 011 Delta ID No. (FS) 001 002 003 Delta ID No. (TK) 001 NA, Insignificant Activity NA, Insignificant Activity NA, Insignificant Activity NA, Insignificant Activity NA, Insignificant Activity
Tempo ID No. (EQUI) EQUI 5 EQUI 6 EQUI 16 EQUI 17 EQUI 7 EQUI 11 EQUI 18 EQUI 19 Tempo ID No. (FUGI) FUGI 1 FUGI 2 FUGI 3 Tempo ID No. (EQUI) NA, Insignificant Activity NA, Insignificant Activity EQUI 23 EQUI 24 NA, Insignificant Activity NA, Insignificant Activity
Fuel 1 Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Diesel Diesel Natural Gas Material Water Natural Gas SF6 Material Diesel Storage Diesel Storage Diesel StorageNatural Gas condensate
Natural Gas condensate
Natural Gas condensate
Fuel 2 Fuel Oil ‐ ‐ ‐ ‐ ‐ ‐ ‐ Drift Rate 0.0005% NA NA Capacity (gal) 900,000 360 5,000 6,615 45 45
Heat Input Capacity 2082 800 2253.3 823.7 70 350 2500 2.87 Cycles 6 NA NA Capacity Units gal gal gal gal gal gal
Heat Input Units MMBtu/hr MMBtu/hr MMBtu/hr MMBtu/hr MMBtu/hr HP kW MMBtu/hr TDS (mg/L) 1500 NA NA
Heat Input Capacity 2 2243 3634 Flow rate (gal/min) 200,000 NA NA
Heat Input Units 2 MMBtu/hr bHP SF6 Leakage Rate NA NA 0.5%
Control Equipment 1 DescriptionDry Low NOx
burners
Dry Low NOx burners None None None None Control Equipment 1 Description
Mist eliminator NA NA
CE1 Delta ID (CE) 002 010 CE1 Delta ID (CE) NA
CE1 Tempo ID (TREA) TREA 9 TREA 10 CE1 Tempo ID (TREA) NA
CE1 Control Efficiency 71 ‐ NOx 71 ‐ NOx CE1 Control Efficiency NA
Control Equipment 2 Description
Steam or Water
Injection Total Particulate Control Efficiency NA
CE2 Delta ID (CE) 004
CE2 Tempo ID (TREA) TREA 4CE2 Control Efficiency 82 ‐ NOx
Control Equipment 3 Description
Selective Catalytic Reduction
Selective Catalytic Reduction
Selective Catalytic Reduction
Selective Catalytic Reduction
CE3 Delta ID (CE) 006 006 011 011
CE3 Tempo ID (TREA) TREA 5 TREA 5 TREA 11 TREA 11CE3 Control Efficiency 80 ‐ NOx 80 ‐ NOx 80 ‐ NOx 80 ‐ NOx
Control Equipment 4 DescriptionCatalytic Oxidizer Catalytic Oxidizer
Catalytic Oxidizer Catalytic Oxidizer
CE4 Delta ID (CE) 008 008 012 012
CE4 Tempo ID (TREA) TREA 6 TREA 6 TREA 12 TREA 12
CE4 Control Efficiency90 ‐ CO40 ‐ VOC
90 ‐ CO40 ‐ VOC
90 ‐ CO40 ‐ VOC
90 ‐ CO40 ‐ VOC
Stack Delta ID No. (SV) 002 002 007 007 003 005 008 009
Stack Tempo ID No. (STRU) STRU 14 STRU 14 STRU 20 STRU 20 STRU 17 STRU 18 STRU 21 STRU 22
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Unit Info]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
EU EU 008 EU 009 EU 002 EU 004FS
TK
SV SV 007 SV 002
Unit Description:
Combustion Turbine #1 ‐ Natural Gas Units Source
Combustion Turbine #1 ‐ Duct Burner Units Source
Combustion Turbine #2 ‐ Natural Gas Units Source
Combustion Turbine #2 ‐ Fuel Oil Units Source
Combustion Turbine #2 ‐ Duct Burner
PM 11.9 lb/hr CTDB1_1 ‐ Combined CTDB1_9 22 lb/hr CTDB2_1 72.6 lb/hr CTDB2_1 ‐ Combined CTDB2_12
PM10 11.9 lb/hr CTDB1_1 ‐ Combined CTDB1_9 22 lb/hr CTDB2_1 72.6 lb/hr CTDB2_1 ‐ Combined CTDB2_12
PM2.5 11.9 lb/hr CTDB1_2 ‐ Combined CTDB1_9 22 lb/hr CTDB2_2 72.6 lb/hr CTDB2_2 ‐ Combined CTDB2_12
SO2 2.2409E‐03 lb/MMBtu CTDB1_3 ‐ Combined CTDB1_9 2.2409E‐03 lb/MMBtu CTDB2_3 96.8 lb/hr CTDB2_1 ‐ Combined CTDB2_12
NOx 273.7 lb/hr CTDB1_1 ‐ Combined CTDB1_9 256.0 lb/hr CTDB2_1 381.9 lb/hr CTDB2_1 ‐ Combined CTDB2_12
VOC 25.1 lb/hr CTDB1_1 ‐ Combined CTDB1_9 19.2 lb/hr CTDB2_1 42.3 lb/hr CTDB2_1 ‐ Combined CTDB2_12
CO 169.5 lb/hr CTDB1_1 ‐ Combined CTDB1_9 119.1 lb/hr CTDB2_1 261.5 lb/hr CTDB2_1 ‐ Combined CTDB2_12
Pb 0.0005 lb/ 106 scf CTDB1_4 ‐ Combined CTDB1_9 0.0005 lb/ 106 scf CTDB2_4 1.40E‐05 lb/MMBtu CTDB2_9 ‐ Combined CTDB2_12
H2SO4 15.179% Calculated CTDB1_5 ‐ Combined CTDB1_9 15.179% Calculated CTDB2_5 15.179% Calculated CTDB2_5 ‐ Combined CTDB2_12
CO2eCO2 116.98 lb/MMBtu GHG Table 116.98 lb/MMBtu GHG Table 116.98 lb/MMBtu GHG Table 163.05 lb/MMBtu GHG Table 116.98 lb/MMBtu GHG TableCH4 2.2E‐03 lb/MMBtu GHG Table 2.2E‐03 lb/MMBtu GHG Table 2.2E‐03 lb/MMBtu GHG Table 6.6E‐03 lb/MMBtu GHG Table 2.2E‐03 lb/MMBtu GHG TableN2O 2.2E‐04 lb/MMBtu GHG Table 2.2E‐04 lb/MMBtu GHG Table 2.2E‐04 lb/MMBtu GHG Table 1.3E‐03 lb/MMBtu GHG Table 2.2E‐04 lb/MMBtu GHG TableSF6 ‐ NA ‐ ‐ NA ‐ NA ‐ ‐ NA ‐ ‐ NA ‐Individual HAPS: CAS #
Acetaldehyde 75‐07‐0 4.0E‐05 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 4.0E‐05 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 ‐ ND CTDB2_13
Acrolein 107‐02‐8 6.4E‐06 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 6.4E‐06 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 ‐ ND CTDB2_13
Arsenic 7440‐38‐2 ‐ lb/MMBtu CTDB1_6 2.0E‐04 lb/MMscf CTDB1_10 ‐ lb/MMBtu CTDB2_6 1.1E‐05 lb/MMBtu CTDB2_10 2.0E‐04 lb/MMscf CTDB2_13
Benzene 71‐43‐2 1.2E‐05 lb/MMBtu CTDB1_6 2.1E‐03 lb/MMscf CTDB1_10 1.2E‐05 lb/MMBtu CTDB2_6 5.5E‐05 lb/MMBtu CTDB2_11 2.1E‐03 lb/MMscf CTDB2_13
1,3‐Butadiene 106‐99‐0 4.3E‐07 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 4.3E‐07 lb/MMBtu CTDB2_6 1.6E‐05 lb/MMBtu CTDB2_11 ‐ ND CTDB2_13
Beryllium 7440‐41‐7 ‐ ND CTDB1_6 1.2E‐05 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 3.1E‐07 lb/MMBtu CTDB2_10 1.2E‐05 lb/MMscf CTDB2_13
Cadmium 7440‐43‐9 ‐ ND CTDB1_6 1.1E‐03 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 4.8E‐06 lb/MMBtu CTDB2_10 1.1E‐03 lb/MMscf CTDB2_13
Chromium 7440‐47‐3 ‐ ND CTDB1_6 1.4E‐03 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 1.1E‐05 lb/MMBtu CTDB2_10 1.4E‐03 lb/MMscf CTDB2_13
Cobalt 744‐48‐4 ‐ ND CTDB1_6 8.4E‐05 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 ‐ ND CTDB2_10 8.4E‐05 lb/MMscf CTDB2_13
Dichlorobenzene 25321‐22‐6 ‐ ND CTDB1_6 1.2E‐03 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 ‐ ND CTDB2_11 1.2E‐03 lb/MMscf CTDB2_13
Ethylbenzene 100‐41‐4 3.2E‐05 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 3.2E‐05 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 ‐ ND CTDB2_13
Formaldehyde 50‐00‐0 ‐ NA see below ‐ Combined CTDB1_9 ‐ NA see below ‐ Combined CTDB2_12 ‐ Combined CTDB2_12
Hexane 110‐54‐3 ‐ NA see below ‐ Combined CTDB1_9 ‐ NA see below ‐ Combined CTDB2_12 ‐ Combined CTDB2_12
Manganese 7439‐96‐5 ‐ ND CTDB1_6 3.8E‐04 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 7.9E‐04 lb/MMBtu CTDB2_10 3.8E‐04 lb/MMscf CTDB2_13
Mercury 7439‐97‐6 ‐ ND CTDB1_6 2.6E‐04 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 1.2E‐06 lb/MMBtu CTDB2_10 2.6E‐04 lb/MMscf CTDB2_13
Naphthalene 91‐20‐3 1.3E‐06 lb/MMBtu CTDB1_6 6.1E‐04 lb/MMscf CTDB1_10 1.3E‐06 lb/MMBtu CTDB2_6 3.5E‐05 lb/MMBtu CTDB2_11 6.1E‐04 lb/MMscf CTDB2_13
Nickel 7440‐02‐0 ‐ ND CTDB1_6 2.1E‐03 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 4.6E‐06 lb/MMBtu CTDB2_10 2.1E‐03 lb/MMscf CTDB2_13
PAH ‐ 2.2E‐06 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 2.2E‐06 lb/MMBtu CTDB2_6 4.0E‐05 lb/MMBtu CTDB2_11 ‐ ND CTDB2_13
POM ‐ ‐ ND CTDB1_6 6.98E‐04 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 ‐ ND CTDB2_11 6.98E‐04 lb/MMscf CTDB2_13
Propylene Oxide 75‐56‐9 2.9E‐05 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 2.9E‐05 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 ‐ ND CTDB2_13
Selenium 7782‐49‐2 ‐ ND CTDB1_6 2.4E‐05 lb/MMscf CTDB1_10 ‐ ND CTDB2_6 2.5E‐05 lb/MMBtu CTDB2_10 2.4E‐05 lb/MMscf CTDB2_13
Toluene 108‐88‐3 1.3E‐04 lb/MMBtu CTDB1_6 3.4E‐03 lb/MMscf CTDB1_10 1.3E‐04 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 3.4E‐03 lb/MMscf CTDB2_13
Xylenes 1330‐20‐7 6.4E‐05 lb/MMBtu CTDB1_6 ‐ ND CTDB1_10 6.4E‐05 lb/MMBtu CTDB2_6 ‐ ND CTDB2_11 ‐ ND CTDB2_13Formaldehyde (< 60% Load) 50‐00‐0 0.00279 lb/MMBtu CTDB1_7 ‐ Combined CTDB1_9 0.00279 lb/MMBtu CTDB2_7 ‐ NA ‐ ‐ Combined CTDB2_12
Formaldehyde (60 ‐ < 90% Load) 50‐00‐0 0.00151 lb/MMBtu CTDB1_7 ‐ Combined CTDB1_9 0.00151 lb/MMBtu CTDB2_7 ‐ NA ‐ ‐ Combined CTDB2_12Formaldehyde (>= 90% Load) 50‐00‐0 0.00105 lb/MMBtu CTDB1_7 ‐ Combined CTDB1_9 0.00105 lb/MMBtu CTDB2_7 ‐ NA ‐ ‐ Combined CTDB2_12
Formaldehyde (Any Load) 50‐00‐0 ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ 2.28 lb/hr CTDB2_7 ‐ Combined CTDB2_12
Hexane (Any Load) 110‐54‐3 0.00034 lb/MMBtu CTDB1_8 ‐ Combined CTDB1_9 0.00034 lb/MMBtu CTDB2_8 0.042 lb/hr CTDB2_12 ‐ Combined CTDB2_12
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
EU
FS
TK
SV
Unit Description:
PMPM10
PM2.5
SO2
NOxVOCCOPbH2SO4
CO2eCO2
CH4
N2OSF6Individual HAPS: CAS #
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 744‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Formaldehyde (< 60% Load) 50‐00‐0Formaldehyde (60 ‐ < 90% Load) 50‐00‐0
Formaldehyde (>= 90% Load) 50‐00‐0Formaldehyde (Any Load) 50‐00‐0Hexane (Any Load) 110‐54‐3
EU 005 EU 007 EU 010 EU 011FS 001
Auxiliary Boiler Units Source Fire pump Units Source
Diesel Fired Emergency Generator Units Source Bath Heater Units Source Cooling Tower Units Source
8.0E‐03 lb/MMBtu AB1 2.4E‐04 lb/hp‐hr FP1 6.07E‐05 lb/hp‐hr EG1 7.6 lb/ 106 scf BH2 ‐ Formula CL1
8.0E‐03 lb/MMBtu AB1 2.4E‐04 lb/hp‐hr FP1 6.07E‐05 lb/hp‐hr EG1 7.6 lb/ 106 scf BH2 ‐ Formula CL1
8.0E‐03 lb/MMBtu AB3 2.4E‐04 lb/hp‐hr FP1 6.07E‐05 lb/hp‐hr EG1 7.6 lb/ 106 scf BH2 ‐ Formula CL1
1.0E‐03 lb/MMBtu AB1 3.3E‐04 lb/hp‐hr FP1 2.05E‐03 lb/hp‐hr EG3 0.6 lb/ 106 scf BH2 ‐ NA
3.6E‐02 lb/MMBtu AB1 3.37 lb/hr FP2 5.31E‐03 lb/hp‐hr EG1 100 lb/ 106 scf BH1 ‐ NA
7.0E‐03 lb/MMBtu AB1 4.4E‐04 lb/hp‐hr FP1 2.88E‐04 lb/hp‐hr EG1 5.5 lb/ 106 scf BH2 ‐ NA
6.0E‐02 lb/MMBtu AB1 1.4E‐03 lb/hp‐hr FP1 5.31E‐03 lb/hp‐hr EG1 84 lb/ 106 scf BH1 ‐ NA
0.0005 lb/ 106 scf AB2 ‐ ND FP3 ‐ ND EG3 0.0005 lb/ 106 scf BH2 ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ NA
116.98 lb/MMBtu GHG Table 163.05 lb/MMBtu GHG Table 163.05 lb/MMBtu GHG Table 116.98 lb/MMBtu GHG Table ‐ NA
2.2E‐03 lb/MMBtu GHG Table 6.6E‐03 lb/MMBtu GHG Table 6.6E‐03 lb/MMBtu GHG Table 2.2E‐03 lb/MMBtu GHG Table ‐ NA
2.2E‐04 lb/MMBtu GHG Table 1.3E‐03 lb/MMBtu GHG Table 1.3E‐03 lb/MMBtu GHG Table 2.2E‐04 lb/MMBtu GHG Table ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ ND AB4 7.67E‐04 lb/MMBtu FP4 2.52E‐05 lb/MMBtu EG4 ‐ ND BH3 ‐ NA
‐ ND AB4 9.25E‐05 lb/MMBtu FP4 7.88E‐06 lb/MMBtu EG4 ‐ ND BH3 ‐ NA
2.0E‐04 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 2.0E‐04 lb/ 106 scf BH3 ‐ NA
2.1E‐03 lb/ 106 scf AB4 9.33E‐04 lb/MMBtu FP4 7.76E‐04 lb/MMBtu EG4 2.1E‐03 lb/ 106 scf BH3 ‐ NA
‐ ND AB4 3.91E‐05 lb/MMBtu FP4 3.91E‐05 lb/MMBtu EG5 ‐ ND BH3 ‐ NA
1.2E‐05 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 1.2E‐05 lb/ 106 scf BH3 ‐ NA
1.1E‐03 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 1.1E‐03 lb/ 106 scf BH3 ‐ NA
1.4E‐03 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 1.4E‐03 lb/ 106 scf BH3 ‐ NA
8.4E‐05 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 8.4E‐05 lb/ 106 scf BH3 ‐ NA
1.2E‐03 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 1.2E‐03 lb/ 106 scf BH3 ‐ NA
‐ ND AB4 ‐ ND FP4 ‐ ND EG4 ‐ ND BH3 ‐ NA
7.5E‐02 lb/ 106 scf AB4 1.18E‐03 lb/MMBtu FP4 7.89E‐05 lb/MMBtu EG4 7.5E‐02 lb/ 106 scf BH3 ‐ NA
1.8E+00 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 1.8E+00 lb/ 106 scf BH3 ‐ NA
3.8E‐04 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 3.8E‐04 lb/ 106 scf BH3 ‐ NA
2.6E‐04 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 2.6E‐04 lb/ 106 scf BH3 ‐ NA
6.1E‐04 lb/ 106 scf AB4 8.48E‐05 lb/MMBtu FP4 1.30E‐04 lb/MMBtu EG6 6.1E‐04 lb/ 106 scf BH3 ‐ NA
2.1E‐03 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 2.1E‐03 lb/ 106 scf BH3 ‐ NA
‐ ND AB4 1.68E‐04 lb/MMBtu FP5 2.12E‐04 lb/MMBtu EG6 ‐ ND BH3 ‐ NA
6.98E‐04 lb/ 106 scf AB5 ‐ ND FP4 ‐ ND EG4 6.98E‐04 lb/ 106 scf BH4 ‐ NA
‐ ND AB4 ‐ ND FP4 ‐ ND EG4 ‐ ND BH3 ‐ NA
2.4E‐05 lb/ 106 scf AB4 ‐ ND FP4 ‐ ND EG4 2.4E‐05 lb/ 106 scf BH3 ‐ NA
3.4E‐03 lb/ 106 scf AB4 4.09E‐04 lb/MMBtu FP4 2.81E‐04 lb/MMBtu EG4 3.4E‐03 lb/ 106 scf BH3 ‐ NA
‐ ND AB4 2.85E‐04 lb/MMBtu FP4 1.93E‐04 lb/MMBtu EG4 ‐ ND BH3 ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA ‐ ‐ NA
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
EU
FS
TK
SV
Unit Description:
PMPM10
PM2.5
SO2
NOxVOCCOPbH2SO4
CO2eCO2
CH4
N2OSF6Individual HAPS: CAS #
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 744‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Formaldehyde (< 60% Load) 50‐00‐0Formaldehyde (60 ‐ < 90% Load) 50‐00‐0
Formaldehyde (>= 90% Load) 50‐00‐0Formaldehyde (Any Load) 50‐00‐0Hexane (Any Load) 110‐54‐3
FS 002 FS 003TK 001 TK ‐ TK ‐ TK ‐
Natural Gas Fugitives Units Source Breaker Fugitives Units Source
Fuel Oil Storage Tank Units Source
Fire Pump Fuel Tank Units Source
Emergency Generator Diesel Fuel
Tank Units Source
Natural Gas Condensate Tank ‐ Plant Units Source
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ Formula TK1_1 ‐ Formula TK2_1 ‐ Formula TK3_1 ‐ Formula TK4_1
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ Formula NGF1 ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ Formula NGF1 ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ Formula BSF_1 ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
‐ NA ‐ NA ‐ NA ‐ NA ‐ NA ‐ NA
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
EU
FS
TK
SV
Unit Description:
PMPM10
PM2.5
SO2
NOxVOCCOPbH2SO4
CO2eCO2
CH4
N2OSF6Individual HAPS: CAS #
Acetaldehyde 75‐07‐0Acrolein 107‐02‐8Arsenic 7440‐38‐2Benzene 71‐43‐2
1,3‐Butadiene 106‐99‐0Beryllium 7440‐41‐7Cadmium 7440‐43‐9Chromium 7440‐47‐3
Cobalt 744‐48‐4Dichlorobenzene 25321‐22‐6
Ethylbenzene 100‐41‐4Formaldehyde 50‐00‐0
Hexane 110‐54‐3Manganese 7439‐96‐5
Mercury 7439‐97‐6Naphthalene 91‐20‐3
Nickel 7440‐02‐0PAH ‐POM ‐
Propylene Oxide 75‐56‐9Selenium 7782‐49‐2Toluene 108‐88‐3Xylenes 1330‐20‐7
Formaldehyde (< 60% Load) 50‐00‐0Formaldehyde (60 ‐ < 90% Load) 50‐00‐0
Formaldehyde (>= 90% Load) 50‐00‐0Formaldehyde (Any Load) 50‐00‐0Hexane (Any Load) 110‐54‐3
TK ‐ TK ‐
Natural Gas Condensate Tank ‐ CT1 Units Source
Natural Gas Condensate Tank ‐ CT2 Units Source
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ Formula TK5_1 ‐ Formula TK6_1
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
‐ NA ‐ NA
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
Emission Factor SourcesCombustion Turbine #1 + Duct BurnersCTDB1_1
CTDB1_2
CTDB1_3
CTDB1_4
CTDB1_5
CTDB1_6
CTDB1_7
CTDB1_8
CTDB1_9
CTDB1_10
Combustion Turbine #2 + Duct BurnersCTDB2_1
CTDB2_2
CTDB2_3
CTDB2_4
CTDB2_5
CTDB2_6
CTDB2_7
CTDB2_8
CTDB2_9
CTDB2_10
CTDB2_11
CTDB2_12
CTDB2_13
Auxiliary BoilerAB1
AB2
AB4
AB5
AB3 PM2.5 emission rate assumed equal to total PM rate
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐3
These pollutants are accounted for at the stack level in the combined CT and DB data.
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
Hexane emission factor based on most recent stack test at SV002 (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runs
These pollutants are accounted for at the stack level in the combined CT and DB data.
Based on Permit 01300098‐002 emission limit
See "Worst Case Emissions CT1 CT2" sheet for emission factor selection and/or calculation, based on fuel type.
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐5
DB: AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
Formaldehyde emission factors based on most recent stack test (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runsHexane emission factor based on most recent stack test at SV002 (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runs
Potential PM, PM10, and PM2.5 emissions were based on vendor data, operating experience and stack tests from other similar Calpine facilities.
PM2.5 emission factor assumed equal to PM emisison factor
No data for lead available in AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00) Table 3.1‐4; used natural gas lead emission factor from AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2
Based on Permit 01300098‐002 emission limit
H2SO4 calculated as percentage of SO2 emission factor.
Based on Auxiliary Boiler emission limits in Permit 01300098‐002
AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐4
Lead emission factor for Fuel oil from from AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐5
DB ‐ Emission factors from AP‐42, Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4. Total POM emission factor is equal to the sum of the individual emissions of POM compounds (including Naphthalene).
No data for lead available in AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00) Table 3.1‐4; used natural gas lead emission factor from AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2
PM2.5 emission factor assumed equal to PM emisison factor
H2SO4 calculated as percentage of SO2 emission factor.AP‐42 Section 3.1 "Stationary Gas Turbines" (rev 04/00); Table 3.1‐3Formaldehyde emission factors based on most recent stack test (Report No: 183284.CTG2.AB.COMP; September 2011); Maximum of 3 runs
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
Emission Factor SourcesFire PumpFP1
FP2
FP3
FP4
FP5
Diesel Fired Emergency GeneratorEG1
EG2
EG3
EG4
EG5
EG6
Bath HeaterBH1
BH2
BH3
BH4
Cooling TowerCL1
Natural Gas Fugitive EmissionsNGF1
Breaker Fugitive EmissionsBSF1
Fuel Oil Storage TankTK1_1
Fire Pump Fuel TankTK2_1
Emergency Generator Diesel Fuel TankTK3_1
Natural Gas Condensate Tank ‐ PlantTK4_1
Natural Gas Condensate Tank ‐ CT1TK5_1
Natural Gas Condensate Tank ‐ CT2TK6_1
TANKS run, 10/23/2015
AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); Table 3.4‐4; Total PAH includes Naphthalene which is also separately counted
Based on Vendor Data, at 3633 braking hp, converted from g/hp‐hr to lb/hp‐hr
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐2AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Tables 1.4‐3 and 1.4‐4, sum of all pollutants listed as POM (including Naphthalene)
TANKS run, 10/23/2015
TANKS run, 10/23/2015
See Breaker Fugitive Emissions sheet for individual component factors for SF6.
AP‐42 Section 1.4 "Natural Gas Combustion" (Rev 7/98); Table 1.4‐1; Small Boilers, Uncontrolled
See Natural Gas Fugitive Emissions sheet for individual component factors for CO2 and CH4.
TANKS run, 10/23/2015
AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2. (No data for 1,3‐Butadiene in AP‐42 Section 3.4)
PM emission factor is from AP‐42 Section 13.4 (01/95). See Cooling Tower sheet for additional details.
TANKS run, 10/23/2015
TANKS run, 10/23/2015
Based on Vendor Data, at 350 braking hp (See Fire Pump data sheet)Based on Vendor Data, at 300 or 340 braking hp (See Fire Pump data sheet)
AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2 AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); Table 3.3‐2; Total PAH includes Naphthalene which is also separately counted
No data for lead in AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96); or in vendor data
AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); Table 3.4‐3
Based on Nonroad Compression‐Ignition Engines ‐‐ Exhaust Emission Standards (40 CFR 1039.101), for 2500 kW, converted from g/kW‐hr to lb/hp‐hr
No data for lead in AP‐42 Section 3.4 " Large Stationary Diesel And All Stationary Dual‐fuel Engines" (Rev 10/96); or in AP‐42 Section 3.3 "Gasoline and Diesel Industrial Engines" (Rev 10/96)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationEmission Factor Data Sheet
GHG Emission Factor Table
GHG Pollutant GWPNatural Gas (kg/MMBtu)
Fuel Oil ("Distillate #2" or
"Petroleum") (kg/MMBtu)
Natural Gas (lb/MMBtu)
Fuel Oil (lb/MMBtu)
CO2 1 53.06 73.96 116.98 163.05 ConversionsCH4 25 1.0E‐03 3.0E‐03 2.20E‐03 6.61E‐03 lb/kg 2.2046
N2O 298 1.0E‐04 6.0E‐04 2.20E‐04 1.32E‐03HFCsPFCsSF6 22,800
The GWP for SF6 was updated in the final rule published on November 29, 2013 [78 FR 71904] and effective on January 1, 2014.
Source: 40 CFR 98 ; GWP from Table A-1 [79 FR 73779, Dec. 11, 2014], Emission factors from Tables C-1 [78 FR 71950, Nov. 29, 2013] and C-2 [78 FR 71952, Nov. 29, 2013]
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[EF Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationFire Pump Data Sheet
Vendor Data
Emissions DataEmission Factor for Emission Rate for
Pollutant the Listed BHP the Listed BHP300 340 350 300 340 350 Worst‐case Worst‐case
(g/HP/hr) (g/HP/hr) (g/HP/hr) (lb/hr) (lb/hr) (lb/hr) (lb/hr) (g/hp‐hr)PM/PM10/PM2.5 0.07 0.09 0.11 0.046 0.067 0.085 0.085 0.110SO2 0.14 0.14 0.15 0.093 0.105 0.116 0.116 0.150NOx 5.1 4.5 4.2 3.373 3.373 3.241 3.373 5.100CO 0.22 0.45 0.62 0.146 0.337 0.478 0.478 0.620VOC/HC 0.07 0.15 0.20 0.046 0.112 0.154 0.154 0.200
(g/hp‐hr emissions directly from vendor data)Conversion
Worst case emission factors lb/hp‐hr lb/hr HP rating 0.0022046 lb/gPM/PM10/PM2.5 2.43E‐04 ‐ 350 HPSO2 3.31E‐04 ‐ 350 HPNOx ‐ 3.373 300 HPVOC/HC 4.41E‐04 ‐ 350 HPCO 1.37E‐03 ‐ 350 HP
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Fire Pump Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationDiesel Fired Emergency Generator Data Sheet
Vendor Data
Emissions DataEmission Factor for Emission Rate for 0.0022046 lb/g
Pollutant the Listed BHP the Listed BHP3633 2760 1889 1029 497 3633 2760 1889 1029 497 Worst‐case Engine rating 2500 kW
(g/HP/hr) (g/HP/hr) (g/HP/hr) (g/HP/hr) (g/HP/hr) (lb/hr) (lb/hr) (lb/hr) (lb/hr) (lb/hr) (lb/hr) 3633 BHPPM/PM10/PM2.5 0.05 0.05 0.07 0.14 0.29 0.41 0.27 0.29 0.31 0.31 0.41 0.688 kW/BHPNOx 6.38 5.15 3.74 3.50 6.47 50.59 31.09 15.44 7.87 7.02 50.59CO 0.76 0.48 0.58 1.47 4.26 6.01 2.88 2.41 3.30 4.62 6.01VOC/HC 0.14 0.18 0.29 0.40 0.89 1.10 1.10 1.20 0.90 0.96 1.20
Non‐road CI Engine emission standards (40 CFR 1039.101)
Rated Power (kW) TierModel Year NMHC
(g/kW‐hr)
NMHC + NOx (g/kW‐
hr)NOx (g/kW‐
hr)PM
(g/kW‐hr)CO
(g/kW‐hr)NMHC
(lb/kW‐hr)
NMHC + NOx (lb/kW‐
hr)NOx
(lb/kW‐hr)PM
(lb/kW‐hr)CO
(lb/kW‐hr)NMHC
(lb/hp‐hr)
NMHC + NOx
(lb/hp‐hr)NOx
(lb/hp‐hr)PM
(lb/hp‐hr)CO
(lb/hp‐hr)
12000‐2005
1.3 ‐ 9.2 0.54 11.4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
22006‐2010
‐ 6.4 ‐ 0.2 3.5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
2011‐2014
0.4 ‐ 3.5 0.1 3.5 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
2015+ 0.19 ‐ 3.5 0.04 3.5 4.19E‐04 ‐ 7.72E‐03 8.82E‐05 7.72E‐03 2.88E‐04 ‐ 5.31E‐03 6.07E‐05 5.31E‐03Excerpt of table from "http://www.epa.gov/otaq/standards/nonroad/nonroadci.htm", May 11, 2015The NOx standard for generator sets is 0.67 g/kW‐hr.The PM standard for generator sets is 0.03 g/kW‐hr.
Minimum emissions rate
Vendor Data
Non‐road CI Engine emission standards
Selected Rate Reason
lb/hp‐hr lb/hp‐hr lb/hp‐hrPM/PM10/PM2.5 1.10E‐04 6.07E‐05 6.07E‐05 Meets Non‐road CI Engine emission standardsNOx 1.41E‐02 5.31E‐03 5.31E‐03 Meets Non‐road CI Engine emission standardsCO 1.68E‐03 5.31E‐03 5.31E‐03 Meets Non‐road CI Engine emission standards, conservatively using highest emission factorVOC/HC 3.09E‐04 2.88E‐04 2.88E‐04 Meets Non‐road CI Engine emission standards
kW > 900
4
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Emerg Gen Data]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV007 ‐ CT1 Emissions by Operating Scenario ‐ Natural Gas
Mankato Energy Center Emission Representations for Air Permit Application Emission representations are on a per‐unit basis
CASE 1 2 3 4 5 6 7 8 9Siemens‐ Natural Gas
BASE (No DB) Siemens Generic Performance
60% Load Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
60% Load Siemens Generic
Performance
BASE (No DB) Siemens Generic Performance
BASE (Evap cooler + DB) Siemens Generic
Performance
BASE (Evap cooler & No DB) Siemens
Generic Performance
BASE (Evap cooler off & No DB) Siemens
Generic Performance
60% Load Siemens Generic peformance
60% Load Mitsubishi peformance
Gas Turbine Ambient Temperature Dry Bulb (deg F) 6.0 6.0 6.0 44.0 44.0 44.0 95.0 95.0 95.0 95.0 95.0Exhaust Composition
Argon percent 0.90 0.90 0.90 0.89 0.89 0.89 0.88 0.88 0.87 0.88 0.90Nitrogen percent 75.10 75.27 75.10 74.09 74.49 74.09 73.45 73.45 73.31 73.52 73.10Oxygen percent 12.59 13.08 12.59 12.49 13.06 12.49 12.41 12.41 12.42 12.99 12.90
Carbon Dioxide percent 3.81 3.57 3.81 3.75 3.51 3.75 3.70 3.70 3.64 3.64 3.40 Water percent 7.62 7.17 7.62 8.79 8.04 8.79 9.57 9.57 9.60 9.76 9.70
CT Exhaust Flow lb/hr 4,237,304 3,020,461 4,237,304 4,017,524 2,875,811 4,017,524 3640882 3640882 3,517,247 2,640,395 2,499,000CT Power Output MW 211.6 126.9 211.6 194.6 115.9 194.6 172.3 172.3 167.2 96.6 93.3
Heating Value BTU/lb HHV 23,072 23,072 23,072 23072 23072 23072 23072 23072 23072 23072 23072Heat Input mmBtu/hr (LHV) 1,048Heat Input mmBtu/hr (HHV) 2,253 1,509 2,253 2,087 1,412 2,087 1,902 1,902 1,817 1,305 1,218 Max 2253.3 mmBtu/hr (HHV)
Emissions Data NOx ppmvd 35.2 33.1 35.2 35.6 33.2 35.6 36.0 36.0 35.9 33.5 33.9
ppmvd @15% 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0lb/hr 207.8 139.2 207.8 192.4 130.2 192.4 175.4 175.4 167.6 120.3 112.3
CO ppmvd 14.1 66.3 14.1 14.3 66.4 14.3 14.4 14.4 14.4 67.0 13.6ppmvd @15% 10.0 50.0 10.0 10.0 50.0 10.0 10.0 10.0 10.0 50.0 10.0lb/hr 50.6 169.5 50.6 46.9 158.6 46.9 42.7 42.7 40.8 146.5 27.3
VOC ppmvd @15% 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0lb/hr 8.7 5.8 8.7 8.0 5.4 8.0 7.3 7.3 7.0 5.0 4.7
BASE (No DB) Siemens Generic Performance
60% Load Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
60% Load Siemens Generic
Performance
BASE (No DB) Siemens Generic Performance
BASE (Evap cooler + DB) Siemens Generic
Performance
BASE (Evap cooler & No DB) Siemens
Generic Performance
BASE (Evap cooler off & No DB) Siemens
Generic Performance
60% Load Siemens Generic peformance
60% Load Mitsubishi peformance
Duct Burner Ambient Temperature (deg F) 6 6 6 44 44 44 95 95 95 95 95Exhaust Composition
Heat Input mmBtu/hr (LHV) 0 0 741.3 720 0 0 720 0 0 0 0Heat Input mmBtu/hr (HHV) 0 0 823.7 800.0 0 0 800.0 0 0 0 0 Max 823.7 mmBtu/hr (HHV)
Emissions Data NOx lb/mmBtu 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
lb/hr 0.0 0.0 65.9 64.0 0.0 0.0 64.0 0.0 0.0 0.0 0.0CO lb/mmBtu 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
lb/hr 0.0 0.0 82.4 80.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0VOC lb/mmBtu 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
lb/hr 0.0 0.0 16.5 16.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0
10
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1 Case Emissions NG]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV007 ‐ CT1 Emissions by Operating Scenario ‐ Natural Gas
BASE (No DB) Siemens Generic Performance
60% Load Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
BASE (DB) Siemens Generic
Performance
60% Load Siemens Generic
Performance
BASE (No DB) Siemens Generic Performance
BASE (Evap cooler + DB) Siemens Generic
Performance
BASE (Evap cooler & No DB) Siemens
Generic Performance
BASE (Evap cooler off & No DB) Siemens
Generic Performance
60% Load Siemens Generic peformance
60% Load Mitsubishi peformance
Combined GT and DB Ambient Temperature (deg F) 6 6 6 44 44 44 95 95 95 95 95Exhaust Composition CT Hourly Heat Input mmBtu/hr (HHV) 2,253 1,509 2,253 2,087 1,412 2,087 1,902 1,902 1,817 1,305 1,218 Max 2253.3 mmBtu/hr (HHV)DB Hourly Heat Input mmBtu/hr (HHV) 0 0 824 800 0 0 800 0 0 0 0 Max 823.7 mmBtu/hr (HHV)
Total Hourly Heat Input mmBtu/hr (HHV) 2,253 1,509 3,077 2,887 1,412 2,087 2,702 1,902 1,817 1,305 1,218 Max 3077.0 mmBtu/hr (HHV)CT Annual Heat Input mmBtu/hr (HHV) 19,738,908 13,223,045 19,738,908 18,279,277 12,372,506 18,279,277 16,657,578 16,657,578 15,917,139 11,431,800 10,669,680
Emissions Data NOx ppmvd @15% O2 25.0 25.0 24.1 24.1 25.0 25.0 24.0 25.0 25.0 25.0 25.0 NOx
lb/mmBtu 0.0922 0.0922 0.0889 0.0888 0.0922 0.0922 0.0886 0.0922 0.0922 0.0922 0.0922lb/hr 207.8 139.2 273.7 256.4 130.2 192.4 239.4 175.4 167.6 120.3 112.3 Max 273.7 lb/hr SCR Control Eff (%) 88.0% 88.0% 87.6% 87.5% 88.0% 88.0% 87.5% 88.0% 88.0% 88.0% 88.0%ppmvd @15% O2 (controlled) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Max 3.0 ppmvd @15% O2 (controlled)lb/mmBtu (controlled) 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.0111lb/hr (controlled) 24.9 16.7 34.1 31.9 15.6 23.1 29.9 21.0 20.1 14.4 13.5 Max 34.1 lb/hr (controlled)
CO ppmvd @15% O2 10.0 50.0 19.2 19.6 50.0 10.0 20.2 10.0 10.0 50.0 10.0 CO lb/mmBtu 0.022 0.112 0.043 0.044 0.112 0.022 0.045 0.022 0.022 0.112 0.022lb/hr 50.6 169.5 133.0 126.9 158.6 46.9 122.7 42.7 40.8 146.5 27.3 Max 169.5 lb/hr CO Catalyst Control Eff (%) 60.0% 90.6% 79.2% 79.6% 90.6% 60.0% 80.2% 60.0% 60.0% 90.6% 53.0% Max 4.0 ppmvd @15% O2 (controlled) 90% load+ppmvd @15% O2 (controlled) 4.0 4.7 4.0 4.0 4.7 4.0 4.0 4.0 4.0 4.7 4.7 Max 4.7 ppmvd @15% O2 (controlled) 60 to 90% loadlb/mmBtu (controlled) 0.009 0.011 0.009 0.009 0.011 0.009 0.009 0.009 0.009 0.011 0.011lb/hr (controlled) 20.2 15.9 27.6 25.9 14.9 18.7 24.3 17.1 16.3 13.8 12.9 Max 27.6 lb/hr (controlled)
VOC ppmvd @15% O2 3.0 3.0 6.4 6.5 3.0 3.0 6.7 3.0 3.0 3.0 3.0 VOC lb/mmBtu 0.0038 0.0038 0.0082 0.0083 0.0038 0.0038 0.0086 0.0038 0.0038 0.0038 0.0038lb/hr 8.7 5.8 25.1 24.0 5.4 8.0 23.3 7.3 7.0 5.0 4.7 Max 25.1 lb/hrVOC Catalyst Control Eff (%) 0.0% 0.0% 46.6% 47.6% 0.0% 0.0% 49.5% 0.0% 0.0% 0.0% 0.0%ppmvd @15% O2 (controlled) 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 Max 3.4 ppmvd @15% O2 (controlled)lb/mmBtu (controlled) 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004lb/hr (controlled) 8.7 5.8 13.4 12.6 5.4 8.0 11.8 7.3 7.0 5.0 4.7 Max 13.4 lb/hr (controlled)lb/hr (controlled at 3.4 ppm) 9.8 6.6 13.4 12.6 6.2 9.1 11.8 8.3 7.9 5.7 5.3 Max 13.4 lb/hr (controlled at 3.4 ppm)
Stack Parameters Stack Parameters Height (ft) 200 200 200 200 200 200 200 200 200 200 200Diameter (ft) 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0Stack Gas Mol, Wt. (lb/lbmol) 28.5 28.5 28.5 28.3 28.4 28.3 28.2 28.2 28.2 28.5 28.2Temp (deg F) 175 160 175 175 160 175 175 175 175 160 160 Min 160 Temp (deg F)Stack Mass Flow (lb/hr) 4,237,304 3,020,461 4,273,005 4,052,198 2,875,811 4,017,524 3,675,556 3,640,882 3,517,247 2,640,395 2,499,000Velocity (ft/sec) 67.6 47.0 68.2 65.0 44.9 64.4 59.1 58.6 56.7 41.2 39.3 Min 39.3075 Velocity (ft/sec)
Notes: 1) The majority of emissions data is based on Siemens generic data with 5% margin added to heat input2) Worst case VOC emissions are based on Mitsubishi emissions data3) Siemens F4 has highest heat input at 95F4) Mitsubishi has lowest stack velocity at 95F and 60% load
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT1 Case Emissions NG]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV002 ‐ CT2 Siemens Emissions by Operating Scenario ‐ Natural Gas
Mankato Energy Center Emission Representations for Air Permit Application Emission representations are on a per‐unit basis
CASE 1 2 3 4 5 6 7 8 9Siemens‐ Natural Gas Simple Cycle ? No No
BASE (No DB) 60% BASE PWR AUG BASE 60% BASE (No DB) PWR AUG BASE BASE (No DB) 60%Gas Turbine Ambient Temperature Dry Bulb (deg F) 6.4 6.0 6.4 47.9 44.0 44.0 44.0 95.0 95.0 95.0 95.0
Exhaust Composition Argon percent 0.90 0.90 0.90 0.85 0.89 0.89 0.89 0.83 0.88 0.88 0.89
Nitrogen percent 75.10 75.26 75.10 70.91 74.09 74.49 74.09 69.73 73.45 73.45 74.20Oxygen percent 12.65 13.10 12.65 11.57 12.49 13.06 12.49 11.32 12.41 12.41 13.23
Carbon Dioxide percent 3.81 3.60 3.81 3.78 3.75 3.51 3.75 3.75 3.70 3.70 3.39 Water percent 7.55 7.14 7.55 12.90 8.79 8.04 8.79 14.37 9.57 9.57 8.30
CT Exhaust Flow lb/hr 4,114,775 2,935,433 4,114,775 3,980,103 3,822,998 2,778,491 3,822,998 3,711,423 3,591,151 3,591,151 2,573,859CT Power Output MW 206.1 123.2 206.1 206.1 186.0 110.6 186.0 187.8 169.8 169.8 93.3
CT + ST Power Output MW 309.165 184.74 309.165 309.165 279.038 165.896 279.038 281.64 254.73 254.73 139.905Heat Input mmBtu/hr (LHV) 1,876 1,264 1,876 1,841 1726 1173 1726 1,712 1,603 1,603 1,049Heat Input mmBtu/hr (HHV) 2,082 1,403 2,082 2,044 1,916 1,303 1,916 1,900 1,779 1,779 1,164
Emissions Data NOx ppmvd 35.0 33.0 35.0 39.6 35.6 33.2 35.6 40.6 36.0 36.0 32.5
ppmvd @15% 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0lb/hr 192.0 129.3 192.0 188.5 176.7 120.1 176.7 175.2 164.1 164.1 107.4 192.0 Maximum Emissions (lbs/hr)
CO ppmvd 10.0 50.0 10.0 25.0 10.0 50.0 10.0 25.0 10.0 10.0 50.0ppmvd @15% 7.1 37.8 7.1 15.8 7.0 37.6 7.0 15.4 7.0 7.0 38.4lb/hr 33.4 119.1 33.4 72.5 30.2 110.1 30.2 65.6 27.8 27.8 100.5 119.1 Maximum Emissions (lbs/hr)
VOC ppmvd @15% 1.2 3.0 1.2 1.2 1.2 3.0 1.2 1.2 1.2 1.2 3.0lb/hr 3.2 5.4 3.2 3.1 2.9 5.0 2.9 2.9 2.7 2.7 4.5 5.4 Maximum Emissions (lbs/hr)
PM lb/hr 10 10 10 10 10 10 10 10 10 10 10 10.0 Maximum Emissions (lbs/hr)lb/mmBtu (HHV) 0.0048 0.0071 0.0048 0.0049 0.0052 0.0077 0.0052 0.0053 0.0056 0.0056 0.0086
Simple Cycle ? No NoBASE (No DB) 60% BASE PWR AUG BASE 60% BASE (No DB) PWR AUG BASE BASE (No DB) 60%
Duct Burner Ambient Temperature (deg F) 6 6 6 48 44 44 44 95 95 95 95Exhaust Composition
Heat Input mmBtu/hr (LHV) 0 0 720 720 720 0 0 720 720 0 0Heat Input mmBtu/hr (HHV) 0 0 800 800 800 0 0 800 800 0
Emissions Data NOx lb/mmBtu 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
lb/hr 0.0 0.0 64.0 64.0 64.0 0.0 0.0 64.0 64.0 0.0 0.0 64.0 Maximum Emissions (lbs/hr)CO lb/mmBtu 0.100 0.100 0.100 0.250 0.100 0.100 0.100 0.250 0.100 0.100 0.100
lb/hr 0.0 0.0 80.0 200.0 80.0 0.0 0.0 200.0 80.0 0.0 0.0 80.0 Maximum Emissions (lbs/hr)VOC lb/mmBtu 0.020 0.020 0.020 0.050 0.020 0.020 0.020 0.050 0.020 0.020 0.020
lb/hr 0.0 0.0 16.0 40.0 16.0 0.0 0.0 40.0 16.0 0.0 0.0 16.0 Maximum Emissions (lbs/hr)PM lb/mmBtu 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
lb/hr 0.0 0.0 12.0 12.0 12.0 0.0 0.0 12.0 12.0 0.0 0.0 12.0 Maximum Emissions (lbs/hr)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2 Siemens Emission Calcs NG]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV002 ‐ CT2 Siemens Emissions by Operating Scenario ‐ Natural Gas
Simple Cycle ? No NoBASE (No DB) 60% BASE PWR AUG BASE 60% BASE (No DB) PWR AUG BASE BASE (No DB) 60%
Combined GT and DB Ambient Temperature (deg F) 6.4206 6 6.4206 47.8674 44 44 44 95 95 95 95Exhaust Composition CT Hourly Heat Input mmBtu/hr (HHV) 2,082 1,403 2,082 2,044 1,916 1,303 1,916 1,900 1,779 1,779 1,164DB Hourly Heat Input mmBtu/hr (HHV) 0 0 800 800 800 0 0 800 800 0 0
Total Hourly Heat Input mmBtu/hr (HHV) 2,082 1,403 2,882 2,844 2,716 1,303 1,916 2,700 2,579 1,779 1,164 2881.8 Maximum Heat Input (mmBtu/hr)CT Annual Heat Input mmBtu/hr (HHV) 18,236,826 12,286,939 18,236,826 17,902,705 16,782,928 11,410,566 16,782,928 16,643,337 15,588,206 15,588,206 10,199,213
Emissions Data NOx ppmvd @15% O2 25.0 25.0 24.1 24.1 24.0 25.0 25.0 24.0 24.0 25.0 25.0
lb/mmBtu 0.0922 0.0922 0.0888 0.0888 0.0886 0.0922 0.0922 0.0886 0.0884 0.0922 0.0922lb/hr 192.0 129.3 256.0 252.5 240.7 120.1 176.7 239.2 228.1 164.1 107.4 256.0 Maximum Emissions (lbs/hr)SCR Control Eff (%) 86.0% 86.0% 85.5% 85.5% 85.4% 86.0% 86.0% 85.4% 85.4% 86.0% 86.0%ppmvd @15% O2 (controlled) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5lb/mmBtu (controlled) 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129lb/hr (controlled) 26.9 18.1 37.2 36.7 35.1 16.8 24.7 34.9 33.3 23.0 15.0 37.2 Maximum Emissions (lbs/hr)lb/MWh (controlled) 0.09 0.10 0.12 0.12 0.13 0.10 0.09 0.12 0.13 0.09 0.11
CO ppmvd @15% O2 7.1 37.8 17.5 42.7 18.1 37.6 7.0 43.8 18.6 7.0 38.4lb/mmBtu 0.016 0.085 0.039 0.096 0.041 0.084 0.016 0.098 0.042 0.016 0.086lb/hr 33.4 119.1 113.4 272.5 110.2 110.1 30.2 265.6 107.8 27.8 100.5 119.1 Maximum Emissions (lbs/hr)CO Catalyst Control Eff (%) 90.0% 90.0% 90.0% 89.0% 89.0% 90.0% 90.0% 90.0% 89.0% 90.0% 90.0%ppmvd @15% O2 (controlled) 0.7 3.8 1.8 4.7 2.0 3.8 0.7 4.4 2.0 0.7 3.8lb/mmBtu (controlled) 0.002 0.008 0.004 0.011 0.004 0.008 0.002 0.010 0.005 0.002 0.009lb/hr (controlled) 3.3 11.9 11.3 30.0 12.1 11.0 3.0 26.6 11.9 2.8 10.0 12.1 Maximum Emissions (lbs/hr)
VOC ppmvd @15% O2 1.2 3.0 5.2 11.8 5.4 3.0 1.2 12.4 5.7 1.2 3.0lb/mmBtu 0.0015 0.0038 0.0067 0.0152 0.0070 0.0038 0.0015 0.0159 0.0073 0.0015 0.0038lb/hr 3.2 5.4 19.2 43.1 18.9 5.0 2.9 42.9 18.7 2.7 4.5 19.2 Maximum Emissions (lbs/hr)VOC Catalyst Control Eff (%) 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0%ppmvd @15% O2 (controlled) 0.72 1.80 3.12 7.10 3.26 1.80 0.72 7.43 3.40 0.72 1.80lb/mmBtu (controlled) 0.001 0.002 0.004 0.009 0.004 0.002 0.001 0.010 0.004 0.001 0.002lb/hr (controlled) 1.9 3.2 11.5 25.9 11.4 3.0 1.8 25.8 11.2 1.6 2.7 11.5 Maximum Emissions (lbs/hr)
PM lb/hr 10.0 10.0 22.0 22.0 22.0 10.0 10.0 22.0 22.0 10.0 10.0 22.0 Maximum Emissions (lbs/hr)lb/mmBtu 0.005 0.007 0.008 0.008 0.008 0.008 0.005 0.008 0.009 0.006 0.009
Stack Parameters Height (ft) 150 150 150 150 150 150 150 150 150 150 150Diameter (ft) 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0Stack Gas Mol, Wt. (lb/lbmol) 28.48 28.50 28.31 27.73 28.16 28.40 28.34 27.56 28.06 28.25 28.36Temp (deg F) 175 160 175 175 175 160 175 185 185 185 160 160.0 Lowest Stack Temp (deg F)Stack Mass Flow (lb/hr) 4,114,775 2,935,433 4,148,278 4,013,605 3,856,500 2,778,491 3,822,998 3,744,926 3,624,653 3,591,151 2,573,859Velocity (ft/sec) 65.6 45.7 66.6 65.8 62.2 43.4 61.3 62.7 59.6 58.7 40.3 40.3 Lowest Velocity (ft/sec)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2 Siemens Emission Calcs NG]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV002 ‐ CT2 Siemens Emissions by Operating Scenario ‐ Fuel Oil
Mankato Energy Center Emission Representations for Air Permit Application Emission representations are on a per‐unit basis
CASE 1 2 3 4 5 6 7 8 9Siemens‐ Fuel Oil Simple Cycle ? No
BASE (No DB) BASE 60% BASE BASE (No DB) 60% BASE BASE (No DB) 60%Gas Turbine Ambient Temperature Dry Bulb (deg F) 44.0 44.0 44.0 ‐9.6 ‐9.6 ‐9.6 95.0 95.0 95.0
Exhaust Composition Argon percent 0.88 0.88 0.90 0.90 0.90 0.92 0.88 0.88 0.90
Nitrogen percent 73.98 73.98 75.40 75.01 75.01 76.57 73.35 73.35 75.03Oxygen percent 12.63 12.63 14.87 12.72 12.72 15.13 12.56 12.56 14.84
Carbon Dioxide percent 4.94 4.94 3.68 5.07 5.07 3.72 4.87 4.87 3.63 Water percent 7.56 7.56 5.15 6.30 6.30 3.67 8.34 8.34 5.60
CT Exhaust Flow lb/hr 3,868,176 3,868,176 3,409,311 4,262,125 4,262,125 3,751,334 3,633,403 3,633,403 3,094,336CT Power Output MW 178.8 178.8 106.3 206.1 206.1 123.6 163.0 163.0 89.3
CT + ST Power Output MW 268.24 268.24 159.41 309.165 309.165 185.428 244.44 244.44 133.95Heat Input mmBtu/hr (LHV) 1,712 1,712 1116 1924 1924 1233 1,589 1,589 1,001Heat Input mmBtu/hr (HHV) 1,827 1,827 1,190 2,051.8 2,052 1,315 1,695 1,695 1,068 2051.8 Maximum Heat Input (mmBtu/hr)
Emissions Data NOx ppmvd 58.9 58.9 51.1 58.2 58.2 48.9 59.3 59.3 51.4
ppmvd @15% 42.0 42.0 50.0 42.0 42.0 50.0 42.0 42.0 50.0lb/hr 283.0 283.0 219.5 317.9 317.9 242.6 262.6 262.6 196.9 317.9 Maximum Emissions (lbs/hr)
CO ppmvd 10.0 10.0 100.0 10.0 10.0 100.0 10.0 10.0 100.0ppmvd @15% 7.1 7.1 97.8 7.2 7.2 102.2 7.1 7.1 97.4lb/hr 29.3 29.3 261.5 33.2 33.2 301.9 26.9 26.9 233.4 261.5 Maximum Emissions (lbs/hr)
VOC ppmvd @15% 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0lb/hr 23.4 23.4 15.3 26.3 26.3 16.9 21.7 21.7 13.7 26.3 Maximum Emissions (lbs/hr)
PM lb/hr 54.8 54.8 82.2 60.8 60.8 91.2 51.1 51.1 74.3 82.2 Maximum Emissions (lbs/hr)lb/mmBtu (HHV) 0.0300 0.0300 0.0690 0.0296 0.0296 0.0693 0.0302 0.0302 0.0696
SO2 ppmvd 12.8 12.8 9.3 12.6 12.6 8.9 12.9 12.9 9.3ppmvd @15% 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10lb/mmBtu 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047lb/hr 85.29 85.29 55.58 95.81 95.81 61.42 79.15 79.15 49.86 95.8 Maximum Emissions (lbs/hr)
BASE (No DB) BASE 60% BASE BASE (No DB) 60% BASE BASE (No DB) 60%Duct Burner Ambient Temperature (deg F) 44 44 44 ‐10 ‐10 ‐10 95 95 95
Exhaust Composition Heat Input mmBtu/hr (LHV) 0 720 0 720 0 0 720 0 0Heat Input mmBtu/hr (HHV) 0 800 0 800 0 0 800 0 0
Emissions Data NOx lb/mmBtu 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
lb/hr 0.0 64.0 0.0 64.0 0.0 0.0 64.0 0.0 0.0 64.0 Maximum Emissions (lbs/hr)CO lb/mmBtu 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
lb/hr 0.0 80.0 0.0 80.0 0.0 0.0 80.0 0.0 0.0 80.0 Maximum Emissions (lbs/hr)VOC lb/mmBtu 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
lb/hr 0.0 16.0 0.0 16.0 0.0 0.0 16.0 0.0 0.0 16.0 Maximum Emissions (lbs/hr)PM lb/mmBtu 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
lb/hr 0.0 12.0 0.0 12.0 0.0 0.0 12.0 0.0 0.0 12.0 Maximum Emissions (lbs/hr)SO2 lb/mmBtu 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
lb/hr 0.00 0.96 0.00 0.96 0.00 0.00 0.96 0.00 0.00 1.0 Maximum Emissions (lbs/hr)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2 Siemen Emission Calcs FO]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationSV002 ‐ CT2 Siemens Emissions by Operating Scenario ‐ Fuel Oil
BASE (No DB) BASE 60% BASE BASE (No DB) 60% BASE BASE (No DB) 60%Combined GT and DB Ambient Temperature (deg F) 44 44 44 ‐9.6154 ‐9.6154 ‐9.6154 95 95 95
Exhaust Composition CT Hourly Heat Input mmBtu/hr (HHV) 1,827 1,827 1,190 2,052 2,052 1,315 1,695 1,695 1,068DB Hourly Heat Input mmBtu/hr (HHV) 0 800 0 800 0 0 800 0 0
Total Hourly Heat Input mmBtu/hr (HHV) 1,827 2,627 1,190 2,852 2,052 1,315 2,495 1,695 1,068 2851.8 Maximum Heat Input (mmBtu/hr)CT Annual Heat Input mmBtu/hr (HHV) 16,000,759 16,000,759 10,427,370 17,973,900 17,973,900 11,523,154 14,848,907 14,848,907 9,353,545
Emissions Data NOx ppmvd @15% O2 42.0 35.8 50.0 36.3 42.0 50.0 35.5 42.0 50.0
lb/mmBtu 0.1549 0.1321 0.1844 0.1339 0.1549 0.1844 0.1309 0.1549 0.1844lb/hr 283.0 347.0 219.5 381.9 317.9 242.6 326.6 262.6 196.9 381.9 Maximum Emissions (lbs/hr)SCR Control Eff (%) 85.7% 83.2% 88.0% 83.5% 85.7% 88.0% 83.1% 85.7% 88.0%ppmvd @15% O2 (controlled) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0lb/mmBtu (controlled) 0.0221 0.0221 0.0221 0.0221 0.0221 0.0221 0.0221 0.0221 0.0221lb/hr (controlled) 40.4 58.1 26.3 63.1 45.4 29.1 55.2 37.5 23.6 63.1 Maximum Emissions (lbs/hr)lb/MWh (controlled) 0.15 0.22 0.17 0.20 0.15 0.16 0.23 0.15 0.18
CO ppmvd @15% O2 7.1 18.5 97.8 17.7 7.2 102.2 19.1 7.1 97.4lb/mmBtu 0.016 0.042 0.220 0.040 0.016 0.230 0.043 0.016 0.219lb/hr 29.3 109.3 261.5 113.2 33.2 301.9 106.9 26.9 233.4 261.5 Maximum Emissions (lbs/hr)CO Catalyst Control Eff (%) 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0%ppmvd @15% O2 (controlled) 0.7 1.9 9.8 1.8 0.7 10.2 1.9 0.7 9.7lb/mmBtu (controlled) 0.002 0.004 0.022 0.004 0.002 0.023 0.004 0.002 0.022lb/hr (controlled) 2.9 10.9 26.1 11.3 3.3 30.2 10.7 2.7 23.3 26.1 Maximum Emissions (lbs/hr)
VOC ppmvd @15% O2 10.0 11.7 10.0 11.6 10.0 10.0 11.8 10.0 10.0lb/mmBtu 0.0128 0.0150 0.0128 0.0148 0.0128 0.0128 0.0151 0.0128 0.0128lb/hr 23.4 39.4 15.3 42.3 26.3 16.9 37.7 21.7 13.7 42.3 Maximum Emissions (lbs/hr)VOC Catalyst Control Eff (%) 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0% 40.0%ppmvd @15% O2 (controlled) 6.0 7.0 6.0 6.9 6.0 6.0 7.1 6.0 6.0lb/mmBtu (controlled) 0.008 0.009 0.008 0.009 0.008 0.008 0.009 0.008 0.008lb/hr (controlled) 14.1 23.7 9.2 25.4 15.8 10.1 22.6 13.0 8.2 25.4 Maximum Emissions (lbs/hr)
PM lb/hr 72.6 72.6 72.6 72.6 72.6 72.6 72.6 72.6 72.6 72.6 Maximum Emissions (lbs/hr)lb/mmBtu 0.040 0.028 0.061 0.025 0.035 0.055 0.029 0.043 0.068
SO2 ppmvd @15% O2 9.10 6.40 9.10 6.61 9.10 9.10 6.26 9.10 9.10lb/mmBtu 0.0467 0.0328 0.0467 0.0339 0.0467 0.0467 0.0321 0.0467 0.0467lb/hr 85.29 86.25 55.58 96.77 95.81 61.42 80.11 79.15 49.86 96.8 Maximum Emissions (lbs/hr)
Stack Parameters Height (ft) 150 150 150 150 150 150 150 150 150Diameter (ft) 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0Stack Gas Mol, Wt. (lb/lbmol) 28.66 28.47 28.78 28.64 28.81 28.95 28.37 28.56 28.73Temp (deg F) 175 175 160 165 165 165 180 180 160 180.0 Lowest Stack Temp (deg F)Stack Mass Flow (lb/hr) 3,868,176 3,901,679 3,409,311 4,295,627 4,262,125 3,751,334 3,666,905 3,633,403 3,094,336Velocity (ft/sec) 61.3 62.2 52.5 67.1 66.2 57.9 59.2 58.2 47.8 67.1 Lowest Velocity (ft/sec)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[CT2 Siemen Emission Calcs FO]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationWorst‐Case Emissions for Combustion Turbine #1 and Combustion Turbine #2
Operating Hours 8760
Combustion Turbine #1, Uncontrolled Combustion Turbine #2, Uncontrolled
Pollutant lb/hr ton/yr lb/hr ton/yr Pollutant lb/hr ton/yr lb/hr ton/yr lb/hr ton/yrPM 11.9 52.1 11.9 52.1 PM 22.0 96.4 72.6 318.0 72.6 318.0
PM10 11.9 52.1 11.9 52.1 PM10 22.0 96.4 72.6 318.0 72.6 318.0
PM2.5 11.9 52.1 11.9 52.1 PM2.5 22.0 96.4 72.6 318.0 72.6 318.0
SOx 6.9 30.2 6.9 30.2 SOx 6.5 28.3 96.8 423.9 96.8 423.9
NOx 273.7 1198.8 273.7 1198.8 NOx 256.0 1121.2 381.9 1672.6 381.9 1672.6
VOC 25.1 110.1 25.1 110.1 VOC 19.2 84.1 42.3 185.4 42.3 185.4
CO 169.5 742.2 169.5 742.2 CO 119.1 521.7 261.5 1145.2 261.5 1145.2
Note: SV007 potential PM, PM10, and PM2.5 emissions were based on vendor data, operating experience and stack tests from other similar Calpine facilities.SO2 lb/hr emissions rate based on lb/MMBtu limit
Combustion Turbine #1, Controlled Combustion Turbine #2, Controlled
Pollutant lb/hr ton/yr lb/hr ton/yr Pollutant lb/hr ton/yr lb/hr ton/yr lb/hr ton/yrPM 11.9 52.1 11.9 52.1 PM 22.0 96.4 72.6 318.0 72.6 318.0
PM10 11.9 52.1 11.9 52.1 PM10 22.0 96.4 72.6 318.0 72.6 318.0
PM2.5 11.9 52.1 11.9 52.1 PM2.5 22.0 96.4 72.6 318.0 72.6 318.0
SOx 6.9 30.2 6.9 30.2 SOx 6.5 28.3 96.8 423.9 96.8 423.9
NOx 34.1 149.1 34.1 149.1 NOx 37.2 163.0 63.1 276.5 63.1 276.5
VOC 13.4 58.8 13.4 58.8 VOC 11.5 50.5 25.4 111.2 25.4 111.2
CO 27.6 121.0 27.6 121.0 CO 12.1 53.1 26.1 114.5 26.1 114.5
Note: SV007 PM, PM10, PM2.5 lb/hr emissions rates based on modeling data.SO2 lb/hr emissions rate based on lb/MMBtu limit
Worst Case Siemens Worst Case Siemens SV002: CT#2Uncontrolled Natural Gas Uncontrolled Fuel Oil Uncontrolled Emissions
Emissions Emissions Gas or Oil Worst‐case
Worst Case Siemens Worst Case Siemens SV002: CT#2Controlled Natural Gas Controlled Fuel Oil Controlled Emissions
Emissions Emissions Gas or Oil Worst‐case
Worst Case SV007: CT #1Uncontrolled Natural Gas Uncontrolled Emissions
Emissions Natural Gas Only
Worst Case SV007: CT #1Controlled Natural Gas Controlled Emissions
Emissions Natural Gas Only
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[Worst Case Emissions CT1 CT2]
Mankato Energy CenterFacility ID: 013000982015 Air Permit ApplicationH2SO4 Emissions Derivation Calculations
Combined Cycle System (Combustion Turbine and Ductburners) Natural Gas or Fuel Oil Firing
AssumptionsPredicted Conversion of Sulfur to SO2 = 92.0%
Predicted Conversion of Sulfur to SO3 = 8.0%
Predicted Conversion of SO3 to H2SO4 = 100%
Predicted Additional % of H2SO4 from SCR = 10.0%
Predicted Additional % of H2SO4 from Oxidation Catalyst = 4.0%
Molecular Weight of Sulfur = 32
Molecular Weight of SO2 = 64
Molecular Weight of SO3 = 80
Molecular Weight of H2SO4 = 98
Initial SO2 content: 1.00 (lb SO2 / lb SO2 emitted)
Conversion from SO2 to Sulfur(1.00 lbs SO2 / lb SO2 emitted) / (1‐0.08) * (32/64) = 0.54 (lb Sulfur / lb SO2 emitted)
Conversion of Sulfur to SO3
(0.54 lb Sulfur / lb SO2 emitted)) * (0.08) * (80/32) = 0.11 (lb SO3 / lb SO2 emitted)
Conversion of SO3 to H2SO4
(0.11 lb SO3 / lb SO2 emitted) * (98/80) = 0.13 (lb H2SO4 / lb SO2 emitted)
Control Equipment H2SO4 Contribution
(0.13 lb H2SO4 / lb SO2 emitted) * (0.04+0.10) = 0.02 (lb H2SO4 / lb SO2 emitted)
Total H2SO4
(0.13 lb H2SO4 / lb SO2 emitted) + (0.02 lb H2SO4 / lb SO2 emitted) = 0.15 (lb H2SO4 / lb SO2 emitted)
Derived Percentage of H2SO4 Compared to SO2
(0.15 lb H2SO4 / lb SO2 emitted) * 100% = 15.18% (lb H2SO4 / lb SO2 emitted)
C:\Users\thanafy\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\VZ60O0D0\MEC Calculations (TSD Attachment 1).xlsx[H2SO4 derivation]
Subject ItemID Seq. # Requirement
TFAC 1(01300098)
1240
Permit Appendices: This permit contains appendices as listed in the permit Table of Contents. The Permitteeshall comply with all requirements contained in Appendices A (Insignificant Activities and ApplicableRequirements); C (Acid Rain Permit Application); and D (Transport Rule (TR) Trading Program Title VRequirements).
Modeling parameters in Appendix B (Stack Parameters Relied Upon in Modeling) are included for reference onlyas described elsewhere in this permit.
The Permittee is authorized to construct EQUI 16 (approximately 200 MW Combustion Turbine #1 with dry lowNOx burners at 6 degrees F), EQUI 17 (824 mmBtu/hr Duct Burners), EQUI 18 (2500 kW Diesel FiredEmergency Generator), EQUI 20 (CT#1 CEMS Data Acquisition System), EQUI 21 (CT#1 NOx CEMS), EQUI22 (CT#1 CO CEMS), TREA 11 (Selective Catalytic Reduction), TREA 12 (Catalytic Oxidizer), FUGI 2 (NaturalGas Fugitives), FUGI 3 (Breaker Fugitives), additional 4 cells to FUGI 1 (Cooling Tower). The constructionauthorization expires if construction does not commence within 18 months after receipt of such approval by AirEmissions Permit No. 01300098-101, if construction is discontinued for a period of 18 months or more, or ifconstruction is not completed within a reasonable time.
1260
PERMIT SHIELD: Subject to the limitations in Minn. R. 7007.1800, compliance with the conditions of this permitshall be deemed compliance with the specific provision of the applicable requirement identified in the permit asthe basis of each condition. Subject to the limitations of Minn. R. 7007.1800 and 7017.0100, subp. 2,notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, anyperson (including the Permittee) may also use other credible evidence to establish compliance ornoncompliance with applicable requirements.
This permit shall not alter or affect the liability of the Permittee for any violation of applicable requirements priorto or at the time of permit issuance.
1300Modeled Parameters for CO: The parameters used in CO modeling for permit number 01300098-002 are listedin Appendix B of this permit. The parameters describe the operation of the facility at maximum permittedcapacity. The purpose of listing the parameters in the appendix is to provide a benchmark for future changes.
1310Changes to Modeled Parameters for CO: Any permit amendment that affects any modeled parameter oremission rate for CO listed in Appendix B must be a major amendment. Any addition to the informationdocumented in Appendix B requires a major amendment.
Equivalent or Better Dispersion (EBD) Modeling Triggers (Modeling Required) for NOx: Changes that affect anymodeled parameter or emission rate listed in Appendix B, or an addition to the information documented inAppendix B, trigger the EBD Modeling Submittal requirement.
1320
EBD Modeling Submittal Content for NOx: The information submitted must include, for stack and vent sources,source emission rate, location, height, diameters, exit velocity, exit temperature, discharge direction, use of raincaps or rain hats, and, if applicable, locations and dimensions of nearby buildings. For non-stack/vent sources,this includes the source emission rate, location, size and shape, release height, and, if applicable, any emissionrate scalars, and the initial lateral dimensions and initial vertical dimensions and adjacent building heights.
Minn. R. 7007.0800, subp. 2
40 CFR 52.21(r)(2) & Minn. R.7007.3000
Minn. R. 7007.1800, (A)(2)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
1320j g g
EBD Modeling Submittal for NOx: For changes meeting the criteria in the EBD Modeling Triggers (ModelingRequired) requirement, the Permittee shall submit an EBD modeling submittal in accordance with the currentversion of the MPCA Air Dispersion Modeling Guidance at the time of the modeling and shall wait for writtenapproval (in the form of an issued permit amendment) before making such changes.
1330EBD Modeling Results for NOx: The dispersion characteristics due to the revisions of the information inAppendix B must be equivalent to or better than the dispersion characteristics modeled October 2015. ThePermittee shall demonstrate this equivalency in the proposal.
Outdated EBD Baseline Modeling for NOx: Prior to conducting the EBD analysis, the Permittee shall use thecurrent version of the MPCA Air Dispersion Modeling Guidance to determine if the Baseline Modeling (the mostrecent refined modeling demonstration) is outdated. If the Baseline Modeling is outdated, the Permittee shallupdate the Baseline Modeling to be consistent with the current version of the MPCA Air Dispersion ModelingGuidance. The updated modeling will become the new Baseline Modeling.
This requirement does not require the Permittee to complete a new refined modeling demonstration using therevisions made for the EBD demonstration.
1340
Computer Dispersion Modeling Protocol: due 180 days after receipt of written MPCA request for NOx refinedmodeling. The Permittee shall submit a Computer Dispersion Modeling Protocol that is complete and approvableby MPCA by the deadline in this requirement. This protocol will describe the proposed modeling methodologyand input data, in accordance with the current version of the MPCA Air Dispersion Modeling Guidance. Theprotocol must be based on projected operating conditions under the next permit term.
Computer Dispersion Modeling Triggers for NOx: The Permittee shall conduct a refined remodeling analysis inaccordance with the Computer Dispersion Modeling requirements of this permit and the current version of theMPCA Air Dispersion Modeling Guidance if: (1) the results of the EBD modeling analysis do not demonstrateequivalent or better dispersion characteristics; (2) a conclusion cannot readily be made about the dispersion, or(3) the criteria in the EBD Modeling Triggers requirement are met and the Permittee has previously conductedthree successive EBD analyses using the same Baseline Modeling.
1350 Computer Dispersion Modeling Protocol: due 60 days after receipt of written MPCA request for revisions to thesubmitted protocol for NOx modeling.
Computer Dispersion Modeling Results: due 180 days after receipt of written MPCA approval of ComputerDispersion Modeling Protocol for NOx. The Permittee shall submit a final Computer Dispersion Modeling Reportthat is complete and approvable by MPCA by the deadline in this requirement. The submittal shall adhere to thecurrent version of the MPCA Air Dispersion Modeling Guidance and the approved Computer DispersionModeling Protocol.
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
Minn. R. 7007.3000, Title I Condition:40 CFR 52.21(k)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
g
1360
This source is subject to the U.S. EPA Acid Rain Program codified at 40 CFR pts. 72, 73, and 75. Eachcombustion turbine and duct burner (EQUI 5/EQUI 6 and EQUI 16/EQUI 17) is a utility unit that also is agas-fired unit and a new unit, as defined in 40 CFR Section 72.2.
Some of the Acid Rain Program requirements are included in this permit for MPCA tracking purposes. ThePermittee's acid rain permit application is in Appendix C of this permit.
1370
These requirements apply if a reasonable possibility (RP) as defined in 40 CFR Section 52.21(r)(6)(vi) existsthat a proposed project, analyzed using the actual-to-projected-actual (ATPA) test (either by itself or as part ofthe hybrid test at Section 52.21(a)(2)(iv)(f)) and found to not be part of a major modification, may result in asignificant emissions increase (SEI). If the ATPA test is not used for the project, or if there is no RP that theproposed project could result in a SEI, these requirements do not apply to that project. The Permittee is onlysubject to the Preconstruction Documentation requirement for a project where a RP occurs only within themeaning of Section 52.21(r)(6)(vi)(b).
Even though a particular modification is not subject to New Source Review (NSR), or where there isn't a RP thata proposed project could result in a SEI, a permit amendment, recordkeeping, or notification may still berequired by Minn. R. 7007.1150 - 7007.1500.
1400
Preconstruction Documentation -- Before beginning actual construction on a project, the Permittee shalldocument the following:
1. Project description2. Identification of any emission unit whose emissions of an NSR pollutant could be affected3. Pre-change potential emissions of any affected existing emission unit, and the projected post-changepotential emissions of any affected existing or new emission unit.4. A description of the applicability test used to determine that the project is not a major modification for anyregulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount ofemissions excluded due to increases not associated with the modification and that the emission unit could haveaccommodated during the baseline period, an explanation of why the amounts were excluded, and any credita..
1420
The Permittee shall monitor the actual emissions of any regulated NSR pollutant that could increase as a resultof the project and that were analyzed using the ATPA test, and the potential emissions of any regulated NSRpollutant that could increase as a result of the project and that were analyzed using potential emissions in thehybrid test. The Permittee shall calculate and maintain a record of the sum of the actual and potential (if thehybrid test was used in the analysis) emissions of the regulated pollutant, in tons per year on a calendar yearbasis, for a period of 5 years following resumption of regular operations after the change, or for a period of 10years following resumption of regular operations after the change if the project increases the design capacity ofor potential to emit of any unit associated with the project.
1440
The Permittee must submit a report to the Agency if the annual summed (actual, plus potential if used in hybridtest) emissions differ from the preconstruction projection and exceed the baseline actual emissions by asignificant amount as listed at 40 CFR Section 52.21(b)(23). Such report shall be submitted to the Agency within60 days after the end of the year in which the exceedances occur. The report shall contain:
a. The name and ID number of the Facility, and the name and telephone number of the Facility contact person
b. The annual emissions (actual, plus potential if any part of the project was analyzed using the hybrid test) foreach pollutant for which the preconstruction projection and significant emissions increase are exceeded...
1460Before beginning actual construction of any project which includes any electric utility steam generating unit(EUSGU), the Permittee shall submit a copy of the preconstruction documentation (items 1-4 underPreconstruction Documentation, above) to the Agency.
1470
For any project which includes any EUSGU, the Permittee must submit an annual report to the Agency, within60 days after the end of the calendar year. The report shall contain:
a. The name and ID number of the facility, and the name and telephone number of the facility contact person
b. The quantified annual emissions analyzed using the ATPA test, plus the potential emissions associated withthe same project analyzed as part of a hybrid test.
c. Any other information, such as an explanation as to why the summed emissions differ from the preconstructi..
40 CFR pt. 72, 40 CFR pt. 73, 40 CFRpt. 75, Minn. R. 7007.1075
Minn. R. 7007.0800, subp. 2, Title ICondition: 40 CFR 52.21(r)(6) andMinn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Minn.R. 7007.1200, subp. 4, Title I Condition:40 CFR 52.21(r)(6) and Minn. R.7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(r)(6) andMinn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(r)(6) andMinn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(r)(6)(ii) andMinn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(r)(6) andMinn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
1480
For any project which does not include any EUSGU, the Permittee must submit a report to the Agency if theannual summed (actual, plus potential used in hybrid test) emissions differ from the preconstruction projectionand exceed the baseline actual emissions by a significant amount as listed at 40 CFR Section 52.21(b)(23).Such report shall be submitted to the Agency within 60 days after the end of the year in which the exceedancesoccur. The report shall contain:
a. The name and ID number of the facility, and the name and telephone number of the facility contact person
b. The annual emissions (actual, plus potential if any part of the project was analyzed using the hybrid test) for ..
1490The Permittee shall comply with National Primary and Secondary Ambient Air Quality Standards, 40 CFR pt. 50,and the Minnesota Ambient Air Quality Standards, Minn. R. 7009.0010 to 7009.0080. Compliance shall bedemonstrated upon written request by the MPCA.
1500Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which wouldotherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutantemitted.
1510 Air Pollution Control Equipment: Operate all pollution control equipment whenever the corresponding processequipment and emission units are operated.
1550
Operation and Maintenance Plan: Retain at the stationary source an operation and maintenance plan for all airpollution control equipment. At a minimum, the O & M plan shall identify all air pollution control equipment andcontrol practices and shall include a preventative maintenance program for the equipment and practices, adescription of (the minimum but not necessarily the only) corrective actions to be taken to restore the equipmentand practices to proper operation to meet applicable permit conditions, a description of the employee trainingprogram for proper operation and maintenance of the control equipment and practices, and the records kept todemonstrate plan implementation.
1620Fugitive Emissions: Do not cause or permit the handling, use, transporting, or storage of any material in amanner which may allow avoidable amounts of particulate matter to become airborne. Comply with all otherrequirements listed in Minn. R. 7011.0150.
Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practicalsteps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may requirefeasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions unitsthat have an unreasonable shutdown or breakdown frequency of process or control equipment shall bepermitted to operate.
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(r)(6) andMinn. R. 7007.3000
Minn. R. 7007.0100, subp. 7(A), 7(L), &7(M), Minn. R. 7007.0800, subp. 4,Minn. R. 7007.0800, subps. 1-2, Minn.R. 7009.0010-7009.0080, Minn. Stat.116.07, subd. 4a, Minn. Stat. 116.07,subd. 9
Minn. R. 7011.0020
Minn. R. 7007.0800, subp. 16(J), Minn.R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 14, Minn. R.7007.0800, subp. 16(J)
Minn. R. 7019.1000, subp. 4
Minn. R. 7011.0150
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
p p
1630Noise: The Permittee shall comply with the noise standards set forth in Minn. R. 7030.0010 to 7030.0080 at alltimes during the operation of any emission units. This is a state only requirement and is not enforceable by theEPA Administrator or citizens under the Clean Air Act.
1640 Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R.7007.0800, subp. 9(A).
1650 The Permittee shall comply with the General Conditions listed in Minn. R. 7007.0800, subp. 16.
1660 Performance Testing: Conduct all performance tests in accordance with Minn. R. ch. 7017 unless otherwisenoted in this permit.
1670
Performance Test Notifications and Submittals:
Performance Tests are due as outlined in this permit.
Performance Test Notification (written): due 30 days before each Performance Test
Performance Test Plan: due 30 days before each Performance Test
Performance Test Pre-test Meeting: due 7 days before each Performance Test..
1680
Limits set as a result of a performance test (conducted before or after permit issuance) apply until supersededas stated in the MPCA's Notice of Compliance letter granting preliminary approval. Preliminary approval is basedon formal review of a subsequent performance test on the same unit as specified by Minn. R. 7017.2025, subp.3. The limit is final upon issuance of a permit amendment incorporating the change.
1690
Monitoring Equipment Calibration - The Permittee shall either:
1. Calibrate or replace required monitoring equipment every 12 months; or
2. Calibrate at the frequency stated in the manufacturer's specifications.
For each monitor, the Permittee shall maintain a record of all calibrations, including the date conducted, and an..
Minn. R. 7030.0010-7030.0080
Minn. R. 7007.0800, subp. 9(A)
Minn. R. 7007.0800, subp. 16
Minn. R. ch. 7017
Minn. R. 7017.2018, Minn. R.7017.2030, subps. 1-4, Minn. R.7017.2035, subps. 1-2
Minn. R. 7017.2025, subp. 3
Minn. R. 7007.0800, subp. 4(D)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
1710
Operation of Monitoring Equipment: Unless noted elsewhere in this permit, monitoring a process or controlequipment connected to that process is not necessary during periods when the process is shutdown, or duringchecks of the monitoring systems, such as calibration checks and zero and span adjustments. If monitoringrecords are required, they should reflect any such periods of process shutdown or checks of the monitoringsystem.
1720 The Permittee shall submit an application for permit reissuance : Due 180 calendar days before PermitExpiration Date.
1750
Recordkeeping: Retain all records at the stationary source, unless otherwise specified within this permit, for aperiod of five (5) years from the date of monitoring, sample, measurement, or report. Records which must beretained at this location include all calibration and maintenance records, all original recordings for continuousmonitoring instrumentation, and copies of all reports required by the permit. Records must conform to therequirements listed in Minn. R. 7007.0800, subp. 5(A).
1760Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R. 7007.1250,subp. 3) or changes contravening permit terms (as required by Minn. R. 7007.1350, subp. 2), including recordsof the emissions resulting from those changes.
1870
If the Permittee determines that no permit amendment or notification is required prior to making a change, thePermittee must retain records of all calculations required under Minn. R. 7007.1200. For expiring permits, theserecords shall be kept for a period of five years from the date the change was made or until permit reissuance,whichever is longer. The records shall be kept at the stationary source for the current calendar year of operationand may be kept at the stationary source or office of the stationary source for all other years. The records maybe maintained in either electronic or paper format.
1880
Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of anycontrol equipment or process equipment if the shutdown would cause any increase in the emissions of anyregulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notificationshall be made to the Commissioner as soon as possible after the shutdown. However, notification is not requiredin the circumstances outlined in Items A, B and C of Minn. R. 7019.1000, subp. 3.
At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdownand the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over.
3340
Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hourduration of any control equipment or process equipment if the breakdown causes any increase in the emissionsof any regulated air pollutant. The 24-hour time period starts when the breakdown was discovered or reasonablyshould have been discovered by the owner or operator. However, notification is not required in thecircumstances outlined in Items A, B and C of Minn. R. 7019.1000, subp. 2.
At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissionerof the cause of the breakdown and the estimated duration. The owner or operator shall notify the Commissionerwhen the breakdown is over.
Minn. R. 7007.0800, subp. 4(D)
Minn. R. 7007.0400, subp. 2
Minn. R. 7007.0800, subp. 5(C)
Minn. R. 7007.0800, subp. 5(B)
Minn. R. 7007.1200, subp. 4
Minn. R. 7019.1000, subp. 3
Minn. R. 7019.1000, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
18910Notification of Deviations Endangering Human Health or the Environment: As soon as possible after discovery,notify the Commissioner or the state duty officer, either orally or by facsimile, of any deviation from permitconditions which could endanger human health or the environment.
18920
Notification of Deviations Endangering Human Health or the Environment Report: Within 2 working days ofdiscovery, notify the Commissioner in writing of any deviation from permit conditions which could endangerhuman health or the environment. Include the following information in this written description:
1. the cause of the deviation;
2. the exact dates of the period of the deviation, if the deviation has been corrected;
3. whether or not the deviation has been corrected;
4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and ..
18930
The Permittee shall submit a semiannual deviations report : Due semiannually, by the 30th of January and JulyThe first semiannual report submitted by the Permittee shall cover the calendar half-year in which the permit isissued. The first report of each calendar year covers January 1 - June 30. The second report of each calendaryear covers July 1 - December 31. If no deviations have occurred, the Permittee shall submit the report statingno deviations.
18940
Application for Permit Amendment: If a permit amendment is needed, submit an application in accordance withthe requirements of Minn. R. 7007.1150 through Minn. R. 7007.1500. Submittal dates vary, depending on thetype of amendment needed.
Upon adoption of a new or amended federal applicable requirement, and if there are more than 3 yearsremaining in the permit term, the Permittee shall file an application for an amendment within nine months ofpromulgation of the applicable requirement, pursuant to Minn. R. 7007.0400, subp. 3.
18950
Extension Requests: The Permittee may apply for an Administrative Amendment to extend a deadline in apermit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R.7007.1400, subp. 1(H). Performance testing deadlines from the General Provisions of 40 CFR pt. 60 and pt. 63are examples of deadlines for which the MPCA does not have authority to grant extensions and therefore do notmeet the requirements of Minn. R. 7007.1400, subp. 1(H).
18960The Permittee shall submit a compliance certification : Due annually, by the 31st of January (for the previouscalendar year). The Permittee shall submit this to the Commissioner on a form approved by the Commissioner.This report covers all deviations experienced during the calendar year.
18970 Emission Inventory Report: due on or before April 1 of each calendar year following permit issuance, to besubmitted on a form approved by the Commissioner.
Minn. R. 7019.1000, subp. 1
Minn. R. 7019.1000, subp. 1
Minn. R. 7007.0800, subp. 6(A)(2)
Minn. R. 7007.0400, subp. 3, Minn. R.7007.1150 - 7007.1500
Minn. R. 7007.1400, subp. 1(H)
Minn. R. 7007.0800, subp. 6(C)
Minn. R. 7019.3000-7019.3100
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementTFAC 1(01300098)
pp y
18980 Emission Fees: due 30 days after receipt of an MPCA bill.
19390
The Permittee shall submit excess emission/downtime report : Due by 30 days after the end of each calendarquarter following permit issuance. Submit Deviations Reporting Form DRF-1 as amended. The EER shallindicate all periods of monitor bypass and all periods of exceedances of the limit including exceedances allowedby an applicable standard, i.e. during startup, shutdown, and malfunctions. The EER must be submitted even ifthere were no excess emissions, downtime or bypasses during the quarter.
COMG 5 1Formaldehyde <= 9.0 tons per year 12-month rolling sum, regardless of fuel type. This limit applies to the totalcombined emissions from the subject items associated with COMG 5, and at all times including startup,shutdown, and malfunction.
2Hexane <= 9.0 tons per year 12-month rolling sum, regardless of fuel type. This limit applies to the totalcombined emissions from the subject items associated with COMG 5, and at all times including startup,shutdown, and malfunction.
3 HAPs - Total <= 22.5 tons per year 12-month rolling sum. This limit applies to the total combined emissions fromthe subject items associated with COMG 5, and at all times including startup, shutdown, and malfunction.
4
HAP Emissions Monitoring: The Permittee shall determine EQUI 7, EQUI 11, EQUI 18 and EQUI 19formaldehyde, n-hexane, other single HAPs, and total HAP emissions using monthly heat input records, monthlyoperating hours, and applicable emission factors as listed below.EQUI 7: AP 42 Tables 1.4-3 and 1.4-4;EQUI 11: AP 42 Table 3.3-2;EQUI 18: AP 42 Tables 3.3-2, 3.4-3 and 3.4-4;EQUI 19: AP 42 Tables 1.4-3 and 1.4-4.
5 Monthly Heat Input Monitoring: By the 15th of the month, the Permittee shall calculate and record total heat input(in million Btus) for EQUI 7, EQUI 11, EQUI 18 and EQUI 19 for the previous operating month.
Minn. R. 7002.0005-7002.0095
40 CFR 60.7(c), 40 CFR 75.64, Minn.R. 7017.1110, subp. 1-2
Minn. R. 7011.7000, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7011.7000, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7011.7000, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementCOMG 5
( ) p p g
6
Monthly HAPs Emissions Monitoring and Recordkeeping:By the 15th of the month, the Permittee shall calculate and record monthly EQUI 7, EQUI 11, EQUI 18 andEQUI 19 formaldehyde, n-hexane and total HAP emissions for the previous calendar month, and the 12 monthrolling sum by summing the formaldehyde, n-hexane and total HAP emissions for the previous 12 months.Formaldehyde, n-hexane and other single HAP emissions are determined using monthly EQUI 7, EQUI 11,EQUI 18 and EQUI 19 heat input data and the applicable lb/mmBtu emission factor from the appropriate Tablein AP 42.Total HAP emissions are determined by summing all individual HAPs data for the previous calendar month andprevious 12 months (12-month rolling sum).
7HAP Emissions Monitoring, Daily Heat Input Monitoring and Monthly HAPs Emissions Monitoring andRecordkeeping requirements are located at STRU 14 for EQUI 5 and EQUI 6, and at STRU 20 for EQUI 16 andEQUI 17.
8
In lieu of using monthly recordkeeping for EQUI 7, EQUI 11, EQUI 18 and EQUI 19, the Permittee may use thefollowing monthly potential to emit values:EQUI 7: Formaldehyde = 0.002 tons/month, n-hexane = 0.045 tons/month, Total HAPs = 0.048 tons/monthEQUI 11: Formaldehyde = 1.2E-05 tons/month, n-hexane = 0 tons/month, Total HAPs = 3.95E-05 tons/monthEQUI 18: Formaldehyde = 8.36E-06 tons/month, n-hexane = 0 tons/month, Total HAPs = 1.71E-04 tons/monthEQUI 19: Formaldehyde = 7.70E-05 tons/month, n-hexane = 1.85E-03 tons/month, Total HAPs = 1.94E-03tons/month.
EQUI 3(MR003)
1 NOx CEMS Daily Calibration Error (CE) Test: Conduct daily CE testing on the NOx CEMS in accordance with 40CFR pt. 75, Appendix B.
4 NOx CEMS RATA Notification: due 30 days before CEMS Relative Accuracy Test Audit (RATA).
5
NOx CEMS Relative Accuracy Test Audit (RATA): Due semiannually following Permit Issuance, i.e., once everytwo successive QA operating quarters (calendar quarter in which there are at least 168 unit operating hours).Conduct a RATA on all CEMS required by the Acid Rain Program, in accordance with 40 CFR pt. 75, AppendixB. Relative accuracy test audits may be performed annually (i.e., once every four successive QA operatingquarters, rather than once every two successive QA operating quarters) if any of the conditions listed in 40 CFRpt. 75, Appendix B, Sections 2.3.1.2(a) through 2.3.1.2(i) are met.
2200 Relative Accuracy Test Audit (RATA) Results Summary: due 30 days after end of each calendar quarter inwhich a RATA was conducted.
Minn. R. 7007.0800, subps. 4-5, Minn.R. 7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subps. 4-5, Minn.R. 7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
40 CFR pt. 75, Appendix B(Sect 2.1)
Minn. R. 7017.1180, subp. 2
40 CFR pt. 75, Appendix B (Sect 2.3.1),Minn. R. 7017.1020
Minn. R. 7017.1180, subp. 3
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 3(MR003)
2220 Cylinder Gas Audit (CGA) Results Summary: due 30 days after end of each calendar quarter in which a CGAwas conducted.
2410The CEMS/COMS requirements listed below outline the typical standards of 40 CFR Pt. 75. Additionalmonitoring requirements may also apply to the Facility based on the standard and it is the responsibility of theFacility to meet all applicable requirements.
2420 Emissions Monitoring: The owner or operator shall use a CEMS to measure emissions from EQUI 5.
2440
Monitoring Data: Hourly averages shall be computed using at least one data point in each fifteen minutequadrant of an hour, where the unit combusted fuel during that quadrant of an hour. Not withstanding thisrequirement, an hourly average may be computed from at least two data points separated by a minimum of 15minutes (where the unit operates for more than one quadrant of an hour) if data is unavailable as a result of theperformance of calibration, quality assurance, or preventive maintenance activities pursuant to 40 CFR Section75.21 and appendix B of pt. 75, or backups of data from the data acquisition and handling system, orrecertification, pursuant to Section 75.20. The owner or operator shall use all valid measurements or data pointscollected during an hour to calculate the hourly averages. All data points collected during an hour shall be, to theextent practicable, evenly spaced over the hour.
2450 CEMS QA/QC NOx and Diluent Monitoring: The owner or operator of an affected facility shall operate, calibrate,and maintain each CEMS according to the QA/QC procedures in 40 CFR pt. 75, Appendix B as amended.
2470
The Permittee shall conduct linearity and leak check : Due after Startup of Monitor Date quarterly in accordancewith procedures in 40 CFR pt. 75, Appendix B, Sections 2.2.1 and 2.2.2, and Appendix A, Section 6.2. Thismeans once every calendar quarter in which there are at least 168 unit operating hours. Perform a leak check atleast once during each QA operating quarter.
2490 Quarterly Reports: Electronically report the data and information in 40 CFR Section 75.64 (a), (b), and (c) to theAdministrator quarterly.
Minn. R. 7017.1180, subp. 1
Minn. R. 7007.subp. 4, A
40 CFR 75.10(a)
40 CFR 75.10(d)(1)
40 CFR 75.21(a)
40 CFR pt. 75, Appendix B, 2.2
40 CFR 75.64
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 3(MR003)
q y
2500
Recordkeeping: The owner or operator shall maintain for each affected unit a file of all measurements, data,reports, and other information required by this part at the source in a form suitable for inspection for at leastthree (3) years from the date of each record. The file shall contain all information required by 40 CFR Section75.57.
EQUI 4(MR004)
4 CEMS QA/QC Diluent Monitoring: The owner or operator of an affected facility shall operate, calibrate, andmaintain each CEMS according to the QA/QC procedures in 40 CFR pt. 75, Appendix B as amended.
2200 Relative Accuracy Test Audit (RATA) Notification: due 30 days before CO CEMS Relative Accuracy Test Audit(RATA).
2220 Relative Accuracy Test Audit (RATA) Results Summary: due 30 days after end of each calendar quarter inwhich a RATA was conducted.
2230 Cylinder Gas Audit (CGA) Results Summary: due 30 days after end of each calendar quarter in which a CGAwas conducted.
2240The CEMS/COMS requirements listed below outline the typical standards of 40 CFR pt. 60 when combined withMinn. R. Additional monitoring requirements may also apply to the Facility based on this combination ofstandards and it is the responsibility of the Facility to meet all applicable requirements.
2260 Carbon Monoxide: Emissions Monitoring: The owner or operator shall use a CEMS to measure emissions fromEQUI 5.
40 CFR 75.57
40 CFR 75.21(a)
Minn. R. 7017.1180, subp. 2
Minn. R. 7017.1180, subp. 3
Minn. R. 7017.1180, subp. 1
Minn. R. 7017.1010
40 CFR pt. 60, subp. GG, Minn. R.7017.1010, subp 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 4(MR004)
2270
Certification Test Plan due 30 days before Certification Test.Certification Test Pretest Meeting due 7 days before Certification Test.Certification Test Report - Microfiche Copy due 105 days after Certification Test.Certification Test Report due 45 days after Certification Test.The Notification, Test Plan, and Test Report may be submitted in alternate format as allowed by Minn. R.7017.1120, subp. 2.
2280
Continuous Operation: CEMS must be operated and data recorded during all periods of emission unit operationincluding periods of emission unit start-up, shutdown, or malfunction except for periods of acceptable monitordowntime. This requirement applies whether or not a numerical emission limit applies during these periods. ACEMS must not be bypassed except in emergencies where failure to bypass would endanger human health,safety, or plant equipment.
2290
QA Plan: Develop and implement a written quality assurance plan that covers each CEMS. The plan shall be onsite and available for inspection within 30 days after monitor certification. The plan shall contain all of theinformation required by 40 CFR Part 60, Appendix F, Section 3. The plan shall include the manufacturer's spareparts list for each CEMS and require that those parts be kept at the facility unless the Commissioner giveswritten approval to exclude specific spare parts from the list.
2300
CEMS QA/QC: The owner or operator of an affected facility is subject to the performance specifications listed in40 CFR pt. 60, Appendix B and shall operate, calibrate, and maintain each CEMS according to the QA/QCprocedures in 40 CFR pt. 60, Appendix F as amended and maintain a written QA/QC program available in aform suitable for inspection.
2310
CEMS Daily Calibration Drift Test: Check the zero (low level value between 0 and 20 percent of span value) andspan (50 to 100 percent of span value) calibration drifts at least once daily. The zero and span must, at aminimum, be adjusted whenever the drift exceeds two times the limit specified in 40 CFR pt. 60, Appendix B. 40CFR pt. 60, Appendix F, Section 4.3.1 shall be used to determine out-of-control periods for CEMS.
2360Recordkeeping: The owner or operator must retain records of all CEMS monitoring data and support informationfor a period of five years from the date of the monitoring sample, measurement or report. Records shall be keptat the source.
2370CEMS Certification/Recertification Test: due 90 days after the first excess emissions report required for theCEMS or any change which invalidates the monitor's certification status as outlined in Minn. R. 7017.1050, subp.2.
40 CFR 60.7(a)(5), Minn. R.7017.1060, subp. 1-3, Minn. R.7017.1080, subp. 1-4
40 CFR 60.13(e), Minn. R. 7017.1090
40 CFR pt. 60, Appendix F, 3, Minn. R.7017.1170, subp. 2
40 CFR 60.13(a), 40 CFR pt. 60,Appendix F
40 CFR 60.13(d)(1), 40 CFR pt. 60,Appendix F, 4.1, Minn. R. 7017.1170,subp. 3
40 CFR 60.7(f), Minn. R. 7017.1130
40 CFR 60.13(b)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 4(MR004)
2380The Permittee shall conduct CEMS cylinder gas audit (CGA) : Due after CEMS Certification Test Date quarterlybut no more than three quarters in succession. A CGA is not required during any calendar quarter in which aRATA was performed.
2381 The Permittee shall conduct CEMS relative accuracy test audit (RATA) : Due after CEMS Certification Test Dateannually meaning by the end of every one of four calendar quarters.
EQUI 5(EU002)
1
Nitrogen Oxides: less than or equal to the value determined by the following equation:
STD = 0.0075 * (14.4/Y) + F
STD = NOx limit in percent by volume at 15 percent oxygen and on a dry basisY = manufacturer's rated heat rate at manufacturer's rated load in kilojoules per watt hour, or actual measuredheat rate based on lower heating value of fuel as measured at actual peak load, not to exceed 14.4 kilojoulesper watt hourF = NOx emission allowance for fuel-bound nitrogen
The use of F (fuel-bound nitrogen allowance) is optional.
2The Permittee shall limit Sulfur Dioxide <= 0.015 percent by volume at 15 percent oxygen and on a dry basis, or
The Permittee shall limit Sulfur Content of Fuel <= 0.8 percent by weight.
3 The Permittee shall limit Sulfur Dioxide <= 0.50 pounds per million Btu heat input The potential to emit from theunit is 0.0022409 lb/MMBtu due to equipment design and allowable fuels.
5 Opacity <= 20 percent opacity once operating temperatures have been attained.
6Permitted Fuel Types: Natural gas as defined in 40 CFR Section 72.2, except total sulfur content shall notexceed 0.8 grains/100 scf and the natural gas shall be obtained from a supplier through a pipeline, and distillatefuel oil with a sulfur content not to exceed 0.05% by weight.
40 CFR pt. 60, Appendix F, 5.1.3
40 CFR pt. 60, Appendix F, 5.1.1
40 CFR 60.332(a)(1), Minn. R.7011.2350
40 CFR 60.333, Minn. R. 7011.2350
Minn. R. 7011.2300, subp. 2
Minn. R. 7011.2300, subp. 1
Minn. R. 7011.2300, subp. 2, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
y g
7 The Permittee shall limit Operating Hours <= 875 hours per year 12-month rolling sum while using distillate fueloil.
8NOx Monitoring: The Permittee shall use a CEM to measure NOx emissions according to 40 CFR Sections60.334(d) and (e), or continuously measure the water to fuel or steam to fuel ratio as described in 40 CFRSection 60.334(a).
9Fuel Monitoring: The Permittee shall follow the applicable fuel sulfur and nitrogen content monitoringrequirements in 40 CFR Section 60.334(h) and shall monitor at the frequency specified in 40 CFR Section60.334(i).
10
Recordkeeping - Fuel Oil Operating Hours: Once each day the Permittee shall calculate and record the numberof hours, to the nearest tenth, that the combustion turbine combusted fuel oil, during the previous calendar day.
By the last day of each month, the Permittee shall calculate and record the total fuel oil combustion operatinghours for the combustion turbine, for the previous calendar month and the previous 12-month period.
Separate daily, monthly, and 12-month rolling sum records shall be kept for the combustion turbine.
11 Excess Emission Reports: The Permittee shall submit reports of excess emissions required by 40 CFR Section60.334(j) with the EER required for STRU 14 listed in this permit.
12Performance Testing: The Permittee shall conduct performance testing to measure NOx and SO2, as requiredby 40 CFR Section 60.335, unless the Permittee obtains approval from the Administrator to use alternate testmethods according to 40 CFR Section 60.8(b).
13 The Permittee shall keep records of fuel type and usage on a monthly basis.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
40 CFR 60.334(d) & (e), Minn. R.7011.2350
40 CFR 60.334(h) & (i), Minn. R.7011.2350
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
40 CFR 60.334(j), Minn. R. 7011.2350
40 CFR 60.335, 40 CFR 60.8(a), Minn.R. 7011.2350
Minn. R. 7007.0800, subp. 5
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
p yp g y
14 Fuel Supplier Certification: The Permittee shall obtain and maintain annual fuel supplier certification for pipelinedelivery of natural gas, certifying that the sulfur content does not exceed 0.8 grains/100 scf.
15 For the purposes of the 40 CFR pt. 97, subp. AAAAA requirements in this permit, the "Permittee" is an "owner"and "operator" as defined in 40 CFR Section 97.402.
16 Transport Rule (TR) NOx Annual Trading Program Requirements.The Permittee shall comply with the TR NOx Annual Trading Program requirements contained in Appendix D.
17Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Sections 97.413 through 97.418.
18
TR NOx Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators and the designated representative of each TR NOx Annual source and each TRNOx Annual unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of 40CFR Section 97.430 (general requirements, including installation, certification, and data accounting, compliancedeadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.431 (initial monitoringsystem certification and recertification procedures), 40 CFR Section 97.432 (monitoring system out-of-controlperiods), 40 CFR Section 97.433 (notifications concerning monitoring), 40 CFR Section 97.434 (recordkeepingand reporting, including monitoring plans, certification applications, quarterly reports, and compliancecertification), and 40 CFR Section 97.435 (petitions for alternatives to monitoring, recordkeeping, or reportingrequirements).2) The emissions data determined in accordance with 40 CFR Section 97.430 through 97.435 shall be used to ..
19
TR NOx Annual emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR NOx Annual source and each TR NOx Annual unit at the source shall hold, in the source'scompliance account, TR NOx Annual allowances available for deduction for such control period under 40 CFRSection 97.424(a) in an amount not less than the tons of total NOx emissions for such control period from all TRNOx Annual units at the source.ii) If total NOx emissions during a control period in a given year from the TR NOx Annual units at a TR NOxAnnual source are in excess of the TR NOx Annual emissions limitation set forth in 40 CFR Section97.406(c)(1)(i) above, then: A) The owners and operators of the source and each TR NOx Annual unit at thesource shall hold the TR NOx Annual allowances required for deduction under 40 CFR Section 97.424(d); and ..
20
TR NOx Annual assurance provisions.i) If total NOx emissions during a control period in a given year from all TR NOx Annual units at TR NOx Annualsources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level, thenthe owners and operators of such sources and units in each group of one or more sources and units having acommon designated representative for such control period, where the common designated representative'sshare of such NOx emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR NOx Annual allowances available for deduction for such control periodunder 40 CFR Section 97.425(a) in an amount equal to two times the product (rounded to the nearest wholenumber), as determined by the Administrator in accordance with 40 CFR Section 97.425(b), of multiplying— A)The quotient of the amount by which the common designated representative's share of such NOx emissions ex..
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR pt. 52, 21(j)(BACT)& Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
40 CFR 97.430-435
40 CFR 97.406(a)
40 CFR 97.406(b)
40 CFR 97.406(c)(1)
40 CFR 97.406(c)(2)(i)-(v)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
21
Compliance periods.i) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(1) above for thecontrol period starting on the later of January 1, 2015, or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.ii) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.
22
Vintage of allowances held for compliance.i) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section 97.406(c)(1)(i)above for a control period in a given year must be a TR NOx Annual allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section97.406(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR NOx Annualallowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
23Allowance Management System requirements.Each TR NOx Annual allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart AAAAA.
24
Limited authorization.A TR NOx Annual allowance is a limited authorization to emit one ton of NOx during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR NOx Annual Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, the Administrator has the authority to terminate or limitthe use and duration of such authorization to the extent the Administrator determines is necessary orappropriate to implement any provision of the Clean Air Act.
25 Property right. A TR NOx Annual allowance does not constitute a property right.
26
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR NOx Annual source and each TR NOxAnnual unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.416 for the designated representative for the sourceand each TR NOx Annual unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.416 changing thedesignated representative. ..
27
Liability.1) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual source or thedesignated representative of a TR NOx Annual source shall also apply to the owners and operators of suchsource and of the TR NOx Annual unit shall also apply to the owners and operators of such unit.2) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual unit or the designatedrepresentative of a TR NOx Annual unit shall also apply to the owners and operators of such unit.
40 CFR 97.406(c)(3)
40 CFR 97.406(c)(4)
40 CFR 97.406(c)(5)
40 CFR 97.406(c)(6)
40 CFR 97.406(c)(7)
40 CFR 97.406(e)
40 CFR 97.406(f)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
p pp y p
28
Effect on other authorities.No provision of the TR NOx Annual Trading Program or exemption under 40 CFR Section 97.405 shall beconstrued as exempting or excluding the owners and operators, and the designated representative, of a TR NOxAnnual source or TR NOx Annual unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
29 Transport Rule (TR) SO2 Group 2 Trading Program Requirements.The Permittee shall comply with the TR SO2 Group 2 Trading Program Requirements contained in Appendix D.
30Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Section 97.713 through 97.718.
31
TR SO2 Group 2 Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators, and the designated representative, of each TR SO2 Group 2 source and each TRSO2 Group 2 unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of40 CFR Section 97.730 (general requirements, including installation, certification, and data accounting,compliance deadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.731 (initialmonitoring system certification and recertification procedures), 40 CFR Section 97.732 (monitoring systemout-of-control periods), 40 CFR Section 97.733 (notifications concerning monitoring), 40 CFR Section 97.734(recordkeeping and reporting, including monitoring plans, certification applications, quarterly reports, andcompliance certification), and 40 CFR Section 97.735 (petitions for alternatives to monitoring, recordkeeping, orreporting requirements).2) The emissions data determined in accordance with 40 CFR Section 97.730 through 97.735 shall be used to ..
32
TR SO2 Group 2 emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR SO2 Group 2 source and each TR SO2 Group 2 unit at the source shall hold, in thesource's compliance account, TR SO2 Group 2 allowances available for deduction for such control period under40 CFR Section 97.724(a) in an amount not less than the tons of total SO2 emissions for such control periodfrom all TR SO2 Group 2 units at the source.ii) If total SO2 emissions during a control period in a given year from the TR SO2 Group 2 units at a TR SO2Group 2 source are in excess of the TR SO2 Group 2 emissions limitation set forth in paragraph 40 CFR Section97.706(c)(1)(i) above, then: A) The owners and operators of the source and each TR SO2 Group 2 unit at thesource shall hold the TR SO2 Group 2 allowances required for deduction under 40 CFR Section 97.724(d); and..
33
TR SO2 Group 2 assurance provisions.i) If total SO2 emissions during a control period in a given year from all TR SO2 Group 2 units at TR SO2 Group2 sources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level,then the owners and operators of such sources and units in each group of one or more sources and units havinga common designated representative for such control period, where the common designated representative'sshare of such SO2 emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR SO2 Group 2 allowances available for deduction for such controlperiod under 40 CFR Section 97.725(a) in an amount equal to two times the product (rounded to the nearestwhole number), as determined by the Administrator in accordance with 40 CFR Section 97.725(b), ofmultiplying— A) The quotient of the amount by which the common designated representative's share of such S..
34
Compliance Periods.i) A TR SO2 Group 2 unit shall be subject to the requirements under 40 CFR Section 97.706(c)(1) above for thecontrol period starting on the later of January 1, 2015 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafterii) A TR SO2 Group 2 unit shall be subject to the requirements under 40 Section CFR 97.706(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafter.
40 CFR 97.406(g)
40 CFR 97.730-735
40 CFR 97.706(a)
40 CFR 97.706(b)
40 CFR 97.706(c)(1)
40 CFR 97.706(c)(2)(i)-(v)
40 CFR 97.706(c)(3)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
q ( ) p
35
Vintage of allowances held for compliance.i) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section 97.706(c)(1)(i)above for a control period in a given year must be a TR SO2 Group 2 allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section97.706(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR SO2 Group 2allowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
36Allowance Management System requirements.Each TR SO2 Group 2 allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart DDDDD.
37
Limited authorization.A TR SO2 Group 2 allowance is a limited authorization to emit one ton of SO2 during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR SO2 Group 2 Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, subpart DDDDD, the Administrator has the authorityto terminate or limit the use and duration of such authorization to the extent the Administrator determines isnecessary or appropriate to implement any provision of the Clean Air Act.
38 Property right.A TR SO2 Group 2 allowance does not constitute a property right.
39
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR SO2 Group 2 source and each TR SO2Group p2 unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.716 for the designated representative for the sourceand each TR SO2 Group 2 unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.716 changing thedesignated representative. ..
40
Liability.1) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 source or thedesignated representative of a TR SO2 Group 2 source shall also apply to the owners and operators of suchsource and of the TR SO2 Group 2 units at the source.2) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 unit or thedesignated representative of a TR SO2 Group 2 unit shall also apply to the owners and operators of such unit.
41
Effect on other authorities.No provision of the TR SO2 Group 2 Trading Program or exemption under 40 CFR Section 97.705 shall beconstrued as exempting or excluding the owners or operators, and the designated representative, of a TR SO2Group 2 source or TR SO2 Group 2 unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
40 CFR 97.706(c)(4)
40 CFR 97.706(c)(5)
40 CFR 97.706(c)(6)
40 CFR 97.706(c)(7)
40 CFR 97.706(e)
40 CFR 97.706(f)
40 CFR 97.706(g)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 5(EU002)
p p y p
42 Additional requirements for Combustion Turbine #2 are located at STRU 14.
EQUI 6(EU004)
1
The Permittee shall limit Sulfur Dioxide <= 0.20 pounds per million Btu heat input 30-day rolling average exceptduring startup, shutdown, or malfunction.
'30-day Rolling Average' is '30 successive boiler operating days rolling average', and 'boiler operating day' isdefined at 40 CFR Section 60.41Da.
2
The Permittee shall limit Nitrogen Oxides <= 1.6 pounds per megawatt-hour 30-day rolling average exceptduring startup, shutdown, or malfunction, or,
The Permittee shall limit Nitrogen Oxides <= 0.15 lb/million Btu using 30-day Rolling Average except duringstartup, shutdown, or malfunction.
'30-day Rolling Average' is '30 successive boiler operating days rolling average', and 'boiler operating day' isdefined at 40 CFR Section 60.41Da. Megawatt-hour is on a gross output basis.
3 Permitted Fuel Type: Natural gas as defined in 40 CFR Section 72.2, except total sulfur content shall not exceed0.8 grains/100 scf and the natural gas shall be obtained from a supplier through a pipeline.
4 Fuel Supplier Certification: The Permittee shall obtain and maintain annual fuel supplier certification for pipelinedelivery of natural gas, certifying that the sulfur content does not exceed 0.8 grains/100 scf.
5Duct Burner Compliance Provisions: The Permittee shall follow the compliance provisions in 40 CFR Section60.48Da to determine duct burner compliance with the SO2 limit in 40 CFR Section 60.42Da(b)(2) and the NOxlimit in 40 CFR Section 60.44Da(d).
6 Reporting: Follow reporting requirements in 40 CFR Section 60.49Da as applicable.
Minn. R. 7007.0800, subp. 2
40 CFR 60.43Da(b)(2), 40 CFR60.48Da(a) & (b), Minn. R. 7011.0560
40 CFR 60.44Da(d), 40 CFR60.48Da(a) & (b), Minn. R. 7011.0560
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR pt. 52, 21(j)(BACT)& Minn. R. 7007.3000
40 CFR 60.48Da, Minn. R. 7011.0560
40 CFR 60.49Da, Minn. R. 7011.0560
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 6(EU004)
p g p g q pp
36 For the purposes of the 40 CFR pt. 97, subp. AAAAA requirements in this permit, the "Permittee" is an "owner"and "operator" as defined in 40 CFR Section 97.402.
20760 Transport Rule (TR) NOx Annual Trading Program Requirements.The Permittee shall comply with the TR NOx Annual Trading Program requirements contained in Appendix D.
20770Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Sections 97.413 through 97.418.
20780
TR NOx Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators and the designated representative of each TR NOx Annual source and each TRNOx Annual unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of 40CFR Section 97.430 (general requirements, including installation, certification, and data accounting, compliancedeadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.431 (initial monitoringsystem certification and recertification procedures), 40 CFR Section 97.432 (monitoring system out-of-controlperiods), 40 CFR Section 97.433 (notifications concerning monitoring), 40 CFR Section 97.434 (recordkeepingand reporting, including monitoring plans, certification applications, quarterly reports, and compliancecertification), and 40 CFR Section 97.435 (petitions for alternatives to monitoring, recordkeeping, or reportingrequirements).2) The emissions data determined in accordance with 40 CFR Section 97.430 through 97.435 shall be used to ..
20790
TR NOx Annual emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR NOx Annual source and each TR NOx Annual unit at the source shall hold, in the source'scompliance account, TR NOx Annual allowances available for deduction for such control period under 40 CFRSection 97.424(a) in an amount not less than the tons of total NOx emissions for such control period from all TRNOx Annual units at the source.ii) If total NOx emissions during a control period in a given year from the TR NOx Annual units at a TR NOxAnnual source are in excess of the TR NOx Annual emissions limitation set forth in 40 CFR Section97.406(c)(1)(i) above, then: A) The owners and operators of the source and each TR NOx Annual unit at thesource shall hold the TR NOx Annual allowances required for deduction under 40 CFR Section 97.424(d); and ..
20800
TR NOx Annual assurance provisions.i) If total NOx emissions during a control period in a given year from all TR NOx Annual units at TR NOx Annualsources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level, thenthe owners and operators of such sources and units in each group of one or more sources and units having acommon designated representative for such control period, where the common designated representative'sshare of such NOx emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR NOx Annual allowances available for deduction for such control periodunder 40 CFR Section 97.425(a) in an amount equal to two times the product (rounded to the nearest wholenumber), as determined by the Administrator in accordance with 40 CFR Section 97.425(b), of multiplying— A)The quotient of the amount by which the common designated representative's share of such NOx emissions ex..
20810
Compliance periods.i) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(1) above for thecontrol period starting on the later of January 1, 2015, or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.ii) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.
Minn. R. 7007.0800, subp. 2
40 CFR 97.430-435
40 CFR 97.406(a)
40 CFR 97.406(b)
40 CFR 97.406(c)(1)
40 CFR 97.406(c)(2)(i)-(v)
40 CFR 97.406(c)(3)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 6(EU004)
q ( ) p
20820
Vintage of allowances held for compliance.i) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section 97.406(c)(1)(i)above for a control period in a given year must be a TR NOx Annual allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section97.406(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR NOx Annualallowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
20830Allowance Management System requirements.Each TR NOx Annual allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart AAAAA.
20840
Limited authorization.A TR NOx Annual allowance is a limited authorization to emit one ton of NOx during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR NOx Annual Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, the Administrator has the authority to terminate or limitthe use and duration of such authorization to the extent the Administrator determines is necessary orappropriate to implement any provision of the Clean Air Act.
20850 Property right. A TR NOx Annual allowance does not constitute a property right.
20860
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR NOx Annual source and each TR NOxAnnual unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.416 for the designated representative for the sourceand each TR NOx Annual unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.416 changing thedesignated representative. ..
20870
Liability.1) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual source or thedesignated representative of a TR NOx Annual source shall also apply to the owners and operators of suchsource and of the TR NOx Annual unit shall also apply to the owners and operators of such unit.2) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual unit or the designatedrepresentative of a TR NOx Annual unit shall also apply to the owners and operators of such unit.
20880
Effect on other authorities.No provision of the TR NOx Annual Trading Program or exemption under 40 CFR Section 97.405 shall beconstrued as exempting or excluding the owners and operators, and the designated representative, of a TR NOxAnnual source or TR NOx Annual unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
40 CFR 97.406(c)(4)
40 CFR 97.406(c)(5)
40 CFR 97.406(c)(6)
40 CFR 97.406(c)(7)
40 CFR 97.406(e)
40 CFR 97.406(f)
40 CFR 97.406(g)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 6(EU004)
p p y p
20890 Transport Rule (TR) SO2 Group 2 Trading Program Requirements.The Permittee shall comply with the TR SO2 Group 2 Trading Program Requirements contained in Appendix D.
20900Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Section 97.713 through 97.718.
20910
TR SO2 Group 2 Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators, and the designated representative, of each TR SO2 Group 2 source and each TRSO2 Group 2 unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of40 CFR Section 97.730 (general requirements, including installation, certification, and data accounting,compliance deadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.731 (initialmonitoring system certification and recertification procedures), 40 CFR Section 97.732 (monitoring systemout-of-control periods), 40 CFR Section 97.733 (notifications concerning monitoring), 40 CFR Section 97.734(recordkeeping and reporting, including monitoring plans, certification applications, quarterly reports, andcompliance certification), and 40 CFR Section 97.735 (petitions for alternatives to monitoring, recordkeeping, orreporting requirements).2) The emissions data determined in accordance with 40 CFR Section 97.730 through 97.735 shall be used to ..
20920
TR SO2 Group 2 emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR SO2 Group 2 source and each TR SO2 Group 2 unit at the source shall hold, in thesource's compliance account, TR SO2 Group 2 allowances available for deduction for such control period under40 CFR Section 97.724(a) in an amount not less than the tons of total SO2 emissions for such control periodfrom all TR SO2 Group 2 units at the source.ii) If total SO2 emissions during a control period in a given year from the TR SO2 Group 2 units at a TR SO2Group 2 source are in excess of the TR SO2 Group 2 emissions limitation set forth in paragraph 40 CFR Section97.706(c)(1)(i) above, then: A) The owners and operators of the source and each TR SO2 Group 2 unit at thesource shall hold the TR SO2 Group 2 allowances required for deduction under 40 CFR Section 97.724(d); and..
20930
TR SO2 Group 2 assurance provisions.i) If total SO2 emissions during a control period in a given year from all TR SO2 Group 2 units at TR SO2 Group2 sources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level,then the owners and operators of such sources and units in each group of one or more sources and units havinga common designated representative for such control period, where the common designated representative'sshare of such SO2 emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR SO2 Group 2 allowances available for deduction for such controlperiod under 40 CFR Section 97.725(a) in an amount equal to two times the product (rounded to the nearestwhole number), as determined by the Administrator in accordance with 40 CFR Section 97.725(b), ofmultiplying— A) The quotient of the amount by which the common designated representative's share of such S..
20940
Compliance Periods.i) A TR SO2 Group 2 unit shall be subject to the requirements under 40 CFR Section 97.706(c)(1) above for thecontrol period starting on the later of January 1, 2015 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafterii) A TR SO2 Group 2 unit shall be subject to the requirements under 40 Section CFR 97.706(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafter.
20950
Vintage of allowances held for compliance.i) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section 97.706(c)(1)(i)above for a control period in a given year must be a TR SO2 Group 2 allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section97.706(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR SO2 Group 2allowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
40 CFR 97.730-735
40 CFR 97.706(a)
40 CFR 97.706(b)
40 CFR 97.706(c)(1)
40 CFR 97.706(c)(2)(i)-(v)
40 CFR 97.706(c)(3)
40 CFR 97.706(c)(4)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 6(EU004)
y g y
20960Allowance Management System requirements.Each TR SO2 Group 2 allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart DDDDD.
20970
Limited authorization.A TR SO2 Group 2 allowance is a limited authorization to emit one ton of SO2 during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR SO2 Group 2 Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, subpart DDDDD, the Administrator has the authorityto terminate or limit the use and duration of such authorization to the extent the Administrator determines isnecessary or appropriate to implement any provision of the Clean Air Act.
20980 Property right.A TR SO2 Group 2 allowance does not constitute a property right.
20990
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR SO2 Group 2 source and each TR SO2Group p2 unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.716 for the designated representative for the sourceand each TR SO2 Group 2 unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.716 changing thedesignated representative. ..
21000
Liability.1) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 source or thedesignated representative of a TR SO2 Group 2 source shall also apply to the owners and operators of suchsource and of the TR SO2 Group 2 units at the source.2) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 unit or thedesignated representative of a TR SO2 Group 2 unit shall also apply to the owners and operators of such unit.
21010
Effect on other authorities.No provision of the TR SO2 Group 2 Trading Program or exemption under 40 CFR Section 97.705 shall beconstrued as exempting or excluding the owners or operators, and the designated representative, of a TR SO2Group 2 source or TR SO2 Group 2 unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
21011 Additional requirements for Duct Burner (Combustion Turbine #2) are located at STRU 14.
40 CFR 97.706(c)(5)
40 CFR 97.706(c)(6)
40 CFR 97.706(c)(7)
40 CFR 97.706(e)
40 CFR 97.706(f)
40 CFR 97.706(g)
Minn. R. 7007.0800, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # Requirement( ) q ( )
EQUI 7(EU005)
2 Total Particulate Matter <= 0.008 pounds per million Btu heat input 3-hour block average.
3 PM < 10 micron <= 0.008 pounds per million Btu heat input 3-hour block average.
4 Nitrogen Oxides <= 0.036 pounds per million Btu heat input 3-hour block average.
5 Sulfur Dioxide <= 0.001 pounds per million Btu heat input 3-hour block average.
6 Carbon Monoxide <= 0.06 pounds per million Btu heat input 3-hour block average.
7 Volatile Organic Compounds <= 0.007 pounds per million Btu heat input 3-hour block average.
9 Permitted Fuel Type: Restricted to natural gas with a sulfur content no greater than 0.8 grains per 100 scf.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 7(EU005)
yp g g g p
11 Fuel Usage Recordkeeping: Record and maintain records of the amounts fuel combusted on a monthly basis.These records may be in the form of fuel bills or meter readings.
19950
PM < 10 micron : The Permittee shall conduct an initial performance test : Due 180 calendar days after PermitIssuance Date to measure emissions. The performance test shall be conducted at worst case conditions asdefined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 201A and 202, or other method approvedby MPCA in the performance test plan approval.
19970
Total Particulate Matter : The Permittee shall conduct an initial performance test : Due 180 calendar days afterPermit Issuance Date to measure emissions. The performance test shall be conducted at worst case conditionsas defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 5 and 202, or other method approvedby MPCA in the performance test plan approval.
20000
Sulfur Dioxide : The Permittee shall conduct an initial performance test : Due 180 calendar days after PermitIssuance Date to measure emissions. The performance test shall be conducted at worst case conditions asdefined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 6C, or other method approved by MPCAin the performance test plan approval.
20010
Volatile Organic Compounds : The Permittee shall conduct an initial performance test : Due 180 calendar daysafter Permit Issuance Date to measure emissions. The performance test shall be conducted at worst caseconditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 25A, or other methodapproved by MPCA in the performance test plan approval.
20260
Carbon Monoxide : The Permittee shall conduct a performance test : Due before 07/13/2021 every 60 months tomeasure emissions. The first test is due by the date specified and all subsequent tests are due by the end ofeach 60-month period following that date. The performance test shall be conducted at worst case conditions asdefined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 10, or other method approved by MPCAin the performance test plan approval.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required:1) by this permit;2) by the most recently approved Performance Test Frequency Plan; or3) within a Notice of Compliance letter. Testing conducted more than two months prior to the performance test ..
20270
Nitrogen Oxides : The Permittee shall conduct a performance test : Due before 07/13/2021 every 60 months tomeasure emissions. The first test is due by the date specified and all subsequent tests are due by the end ofeach 60-month period following that date. The performance test shall be conducted at worst case conditions asdefined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 7E, or other method approved by MPCAin the performance test plan approval.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required:1) by this permit;2) by the most recently approved Performance Test Frequency Plan; or3) within a Notice of Compliance letter. Testing conducted more than two months prior to the performance test ..
40 CFR 60.48c(g)(2), Minn. R.7011.0570
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 7(EU005)
20300
PM < 10 micron: The Permittee shall submit a test frequency plan for PM10: Due 60 calendar days after InitialPerformance Test Date for PM10 emissions. The plan shall specify a testing frequency based on the test dataand MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
20320
Total Particulate Matter: The Permittee shall submit a test frequency plan for Total Particulate Matter: Due 60calendar days after Initial Performance Test Date for PM emissions. The plan shall specify a testing frequencybased on the test data and MPCA guidance. Future performance tests based on 12-month, 36-month, or60-month intervals, or as applicable, shall be required upon written approval of the MPCA.
20350
Sulfur Dioxide: The Permittee shall submit a test frequency plan for Sulfur Dioxide: Due 60 calendar days afterInitial Performance Test Date for SO2 emissions. The plan shall specify a testing frequency based on the testdata and MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
20360
Volatile Organic Compounds: The Permittee shall submit a test frequency plan for Volatile Organic Compounds:Due 60 calendar days after Initial Performance Test Date for VOC emissions. The plan shall specify a testingfrequency based on the test data and MPCA guidance. Future performance tests based on 12-month, 36-month,or 60-month intervals, or as applicable, shall be required upon written approval of the MPCA.
EQUI 11(EU007)
2EQUI 11 is a 350 hp existing compression ignition reciprocating internal combustion engine (RICE) for whichconstruction commenced prior to June 12, 2006 and is located at an area source of hazardous air pollutants(HAPs).
3 The Permittee shall comply with the applicable requirements for EQUI 11 under 40 CFR pt. 63, subp. ZZZZ nolater than May 3, 2013.
5
Part 63, Subpart ZZZZ Table 2d Requirements:
a. Change oil and filter every 500 hours of operation or annually, whichever comes first;b. Inspect air cleaner every 1,000 hours of operation or annually, whichever comes first; andc. Inspect all hoses and belts every 500 hours of operation or annually, whichever comes first, and replace asnecessary.
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
40 CFR 63.6590(a)(1)(iii), Minn. R.7011.8150
40 CFR 63.6595(a), Minn. R.7011.8150
40 CFR 63.6603(a), 40 CFR pt. 63,subp. ZZZZ(Table 2d), Minn. R.7011.8150
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
y
6 The Permittee shall be in compliance with the emission limitations and operating limitations in 40 CFR pt. 63,subp. ZZZZ that apply to EQUI 11 at all times.
7
At all times the Permittee must operate and maintain any affected source, including associated air pollutioncontrol equipment and monitoring equipment, in a manner consistent with safety and good air pollution controlpractices for minimizing emissions. The general duty to minimize emissions does not require the Permittee tomake any further efforts to reduce emissions if levels required by this standard have been achieved.Determination of whether such operation and maintenance procedures are being used will be based oninformation available to the Administrator which may include, but is not limited to, monitoring results, review ofoperation and maintenance procedures, review of operation and maintenance records, and inspection of thesource.
8
The Permittee must operate and maintain EQUI 11 and after-treatment control device (if any) according to themanufacturer's emission-related written instructions, or develop a maintenance plan which must provide to theextent practicable for the maintenance and operation of EQUI 11 in a manner consistent with good air pollutioncontrol practice for minimizing emissions.
9 The Permittee shall install a non-resettable hour meter on EQUI 11 if one is not already installed.
10The Permittee shall minimize EQUI 11 time spent at idle during startup and minimize EQUI 11 startup time to aperiod needed for appropriate and safe loading of EQUI 11, not to exceed 30 minutes, after which time theemission standards applicable to all times other than startup in Table 2d in 40 CFR pt. 63, subp. ZZZZ apply.
11
The Permittee has the option of utilizing an oil analysis program in order to extend the specified oil changerequirement in Table 2d to 40 CFR pt. 63, subp. ZZZZ. The oil analysis must be performed at the samefrequency specified for changing the oil in Table 2d to 40 CFR pt. 63, subp. ZZZZ. The analysis program must ata minimum analyze the following three parameters: Total Base Number, viscosity, and percent water content.The condemning limits for these parameters are as follows: Total Base Number is less than 30 percent of theTotal Base Number of the oil when new; viscosity of the oil has changed by more than 20 percent from theviscosity of the oil when new; or percent water content (by volume) is greater than 0.5. If all of these condemninglimits are not exceeded, the Permittee is not required to change the oil. If any of the limits are exceeded, thePermittee must change the oil within 2 days of receiving the results of the analysis; if EQUI 11 is not in operationwhen the results of the analysis are received, the Permittee must change the oil within 2 days or beforecommencing operation, whichever is later. The Permittee must keep records of the parameters that are analyz..
13The Permittee must demonstrate continuous compliance with each emission limitation and operating limitation inTable 2d to 40 CFR pt. 63, subp. ZZZZ that applies to EQUI 11 according to methods specified in item 9 inTable 6 to 40 CFR pt. 63, subp. ZZZZ.
40 CFR 63.6605(a), Minn. R.7011.8150
40 CFR 63.6605(b), Minn. R.7011.8150
40 CFR 63.6625(e)(3), Minn. R.7011.8150
40 CFR 63.6625(f), Minn. R. 7011.8150
40 CFR 63.6625(h), Minn. R.7011.8150
40 CFR 63.6625(i), Minn. R. 7011.8150
40 CFR 63.6640(a), Minn. R.7011.8150
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
p p
14 The Permittee must also report each instance in which the Permittee did not meet the applicable requirementsfor EQUI 11 in Table 8 of 40 CFR pt. 63, subp. ZZZZ.
15
The Permittee must operate EQUI 11 according to the requirements in 40 CFR Section 63.6640(f)(1) through(4). Any operation other than emergency operation, maintenance and testing, and operation in nonemergencysituations for 50 hours per year, as described in 40 CFR Section 63.6640(f)(1) through (4), is prohibited. If thePermittee does not operate EQUI 11 according to the requirements in 40 CFR Section 63.6640(f)(1) through (4),EQUI 11 will not be considered an emergency engine under 40 CFR pt. 63, subp. ZZZZ and will need to meet allrequirements for non-emergency engines.
16 There is no time limit on the use of EQUI 11 in emergency situations.
17
The Permittee may operate EQUI 11 for any combination of the purposes specified in 40 CFR Section63.6640(f)(2)(i) through (iii) for a maximum of 100 hours per calendar year. Any operation for non-emergencysituations as allowed by 40 CFR Section 63.6640(f)(3) and (4) counts as part of the 100 hours per calendar yearallowed by 40 CFR Section 63.6640(f)(2).
18
The Permittee may operate EQUI 11 for the purpose of maintenance checks and readiness testing, providedthat the tests are recommended by Federal, State or local government, the manufacturer, the vendor, or theinsurance company associated with EQUI 11. Maintenance checks and readiness testing of such units is limitedto 100 hours per year. The Permittee may petition the Administrator for approval of additional hours to be usedfor maintenance checks and readiness testing, but a petition is not required if the Permittee maintains recordsindicating that Federal, State, or local standards require maintenance and testing of emergency RICE beyond100 hours per year.
19EQUI 11 may be operated for up to 50 hours per calendar year in non-emergency situations. The 50 hours ofoperation in non-emergency situations are counted as part of the 100 hours per calendar year for maintenanceand testing provided in 40 CFR Section 63.6640(f)(2)(i).
20 The requirement to submit all of the notifications in 40 CFR Sections 63.7(b) and (c), 63.8(e), (f)(4) and (f)(6),63.9(b) through (e), and (g) and (h) do not apply to EQUI 11 (existing emergency RICE).
40 CFR 63.6640(e), Minn. R.7011.8150
40 CFR 63.6640(f), Minn. R. 7011.8150
40 CFR 63.6640(f)(1), Minn. R.7011.8150
40 CFR 63.6640(f)(2), Minn. R.7011.8150
40 CFR 63.6640(f)(2)(i), Minn. R.7011.8150
40 CFR 63.6640(f)(4), Minn. R.7011.8150
40 CFR 63.6645(a)(5), Minn. R.7011.8150
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
( ) g ( ) (g) ( ) pp y ( g g y )
22
If EQUI 11 is operating during an emergency and it is not possible to shut down EQUI 11 in order to perform themanagement practice requirements on the schedule required in Table 2d of 40 CFR pt. 63, subp. ZZZZ, or ifperforming the management practice on the required schedule would otherwise pose an unacceptable riskunder federal, state, or local law, the management practice can be delayed until the emergency is over or theunacceptable risk under federal, state, or local law has abated. The management practice should be performedas soon as practicable after the emergency has ended or the unacceptable risk under federal, state, or local lawhas abated. The Permittee must report any failure to perform the management practice on the schedule requiredand the federal, state or local law under which the risk was deemed unacceptable.
24
The Permittee shall keep the following records:
(1) A copy of each notification and report that you submitted to comply with 40 CFR pt. 63, subp. ZZZZ,including all documentation supporting any Initial Notification or Notification of Compliance Status submitted,according to the requirement in 40 CFR Section 63.10(b)(2)(xiv).(2) Records of the occurrence and duration of each malfunction of operation (i.e., process equipment) or the airpollution control and monitoring equipment.(3) Records of performance tests and performance evaluations as required in 40 CFR Section 63.10(b)(2)(viii).(4) Records of all required maintenance performed on the air pollution control and monitoring equipment.(5) Records of actions taken during periods of malfunction to minimize emissions in accordance with 40 CFRSection 63.6605(b), including corrective actions to restore malfunctioning process and air pollution control and ..
26 The Permittee must keep the records required in Table 6 of 40 CFR pt. 63, subp. ZZZZ to show continuouscompliance with each applicable emission or operating limitation.
27The Permittee must keep records of the maintenance conducted on EQUI 11 in order to demonstrate that thePermittee operated and maintained EQUI 11 and after-treatment control device (if any) according to thePermittee's maintenance plan.
28
If EQUI 11 does not meet the standards applicable to non-emergency engines, the Permittee must keep recordsof the hours of operation of EQUI 11 that is recorded through the non-resettable hour meter. The Permittee mustdocument how many hours are spent for emergency operation, including what classified the operation asemergency and how many hours are spent for non-emergency operation.
29
(a) Records must be in a form suitable and readily available for expeditious review according to 40 CFR Section63.10(b)(1).
(b) As specified in 40 CFR Section 63.10(b)(1), the Permittee must keep each record for 5 years following thedate of each occurrence, measurement, maintenance, corrective action, report, or record.
(c) The Permittee must keep each record readily accessible in hard copy or electronic form for at least 5 yearsafter the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to40 CFR Section 63.10(b)(1).
32 Opacity <= 20 percent opacity once operating temperatures have been attained.
40 CFR pt. 63, subp. ZZZZ(Table2d)(footnote 2)
40 CFR 63.6655(a), Minn. R.7011.8150
40 CFR 63.6655(d), Minn. R.7011.8150
40 CFR 63.6655(e), Minn. R.7011.8150
40 CFR 63.6655(f), Minn. R. 7011.8150
40 CFR 63.6660, Minn. R. 7011.8150
Minn. R. 7011.2300, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
p y p p y p g p
33 The Permittee shall limit Total Particulate Matter <= 0.07 grams per horsepower-hour 3-hour block average.
34 The Permittee shall limit PM < 10 micron <= 0.07 grams per horsepower-hour 3-hour block average.
35 The Permittee shall limit Sulfur Dioxide <= 0.14 grams per horsepower-hour 3-hour block average.
36 The Permittee shall limit Sulfur Dioxide <= 0.50 pounds per million Btu heat input. The potential to emit from theunit is 0.04735 lb/MMBtu due to equipment design and allowable fuels.
37 The Permittee shall limit Nitrogen Oxides <= 5.70 grams per horsepower-hour 3-hour block average.
39 The Permittee shall limit Carbon Monoxide <= 0.25 grams per horsepower-hour 3-hour block average.
40 The Permittee shall limit Volatile Organic Compounds <= 0.08 grams per horsepower-hour 3-hour blockaverage.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7011.2300, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
g
43 Permitted Fuel Type: Restricted to distillate fuel oil with a sulfur content no greater than 0.05% by weight.
3520
The Permittee shall limit Operating Hours <= 300 hours per year 12-month rolling sum calculated monthly by thelast day of each month. Note this limit is pre-empted by the 100 hour per year limit prescribed by 40 CFRSection 63.6640(f)(2)(i) (except for emergency operation for which the 100 hour per year limit does not apply asprescribed by 40 CFR Section 63.6640(f)(1)).
3530
Monitoring - Distillate Fuel Oil Sulfur Content:
The Permittee shall determine the sulfur content of all distillate fuel oil deliveries using one of the followingoptions:
1. Obtain a supplier certification for each fuel oil delivery stating the percent sulfur by weight in the delivereddistillate fuel oil;
2. Use the results of the 40 CFR part 75 Appendix D fuel oil sulfur determination requirements conducted forEQUI 5, if the distillate fuel oil used by EQUI 11 is from the same supplier and delivery as the distillate fuel oilused by EQUI 5 (two separate fuel oil storage tanks are used; one for EQUI 11 and another for EQUI 5).
3540
Operating Hours Recordkeeping: On each day of operation, the Permittee shall record the operating hours to thenearest tenth of an hour. By the last day of each month, the Permittee shall calculate and record the operatinghours for the previous month based on the daily records, and for the previous 12-month period based on themonthly records.
3550
Hours of Operation: The Permittee shall maintain documentation on site that the unit is an emergency generatorby design that qualifies under the U.S. EPA memorandum entitled "Calculating Potential to Emit (PTE) forEmergency Generators" dated September 6, 1995, limiting operation to 500 hours per year. (EQUI 11 is limitedto 300 hours of operation per year.).
3560 The Permittee shall keep records of fuel type and usage on a monthly basis.
3565 Fuel Supplier Certification: The Permittee shall obtain and maintain a fuel supplier certification for each shipmentof diesel fuel oil, certifying that the sulfur content does not exceed 0.050 percent by weight.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR 52.21(k)(1)(i)& Minn. R. 7007.3000
Minn. R. 7007.subps. 4-5, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(k)(1)(i) &Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5
Minn. R. 7007.0800, subp. 5
Minn. R. 7007.0800, subps. 4-5
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 11(EU007)
y g p y g
3566 EQUI 11 shall operate on ultra low sulfur (15 ppm) diesel fuel.
3568 The Permittee shall orient STRU 18 so that it vents emissions from EQUI 11 vertically without obstruction.
3569 The Permittee shall locate EQUI 11 away from fresh air intake vents. If the generator is located near a school ordaycare, be aware of times and areas when and where people congregate and avoid them.
EQUI 16(EU008)
2 The combustion turbine shall demonstrate a maximum net heat rate of 7,979 Btu/kWh (HHV) while conductingnet rate performance testing at base load unfired 1X1 operation.
3 The Permittee shall limit Sulfur Dioxide <= 0.50 pounds per million Btu heat input. The potential to emit from theunit is 0.0022409 lb/MMBtu due to equipment design and allowable fuels.
4 Opacity <= 20 percent opacity once operating temperatures have been attained.
5 Permitted Fuel Type: Natural gas as defined in 40 CFR Section 72.2 except total sulfur content shall not exceed0.8 grains/100 scf and the natural gas shall be obtained from a supplier through a pipeline.
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7011.2300, subp. 2
Minn. R. 7011.2300, subp. 1
Minn. R. 7011.2300, subp. 2, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 16(EU008)
g g pp g p p
6 The Permittee shall keep records of fuel type and usage on a monthly basis.
7 Fuel Supplier Certification: The Permittee shall obtain and maintain annual fuel supplier certification for pipelinedelivery of natural gas, certifying that the sulfur content does not exceed 0.8 grains/100 scf.
8 The Permittee shall conduct an initial performance test : Due 180 calendar days after Initial Startup Date of firstfiring and again prior to obtaining a new permit to verify compliance with the heat rate limit.
9 For the purposes of the 40 CFR pt. 97, subp. AAAAA requirements in this permit, the "Permittee" is an "owner"and "operator" as defined in 40 CFR Section 97.402.
10 Transport Rule (TR) NOx Annual Trading Program Requirements.The Permittee shall comply with the TR NOx Annual Trading Program requirements contained in Appendix D.
11Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Sections 97.413 through 97.418.
12
TR NOx Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators and the designated representative of each TR NOx Annual source and each TRNOx Annual unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of 40CFR Section 97.430 (general requirements, including installation, certification, and data accounting, compliancedeadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.431 (initial monitoringsystem certification and recertification procedures), 40 CFR Section 97.432 (monitoring system out-of-controlperiods), 40 CFR Section 97.433 (notifications concerning monitoring), 40 CFR Section 97.434 (recordkeepingand reporting, including monitoring plans, certification applications, quarterly reports, and compliancecertification), and 40 CFR Section 97.435 (petitions for alternatives to monitoring, recordkeeping, or reportingrequirements).2) The emissions data determined in accordance with 40 CFR Section 97.430 through 97.435 shall be used to ..
Minn. R. 7007.0800, subp. 5
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
40 CFR 97.430-435
40 CFR 97.406(a)
40 CFR 97.406(b)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 16(EU008)
13
TR NOx Annual emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR NOx Annual source and each TR NOx Annual unit at the source shall hold, in the source'scompliance account, TR NOx Annual allowances available for deduction for such control period under 40 CFRSection 97.424(a) in an amount not less than the tons of total NOx emissions for such control period from all TRNOx Annual units at the source.ii) If total NOx emissions during a control period in a given year from the TR NOx Annual units at a TR NOxAnnual source are in excess of the TR NOx Annual emissions limitation set forth in 40 CFR Section97.406(c)(1)(i) above, then: A) The owners and operators of the source and each TR NOx Annual unit at thesource shall hold the TR NOx Annual allowances required for deduction under 40 CFR Section 97.424(d); and ..
14
TR NOx Annual assurance provisions.i) If total NOx emissions during a control period in a given year from all TR NOx Annual units at TR NOx Annualsources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level, thenthe owners and operators of such sources and units in each group of one or more sources and units having acommon designated representative for such control period, where the common designated representative'sshare of such NOx emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR NOx Annual allowances available for deduction for such control periodunder 40 CFR Section 97.425(a) in an amount equal to two times the product (rounded to the nearest wholenumber), as determined by the Administrator in accordance with 40 CFR Section 97.425(b), of multiplying— A)The quotient of the amount by which the common designated representative's share of such NOx emissions ex..
15
Compliance periods.i) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(1) above for thecontrol period starting on the later of January 1, 2015, or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.ii) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.
16
Vintage of allowances held for compliance.i) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section 97.406(c)(1)(i)above for a control period in a given year must be a TR NOx Annual allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section97.406(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR NOx Annualallowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
17Allowance Management System requirements.Each TR NOx Annual allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart AAAAA.
18
Limited authorization.A TR NOx Annual allowance is a limited authorization to emit one ton of NOx during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR NOx Annual Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, the Administrator has the authority to terminate or limitthe use and duration of such authorization to the extent the Administrator determines is necessary orappropriate to implement any provision of the Clean Air Act.
19 Property right. A TR NOx Annual allowance does not constitute a property right.
40 CFR 97.406(c)(1)
40 CFR 97.406(c)(2)(i)-(v)
40 CFR 97.406(c)(3)
40 CFR 97.406(c)(4)
40 CFR 97.406(c)(5)
40 CFR 97.406(c)(6)
40 CFR 97.406(c)(7)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 16(EU008)
p y g p p y g
20
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR NOx Annual source and each TR NOxAnnual unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.416 for the designated representative for the sourceand each TR NOx Annual unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.416 changing thedesignated representative. ..
21
Liability.1) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual source or thedesignated representative of a TR NOx Annual source shall also apply to the owners and operators of suchsource and of the TR NOx Annual unit shall also apply to the owners and operators of such unit.2) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual unit or the designatedrepresentative of a TR NOx Annual unit shall also apply to the owners and operators of such unit.
22
Effect on other authorities.No provision of the TR NOx Annual Trading Program or exemption under 40 CFR Section 97.405 shall beconstrued as exempting or excluding the owners and operators, and the designated representative, of a TR NOxAnnual source or TR NOx Annual unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
23 Transport Rule (TR) SO2 Group 2 Trading Program Requirements.The Permittee shall comply with the TR SO2 Group 2 Trading Program Requirements contained in Appendix D.
24Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Section 97.713 through 97.718.
25
TR SO2 Group 2 Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators, and the designated representative, of each TR SO2 Group 2 source and each TRSO2 Group 2 unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of40 CFR Section 97.730 (general requirements, including installation, certification, and data accounting,compliance deadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.731 (initialmonitoring system certification and recertification procedures), 40 CFR Section 97.732 (monitoring systemout-of-control periods), 40 CFR Section 97.733 (notifications concerning monitoring), 40 CFR Section 97.734(recordkeeping and reporting, including monitoring plans, certification applications, quarterly reports, andcompliance certification), and 40 CFR Section 97.735 (petitions for alternatives to monitoring, recordkeeping, orreporting requirements).2) The emissions data determined in accordance with 40 CFR Section 97.730 through 97.735 shall be used to ..
26
TR SO2 Group 2 emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR SO2 Group 2 source and each TR SO2 Group 2 unit at the source shall hold, in thesource's compliance account, TR SO2 Group 2 allowances available for deduction for such control period under40 CFR Section 97.724(a) in an amount not less than the tons of total SO2 emissions for such control periodfrom all TR SO2 Group 2 units at the source.ii) If total SO2 emissions during a control period in a given year from the TR SO2 Group 2 units at a TR SO2Group 2 source are in excess of the TR SO2 Group 2 emissions limitation set forth in paragraph 40 CFR Section97.706(c)(1)(i) above, then: A) The owners and operators of the source and each TR SO2 Group 2 unit at thesource shall hold the TR SO2 Group 2 allowances required for deduction under 40 CFR Section 97.724(d); and..
40 CFR 97.406(e)
40 CFR 97.406(f)
40 CFR 97.406(g)
40 CFR 97.730-735
40 CFR 97.706(a)
40 CFR 97.706(b)
40 CFR 97.706(c)(1)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 16(EU008)
27
TR SO2 Group 2 assurance provisions.i) If total SO2 emissions during a control period in a given year from all TR SO2 Group 2 units at TR SO2 Group2 sources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level,then the owners and operators of such sources and units in each group of one or more sources and units havinga common designated representative for such control period, where the common designated representative'sshare of such SO2 emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR SO2 Group 2 allowances available for deduction for such controlperiod under 40 CFR Section 97.725(a) in an amount equal to two times the product (rounded to the nearestwhole number), as determined by the Administrator in accordance with 40 CFR Section 97.725(b), ofmultiplying— A) The quotient of the amount by which the common designated representative's share of such S..
28
Compliance Periods.i) A TR SO2 Group 2 unit shall be subject to the requirements under 40 CFR Section 97.706(c)(1) above for thecontrol period starting on the later of January 1, 2015 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafterii) A TR SO2 Group 2 unit shall be subject to the requirements under 40 Section CFR 97.706(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafter.
29
Vintage of allowances held for compliance.i) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section 97.706(c)(1)(i)above for a control period in a given year must be a TR SO2 Group 2 allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section97.706(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR SO2 Group 2allowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
30Allowance Management System requirements.Each TR SO2 Group 2 allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart DDDDD.
31
Limited authorization.A TR SO2 Group 2 allowance is a limited authorization to emit one ton of SO2 during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR SO2 Group 2 Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, subpart DDDDD, the Administrator has the authorityto terminate or limit the use and duration of such authorization to the extent the Administrator determines isnecessary or appropriate to implement any provision of the Clean Air Act.
32 Property right.A TR SO2 Group 2 allowance does not constitute a property right.
33
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR SO2 Group 2 source and each TR SO2Group p2 unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.716 for the designated representative for the sourceand each TR SO2 Group 2 unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.716 changing thedesignated representative. ..
40 CFR 97.706(c)(2)(i)-(v)
40 CFR 97.706(c)(3)
40 CFR 97.706(c)(4)
40 CFR 97.706(c)(5)
40 CFR 97.706(c)(6)
40 CFR 97.706(c)(7)
40 CFR 97.706(e)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 16(EU008)
34
Liability.1) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 source or thedesignated representative of a TR SO2 Group 2 source shall also apply to the owners and operators of suchsource and of the TR SO2 Group 2 units at the source.2) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 unit or thedesignated representative of a TR SO2 Group 2 unit shall also apply to the owners and operators of such unit.
35
Effect on other authorities.No provision of the TR SO2 Group 2 Trading Program or exemption under 40 CFR Section 97.705 shall beconstrued as exempting or excluding the owners or operators, and the designated representative, of a TR SO2Group 2 source or TR SO2 Group 2 unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
36 Additional requirements for Combustion Turbine #1 are located at STRU 20.
EQUI 17(EU009)
1 Permitted Fuel Type: Natural gas as defined in 40 CFR Section 72.2, except total sulfur content shall not exceed0.8 grains/100 scf and the natural gas shall be obtained from a supplier through a pipeline.
3 Fuel Supplier Certification: The Permittee shall obtain and maintain annual fuel supplier certification for pipelinedelivery of natural gas, certifying that the sulfur content does not exceed 0.8 grains/100 scf.
32 For the purposes of the 40 CFR pt. 97, subp. AAAAA requirements in this permit, the "Permittee" is an "owner"and "operator" as defined in 40 CFR Section 97.402.
20760 Transport Rule (TR) NOx Annual Trading Program Requirements.The Permittee shall comply with the TR NOx Annual Trading Program requirements contained in Appendix D.
40 CFR 97.706(f)
40 CFR 97.706(g)
Minn. R. 7007.0800, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR pt. 52, 21(j)(BACT)& Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
40 CFR 97.430-435
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 17(EU009)
p y g g q pp
20770Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Sections 97.413 through 97.418.
20780
TR NOx Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators and the designated representative of each TR NOx Annual source and each TRNOx Annual unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of 40CFR Section 97.430 (general requirements, including installation, certification, and data accounting, compliancedeadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.431 (initial monitoringsystem certification and recertification procedures), 40 CFR Section 97.432 (monitoring system out-of-controlperiods), 40 CFR Section 97.433 (notifications concerning monitoring), 40 CFR Section 97.434 (recordkeepingand reporting, including monitoring plans, certification applications, quarterly reports, and compliancecertification), and 40 CFR Section 97.435 (petitions for alternatives to monitoring, recordkeeping, or reportingrequirements).2) The emissions data determined in accordance with 40 CFR Section 97.430 through 97.435 shall be used to ..
20790
TR NOx Annual emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR NOx Annual source and each TR NOx Annual unit at the source shall hold, in the source'scompliance account, TR NOx Annual allowances available for deduction for such control period under 40 CFRSection 97.424(a) in an amount not less than the tons of total NOx emissions for such control period from all TRNOx Annual units at the source.ii) If total NOx emissions during a control period in a given year from the TR NOx Annual units at a TR NOxAnnual source are in excess of the TR NOx Annual emissions limitation set forth in 40 CFR Section97.406(c)(1)(i) above, then: A) The owners and operators of the source and each TR NOx Annual unit at thesource shall hold the TR NOx Annual allowances required for deduction under 40 CFR Section 97.424(d); and ..
20800
TR NOx Annual assurance provisions.i) If total NOx emissions during a control period in a given year from all TR NOx Annual units at TR NOx Annualsources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level, thenthe owners and operators of such sources and units in each group of one or more sources and units having acommon designated representative for such control period, where the common designated representative'sshare of such NOx emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR NOx Annual allowances available for deduction for such control periodunder 40 CFR Section 97.425(a) in an amount equal to two times the product (rounded to the nearest wholenumber), as determined by the Administrator in accordance with 40 CFR Section 97.425(b), of multiplying— A)The quotient of the amount by which the common designated representative's share of such NOx emissions ex..
20810
Compliance periods.i) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(1) above for thecontrol period starting on the later of January 1, 2015, or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.ii) A TR NOx Annual unit shall be subject to the requirements under 40 CFR Section 97.406(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR 97.430(b) and for each control period thereafter.
20820
Vintage of allowances held for compliance.i) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section 97.406(c)(1)(i)above for a control period in a given year must be a TR NOx Annual allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR NOx Annual allowance held for compliance with the requirements under 40 CFR Section97.406(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR NOx Annualallowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
20830Allowance Management System requirements.Each TR NOx Annual allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart AAAAA.
40 CFR 97.406(a)
40 CFR 97.406(b)
40 CFR 97.406(c)(1)
40 CFR 97.406(c)(2)(i)-(v)
40 CFR 97.406(c)(3)
40 CFR 97.406(c)(4)
40 CFR 97.406(c)(5)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 17(EU009)
g y p p
20840
Limited authorization.A TR NOx Annual allowance is a limited authorization to emit one ton of NOx during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR NOx Annual Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, the Administrator has the authority to terminate or limitthe use and duration of such authorization to the extent the Administrator determines is necessary orappropriate to implement any provision of the Clean Air Act.
20850 Property right. A TR NOx Annual allowance does not constitute a property right.
20860
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR NOx Annual source and each TR NOxAnnual unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.416 for the designated representative for the sourceand each TR NOx Annual unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.416 changing thedesignated representative. ..
20870
Liability.1) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual source or thedesignated representative of a TR NOx Annual source shall also apply to the owners and operators of suchsource and of the TR NOx Annual unit shall also apply to the owners and operators of such unit.2) Any provision of the TR NOx Annual Trading Program that applies to a TR NOx Annual unit or the designatedrepresentative of a TR NOx Annual unit shall also apply to the owners and operators of such unit.
20880
Effect on other authorities.No provision of the TR NOx Annual Trading Program or exemption under 40 CFR Section 97.405 shall beconstrued as exempting or excluding the owners and operators, and the designated representative, of a TR NOxAnnual source or TR NOx Annual unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
20890 Transport Rule (TR) SO2 Group 2 Trading Program Requirements.The Permittee shall comply with the TR SO2 Group 2 Trading Program Requirements contained in Appendix D.
20900Designated representative requirements.The owners and operators shall comply with the requirement to have a designated representative, and mayhave an alternate designated representative, in accordance with 40 CFR Section 97.713 through 97.718.
40 CFR 97.406(c)(6)
40 CFR 97.406(c)(7)
40 CFR 97.406(e)
40 CFR 97.406(f)
40 CFR 97.406(g)
40 CFR 97.730-735
40 CFR 97.706(a)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 17(EU009)
g p g
20910
TR SO2 Group 2 Emissions monitoring, reporting, and recordkeeping requirements.1) The owners and operators, and the designated representative, of each TR SO2 Group 2 source and each TRSO2 Group 2 unit at the source shall comply with the monitoring, reporting, and recordkeeping requirements of40 CFR Section 97.730 (general requirements, including installation, certification, and data accounting,compliance deadlines, reporting data, prohibitions, and long-term cold storage), 40 CFR Section 97.731 (initialmonitoring system certification and recertification procedures), 40 CFR Section 97.732 (monitoring systemout-of-control periods), 40 CFR Section 97.733 (notifications concerning monitoring), 40 CFR Section 97.734(recordkeeping and reporting, including monitoring plans, certification applications, quarterly reports, andcompliance certification), and 40 CFR Section 97.735 (petitions for alternatives to monitoring, recordkeeping, orreporting requirements).2) The emissions data determined in accordance with 40 CFR Section 97.730 through 97.735 shall be used to ..
20920
TR SO2 Group 2 emissions limitation.i) As of the allowance transfer deadline (midnight of March 1 (if it is a business day), or midnight of the firstbusiness day thereafter (if March 1 is not a business day)) for a control period in a given year, the owners andoperators of each TR SO2 Group 2 source and each TR SO2 Group 2 unit at the source shall hold, in thesource's compliance account, TR SO2 Group 2 allowances available for deduction for such control period under40 CFR Section 97.724(a) in an amount not less than the tons of total SO2 emissions for such control periodfrom all TR SO2 Group 2 units at the source.ii) If total SO2 emissions during a control period in a given year from the TR SO2 Group 2 units at a TR SO2Group 2 source are in excess of the TR SO2 Group 2 emissions limitation set forth in paragraph 40 CFR Section97.706(c)(1)(i) above, then: A) The owners and operators of the source and each TR SO2 Group 2 unit at thesource shall hold the TR SO2 Group 2 allowances required for deduction under 40 CFR Section 97.724(d); and..
20930
TR SO2 Group 2 assurance provisions.i) If total SO2 emissions during a control period in a given year from all TR SO2 Group 2 units at TR SO2 Group2 sources in Minnesota and Indian country within the borders of Minnesota exceed the state assurance level,then the owners and operators of such sources and units in each group of one or more sources and units havinga common designated representative for such control period, where the common designated representative'sshare of such SO2 emissions during such control period exceeds the common designated representative'sassurance level for the state and such control period, shall hold (in the assurance account established for theowners and operators of such group) TR SO2 Group 2 allowances available for deduction for such controlperiod under 40 CFR Section 97.725(a) in an amount equal to two times the product (rounded to the nearestwhole number), as determined by the Administrator in accordance with 40 CFR Section 97.725(b), ofmultiplying— A) The quotient of the amount by which the common designated representative's share of such S..
20940
Compliance Periods.i) A TR SO2 Group 2 unit shall be subject to the requirements under 40 CFR Section 97.706(c)(1) above for thecontrol period starting on the later of January 1, 2015 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafterii) A TR SO2 Group 2 unit shall be subject to the requirements under 40 Section CFR 97.706(c)(2) above for thecontrol period starting on the later of January 1, 2017 or the deadline for meeting the unit's monitor certificationrequirements under 40 CFR Section 97.730(b) and for each control period thereafter.
20950
Vintage of allowances held for compliance.i) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section 97.706(c)(1)(i)above for a control period in a given year must be a TR SO2 Group 2 allowance that was allocated for suchcontrol period or a control period in a prior year.ii) A TR SO2 Group 2 allowance held for compliance with the requirements under 40 CFR Section97.706(c)(1)(ii)(A) and (2)(i) through (iii) above for a control period in a given year must be a TR SO2 Group 2allowance that was allocated for a control period in a prior year or the control period in the given year or in theimmediately following year.
20960Allowance Management System requirements.Each TR SO2 Group 2 allowance shall be held in, deducted from, or transferred into, out of, or betweenAllowance Management System accounts in accordance with 40 CFR part 97, subpart DDDDD.
20970
Limited authorization.A TR SO2 Group 2 allowance is a limited authorization to emit one ton of SO2 during the control period in oneyear. Such authorization is limited in its use and duration as follows:i) Such authorization shall only be used in accordance with the TR SO2 Group 2 Trading Program; andii) Notwithstanding any other provision of 40 CFR part 97, subpart DDDDD, the Administrator has the authorityto terminate or limit the use and duration of such authorization to the extent the Administrator determines isnecessary or appropriate to implement any provision of the Clean Air Act.
40 CFR 97.706(b)
40 CFR 97.706(c)(1)
40 CFR 97.706(c)(2)(i)-(v)
40 CFR 97.706(c)(3)
40 CFR 97.706(c)(4)
40 CFR 97.706(c)(5)
40 CFR 97.706(c)(6)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 17(EU009)
y pp p p y p
20980 Property right.A TR SO2 Group 2 allowance does not constitute a property right.
20990
Additional recordkeeping and reporting requirements.1) Unless otherwise provided, the owners and operators of each TR SO2 Group 2 source and each TR SO2Group p2 unit at the source shall keep on site at the source each of the following documents (in hardcopy orelectronic format) for a period of 5 years from the date the document is created. This period may be extended forcause, at any time before the end of 5 years, in writing by the Administrator.i) The certificate of representation under 40 CFR Section 97.716 for the designated representative for the sourceand each TR SO2 Group 2 unit at the source and all documents that demonstrate the truth of the statements inthe certificate of representation; provided that the certificate and documents shall be retained on site at thesource beyond such 5-year period until such certificate of representation and documents are supersededbecause of the submission of a new certificate of representation under 40 CFR Section 97.716 changing thedesignated representative. ..
21000
Liability.1) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 source or thedesignated representative of a TR SO2 Group 2 source shall also apply to the owners and operators of suchsource and of the TR SO2 Group 2 units at the source.2) Any provision of the TR SO2 Group 2 Trading Program that applies to a TR SO2 Group 2 unit or thedesignated representative of a TR SO2 Group 2 unit shall also apply to the owners and operators of such unit.
21010
Effect on other authorities.No provision of the TR SO2 Group 2 Trading Program or exemption under 40 CFR Section 97.705 shall beconstrued as exempting or excluding the owners or operators, and the designated representative, of a TR SO2Group 2 source or TR SO2 Group 2 unit from compliance with any other provision of the applicable, approvedstate implementation plan, a federally enforceable permit, or the Clean Air Act.
21011 Additional requirements for Duct Burners (Combustion Turbine #1) are located at STRU 20.
EQUI 18(EU010)
1 The Permittee shall limit Sulfur Dioxide <= 0.50 pounds per million Btu heat input. The potential to emit from theunit is 0.20 lb/MMBtu due to equipment design and allowable fuels.
3 Opacity <= 20 percent opacity once operating temperatures have been attained.
40 CFR 97.706(c)(7)
40 CFR 97.706(e)
40 CFR 97.706(f)
40 CFR 97.706(g)
Minn. R. 7007.0800, subp. 2
Minn. R. 7011.2300, subp. 2
Minn. R. 7011.2300, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
p y p p y p g p
4 The Permittee shall limit Operating Hours <= 100 hours per year 12-month rolling sum calculated monthly by thelast day of each month.
5 Operating Hours Daily Recordkeeping: On each day of operation, the Permittee shall record the operating hoursto the nearest tenth of an hour.
6Operating Hours Monthly Recordkeeping: By the 15th of each month, the Permittee shall calculate and recordthe operating hours for the previous month by summing the daily operating hour records, and for the previous12-month period by summing the previous 12 monthly records.
7 The Permittee shall operate EQUI 18 in a manner consistent with good energy efficiency measures according tothe manufacturer's specifications to restrict GHG (greenhouse gas) emissions.
12 Fuel type: No. 2 fuel oil/diesel fuel meeting the requirements of 40 CFR Section 80.510(c) only.
14 The Permittee shall keep records of fuel type and usage on a monthly basis.
15 Fuel Supplier Certification: The Permittee shall obtain and maintain a fuel supplier certification for each shipmentof diesel fuel oil, certifying that the sulfur content does not exceed 0.050 percent by weight.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7007.0800, subps. 4-5
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7005.0100, subp. 35a
Minn. R. 7007.0800, subp. 5
Minn. R. 7007.0800, subps. 4-5
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
y g p y g
16 The Permittee shall use only ultra low sulfur (15 ppm) diesel fuel in EQUI 18.
17 The Permittee shall orient STRU 21 so that it vents emissions from EQUI 18 vertically without obstruction.
18The Permittee shall place EQUI 18 in a location that does not affect ambient or indoor air. If the generator islocated near a school or daycare, be aware of times and areas when and where people congregate and avoidthem.
19
EQUI 18 is a new affected source as defined under 40 CFR pt. 63, subp. ZZZZ, and the facility is an area sourceas defined at 40 CFR Section 63.2, and EQUI 18 is a CI RICE with a site rating of 3352.6 brake HP (2500 kW).The Permittee shall meet the requirements of 40 CFR pt. 63, subp. ZZZZ by meeting the requirements of 40CFR pt. 60, subp. IIII. No further requirements of 40 CFR pt. 63, subp. ZZZZ apply to EQUI 18.
20An affected source that meets any of the criteria in 40 CFR Section 63.6590(c)(1) through (7) must meet therequirements of this part by meeting the requirements of 40 CFR part 60 subpart IIII, for compression ignitionengines. No further requirements apply for such engines under this part.
21The Permittee must comply with the emission standards for new nonroad CI engines in 40 CFR Section60.4202, for all pollutants, for the same model year and maximum engine power for their 2007 model year andlater emergency stationary CI ICE.
22 The Permittee must operate and maintain stationary CI ICE that achieve the emission standards as required in40 CFR Sections 60.4204 and 60.4205 over the entire life of the engine.
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
40 CFR 63.6590(c), Minn. R.7011.8150
40 CFR 63.6590(c), Minn. R.7011.8150
40 CFR 60.4205(b), 40 CFR63.6590(c)(1), Minn. R. 7011.2305,Minn. R. 7011.8150
40 CFR 60.4206, 40 CFR63.6590(c)(1), Minn. R. 7011.2305,Minn. R. 7011.8150
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
g
23The Permittee must use diesel fuel that meets the requirements of 40 CFR Section 80.510(b) for nonroad dieselfuel, except that any existing diesel fuel purchased (or otherwise obtained) prior to October 1, 2010, may beused until depleted.
24 The Permittee must meet the monitoring requirements of this section. In addition, the Permittee must also meetthe monitoring requirements specified in 40 CFR Section 60.4211.
25
The Permittee must do all of the following, except as permitted under 40 CFR Section 60.4211(g):
(1) Operate and maintain the stationary CI internal combustion engine and control device according to themanufacturer's emission-related written instructions;(2) Change only those emission-related settings that are permitted by the manufacturer; and(3) Meet the requirements of 40 CFR parts 89, 94 and/or 1068, as they apply to you.(c) The Permittee must comply by purchasing an engine certified to the emission standards in 40 CFR Section60.4204(b), or 40 CFR Section 60.4205(b) or (c), as applicable, for the same model year and maximum (or inthe case of fire pumps, NFPA nameplate) engine power. The engine must be installed and configured accordingto the manufacturer's emission-related specifications, except as permitted in 40 CFR Section 60.4211(g).(f) The Permittee must operate the emergency stationary ICE according to the requirements in 40 CFR Section..
26
(continued from above)(3) Emergency stationary ICE may be operated for up to 50 hours per calendar year in non-emergencysituations. The 50 hours of operation in non-emergency situations are counted as part of the 100 hours percalendar year for maintenance and testing and emergency demand response provided in 40 CFR Section60.4211(f)(2). Except as provided in 40 CFR Section 60.4211(f)(3)(i), the 50 hours per calendar year fornon-emergency situations cannot be used for peak shaving or non-emergency demand response, or to generateincome for a facility to an electric grid or otherwise supply power as part of a financial arrangement with anotherentity.
(i) The 50 hours per year for non-emergency situations can be used to supply power as part of a financialarrangement with another entity if all of the following conditions are met:..
27
The Permittee is not required to submit an initial notification. Starting with the model years in 40 CFR pt. 60,subp. IIII table 5, if the emergency engine does not meet the standards applicable to non-emergency engines inthe applicable model year, the Permittee must keep records of the operation of the engine in emergency andnon-emergency service that are recorded through the non-resettable hour meter. The Permittee must record thetime of operation of the engine and the reason the engine was in operation during that time.
28
Except as provided in subparts B and C, the provisions of this part apply to the owner or operator of anystationary source which contains an affected facility, the construction or modification of which is commencedafter the date of publication in this part of any standard (or, if earlier, the date of publication of any proposedstandard) applicable to that facility.
29
Any new or revised standard of performance promulgated pursuant to section 111(b) of the Act shall apply to theowner or operator of any stationary source which contains an affected facility, the construction or modification ofwhich is commenced after the date of publication in this part of such new or revised standard (or, if earlier, thedate of publication of any proposed standard) applicable to that facility.
40 CFR 60.4207(b), 40 CFR63.6590(c)(1), 40 CFR 80.510(b), Minn.R. 7011.2305, Minn. R. 7011.8150
40 CFR 60.4209, 40 CFR63.6590(c)(1), Minn. R. 7011.2305,Minn. R. 7011.8150
40 CFR 60.4211(a) - (f)(2), 40 CFR63.6590(c)(1), Minn. R. 7011.2305,Minn. R. 7011.8150
40 CFR 60.4211(f)(3), 40 CFR63.6590(c)(1), Minn. R. 7011.2305,Minn. R. 7011.8150
40 CFR 60.4214(b), 40 CFR63.6590(c)(1), 40 CFR pt. 60, subp.IIII(Table 5), Minn. R. 7011.2305, Minn.R. 7011.8150
40 CFR 60.1(a), Minn. R. 7011.0050
40 CFR 60.1(b), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
p y p p ) pp y
30
In addition to complying with the provisions of this part, the owner or operator of an affected facility may berequired to obtain an operating permit issued to stationary sources by an authorized State air pollution controlagency or by the Administrator of the U.S. Environmental Protection Agency (EPA) pursuant to Title V of theClean Air Act (Act) as amended November 15, 1990 (42 U.S.C. 7661). For more information about obtaining anoperating permit see 40 CFR pt. 70.
31
The availability to the public of information provided to, or otherwise obtained by, the Administrator under thispart shall be governed by 40 CFR pt. 2. (Information submitted voluntarily to the Administrator for the purposesof 40 CFR Sections 60.5 and 60.6 is governed by 40 CFR Sections 2.201 through 2.213 and not by 40 CFRSection 2.301.).
32
The provisions of this part shall not be construed in any manner to preclude any State or political subdivisionthereof from:
(a) Adopting and enforcing any emission standard or limitation applicable to an affected facility, provided thatsuch emission standard or limitation is not less stringent than the standard applicable to such facility.(b) Requiring the Permittee to obtain permits, licenses, or approvals prior to initiating construction, modification,or operation of such facility.
33 No owner or operator shall build, erect, install, or use any article, machine, equipment or process, the use ofwhich conceals an emission which would otherwise constitute a violation of an applicable standard.
34
Except as provided under 40 CFR Section 60.14(e) and (f), any physical or operational change to an existingfacility which results in an increase in the emission rate to the atmosphere of any pollutant to which a standardapplies shall be considered a modification within the meaning of section 111 of the Act. Upon modification, anexisting facility shall become an affected facility for each pollutant to which a standard applies and for whichthere is an increase in the emission rate to the atmosphere.
35 Emission rate shall be expressed as kg/hr of any pollutant discharged into the atmosphere for which a standardis applicable. The Administrator shall use 40 CFR Section 60.14(b)(1) and (2) to determine emission rate.
36 The addition of an affected facility to a stationary source as an expansion to that source or as a replacement foran existing facility shall not by itself bring within the applicability of this part any other facility within that source.
40 CFR 60.1(c), Minn. R. 7011.0050
40 CFR 60.9
40 CFR 60.10
40 CFR 60.12, Minn. R. 7011.0050
40 CFR 60.14(a), Minn. R. 7011.0050
40 CFR 60.14(b), Minn. R. 7011.0050
40 CFR 60.14(c), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
g y y g pp y p y y
37
The following shall not, by themselves, be considered modifications under this part:
(1) Maintenance, repair, and replacement which the Administrator determines to be routine for a sourcecategory, subject to the provisions of 40 CFR Section 60.14(c) and 40 CFR Section 60.15.(2) An increase in production rate of an existing facility, if that increase can be accomplished without a capitalexpenditure on that facility.(3) An increase in the hours of operation.(4) Use of an alternative fuel or raw material if, prior to the date any standard under this part becomes applicableto that source type, as provided by 40 CFR Section 60.1, the existing facility was designed to accommodate thatalternative use. A facility shall be considered to be designed to accommodate an alternative fuel or raw materialif that use could be accomplished under the facility's construction specifications as amended prior to the chang..
38 Special provisions set forth under an applicable subpart of this part shall supersede any conflicting provisions ofthis section.
39 Within 180 days of the completion of any physical or operational change subject to the control measuresspecified in 40 CFR Section 60.14(a), compliance with all applicable standards must be achieved.
40
No physical change, or change in the method of operation, at an existing electric utility steam generating unitshall be treated as a modification for the purposes of this section provided that such change does not increasethe maximum hourly emissions of any pollutant regulated under this section above the maximum hourlyemissions achievable at that unit during the 5 years prior to the change.
45 An existing facility, upon reconstruction, becomes an affected facility, irrespective of any change in emissionrate.
46
Reconstruction means the replacement of components of an existing facility to such an extent that:
(1) The fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would berequired to construct a comparable entirely new facility, and(2) It is technologically and economically feasible to meet the applicable standards set forth in this part.
47 Fixed capital cost means the capital needed to provide all the depreciable components.
40 CFR 60.14(e), Minn. R. 7011.0050
40 CFR 60.14(f), Minn. R. 7011.0050
40 CFR 60.14(g), Minn. R. 7011.0050
40 CFR 60.14(h), Minn. R. 7011.0050
40 CFR 60.15(a), Minn. R. 7011.0050
40 CFR 60.15(b), Minn. R. 7011.0050
40 CFR 60.15(c), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 18(EU010)
p p p p p
48
If a Permittee proposes to replace components, and the fixed capital cost of the new components exceeds 50percent of the fixed capital cost that would be required to construct a comparable entirely new facility, thePermittee shall notify the Administrator of the proposed replacements. The notice must be postmarked 60 days(or as soon as practicable) before construction of the replacements is commenced and must include thefollowing information:
(1) Name and address of the owner or operator.(2) The location of the existing facility.(3) A brief description of the existing facility and the components which are to be replaced.(4) A description of the existing air pollution control equipment and the proposed air pollution control equipment.(5) An estimate of the fixed capital cost of the replacements and of constructing a comparable entirely new facil..
49The Administrator will determine, within 30 days of the receipt of the notice required by 40 CFR Section 60.15(d)and any additional information he may reasonably require, whether the proposed replacement constitutesreconstruction.
50
The Administrator's determination under 40 CFR Section 60.15(e) shall be based on:
(1) The fixed capital cost of the replacements in comparison to the fixed capital cost that would be required toconstruct a comparable entirely new facility;(2) The estimated life of the facility after the replacements compared to the life of a comparable entirely newfacility;(3) The extent to which the components being replaced cause or contribute to the emissions from the facility;and(4) Any economic or technical limitations on compliance with applicable standards of performance which areinherent in the proposed replacements.
3520 Individual subparts of this part may include specific provisions which refine and delimit the concept ofreconstruction set forth in this section.
3560
If the Permittee is required to submit periodic reports under 40 CFR pt. 60, and there is an established timelinefor submission of periodic reports that is consistent with the reporting frequency(ies) specified for such facility,the Permittee may change the dates by which periodic reports under 40 CFR pt. 60 shall be submitted (withoutchanging the frequency of reporting) to be consistent with the schedule by mutual agreement between thePermittee and the State. The allowance in the previous sentence applies in each State beginning 1 year afterthe affected facility is required to be in compliance with the applicable subpart in 40 CFR pt. 60. Proceduresgoverning the implementation of this provision are specified in paragraph (f) of 40 CFR Section 60.19.
3565
If a Permittee supervises one or more stationary sources affected by standards set under 40 CFR pt. 60 and thatstandards set under pts. 61, 63 or both of this chapter, the Permittee may arrange by mutual agreementbetween the Permittee and the Administrator (or the State with approved permit program) a common scheduleon which periodic reports required by each applicable standard shall be submitted throughout the year. Theallowance in the previous sentence applies in each State beginning 1 year after the affected facility is required tobe in compliance with the applicable subpart in 40 CFR pt. 60, or 1 year after the stationary source is required tobe in compliance with the applicable 40 CFR pt. 61 or 63 of this chapter standard, whichever is latest.Procedures governing the implementation of this provision are specified in paragraph (f) of 40 CFR Section60.19.
19530
Until an adjustment of a time period or postmark deadline has been approved by the Administrator under 40CFR Section 60.19(f)(2) and (f)(3), the Permittee remains strictly subject to the requirements of 40 CFR pt. 60.A Permittee shall request the adjustment provided for in 40 CFR Section 60.19(f)(2) and (f)(3) each time he orshe wishes to change an applicable time period or postmark deadline specified in 40 CFR pt. 60.
(2) Notwithstanding time periods or postmark deadlines specified in this part for the submittal of information tothe Administrator by a Permittee, or the review of such information by the Administrator, such time periods ordeadlines may be changed by mutual agreement between the Permittee and the Administrator. A Permittee whowishes to request a change in a time period or postmark deadline for a particular requirement shall request theadjustment in writing as soon as practicable before the subject activity is required to take place. The Permitteeshall include in the request whatever information he or she considers useful to convince the Administrator that ..
40 CFR 60.15(d), Minn. R. 7011.0050
40 CFR 60.15(e), Minn. R. 7011.0050
40 CFR 60.15(f), Minn. R. 7011.0050
40 CFR 60.15(g), Minn. R. 7011.0050
40 CFR 60.19(d), Minn. R. 7011.0050
40 CFR 60.19(e), Minn. R. 7011.0050
40 CFR 60.19(f), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # Requirement( )
EQUI 19(EU011)
1 The Permittee shall limit Total Particulate Matter <= 0.40 pounds per million Btu heat input 3-hour average.
2 Opacity <= 20 percent opacity; except for one six-minute period per hour of not more than 60 percent opacity.
EQUI 21(MR005)
1 NOx CEMS Daily Calibration Error (CE) Test: Conduct daily CE testing on the NOx CEMS in accordance with 40CFR pt. 75, Appendix B.
4 NOx CEMS RATA Notification: due 30 days before CEMS Relative Accuracy Test Audit (RATA).
5
NOx CEMS Relative Accuracy Test Audit (RATA): Due semiannually following certification of the equipment, i.e.,once every two successive QA operating quarters (calendar quarter in which there are at least 168 unitoperating hours). Conduct a RATA on all CEMS required by the Acid Rain Program, in accordance with 40 CFRpt. 75, Appendix B. Relative accuracy test audits may be performed annually (i.e., once every four successiveQA operating quarters, rather than once every two successive QA operating quarters) if any of the conditionslisted in 40 CFR pt. 75, Appendix B, Sections 2.3.1.2(a) through 2.3.1.2(i) are met.
2200 Relative Accuracy Test Audit (RATA) Results Summary: due 30 days after end of each calendar quarter inwhich a RATA was conducted.
2210 Installation Notification: due 60 days before installing the continuous emissions monitoring system. Thenotification shall include plans and drawings of the system.
Minn. R. 7011.0515, subp. 1, Minn. R.7011.0550
Minn. R. 7011.0515, subp. 2
40 CFR pt. 75, Appendix B(Sect 2.1)
Minn. R. 7017.1180, subp. 2
40 CFR pt. 75, Appendix B (Sect 2.3.1),Minn. R. 7017.1020
Minn. R. 7017.1180, subp. 3
Minn. R. 7017.1040, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 21(MR005)
p g y
2220 Cylinder Gas Audit (CGA) Results Summary: due 30 days after end of each calendar quarter in which a CGAwas conducted.
2410The CEMS/COMS requirements listed below outline the typical standards of 40 CFR Pt. 75. Additionalmonitoring requirements may also apply to the Facility based on the standard and it is the responsibility of theFacility to meet all applicable requirements.
2420 Emissions Monitoring: The owner or operator shall use a CEMS to measure emissions from EQUI 16.
2430
Certification Application: The owner or operator shall apply for certification of each continuous emission oropacity monitoring system used under the Acid Rain Program. The owner or operator shall submit thecertification application in accordance with 40 CFR Section 75.60 and each complete certification applicationshall include the information specified in Section 75.63.
2440
Monitoring Data: Hourly averages shall be computed using at least one data point in each fifteen minutequadrant of an hour, where the unit combusted fuel during that quadrant of an hour. Not withstanding thisrequirement, an hourly average may be computed from at least two data points separated by a minimum of 15minutes (where the unit operates for more than one quadrant of an hour) if data is unavailable as a result of theperformance of calibration, quality assurance, or preventive maintenance activities pursuant to 40 CFR Section75.21 and appendix B of pt. 75, or backups of data from the data acquisition and handling system, orrecertification, pursuant to Section 75.20. The owner or operator shall use all valid measurements or data pointscollected during an hour to calculate the hourly averages. All data points collected during an hour shall be, to theextent practicable, evenly spaced over the hour.
2450 CEMS QA/QC NOx and Diluent Monitoring: The owner or operator of an affected facility shall operate, calibrate,and maintain each CEMS according to the QA/QC procedures in 40 CFR pt. 75, Appendix B as amended.
2470
The Permittee shall conduct linearity and leak check : Due after Startup of Monitor Date quarterly in accordancewith procedures in 40 CFR pt. 75, Appendix B, Sections 2.2.1 and 2.2.2, and Appendix A, Section 6.2. Thismeans once every calendar quarter in which there are at least 168 unit operating hours. Perform a leak check atleast once during each QA operating quarter.
Minn. R. 7017.1180, subp. 1
Minn. R. 7007.subp. 4, A
40 CFR 75.10(a)
40 CFR 75.20(a)(2), 40 CFR75.60(b)(1), 40 CFR 75.63
40 CFR 75.10(d)(1)
40 CFR 75.21(a)
40 CFR pt. 75, Appendix B, 2.2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 21(MR005)
g p g q
2490 Quarterly Reports: Electronically report the data and information in 40 CFR Section 75.64 (a), (b), and (c) to theAdministrator quarterly.
2500
Recordkeeping: The owner or operator shall maintain for each affected unit a file of all measurements, data,reports, and other information required by this part at the source in a form suitable for inspection for at leastthree (3) years from the date of each record. The file shall contain all information required by 40 CFR Section75.57.
EQUI 22(MR006)
4 CEMS QA/QC Diluent Monitoring: The owner or operator of an affected facility shall operate, calibrate, andmaintain each CEMS according to the QA/QC procedures in 40 CFR pt. 75, Appendix B as amended.
2200 Relative Accuracy Test Audit (RATA) Notification: due 30 days before CO CEMS Relative Accuracy Test Audit(RATA).
2210 Relative Accuracy Test Audit (RATA) Results Summary: due 30 days after end of each calendar quarter inwhich a RATA was conducted.
2220 Installation Notification: due 60 days before installing the continuous emissions monitoring system. Thenotification shall include plans and drawings of the system.
2230 Cylinder Gas Audit (CGA) Results Summary: due 30 days after end of each calendar quarter in which a CGAwas conducted.
40 CFR 75.64
40 CFR 75.57
40 CFR 75.21(a)
Minn. R. 7017.1180, subp. 2
Minn. R. 7017.1180, subp. 3
Minn. R. 7017.1040, subp. 1
Minn. R. 7017.1180, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 22(MR006)
2240The CEMS/COMS requirements listed below outline the typical standards of 40 CFR pt. 60 when combined withMinn. R. Additional monitoring requirements may also apply to the Facility based on this combination ofstandards and it is the responsibility of the Facility to meet all applicable requirements.
2260 Carbon Monoxide: Emissions Monitoring: The owner or operator shall use a CEMS to measure emissions fromEQUI 16.
2270
Certification Test Plan due 30 days before Certification Test.Certification Test Pretest Meeting due 7 days before Certification Test.Certification Test Report - Microfiche Copy due 105 days after Certification Test.Certification Test Report due 45 days after Certification Test.The Notification, Test Plan, and Test Report may be submitted in alternate format as allowed by Minn. R.7017.1120, subp. 2.
2280
Continuous Operation: CEMS must be operated and data recorded during all periods of emission unit operationincluding periods of emission unit start-up, shutdown, or malfunction except for periods of acceptable monitordowntime. This requirement applies whether or not a numerical emission limit applies during these periods. ACEMS must not be bypassed except in emergencies where failure to bypass would endanger human health,safety, or plant equipment.
2290
QA Plan: Develop and implement a written quality assurance plan that covers each CEMS. The plan shall be onsite and available for inspection within 30 days after monitor certification. The plan shall contain all of theinformation required by 40 CFR Part 60, Appendix F, Section 3. The plan shall include the manufacturer's spareparts list for each CEMS and require that those parts be kept at the facility unless the Commissioner giveswritten approval to exclude specific spare parts from the list.
2300
CEMS QA/QC: The owner or operator of an affected facility is subject to the performance specifications listed in40 CFR pt. 60, Appendix B and shall operate, calibrate, and maintain each CEMS according to the QA/QCprocedures in 40 CFR pt. 60, Appendix F as amended and maintain a written QA/QC program available in aform suitable for inspection.
2310
CEMS Daily Calibration Drift Test: Check the zero (low level value between 0 and 20 percent of span value) andspan (50 to 100 percent of span value) calibration drifts at least once daily. The zero and span must, at aminimum, be adjusted whenever the drift exceeds two times the limit specified in 40 CFR pt. 60, Appendix B. 40CFR pt. 60, Appendix F, Section 4.3.1 shall be used to determine out-of-control periods for CEMS.
Minn. R. 7017.1010
40 CFR pt. 60, subp. KKKK, Minn. R.7017.1010, subp 1
40 CFR 60.7(a)(5), Minn. R.7017.1060, subp. 1-3, Minn. R.7017.1080, subp. 1-4
40 CFR 60.13(e), Minn. R. 7017.1090
40 CFR pt. 60, Appendix F, 3, Minn. R.7017.1170, subp. 2
40 CFR 60.13(a), 40 CFR pt. 60,Appendix F
40 CFR 60.13(d)(1), 40 CFR pt. 60,Appendix F, 4.1, Minn. R. 7017.1170,subp. 3
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 22(MR006)
p pp p
2350Recordkeeping: The owner or operator must retain records of all CEMS monitoring data and support informationfor a period of five years from the date of the monitoring sample, measurement or report. Records shall be keptat the source.
2360 The Permittee shall submit start-up notification : Due 10 working days after Startup of Monitor Date.
2370CEMS Certification/Recertification Test: due 90 days after the first excess emissions report required for theCEMS or any change which invalidates the monitor's certification status as outlined in Minn. R. 7017.1050, subp.2.
2380The Permittee shall conduct CEMS cylinder gas audit (CGA) : Due after CEMS Certification Test Date quarterlybut no more than three quarters in succession. A CGA is not required during any calendar quarter in which aRATA was performed.
2381 The Permittee shall conduct CEMS relative accuracy test audit (RATA) : Due after CEMS Certification Test Dateannually meaning by the end of every one of four calendar quarters.
EQUI 23 1 The Permittee shall install a fixed roof tank.
2 The Permittee shall maintain the tank in good working condition according to the operation and maintenance(O&M) plan.
40 CFR 60.7(f), Minn. R. 7017.1130
Minn. R. 7007.0800, subp. 2
40 CFR 60.13(b)
40 CFR pt. 60, Appendix F, 5.1.3
40 CFR pt. 60, Appendix F, 5.1.1
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementEQUI 23
( ) p
3 The Permittee shall equip the storage vessel with a permanent submerged fill pipe.
EQUI 24 1 The Permittee shall maintain the tank in good working condition according to the operation and maintenance(O&M) plan.
2 The Permittee shall equip the storage vessel with a permanent submerged fill pipe.
FUGI 1(FS001)
1 The Permittee shall control PM, PM10 and PM2.5 emissions by installing, operating, and maintaining a misteliminator with a drift rate designed not to exceed 0.0005%.
2 Total Particulate Matter <= 0.020 grains per dry standard cubic foot.
3680 Opacity <= 20 percent opacity.
3681 The Permittee shall maintain documentation of manufacturer's guarantee that the mist eliminator meets thedesign drift rate of 0.0005%.
Minn. R. 7011.1505, subp. 3.B
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7011.1505, subp. 3.B
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7011.0735, Table 2
Minn. R. 7011.0715, subp. 1(B)
Minn. R. 7007.0800, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # Requirement( ) g
FUGI 2(FS002)
1 The Permittee shall conduct audio/visual/olfactory (AVO) inspections each calendar quarter for natural gaspiping components to detect leaks of natural gas.
2 The Permittee shall keep records of the quarterly AVO leak inspections on natural gas piping components.
FUGI 3(FS003)
1 The Permittee shall use state-of-the-art enclosed-pressure sulfur hexafluoride (SF6) circuit breakers with leakdetection for the breakers associated with EQUI 16.
2 At least once per calendar month, the Permittee shall inspect the pressure and record the results of theinspection.
3Corrective Actions: The Permittee shall take corrective action as soon as possible if the pressure of the breakersis found to be outside the manufacturer's recommended range during the monthly inspection. The Permitteeshall keep a record of the type and date of any corrective action taken for FUGI 3.
STRU 14(SV002)
3 The Permittee shall operate the combustion turbine generator/duct burner (CTG/DB; EQUI 5/EQUI 6) in amanner consistent with good combustion practices to restrict emissions of PM, PM10, NOx, CO, and VOC.
5
Operating Mode: Normal operating mode is all operation of EQUI 5 at 60% or greater of the CTG maximumpotential load based on ambient conditions at the time of operation when combusting natural gas or distillate fueloil. Limits apply whether or not the duct burners are operating.
For CO limit applicability, full load is all operation at 90% or greater of rated capacity for the ambient conditions,and less than full load is all operation greater than or equal to 60% load and less than 90% of rated capacity forthe ambient conditions.
The CEMS data acquisition and handling system monitors EQUI 5 load (using a CTG gross megawatt signalprovided by the CTG control system (not including steam turbine electrical output)) and indicates whether EQUI5 is operating in normal mode or startup/shutdown mode. The percent load signal is also used by the CEMS to ..
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 5, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR pt. 52,21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
8The Permittee shall limit Nitrogen Oxides <= 3.0 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2 when EQUI 5 combusts natural gas. This limit does not apply during startup,shutdown, or malfunction.
9The Permittee shall limit Nitrogen Oxides <= 5.5 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2 when EQUI 5 combusts distillate fuel oil. This limit does not apply during startup,shutdown, or malfunction.
11The Permittee shall limit Carbon Monoxide <= 4.0 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2. This limit applies at all times when EQUI 5 combusts natural gas and operates at fullload. This limit does not apply during startup, shutdown, or malfunction.
12The Permittee shall limit Carbon Monoxide <= 4.7 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2. This limit applies at all times when EQUI 5 combusts natural gas and operates atless than full load. This limit does not apply during startup, shutdown, or malfunction.
13The Permittee shall limit Carbon Monoxide <= 4.8 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2 when EQUI 5 combusts distillate fuel oil and operates at full load. This limit does notapply during startup, shutdown, or malfunction.
14The Permittee shall limit Carbon Monoxide <= 10.2 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2 when EQUI 5 combusts distillate fuel oil and operates at less than full load. This limitdoes not apply during startup, shutdown, or malfunction.
16The Permittee shall limit Volatile Organic Compounds <= 3.4 parts per million 3-hour block average by volumeon a dry basis corrected to 15% O2 when EQUI 5 combusts natural gas. This limit applies at all times exceptduring startup, shutdown, or malfunction.
40 CFR 60.332(a)(1), Minn. R.7011.2350, Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000,Title I Condition: 40 CFR 52.21(k)(1)(i)& Minn. R. 7007.3000
40 CFR 60.332(a)(1), Minn. R.7011.2350, Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000,Title I Condition: 40 CFR 52.21(k)(1)(i)& Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
g p
17The Permittee shall limit Volatile Organic Compounds <= 7.1 parts per million 3-hour block average by volumeon a dry basis corrected to 15% O2 when EQUI 5 combusts distillate fuel oil. This limit applies at all times exceptduring startup, shutdown, or malfunction.
19The Permittee shall limit Total Particulate Matter <= 0.009 pounds per million Btu heat input 3-hour blockaverage and not to exceed 22.0 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 5.This limit applies at all times including during startup, shutdown, or malfunction.
20The Permittee shall limit Total Particulate Matter <= 0.057 pounds per million Btu heat input 3-hour blockaverage and not to exceed 72.8 lb/hr, also on a 3-hour block average, when combusting distillate fuel oil in EQUI5. This limit applies at all times including during startup, shutdown, or malfunction.
22The Permittee shall limit PM < 10 micron <= 0.009 pounds per million Btu heat input 3-hour block average andnot to exceed 22.0 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 5. This limitapplies at all times including during startup, shutdown, or malfunction.
23The Permittee shall limit PM < 10 micron <= 0.057 pounds per million Btu heat input 3-hour block average andnot to exceed 72.8 lb/hr, also on a 3-hour block average, when combusting distillate fuel oil in EQUI 5. This limitapplies at all times including during startup, shutdown, or malfunction.
25The Permittee shall limit PM < 2.5 micron <= 0.009 pounds per million Btu heat input 3-hour block average andnot to exceed 22.0 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 5. This limitapplies at all times including during startup, shutdown, or malfunction.
26The Permittee shall limit PM < 2.5 micron <= 0.057 pounds per million Btu heat input 3-hour block average andnot to exceed 72.8 lb/hr, also on a 3-hour block average, when combusting distillate fuel oil in EQUI 5. This limitapplies at all times including during startup, shutdown, or malfunction.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
pp g g p
33The Permittee shall limit Sulfur Dioxide <= 0.8 grains of sulfur/100 standard cubic feet of natural gas on acalendar year average. This limit applies at all times including startup, shutdown, and malfunction. This limit isequivalent to 0.0022409 lb SO2/mmBtu at 1020 Btu/scf.
34 The Permittee shall limit Sulfur Content of Fuel <= 0.05 percent by weight for No. 2 distillate fuel oil. This limitapplies at all times including startup, shutdown, and malfunction.
35
Startup and Shutdown Operating Mode is all operation of EQUI 5 at less than 60 percent of the CTG maximumpotential load based on ambient conditions at the time of operation when combusting natural gas or distillate fueloil.
Cold startup is when the Combustion Turbine #2 steam turbine was last online more than 48 hours prior to thestartup. Warm startup is any startup that occurs when the steam turbine was last online no more than 48 hoursprior to the startup. The steam turbine is online when any steam is fed to the steam turbine.
For distillate fuel oil startup, EQUI 5 initially combusts natural gas and then switches to distillate fuel oil duringthe startup process. For distillate fuel oil shutdown, EQUI 5 switches from distillate fuel oil to natural gas duringthe shutdown process.
37 EQUI 5 Startup, Shutdown, and Malfunction: The terms "startup", "shutdown", and "malfunction" shall have thesame meanings as defined in 40 CFR Section 60.2.
38 The Permittee shall restrict startup and shutdown operation for the CTG/DB (EQUI 5/EQUI 6) to the shortesttime period possible to restrict emissions of PM, PM10, NOx, CO, and VOC.
39Control Equipment Operation During Startup and Shutdown: Operation of TREA 4, TREA 5, and TREA 6, andTREA 9 is not required during EQUI 5 startup. During shutdown, control equipment operation shall continue aslong as is physically possible.
40 The Permittee shall limit Nitrogen Oxides <= 7.44 tons per year 12-month rolling sum during cold startups onnatural gas. NOx is limited to 323.5 lbs per cold startup event on natural gas.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
g p p g
41
The Permittee shall limit Nitrogen Oxides <= 1.38 tons per year 12-month rolling sum during cold startups ondistillate fuel oil. NOx is limited to 459.3 lbs per cold startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
42 The Permittee shall limit Nitrogen Oxides <= 13.64 tons per year 12-month rolling sum during warm startups onnatural gas. NOx is limited to 148.3 lbs per warm startup event on natural gas.
44
The Permittee shall limit Nitrogen Oxides <= 1.69 tons per year 12-month rolling sum during warm startups ondistillate fuel oil. NOx is limited to 140.7 lbs per warm startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
45 The Permittee shall limit Nitrogen Oxides <= 0.50 tons per year 12-month rolling sum during shutdown ofequipment while firing natural gas. NOx is limited to 4.4 lbs per shutdown event while firing natural gas.
46
The Permittee shall limit Nitrogen Oxides <= 0.25 tons per year 12-month rolling sum during shutdown ofequipment while firing distillate fuel oil. NOx is limited to 16.8 lbs per shutdown event while firing distillate fuel oil.
Emissions from natural gas combustion that occur after the switch from distillate fuel oil to natural gas as part ofthe distillate fuel oil shutdown process are included in the emissions subject to this limit.
47 The Permittee shall limit Carbon Monoxide <= 123.94 tons per year 12-month rolling sum during cold startups onnatural gas. CO is limited to 5387.6 lbs per cold startup event on natural gas.
48
The Permittee shall limit Carbon Monoxide <= 4.49 tons per year 12-month rolling sum during cold startups ondistillate fuel oil. CO is limited to 1498.2 lbs per cold startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
p p j
49 The Permittee shall limit Carbon Monoxide <= 282.31 tons per year 12-month rolling sum during warm startupson natural gas. CO is limited to 3068.6 lbs per warm startup event on natural gas.
51
The Permittee shall limit Carbon Monoxide <= 6.55 tons per year 12-month rolling sum during warm startups ondistillate fuel oil. CO is limited to 545.9 lbs per warm startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
52 The Permittee shall limit Carbon Monoxide <= 5.39 tons per year 12-month rolling sum during shutdown ofequipment while firing natural gas. CO is limited to 46.8 lbs per shutdown event while firing natural gas.
53
The Permittee shall limit Carbon Monoxide <= 4.64 tons per year 12-month rolling sum during shutdown ofequipment while firing distillate fuel oil. CO is limited to 309.3 lbs per shutdown event while firing distillate fuel oil.
Emissions from natural gas combustion that occur after the switch from distillate fuel oil to natural gas as part ofthe distillate fuel oil shutdown process are included in the emissions subject to this limit.
54 The Permittee shall limit Volatile Organic Compounds <= 61.96 tons per year 12-month rolling sum during coldstartups on natural gas only. VOC is limited to 2693.8 lbs per cold startup event on natural gas only.
55
The Permittee shall limit Volatile Organic Compounds <= 2.25 tons per year 12-month rolling sum during coldstartups on distillate fuel oil. VOC is limited to 749.1 lbs per cold startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
56 The Permittee shall limit Volatile Organic Compounds <= 141.15 tons per year 12-month rolling sum duringwarm startups on natural gas. VOC is limited to 1534.3 lbs per warm startup event on natural gas.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
p g p p g
58
The Permittee shall limit Volatile Organic Compounds <= 3.28 tons per year 12-month rolling sum during warmstartups on distillate fuel oil. VOC is limited to 272.9 lbs per warm startup event on distillate fuel oil.
Emissions from natural gas combustion that occur before the switch to distillate fuel oil that is part of the distillatefuel oil startup process are included in the emissions subject to this limit.
59The Permittee shall limit Volatile Organic Compounds <= 2.69 tons per year 12-month rolling sum duringshutdown of equipment while firing natural gas. VOC is limited to 23.4 lbs per shutdown event while firing naturalgas.
60
The Permittee shall limit Volatile Organic Compounds <= 2.32 tons per year 12-month rolling sum duringshutdown of equipment while firing distillate fuel oil. VOC is limited to 154.7 lbs per shutdown event while firingdistillate fuel oil.
Emissions from natural gas combustion that occur after the switch from distillate fuel oil to natural gas as part ofthe distillate fuel oil shutdown process are included in the emissions subject to this limit.
64HAP Emissions Monitoring: The Permittee shall determine STRU 14 formaldehyde, n-hexane, other singleHAPs, and total HAP emissions using daily heat input records, daily operating hours, and applicable emissionfactors as specified in this permit.
71
Daily Heat Input Monitoring: Once each calendar day, the Permittee shall calculate and record total EQUI 5 heatinput (in million Btus) for each of the three defined EQUI 5 operating levels (<60% load, 60% - <90% load, and90% or greater load) during the previous operating day. If EQUI 6 is operated, the Permittee shall calculate andseparately record EQUI 6 heat input (in million Btus) for the previous operating day.
EQUI 5 operating load is determined on an hourly basis according to the CTG operating capacity for the ambientconditions at the time of operation.
72
Determination of Formaldehyde and n-Hexane Emission Factors For Emission Calculations:
1. The Permittee shall determine the load-dependent formaldehyde emission factors for calculatingformaldehyde emissions from combusting natural gas (NG) using the results from the most recentMPCA-approved and reviewed stack test as follows:
a. The NG formaldehyde factor for determining emissions from operation at less than 60 percent load shall bethe average of three test runs, or the maximum one hour test run as allowed by this permit, at 15 to 30 percentload;b. The NG formaldehyde factor for determining emissions from operation at 60 to less than 90 percent load shallbe the average of three test runs, or the maximum one hour test run as allowed by this permit, at 60 to 70 perc..
73
Monthly HAPs Emissions Monitoring and Recordkeeping:
By the last day of each month, the Permittee shall calculate and record monthly STRU 14 formaldehyde,n-hexane, and total HAP emissions for the previous calendar month.
NG HAP Emissions: Formaldehyde and n-hexane emissions from NG combustion are determined using dailyEQUI 5 and EQUI 6 heat input data and the applicable lb/mmBtu emission factor. For all other single HAPs fromNG combustion, EQUI 5 and EQUI 6 single HAP emissions are determined for each emission unit using eachunit's daily heat input records and applicable AP-42 emission factor.
FO HAP Emissions: Formaldehyde and n-hexane emissions from FO combustion are determined using daily E..
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 4
Minn. R. 7007.0800, subp. 4
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
74 See EQUI 3 for additional NOx CEMS requirements and EQUI 4 for additional CO CEMS requirements.
75 Emissions Monitoring: The Permittee shall measure or calculate SO2, NOx, and CO2 emission rates inaccordance with 40 CFR pt. 75.
76
Emissions Monitoring: The Permittee shall use a Continuous Emissions Monitoring System (CEMS) to measureNOx emissions, and measure or calculate SO2 and CO2 in accordance with 40 CFR pt. 75 for STRU 14. ThePermittee shall measure NOx emissions in ppmvd corrected to 15% oxygen and automatically calculate andrecord the 3-hour average NOx emission rate. NOx ppmvd emission data shall also be converted to lb/mmBtuas required by 40 CFR pt. 75.
78 Emissions Monitoring: The Permittee shall use a CEMS to measure CO emissions in ppmvd corrected to 15%oxygen. The Permittee shall automatically calculate and record the 3-hour average CO emission rate.
79
Operating Load and Operating Conditions Monitoring - The Permittee shall:
1. Continuously monitor, determine, and record the hourly heat input rate (mmBtu/hr) for EQUI 5/EQUI 6 usingthe methods specified at 40 CFR pt. 75, Appendix D Section 3.4;2. Monitor and record the time and duration of each startup, shutdown, and malfunction;3. Record the start and stop time of each steam turbine-generator on-line and off-line period.4. Monitor and record the percent operating load (using the combustion turbine automated control system andthe CEMS data aquisition and handling system).
80 NOx CEMS Quality Assurance/Quality Control (QA/QC): The Permittee shall operate, calibrate, and maintain theNOx CEMS according to the QA/QC procedure in 40 CFR pt. 75, Appendix B, as amended.
82
NOx CEMS and CO CEMS Continuous Operation: The NOx CEMS and CO CEMS must be operated and datarecorded during all periods of emission unit operation including periods of emission unit start-up, shutdown, ormalfunction except for periods of acceptable monitor downtime. This requirement applies whether or not anumerical emission limit applies during these periods. The CEMS must not be bypassed except in emergencieswhere failure to bypass would endanger human health, safety, or plant equipment.
Acceptable CEM downtime includes reasonable periods as listed in items A, B, C and D of Minn. R. 7017.1090,subp. 2.
Minn. R. 7007.0800, subp. 2
40 CFR 75.10, Minn. R. 7017.1020
40 CFR 75.10, Minn. R. 7017.1006,Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
40 CFR 75.10, Minn. R. 7007.0800,subp. 4, Minn. R. 7011.7000, Minn. R.7017.1006, Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000,Title I Condition: Avoid major sourceunder 40 CFR 63.2
40 CFR 75.21
Minn. R. 7017.1090, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
p
84 NOx and CO CAM Requirements: The Permittee shall use the NOx CEMS and CO CEMS to satisfy therequirements of 40 CFR pt. 64.
85
VOC CAM Requirements: The Permittee shall use the CO CEMS for VOC compliance assurance monitoring.Compliance with the CO limit indicated by the CO CEMS assures that VOC emissions are in compliance withthe VOC limit.
The Permittee shall demonstrate this correlation by recording and comparing CO CEMS emissions data duringSTRU 14 VOC performance testing, with results of the VOC testing. The correlation shall be valid only if testingdemonstrates that VOC emissions comply with the applicable VOC limit at the same time that CO emissions(measured by the CO CEMS) comply with the applicable CO limit, and the CO CEMS certification testing hasbeen satisfactorily completed.
96
Documentation of Need for Improved VOC Monitoring: If the Permittee fails to achieve compliance with the VOCemission limit when the CO CEMS did not provide an indication of a VOC emissions excursion or exceedancewhile the CO CEMS provided valid CO emissions data, or the results of VOC performance testing document aneed to modify the existing CO indicator of VOC emissions compliance, the Permittee shall promptly notify theMPCA and, if necessary, submit a permit amendment application to address the necessary monitoring changes.
97Recordkeeping: The Permittee must retain records of all CEMS monitoring data and support information for aperiod of five years from the date of the monitoring sample, measurement or report. Records shall be kept at thesource.
98
PM < 10 micron : The Permittee shall conduct a performance test : Due before 09/30/2016 every 60 months tomeasure emissions at Natural Gas base load with duct burner operation. The first test is due by the datespecified and all subsequent tests are due by the end of each 60-month period following that date. Theperformance test shall be conducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, usingEPA Reference Method 201A and 202, or other method approved by MPCA in the performance test planapproval. Testing while combusting distillate fuel oil at base load is only required if EQUI 5 combusts distillatefuel oil for more than 50 hours in any 12-month period during the 60 months prior to the required performancetest.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required: ..
99
PM < 2.5 micron : The Permittee shall conduct a performance test : Due before 06/23/2018 every 60 months tomeasure emissions at Natural Gas base load with duct burner operation. The first test is due by the datespecified and all subsequent tests are due by the end of each 60-month period following that date. Theperformance test shall be conducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, usingEPA Reference Method 201A and 202, or other method approved by MPCA in the performance test planapproval. Testing while combusting distillate fuel oil at base load is only required if EQUI 5 combusts distillatefuel oil for more than 50 hours in any 12-month period during the 60 months prior to the required performancetest.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required: ..
19880
Total Particulate Matter : The Permittee shall conduct a performance test : Due before 09/30/2016 every 60months to measure emissions at Natural Gas base load with duct burner operation. The first test is due by thedate specified and all subsequent tests are due by the end of each 60-month period following that date. Theperformance test shall be conducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, usingEPA Reference Method 5 and 202, or other method approved by MPCA in the performance test plan approval.Testing while combusting distillate fuel oil at base load is only required if EQUI 5 combusts distillate fuel oil formore than 50 hours in any 12-month period during the 60 months prior to the required performance test.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required:1) by this permit; ..
40 CFR 64.3(d), Minn. R. 7017.0200
40 CFR 64.3(a), 40 CFR 64.6(b), Minn.R. 7017.0200
40 CFR 64.7(e), Minn. R. 7017.0200
40 CFR 75.57, Minn. R. 7017.1130
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2, Minn. R.7017.2020, subp. 1
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
19890
Volatile Organic Compounds : The Permittee shall conduct a performance test : Due before 09/30/2016 every 60months to measure emissions. The first test is due by the date specified and all subsequent tests are due by theend of each 60-month period following that date. The performance test shall be conducted at worst caseconditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 25A, or other methodapproved by MPCA in the performance test plan approval. Testing while combusting distillate fuel oil is onlyrequired if EQUI 5 combusts distillate fuel oil for more than 50 hours in any 12-month period during the 60months prior to the required performance test.
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required:1) by this permit; ..
20230
Hexane : The Permittee shall conduct a performance test : Due before 09/30/2016 every 60 months to verify theemission factor of hexane (in lb/mmBtu). The first test is due by the date specified and all subsequent tests aredue by the end of each 60-month period following that date. The performance test shall be conducted at worstcase conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 18, 320, or othermethod approved by MPCA in the performance test plan approval. The tests shall be conducted whilecombusting natural gas at 90 to 100 percent load (base load with EQUI 6).
Testing conducted during the 60 days prior to the performance test due date satisfies the performance test duedate, and will not reset the test due date for future testing as required:1) by this permit;2) by the most recently approved Performance Test Frequency Plan; or ..
20240
Formaldehyde : The Permittee shall conduct a performance test : Due before 09/30/2016 every 30 months toverify the emission factor of formaldehyde (in lb/mmBtu). The first test is due by the date specified and allsubsequent tests are due by the end of each 30-month period following that date. The performance test shall beconducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method18, 320, or other method approved by MPCA in the performance test plan approval. The tests shall beconducted while combusting natural gas under the following conditions:
1. 15 to 30 percent load;2. 60 to 70 percent load;3. 90 to 100 percent load (base load with EQUI 6)...
20250
NG Formaldehyde Testing Frequency Plan:The Permittee may submit a Testing Frequency Plan (TFP) after any formaldehyde emission factor test in orderto reduce test frequency, based on the MPCA emission factor test frequency guidance, and the most recent NGformaldehyde test results. Any revision to test frequency through submittal of a TFP does not take effect until thetest frequency is incorporated into this permit through a permit amendment.Notwithstanding other STRU 14 testing requirements in this permit that allow formaldehyde testing at 60-monthintervals, test frequency may only be reduced through the submittal of a TFP if current test results showformaldehyde emission factor variability is less than or equal to 40% of the previous formaldehyde test at thecomparable CTG operating level.As described in the MPCA emission factor test frequency guidance, test frequency may be relaxed to onceevery 36 months if emission factor variability is between 10% through 40% of the previous test result for the co..
20290
Protocol for Re-Setting Emission Factors Used For Calculating Formaldehyde and n-Hexane Emissions FromNG Combustion: The Permittee shall conduct performance testing under conditions that produce:
1. The maximum formaldehyde emission rate for each of the three operating ranges (<60%, 60% - <90%, and90% or greater load (also referred to as 'full load')); and,
2. The maximum n-hexane emission rate at 90% or greater load.
The Permittee shall use U.S. EPA Reference Methods 323 and 18 to measure formaldehyde and n-hexaneemissions, respectively, as required elsewhere in this permit. The Permittee shall report each test result as alb/mmBtu emission factor in the performance test report required by Minn. R. 7017.2035, subp. 1...
20291
Notwithstanding the Protocol detailed above, the MPCA reserves the right to set operational limits andrequirements as allowed under Minn. R. 7017.2025. If the MPCA sets limits, the new limits shall be implementedupon receipt of the NOC letter that notifies the Permittee of preliminary approval. The limits set according toMinn. R. 7017.2025 are final upon issuance of a permit amendment incorporating the change.
20292The Permittee must apply for and obtain a major permit amendment if the Permittee wishes to deviate from theProtocol for Re-Setting Emission Factors Used For Calculating Formaldehyde and n-Hexane Emissions FromNatural Gas Combustion established by this permit.
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7017.2020, subp. 1
Minn. R. 7011.7000, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7017.2025
Minn. R. 7007.1500, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 14(SV002)
y p
20293 Additional requirements for Combustion Turbine #2 are located at EQUI 5. Additional requirements for DuctBurner (Combustion Turbine #2) are located at EQUI 6.
STRU 20(SV007)
1 The Permittee shall operate the combustion turbine generator/duct burner (CTG/DB; EQUI 16/EQUI 17) in amanner consistent with good combustion practices to restrict emissions of PM, PM10, NOx, CO, and VOC.
2
Operating Mode: Normal operating mode is all operation of EQUI 16 at 60% or greater of the CTG maximumpotential load based on ambient conditions at the time of operation when combusting natural gas. Limits applywhether or not the duct burners are operating.
For CO limit applicability, full load is all operation at 90% or greater of rated capacity for the ambient conditions,and less than full load is all operation greater than or equal to 60% load and less than 90% of rated capacity forthe ambient conditions.
The CEMS data acquisition and handling system monitors EQUI 16 load (using a CTG gross megawatt signalprovided by the CTG control system (not including steam turbine electrical output)) and indicates whether EQUI16 is operating in normal mode or startup/shutdown mode. The percent load signal is also used by the CEMS t..
3
The shakedown period for EQUI 16 is defined as the period of time commencing on the date of initial startup andterminating on the earlier of the following three dates:
1. 180 days after initial startup of EQUI 16, or2. 60 days after achieving maximum production of EQUI 16, or3. Submittal of successful compliance test and CEMS certification reports for EQUI 16.
4The Permittee shall limit Nitrogen Oxides <= 3.0 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2 when EQUI 16 combusts natural gas. This limit does not apply during startup,shutdown, malfunction, or tuning. This limit does not apply until after the shakedown period ends.
5
The Permittee shall limit Carbon Monoxide <= 4.0 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2. This limit applies at all times when EQUI 16 combusts natural gas and operates atfull load. This limit does not apply during startup, shutdown, malfunction, or tuning. This limit does not apply untilafter the shakedown period ends.
6
The Permittee shall limit Carbon Monoxide <= 4.7 parts per million 3-hour rolling average by volume on a drybasis corrected to 15% O2. This limit applies at all times when EQUI 16 combusts natural gas and operates atless than full load. This limit does not apply during startup, shutdown, malfunction, or tuning. This limit does notapply until after the shakedown period ends.
Minn. R. 7007.0800, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 2
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000,Title I Condition: 40 CFR 52.21(k)(1)(i)& Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
pp y p
7The Permittee shall limit Volatile Organic Compounds <= 3.4 parts per million 3-hour block average by volumeon a dry basis corrected to 15% O2 when EQUI 16 combusts natural gas. This limit does not apply duringstartup, shutdown, malfunction, or tuning. This limit does not apply until after the shakedown period ends.
8
The Permittee shall limit Total Particulate Matter <= 0.0098 pounds per million Btu heat input 3-hour blockaverage and not to exceed 11.9 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 16.This limit applies at all times including during startup, shutdown, or malfunction. This limit does not apply untilafter the shakedown period ends.
9
The Permittee shall limit PM < 10 micron <= 0.0098 pounds per million Btu heat input 3-hour block average andnot to exceed 11.9 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 16. This limitapplies at all times including during startup, shutdown, or malfunction. This limit does not apply until after theshakedown period ends.
10
The Permittee shall limit PM < 2.5 micron <= 0.0098 pounds per million Btu heat input 3-hour block average andnot to exceed 11.9 lb/hr, also on a 3-hour block average, when combusting natural gas in EQUI 16. This limitapplies at all times including during startup, shutdown, or malfunction. This limit does not apply until after theshakedown period ends.
11The Permittee shall limit Carbon Dioxide (Total) and Carbon Dioxide Equivalent <= 1000 pounds permegawatt-hour 12-month rolling average of gross energy output. This limit does not apply until after theshakedown period ends.
12
Startup and Shutdown Operating Mode is all operation of EQUI 16 at less than 60 percent of the CTG maximumpotential load based on ambient conditions at the time of operation when combusting natural gas.
Cold startup is when the Combustion Turbine #1 steam turbine was last online more than 48 hours prior to thestartup. Warm startup is any startup that occurs when the steam turbine was last online no more than 48 hoursprior to the startup. The steam turbine is online when any steam is fed to the steam turbine.
13 EQUI 16 Startup, Shutdown, and Malfunction: The terms "startup", "shutdown", and "malfunction" shall have thesame meanings as defined in 40 CFR Section 60.2.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
40 CFR 60.5520(a), 40 CFR pt. 60,subp. TTTT(Table 2), Title I Condition:40 CFR 52.21(j)(BACT) & Minn. R.7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
g
14 The Permittee shall restrict startup and shutdown operation for the CTG/DB (EQUI 16/EQUI 17) to the shortesttime period possible to restrict emissions of PM, PM10, NOx, CO, and VOC.
15Control Equipment Operation During Startup and Shutdown: Operation of TREA 10, TREA 11, and TREA 12 isnot required during EQUI 16 startup. During shutdown, control equipment operation shall continue as long as isphysically possible.
16
The Permittee shall limit Nitrogen Oxides <= 41.9 tons per year 12-month rolling sum during cold startups, warmstartups and shutdowns on natural gas. NOx is limited to 414 lbs per cold startup event, 220 lbs per warmstartup event, and 27 lbs per shutdown event on natural gas. This limit does not apply until after the shakedownperiod ends.
19
The Permittee shall limit Carbon Monoxide <= 666.63 tons per year 12-month rolling sum during cold startups,warm startups and shutdowns on natural gas. CO is limited to 5919 lbs per cold startup event, 3788 lbs perwarm startup event, and 301 lbs per shutdown event on natural gas. This limit does not apply until after theshakedown period ends.
22
The Permittee shall limit Volatile Organic Compounds <= 333.32 tons per year 12-month rolling sum during coldstartups, warm startups and shutdowns on natural gas. VOC is limited to 2959.5 lbs per cold startup event,1894.0 lbs per warm startup event, and 150.5 lbs per shutdown event on natural gas. This limit does not applyuntil after the shakedown period ends.
25HAP Emissions Monitoring: The Permittee shall determine STRU 20 formaldehyde, n-hexane, other singleHAPs, and total HAP emissions using daily heat input records, daily operating hours, and applicable emissionfactors as specified in this permit.
26
Daily Heat Input Monitoring: Once each calendar day, the Permittee shall calculate and record total EQUI 16heat input (in million Btus) for each of the three defined EQUI 16 operating levels (<60% load, 60% - <90% load,and 90% or greater load) during the previous operating day. If EQUI 17 is operated, the Permittee shall calculateand separately record EQUI 17 heat input (in million Btus) for the previous operating day.
EQUI 16 operating load is determined on an hourly basis according to the CTG operating capacity for theambient conditions at the time of operation.
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 4, Minn. R.7011.7000, Title I Condition: Avoidmajor source under 40 CFR 63.2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p
27
Determination of Formaldehyde and n-Hexane Emission Factors For Emission Calculations:
1. The Permittee shall determine the load-dependent formaldehyde emission factors for calculatingformaldehyde emissions from combusting natural gas (NG) using the results from the most recentMPCA-approved and reviewed stack test as follows:
a. The NG formaldehyde factor for determining emissions from operation at less than 60 percent load shall bethe average of three test runs, or the maximum one hour test run as allowed by this permit, at 15 to 30 percentload;b. The NG formaldehyde factor for determining emissions from operation at 60 to less than 90 percent load shallbe the average of three test runs, or the maximum one hour test run as allowed by this permit, at 60 to 70 perc..
28
Monthly HAPs Emissions Monitoring and Recordkeeping:
By the last day of each month, the Permittee shall calculate and record monthly STRU 20 formaldehyde,n-hexane, and total HAP emissions for the previous calendar month.
NG HAP Emissions: Formaldehyde and n-hexane emissions from NG combustion are determined using dailyEQUI 16 and EQUI 17 heat input data and the applicable lb/mmBtu emission factor. For all other single HAPsfrom NG combustion, EQUI 16 and EQUI 17 single HAP emissions are determined for each emission unit usingeach unit's daily heat input records and applicable AP-42 emission factor.
Total HAP emissions are determined by summing all individual HAPs data for the previous calendar month...
29
Protocol for Re-Setting Emission Factors Used For Calculating Formaldehyde and n-Hexane Emissions FromNG Combustion: The Permittee shall conduct performance testing under conditions that produce:
1. The maximum formaldehyde emission rate for each of the three operating ranges (<60%, 60% - <90%, and90% or greater load (also referred to as 'full load')); and,
2. The maximum n-hexane emission rate at 90% or greater load.
The Permittee shall use U.S. EPA Reference Methods 323 and 18 to measure formaldehyde and n-hexaneemissions, respectively, as required elsewhere in this permit. The Permittee shall report each test result as alb/mmBtu emission factor in the performance test report required by Minn. R. 7017.2035, subp. 1...
30
Notwithstanding the Protocol detailed above, the MPCA reserves the right to set operational limits andrequirements as allowed under Minn. R. 7017.2025. If the MPCA sets limits, the new limits shall be implementedupon receipt of the NOC letter that notifies the Permittee of preliminary approval. The limits set according toMinn. R. 7017.2025 are final upon issuance of a permit amendment incorporating the change.
31The Permittee must apply for and obtain a major permit amendment if the Permittee wishes to deviate from theProtocol for Re-Setting Emission Factors Used For Calculating Formaldehyde and n-Hexane Emissions FromNatural Gas Combustion established by this permit.
32 See EQUI 21 for additional NOx CEMS requirements and EQUI 22 for additional CO CEMS requirements.
33 Emissions Monitoring: The Permittee shall measure or calculate SO2, NOx, and CO2 emission rates inaccordance with 40 CFR pt. 75.
Minn. R. 7007.0800, subp. 4
Minn. R. 7007.0800, subp. 4
Minn. R. 7011.7000, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7017.2025
Minn. R. 7007.1500, subp. 1
Minn. R. 7007.0800, subp. 2
40 CFR 75.10, Minn. R. 7017.1020
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p
34
Emissions Monitoring: The Permittee shall use a Continuous Emissions Monitoring System (CEMS) to measureNOx emissions, and measure or calculate SO2 and CO2 in accordance with 40 CFR pt. 75 for STRU 20. ThePermittee shall measure NOx emissions in ppmvd corrected to 15% oxygen and automatically calculate andrecord the 3-hour average NOx emission rate. NOx ppmvd emission data shall also be converted to lb/mmBtuas required by 40 CFR pt. 75.
35 Emissions Monitoring: The Permittee shall use a CEMS to measure CO emissions in ppmvd corrected to 15%oxygen. The Permittee shall automatically calculate and record the 3-hour average CO emission rate.
36
Operating Load and Operating Conditions Monitoring - The Permittee shall:
1. Continuously monitor, determine, and record the hourly heat input rate (mmBtu/hr) for EQUI 16/EQUI 17using the methods specified at 40 CFR pt. 75, Appendix D Section 3.4;2. Monitor and record the time and duration of each startup, shutdown, and malfunction;3. Record the start and stop time of each steam turbine-generator on-line and off-line period.4. Monitor and record the percent operating load (using the combustion turbine automated control system andthe CEMS data acquisition and handling system).
37 NOx CEMS Quality Assurance/Quality Control (QA/QC): The Permittee shall operate, calibrate, and maintain theNOx CEMS according to the QA/QC procedure in 40 CFR pt. 75, Appendix B, as amended.
38
NOx CEMS and CO CEMS Continuous Operation: The NOx CEMS and CO CEMS must be operated and datarecorded during all periods of emission unit operation including periods of emission unit start-up, shutdown, ormalfunction except for periods of acceptable monitor downtime. This requirement applies whether or not anumerical emission limit applies during these periods. The CEMS must not be bypassed except in emergencieswhere failure to bypass would endanger human health, safety, or plant equipment.
Acceptable CEM downtime includes reasonable periods as listed in items A, B, C and D of Minn. R. 7017.1090,subp. 2.
39 NOx and CO CAM Requirements: The Permittee shall use the NOx CEMS and CO CEMS to satisfy therequirements of 40 CFR pt. 64.
40
VOC CAM Requirements: The Permittee shall use the CO CEMS for VOC compliance assurance monitoring.Compliance with the CO limit indicated by the CO CEMS assures that VOC emissions are in compliance withthe VOC limit.
The Permittee shall demonstrate this correlation by recording and comparing CO CEMS emissions data duringSTRU 20 VOC performance testing, with results of the VOC testing. The correlation shall be valid only if testingdemonstrates that VOC emissions comply with the applicable VOC limit at the same time that CO emissions(measured by the CO CEMS) comply with the applicable CO limit, and the CO CEMS certification testing hasbeen satisfactorily completed.
40 CFR 75.10, Minn. R. 7017.1006,Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
40 CFR 75.10, Minn. R. 7007.0800,subp. 4, Minn. R. 7011.7000, Minn. R.7017.1006, Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000,Title I Condition: Avoid major sourceunder 40 CFR 63.2
40 CFR 75.21
Minn. R. 7017.1090, subp. 1
40 CFR 64.3(d), Minn. R. 7017.0200
40 CFR 64.3(a), 40 CFR 64.6(b), Minn.R. 7017.0200
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
y p
41
Documentation of Need for Improved VOC Monitoring: If the Permittee fails to achieve compliance with the VOCemission limit when the CO CEMS did not provide an indication of a VOC emissions excursion or exceedancewhile the CO CEMS provided valid CO emissions data, or the results of VOC performance testing document aneed to modify the existing CO indicator of VOC emissions compliance, the Permittee shall promptly notify theMPCA and, if necessary, submit a permit amendment application to address the necessary monitoring changes.
42Recordkeeping: The Permittee must retain records of all CEMS monitoring data and support information for aperiod of five years from the date of the monitoring sample, measurement or report. Records shall be kept at thesource.
43
The Permittee shall limit Nitrogen Oxides <= 15 parts per million 30-day rolling average by volume at 15 percentO2 or 54 ng/J of useful output (0.43 lb/MWh) while combusting natural gas when the turbine is operating at orabove 75 percent of peak load and when operating at ambient temperatures of 0 degrees F or above. This limitapplies to EQUI 16 and EQUI 17.
44
The Permittee shall limit Nitrogen Oxides <= 96 parts per million 30-day rolling average by volume at 15 percentO2 or 590 ng/J of useful output (4.70 lb/MWh) while combusting natural gas and the turbine is operating at lessthan 75 percent of peak load or operating at ambient temperatures less than 0 degrees F. This limit applies toEQUI 16 and EQUI 17.
45 The Permittee shall limit Sulfur Dioxide <= 0.060 pounds per million Btu heat input (26 ng SO2/J).
46The Permittee must operate and maintain EQUI 16, EQUI 17, air pollution control equipment, and monitoringequipment in a manner consistent with good air pollution control practices for minimizing emissions at all timesincluding during startup, shutdown, and malfunction.
47
The Permittee shall either:
(1) Determine compliance with the applicable NOx emissions limits by measuring the emissions combined withthe emissions from the other unit(s) utilizing the common heat recovery unit; or(2) Develop, demonstrate, and provide information satisfactory to the Administrator on methods for apportioningthe combined gross energy output from the heat recovery unit for each of the affected combustion turbines. TheAdministrator may approve such demonstrated substitute methods for apportioning the combined gross energyoutput measured at the steam turbine whenever the demonstration ensures accurate estimation of emissionsrelated under this part.
40 CFR 64.7(e), Minn. R. 7017.0200
40 CFR 75.57, Minn. R. 7017.1130
40 CFR 60.4320(a), 40 CFR pt. 60,subp. KKKK(Table 1)
40 CFR 60.4320(a), 40 CFR pt. 60,subp. KKKK(Table 1)
40 CFR 60.4330(a)(2)
40 CFR 60.4333(a)
40 CFR 60.4333(b)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p
50
Each NOx diluent CEMS must be installed and certified according to Performance Specification 2 (PS 2) in 40CFR pt. 60, appendix B, except the 7-day calibration drift is based on unit operating days, not calendar days.With state approval, Procedure 1 in 40 CFR pt. 60, appendix F is not required. Alternatively, a NOx diluentCEMS that is installed and certified according to 40 CFR pt. 75, appendix A is acceptable for use under 40 CFRpt. 60, subp. KKKK. The relative accuracy test audit (RATA) of the CEMS shall be performed on a lb/MMBtubasis.
51
As specified in 40 CFR Section 60.13(e)(2), during each full unit operating hour, both the NOx monitor and thediluent monitor must complete a minimum of one cycle of operation (sampling, analyzing, and data recording) foreach 15-minute quadrant of the hour, to validate the hour. For partial unit operating hours, at least one valid datapoint must be obtained with each monitor for each quadrant of the hour in which the unit operates. For unitoperating hours in which required quality assurance and maintenance activities are performed on the CEMS, aminimum of two valid data points (one in each of two quadrants) are required for each monitor to validate theNOx emission rate for the hour.
52Each fuel flowmeter shall be installed, calibrated, maintained, and operated according to the manufacturer'sinstructions. Alternatively, with state approval, fuel flowmeters that meet the installation, certification, and qualityassurance requirements of 40 CFR pt. 75, appendix D are acceptable for use under 40 CFR pt. 60, subp. KKKK.
53 Each watt meter, steam flow meter, and each pressure or temperature measurement device shall be installed,calibrated, maintained, and operated according to manufacturer's instructions.
54
The Permittee shall develop and keep on-site a quality assurance (QA) plan for all of the continuous monitoringequipment described in 40 CFR Section 60.4345(a), (c), and (d). For the CEMS and fuel flow meters, thePermittee may, with state approval, satisfy the requirements of 40 CFR Section 60.4345(e) by implementing theQA program and plan described in 40 CFR pt. 75, appendix B, section 1.
55 All CEMS data must be reduced to hourly averages as specified in 40 CFR Section 60.13(h).
56
For each unit operating hour in which a valid hourly average, as described in 40 CFR Section 60.4345(b), isobtained for both NOx and diluent monitors, the data acquisition and handling system must calculate and recordthe hourly NOx emission rate in units of ppm or lb/MMBtu, using the appropriate equation from method 19 in 40CFR pt. 60, appendix A. For any hour in which the hourly average O2 concentration exceeds 19.0 percent O2(or the hourly average CO2 concentration is less than 1.0 percent CO2), a diluent cap value of 19.0 percent O2or 1.0 percent CO2 (as applicable) may be used in the emission calculations.
40 CFR 60.4345(a)
40 CFR 60.4345(b)
40 CFR 60.4345(c)
40 CFR 60.4345(d)
40 CFR 60.4345(e)
40 CFR 60.4350(a)
40 CFR 60.4350(b)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p ( pp ) y
57 Correction of measured NOx concentrations to 15 percent O2 is not allowed.
58
If the Permittee has installed and certified a NOx diluent CEMS to meet the requirements of 40 CFR pt. 75,states can approve that only quality assured data from the CEMS shall be used to identify excess emissionsunder 40 CFR pt. 60, subp. KKKK. Periods where the missing data substitution procedures in 40 CFR pt. 75,subpart D are applied are to be reported as monitor downtime in the excess emissions and monitoringperformance report required under 40 CFR Section 60.7(c).
59 All required fuel flow rate, steam flow rate, temperature, pressure, and megawatt data must be reduced to hourlyaverages.
60 Calculate the hourly average NOx emission rates, in units of the emission standards under 40 CFR Section60.4320, using ppm for units complying with the concentration limit.
62
The Permittee must monitor the total sulfur content of the fuel being fired in the turbine, except as provided in 40CFR Section 60.4365. The sulfur content of the fuel must be determined using total sulfur methods described in40 CFR Section 60.4415 or 40 CFR pt. 75. Alternatively, if the total sulfur content of the gaseous fuel during themost recent performance test was less than half the applicable limit, ASTM D4084, D4810, D5504, or D6228, orGas Processors Association Standard 2377 (all of which are incorporated by reference, see 40 CFR Section60.17), which measure the major sulfur compounds, may be used.
63
The Permittee may elect not to monitor the total sulfur content of the fuel combusted in the turbine, if the fuel isdemonstrated not to exceed potential sulfur emissions of 26 ng SO2/J (0.060 lb SO2/MMBtu) heat input for unitslocated in continental areas. The Permittee must use one of the following sources of information to make therequired demonstration:
(a) The fuel quality characteristics in a current, valid purchase contract, tariff sheet or transportation contract forthe fuel, specifying that the total sulfur content for natural gas use in continental areas is 20 grains of sulfur orless per 100 standard cubic feet, has potential sulfur emissions of less than less than 26 ng SO2/J (0.060 lbSO2/MMBtu) heat input for continental areas; or(b) Representative fuel sampling data which show that the sulfur content of the fuel does not exceed 26 ngSO2/J (0.060 lb SO2/MMBtu) heat input for continental areas. At a minimum, the amount of fuel sampling data ..
64
The frequency of determining the sulfur content of the fuel must be as follows:
(b) Gaseous fuel. If the Permittee elects not to demonstrate sulfur content using options in 40 CFR Section60.4365, and the fuel is supplied without intermediate bulk storage, the sulfur content value of the gaseous fuelmust be determined and recorded once per unit operating day.
(c) Custom schedules. Notwithstanding the requirements of 40 CFR Section 60.4370(b), operators or fuelvendors may develop custom schedules for determination of the total sulfur content of gaseous fuels, based onthe design and operation of the affected facility and the characteristics of the fuel supply. Except as provided in40 CFR Section 60.4370(c)(1) and (c)(2), custom schedules shall be substantiated with data and shall beapproved by the Administrator before they can be used to comply with the standard in 40 CFR Section 60.4330..
40 CFR 60.4350(c)
40 CFR 60.4350(d)
40 CFR 60.4350(e)
40 CFR 60.4350(f)
40 CFR 60.4360
40 CFR 60.4365
40 CFR 60.4370(b) - (c)(1)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
65
(continued from above)(2) The Permittee may use the data collected from the 720-hour sulfur sampling demonstration described insection 2.3.6 of 40 CFR pt. 75, appendix D to determine a custom sulfur sampling schedule, as follows:
(i) If the maximum fuel sulfur content obtained from the 720 hourly samples does not exceed 20 grains/100 scf,no additional monitoring of the sulfur content of the gas is required, for the purposes of 40 CFR pt. 60, subp.KKKK.(ii) If the maximum fuel sulfur content obtained from any of the 720 hourly samples exceeds 20 grains/100 scf,but none of the sulfur content values (when converted to weight percent sulfur) exceeds half the applicable limit,then the minimum required sampling frequency shall be one sample at 12 month intervals.(iii) If any sample result exceeds half the applicable limit, but none exceeds the applicable limit, follow the provi..
66The Permittee must submit reports of excess emissions and monitor downtime, in accordance with 40 CFRSection 60.7(c). Excess emissions must be reported for all periods of unit operation, including start-up,shutdown, and malfunction.
67
For turbines using continuous emission monitoring, as described in 40 CFR Sections 60.4335(b) and 60.4345:An excess emissions is any unit operating period in which the 4-hour or 30-day rolling average NOx emissionrate exceeds the applicable emission limit in 40 CFR Section 60.4320. For the purposes of 40 CFR pt. 60, subp.KKKK, a 4-hour rolling average NOx emission rate is the arithmetic average of the average NOx emission rate inppm or ng/J (lb/MWh) measured by the continuous emission monitoring equipment for a given hour and thethree unit operating hour average NOx emission rates immediately preceding that unit operating hour. Calculatethe rolling average if a valid NOx emission rate is obtained for at least 3 of the 4 hours. For the purposes of 40CFR pt. 60, subp. KKKK, a 30-day rolling average NOx emission rate is the arithmetic average of all hourly NOxemission data in ppm or ng/J (lb/MWh) measured by the continuous emission monitoring equipment for a givenday and the twenty-nine unit operating days immediately preceding that unit operating day. A new 30-dayaverage is calculated each unit operating day as the average of all hourly NOx emissions rates for the precedin..
68
A period of monitor downtime is any unit operating hour in which the data for any of the following parameters areeither missing or invalid: NOx concentration, CO2 or O2 concentration, fuel flow rate, steam flow rate, steamtemperature, steam pressure, or megawatts. The steam flow rate, steam temperature, and steam pressure areonly required if the Permittee will use this information for compliance purposes.
69For operating periods during which multiple emissions standards apply, the applicable standard is the averageof the applicable standards during each hour. For hours with multiple emissions standards, the applicable limitfor that hour is determined based on the condition that corresponded to the highest emissions standard.
70
For turbines required to monitor combustion parameters or parameters that document proper operation of theNOx emission controls:An excess emission is a 4-hour rolling unit operating hour average in which any monitored parameter does notachieve the target value or is outside the acceptable range defined in the parameter monitoring plan for the unit.
71 A period of monitor downtime is a unit operating hour in which any of the required parametric data are either notrecorded or are invalid.
40 CFR 60.4370(c)(2)
40 CFR 60.4375(a)
40 CFR 60.4380(b)(1)
40 CFR 60.4380(b)(2)
40 CFR 60.4380(b)(3)
40 CFR 60.4380(c)(1)
40 CFR 60.4380(c)(2)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
72
For samples of gaseous fuel obtained using daily sampling or flow proportional sampling, an excess emissionoccurs each unit operating hour included in the period beginning on the date and hour of any sample for whichthe sulfur content of the fuel being fired in the combustion turbine exceeds the applicable limit and ending on thedate and hour that a subsequent sample is taken that demonstrates compliance with the sulfur limit.
73A period of monitor downtime begins when a required sample is not taken by its due date. A period of monitordowntime also begins on the date and hour of a required sample, if invalid results are obtained. The period ofmonitor downtime ends on the date and hour of the next valid sample.
74 The Permittee shall submit a report : Due semiannually and each report must be postmarked by the 30th dayfollowing the end of each 6-month period as required under 40 CFR Section 60.7(c).
75Perform a minimum of nine RATA reference method runs, with a minimum time per run of 21 minutes, at asingle load level, within plus or minus 25 percent of 100 percent of peak load. The ambient temperature must begreater than 0 degrees F during the RATA runs.
76 For each RATA run, concurrently measure the heat input to the unit using a fuel flow meter (or flow meters) andmeasure the electrical and thermal output from the unit.
77Use the test data both to demonstrate compliance with the applicable NOx emission limit under 40 CFR Section60.4320 and to provide the required reference method data for the RATA of the CEMS described under 40 CFRSection 60.4335.
78Compliance with the applicable emission limit in 40 CFR Section 60.4320 is achieved if the arithmetic average ofall of the NOx emission rates for the RATA runs, expressed in units of ppm or lb/MWh, does not exceed theemission limit.
40 CFR 60.4385(a)
40 CFR 60.4385(c)
40 CFR 60.4395
40 CFR 60.4405(a)
40 CFR 60.4405(b)
40 CFR 60.4405(c)
40 CFR 60.4405(d)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
79
When monitoring combustion parameters in accordance with 40 CFR Section 60.4340, the appropriateparameters must be continuously monitored and recorded during each run of the initial performance test, toestablish acceptable operating ranges, for purposes of the parameter monitoring plan for the affected unit, asspecified in 40 CFR Section 60.4355.
80
The Permittee must conduct an initial performance test, as required in 40 CFR Section 60.8. Subsequent SO2performance tests shall be conducted on an annual basis (no more than 14 calendar months following theprevious performance test). There are three methodologies that the Permittee may use to conduct theperformance tests.
(1) If the Permittee chooses to periodically determine the sulfur content of the fuel combusted in the turbine, arepresentative fuel sample would be collected following ASTM D5287 (incorporated by reference, see 40 CFRSection 60.17) for natural gas. The fuel analyses of this section may be performed either by the Permittee, aservice contractor retained by the Permittee, the fuel vendor, or any other qualified agency. Analyze the samplesfor the total sulfur content of the fuel using:..
81
Use methods in 40 CFR pt. 98, subp. C including flow monitoring of fuel usage and fuel gas analysis. Calculateemissions following procedures specified in 40 CFR pt. 98, subp. C with a conversion from metric tons to shorttons. The Permittee shall calculate and record the 12-month rolling average of gross energy output (net) ofCO2e emissions by the 15th day of each month for the 12-month rolling average periods ending on the last dayof the preceding month.
82
Except as specified in 40 CFR Section 60.5520(c) and (d), the Permittee must comply with the applicable grossenergy output standard, and the operating permit must include monitoring, recordkeeping, and reportingmethodologies based on the applicable gross energy output standard. For the remainder of this subpart (forsources that do not qualify under 40 CFR Section 60.5520(c) and (d)), where the term “gross or net energyoutput” is used, the term that applies is “gross energy output.”.
83For each affected EGU subject to a CO2 emissions standard based on a 12-operating-month rolling average,the Permittee must determine compliance monthly by calculating the average CO2 emissions rate for theaffected EGU at the end of the initial and each subsequent 12-operating-month period.
84
At all times the Permittee must operate and maintain each affected EGU, including associated equipment andmonitors, in a manner consistent with safety and good air pollution control practice. The Administrator willdetermine if the Permittee is using consistent operation and maintenance procedures based on informationavailable to the Administrator that may include, but is not limited to, fuel use records, monitoring results, reviewof operation and maintenance procedures and records, review of reports required by 40 CFR pt. 60, subp.TTTT, and inspection of the EGU.
85
Within 30 days after the end of the initial compliance period (i.e., no more than 30 days after the first12-operating-month compliance period), the Permittee must make an initial compliance determination for theaffected EGU(s) with respect to the applicable emissions standard in 40 CFR pt. 60, subp. TTTT table 1 or 2, inaccordance with the requirements in this subpart. The first operating month included in the initial12-operating-month compliance period shall be determined as follows:
(1) For an affected EGU that commences commercial operation (as defined in 40 CFR Section 72.2) on or afterOctober 23, 2015, the first month of the initial compliance period shall be the first operating month (as defined in40 CFR Section 60.5580) after the calendar month in which emissions reporting is required to begin under 40CFR Section 63.5555(c)(3)(i), for units subject to the Acid Rain Program.
40 CFR 60.4410
40 CFR 60.4415(a)(1) - (3)
40 CFR 60.5520(a), 40 CFR pt. 60,subp. TTTT(Table 2), 40 CFR pt. 98,subp. C, Title I Condition: 40 CFR52.21(j)(BACT) & Minn. R. 7007.3000
40 CFR 60.5520(b)
40 CFR 60.5525(a)(1)
40 CFR 60.5525(b)
40 CFR 60.5525(c)(1)(i)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
( )( )( ) j g
86
The Permittee must prepare a monitoring plan to quantify the hourly CO2 mass emission rate (tons/h), inaccordance with the applicable provisions in 40 CFR Section 75.53(g) and (h). The electronic portion of themonitoring plan must be submitted using the ECMPS Client Tool and must be in place prior to reportingemissions data and/or the results of monitoring system certification tests under 40 CFR pt. 60, subp. TTTT. Themonitoring plan must be updated as necessary. Monitoring plan submittals must be made by the DesignatedRepresentative (DR), the Alternate DR, or a delegated agent of the DR (see 40 CFR Section 60.5555(c)).
87
The Permittee may determine the hourly CO2 mass emissions according to 40 CFR Section 60.5535(c)(1)through (4).
(1) The Permittee must implement the applicable procedures in 40 CFR pt. 75, appendix D to determine hourlyEGU heat input rates (MMBtu/h), based on hourly measurements of fuel flow rate and periodic determinations ofthe gross calorific value (GCV) of each fuel combusted.
(2) For each measured hourly heat input rate, use Equation G-4 in 40 CFR pt. 75, appendix G to calculate thehourly CO2 mass emission rate (tons/h). The Permittee may determine site-specific carbon-based F-factors (Fc)using Equation F-7b in 40 CFR pt. 75, appendix F section 3.3.6, and the Permittee may use these Fc values inthe emissions calculations instead of using the default Fc values in the Equation G-4 nomenclature...
88
The Permittee must install, calibrate, maintain, and operate a sufficient number of watt meters to continuouslymeasure and record the hourly gross electric output, as applicable, from the affected EGU(s). Thesemeasurements must be performed using 0.2 class electricity metering instrumentation and calibrationprocedures as specified under ANSI Standards No. C12.20 (incorporated by reference, see 40 CFR Section60.17). The plan shall ensure that you install, calibrate, maintain, and operate meters to record each componentof the determination, hour-by-hour.
89
For the initial and each subsequent 12-operating-month rolling average compliance period, the Permittee mustfollow the procedures in 40 CFR Section 60.5540(a)(1) through (7) to calculate the CO2 mass emissions rate forthe affected EGU(s) in units of the applicable emissions standard (i.e., either kg/MWh or lb/MMBtu). ThePermittee must use the hourly CO2 mass emissions calculated under 40 CFR Section 60.5535(b) or (c), asapplicable, and either the generating load data from 40 CFR Section 60.5535(d)(1) for output-basedcalculations.
(1) Each compliance period shall include only "valid operating hours" in the compliance period, i.e., operatinghours for which:
(i) "Valid data" (as defined in 40 CFR Section 60.5580) are obtained for all of the parameters used to determine..
90
(continued from above)Pgross/net = [(Pe)ST + (Pe)CT + (Pe)IE - (Pe)FW - (Pe)A]/TDF + [(Pt)PS + (Pt)HR + (Pt)IE]
Where:
Pgross/net = In accordance with 40 CFR Section 60.5520, gross or net energy output of the affected EGU foreach valid operating hour (as defined in 40 CFR Section 60.5540(a)(1)) in MWh.
(Pe)ST = Electric energy output plus mechanical energy output (if any) of steam turbines in MWh.
(Pe)CT = Electric energy output plus mechanical energy output (if any) of stationary combustion turbine(s) in M..
91
In accordance with 40 CFR Section 60.5520, to demonstrate compliance with the applicable CO2 emissionstandard, for the initial and each subsequent 12-operating-month compliance period, the CO2 mass emissionsrate for the affected EGU must be determined according to the procedures specified in 40 CFR Section60.5540(a)(1) through (7) and must be less than or equal to the applicable CO2 emissions standard in 40 CFRpt. 60, subp. TTTT table 1 or 2, or the emissions standard calculated in accordance with 40 CFR Section60.5525(a)(2).
92 The Permittee must prepare and submit the notifications specified in 40 CFR Section 60.7(a)(1) and (a)(3) and40 CFR Section 60.19, as applicable to the affected EGU(s) (see 40 CFR pt. 60, subp. TTTT table 3).
40 CFR 60.5535(a)
40 CFR 60.5535(c)(1) - (4)
40 CFR 60.5535(d)(1)
40 CFR 60.5540(a)(1) - (5)
40 CFR 60.5540(a)(5) - (7)
40 CFR 60.5540(b)
40 CFR 60.5550(a)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
pp ( ) ( p p )
93 The Permittee must prepare and submit notifications specified in 40 CFR Section 75.61, as applicable to theaffected EGU(s).
94
The Permittee shall submit a report : Due by the end of each calendar quarter after accumulating the first12-operating months for the affected EGU, for the calendar quarter that includes the twelfth operating month nolater than 30 days after the end of that quarter. Thereafter, the Permittee must submit a report for eachsubsequent calendar quarter, no later than 30 days after the end of the quarter.
95
In each quarterly report the Permittee must include the following information, as applicable:
(i) Each rolling average CO2 mass emissions rate for which the last (twelfth) operating month in a12-operating-month compliance period falls within the calendar quarter. The Permittee must calculate eachaverage CO2 mass emissions rate for the compliance period according to the procedures in 40 CFR Section60.5540. The Permittee must report the dates (month and year) of the first and twelfth operating months in eachcompliance period for which the Permittee performed a CO2 mass emissions rate calculation. If there are nocompliance periods that end in the quarter, the Permittee must include a statement to that effect;(ii) If one or more compliance periods end in the quarter, the Permittee must identify each operating month in thecalendar quarter where the EGU violated the applicable CO2 emission standard;(iii) If one or more compliance periods end in the quarter and there are no violations for the affected EGU, the P..
96
In the final quarterly report of each calendar year, the Permittee must include the following:
(i) Consistent with 40 CFR Section 60.5520, gross energy output or net energy output sold to an electric grid, asapplicable to the units of your emission standard, over the four quarters of the calendar year; and(ii) The potential electric output of the EGU.
97The Permittee must submit all electronic reports required under 40 CFR Section 60.5555(a) using the EmissionsCollection and Monitoring Plan System (ECMPS) Client Tool provided by the Clean Air Markets Division in theOffice of Atmospheric Programs of EPA.
98 The Permittee must meet all applicable reporting requirements and submit reports as required under 40 CFR pt.75, subpart G.
99
The Permittee must begin submitting the quarterly electronic emissions reports described in 40 CFR Section60.5555(c)(1) in accordance with 40 CFR Section 75.64(a), i.e., beginning with data recorded on and after theearlier of:
(A) The date of provisional certification, as defined in 40 CFR Section 75.20(a)(3); or(B) 180 days after the date on which the EGU commences commercial operation (as defined in 40 CFR Section72.2).
40 CFR 60.5550(b)
40 CFR 60.5555(a)(1)
40 CFR 60.5555(a)(2)(i) - (vi)
40 CFR 60.5555(a)(3)(i) - (ii)
40 CFR 60.5555(b)
40 CFR 60.5555(c)(1)
40 CFR 60.5555(c)(3)(i)(A) - (B)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
)
100
The reports required under 40 CFR Section 60.5555(a) and (c)(1) shall be submitted by:
(1) The person appointed as the Designated Representative (DR) under 40 CFR Section 72.20; or(2) The person appointed as the Alternate Designated Representative (ADR) under 40 CFR Section 72.22; or(3) A person (or persons) authorized by the DR or ADR under 40 CFR Section 72.26 to make the requiredsubmissions.
101
The Permittee must maintain records of the information used to demonstrate compliance with 40 CFR pt. 60,subp. TTTT as specified in 40 CFR Section 60.7(b) and (f).
(b)(1) The Permittee must follow the applicable recordkeeping requirements and maintain records as requiredunder 40 CFR pt. 75, subpart F.(f) The Permittee must keep records of the calculations performed to assess compliance with each applicableCO2 mass emissions standard in 40 CFR pt. 60, subp. TTTT Table 1 or 2.
102Consistent with 40 CFR Section 60.5520, the Permittee must keep records of the applicable data recorded andcalculations performed that were used to determine the affected EGU's gross or net energy output for eachoperating month.
103 The Permittee must keep records of the calculations performed to determine the percentage of valid CO2 massemission rates in each compliance period.
104 Records must be in a form suitable and readily available for expeditious review.
105 The Permittee must maintain each record for 3 years after the date of conclusion of each compliance period.
106
The Permittee must maintain each record on site for at least 2 years after the date of each occurrence,measurement, maintenance, corrective action, report, or record, according to 40 CFR Section 60.7. Records thatare accessible from a central location by a computer or other means that instantly provide access at the sitemeet this requirement. The Permittee may maintain the records off site for the remaining year(s) as required by40 CFR pt. 60, subp. TTTT.
40 CFR 60.5555(d)(1) - (3)
40 CFR 60.5560(a)(b)(1) & (f)
40 CFR 60.5560(d)
40 CFR 60.5560(e)
40 CFR 60.5565(a)
40 CFR 60.5565(b)
40 CFR 60.5565(c)
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p p
107 Notwithstanding any other provision of this chapter, certain parts of the general provisions in 40 CFR Sections60.1 through 60.19, listed in 40 CFR pt. 60, subp. TTTT table 3, do not apply to the affected EGU.
108
Except as provided in subparts B and C, the provisions of this part apply to the owner or operator of anystationary source which contains an affected facility, the construction or modification of which is commencedafter the date of publication in this part of any standard (or, if earlier, the date of publication of any proposedstandard) applicable to that facility.
109
Any new or revised standard of performance promulgated pursuant to section 111(b) of the Act shall apply to theowner or operator of any stationary source which contains an affected facility, the construction or modification ofwhich is commenced after the date of publication in this part of such new or revised standard (or, if earlier, thedate of publication of any proposed standard) applicable to that facility.
110
In addition to complying with the provisions of this part, the owner or operator of an affected facility may berequired to obtain an operating permit issued to stationary sources by an authorized State air pollution controlagency or by the Administrator of the U.S. Environmental Protection Agency (EPA) pursuant to Title V of theClean Air Act (Act) as amended November 15, 1990 (42 U.S.C. 7661). For more information about obtaining anoperating permit see 40 CFR pt. 70.
111
The Permittee shall submit a notification of the date construction began : Due 30 calendar days after Date ofConstruction Start (or reconstruction as defined under 40 CFR Section 60.15) of an affected facility. Thenotification shall be postmarked no later than 30 days after such date. This requirement shall not apply in thecase of mass-produced facilities which are purchased in completed form.
112 The Permittee shall submit a notification of the actual date of initial startup : Due 15 calendar days after InitialStartup Date.
113
The Permittee shall submit a notification of any physical or operational change to an existing facility which mayincrease the emission rate of any air pollutant to which a standard applies, unless that change is specificallyexempted under an applicable subpart or in 40 CFR Section 60.14(e). This notice shall be postmarked 60 daysor as soon as practicable before the change is commenced and shall include information describing the precisenature of the change, present and proposed emission control systems, productive capacity of the facility beforeand after the change, and the expected completion date of the change. The Administrator may requestadditional relevant information subsequent to this notice.
40 CFR 60.5570
40 CFR 60.1(a), Minn. R. 7011.0050
40 CFR 60.1(b), Minn. R. 7011.0050
40 CFR 60.1(c), Minn. R. 7011.0050
40 CFR 60.7(a)(1), Minn. R.7019.0100, subp. 1
40 CFR 60.7(a)(3), Minn. R.7019.0100, subp. 1
40 CFR 60.7(a)(4), Minn. R.7019.0100, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
q
114 The Permittee shall submit a notification : Due 30 calendar days before Initial Startup Date of the continuousmonitoring system (CMS) in accordance with 40 CFR Section 60.13(c).
116The Permittee shall submit a notification : Due 30 calendar days before Opacity Observation Date required by40 CFR Section 60.11(e)(1). The notification shall also include, if appropriate, a request for the Administrator toprovide a visible emissions reader during a performance test.
117Recordkeeping: The Permittee shall maintain records of the occurrence and duration of any startup, shutdown,or malfunction in the operation of an affected facility; any malfunction of the air pollution control equipment; orany periods during which a continuous monitoring system or monitoring device is inoperative.
118
The Permittee shall submit excess emission/downtime report : Due by the end of each calendar half-year,except when: more frequent reporting is specifically required by an applicable subpart; or the Administrator, on acase-by-case basis, determines that more frequent reporting is necessary to accurately assess the compliancestatus of the source. All reports shall be postmarked by the 30th day following the end of each six-month periodand include the information in 40 CFR Section 60.7(c)(1) through (4).
119
The summary report form shall contain the information and be in the format shown in figure 1 of 40 CFR Section60.7 unless otherwise specified by the Administrator. One summary report form shall be submitted for eachpollutant monitored at each affected facility.
(1) If the total duration of excess emissions for the reporting period is less than 1 percent of the total operatingtime for the reporting period and CMS downtime for the reporting period is less than 5 percent of the totaloperating time for the reporting period, only the summary report form shall be submitted and the excessemission report described in 40 CFR Section 60.7(c) need not be submitted unless requested by theAdministrator.(2) If the total duration of excess emissions for the reporting period is 1 percent or greater of the total operatingtime for the reporting period or the total CMS downtime for the reporting period is 5 percent or greater of the tot..
120
Notwithstanding the frequency of reporting requirements specified in 40 CFR Section 60.7(c), a Permittee who isrequired by an applicable subpart to submit excess emissions and monitoring systems performance reports (andsummary reports) on a quarterly (or more frequent) basis may reduce the frequency of reporting for thatstandard to semiannual if the following conditions are met:
(i) For 1 full year (e.g., 4 quarterly or 12 monthly reporting periods) the affected facility's excess emissions andmonitoring systems reports submitted to comply with a standard under this part continually demonstrate that thefacility is in compliance with the applicable standard;(ii) The Permittee continues to comply with all recordkeeping and monitoring requirements specified in thissubpart and the applicable standard; and(iii) The Administrator does not object to a reduced frequency of reporting for the affected facility, as provided in..
121
The frequency of reporting of excess emissions and monitoring systems performance (and summary) reportsmay be reduced only after the Permittee notifies the Administrator in writing of his or her intention to make sucha change and the Administrator does not object to the intended change. In deciding whether to approve areduced frequency of reporting, the Administrator may review information concerning the source's entireprevious performance history during the required recordkeeping period prior to the intended change, includingperformance test results, monitoring data, and evaluations of a Permittee's conformance with operation andmaintenance requirements. Such information may be used by the Administrator to make a judgment about thesource's potential for noncompliance in the future. If the Administrator disapproves the Permittee's request toreduce the frequency of reporting, the Administrator will notify the Permittee in writing within 45 days afterreceiving notice of the Permittee's intention. The notification from the Administrator to the Permittee will specifythe grounds on which the disapproval is based. In the absence of a notice of disapproval within 45 days, appro..
40 CFR 60.13(c), 40 CFR 60.7(a)(5),Minn. R. 7019.0100, subp. 1
40 CFR 60.7(a)(6), Minn. R.7019.0100, subp. 1
40 CFR 60.7(b), Minn. R. 7019.0100,subp. 1
40 CFR 60.7(c), Minn. R. 7019.0100,subp. 1
40 CFR 60.7(d), Minn. R. 7019.0100,subp. 1
40 CFR 60.7(e)(1), Minn. R.7019.0100, subp. 1
40 CFR 60.7(e)(2), Minn. R.7019.0100, subp. 1
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
122
As soon as monitoring data indicate that the affected facility is not in compliance with any emission limitation oroperating parameter specified in the applicable standard, the frequency of reporting shall revert to the frequencyspecified in the applicable standard, and the Permittee shall submit an excess emissions and monitoringsystems performance report (and summary report, if required) at the next appropriate reporting period followingthe noncomplying event. After demonstrating compliance with the applicable standard for another full year, thePermittee may again request approval from the Administrator to reduce the frequency of reporting for thatstandard as provided for in 40 CFR Section 60.7(e)(1) and (e)(2).
123 Recordkeeping: Maintain a file of all measurements, maintenance, reports and records for at least five years. 40CFR Section 60.7(f) specifies two years.
124If notification substantially similar to that in 40 CFR Section 60.7(a) is required by any other State or localagency, sending the Administrator a copy of that notification will satisfy the requirements of 40 CFR Section60.7(a).
125 Individual subparts of this part may include specific provisions which clarify or make inapplicable the provisionsset forth in this section.
126
The availability to the public of information provided to, or otherwise obtained by, the Administrator under thispart shall be governed by 40 CFR pt. 2. (Information submitted voluntarily to the Administrator for the purposesof 40 CFR Sections 60.5 and 60.6 is governed by 40 CFR Sections 2.201 through 2.213 and not by 40 CFRSection 2.301.).
127
The provisions of this part shall not be construed in any manner to preclude any State or political subdivisionthereof from:
(a) Adopting and enforcing any emission standard or limitation applicable to an affected facility, provided thatsuch emission standard or limitation is not less stringent than the standard applicable to such facility.(b) Requiring the Permittee to obtain permits, licenses, or approvals prior to initiating construction, modification,or operation of such facility.
128 Compliance with standards in this part, other than opacity standards, shall be determined in accordance withperformance tests established by 40 CFR Section 60.8, unless otherwise specified in the applicable standard.
40 CFR 60.7(e)(3), Minn. R.7019.0100, subp. 1
40 CFR 60.7(f), Minn. R. 7019.0100,subp. 1
40 CFR 60.7(g), Minn. R. 7019.0100,subp. 1
40 CFR 60.7(h), Minn. R. 7019.0100,subp. 1
40 CFR 60.9
40 CFR 60.10
40 CFR 60.11(a), Minn. R. 7017.2015
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p y p pp
129
Compliance with opacity standards in this part shall be determined by conducting observations in accordancewith Method 9 in 40 CFR pt. 60, appendix A, any alternative method that is approved by the Administrator, or asprovided in 40 CFR Section 60.11(e)(5). For purposes of determining initial compliance, the minimum total timeof observations shall be 3 hours (30 6-minute averages) for the performance test or other set of observations(meaning those fugitive-type emission sources subject only to an opacity standard).
130 The opacity standards set forth in this part shall apply at all times except during periods of startup, shutdown,malfunction, and as otherwise provided in the applicable standard.
131
At all times, including periods of startup, shutdown, and malfunction, the Permittee shall, to the extentpracticable, maintain and operate any affected facility including associated air pollution control equipment in amanner consistent with good air pollution control practice for minimizing emissions. Determination of whetheracceptable operating and maintenance procedures are being used will be based on information available to theAdministrator which may include, but is not limited to, monitoring results, opacity observations, review ofoperating and maintenance procedures, and inspection of the source.
132For the purpose of demonstrating initial compliance, conduct opacity observations concurrently with the initialperformance test required in 40 CFR Section 60.8 and include the results in the test report, pursuant to theconditions described in 40 CFR Section 60.11(e)(1)-(8).
133 Special provisions set forth under an applicable subpart shall supersede any conflicting provisions in 40 CFRSection 60.11(a) through (e).
134
For the purpose of submitting compliance certifications or establishing whether or not a person has violated or isin violation of any standard in this part, nothing in this part shall preclude the use, including the exclusive use, ofany credible evidence or information, relevant to whether a source would have been in compliance withapplicable requirements if the appropriate performance or compliance test or procedure had been performed.
135 No owner or operator shall build, erect, install, or use any article, machine, equipment or process, the use ofwhich conceals an emission which would otherwise constitute a violation of an applicable standard.
40 CFR 60.11(b), Minn. R. 7017.2015
40 CFR 60.11(c), Minn. R. 7017.2015
40 CFR 60.11(d), Minn. R. 7017.2015
40 CFR 60.11(e), Minn. R. 7017.2015
40 CFR 60.11(f), Minn. R. 7017.2015
40 CFR 60.11(g), Minn. R. 7017.2015
40 CFR 60.12, Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
pp
136
CEMS QA/QC: The owner or operator of an affected facility is subject to the performance specifications listed in40 CFR pt. 60, Appendix B and shall operate, calibrate, and maintain each CEMS according to the QA/QCprocedures in 40 CFR pt. 60, Appendix F as amended and maintain a written QA/QC program available in aform suitable for inspection.
137 All continuous monitoring systems and monitoring devices required under 40 CFR 60, including CEMS andCOMS shall be installed and operational prior to conducting performance tests under 40 CFR Section 60.8.
138
The Permittee shall conduct a performance evaluation of the CEMS during any performance test required under40 CFR Section 60.8 or within 30 days thereafter in accordance with the applicable performance specification in40 CFR pt. 60, appendix B. The Permittee shall conduct CEMS performance evaluations at such other times asmay be required by the Administrator under section 114 of the Act.
140
The Permittee must check the zero (or low level value between 0 and 20 percent of span value) and span (50 to100 percent of span value) calibration drifts at least once each operating day in accordance with a writtenprocedure. The zero and span must, at a minimum, be adjusted whenever either the 24-hour zero drift or the24-hour span drift exceeds two times the limit of the applicable performance specification in 40 CFR pt. 60,appendix B. The system must allow the amount of the excess zero and span drift to be recorded and quantifiedwhenever specified. The Permittee must check the zero and upscale (span) calibration drifts at least once daily.For a particular COMS, the acceptable range of zero and upscale calibration materials is defined in theapplicable version of PS-1 in 40 CFR pt. 60, appendix B. For a COMS, the optical surfaces, exposed to theeffluent gases, must be cleaned before performing the zero and upscale drift adjustments, except for systemsusing automatic zero adjustments. The optical surfaces must be cleaned when the cumulative automatic zerocompensation exceeds 4 percent opacity.
141
Except for system breakdowns, repairs, calibration checks, and zero and span adjustments required under 40CFR Section 60.13(d), all continuous monitoring systems shall be in continuous operation and shall meetminimum frequency of operation requirements as follows:
All continuous monitoring systems referenced by 40 CFR Section 60.13(c) for measuring emissions, exceptopacity, shall complete a minimum of one cycle of operation (sampling, analyzing, and data recording) for eachsuccessive 15-minute period.
142
All continuous monitoring systems or monitoring devices shall be installed such that representativemeasurements of emissions or process parameters from the affected facility are obtained. Additional proceduresfor location of continuous monitoring systems contained in the applicable Performance Specifications of 40 CFRpt. 60, appendix B shall be used.
143
When the effluents from a single affected facility or two or more affected facilities subject to the same emissionstandards are combined before being released to the atmosphere, the Permittee may install applicablecontinuous monitoring systems on each effluent or on the combined effluent. When the affected facilities are notsubject to the same emission standards, separate continuous monitoring systems shall be installed on eacheffluent. When the effluent from one affected facility is released to the atmosphere through more than one point,the Permittee shall install an applicable continuous monitoring system on each separate effluent unless theinstallation of fewer systems is approved by the Administrator. When more than one continuous monitoringsystem is used to measure the emissions from one affected facility (e.g., multiple breechings, multiple outlets),the Permittee shall report the results as required from each continuous monitoring system.
40 CFR 60.13(a), 40 CFR pt. 60,Appendix F, Minn. R. 7017.1010
40 CFR 60.13(b), Minn. R. 7017.1010
40 CFR 60.13(c), Minn. R. 7017.1010
40 CFR 60.13(d)(1), Minn. R.7017.1010
40 CFR 60.13(e), Minn. R. 7017.1010
40 CFR 60.13(f), Minn. R. 7017.1010
40 CFR 60.13(g), Minn. R. 7017.1010
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
p q g y
144
For continuous monitoring systems other than opacity, 1-hour averages shall be computed as specified in 40CFR Section 60.13(h)(2)(i) through (ix), except that the provisions pertaining to the validation of partial operatinghours are only applicable for affected facilities that are required by the applicable subpart to include partial hoursin the emission calculations.
145All excess emissions shall be converted into units of the standard using the applicable conversion proceduresspecified in the applicable subpart. After conversion into units of the standard, the data may be rounded to thesame number of significant digits used in the applicable subpart to specify the emission limit.
146After receipt and consideration of written application, the Administrator may approve alternatives to anymonitoring procedures or requirements of this part including, but not limited to the requirements listed at 40 CFRSection 60.13(i)(1) through (9).
147 An alternative to the relative accuracy (RA) test specified in Performance Specification 2 of 40 CFR pt. 60,appendix B may be requested as described in 40 CFR Section 60.13(j)(1) and (j)(2).
148
Except as provided under 40 CFR Section 60.14(e) and (f), any physical or operational change to an existingfacility which results in an increase in the emission rate to the atmosphere of any pollutant to which a standardapplies shall be considered a modification within the meaning of section 111 of the Act. Upon modification, anexisting facility shall become an affected facility for each pollutant to which a standard applies and for whichthere is an increase in the emission rate to the atmosphere.
150 The addition of an affected facility to a stationary source as an expansion to that source or as a replacement foran existing facility shall not by itself bring within the applicability of this part any other facility within that source.
151
The following shall not, by themselves, be considered modifications under this part:
(1) Maintenance, repair, and replacement which the Administrator determines to be routine for a sourcecategory, subject to the provisions of 40 CFR Section 60.14(c) and 40 CFR Section 60.15.(2) An increase in production rate of an existing facility, if that increase can be accomplished without a capitalexpenditure on that facility.(3) An increase in the hours of operation.(4) Use of an alternative fuel or raw material if, prior to the date any standard under this part becomes applicableto that source type, as provided by 40 CFR Section 60.1, the existing facility was designed to accommodate thatalternative use. A facility shall be considered to be designed to accommodate an alternative fuel or raw materialif that use could be accomplished under the facility's construction specifications as amended prior to the chang..
40 CFR 60.13(h)(2), Minn. R.7017.1010
40 CFR 60.13(h)(3), Minn. R.7017.1010
40 CFR 60.13(i), Minn. R. 7017.1010
40 CFR 60.13(j), Minn. R. 7017.1010
40 CFR 60.14(a), Minn. R. 7011.0050
40 CFR 60.14(c), Minn. R. 7011.0050
40 CFR 60.14(e), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
152 Special provisions set forth under an applicable subpart of this part shall supersede any conflicting provisions ofthis section.
153 Within 180 days of the completion of any physical or operational change subject to the control measuresspecified in 40 CFR Section 60.14(a), compliance with all applicable standards must be achieved.
154
No physical change, or change in the method of operation, at an existing electric utility steam generating unitshall be treated as a modification for the purposes of this section provided that such change does not increasethe maximum hourly emissions of any pollutant regulated under this section above the maximum hourlyemissions achievable at that unit during the 5 years prior to the change.
155
Repowering projects that are awarded funding from the Department of Energy as permanent clean coaltechnology demonstration projects (or similar projects funded by EPA) are exempt from the requirements of thissection provided that such change does not increase the maximum hourly emissions of any pollutant regulatedunder this section above the maximum hourly emissions achievable at that unit during the five years prior to thechange.
156
Repowering projects that qualify for an extension under section 409(b) of the Clean Air Act are exempt from therequirements of this section, provided that such change does not increase the actual hourly emissions of anypollutant regulated under this section above the actual hourly emissions achievable at that unit during the 5years prior to the change.This exemption shall not apply to any new unit that:
(i) Is designated as a replacement for an existing unit;(ii) Qualifies under section 409(b) of the Clean Air Act for an extension of an emission limitation compliance dateunder section 405 of the Clean Air Act; and(iii) Is located at a different site than the existing unit.
157
The installation, operation, cessation, or removal of a temporary clean coal technology demonstration project isexempt from the requirements of this section. A temporary clean coal control technology demonstration project,for the purposes of this section is a clean coal technology demonstration project that is operated for a period of 5years or less, and which complies with the State implementation plan for the State in which the project is locatedand other requirements necessary to attain and maintain the national ambient air quality standards during theproject and after it is terminated.
158 The reactivation of a very clean coal-fired electric utility steam generating unit is exempt from the requirementsof this section.
40 CFR 60.14(f), Minn. R. 7011.0050
40 CFR 60.14(g), Minn. R. 7011.0050
40 CFR 60.14(h), Minn. R. 7011.0050
40 CFR 60.14(i), Minn. R. 7011.0050
40 CFR 60.14(j), Minn. R. 7011.0050
40 CFR 60.14(k), Minn. R. 7011.0050
40 CFR 60.14(l), Minn. R. 7011.0050
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
159 An existing facility, upon reconstruction, becomes an affected facility, irrespective of any change in emissionrate.
160
Reconstruction means the replacement of components of an existing facility to such an extent that:
(1) The fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would berequired to construct a comparable entirely new facility, and(2) It is technologically and economically feasible to meet the applicable standards set forth in this part.
161 Fixed capital cost means the capital needed to provide all the depreciable components.
168
If a Permittee proposes to replace components, and the fixed capital cost of the new components exceeds 50percent of the fixed capital cost that would be required to construct a comparable entirely new facility, thePermittee shall notify the Administrator of the proposed replacements. The notice must be postmarked 60 days(or as soon as practicable) before construction of the replacements is commenced and must include thefollowing information:
(1) Name and address of the owner or operator.(2) The location of the existing facility.(3) A brief description of the existing facility and the components which are to be replaced.(4) A description of the existing air pollution control equipment and the proposed air pollution control equipment.(5) An estimate of the fixed capital cost of the replacements and of constructing a comparable entirely new facil..
169
PM < 10 micron : The Permittee shall conduct an initial performance test : Due 180 calendar days after InitialStartup Date to measure emissions at base load with duct burners. The performance test shall be conducted atworst case conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 201A and 202,or other method approved by MPCA in the performance test plan approval.
170
PM < 2.5 micron : The Permittee shall conduct an initial performance test : Due 180 calendar days after InitialStartup Date to measure emissions at base load with duct burners. The performance test shall be conducted atworst case conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 201A and 202,or other method approved by MPCA in the performance test plan approval.
171
Total Particulate Matter : The Permittee shall conduct an initial performance test : Due 180 calendar days afterInitial Startup Date to measure emissions at base load with duct burners. The performance test shall beconducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 5and 202, or other method approved by MPCA in the performance test plan approval.
40 CFR 60.15(a), Minn. R. 7011.0050
40 CFR 60.15(b), Minn. R. 7011.0050
40 CFR 60.15(c), Minn. R. 7011.0050
40 CFR 60.15(d), Minn. R. 7011.0050
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
pp y p p pp
172
Volatile Organic Compounds : The Permittee shall conduct an initial performance test : Due 180 calendar daysafter Initial Startup Date to measure emissions. The performance test shall be conducted at worst caseconditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 25A, or other methodapproved by MPCA in the performance test plan approval.
175
Hexane : The Permittee shall conduct an initial performance test : Due 180 calendar days after Initial StartupDate to verify the emission factor of hexane (in lb/mmBtu). The performance test shall be conducted at worstcase conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method 18, 320, or othermethod approved by MPCA in the performance test plan approval. Tests shall be conducted while combustingnatural gas at 90 to 100 percent load (base load with EQUI 17).
176
Formaldehyde : The Permittee shall conduct an initial performance test : Due 180 calendar days after InitialStartup Date to verify the emission factor of formaldehyde (in lb/mmBtu). The performance test shall beconducted at worst case conditions as defined at Minn. R. 7017.2025, subp. 2, using EPA Reference Method18, 320, or other method approved by MPCA in the performance test plan approval. The tests shall beconducted while combusting natural gas under the following conditions:
1. 15 to 30 percent load;2. 60 to 70 percent load;3. 90 to 100 percent load (base load with EQUI 17).
177
PM < 10 micron : The Permittee shall submit a test frequency plan : Due 60 calendar days after InitialPerformance Test Date for PM10 emissions. The plan shall specify a testing frequency based on the test dataand MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
178
PM < 2.5 micron : The Permittee shall submit a test frequency plan : Due 60 calendar days after InitialPerformance Test Date for PM2.5 emissions. The plan shall specify a testing frequency based on the test dataand MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
179
Total Particulate Matter : The Permittee shall submit a test frequency plan : Due 60 calendar days after InitialPerformance Test Date for PM emissions. The plan shall specify a testing frequency based on the test data andMPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
180
Volatile Organic Compounds : The Permittee shall submit a test frequency plan : Due 60 calendar days afterInitial Performance Test Date for VOC emissions. The plan shall specify a testing frequency based on the testdata and MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or asapplicable, shall be required upon written approval of the MPCA.
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
Minn. R. 7017.2020, subp. 1, Title ICondition: 40 CFR 52.21(j)(BACT) &Minn. R. 7007.3000
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemID Seq. # RequirementSTRU 20(SV007)
pp q p pp
182
Hexane : The Permittee shall submit a test frequency plan : Due 60 calendar days after Initial Performance TestDate for hexane emission factor. The plan shall specify a testing frequency based on the test data and MPCAguidance. Future performance tests based on 12-month, 36-month, or 60-month intervals, or as applicable, shallbe required upon written approval of the MPCA.
183
Formaldehyde : The Permittee shall submit a test frequency plan : Due 60 calendar days after InitialPerformance Test Date for formaldehyde emission factor. The plan shall specify a testing frequency based onthe test data and MPCA guidance. Future performance tests based on 12-month, 36-month, or 60-monthintervals, or as applicable, shall be required upon written approval of the MPCA.
184
The Permittee shall submit a notification : Due within 30 days of the end of the shakedown period for EQUI 16.The shakedown period shall be the earlier of 180 days after initial startup of EQUI 16, or 60 days after achievingmaximum production of EQUI 16, or submittal of successful compliance test and CEMS certification reports forEQUI 16.
19670 Additional requirements for Combustion Turbine #1 are located at EQUI 16. Additional requirements for DuctBurners (Combustion Turbine #1) are located at EQUI 17.
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7011.7000, Minn. R.7017.2020, subp. 1, Title I Condition:Avoid major source under 40 CFR 63.2
Minn. R. 7007.0800, subp. 2
Minn. R. 7007.0800, subp. 2
TSD Requirement (Print version)
Agency Interest Name: Mankato Energy Center LLCActivity Number: IND20150001
Subject ItemCategory Description Subject Item Type DescriptionActivity Insignificant Air Emissions Activity
Agency Interest Conventional Site
Component Group Air Component Group
Equipment Aboveground Storage Tank
Boiler
Continuous Emission Monitor
Data Acquisition System
Duct Burner
Reciprocating IC Engine
Turbine
Fugitive Cooling Tower
Equipment Leaks
Structure Building
Stack/Vent
Total Facility Air Quality Total Facility
Treatment 028-Steam or Water Injection
099-Other
109-Catalytic Oxidizer
139-SCR (Selective Catalytic Reduction)
205-Low Nox Burners
1
1
2
2
2
2
2
4
2
2
2
1
6
13
1
1
2
2
1
1
Overview of SI's (count) by type
Agency Interest: Mankato Energy Center LLCAgency Interest ID: NoneActivity: IND20150001 (None)
Details for:SI Category: AllSI Type: All
Agency Interest Name Subject Item ID Subject Item .. Subject Item DescriptionMankato Energy CenterLLC
ACTV3 Null All IAs
AISI95792 Null Null
COMG5 Null Formaldehyde, n-Hexane, and Total HAPs
COMG6 Null Combustion Turbines and Duct Burners (SV002 & SV007)
EQUI2 DA002 CT #2 CEMS
EQUI3 MR003 NOx CEM for CT #2
EQUI4 MR004 CO CEM for CT #2
EQUI5 EU002 Combustion Turbine #2
EQUI6 EU004 Duct Burner (Combustion Turbine #2)
EQUI7 EU005 Auxiliary Boiler
EQUI11 EU007 Fire Pump Engine
EQUI16 EU008 Combustion Turbine #1
EQUI17 EU009 Duct Burners (Combustion Turbine #1)
EQUI18 EU010 Diesel Fired Emergency Generator
EQUI19 EU011 Bath Heater
EQUI20 DA003 CT #1 CEMS
EQUI21 MR005 NOx CEM for CT #1
EQUI22 MR006 CO CEM for CT #1
EQUI23 Null Diesel Fired Emergency Generator Tank
EQUI24 Null Natural Gas Condensate Tank - Plant
FUGI1 FS001 Cooling Tower
FUGI2 FS002 Natural Gas Fugitives
FUGI3 FS003 Breaker Fugitives
STRU1 BG001 Administration / Warehouse Building (SPF: 14)
STRU2 BG002 Water Treatment/ Electrical Control Building(13)
STRU3 BG003 Fire Pump House (Site Plan Reference: 52)
STRU4 BG004 Cooling Tower (Site Plan Reference: 20)
STRU5 BG005 Cooling Tower Chemical Feed Building (28)
STRU6 BG006 Heat Recovery Steam Generator #2 (SPF: 4)
STRU7 BG007 Steam Turbine Generator Building (SPF: 56)
STRU8 BG008 Combustion Turbine #2 (Site Plan Reference:2)
STRU9 BG009 Auxiliary Boiler (Site Plan Reference: 53)
STRU10 BG010 Demineralized Water Storage Tank (SPF: 24)
STRU11 BG011 Fuel Oil Storage Tank (Site Plan Reference: 58)
STRU12 BG012 Raw Water Storage Tank (Site Plan Refere:23)
STRU13 BG013 Existing Warehouse Building (Site Plan Ref:15)
STRU14 SV002 Combustion Turbine #2 & Duct Burners #2 Stack
STRU17 SV003 Auxiliary Boiler Stack
STRU18 SV005 Fire Pump Engine Stack
STRU20 SV007 Combustion Turbine #1 & Duct Burners #1 Stack
STRU21 SV008 Diesel Fired Emergency Generator Stack
STRU22 SV009 Bath Heater Stack
TFAC1 01300098 Mankato Energy Center LLC
TREA4 CE004 Steam or Water Injection for CT #2
List of SIs
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: NoneSI Type: All
Agency Interest Name Subject Item ID Subject Item .. Subject Item DescriptionMankato Energy CenterLLC
jTREA5 CE006 SCR (Selective Catalytic Reduction) for CT #2
TREA6 CE008 Catalytic Oxidizer for CT #2
TREA7 CE009 Low NOx Burners for EQUI 7
TREA9 CE002 Lean Pre-mix DLN Combustion for CT #2
TREA11 CE011 SCR (Selective Catalytic Reduction) for CT #1
TREA12 CE012 Catalytic Oxidizer for CT #1
List of SIs
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: NoneSI Type: All
Subject ItemCategoryDescription
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Pollutant
Pote
ntia
l (lb
s/hr
)
Unr
estr
icte
d Po
tent
ial
(tons
/yr)
Pote
ntia
l Lim
ited
(tons
/yr)
Act
ual E
mis
sion
s(to
ns/y
r)
Equipment AbovegroundStorage Tank
EQUI23 Null Volatile Organic Compounds
EQUI24 Null Volatile Organic Compounds
Boiler EQUI7 EU005 1,4-Dichlorobenzene (para-)
Arsenic compounds
Benzene
Beryllium
Cadmium compounds
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
Chromium compounds
Cobalt compounds
Formaldehyde
HAPs - Total
Hexane
Lead
Manganese compounds
Mercury
Methane
Naphthalene
Nickel compounds
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Polycyclic organic matter
Selenium compounds
Sulfur Dioxide
Sulfuric Acid Mist
Toluene
Total Particulate Matter
Volatile Organic Compounds
EQUI19 EU011 1,4-Dichlorobenzene (para-)
Arsenic compounds
Benzene
Beryllium
Cadmium compounds
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
0.0002750.0002756.28e-050.050.050.01
2.152.45
0.001020.0490.31
7.21e-060.00021
2.452.450.07
11.040.0006310.000183
0.687.82e-050.000114
0.000150.5410.568
0.02252.52e-050.000421
18.435,90235,865
0.0003313.61e-060.0006316.01e-050.000361
2.152.45
0.001020.0490.31
7.21e-060.00021
2.452.450.07
11.040.0006310.000183
0.687.82e-050.000114
0.000150.5410.568
0.02252.52e-050.000421
18.435,90235,865
0.0003313.61e-060.0006316.01e-050.000361
0.490.56
0.0002330.0112
0.071.65e-064.79e-05
0.560.560.022.52
0.0001444.19e-05
0.151.78e-052.61e-053.43e-05
0.1240.13
0.005155.76e-069.61e-05
4.28,1978,188
7.55e-058.24e-070.0001441.37e-058.24e-05
1.041,4721,470
1.36e-051.48e-072.59e-052.46e-061.48e-05
1.041,4721,470
1.36e-051.48e-072.59e-052.46e-061.48e-05
0.24336336
3.1e-063.38e-085.91e-065.63e-073.38e-06
PTE by subject item
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemCategoryDescription
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Pollutant
Pote
ntia
l (lb
s/hr
)
Unr
estr
icte
d Po
tent
ial
(tons
/yr)
Pote
ntia
l Lim
ited
(tons
/yr)
Act
ual E
mis
sion
s(to
ns/y
r)
Equipment Boiler EQUI19 EU011 Chromium compounds
Cobalt compounds
Formaldehyde
HAPs - Total
Hexane
Lead
Manganese compounds
Mercury
Methane
Naphthalene
Nickel compounds
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Polycyclic organic matter
Selenium compounds
Sulfur Dioxide
Toluene
Total Particulate Matter
Volatile Organic Compounds
ReciprocatingIC Engine
EQUI11 EU007 1,3-Butadiene
Acetaldehyde
Acrolein
Benzene
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
Formaldehyde
HAPs - Total
Methane
Naphthalene
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Sulfur Dioxide
Sulfuric Acid Mist
Toluene
Total Particulate Matter
0.070.09
4.19e-050.00739
2.96e-078.6e-06
0.090.09
0.0002771.23
2.59e-057.52e-060.002773.2e-06
4.68e-066.16e-06
0.02220.0233
0.0009241.04e-061.73e-05
0.070.09
4.19e-050.00739
2.96e-078.6e-06
0.090.09
0.0002771.23
2.59e-057.52e-060.002773.2e-06
4.68e-066.16e-06
0.02220.0233
0.0009241.04e-061.73e-05
0.020.02
9.57e-060.00169
6.75e-081.96e-06
0.020.02
0.0006330.28
5.91e-061.72e-060.00633
7.32e-071.07e-061.41e-060.005060.00531
0.0002112.36e-073.94e-06
0.0045.01e-050.000722
0.0060.0040.004
0.0001620.169
1.04e-050.00081
0.0004750.000145
0.0242020
0.0001141.13e-059.4e-05
4.79e-06
0.0045.01e-050.00361
0.0060.0040.004
0.0001620.169
1.04e-050.00081
0.0004750.000145
0.0242020
0.0001141.13e-059.4e-05
4.79e-06
0.080.001
0.01440.120.080.08
0.003243.37
0.0002080.0162
0.009490.00289
0.48401399
0.002290.000227
0.001889.58e-05
PTE by subject item
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemCategoryDescription
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Pollutant
Pote
ntia
l (lb
s/hr
)
Unr
estr
icte
d Po
tent
ial
(tons
/yr)
Pote
ntia
l Lim
ited
(tons
/yr)
Act
ual E
mis
sion
s(to
ns/y
r)
Equipment ReciprocatingIC Engine
EQUI11 EU007 Total Polycyclic aromatic hydr..
Volatile Organic Compounds
Xylenes, Total
EQUI18 EU010 1,3-Butadiene
Acetaldehyde
Acrolein
Benzene
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
Formaldehyde
HAPs - Total
Methane
Naphthalene
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Sulfur Dioxide
Toluene
Total Particulate Matter
Total Polycyclic aromatic hydr..
Volatile Organic Compounds
Xylenes, Total
Fugitive Cooling Tower FUGI1 FS001 PM < 2.5 micron
PM < 10 micron
Total Particulate Matter
EquipmentLeaks
FUGI2 FS002 Carbon Dioxide
Carbon Dioxide Equivalent
Methane
FUGI3 FS003 Carbon Dioxide Equivalent
Sulfur Hexafluoride
Structure Stack/Vent STRU14 SV002 1,3-Butadiene
1,4-Dichlorobenzene (para-)
Acetaldehyde
Acrolein
Arsenic compounds
Benzene
Beryllium
Cadmium compounds
3.49e-050.008
2.06e-05
3.49e-050.008
2.06e-05
0.0006980.15
0.000412
0.0002450.04
0.000270.01
0.0003570.260.010.01
0.001680.66
0.0001650.008410.002050.0001
0.66207.4207.4
0.0009871e-05
3.21e-054.97e-05
0.001230.18
0.001350.04
0.001791.280.040.04
0.008413.32
0.0008270.04210.0103
0.0005023.32
1,040.51,036.90.00493
5.01e-050.00016
0.000249
0.004910.72
0.005390.15
0.007155.130.150.15
0.033613.27
0.003310.1680.041
0.0020113.274,1624,148
0.01970.0002
0.0006410.000995
15.872.7
0.0212
15.872.7
0.0212
3.620.62
0.00484
266.76,669
2.8
266.76,669
2.8
60.91,523
0.6
0.0014333
0.0014333
0.0003277
0.008490.000345
0.1590.109
0.05840.365
0.004120.0192
0.050980.00309
0.5470.109
0.05840.365
0.004120.157
0.011660.0007044
0.1250.02480.01330.0833
0.0009410.0359
PTE by subject item
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemCategoryDescription
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Pollutant
Pote
ntia
l (lb
s/hr
)
Unr
estr
icte
d Po
tent
ial
(tons
/yr)
Pote
ntia
l Lim
ited
(tons
/yr)
Act
ual E
mis
sion
s(to
ns/y
r)
Structure Stack/Vent STRU14 SV002p
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
Chromium compounds
Cobalt compounds
Ethylbenzene
Formaldehyde
HAPs - Total
Hexane
Lead
Manganese compounds
Mercury
Methane
Naphthalene
Nickel compounds
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Polycyclic organic matter
Propylene oxide
Selenium compounds
Sulfur Dioxide
Sulfuric Acid Mist
Toluene
Total Particulate Matter
Total Polycyclic aromatic hydr..
Volatile Organic Compounds
Xylenes, Total
STRU20 SV007 1,3-Butadiene
1,4-Dichlorobenzene (para-)
Acetaldehyde
Acrolein
Arsenic compounds
Benzene
Beryllium
Cadmium compounds
Carbon Dioxide
Carbon Dioxide Equivalent
Carbon Monoxide
0.584262
0.0573118.5
1.210.2967.8
0.02460.264
0.0024118.5118.52.78
174.130.01170.047127.82
0.01270.7810.02
922.5
90.292
0.0002890.0156477.94
1,478,1321,476,608
0.584185.390.393
317.991.2
64.34423.860.2460.264
0.0024317.99317.9913.77
1,672.640.05240.34672.7
0.01277.76
0.1384.29
39.6535.220.292
0.0002890.113
1,145.182,017,6842,011,764
0.13325.4
0.089772.6
0.27314.6996.77
0.05610.0604
0.00054872.672.63.15
63.120.011950.07898
16.590.002894
1.770.0314
0.989.058.04
0.06666.59e-05
0.025826.15
460,659459,307
767.981,578,1451,576,517
0.003894.24e-05
0.1250.000707
0.06320.395
0.004240.00423
1,288.11,578,1451,576,517
0.003894.24e-05
0.1250.000707
0.06320.395
0.004240.00423
27.64360,307359,935
0.0008889.69e-06
0.02870.000162
0.01440.0901
0.0009690.000967
PTE by subject item
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemCategoryDescription
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Pollutant
Pote
ntia
l (lb
s/hr
)
Unr
estr
icte
d Po
tent
ial
(tons
/yr)
Pote
ntia
l Lim
ited
(tons
/yr)
Act
ual E
mis
sion
s(to
ns/y
r)
Structure Stack/Vent STRU20 SV007 Chromium compounds
Cobalt compounds
Ethylbenzene
Formaldehyde
HAPs - Total
Hexane
Lead
Manganese compounds
Mercury
Methane
Naphthalene
Nickel compounds
Nitrogen Oxides
Nitrous Oxide
PM < 2.5 micron
PM < 10 micron
Polycyclic organic matter
Propylene oxide
Selenium compounds
Sulfur Dioxide
Sulfuric Acid Mist
Toluene
Total Particulate Matter
Total Polycyclic aromatic hydr..
Volatile Organic Compounds
Xylenes, Total 0.63382.540.021752.121.294.5830.2
8.49e-050.286
0.0024752.1252.122.97
166.780.00743
0.01529.71
0.000920.001340.00661
922.5
90.316
0.0002970.00495
0.63425.5
0.021752.121.294.5830.2
8.49e-050.286
0.0024752.1252.122.97
1,198.770.00743
0.01529.71
0.000920.001340.00661
4.5842.1937.6
0.3160.000297
0.00495
0.1413.42
0.0049611.9
0.2931.056.9
1.94e-050.0653
0.00056411.911.90.68
34.050.0017
0.003426.78
0.000210.000307
0.001511.059.638.58
0.07216.78e-050.00113
PTE by subject item
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemCategoryDescription
Subject Item TypeDescription Subject Item ID
Subject ItemDesignation Subject Item Description
Relationship(F/R)
Related Subject ItemID
Related Subject Item TypeDescription
Start Date(Subject ItemRelated)
End Date(Subject ItemRelated)
ConfidentialityFlag
Equipment Boiler EQUI7 EU005 Auxiliary Boiler is controlled .. TREA0000000007 205-Low Nox Burners 9/29/2004 Null Null
sends to STRU0000000017 Stack/Vent 9/29/2004 Null Null
EQUI19 EU011 Bath Heater sends to STRU0000000022 Stack/Vent 10/31/2006 Null Not Confidential
Continuous EmissionMonitor
EQUI3 MR003 NOx CEM for CT #2 sends to EQUI0000000002 Data Acquisition System 8/18/2009 Null Null
EQUI4 MR004 CO CEM for CT #2 sends to EQUI0000000002 Data Acquisition System 8/18/2009 Null Null
EQUI21 MR005 NOx CEM for CT #1 sends to EQUI0000000020 Data Acquisition System 4/1/2016 Null Not Confidential
EQUI22 MR006 CO CEM for CT #1 sends to EQUI0000000020 Data Acquisition System 4/1/2016 Null Not Confidential
Duct Burner EQUI6 EU004 Duct Burner (CombustionTurbine #2)
is controlledby
TREA0000000005 139-SCR (Selective Catalyti.. 9/29/2004 Null Null
TREA0000000006 109-Catalytic Oxidizer 9/29/2004 Null Null
sends to STRU0000000014 Stack/Vent 9/29/2004 Null Null
EQUI17 EU009 Duct Burners (CombustionTurbine #1)
is controlledby
TREA0000000011 139-SCR (Selective Catalyti.. 4/1/2016 Null Not Confidential
TREA0000000012 109-Catalytic Oxidizer 4/1/2016 Null Not Confidential
sends to STRU0000000020 Stack/Vent 4/1/2016 Null Not Confidential
Reciprocating ICEngine
EQUI11 EU007 Fire Pump Engine sends to STRU0000000018 Stack/Vent 9/29/2004 Null Null
EQUI18 EU010 Diesel Fired Emergency Gene.. sends to STRU0000000021 Stack/Vent 4/1/2016 Null Not Confidential
Turbine EQUI5 EU002 Combustion Turbine #2 is controlledby
TREA0000000004 028-Steam or Water Injection 9/29/2004 Null Null
TREA0000000005 139-SCR (Selective Catalyti.. 9/29/2004 Null Null
TREA0000000006 109-Catalytic Oxidizer 9/29/2004 Null Null
TREA0000000009 099-Other 9/29/2004 Null Null
is monitoredby
EQUI0000000003 Continuous Emission Monitor 8/18/2009 Null Null
EQUI0000000004 Continuous Emission Monitor 8/18/2009 Null Null
sends to EQUI0000000002 Data Acquisition System 8/18/2009 Null Null
STRU0000000014 Stack/Vent 9/29/2004 Null Null
EQUI16 EU008 Combustion Turbine #1 is controlledby
TREA0000000011 139-SCR (Selective Catalyti.. 4/1/2016 Null Not Confidential
TREA0000000012 109-Catalytic Oxidizer 4/1/2016 Null Not Confidential
is monitoredby
EQUI0000000021 Continuous Emission Monitor 4/1/2016 Null Not Confidential
EQUI0000000022 Continuous Emission Monitor 4/1/2016 Null Not Confidential
sends to EQUI0000000020 Data Acquisition System 4/1/2016 Null Not Confidential
STRU0000000020 Stack/Vent 4/1/2016 Null Not Confidential
Treatment 099-Other TREA9 CE002 Lean Pre-mix DLN Combustionfor CT #2
is controlled inseries by
TREA0000000004 028-Steam or Water Injection 9/29/2004 Null Not Confidential
TREA0000000005 139-SCR (Selective Catalyti.. 9/29/2004 Null Not Confidential
TREA0000000006 109-Catalytic Oxidizer 9/29/2004 Null Not Confidential
109-Catalytic Oxidiz.. TREA12 CE012 Catalytic Oxidizer for CT #1 is controlled i.. TREA0000000011 139-SCR (Selective Catalyti.. 4/1/2016 Null Not Confidential
SI - SI relationships
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: AllSI Type: All
Subject ItemTypeDescription Subject Item ID
Capacity(gal) AST Substance Stored
ColumnDiameter(ft)
ColumnCount Deck Type
InteriorDiameter(ft)
InteriorHeight(ft)
MaximumTrueVaporPressure(psia)
ConstructionType Seal Type Support Type
ConfidentialityFlag
AbovegroundStorage Tank
EQUI23 Null Null Null Null Null 7 16 Null Fixed Roof Null Null Not Confidential
EQUI24 Null Null Null Null Null 10 11 0.87 Fixed Roof Null Null Not Confidential
Aboveground Storage Tanks, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: EquipmentSI Type: Aboveground Storage Tank
Subject ItemTypeDescription Subject Item ID
Subject ItemDesignation Manufacturer Model
Max DesignCapacity
Max DesignCapacityUnits(numerator)
Max DesignCapacityUnits(denominator) Material
ConstructionStart Date
OperationStart Date
Modification Date
ConfidentialityFlag
Turbine EQUI5 EU002 Siemens-Westinghouse 501F-D2 375 megawatts hours Electrical Energy 11/1/2004 7/1/2006 Null Null
EQUI16 EU008 TBD TBD 2253.3 million British.. hours Energy Null Null Null Not Confidential
Emission Units 1
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: EquipmentSI Type: Turbine
Boiler EQUI7 Nebraska Boiler DS-57-SH-AL 50000 pounds hours Steam 11/1/2004 7/1/2006 Null Not coal burni.. Null Null
EQUI19 Parsons 15197 2.87 million British thermal units hours Heat 5/18/2005 10/31/2006 Null Not coal burni.. Null Null
Duct Burner EQUI6 Coen custom 1000000 pounds hours Steam 11/1/2004 7/1/2006 Null Not coal burni.. Null Null
EQUI17 TBD TBD 823.7 million British thermal units hours Energy Null Null Null Not coal burni.. Null Null
Reciprocating IC Engine EQUI11 Peerless 8AEFZOG 350 horsepower hours Diesel Fuel 11/1/2004 7/1/2006 Null CI Emergency/blackstart 8100
EQUI18 TBD TBD 2500 kilowatts hours Energy Null Null Null CI Emergency/blackstart 78080
Emission Units 2
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: EquipmentSI Type: Boiler, Duct Burner, Reciprocating IC Engine
Subject ItemTypeDescription Subject Item ID Manufacturer Model Serial Number
ParameterMonitored(continuousmonitors)
Primary orbackupmonitor?
Em BypassCapability?
MonitorInstall Date
CertificationDate
CertificationBasis Em Span
System FullScale Value
Optical PathLength
ConfidentialityFlag
ContinuousEmissionMonitor
EQUI3 Teledyne Instruments M200EM NO459 Nitrogen Oxides P N 8/18/2009 9/23/2009 40 CFR Pt 75 200 200 Null Null
EQUI4 Teledyne Instruments M300EM CO332 Carbon Monoxide P N 8/18/2009 9/23/2009 40 CFR Pt 60 3000 5000 1.19 Null
EQUI21 Null Null Null Nitrogen Oxides P N Null Null 40 CFR Pt 75 Null Null Null Not Confidential
EQUI22 Null Null Null Carbon Monoxide P N Null Null 40 CFR Pt 60 Null Null Null Not Confidential
CEMs/COM, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: EquipmentSI Type: Continuous Emission Monitor
Subject Item ID Manufacturer Model Serial NumberPrimary orbackup DAS?
Das InstallDate
Confidentiality Flag
EQUI2 General Electric GE NetDAHS n/a P 6/1/2006 Null
EQUI20 Null Null Null P Null Null
Data Acquisition System, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: EquipmentSI Type: Data Acquisition System
Subject ItemTypeDescription Subject Item ID Install Year
Parameter Monitored(fugitive)
ConfidentialityFlag
CoolingTower
FUGI1 2006 PM < 2.5 micron Null
PM < 10 micron Null
Total Particulate Matter Null
EquipmentLeaks
FUGI2 Null Carbon Dioxide Not Confidential
Methane Not Confidential
FUGI3 Null Sulfur Hexafluoride Not Confidential
Fugitive Sources
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: FugitiveSI Type: Cooling Tower & Equipment Leaks
Subject ItemTypeDescription Subject Item ID Height Units (height) Length Units (length) Width Units (width)
ConfidentialityFlag
Building STRU1 25 feet 230 feet 60 feet Not Confidential
STRU2 25 feet 185 feet 75 feet Not Confidential
STRU3 12 feet 34 feet 17 feet Not Confidential
STRU4 43 feet 440 feet 55 feet Not Confidential
STRU5 16 feet 68 feet 38 feet Not Confidential
STRU6 100 feet 135 feet 50 feet Not Confidential
STRU7 80 feet 197 feet 110 feet Not Confidential
STRU8 77 feet 110 feet 50 feet Not Confidential
STRU9 30 feet 55 feet 40 feet Not Confidential
STRU10 30 feet 37.37 feet 40 feet Not Confidential
STRU11 30 feet 44 feet 55 feet Not Confidential
STRU12 40 feet 46 feet 42 feet Not Confidential
STRU13 25 feet 120 feet 60 feet Not Confidential
Buildings, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: StructureSI Type: Building
Subject ItemTypeDescription Subject Item ID
Stack Height(feet)
StackDiameter(feet)
Stack Length(feet)
Stack Width(feet)
Stack FlowRate (cubicft/min)
DischargeTemp (°F)
Info SourceDesc Discharge Direction
ConfidentialityFlag
Stack/Vent STRU14 200 19 Null Null 684892 160 Manufacturer Upwards with no cap on stack/vent Not Confidential
STRU17 100 4 Null Null 24150 325 Manufacturer Upwards with no cap on stack/vent Not Confidential
STRU18 15 0.6 Null Null 663 829 Manufacturer Upwards with no cap on stack/vent Not Confidential
STRU20 200 19 Null Null 668591 160 Manufacturer Upwards with no cap on stack/vent Not Confidential
STRU21 13 0.67 Null Null 19582 915.3 Manufacturer Upwards with no cap on stack/vent Not Confidential
STRU22 25 1.67 Null Null 1507.66 913 Manufacturer Upwards with no cap on stack/vent Not Confidential
Stack/Vent, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: StructureSI Type: Stack/Vent
Subject Item TypeDescription Subject Item ID Manufacturer Model
Install StartDate
PollutantControlled(treatment)
CaptureEfficiency (%)
Destruction/CollectionEfficiency (%)
Subject toCAM? Large PSEU? Efficiency Basis
Other operating parameters?
Other operatingparametersdescription
ConfidentialityFlag
099-Other TREA9 Siemens-Westin.. Null 6/1/2006 Nitrogen Oxides 100 Null N Null Mfr/Vendor data N Null Not Confidential
139-SCR (SelectiveCatalytic Reduction)
TREA5 Nooter-Eriksen/P.. custom 6/1/2006 Nitrogen Oxides 100 80 Y Y Mfr/Vendor data Y Minimum design tem.. Not Confidential
TREA11 Null Null Null Nitrogen Oxides 100 80 Y Y Mfr/Vendor data Y Minimum design tem.. Not Confidential
205-Low Nox Burners TREA7 NATCOM P-66-G-1.. 6/1/2006 Nitrogen Oxides 100 50 N Null Mfr/Vendor data N Null Not Confidential
Other Control Equipment
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: TreatmentSI Type: 099-Other, 139-SCR (Selective Catalytic Reduction), 205-Low Nox Burners
The view is broken down by Subject Item Type Description, Subject Item ID, Manufacturer, Model, Install Start Date, Pollutant Controlled (treatment), Capture Efficiency (%), Destruction/Collection Efficiency (%), Subject to CAM?, Large PSEU?,Efficiency Basis, Other operating parameters?, Other operating parameters description and Confidentiality Flag. Details are shown for Agency Interest ID and Activity Type Label. The data is filtered on Agency Interest Name, Subject Item Cate-gory Description, Activity ID and Effective Flag. The Agency Interest Name filter keeps Mankato Energy Center LLC. The Subject Item Category Description filter keeps Treatment. The Activity ID filter keeps IND20150001. The Effective Flag filterkeeps Other permit activities. The view is filtered on Subject Item Type Description, which keeps 38 of 235 members.
Subject ItemTypeDescription Subject Item ID Manufacturer Model
Install StartDate
PollutantControlled(treatment)
CaptureEfficiency (%)
Destruction/CollectionEfficiency (%)
Subject toCAM? Large PSEU? Efficiency Basis
Catalyst BedReactivity(kat)
BurnerCapacity(MMBTU/hr)
CatatlyticOxidizer InletTemperature(°F)
OutletTemperature(°F)
ConfidentialityFlag
109-CatalyticOxidizer
TREA6 Englehard custom 6/1/2006 Carbon Monoxide 100 90 Y Y Mfr/Vendor data Null Null 651 651 Not Confidential
Volatile Organic C.. 100 40 Y Y Mfr/Vendor data Null Null 651 651 Not Confidential
TREA12 Null Null Null Carbon Monoxide 100 90 Y Y Mfr/Vendor data Null Null Null Null Not Confidential
Volatile Organic C.. 100 40 Y Y Mfr/Vendor data Null Null Null Null Not Confidential
Catalytic Oxidizers, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: TreatmentSI Type: 109-Catalytic Oxidizer
Subject Item ID Manufacturer ModelInstall StartDate
PollutantControlled(treatment)
CaptureEfficiency(%)
Destruction/CollectionEfficiency (%)
Subject toCAM? Large PSEU?
EfficiencyBasis
Injection SystemMaterial Injected
InjectionSystemMaximumInjection Rate
Injection SystemMaximum UnitsDescription
InjectionSystemMinimumInjection Rate
Injection SystemMinimum UnitsDescription
ConfidentialityFlag
..ater Injection, TREA4 Siemens-Westin.. custom 6/1/2006 Nitrogen Oxid.. 100 82 N Null Mfr/Vendor d.. Steam or Water 5520 gallons per hour 3774 gallons per hour Not Confidential
Injections Systems, General
Agency Interest: Mankato Energy Center LLCAgency Interest ID: 95792Activity: IND20150001 (Major Amendment)
Details for:SI Category: TreatmentSI Type: 028-Steam or Water Injection
COMPLIANCE ASSURANCE MONITORING CATALYTIC OXIDATION SYSTEM FOR VOC CONTROL:
MANKATO ENERGY CENTER, COMBUSTION TURBINE NO. 1 AND DUCT BURNER
I. Background A. Emissions Unit
Description: Combustion Turbine #1; Duct Burner #1
Emission Unit ID: EQUI16 and EQUI17
Control Equipment ID: TREA12 Facility: Mankato Energy Center Mankato, MN
B. Applicable Regulation, Emissions Limit, and Monitoring Requirements Regulation: Permit and State Regulation
Emission Limits: VOC: Normal Operations Less than or equal to 3.4 ppm VOC using a 3-hour block average by volume on a dry basis corrected to 15% O2. This limit applies at all times when EQUI16 combusts natural gas except during startup and shutdown events, malfunction, tuning and roll back periods. (40 CFR Section 52.21(j) BACT limit) Start-up/Shutdown (SUSD) Less than or equal to 333.32 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns.
Proposed Monitoring: The combustion turbine/duct burner stack will be
equipped with a Continuous Emission Monitor for CO. Requirements: A Continuous Emission Monitoring System (CEMS) for CO
is required by the permit, with a regulatory basis of Minn. R. 7017.1006 and 7017.1090, Subp. 1
C. Control Technology: Oxidation Catalyst
II. Monitoring Approach A. Indicator(s) Continuous Emission Monitoring System (CEMS) for CO,
if the CO concentration is 4.0 ppm or less on a 3-hour rolling average basis when EQUI16 combusts natural gas and operates at full load (i.e. greater than 90% load), then the facility is in compliance with the VOC limit.
CEMS for CO, if the CO concentration is 4.7 ppm or less on a 3-hour rolling average basis when EQUI16 combusts natural gas and operates between 60 to 90% load, then the facility is in compliance with the VOC limit.
CEMS for CO, if the CO for SUSD is less than or equal to 666.63 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns; then the facility is in compliance with the VOC SUSD limit.
If the CO concentration exceeds any of the limits above, then the Permittee shall perform an inspection of the oxidation catalyst system to determine whether there is a CAM exceedance.
Measurement approach: The CEMS will provide the combustion turbine operators
with stack CO emission readings, indicating the overall performance of the oxidation catalyst system. CO is a product of incomplete combustion and indicates combustion efficiency.
Compliance with CO limits will demonstrate compliance with VOC limits.
B. Indicator Range(s) Indicator ranges will be the same as those specified in 40 CFR Part 60, Appendix B, Performance Specification 4.
C. Performance Criteria 1. Data
Representativeness The CO CEMS will be installed in a USEPA Performance Specification 4 (PS 4)-compliant location. This will ensure that the CEMS will be a reliable indicator of overall oxidation catalyst performance.
2. Verification of Operational Status
The CO CEMS will provide a continuous reading of stack CO emissions. The verification of this signal will be tested via quarterly QA/QC requirements according to PS 4 and 40 CFR Part 60, Appendix F.
3. QA/QC Practices In lieu of meeting PS 4 and Appendix F QA/QC requirements, the CO CEMS will meet 40 CFR Part 75 QA/QC procedures.
4. Monitoring Frequency
CO CEMS – continuous.
5. Data Collection Procedures
Data from the CO monitor will be recorded by the continuous monitoring system.
6. Averaging Period The CO CEMS will reduce data to that dictated by the applicable standard.
III. Monitoring Approach Justification
A. Background a. The CAM-affected “pollutant specific emission unit” (PSEU) is Combustion
Turbine #1 and duct burner. b. The PSEU is subject to a BACT limit under 40 CFR 52.21.
B. Rationale for Selection of Performance Indicators
a. Compliance with the VOC limit will be monitored using the CO CEMS as discussed in Section II. Previous stack testing on STRU14 for natural gas showed CO and VOC emissions well below the applicable permit limits. For natural gas combustion, stack tests on STRU14 in 2011 showed the VOC/CO ratio based on corrected ppmvd at 68% load was approximately 0.15; and at full load with duct burners the VOC/CO ratio was approximately 0.35. For start-up events, stack tests results for another Calpine Facility with similar SW 501F turbines showed a VOC/CO ratio of approximately 0.01 – 0.02 for all three units.
b. An inspection and maintenance program was selected because a systematic approach to investigating problems and conducting routine maintenance is the best possible means of minimizing excess emissions from the oxidation catalyst.
C. Rationale for Selection of Indicator Ranges
a. The CEMS monitored range is set in accordance with PS 4.
D. Control Device Operating Parameter Data Collected to Justify the Proposed Indicator Range
a. Not applicable.
E. Test Plan & Schedule for Obtaining Data if Performance Test Data Are Not Available a. Not applicable.
F. Implementation Plan
a. The CO CEMS system for the combustion turbine/duct burner stack will be operational after the shakedown period described in the facility’s air permit.
COMPLIANCE ASSURANCE MONITORING CATALYTIC OXIDATION SYSTEM FOR CO CONTROL:
MANKATO ENERGY CENTER, COMBUSTION TURBINE NO. 1 AND DUCT BURNER
I. Background A. Emissions Unit
Description: Combustion Turbine #1; Duct Burner #1
Emission Unit ID: EQUI16; EQUI17 Control Equipment ID: TREA12 Facility: Mankato Energy Center Mankato, MN
B. Applicable Regulation, Emissions Limit, and Monitoring Requirements Regulation: Permit and State Regulation
Emission Limits: CO:
Normal Operations Less than or equal to 4.0 ppm CO using a 3-hour rolling average by volume on a dry basis corrected to 15% O2. This limit applies at all times when EQUI16 combusts natural gas and operates at full load (i.e. greater than 90% load). Limit does not apply during startup and shutdown events, malfunction, tuning, and roll back periods. (40 CFR Section 52.21(j) BACT limit) Less than or equal to 4.7 ppm CO using a 3-hour rolling average by volume on a dry basis corrected to 15% O2. This limit applies at all times when EQUI16 combusts natural gas and operates between 60 to 90% load. Limit does not apply during startup and shutdown events, malfunction, tuning, and roll back periods. (40 CFR Section 52.21(j) BACT limit)
Start-up/Shutdown (SUSD) Less than or equal to 666.63 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns.
Proposed Monitoring The combustion turbine/duct burner stack will be
equipped with a Continuous Emission Monitor for CO. Requirements A Continuous Emission Monitoring System (CEMS) for CO
is required by the permit, with a regulatory basis of Minn. R. 7017.1006 and 7017.1090, Subp. 1
C. Control Technology: Oxidation Catalyst II. Monitoring Approach A. Indicator(s) Continuous Emission Monitoring System (CEMS) for CO Continuous Emission Monitoring System (CEMS) for CO, if
the CO concentration is 4.0 ppm or less on a 3-hour rolling average basis when EQUI16 combusts natural gas and operates at full load (i.e. greater than 90% load), then the facility is in compliance with the CO limit.
CEMS for CO, if the CO concentration is 4.7 ppm or less on a 3-hour rolling average basis when EQUI16 combusts natural gas and operates between 60 to 90% load, then the facility is in compliance with the CO limit.
CEMS for CO, if the CO for SUSD is less than or equal to 666.63 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns; then the facility is in compliance with the CO SUSD limit.
If the CO concentration exceeds any of the limits above, then the Permittee shall perform an inspection of the oxidation catalyst system to determine whether there is a CAM exceedance.
Measurement approach: The CEMS will provide the combustion turbine operators
with stack CO emission readings, indicating the overall performance of the oxidation catalyst system. CO is a product of incomplete combustion and indicates combustion efficiency.
B. Indicator Range(s) Indicator ranges will the same as those specified in 40 CFR Part 60, Appendix B, Performance Specification 4.
C. Performance Criteria
1. Data Representativeness
The CO CEMS will be installed in a USEPA Performance Specification 4 (PS 4)-compliant location. This will ensure that the CEMS will be a reliable indicator of overall oxidation catalyst performance.
2. Verification of Operational Status
The CO CEMS will provide a continuous reading of stack CO emissions. The verification of this signal will be tested via quarterly QA/QC requirements according to PS 4 and 40 CFR Part 60, Appendix F.
3. QA/QC Practices In lieu of meeting PS 4 and Appendix F QA/QC requirements, the CO CEMS will meet 40 CFR Part 75 QA/QC procedures.
4. Monitoring Frequency CO CEMS – continuous. 5. Data Collection
Procedures Data from the CO monitor will be recorded by the continuous monitoring system.
6. Averaging Period The CO CEMS will reduce data to that dictated by the applicable standard.
III. Monitoring Approach Justification
A. Background a. The CAM-affected “pollutant specific emission unit” (PSEU) is Combustion
Turbine #1 and duct burner. b. The PSEU is subject to a BACT limit under 40 CFR 52.21.
B. Rationale for Selection of Performance Indicators
a. Use of a CEMS or PEMS meets the requirements of CAM as indicated by 40 CFR 64.3(d).
b. An inspection and maintenance program was selected because a systematic approach to investigating problems and conducting routine maintenance is the best possible means of minimizing excess emissions from the oxidation catalyst.
C. Rationale for Selection of Indicator Ranges
a. The CEMS monitored range is set in accordance with PS 4.
D. Control Device Operating Parameter Data Collected to Justify the Proposed Indicator Range
a. Not applicable.
E. Test Plan & Schedule for Obtaining Data if Performance Test Data Are Not Available a. Not applicable.
F. Implementation Plan
a. The CO CEMS system for the combustion turbine/duct burner stack will be operational after the shakedown period described in the facility’s air permit.
COMPLIANCE ASSURANCE MONITORING
SELECTIVE CATALYTIC REDUCTION SYSTEM FOR NOX CONTROL: MANKATO ENERGY CENTER, COMBUSTION TURBINE NO. 1 AND DUCT BURNER
I. Background
A. Emissions Unit
Description: Combustion Turbine #1; Duct Burner #1
Emission Unit ID: EQUI16; EQUI17 Control Equipment ID: TREA11
Facility: Mankato Energy Center
Mankato, MN
B. Applicable Regulation, Emissions Limit, and Monitoring Requirements
Regulation: Permit and State Regulation
Emission Limits: NOx:
Normal Operations Less than or equal to 3.0 ppm NOx using a 1-hour or 3-hour rolling average (which ever averaging period is included in the final permit) by volume on a dry basis corrected to 15% O2
when EQUI16 combusts natural gas except during startup and shutdown events, malfunction, tuning, and roll back periods. (40 CFR Section 52.21(j) BACT limit) Start-up/Shutdown (SUSD) Less than or equal to 41.9 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns.
Proposed Monitoring: The combustion turbine/duct burner stack will be equipped with a Continuous Emission Monitor for NOx.
Requirements:
A Continuous Emissions Monitoring System (CEMS) for NOx is required by the permit, with a regulatory basis of 40 CFR pt. 75.
C.
Control Technology:
Selective Catalytic Reduction II. Monitoring Approach
A. Indicator(s) Continuous Emission Monitoring System (CEMS) for NOx • Continuous Emission Monitoring System (CEMS) for NOx, if
the NOx concentration is 3.0 ppm or less on a 1-hour or 3-hour rolling average (which ever averaging period is included in the final permit) average basis when EQUI16 combusts natural gas, then the facility is in compliance with the NOx limit.
• CEMS for NOx, if the NOx for SUSD is less than or equal to 41.9 tons per year using a 12-month rolling sum during COLD and WARM startups and shutdowns; then the facility is in compliance with the NOx SUSD limit.
• If the NOx concentration exceeds any of the limits above, then the Permittee shall perform an inspection of the selective catalytic reduction system to determine whether there is a CAM exceedance.
Measurement approach: • The CEMS will provide the combustion turbine/duct burner
operators with stack NOx emission readings, indicating the overall performance of the selective catalytic reduction system.
B. Indicator Range(s) Indicator ranges will the same as those specified in 40 CFR pt. 75 Appendix A & B.
C. Performance Criteria
1. Data Representativeness
The NOx CEMS is installed in a USEPA Performance Specification 2 (PS 2) -compliant location. This will ensure that the CEMS will be a reliable indicator of overall selective catalytic reduction system performance.
2. Verification of Operational Status
The NOx CEMS provides a continuous reading of stack NOx emissions. The verification of this signal will be tested via quarterly QA/QC requirements according to 40 CFR pt. 75 Appendix A and B.
3. QA/QC Practices In lieu of meeting PS 4 and Appendix F QA/QC requirements, the NOx CEMS will meet 40 CFR Part 75 QA/QC procedures.
4. Monitoring Frequency NOx CEMS – continuous. 5. Data Collection
Procedures Data from the NOx CEMS will also be recorded by the continuous monitoring system.
6. Averaging Period The NOx CEMS will reduce NOx data to that dictated by the applicable standard.
III. Monitoring Approach Justification
A. Background
a. The CAM-affected “pollutant specific emission unit” (PSEU) is Combustion Turbine #1 and duct burner.
b. The PSEU is subject to a BACT limit under 40 CFR § 52.21.
B. Rationale for Selection of Performance Indicators a. Use of a CEMS or PEMS meets the requirements of CAM as indicated under
40 CFR § 64.3(d).
C. Rationale for Selection of Indicator Ranges a. The CEMS monitored range is set in accordance with PS 2. b. There is no “range” proposed for the inspection and maintenance program. c. Conditions found will dictate necessary corrective actions, in accordance with
vendor specifications.
D. Control Device Operating Parameter Data Collected to Justify the Proposed Indicator Range
a. Not applicable.
E. Test Plan & Schedule for Obtaining Data if Performance Test Data Are Not Available a. Not applicable.
F. Implementation Plan
a. The NOx CEMS system for the combustion turbine/duct burner stack will be operational after the shakedown period described in the facility’s air permit
Summary
RASS version number = 201405- 25 stacksNo Inputs Allowed on this Page
Screening Date:AQ Facility ID No.:AQ File No.:Facility Name:Facility Location:SIC Code (Required):
Acute SubchronicNoncancer
ChronicNoncancer Cancer Farmer
NoncancerFarmerCancer
UrbanGardener
Noncancer
UrbanGardenerCancer
ResidentNoncancer
ResidentCancer
FarmerNoncancer
FarmerCancer
Urban Gardener Noncancer
UrbanGardenerCancer
ResidentNoncancer
ResidentCancer
8.E-01 2.E-02 2.E-01 3.E-06 5.E-01 6.E-06 1.E-01 2.E-06 2.E-02 1.E-07 6.E-01 9.E-06 3.E-01 4.E-06 2.E-01 3.E-06 Rounded value for final reporting
1.E+00 1.E+00 1.E+00 1.E-05 1.E+00 1.E-05 1.E+00 1.E-05 1.E+00 1.E-05 1.E+00 1.E-05 1.E+00 1.E-05 1.E+00 1.E-05 <<<GuidanceLevel
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK <<<OK or REFINE?
8.2E-01 2.5E-02 1.5E-01 2.8E-06 4.5E-01 5.9E-06 1.0E-01 1.7E-06 1.7E-02 1.3E-07 6.1E-01 8.7E-06 2.5E-01 4.5E-06 1.7E-01 2.9E-06 Calculated value for transparency and further calculation
Endpoint Acute SubchronicNoncancer
ChronicNoncancer
Respiratory 7.5E-01 2.1E-02 1.3E-01
Reproductive/developmental/endocrine/fetotoxicity
6.8E-02 2.6E-03 4.6E-03
Blood/hematological 0.0E+00 5.8E-05 1.1E-02
Neurological 6.7E-02 2.8E-03 2.0E-02
Eyes 6.9E-02 0.0E+00
Digestive 0.0E+00 4.9E-06
Bone & teeth 0.0E+00
Cardiovascular 7.4E-02 2.6E-03 4.6E-03
Kidney 0.0E+00 4.5E-03
Liver 0.0E+00 3.0E-07 9.7E-08
Skin 0.0E+00 3.7E-03
Ethanol specific 0.0E+00 0.0E+00
9.9E-01 9.9E-01 9.9E-01<<<Guidance
Level
OK OK OK <<<OK or REFINE?
Benzene noBromopropane, 1- no
Butadiene, 1,3- no
Carbon disulfide noCellosolve Acetate noChloroform no2-ethoxyethanol noEthylbenzene noEthyl chloride no2-methoxyethanol noTrichloroethylene noArsenic noCarbon tetrachloride noMercury noPropylene oxide no
Ceiling Values Exceeded?
Total Inhalation Screening Hazard Indices and Cancer Risks
Limited PTE
Total Indirect Pathway Screening Hazard Indices and Cancer Risks
Many pollutants have more than a single endpoint and thus are included in multiple endpoints totals
Air Toxics Screen
Note: The hazard index (HI) against which facility risks are compared for acute, sub-chronic and chronic non-cancer risks is 1. The cancer risk against which facility risks are compared is 1 E-5 (or 1 chance in 100,000). These facility risk guidelines are risk management-based. They are not discrete indicators of observed adverse effect. If a risk estimate falls below facility risk guidelines, the MPCA may conclude that the assessed health effects from the proposed action are unlikely to occur, or will be negligible. A risk estimate that exceeds a guideline triggers further careful consideration.
Air Toxics Endpoint Refinement
Total Inhalation Screening Hazard Indices and Cancer Risks
Total Multipathway Screening Hazard Indices and Cancer Risks
Emissions type (PTE, Future Actual):
Mankato, MN
4911
6/12/201513000984198Mankato Energy Center
N:\Technical\1294 Calpine\35 - MEC Expansion\Phase 4c - Air Emissions Risk Analysis\RASS\Calpine_MEC_aq9-22.xlsm 1 of 14 10/23/2015 5:47 PM
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
75-0
7-0
Ace
tald
ehyd
eY
ES
0.75
9545
0.09
0132
0.39
4778
160.
0832
80.
3647
664
00
00
60-3
5-5
Ace
tam
ide
YE
S0.
0000
0075
-86-
5A
ceto
ne C
yano
hydr
in
NO
0.00
0000
75-0
5-8
Ace
toni
trile
YE
S0.
0000
0010
7-02
-8A
crol
ein
YE
S0.
1215
270.
0144
2112
0.06
3164
506
0.01
3324
80.
0583
6262
40
00
079
-06-
1A
cryl
amid
eY
ES
0.00
0000
79-1
0-7
Acr
ylic
aci
dY
ES
0.00
0000
107-
13-1
Acr
ylon
itrile
YE
S0.
0000
0011
1-69
-3A
dipo
nitri
le
NO
0.00
0000
00-0
7-9
Ald
ehyd
esS
ome
0.00
0000
309-
00-2
Ald
rinN
O0.
0000
00
VA
RIO
US
Alip
hatic
Hyd
roca
rbon
Stre
ams
(Mid
rang
e)N
O0.
0000
0075
-85-
4A
myl
Alc
ohol
, ter
t-N
O0.
0000
0010
7-05
-1A
llyl c
hlor
ide
YE
S0.
0000
0074
29-9
0-5
Alu
min
um
NO
0.00
0000
117-
79-3
Am
inoa
nthr
aqui
none
, 2-
NO
0.00
0000
7664
-41-
7A
mm
onia
NO
0.00
0000
62-5
3-3
Ani
line
YE
S0.
0000
0019
1-26
-4A
ntha
nthr
ene
NO
0.00
4857
0.00
0337
995
0.00
1480
418
0.00
4902
557
0.00
3376
112
7440
-36-
0A
ntim
ony
Y
ES
0.00
0000
0-00
-1A
ntim
ony
Com
poun
dsY
ES
0.00
0000
1309
-64-
4A
ntim
ony
triox
ide
YE
S0.
0000
0014
0-57
-8A
ram
iteN
O0.
0000
0074
40-3
8-2
Ars
enic
YE
S0.
0122
510.
0001
6151
0.00
0707
413
0.02
4829
863
0.01
1481
496
1.37
255E
-05
6.01
176E
-05
5.62
745E
-07
2.46
482E
-06
0-00
-2A
rsen
ic C
ompo
unds
Y
ES
0.00
0000
1327
-53-
3A
rsen
ic T
rioxi
deY
ES
0.00
0000
7784
-42-
1A
rsin
eY
ES
0.00
0000
123-
77-3
Azo
dica
rbon
amid
eN
O0.
0000
0071
-43-
2B
enze
neY
ES
0.28
6204
0.02
8735
453
0.12
5861
284
0.12
5012
059
0.15
9685
725
0.00
0144
118
0.00
0631
235
5.90
882E
-06
2.58
806E
-05
92-8
7-5
Ben
zidi
neY
ES
0.00
0000
202-
94-8
11H
-Ben
z[b,
c]ac
eant
hryl
ene
YE
S0.
0000
0019
9-54
-2B
enz[
e]ac
eant
hryl
ene
YE
S0.
0000
0020
2-33
-5B
enz[
j]ace
anth
ryIe
neY
ES
0.00
0000
211-
91-6
Ben
z[l]a
cean
thry
Iene
YE
S0.
0000
0020
5-82
-3B
enzo
(j)flu
oran
then
eY
ES
0.00
0000
207-
08-0
9B
enzo
(k)fl
uora
nthe
neY
ES
0.00
3336
0.00
0148
453
0.00
0650
223
0.00
4902
557
0.00
2685
6556
-55-
3B
enzo
[a]a
nthr
acen
eY
ES
0.00
4520
0.00
0296
022
0.00
1296
575
0.00
4902
557
0.00
3223
212
50-3
2-8
Ben
zo[a
]pyr
ene
YE
S0.
0028
891.
6192
8E-0
67.
0924
6E-0
60.
0049
0255
70.
0028
8200
520
5-99
-2B
enzo
[b]fl
uora
nthe
neY
ES
0.00
3336
0.00
0148
453
0.00
0650
223
0.00
4902
557
0.00
2685
65
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm2
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
205-
12-9
Ben
zo[c
]fluo
rene
YE
S0.
0000
0019
1-24
-2B
enzo
[g,h
,i]pe
ryle
neY
ES
0.00
3607
0.00
0182
252
0.00
0798
265
0.00
4902
557
0.00
2808
774
100-
44-7
Ben
zyl c
hlor
ide
YE
S0.
0000
0074
40-4
1-7
Ber
ylliu
mY
ES
0.00
0392
9.69
059E
-06
4.24
448E
-05
0.00
0704
742
0.00
0345
438.
2352
9E-0
73.
6070
6E-0
63.
38E
-08
1.48
E-0
70-
00-3
Ber
ylliu
m C
ompo
unds
YE
S0.
0000
0092
-52-
4B
iphe
nyl,
1,1-
YE
S0.
0000
00
117-
81-7
Bis
(2-e
thyl
hexy
l)pht
hala
te(D
EH
P)
YE
S0.
0000
0054
2-88
-1B
is(c
hlor
omet
hyl)e
ther
YE
S0.
0000
0010
294-
34-5
Bor
on T
richl
orid
eN
O0.
0000
0010
8-86
-1B
rom
oben
zene
NO
0.00
0000
74-9
7-5
Bro
moc
hlor
omet
hane
NO
0.00
0000
75-2
5-2
Bro
mof
orm
YE
S0.
0000
0010
6-94
-5B
rom
opro
pane
, 1-
NO
0.00
0000
106-
99-0
But
adie
ne, 1
,3-
YE
S0.
0234
560.
0009
6666
60.
0042
3399
60.
0358
880.
0192
2235
40
00
078
-92-
2
But
yl a
lcoh
ol, s
ec-
N
O0.
0000
00
111-
76-2
But
yl C
ello
solv
e (e
thyl
ene
glyc
ol m
onob
utyl
eth
er)
NO
0.00
0000
7440
-43-
9C
adm
ium
YE
S0.
0127
240.
0008
8830
40.
0038
9077
10.
0116
2914
50.
0084
8912
47.
5490
2E-0
50.
0003
3064
73.
0951
E-0
61.
3556
5E-0
50-
00-4
Cad
miu
m C
ompo
unds
YE
S0.
0000
0010
5-60
-2C
apro
lact
umN
O0.
0000
0075
-15-
0C
arbo
n di
sulfi
deY
ES
0.00
0000
630-
08-0
Car
bon
Mon
oxid
eN
O12
65.3
4532
027
.635
3985
676
7.97
7824
226
.145
6671
147
7.93
6269
64.
218
.396
0.23
6352
941
1.03
5225
882
56-2
3-5
Car
bon
tetra
chlo
ride
YE
S0.
0000
00
111-
15-9
Cel
loso
lve
Ace
tate
(eth
ylen
e gl
ycol
mon
oeth
yl e
ther
ace
tate
)N
O0.
0000
00
1306
-38-
3C
eriu
m O
xide
and
Cer
ium
C
ompo
unds
NO
0.00
0000
1278
9-03
-6C
hlor
dane
or (
57-7
4-9)
YE
S0.
0000
00
1081
71-2
6-2
Chl
orin
ated
Par
affin
s (C
12,
60%
Chl
orin
e )N
O0.
0000
0077
82-5
0-5
Chl
orin
eY
ES
0.00
0000
1004
9-04
-4C
hlor
ine
Oxi
de (C
LO2)
NO
0.00
0000
75-6
8-3
Chl
oro-
1,1-
diflu
oroe
than
e, 1
- (H
CFC
-142
b)N
O0.
0000
0053
2-27
-4C
hlor
oace
toph
enon
e, 2
-Y
ES
0.00
0000
108-
90-7
Chl
orob
enze
neY
ES
0.00
0000
98-5
6-6
C
hlor
oben
zotri
fluor
ide,
4-
N
O0.
0000
00
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm3
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
75-4
5-6
Chl
orod
ifluo
rom
etha
ne (H
CFC
-22
)N
O0.
0000
0067
-66-
3C
hlor
ofor
mY
ES
0.00
0000
100-
00-5
C
hlor
onitr
oben
zene
, p-
N
O0.
0000
00
95-8
3-0
Chl
oro-
o-ph
enyl
ened
iam
ine,
4-
NO
0.00
0000
95-6
9-2
Chl
oro-
o-to
luid
ine,
p-
NO
0.00
0000
76-0
6-2
Chl
orop
icrin
NO
0.00
0000
126-
99-8
Chl
orop
rene
YE
S0.
0000
0074
40-4
7-3
Chr
omiu
mY
ES
0.02
0994
0.00
1130
569
0.00
4951
891
0.02
5771
039
0.01
5603
849
9.60
784E
-05
0.00
0420
824
3.93
922E
-06
1.72
538E
-05
1854
0-29
-9C
hrom
ic a
cid
mis
ts a
nd
diss
olve
d C
r(V
I) ae
roso
lsY
ES
0.00
0000
1854
0-29
-9C
hrom
ium
(Hex
aval
ent)
(par
ticul
ate)
YE
S0.
0000
000-
00-5
Chr
omiu
m C
ompo
unds
YE
S0.
0000
00
218-
01-9
Chr
ysen
e(B
enzo
(a)p
hena
nthr
ene)
YE
S0.
0048
030.
0003
3136
80.
0014
5139
0.00
4902
557
0.00
3351
969
8007
-45-
2C
oal T
arN
O0.
0000
0074
40-4
8-4
Cob
alt
YE
S0.
0006
126.
7834
1E-0
50.
0002
9711
36.
5882
4E-0
50.
0002
8856
55.
7647
1E-0
62.
5249
4E-0
52.
3635
3E-0
71.
0352
3E-0
60-
00-7
Cok
e O
ven
Em
issi
ons
YE
S0.
0000
0074
40-5
0-8
Cop
per
NO
0.00
0000
00-0
3-1
Cop
per C
ompo
unds
NO
0.00
0000
120-
71-8
Cre
sidi
ne, p
-N
O0.
0000
0010
8-39
-4C
reso
l, m
-Y
ES
0.00
0000
95-4
8-7
Cre
sol,
o-Y
ES
0.00
0000
106-
44-5
Cre
sol,
p-Y
ES
0.00
0000
1319
-77-
3C
reso
ls/C
resy
lic a
cid
(isom
ers
and
mix
ture
)Y
ES
0.00
0000
98-8
2-8
Cum
ene
YE
S0.
0000
0013
5-20
-6C
upfe
rron
NO
0.00
0000
57-1
2-5
Cya
nide
(Cya
nide
ion,
In
orga
nic
cyan
ides
, Iso
cyan
ide)
YE
S0.
0000
000-
00-8
Cya
nide
Com
poun
dsY
ES
0.00
0000
110-
82-7
Cyc
lohe
xane
NO
0.00
0000
109-
94-1
Cyc
lohe
xano
neN
O0.
0000
0027
208-
37-3
Cyc
lope
nta[
c,d]
pyre
neN
O0.
0000
0020
2-98
-24H
-Cyc
lope
nta[
d,e,
f]chr
ysen
eY
ES
0.00
0000
50-2
9-3
DD
TN
O0.
0000
0061
5-05
-4D
iam
inoa
niso
le, 2
,4-
NO
0.00
0000
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm4
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
103-
33-3
Dia
zene
, Dip
heny
lN
O0.
0000
0022
6-36
-8D
iben
z(a,
h)ac
ridin
eY
ES
0.00
0000
224-
42-0
Dib
enz(
a,j)a
crid
ine
YE
S0.
0000
0053
-70-
3D
iben
z[a,
h]an
thra
cene
YE
S0.
0045
200.
0002
9602
20.
0012
9657
50.
0049
0255
70.
0032
2321
253
85-7
5-1
Dib
enzo
[a,e
]fluo
rant
hene
YE
S0.
0000
0019
2-65
-4D
iben
zo(a
,e)p
yren
eY
ES
0.00
0000
189-
64-0
Dib
enzo
(a,h
)pyr
ene
YE
S0.
0000
0019
1-30
-0D
iben
zo(a
,l)py
rene
YE
S0.
0000
0019
4-59
-2D
iben
zo(c
,g)c
arba
zole
, 7H
-Y
ES
0.00
0000
189-
55-9
Dib
enzo
[a,i]
pyre
neY
ES
0.00
0000
96-1
2-8
Dib
rom
o-3-
chlo
ropr
opan
e, 1
,2-
YE
S0.
0000
0010
6-46
-7D
ichl
orob
enze
ne(p
), 1,
4-Y
ES
0.00
0000
2532
1-22
-6D
ichl
orob
enze
nes
Som
e0.
0087
420.
0009
6905
90.
0042
4447
80.
0009
4117
60.
0041
2235
38.
2352
9E-0
50.
0003
6070
63.
3764
7E-0
61.
4788
9E-0
591
-94-
1D
ichl
orob
enzi
dene
, 3,3
-Y
ES
0.00
0000
764-
41-0
Dic
hlor
o-2-
bute
ne, 1
,4-
NO
0.00
0000
1476
-11-
5D
ichl
oro-
2-bu
tene
, cis
-1,4
-N
O0.
0000
00
75-7
1-8
Dic
hlor
odifl
uoro
met
hane
(CFC
-12
)N
O0.
0000
00
111-
44-4
Dic
hlor
oeth
yl e
ther
(Bis
(2-
chlo
roet
h yl)e
the
YE
S0.
0000
00
75-3
5-4
Dic
hlor
oeth
ylen
e (1
,1-)
(V
inyl
iden
e ch
lorid
e)Y
ES
0.00
0000
156-
60-5
D
ichl
oroe
thyl
ene,
tran
s-1,
2-N
O0.
0000
0054
2-75
-6D
ichl
orop
rope
ne, 1
,3-
YE
S0.
0000
0062
-73-
7D
ichl
orvo
sY
ES
0.00
0000
77-7
3-6
Dic
yclo
pent
adie
neN
O0.
0000
0060
-57-
1D
ield
rinN
O0.
0000
000-
02-4
Die
sel e
xhau
st p
artic
ulat
eN
O11
8.49
7500
72.6
118.
4975
111-
42-2
Die
than
olam
ine
YE
S0.
0000
00
112-
34-5
Die
thyl
ene
Gly
col M
onob
utyl
E
the r
NO
0.00
0000
111-
90-0
Die
thyl
ene
Gly
col M
onoe
thyl
E
ther
N
O0.
0000
0075
-37-
6D
ifluo
roet
hane
, 1,1
-N
O0.
0000
0010
8-20
-3
Diis
opro
pyl E
ther
N
O0.
0000
0060
-11-
7D
imet
hyl a
min
oazo
benz
ene
YE
S0.
0000
0068
-12-
2D
imet
hyl f
orm
amid
eY
ES
0.00
0000
108-
01-0
Dim
ethy
lam
ino
etha
nol,
2-N
O0.
0000
00
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm5
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
57-9
7-6
Dim
ethy
lben
z[a]
anth
race
ne,
7,12
-Y
ES
0.00
0000
57-1
4-7
Dim
ethy
lhyd
razi
ne, 1
,1-
YE
S0.
0000
0042
397-
64-8
Din
itrop
yren
e, 1
,6- (
BaP
)Y
ES
0.00
0000
4239
7-65
-9D
initr
opyr
ene,
1,8
- (B
aP)
YE
S0.
0000
0012
1-14
-2D
initr
otol
uene
, 2,4
-Y
ES
0.00
0000
123-
91-1
Dio
xane
, 1,4
- (1,
4-D
ieth
ylen
e di
oxid
e )Y
ES
0.00
0000
122-
66-7
Dip
heny
lhyd
razi
ne, 1
,2-
YE
S0.
0000
00
106-
89-8
Epi
chlo
rohy
drin
(l-C
hlor
o-2,
3-ep
oxyp
ropa
ne)
YE
S0.
0000
0010
6-88
-7E
poxy
buta
ne, 1
,2-
YE
S0.
0000
0014
0-88
-5E
thyl
Acr
ylat
eY
ES
0.00
0000
110-
80-5
Eth
oxye
than
ol, 2
- (et
hyle
ne
glyc
ol m
onoe
thyl
eth
er)
YE
S0.
0000
0010
0-41
-4E
thyl
ben
zene
YE
S0.
6076
360.
0721
056
0.31
5822
528
0.06
6624
0.29
1813
120
00
051
-79-
6E
thyl
car
bam
ate
(Ure
than
e)Y
ES
0.00
0000
75-0
0-3
Eth
yl c
hlor
ide
(Chl
oroe
than
e)Y
ES
0.00
0000
97-6
3-2
E
thyl
Met
hacr
ylat
e
NO
0.00
0000
106-
93-4
Eth
ylen
e di
brom
ide
(Dib
rom
oeth
ane)
YE
S0.
0000
00
107-
06-2
Eth
ylen
e di
chlo
ride
(1,2
-D
ichl
oroe
than
e )Y
ES
0.00
0000
107-
21-1
Eth
ylen
egl
ycol
YE
S0.
0000
0075
-21-
8E
thyl
ene
oxid
eY
ES
0.00
0000
96-4
5-7
Eth
ylen
e th
iour
eaY
ES
0.00
0000
75-3
4-3
Eth
ylid
ene
dich
lorid
e (1
,1-
Dic
hlor
oeth
ane )
YE
S0.
0000
0020
6-44
-0Fl
uora
nthe
neY
ES
0.00
7550
0.00
0673
781
0.00
2951
160.
0049
0255
70.
0045
9930
7
1101
Fluo
rides
(exc
ept h
ydro
gen
fluor
ide)
NO
0.00
0000
50-0
0-0
Form
alde
hyde
YE
S9.
0234
688.
5848
34.
58.
0407
84.
50.
0051
4705
90.
0225
4411
80.
0002
1102
90.
0009
2430
964
-18-
6
Form
ic A
cid
N
O0.
0000
0011
1-30
-8G
luta
rald
ehyd
eN
O0.
0000
000-
01-2
Gly
col e
ther
sS
ome
0.00
0000
76-4
4-8
Hep
tach
lor
YE
S0.
0000
0010
24-5
7-3
Hep
tach
lor e
poxi
deN
O0.
0000
00
00-0
8-5
Hep
tach
loro
dibe
nzod
ioxi
n, A
ll Is
omer
sY
ES
0.00
0000
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm6
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
6756
2-39
-4H
epta
chlo
rodi
benz
ofur
an,
1,2,
3,4,
6,7,
8-Y
ES
0.00
0000
5567
3-89
-7H
epta
chlo
rodi
benz
ofur
an,
1,2,
3,4,
7,8,
9-Y
ES
0.00
0000
00-0
8-4
Hep
tach
loro
dibe
nzof
uran
, All
Isom
ers
YE
S0.
0000
00
3582
2-46
-9H
epta
chlo
rodi
benz
o-p-
diox
in,
1,2,
3,4,
6,7,
8-Y
ES
0.00
0000
118-
74-1
Hex
achl
orob
enze
n eY
ES
0.00
0000
87-6
8-3
Hex
achl
orob
utad
iene
YE
S0.
0000
00
608-
73-1
Hex
achl
oroc
yclo
hexa
ne(te
chni
calg
rade
) N
O0.
0000
00
319-
84-6
Hex
achl
oroc
yclo
hexa
ne, a
lpha
-N
O0.
0000
00
319-
85-7
Hex
achl
oroc
yclo
hexa
ne, b
eta-
1,2,
3,4,
5,6-
NO
0.00
0000
77-4
7-4
Hex
achl
oroc
yclo
pent
adie
neY
ES
0.00
0000
00-0
8-3
Hex
achl
orod
iben
zodi
oxin
s, A
ll Is
omer
sY
ES
0.00
0000
7064
8-26
-9H
exac
hlor
odib
enzo
fura
n,1,
2,3,
4,7,
8-Y
ES
0.00
0000
5711
7-44
-9H
exac
hlor
odib
enzo
fura
n,1,
2,3,
6,7,
8-Y
ES
0.00
0000
7291
8-21
-9H
exac
hlor
odib
enzo
fura
n,1,
2,3,
7,8,
9-Y
ES
0.00
0000
6085
1-34
-5H
exac
hlor
odib
enzo
fura
n,2,
3,4,
6,7,
8-Y
ES
0.00
0000
00-0
8-2
Hex
achl
orod
iben
zofu
rans
, All
Isom
ers
YE
S0.
0000
00
3922
7-28
-6H
exac
hlor
odib
enzo
-p-d
ioxi
n,1,
2,3,
4,7,
8-Y
ES
0.00
0000
5765
3-85
-7H
exac
hlor
odib
enzo
-p-d
ioxi
n,1,
2,3,
6,7,
8-Y
ES
0.00
0000
1940
8-74
-3H
exac
hlor
odib
enzo
-p-d
ioxi
n,1,
2,3,
7,8,
9-Y
ES
0.00
0000
67-7
2-1
Hex
achl
oroe
than
eY
ES
0.00
0000
822-
06-0
Hex
amet
hyle
ne-1
,6-
diis
ocya
nate
YE
S0.
0000
0011
0-54
-3H
exan
eN
O9.
5632
421.
0461
84.
50.
9798
84.
50.
1235
2941
20.
5410
5882
40.
0050
6470
60.
0221
8341
259
1-78
-6H
exan
one-
2N
O0.
0000
00
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm7
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
302-
01-2
Hyd
razi
neY
ES
0.00
0000
1003
4-93
-2H
ydra
zine
sul
fate
NO
0.00
0000
7647
-01-
0H
ydro
chlo
ric a
cid
(hyd
roge
n ch
lorid
e )Y
ES
0.00
0000
74-9
0-8
Hyd
roge
n cy
anid
eY
ES
0.00
0000
7664
-39-
3H
ydro
gen
fluor
ide
(Hyd
roflu
oric
ac
id)
YE
S0.
0000
0077
83-0
7-5
Hyd
roge
n se
leni
deN
O0.
0000
0077
83-0
6-4
Hyd
roge
n su
lfide
NO
0.00
0000
193-
39-5
Inde
no(1
,2,3
-cd)
pyre
neY
ES
0.00
4520
0.00
0296
022
0.00
1296
575
0.00
4902
557
0.00
3223
212
78-5
9-1
Isop
horo
neY
ES
0.00
0000
67-6
3-0
Isop
ropy
l alc
ohol
NO
0.00
0000
7439
-92-
1Le
adY
ES
0.02
6243
0.00
1508
333
0.00
6606
50.
0317
9415
70.
0194
7969
13.
4313
7E-0
50.
0001
5029
41.
4068
6E-0
66.
1620
6E-0
677
58-9
7-6
Lead
Chr
omat
eY
ES
0.00
0000
0-01
-3Le
ad C
ompo
unds
YE
S0.
0000
0058
-89-
9Li
ndan
e (a
ll is
omer
s)Y
ES
0.00
0000
00-0
7-8
m- a
nd p
-Xyl
enes
YE
S0.
0000
0010
8-31
-6M
alei
c an
hydr
ide
YE
S0.
0000
0074
39-9
6-5
Man
gane
seY
ES
0.77
8005
0.00
0306
869
0.00
1344
085
1.77
2268
039
0.77
6542
287
2.60
784E
-05
0.00
0114
224
1.06
922E
-06
4.68
316E
-06
0-01
-4M
anga
nese
Com
poun
dsY
ES
0.00
0000
1313
-13-
9M
anga
nese
Dio
xide
YE
S0.
0000
0074
39-9
7-6
Mer
cury
(ele
men
tal)
YE
S0.
0030
720.
0002
0996
30.
0009
1963
70.
0028
9552
20.
0020
7075
11.
7843
1E-0
57.
8152
9E-0
57.
3156
9E-0
73.
2042
7E-0
60-
02-3
Mer
cury
Com
poun
dsY
ES
0.00
0000
126-
98-7
Met
hacr
ylon
itrile
NO
0.00
0000
67-5
6-1
Met
hano
lY
ES
0.00
0000
109-
86-4
Met
hoxy
etha
nol,
2- (e
thyl
ene
glyc
ol m
onom
ethy
l eth
er
EG
ME
)Y
ES
0.00
0000
96-3
3-3
Met
hyl a
cryl
ate
NO
0.00
0000
74-8
3-9
Met
hyl b
rom
ide
(Bro
mom
etha
ne)
YE
S0.
0000
0011
0-49
-6M
ethy
l Cel
loso
lve
Ace
tate
NO
0.00
0000
74-8
7-3
Met
hyl c
hlor
ide
(Chl
orom
etha
ne)
YE
S0.
0000
00
71-5
5-6
Met
hyl c
hlor
ofor
m (1
,1,1
-Tr
ichl
oroe
than
e )Y
ES
0.00
0000
78-9
3-3
Met
hyl e
thyl
ket
one
(2-
But
anon
e )N
O0.
0000
0060
-34-
4M
ethy
l Hyd
razi
neY
ES
0.00
0000
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm8
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
108-
10-1
Met
hyl i
sobu
tyl k
eton
e (H
exon
e)Y
ES
0.00
0000
624-
83-9
Met
hyl i
socy
anat
eY
ES
0.00
0000
80-6
2-6
Met
hyl m
etha
cryl
ate
YE
S0.
0000
0016
34-0
4-4
Met
hyl t
ert b
utyl
eth
erY
ES
0.00
0000
56-4
9-5
Met
hylc
hola
nthr
ene,
3-
YE
S0.
0000
0036
97-2
4-3
Met
hylc
hrys
ene,
5-
YE
S0.
0000
00
101-
14-4
Met
hyle
ne b
is(2
-chl
oroa
nilin
e),
4,4-
YE
S0.
0000
0074
-95-
3M
eth y
lene
Bro
mid
eN
O0.
0000
00
75-0
9-2
Met
hyle
ne c
hlor
ide
(Dic
hlor
omet
hane
)Y
ES
0.00
0000
101-
68-8
Met
hyle
ne d
iphe
nyl
diis
ocya
nate
(MD
I)Y
ES
0.00
0000
101-
77-9
Met
hyle
nedi
anili
ne, 4
,4-
YE
S0.
0000
0090
-94-
8M
ichl
er's
ket
one
NO
0.00
0000
1059
5-95
-6N
- Nitr
osom
ethy
leth
ylam
ine
NO
0.00
0000
6472
4-95
-6N
apht
ha, H
igh
Flas
h A
rom
atic
(H
FAN
)
NO
0.00
0000
91-2
0-3
Nap
htha
lene
YE
S0.
0622
910.
0034
2189
50.
0149
879
0.07
8983
431
0.04
7112
237
4.18
627E
-05
0.00
0183
359
1.71
637E
-06
7.51
771E
-06
193-
09-9
Nap
htho
[2,3
-e]p
yren
eY
ES
0.00
0000
7440
-02-
0N
icke
lY
ES
0.01
9813
0.00
1695
853
0.00
7427
836
0.01
1964
859
0.01
1728
155
0.00
0144
118
0.00
0631
235
5.90
882E
-06
2.58
806E
-05
0-01
-5N
icke
l Com
poun
dsY
ES
0.00
0000
1313
-99-
1N
icke
l oxi
deY
ES
0.00
0000
0-02
-5N
icke
l ref
iner
y du
st fr
om th
e p y
rom
etal
lurg
ical
pro
cess
YE
S0.
0000
0012
035-
72-2
Nic
kel s
ulfid
e (N
I3S
2)Y
ES
0.00
0000
7697
-37-
2N
itric
aci
dN
O0.
0000
0060
2-87
-9N
itroa
cena
phth
ene,
5-
YE
S0.
0000
0010
0-01
-6
Nitr
oani
line,
4-
N
O0.
0000
0098
-95-
3N
itrob
enze
neY
ES
0.00
0000
7496
-02-
8N
itroc
hrys
ene,
6-
YE
S0.
0000
0060
7-57
-8N
itrof
luor
ene,
2-
YE
S0.
0000
0010
102-
44-0
Nitr
ogen
oxi
de (N
O2)
NO
353.
1764
1034
.050
7589
416
6.78
1158
463
.117
6271
417
4.12
5239
42.
5211
.037
60.
2813
7254
91.
2324
1176
575
-52-
5N
itrom
etha
neN
O0.
0000
0079
-46-
9N
itrop
ropa
ne, 2
-N
O0.
0000
0055
22-4
3-0
Nitr
opyr
ene,
1-
YE
S0.
0000
0057
835-
92-4
Nitr
opyr
ene,
4-
YE
S0.
0000
0015
6-10
-5N
itros
odip
heny
lam
ine,
p-
NO
0.00
0000
55-1
8-5
N-N
itros
odie
thyl
amin
eN
O0.
0000
00
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm9
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
62-7
5-9
N-N
itros
odim
ethy
lam
ine
YE
S0.
0000
0092
4-16
-3N
-Nitr
osod
i-n-b
utyl
amin
eN
O0.
0000
0062
1-64
-7N
-Nitr
osod
i-n-p
ropy
lam
ine
NO
0.00
0000
86-3
0-6
N-N
itros
odip
heny
lam
ine
NO
0.00
0000
59-8
9-2
N-N
itros
omor
phol
ine
YE
S0.
0000
0010
0-75
-4N
-Nitr
osop
iper
idin
eN
O0.
0000
0011
1-84
-2N
-Non
ane
NO
0.00
0000
3900
1-02
-0O
ctac
hlor
odib
enzo
fura
n,1,
2,3,
4,6,
7,8,
9-Y
ES
0.00
0000
3268
-87-
9O
ctac
hlor
odib
enzo
-p-d
ioxi
n,1,
2,3,
4,6,
7,8,
9-Y
ES
0.00
0000
1002
8-15
-6O
zone
NO
0.00
0000
00-0
8-1
Pen
tach
loro
dibe
nzod
ioxi
ns, A
ll Is
omer
sY
ES
0.00
0000
5711
7-41
-6P
enta
chlo
rodi
benz
ofur
an,
1,2,
3,7,
8-Y
ES
0.00
0000
5711
7-31
-4P
enta
chlo
rodi
benz
ofur
an,
2,3,
4,7,
8-Y
ES
0.00
0000
00-0
9-0
Pen
tach
loro
dibe
nzof
uran
s, A
ll Is
omer
sY
ES
0.00
0000
4032
1-76
-4P
enta
chlo
rodi
benz
o-p-
diox
in,
1,2,
3,7,
8-Y
ES
0.00
0000
87-8
6-5
Pen
tach
loro
phen
olY
ES
0.00
0000
109-
66-0
Pen
tane
, n-
N
O0.
0000
00
00-0
7-7
Pet
role
um H
ydro
carb
ons,
A
lipha
tic(C
7 - C
11)
NO
0.00
0000
85-0
1-8
Phe
nant
hren
eY
ES
0.05
5949
0.00
5191
426
0.02
2738
448
0.03
2683
714
0.03
3210
3710
8-95
-2P
heno
lY
ES
0.00
0000
75-4
4-5
Pho
sgen
eY
ES
0.00
0000
7803
-51-
2P
hosp
hine
YE
S0.
0000
0076
64-3
8-2
Pho
spho
ric a
cid
NO
0.00
0000
85-4
4-9
Pht
halic
anh
ydrid
eY
ES
0.00
0000
1336
-36-
3P
olyc
hlor
inat
ed b
iphe
nyls
(A
rocl
ors
unsp
ecia
ted)
YE
S0.
0000
00
3259
8-13
-3P
CB
77
(3,3
,4,4
-Te
trach
loro
biph
enyl
)Y
ES
0.00
0000
7036
2-50
-4P
CB
81
(3,4
,4,5
Te
trach
loro
biph
enyl
)Y
ES
0.00
0000
3259
8-14
-4P
CB
105
(2,3
,3,4
,4
Pen
tach
loro
biph
enyl
)Y
ES
0.00
0000
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm10
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
7447
2-37
-0P
CB
114
(2,3
,4,4
,5
Pen
tach
loro
biph
enyl
)Y
ES
0.00
0000
3150
8-00
-6P
CB
118
(2,3
,4,4
,5
Pen
tach
loro
biph
enyl
)Y
ES
0.00
0000
6551
0-44
-3P
CB
123
(2,3
,4,4
,5
Pen
tach
loro
biph
enyl
)Y
ES
0.00
0000
5746
5-28
-8P
CB
126
(3,3
,4,4
,5
Pen
tach
loro
biph
enyl
)Y
ES
0.00
0000
3838
0-08
04P
CB
156
(2,3
,3,4
,4,5
H
exac
hlor
obip
hen y
l)Y
ES
0.00
0000
6978
2-90
-7P
CB
157
(2,3
,3,4
,4,5
H
exac
hlor
obip
hen y
l)Y
ES
0.00
0000
5266
3-72
-6P
CB
167
(2,3
,4,4
,5,5
H
exac
hlor
obip
hen y
l)Y
ES
0.00
0000
3277
4-16
-6P
CB
169
(3,3
,4,4
,5,5
H
exac
hlor
obip
hen y
l) Y
ES
0.00
0000
3963
5-31
-9P
CB
189
(2,3
,3,4
,4,5
,5
Hep
tach
loro
biph
enyl
)Y
ES
0.00
0000
00-0
5-0
Pol
ychl
orin
ated
Dib
enzo
diox
ins,
Tot
alY
ES
0.00
0000
00-0
5-1
Pol
ychl
orin
ated
Dib
enzo
fura
ns,
Tota
lY
ES
0.00
0000
00-0
8-0
Pol
ychl
orin
ated
Dib
enzo
-P-
Dio
xins
And
Fur
ans,
Tot
alY
ES
0.00
0000
1304
98-2
9-2
Pol
ycyc
lic A
rom
atic
H
ydro
carb
ons
(PA
H)
YE
S0.
0000
00
00-0
1-7
Pol
ycyc
lic O
rgan
ic M
atte
r (P
OM
)Y
ES
0.00
0000
9016
-87-
9P
olym
eric
dip
heny
lmet
hane
di
isoc
yana
teN
O0.
0000
0077
58-0
1-2
Pot
assi
um b
rom
ate
NO
0.00
0000
1120
-71-
4P
ropa
ne s
ulto
ne, 1
,3-
YE
S0.
0000
0012
3-38
-6P
ropi
onal
dehy
deY
ES
0.00
0000
115-
07-1
Pro
pyle
neN
O37
.232
576
4.41
8235
294
19.3
5187
059
4.08
2352
941
17.8
8070
588
78-8
7-5
Pro
pyle
ne d
ichl
orid
e (1
,2-
Dic
hlor
opro
pane
)Y
ES
0.00
0000
107-
98-2
Pro
pyle
ne G
lyco
l Mon
omet
hyl
Eth
e rN
O0.
0000
0075
-56-
9P
ropy
lene
oxi
deY
ES
0.55
0670
0.06
5345
70.
2862
1416
60.
0603
780.
2644
5564
00
00
930-
55-2
Pyr
rolid
ine,
1-N
itros
o-
NO
0.00
0000
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm11
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
7782
-49-
2S
elen
ium
Y
ES
0.02
4700
1.93
812E
-05
8.48
896E
-05
0.05
6093
824
0.02
4615
266.
7529
4E-0
82.
9577
9E-0
70-
01-9
Sel
eniu
m C
ompo
unds
YE
S0.
0000
00
7631
-86-
9S
ilica
(cry
stal
line,
resp
irabl
e,
PM
4 )N
O0.
0000
0013
10-7
3-2
Sod
ium
hyd
roxi
deN
O0.
0000
0077
89-0
6-2
Stro
ntiu
m c
hrom
ate
NO
0.00
0000
100-
42-5
Sty
rene
YE
S0.
0000
0014
808-
79-8
Sul
fate
sN
O0.
0000
0012
6-33
-0S
ulfo
lane
NO
0.00
0000
7664
-93-
9S
ulfu
ric a
cid
(aer
osol
form
s on
ly)
NO
0.00
0000
8014
-95-
7S
ulfu
ric A
cid
mix
ture
w. s
ulfu
r tri
oxid
e(o
leum
)N
O0.
0000
0074
46-0
9-5
Sul
fur d
ioxi
deN
O98
.314
176
6.89
5249
330
.201
1919
396
.770
8453
967
.798
9893
10.
070.
3066
0.00
1688
235
0.00
7394
471
00-0
9-1
TCD
D E
qiva
lent
s, 2
,3,7
,8-
YE
S0.
0000
00
00-0
8-8
Tetra
chlo
rodi
benz
odio
xins
, All
Isom
ers
YE
S0.
0000
00
5120
7-31
-9Te
trach
loro
dibe
nzof
uran
,2,
3,7,
8-Y
ES
0.00
0000
00-0
8-6
Tetra
chlo
rodi
benz
ofur
ans,
All
Isom
ers
YE
S0.
0000
00
1746
-01-
6Te
trach
loro
dibe
nzo-
p-di
oxin
,2,
3,7,
8-Y
ES
0.00
0000
630-
20-6
Tetra
chlo
roet
hane
, 1,1
,1,2
-N
O0.
0000
0079
-34-
5Te
trach
loro
etha
ne, 1
,1,2
,2-
YE
S0.
0000
00
127-
18-4
Tetra
chlo
roet
hyle
ne(P
erch
loro
ethy
lene
)Y
ES
0.00
0000
811-
97-2
Tetra
fluor
oeth
ane,
1,1
,1,2
-N
O0.
0000
0010
9-99
-9Te
trahy
drof
uran
NO
0.00
0000
62-5
5-5
Thio
acet
amid
eN
O0.
0000
0010
8-88
-3To
luen
eY
ES
2.49
3290
0.29
5674
667
1.29
5055
040.
2733
2666
71.
1971
708
0.00
0233
333
0.00
1022
9.56
667E
-06
0.00
0041
902
95-8
0-7
Tolu
ene
diam
ine,
2,4
-Y
ES
0.00
0000
584-
84-9
Tolu
ene
diis
ocya
nate
, 2,4
-Y
ES
0.00
0000
91-0
8-7
Tolu
ene-
2,6-
diis
ocya
nate
NO
0.00
0000
2647
1-62
-5To
luen
ediis
ocya
nate
(mix
ed
isom
ers )
Som
e0.
0000
00
8001
-35-
2To
xaph
ene
(chl
orin
ated
ca
mph
ene )
YE
S0.
0000
0012
0-82
-1Tr
ichl
orob
enze
ne, 1
,2,4
-Y
ES
0.00
0000
79-0
0-5
Tric
hlor
oeth
ane,
1,1
,2-
YE
S0.
0000
00
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm12
of 1
410
/23/
2015
5:
47 P
M
Em
issi
ons
Inpu
ts m
ay b
e m
ade
in y
ello
w c
ells
RA
SS v
ersi
on n
umbe
r = 2
0140
5- 2
5 st
acks
Scre
enin
g D
ate:
AQ
Fac
ility
ID N
o.:
AQ
File
No.
:Fa
cilit
y N
ame:
Faci
lity
Loc
atio
n:SI
C C
ode
(Req
uire
d):
Em
issi
ons t
ype
(PT
E, F
utur
e A
ctua
l):
CA
S #
or
MPC
A #
Che
mic
al N
ame
HA
PTo
tal A
nnua
l Em
issi
ons
>>>s
tack
(s) i
dent
ifier
>>>>
>>>>
>op
tiona
l>>>
>
(tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
Hou
rly
Em
issi
ons
(lb/h
r)
Ann
ual
Em
issi
ons (
tpy)
SV00
7SV
002
SV00
3SV
009
Stac
k(s)
#1St
ack(
s)#2
Stac
k(s)
#3St
ack(
s)#4
6/12
/201
5
Man
kato
, MN
Lim
ited
PTE
Man
kato
Ene
rgy
Cen
ter
4198
4911
1300
098
79-0
1-6
Tric
hlor
oeth
ylen
eY
ES
0.00
0000
75-6
9-4
Tric
hlor
oflu
orom
etha
ne (C
FC-
11)
NO
0.00
0000
88-0
6-2
Tric
hlor
ophe
nol,
2,4,
6-Y
ES
0.00
0000
96-1
8-4
Tric
hlor
opro
pane
, 1,2
,3-
NO
0.00
0000
96-1
9-5
Tr
ichl
orop
rope
ne, 1
,2,3
-
NO
0.00
0000
121-
44-8
Trie
thyl
amin
eY
ES
0.00
0000
526-
73-8
Trim
ethy
lben
zene
, 1,2
,3-
N
O0.
0000
0095
-63-
6
Trim
ethy
lben
zene
, 1,2
,4-
N
O0.
0000
00
1314
-62-
1V
anad
ium
Pen
toxi
de, (
V2O
5)N
O0.
0000
0010
8-05
-4V
inyl
ace
tate
YE
S0.
0000
0059
3-60
-2V
inyl
bro
mid
eY
ES
0.00
0000
75-0
1-4
Vin
yl c
hlor
ide
YE
S0.
0000
0013
30-2
0-7
Xyl
enes
YE
S1.
2152
710.
1442
112
0.63
1645
056
0.13
3248
0.58
3626
240
00
010
8-38
-3X
ylen
es, m
-Y
ES
0.00
0000
95-4
7-6
Xyl
enes
, o-
YE
S0.
0000
0010
6-42
-3X
ylen
es, p
-Y
ES
0.00
0000
1353
0-65
-9Zi
nc c
hrom
ate
YE
S0.
0000
00
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
0.00
0000
Etha
nol S
peci
fic
N:\T
echn
ical
\129
4 C
alpi
ne\3
5 - M
EC
Exp
ansi
on\P
hase
4c
- Air
Em
issi
ons
Ris
k A
naly
sis\
RA
SS
\Cal
pine
_ME
C_a
q9-2
2.xl
sm13
of 1
410
/23/
2015
5:
47 P
M
StkDisp
Inputs may be made in yellow cells*RASS version number = 201405- 25 stacks
Screening Date:AQ Facility ID No.:AQ File No.:Facility Name:Facility Location:SIC Code (Required):Emissions type (PTE, Future
SV007 SV002 SV003 SV009
Lookup table notes Stack(s)#1 Stack(s)#2 Stack(s)#3 Stack(s)#4
Stack height (m) required for lookup (1-99 m) 60.96 60.96 30.48 4.572
Distance to property line or receptor (m) required for lookup (10-10000m) 54.46 98.7 123 126.3
1-hr dispersion value from Table automatic lookup 1.94156 3.916 75.81 6848.52446
3-hr dispersion value from Table automatic lookup 1.57809 3.53814 41.26 2658.05781
8-hr dispersion value from Table automatic lookup 1.40967 3.24728 26.28385 1328.04539
24-hr dispersion value from Table automatic lookup 0.94505 2.6334 22.72637 571.48637
Monthly dispersion value from Table automatic lookup 0.18179 0.34166 7.18641 57.36056
Annual dispersion value from Table automatic lookup 0.03462 0.1385 2.97885 27.46707
Batch Process (or other) notes Stack(s)#1 Stack(s)#2 Stack(s)#3 Stack(s)#4
1-hr dispersion value from batch process or other air dispersion modeling enter dispersion values manually 1.94 3.92 75.81 6848.52
3-hr dispersion value from batch process or other air dispersion modeling enter dispersion values manually 1.58 3.54 41.26 2658.06
8-hr dispersion value from batch process or other air dispersion modeling enter dispersion values manually 1.41 3.25 26.28 1328.05
24-hr dispersion value from batch process or other air dispersion modeling enter dispersion values manually 0.95 2.63 22.73 571.49
Monthly dispersion value from batch process or other air dispersion modeling enter dispersion values manually 0.18 0.34 7.19 57.36
Annual dispersion value from batch processor other air dispersion modeling enter dispersion values manually 0.03 0.14 2.98 27.47
If the the batch process cells are filled in they are used preferentially over the lookup table values.
*Batch process (i.e., "Disperse") or other screening or refined air dispersion modeling is run separately and dispersion values are entered manually.
Limited PTE
Mankato, MN4911
6/12/201513000984198Mankato Energy Center
N:\Technical\1294 Calpine\35 - MEC Expansion\Phase 4c - Air Emissions Risk Analysis\RASS\Calpine_MEC_aq9-22.xlsm 14 of 14 10/23/2015 5:47 PM
aq9-17.xls
MMREM: Minnesota Mercury Risk Estimation MethodCalculation of Local Mercury Hazard Quotients (HQ), due to fish contamination, from Mercury Emissions from a project.version 2.0 November 24, 2008 Direct any comments to Ed Swain [email protected]
Inputs are in blue and bold Calculated Outputs are in yellow Fixed assumptions are not colored
Facility Name:
Information on the water body for which these calculations are made:
Water body name County Name
MN DNR lake # (if available) (xx-yyyy)
Existing Ambient Fish
Concentration (mg/kg Hg)
Area of fishable waterbody (acres)
Area of rest of watershed
(acres)
Minnesota River Blue Earth NA 0.21 840 6,993 2
Mercury calculations for the increment due to the project:
Hg Species
Modeled Increment to
Mean Air Conc. μg/m3
Percent of each Mercury species
(%)Dep Velocity
(cm/sec)
Calculated Deposition Rate (flux) μg/m2-yr Area (acres)
Conversion factor (m2 / acre)
Annual Mass deposited (μg)
Annual Mass deposited (grams)
Fraction Reaching
Waterbody
Annual Mass reaching
waterbody (grams)
Average concentration over the lakeHg(II) 2.67E-07 30.0% 1.10 0.1 840 4046.9 3.1E+05 0.31 1.00 0.31Hg(0) 4.45E-07 50.0% 0.01 0.0 840 4046.9 4.8E+03 0.00 1.00 0.00Hg-p 1.78E-07 20.0% 0.05 0.0 840 4046.9 9.5E+03 0.01 1.00 0.01Total 8.90E-07 100.0% 0.1
Average concentration over the rest of the watershed (excluding the lake)Hg(II) 2.67E-07 30.0% 1.10 0.1 6,993 4046.9 2.6E+06 2.62 0.26 0.68Hg(0) 4.45E-07 50.0% 0.01 0.0 6,993 4046.9 4.0E+04 0.04 0.26 0.01Hg-p 1.78E-07 20.0% 0.05 0.0 6,993 4046.9 7.9E+04 0.08 0.26 0.02Total 8.90E-07 100.0% 0.1
Total Hg Mass Modeled to the Waterbody from Project Air Concentrations (Direct to Waterbody, plus 26% from Rest-of-Watershed) = 1.04
Mercury calculations for ambient condition (background), assuming no significant local source*:
Deposition rate (flux) μg/m2-yr Area (acres)
Conversion factor (m2 / acre)
Annual mass deposited (μg)
Annual mass deposited (grams)
Fraction reaching
waterbody
Annual mass reaching
waterbody (grams)
Total deposition for the fishable waterbody12.5 840 4046.9 4.2E+07 42.49 1.00 42.49
Total deposition for the rest of the watershed12.5 6,993 4046.9 3.5E+08 353.75 0.26 91.97
Total Hg Mass Modeled to the Waterbody from Ambient Air Concentrations (Direct to Waterbody, plus 26% from Rest-of-Watershed) = 134.47
Fish Increment
Grams Hg to water body from project
Grams Hg to water body from
background
Incremental Hg in fish from project
(mg/kg)
Ratio of: Ambient fish Hg conc.
relative to WQ STD (0.2 mg/kg)
Ratio of: Incremental fish Hg conc. from project relative
to WQ STD
1.0 134.5 0.00 1.1 0.0
Subsistence Fisher Methylmercury Intake Calculations
Assumed daily fish consumed (kg)
Incremental daily Hg consumed
(mg)
Incremental daily HgCH3
consumed (mg) Body weight (kg)
Ambient HgCH3
Exposure mg/kg BW-day
Incremental HgCH3 Exposure mg/kg BW-day
RfD (mg HgCH3/kg bw-day)
Ambient Subsistence Fisher HQ
Incremental Subsistence Fisher HQ
0.142 0.0002 0.0002 70 4.58E-04 3.55E-06 1.00E-04 4.6 0.0
Recreational Fisher Methylmercury Intake Calculations
Assumed daily fish consumed (kg)
Incremental daily Hg consumed
(mg)
Incremental daily HgCH3
consumed (mg) Body weight (kg)
Ambient HgCH3
Exposure mg/kg BW-day
Incremental HgCH3 Exposure mg/kg BW-day
RfD (mg HgCH3/kg bw-day)
Ambient Recreational Fisher HQ
Incremental Recreational Fisher HQ
0.03 0.0000 0.0001 70 9.67E-05 7.49E-07 1.00E-04 1.0 0.0
*The ambient condition is assumed to result from the following background air concentrations and deposition velocities:
Hg Species
Modeled Increment to
Mean Air Conc. μg/m3
Percent of each Mercury species
(%)Dep Velocity
(cm/sec)
Calculated Deposition Rate (flux) μg/m2-yr
Fishable WaterbodyHg(II) 2.00E-05 1.2% 1.10 6.9Hg(0) 1.65E-03 97.6% 0.01 5.2Hg-p 2.00E-05 1.2% 0.05 0.3Total 1.69E-03 100.0% 12.5
Rest-of-Watershed (excluding waterbody)Hg(II) 2.00E-05 1.2% 1.10 6.9Hg(0) 1.65E-03 97.6% 0.01 5.2Hg-p 2.00E-05 1.2% 0.05 0.3Total 1.69E-03 100.0% 12.5
Recreational Fisher Hazard Quotient
Mankato Energy Center
Mercury Loading SummaryWater Quality Standard
Comparison
Subsistence Fisher Hazard Quotient
aq9-17.xls
MMREM: Minnesota Mercury Risk Estimation MethodCalculation of Local Mercury Hazard Quotients (HQ), due to fish contamination, from Mercury Emissions from a project.version 2.0 November 24, 2008 Direct any comments to Ed Swain [email protected]
Inputs are in blue and bold Calculated Outputs are in yellow Fixed assumptions are not colored
Facility Name:
Information on the water body for which these calculations are made:
Water body name County Name
MN DNR lake # (if available) (xx-yyyy)
Existing Ambient Fish
Concentration (mg/kg Hg)
Area of fishable waterbody (acres)
Area of rest of watershed
(acres)Total Mercury Conc
Hiniker Lake Blue Earth 07-014700 0.26 18 180 8.90E-07
Mercury calculations for the increment due to the project:
Hg Species
Modeled Increment to
Mean Air Conc. μg/m3
Percent of each Mercury species
(%)Dep Velocity
(cm/sec)
Calculated Deposition Rate (flux) μg/m2-yr Area (acres)
Conversion factor (m2 / acre)
Annual Mass deposited (μg)
Annual Mass deposited (grams)
Fraction Reaching
Waterbody
Annual Mass reaching
waterbody (grams)
Average concentration over the lakeHg(II) 2.67E-07 30.0% 1.10 0.1 18 4046.9 6.8E+03 0.01 1.00 0.01Hg(0) 4.45E-07 50.0% 0.01 0.0 18 4046.9 1.0E+02 0.00 1.00 0.00Hg-p 1.78E-07 20.0% 0.05 0.0 18 4046.9 2.1E+02 0.00 1.00 0.00Total 8.90E-07 100.0% 0.1
Average concentration over the rest of the watershed (excluding the lake)Hg(II) 2.67E-07 30.0% 1.10 0.1 180 4046.9 6.7E+04 0.07 0.26 0.02Hg(0) 4.45E-07 50.0% 0.01 0.0 180 4046.9 1.0E+03 0.00 0.26 0.00Hg-p 1.78E-07 20.0% 0.05 0.0 180 4046.9 2.0E+03 0.00 0.26 0.00Total 8.90E-07 100.0% 0.1
Total Hg Mass Modeled to the Waterbody from Project Air Concentrations (Direct to Waterbody, plus 26% from Rest-of-Watershed) = 0.03
Mercury calculations for ambient condition (background), assuming no significant local source*:
Deposition rate (flux) μg/m2-yr Area (acres)
Conversion factor (m2 / acre)
Annual mass deposited (μg)
Annual mass deposited (grams)
Fraction reaching
waterbody
Annual mass reaching
waterbody (grams)
Total deposition for the fishable waterbody12.5 18 4046.9 9.2E+05 0.92 1.00 0.92
Total deposition for the rest of the watershed12.5 180 4046.9 9.1E+06 9.11 0.26 2.37
Total Hg Mass Modeled to the Waterbody from Ambient Air Concentrations (Direct to Waterbody, plus 26% from Rest-of-Watershed) = 3.28
Fish Increment
Grams Hg to water body from project
Grams Hg to water body from
background
Incremental Hg in fish from project
(mg/kg)
Ratio of: Ambient fish Hg conc.
relative to WQ STD (0.2 mg/kg)
Ratio of: Incremental fish Hg conc. from project relative
to WQ STD
0.0 3.3 0.00 1.3 0.0
Subsistence Fisher Methylmercury Intake Calculations
Assumed daily fish consumed (kg)
Incremental daily Hg consumed
(mg)
Incremental daily HgCH3
consumed (mg) Body weight (kg)
Ambient HgCH3
Exposure mg/kg BW-day
Incremental HgCH3 Exposure mg/kg BW-day
RfD (mg HgCH3/kg bw-day)
Ambient Subsistence Fisher HQ
Incremental Subsistence Fisher HQ
0.142 0.0003 0.0003 70 5.56E-04 4.31E-06 1.00E-04 5.6 0.0
Recreational Fisher Methylmercury Intake Calculations
Assumed daily fish consumed (kg)
Incremental daily Hg consumed
(mg)
Incremental daily HgCH3
consumed (mg) Body weight (kg)
Ambient HgCH3
Exposure mg/kg BW-day
Incremental HgCH3 Exposure mg/kg BW-day
RfD (mg HgCH3/kg bw-day)
Ambient Recreational Fisher HQ
Incremental Recreational Fisher HQ
0.03 0.0001 0.0001 70 1.17E-04 9.10E-07 1.00E-04 1.2 0.0
*The ambient condition is assumed to result from the following background air concentrations and deposition velocities:
Hg Species
Modeled Increment to
Mean Air Conc. μg/m3
Percent of each Mercury species
(%)Dep Velocity
(cm/sec)
Calculated Deposition Rate (flux) μg/m2-yr
Fishable WaterbodyHg(II) 2.00E-05 1.2% 1.10 6.9Hg(0) 1.65E-03 97.6% 0.01 5.2Hg-p 2.00E-05 1.2% 0.05 0.3Total 1.69E-03 100.0% 12.5
Rest-of-Watershed (excluding waterbody)Hg(II) 2.00E-05 1.2% 1.10 6.9Hg(0) 1.65E-03 97.6% 0.01 5.2Hg-p 2.00E-05 1.2% 0.05 0.3Total 1.69E-03 100.0% 12.5
Mankato Energy Center
Mercury Loading SummaryWater Quality Standard
Comparison
Subsistence Fisher Hazard Quotient
Recreational Fisher Hazard Quotient
1
Hanafy, Tarik (MPCA)
From: Kathryn S. Anderson <[email protected]>Sent: Tuesday, May 17, 2016 10:43 AMTo: Hanafy, Tarik (MPCA); Heidi WhiddenSubject: FW: Message from "R5-18-34"
Hi Tarik‐ Please find below the determinations from EPA Region 5 on the ESA and NHPA consultations. Jennifer Darrow from Region 5 determined below that no further action is needed on either assessment. Please let me know if you need anything further from us. Take care‐ Kathryn Anderson Principal / Air Quality Scientist [email protected] | D 651.294.4593 | C 651.324.8053 1802 Wooddale Drive | Woodbury, MN 55125 ‐‐‐‐‐Original Message‐‐‐‐‐ From: Darrow, Jennifer [mailto:[email protected]] Sent: Tuesday, May 17, 2016 10:27 AM To: Kathryn S. Anderson Subject: RE: Message from "R5‐18‐34" ESA : For this permit action, a response from a threatened or endangered species to an environmental stressor is unlikely. Therefore, no further consultation is necessary under Section 7 of the Endangered Species Act. NHPA: Section 106 of the National Historic Preservation Act allows the Federal Agency initiating the action to determine if an undertaking is likely to affect historic properties. If the undertaking is not the type of activity likely to affect historic properties, then the responsible Federal agency has no further obligation under Section 106. For this permit action, US EPA has determined that the undertaking is not likely to affect historic properties and no further action is required under Section 106 of the NHPA. If there are any questions regarding these determinations, please let me know. Jennifer Darrow ‐‐‐‐‐Original Message‐‐‐‐‐ From: Kathryn S. Anderson [mailto:[email protected]] Sent: Monday, May 16, 2016 10:32 AM To: Darrow, Jennifer <[email protected]> Subject: RE: Message from "R5‐18‐34" Hi Jennifer‐
2
I just wanted to check in on the streamlined bat consultation for Mankato Energy Center. I believe you indicated that was a 30 day review from your colleague. I apologize if I have that timing incorrect. I was also checking on the National Historical Preservation Act review. Thank you for all of your help! Take care‐ Kathryn Anderson Principal / Air Quality Scientist [email protected] | D 651.294.4593 | C 651.324.8053 1802 Wooddale Drive | Woodbury, MN 55125 ‐‐‐‐‐Original Message‐‐‐‐‐ From: Darrow, Jennifer [mailto:[email protected]] Sent: Thursday, April 14, 2016 1:05 PM To: Horton, Andrew Cc: Kathryn S. Anderson Subject: FW: Message from "R5‐18‐34" Andrew ‐ Please see the attached streamlined bat consultation form for a proposed project in Mankato, Minnesota. If you have any questions or concerns please let me know. Jennifer Darrow Air Permits Section Air and Radiation Division US EPA, Region 5 ‐‐‐‐‐Original Message‐‐‐‐‐ From: R5‐18‐[email protected] [mailto:R5‐18‐[email protected]] Sent: Thursday, April 14, 2016 12:40 PM To: Darrow, Jennifer <[email protected]> Subject: Message from "R5‐18‐34" This E‐mail was sent from "R5‐18‐34" (Aficio MP 6001). Scan Date: 04.14.2016 13:40:20 (‐0400) Queries to: R5‐18‐[email protected]
November 2015 3-1 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.0 Best Available Control Technology Determination
The Expansion Project is subject to PSD review for emissions of NOx, CO, PM/PM10/PM2.5, VOC and GHG. These regulations require MEC II to complete a case-by-case BACT determination for each piece of equipment associated with the Expansion Project that has the potential to emit air pollutants subject to PSD. This section documents the BACT determination for each piece of equipment associated with the Expansion Project that has the potential to emit NOx, CO, PM/PM10/PM2.5, VOC and GHG. 3.1 BACT DEFINITION BACT is defined in 40 CFR 52.21(j) BACT as follows:
“an emission limitation (including a visible emission standard) based on the maximum degree of reduction of each air pollutant subject to regulation under the Clean Air Act which would be emitted from any proposed major stationary source or major modification which the Administrator, on a case-by-case basis, taking into account energy, environmental and economic impacts, and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant…”
BACT has been determined using Environmental Protection Agency’s (EPA’s) top-down approach. Following the top-down approach, progressively less stringent control technologies are analyzed until a level of control considered BACT is reached on the basis of environmental, energy, and economic impacts. The steps involved, include:
Step 1 - Identify applicable options; Step 2 - Eliminate technically infeasible options; Step 3 - Rank remaining alternatives by control effectiveness; Step 4 - Evaluate most effective controls; and Step 5 - Select BACT
In determining BACT for the emission units included this project, information from the following sources were evaluated:
On-line EPA RACT/BACT/LAER Clearinghouse (RBLC) System and other state BACT control technology databases; EPA/State/Local Air Quality Permits and Applications; Control Technology Vendors; AP-42-Section 3.1 Stationary Gas Turbines for Electricity Generation; and Alternative Control Techniques Document – NOx emissions form Stationary Gas Turbines EPA-453/R-93-007.
The following sections outline the results of the evaluations to determine BACT for the various emissions units associated with the Expansion Project.
November 2015 3-2 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.2 BACT DETERMINATION FOR COMBINED CYCLE COMBUSTION TURBINE/HRSG OPERATION The Expansion Project will install an additional natural gas fired combustion turbine equipped with DLN burners. The turbine will exhaust to a separate HRSG which is equipped with an 824 MMBtu/hr natural gas only duct burner. MEC II is proposing to install downstream from the HRSG an SCR system to reduce NOx emissions, and a catalytic oxidizer to reduce CO and VOC emissions. A summary of recent BACT determinations, including those for ancillary equipment, is included in Appendix B.
3.2.1 Control of Oxides of NOx Emissions A top-down evaluation of NOx control technologies revealed that DLN burners and SCR are equivalent to the best available control alternatives for natural gas-fired combined cycle units. Both of these technologies will be applied to the proposed expansion at MEC II. The proposed NOx emission performance levels are as follows:
3.0 ppmvd @ 15% O2 for natural gas combustion with DLN burner technology, low-NOx duct burners and SCR technology.
The operating temperatures within combustion turbine burner systems result in the formation of NOx emissions. Thermal NOx and fuel NOx are the two primary NOx formation mechanisms in combustion turbines. Thermal NOx is formed by the dissociation of atmospheric nitrogen and oxygen in the turbine combustor and the subsequent formation of NOx. When fuels containing nitrogen are combusted this additional source of nitrogen results in fuel NOx formation. Thermal NOx is the dominant mechanism for NOx emissions for the proposed turbine because natural gas fuel contains little or no nitrogen. The formation rate of thermal NOx increases exponentially with an increase in temperature. The following technologies were identified as potentially able to control NOx emissions from stationary combined-cycle combustion turbines:
DLN burner technology; Wet controls – water and steam injection; Rich/Quench/Lean (RQL) combustion; SCR; Selective Non-catalytic reduction (SNCR); EMx, formerly SCONOXTM catalytic oxidation/absorption; and Catalytic combustion – XONONTM
3.2.1.1 Technical Feasibility of NOx Control Alternatives The previously referenced information resources were consulted to determine the extent of applicability or each identified control alternative. Combustion Turbine DLN Burner Technology DLN burners use an advanced combustion design to suppress NOx formation and/or promote CO burnout while firing natural gas. The technology can include a lower combustion temperature with lean mixtures of air and fuel, staged premix combustion, or decreased residence time. For turbines such as those proposed for the Expansion Project, DLN burners can achieve 25 ppm NOx without the addition of any further controls. As
November 2015 3-3 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
discussed earlier, MEC II is proposing a turbine equipped with the DLN burner technology, which will be utilized while firing natural gas. Wet Combustion – Water or Steam Injection Water or steam injection into the flame area of the turbine combustor lowers the flame temperature and reduces the formation of thermal NOx. A water injection system consists of a water treatment system, pump(s), water metering valves and instrumentation, turbine-mounted injection nozzles, and piping. Water or steam injection can control NOx concentrations to 25 ppm at 15 percent O2 for natural gas combustion and 42 ppm for distillate fuel oil combustion. The water-to-fuel ratio (WFR) is the most important factor affecting performance of this control technology and varies by manufacturer and model. Because the proposed turbine will be equipped with DLN burners that generate NOx levels equivalent to what is attainable with wet control, this control technology will be eliminated from further consideration in the BACT determination for natural gas firing. The existing combustion turbine utilizes water injection to control NOx emissions when combusting distillate fuel oil. Because the proposed turbine will only fire natural gas, water injection is not required and would not provide any additional control. Rich/Quench/Lean (RQL) Combustion RQL combustors burn fuel-rich in the primary zone and fuel-lean in the secondary zone. Incomplete combustion under fuel-rich conditions in the primary zone produces an atmosphere with a high concentration of CO and hydrogen. The CO and hydrogen replace some of the oxygen normally available for NOx formation and also act as reducing agents for any NOx formed in the primary zone. Thus fuel nitrogen is released with minimal conversion to NOx. The lower peak flame temperatures due to partial combustion also reduce the formation of thermal NOx. As the combustion products leave the primary zone, they are cooled through rapid dilution and combustion is completed under fuel-lean conditions. Thermal NOx is minimized during lean combustion because of the low flame temperature. As indicated in the Alternative Control Techniques (ACT) document, RQL combustors are not commercially available for most turbine designs. Therefore because it is not technically feasible, this control alternative utilizing RQL combustion is eliminated from further consideration in this BACT determination. Selective Catalytic Reduction (SCR) SCR can be installed in HRSGs to control NOx emissions from the combustion turbines and duct burners. Anhydrous ammonia is injected into the flue gas stream, upstream of the SCR catalyst bed, where it mixes with the NOx to form molecular nitrogen and water. The reactions take place on the surface of the catalyst. The function of the catalyst is to effectively lower the activation energy required for the NOx decomposition reactions. Depending on system design and the inlet NOx level, NOx removal of up to 70-90 percent is achievable at optimum theoretical conditions. Depending on the catalyst, NOx reduction occurs within a reaction window of 400 to 1100 degrees Fahrenheit. The design of the HRSG allows for catalyst installation in the optimum temperature zone. As stated earlier MEC II is proposing to install SCR to reduce NOx emissions from the combustion turbine and duct burner system. Selective Non-Catalytic Reduction (SNCR) SNCR technology involves using ammonia or urea injection similar to SCR technology but at a higher temperature window of 1600 to 2200 degrees Fahrenheit, without the use of a
November 2015 3-4 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
catalyst. In certain applications the low end of the operating temperature window can be reduced from 1600 to 1300 degrees Fahrenheit. However, outside of the temperature limits the ammonia can be converted to NOx, resulting in an increase in NOx emissions. Because the exhaust temperatures in combustion turbines typically do not exceed 1250 degrees Fahrenheit, the operative temperature window of this control alternative is not technically feasible in this application. The exhaust temperature is typically around 1150 degrees Fahrenheit at the combustion turbine exit during steady state conditions and 200 degrees Fahrenheit at the exhaust stack, which is less than the acceptable range for SNCR application. Additionally, this technology requires a residence time of approximately 100 milliseconds. This is relatively slow for exhaust gas operating velocities. Thus there may not be adequate residence time for the NOx destruction chemical reaction. Furthermore, a review of the RBLC database for recent BACT/Lowest Achievable Emission Rate (LAER) determinations did not indicate that SNCR systems have been successfully installed for NOx control for similar combined-cycle units. For the above reasons, SNCR will no longer be considered for this analysis because it is not technically feasible for the size of the proposed unit. EMx (Formerly SCONOx ) Catalytic Oxidation/Absorption EMx is a trade name for a proprietary experimental NOx control technology being marketed by EmeraChem, LLC (formerly Goal Line Technologies). EMx guarantees NOx emission concentration of 2 ppmv based on an inlet NOx concentration of 25 ppm. The technology works by allowing the exhaust gases to react with potassium carbonate that is coated on a platinum catalyst surface. The CO is oxidized to CO2 and exhausted out the stack. The NO is oxidized to NO2 and then reacts with the potassium carbonate absorber coating on the catalyst to form potassium nitrites and nitrates at the catalyst surface until the catalyst requires regeneration. The EPA Region IX issued a letter dated March 23, 1998, indicating that emissions data from Sunlaw’s Federal Cogeneration facility in Vernon, California has “demonstrated in practice” NOx emissions at or below 2.0 ppm (3-hour average) using SCONOx . Although this letter is not a Federal LAER determination, the letter does state that future projects subject to LAER should evaluate this technology for feasibility of application. The South Coast Air Quality Management District (SCAQMD) of California also adopted (effective June 12, 1998) a “BACT” guideline for gas turbines less than 50 MW equal to 2.5 ppm at 15 percent O2 (1-hour average corrected for efficiency) based on SCONOx technology. However in Appendix B of a document titled Supporting Material for BACT Review for Electrical Generation Technologies (July 23, 2001), SCAQMD recognized that this technology has not been applied to larger turbines such as those proposed by MEC II when the agency stated the following:
“Because the technology has not been demonstrated for all sizes of turbines, the ARB staff is not considering the SCONOx technology for the purposes of establishing guideline levels”.
In preparation of the Existing Facility 2004 PSD application, ABB Alstom Power was contacted as the license holder of this technology for turbines of similar size to those proposed for the Expansion Project. According to Noel Kuch of ABB Alstom, the largest turbine that this technology has been commercially installed on is 43 MW.
November 2015 3-5 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
In addition to the scale-up concern, there is also significant energy impacts associated with this application of EMx
TM technology. There is a power output penalty, and a fuel penalty associated with the use of the catalyst. The increased backpressure in the turbine from the catalyst installation increases the heat input required and reduces the power output of the turbine. EMx technology has been used to define LAER in non-attainment areas in smaller (32 MW systems). EMx can match the performance of SCR without the ammonia slip; however, catalyst must be regenerated periodically while online using hydrogen produced by a natural gas reforming unit, making this technology not cost effective when compared to SCR. No RBLC entries for permits issued after 2006 have listed SCONOx as BACT. The proposed unit will be equipped with a combination DLN Combustor technology as well as SCR (equivalent control technology) which is capable of reducing emissions to an equivalent level; therefore EMx will be eliminated from consideration in the BACT analysis. Catalytic Combustion – XONONTM
Another new NOx control technology being developed is catalytic combustion. Catalytic combustion minimizes peak temperatures and NOx formation. The XONONTM system is being developed for commercial application by Catalytic Combustion Systems to utilize this technology. Their system includes a pre-burner, a fuel injection and mixing system, a flameless catalyst module and a flameless burnout zone. The pre-burner starts the turbine and a fuel injection system provides a uniform fuel and air mixture to the catalyst, where a portion of the fuel is combusted at reduced temperature to reduce thermal NOx emissions. The remainder of the fuel is combusted in the burnout zone with minimal NOx emissions. The technology has only been tested in small turbines (less than 10 MW) and it is not commercially available for the proposed turbine size. Although the vendor is in the process of developing the technology for larger units, the complete application is believed to be years away from development. Until such time that the technology is commercially available, catalytic combustors are not considered technically feasible. In view of this limitation, utilizing catalytic combustor control is eliminated from further consideration in this BACT determination. 3.2.1.2 Proposal for NOx BACT for the Combustion Turbine/HRSG Various control alternatives were reviewed for technical feasibility in controlling NOx emissions from the proposed combustion turbine/HRSG train. Combustion control utilizing the DLN combustor technology based on lean premix combustion controls and SCR (both of which are proposed for implementation) is equivalent to the highest ranking control technology. As stated previously, the existing technology for MEC I is a Siemens Westinghouse FD-2 combustion turbine which is no longer a standard offering from the manufacturer. It is preferable that the Expansion Project use a gas turbine technology with similar performance and exhaust gas characteristics to provide stable and reliable combined cycle operation, since the existing and new combustion turbine/HRSG trains will be operating in parallel to supply steam to the existing steam turbine. In order to provide a combustion turbine with comparable operating characteristics, MEC II has the following procurement options:
a unit from the gray market, an original manufacturer equipment (OEM) off-market unit built from spare components, or a newer unit, slightly de-rated to the match the performance of the existing unit.
November 2015 3-6 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
Each of these options has long term reliability concerns which could affect the emissions performance. A combustion gas turbine with latest available technology could offer lower emissions, supporting a BACT limit of 2 ppm NOx at the stack. However, the turbine would have to be significantly de-rated to match the existing equipment, negating the performance and efficiency benefits that would otherwise justify its purchase. In addition, operating a modern combustion turbine at a significant de-rating could cause stability and reliability issues when in parallel with the existing combustion turbine/HRSG train. Calpine believes that using a combustion turbine technology similar to the existing equipment for the new expansion is an economically viable option that will provide reliable operation over the life of the plant. In conclusion, BACT for the proposed natural gas-fired combustion turbine/HRSG is the following:
3.0 ppmvd using a 3-hour block average @ 15% O2 for natural gas combustion with DLN burner technology, low NOx duct burners, and SCR technology. This limit does not apply during startup, shutdown, malfunction, tuning, and combustion turbine shakedown
MEC II is proposing BACT limits that apply during startup and shutdown operation. These limits are described in further detail in Section 4. Definitions for combustion turbine shakedown and tuning are also provided in Section 4. 3.2.2 Control of CO Emissions MEC II proposes to install a catalytic oxidizer to decrease CO emissions. The proposed CO emission rates for the combustion turbine/HRSG emission source including the duct burner are as follows:
4 ppmvd using a 3-hour block average @ 15% O2 (while operating at normal turbine base load capacity) and 4.7 ppmvd using a 3-hour block average @ 15% O2 (while operating at load conditions less than the turbine base load capacity) for natural gas combustion with DLN burner technology, low NOx duct burners, and catalytic oxidizer.
Normal turbine base load capacity is defined as 90% or greater of capacity for the ambient conditions. Less than turbine base load capacity is defined as greater than or equal to 60% capacity to less than 90% of rated capacity for the ambient conditions. CO emissions from any combustion process are formed due to incomplete combustion of the fuel. Typically, CO emissions from combustion sources depend on the oxidation efficiency of the fuel. By controlling the combustion process carefully, CO emissions can be minimized. The DLN system used during natural gas firing achieves low NOx emissions at high efficiency and with no water consumption by optimizing the combustion to produce a lower flame temperature. CO emissions are also reduced through more thorough mixing of fuel and air in the DLN burner, which promotes more complete combustion. Additionally, the HRSG duct burners employ good combustion practices to further minimize the formation of CO emissions.
November 2015 3-7 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
A review of the RBLC database shows that two types of CO control technologies have been proposed for combined-cycle applications. The technologies available include the following:
Combustion control, and Catalytic oxidizer.
3.2.2.1 Technical Feasibility of CO Control Alternatives Combustion Control CO is formed due to incomplete combustion or inefficient combustion of the fuel. Improperly tuned turbines operating at off-design levels decrease combustion efficiency, increasing CO emissions. By controlling the combustion process carefully, the generation of CO emissions can be minimized. Improved mixing of fuel and air in the proposed DLN combustors and HRSG duct burners promotes complete combustion of the fuel, which minimizes CO emissions. Catalytic Oxidizer In addition to good combustion control the proposed HRSG will be equipped with a catalytic oxidizer. A catalytic oxidizer removes CO from the combustion turbine and duct burner exhaust gas. The technology does not require introduction of additional chemicals for the reaction to proceed. The oxidation of CO to CO2 uses the excess air present in the turbine exhaust and the activation energy required for the reaction to proceed is lowered in the presence of the catalyst. The catalytic oxidizer is considered the most stringent level of control for combustion turbines similar to the proposed MEC II turbine—capable of oxidizing 80 to 90 percent of the inlet CO concentration. 3.2.2.2 Proposal for CO BACT for the Combustion Turbine/HRSG Both of the available alternatives for controlling CO emissions will be applied to the proposed combustion turbine/HRSG train. The catalytic oxidizer represents the most effective level of control. Furthermore, it will not result in any significant impacts of unregulated air pollutants or unreasonable impacts in other media. Because MEC II is proposing to install a catalytic oxidizer to control CO emissions from the combustion turbine and duct burner, and a catalytic oxidizer results in the greatest control effectiveness, no further analysis is required under a top down BACT analysis. BACT for controlling CO emissions is proposed as follows:
4 ppmvd using a 3-hour block average @15% O2 (while operating at normal base load conditions) and 4.7 ppmvd using a 3-hour block average @ 15% O2 (while operating at load conditions less than the turbine base load capacity) for natural gas combustion with DLN technology, low NOx duct burners, and catalytic oxidizer. This limit does not apply during startup, shutdown, malfunction, tuning, and combustion turbine shakedown.
MEC II is proposing BACT limits that apply during startup and shutdown operation. These limits are described in further detail in Section 4. Similar to the discussion in the NOX BACT section above, the existing technology for MEC I is a Siemens Westinghouse FD-2 combustion turbine which is no longer a standard offering from the manufacturer. It is preferable that the Expansion Project use a gas turbine technology with similar performance and exhaust gas characteristics to provide stable and reliable combined cycle operation, since the existing and new combustion turbine/ HRSG trains will be operating in parallel to supply steam to the existing steam turbine.
November 2015 3-8 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
A combustion gas turbine with latest available technology could offer lower emissions, supporting a lower BACT limit at the stack. However, the turbine would have to be significantly de-rated to match the existing equipment, negating the performance and efficiency benefits that would otherwise justify its purchase. In addition, operating a modern combustion turbine at a significant de-rating could cause stability and reliability issues when in parallel with the existing combustion turbine/HRSG train. 3.2.3 Control of VOC Emissions Similar to CO emissions, VOC emissions are formed in any combustion process due to incomplete combustion of the fuel. The VOCs may consist of a wide spectrum of volatile and semi-volatile organic compounds. By controlling the combustion process carefully, VOC emissions can be minimized. As stated earlier, MEC II is proposing to install a catalytic oxidizer to reduce CO emissions from the turbines. These systems will also reduce VOC emissions from the turbine. The proposed VOC emission rates for the turbine/HRSG emission source are as follows:
3.4 ppmvd using a 3-hour block average @ 15% O2 for natural gas combustion with DLN burner technology, low NOx duct burners, and catalytic oxidizer.
Based on a review of the RBLC database, it was shown that two types of VOC control technologies have been proposed for combined-cycle applications. The technologies available include the following:
Combustion control, and Catalytic oxidizer.
3.2.3.1 Technical Feasibility of VOC Control Alternatives Combustion Control VOCs are formed due to incomplete combustion or inefficient combustion of the fuel. Improperly tuned turbines operating at off-design levels decrease combustion efficiency, increasing VOC emissions. By controlling the combustion process carefully, the generation VOC emissions can be minimized. Catalytic Oxidizer In addition to good combustion control the proposed turbines will be equipped with a catalytic oxidizer. A catalytic oxidizer serves to remove VOCs from the combustion turbine/duct burner exhaust gas. The technology does not require introduction of additional chemicals for the reaction to proceed. The oxidation of VOCs uses the excess air present in the turbine exhaust and the activation energy required for the reaction to proceed is lowered in the presence of the catalyst. The catalytic oxidizer is considered the most stringent level of control for turbines similar to the proposed MEC II turbine. 3.2.3.2 Proposal for VOC BACT for the Combustion Turbine/HRSG Both of the available control alternatives for controlling VOC emissions will be applied to the proposed combustion turbine/HRSG train. The catalytic oxidizer represents the most effective level of control. Furthermore, it will not result in any significant impacts of unregulated air pollutants or unreasonable impacts in other media. Because MEC II is proposing to install a catalytic oxidizer to control CO and VOC emissions from the new
November 2015 3-9 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
combustion turbine and duct burner, and an oxidation catalyst systems results in the greatest control effectiveness, no further analysis is required under a top down BACT analysis. BACT for controlling VOC emissions is proposed as:
3.4 ppmvd using a 3-hour block average @ 15% O2 for natural gas combustion with DLN burner technology, low NOx duct burners, and catalytic oxidizer. This limit does not apply during startup, shutdown, malfunction, tuning, and combustion turbine shakedown.
MEC II is proposing BACT limits that apply during startup and shutdown operation. These limits are described in further detail in Section 4. 3.2.4 Control of PM/PM10/PM2.5 Emissions PM may be formed from non-combustible constituents in fuel or combustion air, from products of incomplete combustion, or from post-combustion formation of ammonium sulfates in units with an SCR. All of the particulate emissions from the combustion turbine are assumed be in the form of PM10 and PM2.5. The proposed PM emission limits are based on vendor data and operating experience at MEC and other units in Calpine’s fleet. Good combustion control is regarded as BACT for PM/PM10/PM2.5. Add-on controls are technically and economically infeasible due to the high flow rates, very low concentrations of PM/PM10/PM2.5, and the extremely small particle diameters. Mankato Energy is not aware of any combined cycle project that has been required to install add-on PM/PM10/PM2.5 controls. The proposed PM/PM10/PM2.5 emission rate for the proposed combustion turbine/HRSG emission source is 11.9 lb/hr using a 3-hour block average for natural gas firing. Potential Combined Cycle Unit PM/PM10/PM2.5 Control Alternatives Based on a review of the RBLC database and the references listed earlier the following PM/PM10/PM2.5 control technologies are available to potentially control emissions from combined cycle units:
Fuel specifications: clean burning fuel; Good combustion practices/combustion control; and Low-sulfur fuel.
3.2.4.1 Technical Feasibility of PM/PM10/PM2.5 Control Alternatives Fuel Specifications: Clean Burn Fuel MEC II is proposing to burn pipeline-quality natural gas. Among traditional fuels natural gas is considered a clean burning fuel since it has a very low potential for generating particulates. The RBLC database indicates that pipeline-quality natural gas is the clean burning fuel of choice for similar combined cycle applications. Good Combustion Practice/Combustion Control Based upon a review of the RBLC, good combustion practice is listed as a control alternative for many similar combined cycle applications. MEC II will maintain the combustion turbines in good working order in accordance with manufacturers’ guidance and implement good combustion practices to minimize particulate emissions. As discussed earlier, the proposed
November 2015 3-10 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
combustion turbine will be equipped with DLN burners that will also contribute towards good combustion practice and further help lower particulate emissions. The Expansion Project’s combustion turbine will burn natural gas only. The sulfur content of natural gas will not exceed 0.8 grains per 100 standard cubic feet of gas. 3.2.4.2 Proposed PM/PM10/PM2.5 BACT for the Combustion Turbine/HRSG Various control alternatives were reviewed for technical feasibility in controlling PM/PM10/PM2.5 emissions from the proposed turbine/HRSG. The proposed combustion turbine will use a combination of all of the above control alternatives in order to provide the best available particulate control. In conclusion, BACT for controlling PM/PM10/PM2.5 emissions from the proposed turbine is proposed as the maintenance of the turbine/HRSGs in good working order, implementation of good combustion practices with DLN burner technology, and use of clean-burning natural gas fuel as the only fuel to meet a PM/PM10/PM2.5 emission rate of 11.9 lb/hr using a 3 hour block average. This limit will apply at all times including during startup, shutdown, or malfunction. This limit will not apply prior to combustion turbine shakedown which is further defined in Section 4. 3.2.5 Control of Greenhouse Gas (GHG) Emissions
3.2.5.1 Available GHG Control Technologies Inherently Lower-Emitting Processes/Practices/Designs
MEC II performed a search of the EPA’s RACT/BACT/LAER Clearinghouse for natural gas fired combustion turbine generators in combined cycle operation and found no entries which address BACT for GHG emissions. Calpine has permitted several units under GHG BACT regulations. Those analyses determined that BACT for GHG emissions was maintenance of the high energy efficiency that is inherent with natural gas fired combined cycle power plants. GHG BACT permit conditions were established which set an efficiency limit (also referred to as heat rate) appropriate for each particular combination of gas turbine, heat recovery steam generator, and steam turbine model. The net heat rate was based on a design base load rate, without duct firing with factors added to account for a design margin and degradation. A summary of available, lower greenhouse gas emitting processes, practices, and designs for combined cycle units is presented below. 3.2.5.1.1 Combined Cycle Energy Efficiency Processes, Practices, and Combustion Turbine Design CO2 is a product of combustion of fuels containing carbon, which is inherent in any power generation technology using fossil fuel. It is not possible to reduce the amount of CO2 generated from combustion, as CO2 is the essential product of the chemical reaction between the fuel and the oxygen in which it burns, not a byproduct caused by imperfect combustion. As such, there is no technology available that can effectively reduce CO2 generation by adjusting the conditions in which combustion takes place.
November 2015 3-11 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
The only effective means to reduce the amount of CO2 generated by a fuel-burning power plant is to generate as much electric power as possible from the combustion, thereby reducing the amount of fuel needed to meet the plant’s required power output. This result is obtained by using the most efficient generating technologies available, so that as much of the energy content of the fuel as possible goes into generating power. The most efficient way to generate electricity from a natural gas fuel source is the use of a combined cycle design. For fossil fuel technologies, efficiency ranges from approximately 30-50% (higher heating value [HHV]). A typical coal-fired Rankine cycle power plant has a base load efficiency of approximately 30% (HHV), while a modern F-Class natural gas fired combined cycle unit operating under optimal conditions has a baseload efficiency of approximately 50% (HHV). Combined cycle units operate based on a combination of two thermodynamic cycles: the Brayton and the Rankine cycles. A combustion turbine operates on the Brayton cycle and the HRSG and steam turbine operate on the Rankine cycle. The combination of the two thermodynamic cycles allows for the high efficiency associated with combined cycle plants. The technology proposed for the additional combustion turbine at MEC II has not been chosen but will be ”F” Class combustion turbine technology. In addition to the high-efficiency primary components of the turbine, there are a number of other design features employed within the combustion turbine that can improve the overall efficiency of the machine. These additional features include those summarized below. Periodic Burner Tuning Modern F-Class combustion turbines have regularly scheduled maintenance programs. These maintenance programs are important for the reliable operation of the unit, as well as to maintain optimal efficiency. As the combustion turbine is operated, the unit experiences degradation and loss in performance. The combustion turbine maintenance program helps restore the recoverable lost performance. The maintenance program schedule is determined by the number of hours of operation and/or turbine starts. There are three basic maintenance levels, commonly referred to as combustion inspections, hot gas path inspections, and major overhauls. Combustion inspections are the most frequent of the maintenance cycles. As part of this maintenance activity, the combustors are tuned to restore highly efficient low-emission operation. Reduction in Heat Loss Modern F-Class combustion turbines have high operating temperatures. The high operating temperatures are a result of the heat of compression in the compressor along with the fuel combustion in the burners. To minimize heat loss from the combustion turbine and protect the personnel and equipment around the machine, insulation blankets are applied to the combustion turbine casing. These blankets minimize the heat loss through the combustion turbine shell and help improve the overall efficiency of the machine. Instrumentation and Controls Modern F-Class combustion turbines have sophisticated instrumentation and controls to automatically control the operation of the combustion turbine. The control system is a digital type and is supplied with the combustion turbine. The distributed control system (DCS) controls all aspects of the turbine’s operation, including the fuel feed and burner operations, to achieve efficient low-NOX combustion. The control system monitors the operation of the unit and modulates the fuel flow and turbine operation to achieve optimal high-efficiency low-emission performance for full-load and part-load conditions.
November 2015 3-12 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.2.5.2 Heat Recovery Steam Generator Energy Efficiency Processes, Practices, and Designs
The HRSG takes waste heat from the combustion turbine exhaust and uses it to convert boiler feed water to steam. Duct burning involves burning additional natural gas in the ducts to the heat recovery boiler, which increases the temperature of the exhaust coming from the combustion turbines and thereby creates additional steam for the steam turbine. The modern F-Class combustion turbine-based combined cycle HRSG is generally a horizontal natural circulation drum-type heat exchanger designed with three pressure levels of steam generation, reheat, split superheater sections with interstage attemperation, post-combustion emissions control equipment, and condensate recirculation. The HRSG is designed to maximize the conversion of the combustion turbine exhaust gas waste heat to steam for all plant ambient and load conditions. Maximizing steam generation will increase the steam turbine’s power generation, which maximizes plant efficiency. Heat Exchanger Design Considerations HRSGs are heat exchangers designed to capture as much thermal energy as possible from the combustion turbine exhaust gases. This is performed at multiple pressure levels. For a drum type configuration, each pressure level incorporates an economizer section(s), evaporator section, and superheater section(s). These heat transfer sections are made up of many thin walled tubes to provide surface area to maximize the transfer of heat to the working fluid. Most of the tubes also include extended surfaces (e.g., fins). The extended surface optimizes the heat transfer, while minimizing the overall size of the HRSG. Additionally, flow guides are used to distribute the flow evenly through the HRSG to allow for efficient use of the heat transfer surfaces and post-combustion emissions control components. Low-temperature economizer sections employ recirculation systems to minimize cold-end corrosion, and stack dampers are used for cycling operation to conserve the thermal energy within the HRSG when the unit is off line. Insulation HRSGs take waste heat from the combustion turbine exhaust gas and uses that waste heat to convert boiler feed water to steam. As such, the temperatures inside the HRSG are nearly equivalent to the exhaust gas temperatures of the turbine. For F-Class combustion turbines, these temperatures can approach 1250°F. HRSGs are designed to maximize the conversion of the waste heat to steam. One aspect of the HRSG design in maximizing this waste heat conversion is the use of insulation. Insulation minimizes heat loss to the surroundings, thereby improving the overall efficiency of the HRSG. Insulation is applied to the HRSG panels that make up the shell of the unit, to the high-temperature steam and water lines, and typically to the bottom portion of the stack. Minimizing Fouling of Heat Exchange Surfaces HRSGs are made up of a number of tubes within the shell of the unit that are used to generate steam from the combustion turbine exhaust gas waste heat. To maximize this heat transfer, the tubes and their extended surfaces need to be as clean as possible. Fouling of the tube surfaces impedes the transfer of heat. Fouling occurs from the constituents within the exhaust gas stream. To minimize fouling, filtration of the inlet air to the combustion turbine is performed. Additionally, cleaning of the tubes is performed during periodic outages. By reducing the fouling, the efficiency of the unit is maintained.
November 2015 3-13 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
Minimizing Vented Steam and Repair of Steam Leaks As with all steam-generated power facilities, minimization of steam vents and repair of steam leaks is important in maintaining the plant’s efficiency. A combined cycle facility has just a few locations where steam is vented from the system, blowdown tank vents and vacuum pumps/steam jet air ejectors. These vents are necessary to improve the overall heat transfer within the HRSG and condenser by removing solids and air that potentially blankets the heat transfer surfaces lowering the equipment’s performance. Additionally, power plant operators are concerned with overall efficiency of their facilities. Therefore, steam leaks are repaired as soon as possible to maintain facility performance. Minimization of vented steam and repair of steam leaks will be performed for this project. 3.2.5.2.1 Plant-wide Energy Efficiency Processes, Practices, and Designs
There are a number of other components within the combined cycle plant that help improve overall efficiency, including:
Fuel gas preheating – The overall efficiency of the combustion turbine is increased with increased fuel inlet temperatures. For the F-Class combustion turbine based combined cycle unit, the fuel gas is generally heated with high temperature water from the HRSG. This improves the efficiency of the combustion turbine. Drain operation – Drains are required to allow for draining the equipment for maintenance (i.e., maintenance drains), and also to allow condensate to be removed from the steam piping and drains for operation (i.e., operation drains). Operation drains are generally controlled to minimize the loss of energy from the cycle. This is accomplished by closing the drains as soon as the appropriate steam conditions are achieved. Multiple combustion turbine/HRSG trains – Multiple combustion turbine/HRSG trains help with part-load operation. The multiple trains allow the unit to achieve higher overall plant part-load efficiency by shutting down trains operating at less efficient part-load conditions and ramping up the remaining train(s) to high-efficiency full-load operation. Boiler feed pump fluid drives – The boiler feed pumps are used as the means to impart high pressure on the working fluid. The pumps require considerable power. To minimize the power consumption at part-loads, the use of fluid drives or variable-frequency drives can be employed. For this project, fluid drives are being used to minimize power consumption at part-load, improving the facility’s overall efficiency.
3.2.5.2.2 Add-On Controls
In addition to power generation process technology options discussed above, it is appropriate to consider add-on technologies as possible ways to capture GHG emissions that are emitted from natural gas combustion in the proposed Expansion Project’s CTG/HRSG unit and to prevent them from entering the atmosphere. These emerging carbon capture and storage (CCS) technologies generally consist of processes that separate CO2 from combustion process flue gas, and then inject it into geologic formations such as oil and gas reservoirs, unmineable coal seams, and underground saline formations. Of the emerging CO2 capture technologies that have been identified, only amine absorption is currently commercially used for state-of-the-art CO2 separation processes. Amine absorption has been applied to processes in the petroleum refining and natural gas processing industries and for exhausts from gas-fired industrial boilers. Other potential absorption and membrane technologies are currently considered developmental.
November 2015 3-14 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
The U.S. Department of Energy’s National Energy Technology Laboratory (DOE-NETL) provides the following brief description of state-of-the-art post-combustion CO2 capture technology and related implementation challenges:
…In the future, emerging R&D will provide numerous cost-effective technologies for capturing CO2 from power plants. At present, however, state-of-the-art technologies for existing power plants are essentially limited to amine absorbents. Such amines are used extensively in the petroleum refining and natural gas processing industries… Amine solvents are effective at absorbing CO2 from power plant exhaust streams—about 90 percent removal—but the highly energy-intensive process of regenerating the solvents decreases plant electricity output…1
The DOE-NETL adds:
…Separating CO2 from flue gas streams is challenging for several reasons: CO2 is present at dilute concentrations (13-15 volume percent in coal-fired systems and 3-4 volume percent in gas-fired turbines) and at low pressure (15-25 pounds per square inch absolute [psia]), which dictates that a high volume of gas be treated. Trace impurities (particulate matter, sulfur dioxide, nitrogen oxides) in the flue gas can degrade sorbents and reduce the effectiveness of certain CO2 capture processes. Compressing captured or separated CO2 from atmospheric pressure to pipeline pressure (about 2,000 psia) represents a large auxiliary power load on the overall power plant system…2
If CO2 capture can be achieved at a power plant, it would need to be routed to a geologic formation capable of long-term storage. The long-term storage potential for a formation is a function of the volumetric capacity of a geologic formation and CO2 trapping mechanisms within the formation, including dissolution in brine, reactions with minerals to form solid carbonates, and/or adsorption in porous rock. The DOE-NETL describes the geologic formations that could potentially serve as CO2 storage sites as follows: “Geologic carbon dioxide (CO2) storage involves the injection of supercritical CO2 into deep geologic formations (injection zones) overlain by competent sealing formations and geologic traps that will prevent the CO2 from escaping. Current research and field studies are focused on developing better understanding of 11 major types of geologic storage reservoir classes, each having their own unique opportunities and challenges. Understanding these different storage classes provides insight into how the systems influence fluids flow within these systems today, and how CO2 in geologic storage would be anticipated to flow in the future. The different storage formation classes include: deltaic, coal/shale, fluvial, alluvial, strandplain, turbidite, eolian, lacustrine, clastic shelf, carbonate shallow shelf, and reef.
1 DOE-NETL, Carbon Sequestration: FAQ Information Portal, http://extsearch1.netl.doe.gov/search?q=cache:e0yvzjAh22cJ:www.netl.doe.gov/technologies/carbon_seq/FAQs/te ch-status.html+emerging+R%26D&access=p&output=xml_no_dtd&ie=UTF-8&client=default_frontend&site=default_collection&proxystylesheet=default_frontend&oe=ISO-8859-1 (last visited Aug. 8, 2011). 2 Id.
November 2015 3-15 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
Basaltic interflow zones are also being considered as potential reservoirs. These storage reservoirs contain fluids that may include natural gas, oil, or saline water; any of which may impact CO2 storage differently…”3 3.2.5.3 Step 2: Eliminate Technically Infeasible Options
In this section, Mankato Energy addresses the potential feasibility of implementing CCS technology as BACT for GHG emissions from the proposed project’s gas turbine/HRSG train. Each component of CCS technology (i.e., capture and compression, transport, and storage) is discussed separately.
3.2.5.3.1 CO2 Capture and Compression
Though amine absorption technology for CO2 capture has been applied to processes in the petroleum refining and natural gas processing industries and to exhausts from gas-fired industrial boilers, it is not yet commercially available for power plant gas turbine exhausts, which have considerably larger flow volumes and considerably lower CO2 concentrations. The Obama Administration’s Interagency Task Force on Carbon Capture and Storage confirms this in its recently completed report on the current status of development of CCS systems: “Current technologies could be used to capture CO2 from new and existing fossil energy power plants; however, they are not ready for widespread implementation primarily because they have not been demonstrated at the scale necessary to establish confidence for power plant application. Since the CO2 capture capacities used in current industrial processes are generally much smaller than the capacity required for the purposes of GHG emissions mitigation at a typical power plant, there is considerable uncertainty associated with capacities at volumes necessary for commercial deployment.”4 3.2.5.3.2 CO2 Transport
Even if it is assumed that CO2 capture and compression could feasibly be achieved for the proposed project, the high-volume CO2 stream generated would need to be transported to a facility capable of storing it. There are no potential geologic storage sites in in Minnesota or the Midwest to which CO2 could be transported if a pipeline was constructed. The current CO2 pipelines are shown in Figure 3-1 on the map found at the end of Section 3.5 Therefore, in order to access any potentially large-scale storage capacity site, assuming that it is eventually demonstrated to indefinitely store a substantial portion of the large volume of CO2 generated by the proposed project, a very long and sizable pipeline would need to be constructed to transport the large volume of high-pressure CO2 from the plant to the storage facility, thereby rendering implementation of a CO2 transport system infeasible.
3.2.5.3.3 CO2 Storage
Even if it is assumed that CO2 capture and compression could feasibly be achieved for the proposed project and that the CO2 could be transported economically, the feasibility of CCS technology would still depend on the availability of a suitable sequestration site. The 3 DOE-NETL, Carbon Sequestration: Geologic Storage Focus Area,http://www.netl.doe.gov/technologies/carbon_seq/corerd/storage.html (last visited Aug.8, 2011) 4 Report of the Interagency Task Force on Carbon Capture and Storage at 50 (Aug. 2010). 5 Denbury Resources, 2012, “CO2 Transportation,” Investor Slides, April, 2012, 25p.
November 2015 3-16 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
suitability of potential storage sites is a function of volumetric capacity of their geologic formations, CO2 trapping mechanisms within formations (including dissolution in brine, reactions with minerals to form solid carbonates, and/or adsorption in porous rock), and potential environmental impacts resulting from injection of CO2 into the formations. Potential environmental impacts resulting from CO2 injection that still require assessment before CCS technology can be considered feasible include:
uncertainty concerning the significance of dissolution of CO2 into brine, risks of brine displacement resulting from large-scale CO2 injection, including a pressure leakage risk for brine into underground drinking water sources and/or surface water, risks to fresh water as a result of leakage of CO2, including the possibility for damage to the biosphere, underground drinking water sources, and/or surface water,6 and potential effects on wildlife.
Potentially suitable storage sites, including EOR sites and saline formations, exist in Iowa and Illinois. Figure 3-2 shows possible storage sites7. However, there are no pipelines that connect to these formations. Based on the reasons provided above, Calpine believes that CCS technology should be eliminated from further consideration as a potential feasible control technology for purposes of this BACT analysis. However, to answer possible questions that the public or the EPA may have concerning the relative costs of implementing hypothetical CCS systems, Calpine has estimated such costs. Those cost estimates are presented on Table 3-1 at the end of Section 3. 3.2.5.4 Step 3: Rank Remaining Control Technologies
As documented above, implementation of CCS technology is currently infeasible, leaving energy efficiency measures as the only technically feasible emission control options. As all of the energy efficiency related processes, practices, and designs discussed in Section 3.2.5.1 of this application are being proposed for this project, a ranking of the control technologies is not necessary for this application. 3.2.5.5 Step 4: Evaluate Most Effective Controls and Document Results
As all of the energy efficiency related processes, practices, and designs discussed in Section 3.2.5.1 of this application are being proposed for this project, an examination of the energy, environmental, and economic impacts of the efficiency designs is not necessary for this application. Because the CCS add-on control option discussed in Section 3.2.5.2 was determined to be technically infeasible, an examination of the energy, environmental, and economic impacts of that option is not necessary for this application. However, MEC II is including estimated costs for implementation of CCS.
6 Id. 7 Exhibit 36, Current State and Future Direction of Coal-fired Power in the Eastern Interconnection, Final Study
Report June 2013
November 2015 3-17 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.2.5.6 Step 5: Select BACT
MEC II proposes as BACT for this project, the following energy efficiency processes, practices, and designs for the proposed combined cycle combustion turbine:
Use of Combined Cycle Power Generation Technology Combustion Turbine Energy Efficiency Processes, Practices, and Designs
o Efficient turbine design o Turbine inlet air cooling o Periodic turbine burner tuning o Reduction in heat loss o Instrumentation and controls
HRSG Energy Efficiency Processes, Practices, and Designs o Efficient heat exchanger design o Insulation of HRSG o Minimizing fouling of heat exchange surfaces o Minimizing vented steam and repair of steam leaks
Plant-wide Energy Efficiency Processes, Practices, and Designs o Fuel gas preheating o Drain operation o Multiple combustion turbine/HRSG trains o Boiler feed pump fluid drive design
Calpine calculated the design base load net heat rate without duct firing for the 1 x 1 Expansion Project combined cycle plant using the new CTG/HRSG train and the existing steam turbine. A compliance margin was applied based upon reasonable degradation factors that may foreseeably reduce efficiency under real world conditions. The design base load net heat rate for the proposed 1 X 1 combined cycle unit without duct firing is 7,075 Btu/kW-hr (HHV) without the application of degradation factors. Note that this rate reflects the facility’s “net” power production, meaning the denominator is the amount of power provided to the grid; it does not reflect the total amount of energy produced by the plant, which also includes auxiliary load consumed by operation of the plant. To determine an appropriate heat rate, the following compliance margins are added to the base heat rate value:
A 3.3% design margin reflecting the possibility that the constructed facility will not be able to achieve the design heat rate. A 6% performance margin reflecting efficiency losses due to equipment degradation prior to maintenance overhauls. A 3% degradation margin reflecting the variability in operation of auxiliary plant equipment due to use over time.
These factors are consistent with the compliance margin factors used in previous Calpine GHG BACT analyses. As a result of these adjustments, MEC II is proposing a BACT net heat rate for the Project of 7,979 Btu/kWh (HHV), corrected to the following conditions of:
Ambient Dry Bulb Temperature: 6ºF Ambient Relative Humidity: 59% Barometric Pressure: 14.28 psia Fuel Lower Heating Value: 21,500 Btu/lb Fuel HHV/LHV Ratio: 1.109
November 2015 3-18 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
A GHG BACT limit of 1,000 lb/MW-hr on a gross power production basis is proposed based on 1 X 1 combined cycle operation. Calpine is proposing a heat rate demonstration test 180 days after first fire and again prior to obtaining a new permit to verify compliance with the heat rate limit. Although derived from a slightly less efficient operating mode, this limit will account for the range of possible MEC operating scenarios. The calculation of the net heat rate is provided on Table 3-2 at the end of this section. 3.3 BACT DETERMINATION FOR THE DIESEL ENGINE-DRIVEN EMERGENCY EQUIPMENT The proposed diesel fired emergency generator will be used for emergency situations, if any. However, the diesel engine-driven equipment will be operated for a minimal period on a bi-weekly basis for testing. 3.3.1 Control of NOx Emissions from Emergency-Use Diesel Engines As a result of the intended use of the proposed diesel fired emergency generator and subsequent limited operation, allowable NOx emissions from these units are minimal with an emission rate of 0.66 tons/yr. Based on a review of similar emission sources associated with recent power plant projects, these types of emission sources typically do not have add-on controls but should be operated according to the manufacturer’s specifications. Therefore, for the proposed diesel fired emergency equipment, BACT for controlling NOx emissions is proposed as maintenance in good working order, operation according to the manufacturer’s specifications and limiting non-emergency operation of the diesel engine to 100 hours per year. 3.3.2 Control of CO Emissions from Emergency-Use Diesel Engines Again, as a result of the intended use of the proposed diesel fired emergency generator and subsequent limited operation, allowable CO emissions from these units are minimal with an emission rate of 0.66 tons/yr. Based on a review of similar emission sources associated with recent power plant projects, these types of emission sources typically do not have add-on controls but should be operated according to the manufacturer’s specifications. Therefore, for the proposed diesel fired emergency equipment, BACT for controlling CO emissions is proposed as maintenance in good working order, operation according to the manufacturer’s specifications, and limiting non-emergency operation of the diesel engine to 100 hours per year. 3.3.3 Control of VOC Emissions from the Emergency-Use Diesel Engines The allowable VOC emissions from the proposed diesel fired emergency generator are minimal with a limited emission rate of 0.04 tons/yr. MEC II completed a review of similar emission sources associated with recent power plant projects. It was determined that these types of emission sources typically do not have add-on controls but should be operated according to the manufacturer’s specifications. Therefore, for the proposed diesel fired emergency generator, BACT for controlling VOC emissions is proposed as maintenance in good working order, operation according to the manufacturer’s specifications, and limiting non-emergency operation of the diesel engine to 100 hours per year.
November 2015 3-19 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.3.4 Control of PM/PM10/PM2.5 Emissions from the Emergency-Use Diesel Engines The allowable PM/PM10/PM2.5 emissions from the proposed diesel fired emergency generator are minimal with a limited emission rate of 0.01 tons/yr. Based on a review of similar emission sources associated with recent power plant projects, these types of emission sources typically do not have add-on controls but should be operated according to the manufacturer’s specifications. Therefore, for the proposed diesel fired emergency generator, BACT for controlling particulate matter emissions is proposed as maintenance in good working order, operation according to the manufacturer’s specifications, and limiting non-emergency operation of the diesel engine to 100 hours per year. 3.3.5 Control of GHG Emissions from the Emergency-Use Diesel Engines Similar to the pollutants above, as a result of the intended use of the proposed diesel fired emergency generator and subsequent limited operation, allowable CO2e emissions from these units are minimal with an emission rate of 208 tons/yr. Generators of this size typically do not have add-on controls but should be operated according to the manufacturer’s specifications. Therefore, for the proposed diesel fired emergency equipment, BACT for controlling greenhouse gas emissions is proposed as maintenance in good working order, operation according to the manufacturer’s specifications, and limiting non-emergency operation of the diesel engine to 100 hours per year. 3.4 BACT DETERMINATION FOR THE COOLING TOWER The existing cooling tower is used for temperature management of process water for the installation. The 4 new cells will accommodate the additional cooling requirements of the expanded combined cycle unit. Projected annual emissions are minimal with an estimated emission rate of 6.58 tons per year for total particulate, 0.64 tons per year for PM10, and 0.01 tons per year for PM2.5 for the 4 additional cells. Based on a review of similar projects, cooling towers associated with combined cycle power plants are equipped with high efficiency mist eliminators. The existing cooling tower and proposed additional cooling tower cells will incorporate a mist eliminator (0.0005% tower drift rate). In conclusion, BACT for controlling PM/PM10/PM2.5 emissions for the proposed additional cooling tower cells is the use of a mist eliminator and maintenance of the fans and equipment in good working order and operation according to the manufacturer’s specifications with an estimated PM/PM10/PM2.5 emissions rates of 6.58 tons per year, 0.64 tons per year, and 0.01 tons per year, respectively. 3.5 BACT DETERMINATION FOR THE DIESEL FUEL STORAGE TANKS The proposed diesel fired emergency generator will be equipped with its own diesel storage tank. The tank will have a capacity of less than 6,000 gallons and will be used to store diesel fuel. Due to the low volatility of this material, potential VOC emissions are anticipated to be negligible. Based on a search of the RBLC, no control is proposed for this source. BACT is proposed as using a fixed roof tank and maintaining the tank in good working condition. 3.6 BACT DETERMINATION FOR NATURAL GAS PIPING FOR GHG EMISSIONS Natural gas is delivered to the site via pipeline. Gas will be metered and piped to the new combustion turbine and duct burner. Project GHG fugitive emissions from the natural gas
November 2015 3-20 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
piping components associated with the new CT/HRSG train will include emissions of methane (CH4) and carbon dioxide (CO2). 3.6.1 Step 1: Identify All Available Control Technologies The following technologies were identified as potential control options for piping fugitives:
Implementation of leak detection and repair (LDAR) program using a hand held analyzer; Implementation of alternative monitoring using a remote sensing technology such as infrared cameras; and Implementation of audio/visual/olfactory (AVO) leak detection program.
The use of instrument LDAR and remote sensing technologies are technically feasible. Since pipeline-quality natural gas is odorized with a small amount of mercaptan, an AVO leak detection program for natural gas piping components is technically feasible. 3.6.2 Step 2: Eliminate Technically Infeasible Options There are no technically infeasible control options. 3.6.3 Step 3: Rank Remaining Control Technologies The use of a LDAR program with a portable gas analyzer meeting the requirements of 40 CFR 60, Appendix A, Method 21, can be effective for identifying leaking methane. The U.S. EPA has allowed the use of an optical gas imaging instrument as an alternative work practice for a Method 21 portable analyzer for monitoring equipment for leaks in 40 CFR 60.18(g). For components containing inorganic or odorous compounds, periodic AVO walk-through inspections provide predicted control efficiencies of 97% control for valves, flanges, relief valves, and sampling connections, and 95% for compressors. 3.6.4 Step 4: Evaluate Most Effective Controls and Document Results The frequency of inspection and the low odor threshold of mercaptans in natural gas make AVO inspections an effective means of detecting leaking components in natural gas service. The predicted emission control efficiency is comparable to the LDAR programs using Method 21 portable analyzers. 3.6.5 Step 5: Select BACT Any leak detection program implemented would be solely due to potential greenhouse gas emissions. Since the uncontrolled CO2e emissions from the natural gas piping represent approximately 0.01% of the total site-wide CO2e emissions, any emission control techniques applied to the piping fugitives will provide minimal CO2e emission reductions. Quarterly AVO inspections are proposed as BACT. 3.7 BACT DETERMINATION FOR ELECTRICAL EQUIPMENT INSULTATED WITH SF6 The generator circuit breakers associated with the proposed unit will be electrically insulated using SF6 gas. SF6 is a colorless, odorless, non-flammable, and non-toxic synthetic gas. It is a fluorinated compound that has an extremely stable molecular structure. The unique chemical properties of SF6 make it an efficient electrical insulator. The gas is used for
November 2015 3-21 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
electrical insulation, arc quenching, and current interruption in high-voltage electrical equipment. SF6 is only used in sealed and safe systems which under normal circumstances do not leak gas. As part the Expansion Project, two new SF6 breakers will be installed. The new combustion turbine generator circuit breaker will contain approximately 35 lbs of SF6 gas. An additional breaker containing approximately 72 lbs of SF6 will be installed between the combustion turbine generator step-up transformer and the 115kV transmission line. Both proposed circuit breakers will be equipped with low pressure alarms and low pressure lockouts. The alarms will alert operating personnel of any leakage in the system and the lockout prevents any operation of the breaker due to lack of “quenching and cooling” SF6 gas. 3.7.1 Step 1: Identify All Available Control Technologies Step 1 of the Top-Down BACT analysis is to identify all feasible control technologies. One technology is the use of state-of-the-art SF6 technology with leak detection to limit fugitive emissions. In comparison to older SF6 circuit breakers, modern breakers are designed as a totally enclosed-pressure system with far lower potential for SF6 emissions. In addition, the effectiveness of leak-tight closed systems can be enhanced by equipping them with a density alarm that provides a warning when 10% of the SF6 (by weight) has escaped. The use of an alarm identifies potential leak problems before the bulk of the SF6 has escaped, so that it can be addressed proactively in order to prevent further release of the gas. One alternative considered in this analysis is to substitute another, non-greenhouse-gas substance for SF6 as the dielectric material in the breakers. Potential alternatives to SF6 were addressed in the National Institute of Standards and Technology (NTIS) Technical Note 1425, Gases for Electrical Insulation and Arc Interruption: Possible Present and Future Alternatives to Pure SF6.8
3.7.2 Step 2: Eliminate Technically Infeasible Options According to the report NTIS Technical Note 1425, SF6 is a superior dielectric gas for nearly all high voltage applications.9 It is easy to use, exhibits exceptional insulation and arc-interruption properties, and has proven its performance by many years of use and investigation. It is clearly superior in performance to the air and oil insulated equipment used prior to the development of SF6 -insulated equipment. The report concluded that although “…various gas mixtures show considerable promise for use in new equipment, particularly if the equipment is designed specifically for use with a gas mixture… it is clear that a significant amount of research must be performed for any new gas or gas mixture to be used in electrical equipment.” Therefore, there are currently no technically feasible options besides use of SF6. 3.7.3 Step 3: Rank Remaining Control Technologies The use of state-of-the-art SF6 technology with leak detection to limit fugitive emissions is the highest ranked control technology that is technically feasible for this application.
8 Christophorous, L.G., J.K. Olthoff, and D.S. Green, Gases for Electrical Insulation and Arc Interruption: Possible Present and Future Alternatives to Pure SF6, NIST Technical Note 1425, Nov.1997. 9 Id. at 28 – 29.
November 2015 3-22 \\woodbury-dc1\woodbury\Technical\1294 Calpine\35 - MEC Expansion\Phase 2a - Prepare Air Permit Amendment\Air Permit Application\Text\MEC II Air Emissions Permit Major Amendment App Text 11 02 15.docx
3.7.4 Step 4: Evaluate Most Effective Controls and Document Results Energy, environmental, or economic impacts were not addressed in this analysis because the use of alternative, non-greenhouse-gas substance for SF6 as the dielectric material in the breakers is not technically feasible. 3.7.5 Step 5: Select BACT Based on this top-down analysis, MEC II concludes that using state-of-the-art enclosed-pressure SF6 circuit breakers with leak detection would be the BACT control technology option. The circuit breakers will be designed to meet the latest of the American National Standards Institute (ANSI) C37.013 standard for high voltage circuit breakers.10 The proposed circuit breakers at the generator output and the step-up transformer output will have low pressure alarms and low pressure lockouts. These alarms will function as early leak detectors that will bring potential fugitive SF6 emissions problems to light before a substantial portion of the SF6 escapes. The lockouts prevent any operation of the breakers due to lack of “quenching and cooling” SF6 gas. The Expansion Project will also complete monthly inspections of the pressure of the breakers. 3.8 BACT DETERMINATION FOR THE CONDENSATE TANK The Expansion Project is proposing to install a small condensate tank. The condensate tank will emit a small amount of VOC. The use of the condensate tank will be minimal and on a batch cycle. The tank will have a capacity of less than 50 gallons. Due to the low volatility of this material; potential VOC emissions are anticipated to be negligible. Based on a search of the RBLC, no control is proposed for this source. BACT is proposed as maintaining the tank in good working condition. 3.9 BACT SUMMARY The emission limitations that are proposed to represent BACT for the emission units associated with the Facility are summarized in Table 3-1.
10 ANSI Standard C37.013, Standard for AC High-Voltage Generator Circuit Breakers on a Symmetrical Current
Nov
embe
r 20
15
3-23
\\w
oodb
ury-
dc1\
woo
dbur
y\Te
chni
cal\
1294
Cal
pine
\35
- M
EC E
xpan
sion
\Pha
se 2
a -
Prep
are
Air
Per
mit A
men
dmen
t\Air
Per
mit A
pplic
atio
n\Te
xt\M
EC I
I Air
Em
issi
ons
Perm
it M
ajor
Am
endm
ent
App
Tex
t 11
02
15.d
ocx
Tab
le 3
-1 B
AC
T S
um
mar
y
BA
CT
Lim
itat
ion
P
rop
ose
d
Equ
ipm
ent
NO
x C
O
PM
/P
M1
0/
PM
2.5
V
OC
G
HG
Co
mb
ined
C
ycle
C
omb
ust
ion
S
yste
m –
N
atu
ral G
as
3.0
ppm
vd u
sing
a 3
-ho
ur b
lock
ave
rage
@
15%
O2
2
4.0
ppm
vd u
sing
a 3
-ho
ur b
lock
ave
rage
@
15%
O2
(whi
le
oper
atin
g at
nor
mal
tu
rbin
e ba
se lo
ad
cond
ition
s),
4.7
ppm
vd u
sing
a 3
-hou
r bl
ock
aver
age
@15
%
O2
(whi
le o
pera
ting
at
load
con
ditio
ns le
ss
than
the
tur
bine
bas
e lo
ad c
apac
ity)1,
2
11.9
lb/h
r us
ing
a 3-
hour
blo
ck a
vera
ge.
This
lim
it ap
plie
s at
al
l tim
es in
clud
ing
star
tup,
shu
tdow
n,
tuni
ng o
r m
alfu
nctio
n.
3.4
ppm
vd u
sing
a 3
-ho
ur b
lock
ave
rage
@
15%
O2
2
1,00
0 lb
CO
2e/M
Whr
(g
ross
) And
Exp
ansi
on
Proj
ect
net
heat
rat
e of
7,9
79 B
tu/k
Wh
(HH
V)
with
out
duct
fir
ing
Pro
po
sed
D
iese
l Fir
ed
Emer
gen
cy
Gen
erat
or
Lim
iting
hou
rs o
f no
n-em
erge
ncy
oper
atio
n to
less
tha
n 10
0 hr
/yr
Lim
iting
hou
rs o
f no
n-em
erge
ncy
oper
atio
n to
less
tha
n 10
0 hr
/yr
Lim
iting
hou
rs o
f no
n-em
erge
ncy
oper
atio
n to
less
tha
n 10
0 hr
/yr
Lim
iting
hou
rs o
f no
n-em
erge
ncy
oper
atio
n to
less
tha
n 10
0 hr
/yr
Ener
gy E
ffic
ienc
y M
easu
res
Die
sel
Sto
rag
e Ta
nk
NA
NA
NA
Fixe
d Roo
f Ta
nk
NA
Coo
ling
To
wer
N
A
NA
Mis
t el
imin
ator
with
0.
0005
% d
rift
N
A
NA
Nat
ura
l Gas
P
ipin
g
NA
NA
NA
N/A
Q
uart
erly
AVO
In
spec
tions
El
ectr
ical
Eq
uip
men
t In
sula
ted
w
ith
SF 6
NA
NA
NA
NA
Sta
te-o
f-th
e-ar
t en
clos
ed-p
ress
ure
SF 6
ci
rcui
t br
eake
rs w
ith
leak
det
ectio
n an
d m
onth
ly p
ress
ure
insp
ectio
ns.
Con
den
sate
Ta
nk
NA
NA
NA
Mai
ntai
ning
the
tan
k in
goo
d w
orki
ng
cond
ition
NA
1 Fo
r th
e CO
lim
it ap
plic
abili
ty,
full
load
is a
ll op
erat
ion
at 9
0% o
r gr
eate
r of
rat
ed c
apac
ity f
or t
he a
mbi
ent
cond
ition
s an
d le
ss t
han
full
load
is a
ll op
erat
ion
grea
ter
than
or
equ
al t
o 60
% lo
ad a
nd le
ss t
han
90%
of th
e ra
ted
capa
city
for
the
am
bien
t co
nditi
ons.
2
The
limit
does
not
app
ly d
urin
g st
artu
p, s
hutd
own,
mal
func
tion,
tun
ing,
and
com
bust
ion
turb
ine
shak
edow
n.
Nov
embe
r 20
15
3-24
\\w
oodb
ury-
dc1\
woo
dbur
y\Te
chni
cal\
1294
Cal
pine
\35
- M
EC E
xpan
sion
\Pha
se 2
a -
Prep
are
Air
Per
mit A
men
dmen
t\Air
Per
mit A
pplic
atio
n\Te
xt\M
EC I
I Air
Em
issi
ons
Perm
it M
ajor
Am
endm
ent
App
Tex
t 11
02
15.d
ocx
Tab
le 3
-2 N
et H
eat
Rat
e C
alcu
lati
on
O
pera
ting
Mod
e N
et P
lant
Out
put
- K
W
Net
Hea
t R
ate
(HH
V)
Hea
t In
put
(HH
V)
CTG
200
,826
2,
056
Duc
t Bu
rner
824
STG
96,
392
Tota
l Aux
iliar
y Lo
ad
6,
648
Tota
l Net
Out
put
- Ba
se O
pera
tions
with
Duc
t Bu
rnin
g29
0,57
0
7,0
75
Btu
/kW
h
2,
056
MM
Btu/
hr
Wei
ghte
d A
vera
ge H
eat
Rat
e7
07
5D
esig
n M
argi
n3.
3%Pe
rfor
man
ce M
argi
n6.
0%D
egra
datio
n M
argi
n3.
0%
Cal
cula
ted
Wei
ghte
d A
vera
ge H
eat
Rat
e w
ith
Com
plia
nce
Mar
gins
79
79
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX07
67LO
NC.HILL
POWER
STAT
ION
LONC.HILL,L.P.
1149
11AN
DPSDT
X138
010
/6/201
5Co
mbine
dCycle
Turbines
(>25
MW)
naturalgas
195MW
SelectiveCatalytic
Redu
ction
2PP
MRO
LLING24
HRAV
ERAG
EBA
CTPSD
Twopo
wer
configurationop
tions
authorize
dSiem
ens
–24
0MW
+25
0millionBritish
thermalun
itspe
rho
ur(M
MBtu/hr)d
uctb
urne
rGE–19
5MW
+67
0MMBtu/hr
ductbu
rne r
*TX07
14
SRBE
RTRO
NELEC
TRIC
GENER
ATINGSTAT
IONNRG
TEXA
SPO
WER
LLC
1027
31PSDT
X129
412
/19/20
14(2)com
bine
dcycle
turbines
naturalgas
240MW
SelectiveCatalytic
Redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVER
AGE
BACT
PSD
0
(1)T
woSiem
ensM
odelF5
(SF5)C
TGse
achratedat
nominalcapabilityof
225megaw
atts(M
W).Each
CTGwillhave
adu
ctfired
HRSG
with
amaxim
umhe
atinpu
tof6
88millionBritish
thermalun
itspe
rho
ur(M
MBtu/hr).
(2)T
woGe
neralElectric
Mod
el7FA(GE7FA
)CTG
seach
ratedat
nominalcapabilityof
215MW.Each
CTGwillhave
adu
ctfired
HRSG
with
amaxim
umhe
atinpu
tof5
23MMBtu/hr.
(3)T
woMitsub
ishiH
eavy
Indu
stry
GFram
e(M
HI50
1G)C
TGse
achratedat
ano
minalelectric
output
of26
3MW.Each
CTGwillhave
adu
ctfired
HRSG
with
amaxim
umhe
atinpu
tof6
86MMBtu/hr.
*CO00
76PU
EBLO
AIRP
ORT
GENER
ATINGSTAT
IONBLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
12/11/20
14Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
each
SCRanddrylowNOxbu
rners
8LB/HR
4HR
ROLLING
AVE/
STAR
TUPAN
DSH
UTD
OWN
BACT
PSD
0
GE,LM60
00PF,naturalgasfire
d,combine
dcycle
combu
stionturbine
5PP
M,vdat
15%O2.
Unitsare
smallerthanCalpine'sp
ropo
sedun
it.Therefore,
limits
willno
tbeconsidered
anyfurthe
r .
*TX07
10VICT
ORIAPO
WER
STAT
ION
VICT
ORIAWLE
L.P.
1082
58PSDT
X134
812
/1/201
4combine
dcycleturbinenaturalgas
197MW
SelectiveCatalytic
Redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVER
AGE
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*WV00
25
MOUNDS
VILLE
COMBINED
CYCLE
POWER
PLAN
TMOUNDS
VILLEPO
WER
,LLC
R1400
3011
/21/20
14Co
mbine
dCycle
Turbine/Du
ctBu
rne r
NaturalGa
s21
59mmBtu/Hr
SCR&DryLow
NOxBu
rners
15.2
LB/HR
BACT
PSD
2PP
M@
15%O2
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*TX07
12TR
INIDAD
GENER
ATINGFA
CILITY
SOUTH
ERNPO
WER
COMPA
NY
1113
93PSDT
X136
811
/20/20
14combine
dcycleturbinenaturalgas
497MW
SelectiveCatalytic
Redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVER
AGE
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*TX06
89
CEDA
RBA
YOU
ELEC
TRIC
GENER
ATION
STAT
ION
NRG
TEXA
SPO
WE R
1058
10,
PSDT
X130
88/29
/201
4Co
mbine
dcyclenatural
gasturbine
sNaturalGa
s22
5MW
DLN,SCR
2PP
M24
HRRO
LLINGAV
G.BA
CTPSD
0Siem
ensM
odelF5,G
E7Fa,and
Mitsub
ishiH
eavy
Indu
stry
GFram
e
*TX06
78
FREEPO
RTLN
GPR
ETRE
ATMEN
TFA
CILIT Y
FREEPO
RTLN
GDE
VELO
PMEN
TLP
1048
40N17
0PSDT
X130
27/16
/201
4Co
mbu
stionTurbine
naturalgas
87MW
SelectiveCatalytic
Redu
ction
2PP
MVD
15@
O2,3
HOUR
ROLLING
AVER
AGE
BACT
PSD
0Manufactureru
nkno
wn .
*TX07
13
TENAS
KABR
OWNSV
ILLE
GENER
ATINGSTAT
IONTENAS
KABR
OWNSV
ILLE
PART
NER
S,LLC
1084
11PSDT
X135
04/29
/201
4(2)com
bine
dcycle
turbines
naturalgas
274MW
SelectiveCatalytic
Redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVER
AGE
BACT
PSD
0Manufactureru
nkno
wn .
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
IONINTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#1
combine
dcycle
naturalgas
2258
mmBtu/hr
Low
NOxbu
rnersa
ndSCR
2PP
M
30DA
YRO
LLINGAV
G.@15
%O2
BACT
PSD
0Siem
ens5
01FD
orF4.
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
IONINTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#2
combine
dcycle
naturalgas
2258
mmBtu/hr
SCR,
Low
NOxbu
rner
2PP
M
30DA
YRO
LLING
AVER
AGE
BACT
PSD
0Siem
ens5
01FD
orF4.
*TX06
60
FGETEXA
SPO
WER
IAN
DFG
ETEXA
SPO
WER
IIFG
EPO
WER
LLC
PSDT
X136
43/24
/201
4Alstom
Turbine
NaturalGa
s23
0.7MW
Selectivecatalytic
redu
ction
2PP
MVD
CORR
ECTED
TO15
%O2,
ROLLING24
HRAV
EBA
CTPSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*OR00
50TR
OUTD
ALEEN
ERGY
CENTER,
LLC
TROUTD
ALEEN
ERGY
CENTER,
LLC
2602
353/5/20
14
Mitsub
ishiM
501GA
Ccombu
stionturbine,
combine
dcycle
configurationwith
duct
burner.
naturalgas
2988
MMBtu/hr
Utilize
drylow
NOxbu
rners
whencombu
sng
naturalgas;
Utilize
water
injectionwhe
ncombu
sng
ULSD;
Utilize
selectivecatalytic
redu
ction(SCR
)with
aque
ous
2PP
MDV
AT15
%O2
3HR
ROLLING
AVER
AGEON
NG
BACT
PSD
0Mitsub
ishiM
501GA
*PA02
98
FUTU
REPO
WER
PA/G
OODSPRINGS
NGC
CFA
CILITY
FUTU
REPO
WER
PAINC
5400
082A
3/4/20
14
Turbine,CO
MBINED
CYCLEUNIT(Siemen
s50
00)
NaturalGa
s22
67MMBtu/hr
SCR
2PP
MVD
@15
%OXYGE
NBA
CTPSD
79.9
TPY
BASEDONA12
MONTH
ROLLING
TOTA
LSiem
ens5
000serie
s.
*PA02
96
BERK
SHO
LLOW
ENER
GYAS
SOC
LLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and# 2
NaturalGa
s30
46MMBtu/hr
SCR
131.6TPY
12MONTH
ROLLING
TOTA
LBA
CTPSD
0Manufactureru
nkno
wn .
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
E THO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
SCRwith
DLNB(selectiv
ecatalytic
redu
ctionwith
dry
lowNOxbu
rners).
3PP
M
24H
ROLL.AVG
.NOT
STAR
TUP/SH
UTD
OWN
BACT
PSD
0Manufactureru
nkno
wn .
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
E THO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3FG
CTGH
RSG:
Startup
&Shutdo
wn
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
SCRwith
DLNB(selectiv
ecatalytic
redu
ctionwith
dry
lowNOxbu
rners).
43.7
LB/H
OPERA
TING
HOUR
DURING
STAR
TUP
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
*TX06
41PINEC
REST
ENER
GYCE
NTER
PINEC
REST
ENER
GYCE
NTERLLC
PSDT
X129
811
/12/20
13combine
dcycleturbinenaturalgas
700MW
selectivecatalytic
redu
ction
2PP
MVD
24HR
ROLLINGAV
G,15
%OXYGE
NBA
CTPSD
0Ge
neralElectric
7FA.05
,the
Siem
ensS
GT650
00F(4),
andtheSiem
ensS
GT650
00F(5 )
*TX07
09SA
NDHILL
ENER
GYCE
NTER
CITY
OFAU
STIN
4810
6,PSDT
X101
2M2
9/13
/201
3
Naturalgasfired
combine
dcycle
turbines
NaturalGa
s17
3.9MW
SCR
2PP
M24
HRRO
LLINGAV
G.BA
CTPSD
0
GE7FANaturalGa
sfired
Combine
dCycleTurbine.
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*TX06
98BA
YPORT
COMPLEX
AIRLIQUIDELARG
EINDU
STRIES
U.S.,L.P.
9346
PSDT
X612
M2
9/5/20
13(4)cogen
eration
turbines
naturalgas
90MW
DLNandClosed
Loop
Emissions
Controls(CLEC)
5PP
MVD
@15
%O2,3
HRRO
LLING
AVER
AGE
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*MI0
410
THETFO
RDGE
NER
ATINGSTAT
IONCO
NSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4
nat.gasfire
dCT
Gw/
DBforH
RSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
LowNOxbu
rnersa
ndselective
catalytic
redu
ction.
3PP
MV
24HRO
LLING
AVER
AGE
BACT
PSD
0Manufactureru
nkno
wn .
*MI0
410
THETFO
RDGE
NER
ATINGSTAT
IONCO
NSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B:4nat
gasfire
dCT
Gwith
DBforH
RSG:
Startup/shutdo
wn
even
tsnaturalgas
2587
MMBT
U/H
desig
nhe
atinpu
t,eac h
LowNOxbu
rnersa
ndselective
catalytic
redu
ction.
78.4
T/YR
12MORO
LLTIMEPERIOD
FOR
STAR
TUP/SH
UTD
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC .
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
duct
burners
NaturalGa
s47
917MMSCF/rolling
12MO
selectivecatalytic
redu
ction
(SCR
);drylowNOx
combu
stors;lean
fuel
techno
log y
20.8
LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
2Mitsub
ishiM
501GA
Cun
itsor
2Siem
ensS
GT80
00Hun
it
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC .
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
outd
uct
burners
NaturalGa
s51
5600
MMSCF/rolling
12mon
ths
selectivecatalytic
redu
ction
(SCR
);drylowNOx
combu
stors;lean
fuel
techno
log y
22LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
BACT
:2.0pp
mvd
at15
%O2.2Mitsub
ishiM
501GA
Cun
itsor
2Siem
ensS
GT80
00Hun
its
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
out
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
selectivecatalytic
redu
ction
(SCR
);drylowNOx
combu
stors;lean
fuel
techno
log y
22.6
LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
BACT
:2.0pp
mvd
at15
%O2.2Mitsub
ishiM
501GA
Cun
itsor
2Siem
ensS
GT80
00Hun
its
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
REMIDLAND
COGE
NER
ATIONVE
NTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
DrylowNOx(DLN
)burne
rand
selectivecatalytic
redu
ction
(SCR
)system.
2PP
M
EACH
CTG;
24HRO
LLING
AVG.
BACT
PSD
0CT
Mod
elno
tlisted
inpe
rmit .
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
REMIDLAND
COGE
NER
ATIONVE
NTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
Naturalgas
2486
MMBT
U/H
DrylowNOx(DLN
)burne
rsandselectivecatalytic
redu
ction(SCR
)system.
2PP
M24
HRO
LLING
AVG
BACT
PSD
0CT
Mod
elno
tlisted
inpe
rmit.
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
REMIDLAND
COGE
NER
ATIONVE
NTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
each
DrylowNOx(DLN
)burne
rand
selectivecatalytic
redu
ction
(SCR
)18
5.7LB/H
HOURLY
DURING
STAR
TUP
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
*PA02
91HICK
ORY
RUN
ENER
GYSTAT
ION
HICK
ORY
RUNEN
ERGY
LLC
3733
7A4/23
/201
3CO
MBINED
CYCLE
UNITS#1
and# 2
NaturalGa
s3.4MMCF/HR
SCR
2PP
MVD
@15
%O2
WITHOR
WITHO
UT
DUCT
BURN
EROTH
ERCA
SEBY
CASE
0
1.Ge
neralElectric
7FA(GE7FA)
2.Siem
ensS
GT650
00F(Siemen
sF)
3.Mitsub
ishiM
501G
(Mitsub
ishiG
)
*VA03
21BR
UNSW
ICKCO
UNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
5240
400
13/12
/201
3CO
MBU
STIONTU
RBINE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Selectivecatalytic
redu
ction
andultralowNOxbu
rners.
2PP
MVD
@15
%O2
1HAV
GBA
CTPSD
0Mitsub
ishiM
501GA
Ccombu
stionturbinegene
rators
*TX07
08LA
PALO
MAEN
ERGY
CENTER
LAPA
LOMAEN
ERGY
CENTER,
LLC
1015
42PSDT
X128
82/7/20
13(2)com
bine
dcycle
turbines
naturalgas
650MW
SelectiveCatalytic
Redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVER
AGE
BACT
PSD
0(1)G
eneralElectric7FA.04
;(2)
Siem
ensS
GT6
5000
F(4);o
r(3)
Siem
ensS
GT650
00F(5).
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3Co
mbine
dCyclePo
wer
Blocks
472MW
(2)
NaturalGa
s0
SCR
2PP
MDV
BACT
PSD
0Manufactureru
nkno
wn.
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGING
ROCK
,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
f fNAT
URA
LGA
S17
2MW
DryLowNOxbu
rnersa
ndSelectiveCatalytic
Redu
ction
21.1
LB/H
BACT
PSD
3PP
MPP
MVD
AT15
%O2ON
3HBLOCK
AVER
AGE
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGING
ROCK
,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
nNAT
URA
LGA
S17
2MW
DryLowNOxbu
rnersa
ndSelectiveCatalytic
Redu
ction
27.6
LB/H
BACT
PSD
3PP
MPP
MVD
AT15
%O2ON
3HBLOCK
AVER
AGE
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
SELECT
IVECA
TALYTIC
REDU
CTIONAN
DDR
YLO
WNOXBU
RNER
S2PP
MVD
3HO
URS
BACT
PSD
0CT
Mod
elno
tlisted
inpe
rmit.
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
STAR
TUP/SH
UTD
OWN
CYCLENAT
URA
LGA
S23
00MMBT
U/H
443LB
EVEN
T*BA
CTPSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINECO
RPORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955
GHG
11/29/20
12CT
G3/HRSG3
(FD2
Serie
s)InitialPh
ase
NaturalGa
s18
0MW
SCR
1.82
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Equivalent
to2.5PP
MNox
at15
%O2
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINECO
RPORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955
GHG
11/29/20
12CT
G3/HRSG3
(FD3
Serie
s)FinalPhase
NaturalGa
s18
0MW
SCR
1.86
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Equivalent
to2.5PP
MNox
at15
%O2
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)
LLC
PSDTX
979
GHG
11/29/20
12CT
G5/H
RSG5
(FD2
Serie
s)naturalgas
180MW
SCR
1.93
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Equivalent
to2.5PP
MNOx,dry,correctedto
15%O2
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)
LLC
PSDTX
979
GHG
11/29/20
12CT
G5/HRSG5
(FD3
Serie
s)NaturalGa
s18
0MW
SCR
1.97
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Equivalent
to2.5PP
MNOx,dry,correctedto
15%O2
*DE00
23NRG
ENER
GYCE
NTER
DOVE
RNRG
ENER
GYCE
NTER
DOVE
RLLC
AQM
001/00
127(R
2)(REV
1)10
/31/20
12UNIT2
KD1
NaturalGa
s65
5MMBT
U/H
SelectiveCatalytic
Redu
ction
5.76
LB/H
1HR
AVER
AGE
OTH
ERCA
SEBY
CASE
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
FL03
37PO
LKPO
WER
STAT
ION
TAMPA
ELEC
TRIC
COMPA
NY
1050
23303
4AC
10/14/20
12Co
mbine
cyclepo
wer
block(4
on1)
naturalgas
1160
MW
SCR/DL
N2PP
MVD
@15
%O2
24HR
BLOCK
(GAS
)CE
MS
BACT
PSD
0Existingun
itscoverted
to4on
1combine
dcycleun
it
PA02
78
MOXIELIBE
RTY
LLC/AS
YLUM
POWER
PLT
MOXIEEN
ERGY
LLC
0800
045A
10/10/20
12
Combine
dcycle
Turbines
(2)
Natural
gasfire
dNaturalGa
s32
77MMBT
U/H
Drylow
NOx(DLN
)com
bustor
andselectivecatalytic
redu
ction(SCR
)2PP
MVD
BACT
PSD
0Manufactureru
nkno
wn .
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
Selectivecatalytic
redu
ction
2PP
MVD
@15
%O2,24
HRRO
LLING
AVG
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*WY00
70CH
EYEN
NEPR
AIRIE
GENER
ATINGSTAT
IONBLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
1)NaturalGa
s40
MW
SCR
3PP
MVAT
15%
O2
1HO
UR
BACT
PSD
25.5
TONSPERYEAR
Manufactureru
nkno
wn.
*WY00
70CH
EYEN
NEPR
AIRIE
GENER
ATINGSTAT
IONBLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
2)NaturalGa
s40
MW
SCR
3PP
MVAT
15%
O2
1HO
UR
BACT
PSD
25.5
TONSPERYEAR
Manufactureru
nkno
wn.
0SA
BINEPA
SSLN
GTERM
INAL
SABINEPA
SSLN
G,LP
&SA
BINEPA
SSLIQUEFAC
TION,LL
PSDLA
703(M3)
12/6/201
1
Combine
dCycle
Refrigeration
CompressorT
urbine
s(8)
naturalgas
286MMBT
U/H
water
injection
22.94LB/H
HOURLY
MAX
IMUM
BACT
PSD
20PP
MV
AT15
%O2
GELM
2500
+G4Unitsareno
tthe
same
manufacturer.Therefore,theBA
CTem
issionlim
itis
nota
pplicableandwillno
tbeconsidered
anyfurthe
r
*MI0
402
SUMPTER
POWER
PLAN
T
WOLVER
INEPO
WER
SUPP
LYCO
OPERA
TIVE
INC.
8111
11/17/20
11
Combine
dcycle
combu
stionturbinew/
HRSG
Naturalgas
130MW
electricalou
tpu t
LowNOxbu
rners
9PP
M
24HR
ROLLING
AVER
AGE
BACT
PSD
0Em
issionlim
it1aboveis9pp
mvdryat
15%oxyge n
TX06
12
THOMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDTX
1244
GHG
11/10/20
11
COMBINED
CYCLE
TURB
INEGE
NER
ATOR
U1STK
NaturalGa
s17
46MMBT
U/H
SCR
1.7T/YR
360DA
YRO
LLING
AVER
AGE
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
DRYLO
WNOX(DLN
)CO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)2PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0
GE7FAnaturalgas
fired
combu
stionturbine
gene
rators.Theseun
itsareno
tthe
same
maufacturer,sothisBA
CTem
issionlim
itisno
tapplicableandwillno
tbeconsidered
anyfurthe
r.
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S11
0MMBT
U/H
DRYLO
WNOX(DLN
)CO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)57
LB/EVE
NT
SHUTD
OWN
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(STA
RTUP
PERIODS
)NAT
URA
LGA
S15
4MW
DRYLO
WNOX(DLN
)CO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)96
LB/EVE
NT
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
TX06
00
THOMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDT
X124
49/1/20
11Naturalgasfired
turbines
naturalgas
390MW
DrylowNOxbu
rnersa
ndSelectiveCatalytic
Redu
ction
2PP
MVD
ROLLING24
HRAT
15%
OXYGE
NBA
CTPSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
2PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehasn
otbe
ende
mon
strated
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
2PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehasn
otbe
ende
mon
strated
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
2PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehasn
otbe
ende
mon
strated
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
2PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehas n
otbe
ende
mon
strated
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(STA
RTUP&am
p;SH
UTD
OWNPERIODS
)NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
160LB/H
EACH
TURB
INE&
HRSG
BACT
PSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehasn
otbe
ende
mon
strated
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(STA
RTUP&am
p;SH
UTD
OWNPERIODS
)NAT
URA
LGA
S18
0MW
SCR,
DRYLO
WNOX
COMBU
STORS
160LB/H
EACH
TURB
INE&
HRSG
BACT
PSD
0Unith
asno
tbeenconstructed.Therefore,
compliancehasn
otbe
ende
mon
strated
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
2MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)2PP
MVD
@15
%O2,1
HRRO
LLING
AVG
BACT
PSD
0Noinform
ationprovided
inRB
LCor
perm
itregarding
unitmakeor
mod
elnu
mbe
r.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
2MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)11
5LB/H
TURB
INE
SHUTD
OWN
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(HOT
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)15
2LB/H
HOTSTAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
for the
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(WAR
MSTAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)24
9.9LB/H
WAR
MSTAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(COLD
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)33
3.3LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
t eno
ugh
inform
ationto
compare
limits.
OR00
48CA
RTYPLAN
TPO
RTLANDGE
NER
ALELEC
TRIC
2500
16ST
0212
/29/20
10
COMBINED
CYCLE
NAT
URA
LGA
SFIRE
DELEC
TRIC
GENER
ATING
UNI T
NAT
URA
LGA
S28
66MMBT
U/H
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)
Equivalent
to2.5PP
MNOx,
dry,corrected
to15
%O2
PPM@15
%O2
3HO
UR
ROLLING
BACT
PSD
0CT
Mod
elno
tlisted
inpe
rmit .
*IL01
12NELSO
NEN
ERGY
CENTER
INVE
NER
GYNELSO
N,LLC
9808
0039
12/28/20
10ElectricGe
neratio
nFacility
NaturalGa
s22
0MW
each
SCRandLow
NOxCo
mbu
stors
4.5PP
MVD
@15
%O2
HOURLYAV
GEXCE
PTDU
RINGSSM
ORTU
NING
BACT
PSD
0Manufactureru
nkno
wn .
AK00
73
INTERN
ATIONAL
STAT
IONPO
WER
PLAN
TCH
UGA
CHELEC
TRIC
ASSO
CIAT
ION
AQ01
64CP
T01
12/20/20
10FuelCo
mbu
stion
NaturalGa
s59
900HP
Turbines
EUIDs5
through8
shallbeeq
uipp
edwith
SelectiveCatalytic
Redu
ction
andDryLowNOx(SCR
and
DLN)com
bustors.SCRisapo
stcombu
stiongastreatmen
t5PP
M4HO
UR
BACT
PSD
0Manufactureru
nkno
wn .
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
VA03
15
WAR
RENCO
UNTY
POWER
PLAN
TDO
MINION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
8139
100
712
/17/20
10
COMBINED
CYCLE
TURB
INE&am
p;DU
CTBU
RNER
,3NaturalGa
s29
96MMBT
U/H
Twostage,lean
premixdry
low
NOxcombu
stor
anda
selectivecatalytic
redu
ction
(SCR
)con
trolsystem
using
ammon
iainjection.
2PP
MVD
@15
%O2
ONEHO
UR
AVER
AGE
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
*CO00
73PU
EBLO
AIRP
ORT
GENER
ATINGSTAT
IONBLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
7/22
/201
0Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
DryLowNOx(DLN
)Com
bustor
andSelectiveCatalytic
Redu
ction(SCR
)3PP
MVD
AT15
%O2
1HR
AVE
BACT
PSD
0GE
,LMS600
0PF,naturalgasfired
,com
bine
dcycle
CTG,
ratedat
373MMBtupe
rhou
reach
ID00
18LANGL
EYGU
LCH
POWER
PLAN
TIDAH
OPO
WER
COMPA
NYP20
09.009
26/25
/201
0
COMBU
STION
TURB
INE,CO
MBINED
CYCLEW/D
UCT
BURN
ERNAT
URA
LGA
S(ONLY)
2375
.28MMBT
U/H
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
),DR
YLO
WNOX(DLN
),GO
ODCO
MBU
STION
PRAC
TICE
S(GCP
)2PP
MVD
3HR
ROLLING
/15%
O2
BACT
PSD
0Siem
ensS
GT650
00FCo
mbu
stionturbine .
GA01
38LIVE
OAK
SPO
WER
PLAN
TLIVE
OAK
SCO
MPA
NY,LLC
4911
12700
75P02
04/8/20
10
COMBINED
CYCLE
COMBU
STIONTU
RBINE
ELEC
TRIC
GENER
ATINGPLAN
TNAT
URA
LGA
S60
0MW
DRYLO
WNOxBU
RNER
S,SELECT
IVECA
TALYTIC
REDU
CTION
2.5PP
M@15
%02
3HO
UR
AVER
AGE/CO
NDITION2.11
BACT
PSD
0Manufactureru
nkno
wn .
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATORS
(NORM
ALOPERA
TION)NAT
URA
LGA
S19
0MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)2.5PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Siem
ensW
estin
ghou
sePo
wer
Corporation50
1FCT
G .
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATOR
(SHU
TDOWNPERIODS
)NAT
URA
LGA
S19
0MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)97
LB/SHU
TDOW
NSH
UTD
OWN
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATOR(STA
RTUP
PERIODS
)NAT
URA
LGA
S19
0MW
DRYLO
WNOXBU
RNER
S(LNB),
SELECT
IVECA
TALYTIC
REDU
CTION(SCR
)35
41LB/COLD
STAR
TUP
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S15
4MW
SCR
2PP
MVD
@15
%O2,1
HRAV
G(NO
DUCT
BURN
ING)
BACT
PSD
0
NaturalGa
sFire
dGE
7FA.
Thisun
itisno
tthe
same
manufacturer,so
thisBA
CTisno
tapp
licableandwill
notb
econsidered
furthe
rinthisanalysis .
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
SCR
2PP
MVD
@15
%O2,1
HRAV
G(W
/DU
CTBU
RNING)
BACT
PSD
0
NaturalGa
sFire
dGE
7FA.
Thisun
itisno
tthe
same
manufacturer,so
thisBA
CTisno
tapp
licableandwill
notb
econsidered
furthe
rinthisanalysis.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NaturalGa
s15
4MW
SCR
2PP
MVD
1HR
AVG,
@15
%O2
(NODU
CTBU
RNING)
BACT
PSD
0
NaturalGa
sFire
dGE
7FA.
Thisun
itisno
tthe
same
manufacturer,so
thisBA
CTisno
tapp
licableandwill
notb
econsidered
furthe
rinthisanalysis.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
SCR
2PP
MVD
@15
%O2,1
HRAV
G(W
/DU
CTBU
RNING)
BACT
PSD
0
NaturalGa
sFire
dGE
7FA.
Thisun
itisno
tthe
same
manufacturer,so
thisBA
CTisno
tapp
licableandwill
notb
econsidered
furthe
rinthisanalysis.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(W
ARM;H
OT
STAR
TUPPERIODS
)NAT
URA
LGA
S15
4MW
SCR
30LB/H
WAR
M&HO
TSTAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(W
ARM;H
OT
STAR
TUPPERIODS
)NAT
URA
LGA
S15
4MW
SCR
30LB/H
WAR
M&
HOW
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(COLD
STAR
TUP
PERIODS
)NAT
URA
LGA
S15
4MW
SCR
52.4
LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(COLD
STAR
TUP
PERIODS
)NAT
URA
LGA
S15
4MW
SCR
52.4
LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S15
4MW
SCR
114LB/H
SHUTD
OWN
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S15
4MW
SCR
114LB/H
SHUTD
OWN
PERIODS
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
TX05
48MAD
ISONBE
LLEN
ERGY
CENTER
MAD
ISONBE
LLPA
RTNER
SLP
8337
88/18
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S27
5MW
SELECT
IVECA
TALYTIC
REDU
CTION
2PP
MVD
@15
%O2,24
HRRO
LLING
AVG
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
CA11
77OTA
YMESAEN
ERGY
CENTERLLC
OTA
YMESAEN
ERGY
CENTERLLC
9783
797/22
/200
9Ga
sturbine
combine
dcycle
Naturalgas
171.7MW
SCR
2.0PP
MVD
@15
%OXYGE
N1HO
UR
OTH
ERCA
SEBY
CASE
0
Consistso
fthree
Gene
ralElectric
(GE)
LMS10
00naturalgas
fired
turbinegene
ratorsat
100MW
each.
Finalized
Nox
limitof
2.5PP
Mat
15%O2as
a1ho
uraverage.
TX05
47
NAT
URA
LGA
SFIRE
DPO
WER
GENER
ATION
FACILIT Y
LAMAR
POWER
PART
NER
SIILLC
8320
76/22
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S25
0MW
SELECT
IVECA
TALYTIC
REDU
CTION
2PP
MVD
@15
%O2,24
HRRO
LLING
AVG
BACT
PSD
0EITH
ER17
0MW
GENER
ALELEC
TRIC
7FAS
OR25
0MW
MITSU
BISH
I501
G S
TX05
46PA
TTILLO
BRAN
CHPO
WER
PLAN
TPA
TTILLO
BRAN
CHPO
WER
COMPA
NYLLC
8364
26/17
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S35
0MW
SELECT
IVECA
TALYTIC
REDU
CTION
2PP
MVD
@15
%O224
HRRO
LLING
AVG
BACT
PSD
0GE
7FA,
GE7FB,
ANDSIEM
ENSSG
T650
00F
CA11
78AP
PLIEDEN
ERGY
LLC
APPLIEDEN
ERGY
LLC
9874
943/20
/200
9Ga
sturbine
combine
dcycle
Naturalgas
0SCR
2PP
M1HO
UR
BACT
PSD
0Manufactureru
nkno
wn.
OK01
29CH
OUTEAU
POWER
PLAN
TAS
SOCIAT
EDELEC
TRIC
COOPERA
TIVE
INC
2007
115C(M
1)PSD
1/23
/200
9
COMBINED
CYCLE
COGE
NER
ATION
>25M
WNAT
URA
LGA
S18
82MMBT
U/H
SCRAN
DDR
YLO
WNOX
2PP
M1HAV
G@
15%O2
BACT
PSD
0SIEM
ENSV8
4.3A
OK01
29CH
OUTEAU
POWER
PLAN
TAS
SOCIAT
EDELEC
TRIC
COOPERA
TIVE
INC
2007
115C(M
1)PSD
1/23
/200
9
COMBINED
CYCLE
COGE
NER
ATION
>25M
WNAT
URA
LGA
S18
82MMBT
U/H
DRYLO
WNOX
568LB/EVE
NT
4HSTAR
TUP
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
FL03
04CA
NEISLANDPO
WER
PARK
FLORIDA
MUNICIPAL
POWER
AGEN
CY(FMP A
PSDFL
400
(097
0043
014
AC)
9/8/20
08
300MW
COMBINED
CYCLECO
MBU
STION
TURB
INE
NAT
URA
LGA
S18
60MMBT
U/H
SCR
2PP
MVD
24HR
BACT
PSD
0
GE4FACo
mbu
stionTurbine.
Unitsareno
tthe
same
manufacturer.Therefore,theBA
CTem
issionlim
itis
nota
pplicableandwillno
tbeconsidered
anyfurthe
r
FL03
03
FPLWESTCO
UNTY
ENER
GYCE
NTERUNIT
3FLORIDA
POWER
AND
LIGH
TCO
MPA
NY(FP&
L)09
9064
600
2AC
(PSD
FL39
6)7/30
/200
8
THRE
ENOMINAL
250
MW
CTG(EAC
H)WITH
SUPP
LEMEN
TARY
FIRE
DHR
SGNAT
URA
LGA
S23
33MMBT
U/H
DRYLO
WNOX
SELECT
IVECA
TALYST
REDU
CTION
2PP
MVD
(GAS
)24
HOURS
BACT
PSD
0
Doosan
Mod
elM50
1GCT
G.Unitsareno
tthe
same
manufacturer.Therefore,theBA
CTem
issionlim
itis
nota
pplicableandwillno
tbeconsidered
anyfurthe
r
LA01
36
PLAQ
UEM
INE
COGE
NER
ATION
FACILIT Y
THEDO
WCH
EMICAL
COMPA
NY
PSDLA
659(M2)
7/23
/200
8
(4)G
ASTU
RBINES/DUCT
BURN
ERS
NAT
URA
LGA
S28
76MMBT
U/H
DRYLO
WNOXBU
RNER
S,SELECT
IVECA
TALYTIC
REDU
CTION
240LB/H
HOURLY
MAX
IMUM
NORM
ALOPERA
TION
BACT
PSD
5PP
MVD
@15
%O2AN
NUAL
AVER
AGE
5PP
M
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8TW
OCO
MBINED
CYCLE
GASTU
RBINE S
NAT
URA
LGA
S21
10MMBT
U/H
LOW
NOXTU
RBINES,D
UCT
BURN
ERSCO
MBINED
WITH
SCR
30.15LB/H
MAX
BACT
PSD
4PP
MVD
@15
%O2
ANNUAL
AVER
AGE
4PP
M
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8
SCN4HO
TSTAR
TUP
CTG1SCN8HO
TSTAR
TUPCT
G2
NAT
URA
LGA
S21
10MMBT
U/H
QUICKLYAS
POSSIBLE
ACCO
RDINGTO
MAN
UFA
CTURE
¿SRE
COMMEN
DED
PROCE
DURE
S.40
0LB/H
MAX
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
MN00
71FA
IRBA
ULT
ENER
GYPA
RKMINNESOTA
MUNICIPAL
POWER
AGEN
CY13
1000
7100
36/5/20
07
COMBINED
CYCLE
COMBU
STIONTU
RBINE
W/DUCT
BURN
ERNAT
URA
LGA
S17
58MMBT
U/H
DRYLO
WNOXCO
MBU
STION
FORNG;
WAT
ERINJECT
ION
FORNO.2OIL;SCR
W/N
HZINJECT
IONIN
HRSG
FORBO
THNG&NO.2
OIL.
3PP
MVD
3HR
.AVG
CTG&DB
NAT
.GAS
OR
DBNOOPE
BACT
PSD
4.5PP
MVD
3HR
.AVG
CTGNG,
DBOIL
Manufactureru
nkno
wn .
CA11
44BLYTHE
ENER
GYPR
OJECT
IICA
ITHN
ESSBLYTHE
II,LLC
SE02
014/25
/200
72CO
MBU
STION
TURB
INES
NAT
URA
LGA
S17
0MW
SELECT
IVECA
TALYTIC
REDU
CTION
2.0PP
MVD
AT15
%O2,3
HRAV
GBA
CTPSD
0Ga
sTurbine
Natural
gasfire
dFClassS
iemen
sV8
4.3A
CT(180
MW
Ratin
g)
OK01
17PSOSO
UTH
WESTERN
POWER
PLT
PUBLICSERV
ICECO
OF
OKLAH
OMA
2003
403CPSD
2/9/20
07GA
SFIRE
DTU
RBINE S
DRYLO
WNOX
9PP
MBA
CTPSD
0Manufactureru
nkno
wn.
FL02
85PR
OGR
ESSBA
RTOW
POWER
PLAN
TPR
OGR
ESSEN
ERGY
FLORIDA
(PEF)
PSDFL
381AN
D10
3001
101
0AC
1/26
/200
7
COMBINED
CYCLE
COMBU
STIONTU
RBINE
SYSTEM
(4ON1)
NAT
URA
LGA
S19
72MMBT
U/H
WAT
ERINJECT
ION
15PP
MVD
UNCO
RREC
TED
30DA
YSBA
SIS
NAT
URA
LGA
SBA
CTPSD
0Mod
elSG
T650
00F
FL02
86FPLWESTCO
UNTY
ENER
GYCE
NTER
FLORIDA
POWER
AND
LIGH
TCO
MPA
NY
PSDFL
354AN
D09
9064
600
1AC
1/10
/200
7
COMBINED
CYCLE
COMBU
STIONGA
STU
RBINES
6UNITS
NAT
URA
LGA
S23
33MMBT
U/H
DRYLO
WNOXAN
DSCR
WAT
ERINJECT
ION
2PP
MVD
@15
%O2
24HR
(GAS
)BA
CTPSD
0
Doosan
Mod
elM50
1GCT
G.Unitsareno
tthe
same
manufacturer.Therefore,theBA
CTem
issionlim
itis
nota
pplicableandwillno
tbeconsidered
anyfurthe
r
OK01
15LAWTO
NEN
ERGY
COGE
NFA
CILIT Y
ENER
GETIX
2001
205CM
1PSD
12/12/20
06CO
MBU
STIONTU
RBINE
ANDDU
CTBU
RNE R
SCRW/D
RYLO
WNOX
BURN
ERSAN
DDR
YLO
WNOX
COMBU
STION
3.5PP
MVD
@15
%O2
BACT
PSD
0Manufactureru
nkno
wn .
TX04
97INEO
SCH
OCO
LATE
BAYO
UFA
CILITY
INEO
SUSA
LLC
PSDTX
983
AND46
192
8/29
/200
6
COGE
NER
ATIONTR
AIN
2AN
D3(TURB
INEAN
DDU
CTBU
RNER
EMISSIONS)
NAT
URA
LGA
S35
MW
SCRTO
CONTR
OLNOX
EMISSIONSFROM
BOTH
TURB
INES
ANDDU
CTBU
RNER
SAF
TERCO
NSIDE
RING
ALTERN
ATIVENOXCO
NTR
OL
11.43LB/H
3HR
AVG.
BACT
PSD
0Manufactureru
nkno
wn .
TX05
02
NAC
OGD
OCH
ESPO
WER
STER
NE
GENER
ATINGFA
CILIT Y
NAC
OGD
OCH
ESPO
WER
LLC
PSDTX
1015
AND49
293
6/5/20
06
WESTINGH
OUSE/SIEM
ENSMODE
LSW
501F
GASTU
RBINEW/4
16.5
MMBT
UDU
CTBU
RNER
SNAT
URA
LGA
S19
0MW
PROPO
SINGTH
EUSE
OFDR
YLO
WNOX(DLN
)COMBU
STORS
FORTH
ETU
RBINES
ANDLO
WNOXBU
RNER
SIN
THEDU
CTBU
RNER
SALONGWITH
45.4
LB/H
BACT
PSD
0WESTINGH
OUSE/SIEMEN
SMODE
LSW
501F
GAS
TURB
INEW/4
16.5MMBT
UDU
CTBU
RNER
S
NY00
95CA
ITHN
ESBE
LLPO
RTEN
ERGY
CENTER
CAITHN
ESSBE
LLPO
RT,LLC
PSDNY00
015/10
/200
6CO
MBU
STIONTU
RBINENAT
URA
LGA
S22
21MMBU
T/H
SCR
2PP
MVD
@15
%0
2BA
CTPSD
0Siem
ensW
estin
ghou
sePo
wer
Corporation50
1FCT
G.
CO00
56RO
CKYMOUNTA
INEN
ERGY
CENTER,
LLC
CALPINECO
RP.
05WE052
45/2/20
06
NAT
URA
LGA
SFIRE
D,CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S30
0MW
LOW
NOXBU
RNER
SAN
DSCR
3PP
M@
15%
O2
HOURLYMAX
BACT
PSD
3PP
M@
15%O2
Manufactureru
nkno
wn.
CA12
13
MOUNTA
INVIEW
POWER
COMPA
NY
LLC
MOUNTA
INVIEW
POWER
COMPA
NYLLC
SE04
014/21
/200
6
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
5.7MW
EA.
1991
MMBT
U/HRDR
YLO
WNOXCO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)2PP
MVD
@15
%O2,60
MIN
AVG
BACT
PSD
0
Four
NaturalGa
sGE724
1FAnaturalgas
combu
stion
turbines.Theseun
itsareno
tthe
samemanufacturer ,
sothisBA
CTem
issionlim
itisno
tapp
licablean
will
notb
econsidered
anyfurthe
r .
CA12
13
MOUNTA
INVIEW
POWER
COMPA
NY
LLC
MOUNTA
INVIEW
POWER
COMPA
NYLLC
SE04
014/21
/200
6
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
5.7MW
EA.
1991
MMBT
U/HRDR
YLO
WNOXCO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)70
LB/SHU
TDOW
N
30MIN
AVG
(SHU
TDOWN
PERIODS
)BA
CTPSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA12
13
MOUNTA
INVIEW
POWER
COMPA
NY
LLC
MOUNTA
INVIEW
POWER
COMPA
NYLLC
SE04
014/21
/200
6
COMBU
STION
TURB
INES
(COMBU
STORTU
NING
PERIODS
)NAT
URA
LGA
S17
5.7MW
EA.
1991
MMBT
U/HRDR
YLO
WNOXCO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)80
LB/H
1HR
AVG
(COMBU
STOR
TUNING
PERIODS
)BA
CTPSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA12
13
MOUNTA
INVIEW
POWER
COMPA
NY
LLC
MOUNTA
INVIEW
POWER
COMPA
NYLLC
SE04
014/21
/200
6
COMBU
STION
TURB
INES
(STA
RTUP
PERIODS
)NAT
URA
LGA
S17
5.7MW
EA.
1991
MMBT
U/HRDR
YLO
WNOXCO
MBU
STORS,SELEC
TIVE
CATA
LYTICRE
DUCT
ION(SCR
)16
0LB/H
3HR
AVG
(STA
RTUPS)
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
COMBU
STIONTU
RBINE
GENER
ATOR,
2un
its(NormalOpe
ratio
n)NAT
URA
LGA
S16
6MW
SCRORSCONOX,DR
YLO
WNOXCO
MBU
STORS
2.5PP
MVD
@15
%O2,1
HRAV
GBA
CTPSD
0Manufactureru
nkno
wn .
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
Combu
stionTurbine
Gene
rator,2un
its(Turbine
Shutdo
wn
Even
ts)
NaturalGa
s16
6MW
SCRORSCONOX
222LB/EVE
NT
TURB
INE
SHUTD
OWN
EVEN
TSBA
CTPSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
COMBU
STIONTU
RBINE
GENER
ATOR,
2un
its(Exten
dedStartup
Even
ts)
NAT
URA
LGA
S16
6MW
SCRORSCONOX
800LB/EVE
NT
EXTENDE
DSTAR
TUP
EVEN
TSBA
CTPSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
TX05
16
CITY
PUBLICSERV
ICE
JKSPRU
CEELEC
TRICE
GENER
ATINGUNIT2
CITY
PUBLICSERV
ICE
PSDTX
1037
AND70
492
12/28/20
05SPRU
CEPO
WER
GENER
ATORUNITNO2
1600
LB/H
BACT
PSD
0
SU/SDLimit.
Calpineprop
osed
aseparate
SUSD
limit
forthe
prop
osed
unit.
Thereisno
teno
ugh
inform
ationto
compare
limits.
NV00
35TR
ACYSU
BSTA
TION
EXPA
NSIONPR
OJEC T
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#2WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
SELECT
IVECA
TALYTIC
REDU
CTIONWITHAM
MONIA
INJECT
ION
2PP
M@
15%
O2
3HO
UR
ROLLING
BACT
PSD
2PP
M@
15%O2
Manufactureru
nkno
wn .
NV00
35TR
ACYSU
BSTA
TION
EXPA
NSIONPR
OJECT
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#1WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
SELECT
IVECA
TALYST
REDU
CTIONW/A
MMONIA
INJECT
ION
2PP
M@
15%
O2
3HO
UR
ROLLING
BACT
PSD
2PP
M@
15%O2
Manufactureru
nkno
wn .
OR00
41WAN
APAEN
ERGY
CENTER
DIAM
ONDWAN
APAI,L.P.
R10P
SDOR05
018/8/20
05
COMBU
STIONTU
RBINE
&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S23
84.1
MMBT
U/H
DRYLO
WNOXBU
RNER
SAN
DSCR.
2PP
MDV
@15
%O2
3HO
URS
BACT
PSD
0
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
FL02
65HINES
POWER
BLOCK
4PR
OGR
ESSEN
ERGY
PSDFL
342AN
D10
5023
401
0AC
6/8/20
05CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S53
0MW
SCR
2.5PP
MNAT
URA
LGA
SBA
CTPSD
2.5PP
M@
15%O2
Manufactureru
nkno
wn .
LA01
92CR
ESCE
NTCITY
POWER
CRESEN
TCITY
POWER
,LLC
PSDLA
704
6/6/20
05GA
STU
RBINES
187
MW
(2)
2006
MMBT
U/H
LOW
NOXBU
RNER
SAN
DSELECT
IVECA
TLYTIC
REDU
CTION(SCR
)ADD
ON
CONTR
OLS
21.8
LB/H
HOURLY
MAX
IMUM
BACT
PSD
3PP
MAN
NUAL
AVER
AGE
Facilitywas
nevercon
structed
andpe
rmitwas
recind
ed.
MI0
366
BERR
IENEN
ERGY
,LL C
BERR
IENEN
ERGY
,LLC
32301
A4/13
/200
5
3CO
MBU
STION
TURB
INES
ANDDU
CTBU
RNER
SNAT
URA
LGA
S15
84MMBT
U/H
DRYLO
WNOXBU
RNER
SAN
DSELECT
IVECA
TALYTIC
REDU
CTION.
2.5PP
MDV
@15
%O2
24HO
UR
ROLLINGAV
GEA
CHHO
UR
BACT
PSD
2.5PP
M@
15%O2
Manufactureru
nkno
wn .
FL02
63FPLTU
RKEY
POINT
POWER
PLAN
TFLORIDA
POWER
AND
LIGH
TPSDFL
338
2/8/20
0517
0MW
COMBU
STION
TURB
INE,4UNITS
NAT
URA
LGA
S17
0MW
NOXEM
ISSIONSWILLBE
REDU
CEDWITHDR
YLO
WNOX
(DLN
)COMBU
STION
TECH
NOLO
GYFO
RGA
SFIRING
ANDWAT
ERINJECT
IONFO
ROILFIRING.
INCO
MBINAT
ION
2PP
MVD
@15
%O2
24HR
(ALL
MODE
SOF
OPERA
TION)
BACT
PSD
2PP
M@
15%O2
STAC
KTEST
(CT&
DUCT
BURN
ER)
Unitsareno
tthe
samemanufacturer.Therefore,the
BACT
emissionlim
itisno
tapp
licableandwillno
tbe
considered
anyfurthe
r .
WA03
28
BPCH
ERRY
POINT
COGE
NER
ATION
PROJECT
BPWESTCO
AST
PRODU
CTS,LLC
EFSEC/2002
011/11
/200
5
GE7FACO
MBU
STION
TURB
INE&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S17
4MW
LEAN
PREMIXDR
YLO
WNOX
BURN
ERSONCT
.LO
WNOX
DUCT
BURN
ERS.
SCR.
2.5PP
MDV
3HR
@15
%O2
BACT
PSD
0*SEE
NOTES
GE7FACO
MBU
STIONTU
RBINE
NC01
01FO
RSYTHEN
ERGY
PLAN
TFO
RSYTHEN
ERGY
PROJECT
S,LLC
4911
8/31
/200
4
TURB
INE,CO
MBINED
CYCLE,NAT
URA
LGA
S,(3)
NAT
URA
LGA
S18
44.3
MMBT
U/H
2.5PP
M@
15%
O2
24HO
UR
ROLLING
AVER
AGE,
FIRST50
0HO
URS
BACT
PSD
3PP
M@
15%O2
0Manufactureru
nkno
wn .
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:N
Ox
Prop
osed
NO
xLi
mit:
3PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
0111
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
t
Emis
sion
Lim
itAv
gTi
me
Cond
ition
Case
ByCa
seBa
sis
Stan
dard
Emis
sion
Lim
it
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
Mankato
Energy
Center
CalpineCo
rporation
NaturalGa
sfired
Combu
stionTurbine
NaturalGa
s30
77MMBtu/hr
SELECT
IVECA
TALYTIC
REDU
CTION
3pp
m3ho
uraverage
BACT
PSD
Manufactureru
nkno
wn.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX07
67LO
NC.HILL
POWER
STAT
ION
LONC.HILL,L.P.
1149
11AN
DPSDT
X138
010
/6/201
5Co
mbine
dCycle
Turbines
(>25
MW)
naturalgas
195MW
Particulate
matter,total<
10μ(TPM
10)&
total<
2.5μ
(TPM
2.5)
Good
combu
stionpractices
anduseof
pipe
linequ
ality
naturalgas
16LB/HR
BACT
PSD
Twopo
wer
configurationop
tions
authorize
dSiem
ens
–24
0MW
+25
0millionBritish
thermalun
itspe
rhou
r(M
MBtu/hr)d
uctb
urne
rGE–19
5MW
+67
0MMBtu/hr
ductbu
rner
Lbs/hr
limitbasedon
onestackand10
9.5TPYlim
it2
isbasedon
both
turbines
*TX07
51
EAGL
EMOUNTA
INSTEA
MELEC
TRIC
STAT
ION
EAGL
EMOUNTA
INPO
WER
COMPA
NY
LLC
1170
26,
PSDT
X139
0,N19
46/29
/201
5
Combine
dCycle
Turbines
(>25
MW)–
naturalgas
naturalgas
210MW
Particulate
matter,total<
10μ(TPM
10)&
total<
2.5μ
(TPM
2.5)
Good
combu
stionpractices,low
sulfu
rfuel
35.47LB/HR
BACT
PSD
Twopo
wer
configurationop
tions
authorize
dSiem
ens
–23
1MW
+50
0millionBritish
thermalun
itspe
rhou
r(M
MBtu/hr)d
uctb
urne
rGE–21
0MW
+34
9.2
MMBtu/hr
ductbu
rne r
*TX07
14
SRBE
RTRO
NELEC
TRIC
GENER
ATING
STAT
ION
NRG
TEXA
SPO
WER
LLC
1027
31PSDT
X129
412
/19/20
14(2)com
bine
dcycle
turbines
naturalgas
240MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0
Threegastrurbineop
tions:2
Siem
ensM
odelF5
(SF5)
CTG's,2Ge
neralElectric
Mod
el7FA9G
E7FA
)CTG
s,2
Mitsub
ishiH
eavy
Indu
stry
GFram
e(M
HI50
1G)C
TGs
*TX07
10VICT
ORIAPO
WER
STAT
ION
VICT
ORIAWLE
L.P.
1082
58PSDT
X134
812
/1/201
4combine
dcycleturbine
naturalgas
197MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0Ge
neralelectric
7FA
.04at
197MW
nominalou
tput.
*WV00
25
MOUNDS
VILLE
COMBINED
CYCLE
POWER
PLAN
TMOUNDS
VILLE
POWER
,LLC
R1400
3011
/21/20
14Co
mbine
dCycle
Turbine/Du
ctBu
rne r
NaturalGa
s21
59mmBtu/Hr
Particulate
matter,total&
2.5μ(TPM
2.5)
Good
Combu
stionPractices,Inlet
Air
Filtration,&useof
NaturalGa
s7.6LB/HR
BACT
PSD
0
Nom
inal19
7mW
Gene
ralElectric
Fram
e7FA.04
Turbinew/D
uctB
urne
rthroughp
utde
notes
aggregatehe
atinpu
tofturbine
anddu
ctbu
rner
(HHV
).
*TX07
12
TRINIDAD
GENER
ATING
FACILIT Y
SOUTH
ERNPO
WER
COMPA
NY
1113
93PSDT
X136
811
/20/20
14combine
dcycleturbine
naturalgas
497MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0
Facilitywillconsist
ofaMitsub
ishiH
eavy
Indu
strie
sJmod
elgasfire
dcombu
stionturbineeq
uipp
edwith
aHR
SGandDB
*TX06
89
CEDA
RBA
YOU
ELEC
TRIC
GENER
ATION
STAT
ION
NRG
TEXA
SPO
WE R
1058
10,
PSDT
X130
88/29
/201
4Co
mbine
dcyclenatural
gasturbine
sNaturalGa
s22
5MW
Particulate
matter,
filterable&2.5
μ(FPM
2.5)
Good
combu
stionpractices,natural
gas
0BA
CTPSD
0
Threeop
tions
wereprop
osed
:Siemen
sMod
elF5,
GE7Fa,andMitsub
ishiH
eavy
Indu
stry
GFram
e.The
newun
itswillprod
ucebe
tween21
526
3MW
each.
*TX06
78
FREEPO
RTLN
GPR
ETRE
ATMEN
TFA
CILIT Y
FREEPO
RTLN
GDE
VELO
PMEN
TLP
1048
40N17
0PSDT
X130
27/16
/201
4Co
mbu
stionTurbine
naturalgas
87MW
Particulate
matter,total&
2.5μ(TPM
2.5)
15.22LB/HR
BACT
PSD
0
*TX07
13
TENAS
KABR
OWNSV
ILLE
GENER
ATING
STAT
ION
TENAS
KABR
OWNSV
ILLE
PART
NER
S,LLC
1084
11PSDT
X135
04/29
/201
4(2)com
bine
dcycle
turbines
naturalgas
274MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0
*IA01
07
MAR
SHALLTOWN
GENER
ATING
STAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#1
combine
dcycle
naturalgas
2258
mmBtu/hr
Particulate
matter,total
(TPM
)0.01
LB/M
MBT
UAV
G.OF3ONE
HOURTEST
RUNS
BACT
PSD
0tw
oiden
ticalSiem
ensS
GT650
00Fcombine
dcycle
turbines
with
outd
uctfiring
*IA01
07
MAR
SHALLTOWN
GENER
ATING
STAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#2
combine
dcycle
naturalgas
2258
mmBtu/hr
Particulate
matter,total
(TPM
)0.01
LB/M
MBT
UAV
ERAG
EOF3ONE
HOURTEST
RUNS
BACT
PSD
0Tw
ocombine
dcycleturbines
with
outd
uctb
urning
*TX06
60
FGETEXA
SPO
WER
IANDFG
ETEXA
SPO
WER
IIFG
EPO
WER
LLC
PSDT
X136
43/24
/201
4Alstom
Turbine
NaturalGa
s23
0.7MW
Particulate
matter,total&
2.5μ(TPM
2.5)
Lowsulfu
rfue
l,good
combu
stion
practices
2PP
MVD
BACT
PSD
0Four
(4)A
lstom
GT24
CTGs
,eachwith
aHR
SGand
DBs,max
desig
ncapacity
409MMBtu/h r
*OR00
50
TROUTD
ALE
ENER
GYCE
NTER,
LLC
TROUTD
ALEEN
ERGY
CENTER,
LLC
2602
353/5/20
14
Mitsub
ishiM
501GA
Ccombu
stionturbine,
combine
dcycle
configurationwith
duct
burner.
naturalgs
2988
MMBtu/hr
Particulate
matter,total&
10μ(TPM
10)
Utilize
onlynaturalgas
orULSDfuel;
Limitthetim
einstartupor
shutdo
wn .
23.6
LB/HRTO
TAL
PM6HR
AVER
AGEON
NG
BACT
PSD
0or
ULSD;
Ductbu
rner
499MMBtu/hr,naturalgas
turbine
*PA02
98
FUTU
REPO
WER
PA/G
OODSPRINGS
NGC
CFA
CILITY
FUTU
REPO
WER
PAINC
5400
082A
3/4/20
14
Turbine,CO
MBINED
CYCLEUNIT(Siemen
s50
00)
NaturalGa
s22
67MMBtu/hr
Particulate
matter,
filterable(FPM
)10
.4LB/HR
WITHDU
CTBU
RNER
BACT
PSD
0
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*PA02
98
FUTU
REPO
WER
PA/G
OODSPRINGS
NGC
CFA
CILITY
FUTU
REPO
WER
PAINC
5400
082A
3/4/20
14
Turbine,CO
MBINED
CYCLEUNIT(Siemen
s50
00)
NaturalGa
s22
67MMBtu/hr
Particulate
matter,total&
10μ(TPM
10)
15.6
LB/HR
WITHDU
CTBU
RNER
BACT
PSD
0
*PA02
96
BERK
SHO
LLOW
ENER
GYAS
SOC
LLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and# 2
NaturalGa
s30
46MMBtu/hr
Particulate
matter,
filterable<
10μ(FPM
10)
48.56TPY
12MONTH
ROLLINGTO
TAL
BACT
PSD
02combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorseq
uipp
edwith
adu
ctbu
rner
*PA02
96
BERK
SHO
LLOW
ENER
GYAS
SOC
LLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and# 2
NaturalGa
s30
46MMBtu/hr
Particulate
matter,total&
2.5μ(TPM
2.5)
48.56TPY
12MONTH
ROLLINGTO
TAL
BACT
PSD
02combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorseq
uipp
edwith
adu
ctbu
rner
*MI0
412
HOLLAN
DBO
ARD
OFPU
BLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Particulate
matter,
filterable(FPM
)Go
odcombu
stionpractices
andthe
useof
pipe
linequ
ality
naturalgas.
0.00
7LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
02combine
dcyclenaturalgas
fired
CTGs
with
HRSG
s
*MI0
412
HOLLAN
DBO
ARD
OFPU
BLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Particulate
matter,total&
10μ(TPM
10)
Good
combu
stionpractices
andthe
useof
pipe
linequ
ality
naturalgas.
0.01
4LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
02Co
mbine
dcycleCT
Gswith
HRSG
swith
ductbu
rners
*MI0
412
HOLLAN
DBO
ARD
OFPU
BLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Particulate
matter,total&
2.5μ(TPM
2.5)
Good
combu
stionpractices
andthe
useof
pipe
linequ
ality
naturalgas.
0.01
4LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
02Co
mbine
dcycleCT
Gswith
HRSG
swith
ductbu
rners
*TX06
41PINEC
REST
ENER
GYCE
NTER
PINEC
REST
ENER
GYCE
NTERLLC
PSDT
X129
811
/12/20
13combine
dcycleturbine
naturalgas
700MW
Particulate
matter,total&
2.5μ(TPM
2.5)
pipe
linequ
ality
naturalgas
andgood
combu
stionpractice s
26.2
LB/H
BACT
PSD
0
2naturalgas
fired
combu
stionturbines,each
exhaustin
gto
afired
heat
recovery
steam
gene
rator
(HRSG).3
mod
elso
fcom
bustionturbines
arebe
ing
considered
:the
Gene
ralElectric
7FA.05
,the
Siem
ens
SGT6
5000
F(4),and
theSiem
ensS
GT650
00F(5).D
uct
Burnersa
reratedat
750MMBtu/hr
each.
*TX07
09SA
NDHILL
ENER
GYCE
NTER
CITY
OFAU
STIN
4810
6,PSDT
X101
2M2
9/13
/201
3
Naturalgasfired
combine
dcycle
turbines
NaturalGa
s17
3.9MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0
*TX06
98BA
YPORT
COMPLEX
AIRLIQUIDELARG
EINDU
STRIES
U.S.,L.P .
9346
PSDT
X612
M2
9/5/20
13(4)cogen
eration
turbines
naturalgas
90MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0(4)G
E7EAturbines
providingpo
wer
andprocess
steam
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4nat.
gasfire
dCT
Gw/D
Bfor
HRSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
Particulate
matter,
filterable(FPM
)
Combu
stionair filters;efficient
combu
stioncontrol;lowsulfu
rnatural
gasfue
l.0.00
33LB/M
MBT
U
TEST
PROTO
COL;(3
1HTESTSIF
POSSIBLE)
BACT
PSD
04nat.gasfire
dCT
Gw/D
BforH
RSG
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4nat.
gasfire
dCT
Gw/D
Bfor
HRSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
Particulate
matter,total&
2.5μ(TPM
2.5)
Combu
stionairfilters,efficient
combu
stioncontrol,lowsulfu
rnatural
gasfue
l.0.00
66LB/M
MBT
U
TEST
PROTO
COL(3
1HTESTSIF
POSSIBLE)
BACT
PSD
04nat.gasfire
dCT
Gw/D
BforH
RSG
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4nat.
gasfire
dCT
Gw/D
Bfor
HRSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
Particulate
matter,total&
10μ(TPM
10)
Combu
stionairfilters;efficient
combu
stioncontrol;lowsulfu
rnatural
gasfue
l.0.00
66LB/M
MBT
U
TEST
PROTO
COL(3
1HTESTSIF
POSSIBLE)
BACT
PSD
04nat.gasfire
dCT
Gw/D
BforH
RSG
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC .
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
duct
burners
NaturalGa
s47
917MMSCF/rolling
12MO
Particulate
matter,total&
10μ(TPM
10)
cleanbu
rningfuel,onlynaturalga s
10.1
LB/H
BACT
PSD
0
2Mitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
300MMBtu/Hdu
ctbu
rners.
Willinstalleith
er2Siem
enso
r2Mitsub
ishi,
notb
oth
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
out
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
Particulate
matter,total&
10μ(TPM
10)
cleanbu
rningfuel,onlynaturalga s
11.3
LB/H
BACT
PSD
0
2Mitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
300MMBtu/Hdu
ctbu
rners.
Willinstalleith
er2Siem
enso
r2Mitsub
ishi,
notb
oth
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
outd
uct
burners
NaturalGa
s51
5600
MMSCF/rolling
12mon
ths
Particulate
matter,total&
10μ(TPM
10)
cleanbu
rningfuel,onlynaturalga s
13.3
LB/H
BACT
PSD
0
2Mitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
300MMBtu/Hdu
ctbu
rners.
Willinstalleith
er2Siem
enso
r2Mitsub
ishi,
notb
oth
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
duct
burners
NaturalGa
s51
560MMSCF/rolling
12MO
Particulate
matter,total&
10μ(TPM
10)
cleanbu
rningfuel,onlynaturalga s
14LB/H
BACT
PSD
0
2Siem
ens2
932MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
ductbu
rners.
Will
installeith
er2Siem
enso
r2Mitsub
ishi,no
tboth .
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
(DB)
Naturalgas
2486
MMBT
U/H
Particulate
matter,total
(TPM
)Go
odcombu
stionpractice s
0.00
4LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
0
2naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)ope
ratin
gwith
anaturalgas
fired
ductbu
rne r
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Particulate
matter,total
(TPM
)Go
odcombu
stionpractice s
0.00
6LB/M
MBT
UEA
CHCT
G;TEST
PROTO
COL
BACT
PSD
02naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
Good
combu
stionpractice s
0.00
6LB/M
MBT
UEA
CHCT
G;TEST
PROTO
COL
BACT
PSD
02naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
Good
combu
stionpractice s
0.00
6LB/M
MBT
UEA
CHCT
G;TEST
PROTO
COL
BACT
PSD
02naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
(DB)
Naturalgas
2486
MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
Good
combu
stionpractice s
0.00
8LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
0
2naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)w
itha
naturalgas
fired
ductbu
rne r
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
gcombine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
(DB)
Naturalgas
2486
MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
Good
combu
stionpractice s
0.00
8LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
0
2naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)w
itha
naturalgas
fired
ductbu
rne r
*VA03
21
BRUNSW
ICK
COUNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
ANDPO
WER
COMPA
NY
5240
400
13/12
/201
3CO
MBU
STIONTU
RBINE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
Lowsulfu
r/carbon
fuelandgood
combu
stionpractices.
0.00
33LB/M
MBT
U3HAV
G/WITHO
UT
DUCT
BURN
ING
BACT
PSD
0
Three(3)M
itsub
ishiM
501GA
Ccombu
stionturbine
gene
ratorswith
HRSG
ductbu
rners(naturalgas
fired
).
*VA03
21
BRUNSW
ICK
COUNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
ANDPO
WER
COMPA
NY
5240
400
13/12
/201
3CO
MBU
STIONTU
RBINE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
Lowsulfu
r/carbon
fuelandgood
combu
stionpractices.
0.00
33LB/M
MBT
U3HAV
G/WITHO
UT
DUCT
BURN
ING
BACT
PSD
0
Three(3)M
itsub
ishiM
501GA
Ccombu
stionturbine
gene
ratorswith
HRSG
ductbu
rners(naturalgas
fired
).
*TX07
08LA
PALO
MA
ENER
GYCE
NTER
LAPA
LOMAEN
ERGY
CENTER,
LLC
1015
42PSDT
X128
82/7/20
13(2)com
bine
dcycle
turbines
naturalgas
650MW
Particulate
matter,total&
2.5μ(TPM
2.5)
0BA
CTPSD
0
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3Co
mbine
dCyclePo
wer
Blocks
472MW
(2)
NaturalGa
s0
Particulate
matter,total
(TPM
)0.00
57LB/M
MBT
UOTH
ERCA
SEBY
CASE
0Co
mbu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3Co
mbine
dCyclePo
wer
Blocks
472MW
(2)
NaturalGa
s0
Particulate
matter,total&
10μ(TPM
10)
0.00
57LB/M
MBT
UOTH
ERCA
SEBY
CASE
0Co
mbu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3Co
mbine
dCyclePo
wer
Blocks
472MW
(2)
NaturalGa
s0
Particulate
matter,total&
2.5μ(TPM
2.5)
0.00
57LB/M
MBT
UOTH
ERCA
SEBY
CASE
0Co
mbu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
DE00
24GA
RRISONEN
ERGY
CENTER
GARR
ISONEN
ERGY
CENTER,
LLC/
CALPINE
CORP
ORA
TION
APC
2012
/009
81/30
/201
3Unit1
NaturalGa
s22
60millionBT
Us
Particulate
matter,total
(TPM
)FuelUsage
Restrictio
nto
natural gas
andlowsulfu
rdistillateoil
120.4TO
NS
12MONTH
ROLLINGAV
ERAG
EBA
CTPSD
0(1)3
09MW
GECo
mbine
dCycleCo
mbu
stionTurbine
Gene
ratin
g
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGINGRO
CK,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
f fNAT
URA
LGA
S17
2MW
Particulate
matter,total&
10μ(TPM
10)
Burningnaturalgas
inan
efficient
combu
stionturbine
15LB/H
BACT
PSD
04GE
7FAcombine
dcycleturbines,whileop
erating
with
thedu
ctbu
rnerso
ff.
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGINGRO
CK,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
nNAT
URA
LGA
S17
2MW
Particulate
matter,total&
10μ(TPM
10)
Burningnaturalgas
inan
efficient
combu
stionturbine
19.9
LB/H
BACT
PSD
04GE
7FAcombine
dcycleturbines,whileop
erating
with
thedu
ctbu
rnerso
ff.
*IN01
58
ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
Particulate
matter,
filterable(FPM
)GO
ODCU
MBU
STIONPR
ACTICE
AND
FUEL
SPEC
IFICAT
ION
18LB/H
3HO
URS
BACT
PSD
0EA
CHTU
RBINEISEQ
UIPED
WITHNAT
URA
LGA
SFIRE
DDU
CTBU
RNER
S,AN
DHR
SG#
*IN01
58
ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
GOODCU
MBU
STIONPR
ACTICE
AND
FUEL
SPEC
IFICAT
ION
18LB/H
3HO
URS
BACT
PSD
0EA
CHTU
RBINEISEQ
UIPED
WITHNAT
URA
LGA
SFIRE
DDU
CTBU
RNER
S,AN
DHR
SG#
*IN01
58
ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
GOODCO
MBU
STIONPR
ACTICE
AND
FUEL
SPEC
IFICAT
ION
18LB/H
3HO
URS
BACT
PSD
0EA
CHTU
RBINEISEQ
UIPED
WITHNAT
URA
LGA
SFIRE
DDU
CTBU
RNER
S,AN
DHR
SG#
TX06
18CH
ANNEL
ENER
GYCE
NTERLLC
CHAN
NEL
ENER
GYCE
NTERLLC
PSDT
X955
M1
10/15/20
12Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total
(TPM
)Go
odcombu
stionandtheuseof
gaseou
sfue
l27
LB/H
BACT
PSD
0TheturbineisaSiem
ens5
01Fwith
ductbu
rne r
TX06
18CH
ANNEL
ENER
GYCE
NTERLLC
CHAN
NEL
ENER
GYCE
NTERLLC
PSDT
X955
M1
10/15/20
12Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total&
10μ(TPM
10)
good
combu
stionandtheuseof
gaseou
sfue
l27
LB/H
BACT
PSD
0TheturbineisaSiem
ens5
01Fwith
ductbu
rne r
TX06
18CH
ANNEL
ENER
GYCE
NTERLLC
CHAN
NEL
ENER
GYCE
NTERLLC
PSDT
X955
M1
10/15/20
12Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total&
2.5μ(TPM
2.5)
good
combu
stionandtheuseof
gaseou
sfue
l27
LB/H
BACT
PSD
0TheturbineisaSiem
ens5
01Fwith
ductbu
rne r
FL03
37PO
LKPO
WER
STAT
ION
TAMPA
ELEC
TRIC
COMPA
NY
1050
23303
4AC
10/14/20
12Co
mbine
cyclepo
wer
block(4
on1)
naturalgas
1160
MW
Particulate
matter,
filterable&10
μ(FPM
10)
workpractices
2GR
S/10
0SCF
OFGA
SBA
CTPSD
04naturalgas
fueled
nominal16
5MW
simplecycle
combu
stionturbineelectricalgene
rators(CTG
s)
PA02
78
MOXIELIBE
RTY
LLC/AS
YLUM
POWER
PLT
MOXIEEN
ERGY
LLC
0800
045A
10/10/20
12
Combine
dcycle
Turbines
(2)
Natural
gasfire
dNaturalGa
s32
77MMBT
U/H
Particulate
matter,total
(TPM
)Usin
gfuelwith
little
orno
ashand
sulfu
rcon
tent.
0.00
4LB/M
MBT
UFO
R46
8MW
POWER
BLOCK
BACT
PSD
0
2combine
cycleTurbines,eachwith
acombu
stion
turbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX06
19DE
ERPA
RKEN
ERGY
CENTER
DEER
PARK
ENER
GYCE
NTERLLC
PSDT
X979
M2
9/26
/201
2Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total
(TPM
)good
combu
stionanduseof
natural
gas
27LB/H
BACT
PSD
0
naturalgas
fired
combine
dcycleturbinegene
rator
with
ahe
atrecovery
steam
gene
ratore
quippe
dwith
adu
ctbu
rner.TheturbineisaSiem
ens5
01F
TX06
19DE
ERPA
RKEN
ERGY
CENTER
DEER
PARK
ENER
GYCE
NTERLLC
PSDT
X979
M2
9/26
/201
2Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total&
10μ(TPM
10)
good
combu
stionandtheuseof
naturalgas
27LB/H
BACT
PSD
0
naturalgas
fired
combine
dcycleturbinegene
rator
with
ahe
atrecovery
steam
gene
ratore
quippe
dwith
adu
ctbu
rner.TheturbineisaSiem
ens 5
01F
TX06
19DE
ERPA
RKEN
ERGY
CENTER
DEER
PARK
ENER
GYCE
NTERLLC
PSDT
X979
M2
9/26
/201
2Co
mbine
dCycle
Turbine
naturalgas
180MW
Particulate
matter,total&
2.5μ(TPM
2.5)
27LB/H
BACT
PSD
0
naturalgas
fired
combine
dcycleturbinegene
rator
with
ahe
atrecovery
steam
gene
ratore
quippe
dwith
adu
ctbu
rner.TheturbineisaSiem
ens5
01F
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
Particulate
matter,total&
2.5μ(TPM
2.5)
18LB/H
PERTU
RBINE
BACT
PSD
03combu
stionturbinegene
rators(CTG
)willbe
the
Gene
ralElectric
7FA.
Nodu
ctbu
rners .
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
Particulate
matter,total&
10μ(TPM
10)
good
combu
stionandnaturalgas
asfuel
18LB/H
PERTU
RBINE
BACT
PSD
03combu
stionturbinegene
rators(CTG
)willbe
the
Gene
ralElectric
7FA.
Nodu
ctbu
rners .
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
Particulate
matter,total
(TPM
)good
combu
stionandnaturalgas
asfuel
18LB/H
PERTU
RBINE
BACT
PSD
03combu
stionturbinegene
rators(CTG
)willbe
the
Gene
ralElectric
7FA.
Nodu
ctbu
rners .
*WY00
70
CHEYEN
NEPR
AIRIE
GENER
ATING
STAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
1)NaturalGa
s40
MW
Particulate
matter,total
(TPM
)good
combu
stionpractice s
4LB/H
3HO
URAV
ERAG
EBA
CTPSD
17.5
TONS
CALENDA
RYEAR
(5)4
0MW
GELM
6000
combu
stionturbinegene
rators
*WY00
70
CHEYEN
NEPR
AIRIE
GENER
ATING
STAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
2)NaturalGa
s40
MW
Particulate
matter,total
(TPM
)good
combu
stionpractice s
4LB/H
3HO
URAV
ERAG
EBA
CTPSD
17.5
TONS
CALENDA
RYEAR
(5)4
0MW
GELM
6000
combu
stionturbinegene
rators
*VA03
19
GATEWAY
COGE
NER
ATION1,
LLC
SMAR
TWAT
ERPR
OJECT
GATEWAY
GREEN
ENER
GY52
37500
28/27
/201
2CO
MBU
STION
TURB
INES,(2)
NaturalGa
s59
3MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
Cleanbu
rningfuelsa
ndgood
combu
stionpractices.
5LB/H
3HAV
GBA
CTPSD
02combu
sionturbines
(RollsRo
yceTren
t60WLE),no
ductbu
rning.
*VA03
19
GATEWAY
COGE
NER
ATION1,
LLC
SMAR
TWAT
ERPR
OJECT
GATEWAY
GREEN
ENER
GY52
37500
28/27
/201
2CO
MBU
STION
TURB
INES,(2)
NaturalGa
s59
3MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
Cleanbu
rningfuelsa
ndgood
combu
stionpractices.
5LB/H
3HAV
GBA
CTPSD
02combu
sionturbines
(RollsRo
yceTren
t60WLE),no
ductbu
rning.
LA02
57SA
BINEPA
SSLN
GTERM
INA L
SABINEPA
SSLN
G,LP
&SA
BINEPA
SSLIQUEFAC
TION,LL
PSDLA
703(M3)
12/6/201
1
Combine
dCycle
Refrigeration
CompressorT
urbine
s(8)
naturalgas
286MMBT
U/H
Particulate
matter,total
(TPM
)Go
odcombu
stionpractices
andfueled
bynaturalgas
2.08
LB/H
HOURLY
MAX
IMUM
BACT
PSD
0
LA02
56CO
GENER
ATION
PLAN
TWESTLAK
EVINYLS
COMPA
NYLP
PSDLA
754
12/6/201
1CO
GENER
ATIONTR
AINS
13(1
10,2
10,3
10)
NAT
URA
LGA
S47
5MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
USE
OFNAT
URA
LGA
SAS
FUEL
AND
GOODCO
MBU
STIONPR
ACTICE
S3.72
LB/H
HOURLY
MAX
IMUM
BACT
PSD
0
EACH
COGE
NTR
AINCO
NSISTSOFA50
MW
GELM
6000
PFSPRINTTU
RBINEAN
DAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOREQ
UIPPEDWITHADU
CTBU
RNER
.
LA02
56CO
GENER
ATION
PLAN
TWESTLAK
EVINYLS
COMPA
NYLP
PSDLA
754
12/6/201
1CO
GENER
ATIONTR
AINS
13(1
10,2
10,3
10)
NAT
URA
LGA
S47
5MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
USE
OFNAT
URA
LGA
SAS
FUEL
AND
GOODCO
MBU
STIONPR
ACTICE
S3.72
LB/H
HOURLY
MAX
IMUM
BACT
PSD
0
EACH
COGE
NTR
AINCO
NSISTSOFA50
MW
GELM
6000
PFSPRINTTU
RBINEAN
DAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOREQ
UIPPEDWITHADU
CTBU
RNER
.
*MI0
402
SUMPTER
POWER
PLAN
T
WOLVER
INEPO
WER
SUPP
LYCO
OPERA
TIVE
INC.
8111
11/17/20
11
Combine
dcycle
combu
stionturbinew/
HRSG
Naturalgas
130MW
electricalou
tpu t
Particulate
matter,total&
10μ(TPM
10)
0.00
66LB/M
MBT
UTES T
OTH
ERCA
SEBY
CASE
0Thisisacombine
dcyclecombu
stionturbine
*MI0
402
SUMPTER
POWER
PLAN
T
WOLVER
INEPO
WER
SUPP
LYCO
OPERA
TIVE
INC.
8111
11/17/20
11
Combine
dcycle
combu
stionturbinew/
HRSG
Naturalgas
130MW
electricalou
tpu t
Particulate
matter,total&
2.5μ(TPM
2.5)
0.00
66LB/M
MBT
UTES T
BACT
PSD
0Thisisacombine
dcyclecombu
stionturbine
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S0.00
48LB/M
MBT
U9HR
AVG(NO
DUCT
BURN
ING)
BACT
PSD
02NAT
URA
LGA
SFIRE
DCO
MBU
STIONTU
RBINE
GENER
ATORS
(CTG
S)
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
Particulate
matter,total&
10μ(TPM
10)
USE
PUCQUALITYNAT
URA
LGA
S0.00
48LB/M
MBT
U9HR
AVG(NO
DUCT
BURN
ING)
BACT
PSD
02NAT
URA
LGA
SFIRE
DCO
MBU
STIONTU
RBINE
GENER
ATORS
(CTG
S)
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
Particulate
matter,total&
2.5μ(TPM
2.5)
USE
PUCQUALITYNAT
URA
LGA
S0.00
48LB/M
MBT
U9HR
AVG(NO
DUCT
BURN
ING)
BACT
PSD
02NAT
URA
LGA
SFIRE
DCO
MBU
STIONTU
RBINE
GENER
ATORS
(CTG
S)
TX06
00
THOMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORIT Y
PSDT
X124
49/1/20
11Naturalgasfired
turbines
naturalgas
390MW
Particulate
matter,total&
2.5μ(TPM
2.5)
pipe
linequ
ality
naturalgas
33.43LB/H
1H
BACT
PSD
0Po
wer
Plant.Tw
onaturalgas
fired
combine
dcycle
turbinegene
rators(GE7FA)
with
unfired
HRS G
LA02
54
NINEM
ILEPO
INT
ELEC
TRIC
GENER
ATING
PLAN
TEN
TERG
YLO
UISIANA
LLC
PSDLA
752
8/16
/201
1
COMBINED
CYCLE
TURB
INEGE
NER
ATORS
(UNITS6A
&am
p;6B
)NAT
URA
LGA
S71
46MMBT
U/H
Particulate
matter,total
<
2.5μ
(TPM
2.5)
WHI
FIRINGNAT
URA
GAS:US
OF
PIPELINEQUALITYNAT
URA
LGA
SAN
DGOODCO
MBU
STIONPR
ACTICE
S
WHILE
FIRINGFU
ELOIL:U
SEOFULTRA
LOW
SULFURFU
ELOILAN
DGO
OD
COMBU
STIONPR
ACTICE
S26
.23LB/H
HOURLYAV
ERAG
EW/O
DUCT
BURN
ERBA
CTPSD
02CO
MBINED
CYCLEGA
STU
RBINES
WITHDU
CTBU
RNER
S
LA02
54
NINEM
ILEPO
INT
ELEC
TRIC
GENER
ATING
PLAN
TEN
TERG
YLO
UISIANA
LLC
PSDLA
752
8/16
/201
1
COMBINED
CYCLE
TURB
INEGE
NER
ATORS
(UNITS6A
&am
p;6B
)NAT
URA
LGA
S71
46MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
WHI
FIRINGNAT
URA
GAS:US
OF
PIPELINEQUALITYNAT
URA
LGA
SAN
DGOODCO
MBU
STIONPR
ACTICE
S
WHILE
FIRINGFU
ELOIL:U
SEOFULTRA
LOW
SULFURFU
ELOILAN
DGO
OD
COMBU
STIONPR
ACTICE
S26
.23LB/H
HOURLYAV
ERAG
EW/O
DUCT
BURN
ERBA
CTPSD
02CO
MBINED
CYCLEGA
STU
RBINES
WITHDU
CTBU
RNER
S
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S8.91
LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total
<
10μ
(TPM
10)
USE
PUCQUALITYNAT
URA
LGA
S8.91
LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S8.91
LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total&
10μ(TPM
10)
USE
PUCQUALITYNAT
URA
LGA
S8.91
LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S11
.78LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total&
10μ(TPM
10)
USE
PUCQUALITYNAT
URA
LGA
S11
.78LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S11
.78LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTERLLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
Particulate
matter,total&
10μ(TPM
10)
USE
PUCQUALITYNAT
URA
LGA
S11
.78LB/H
12MONTH
ROLLINGAV
GBA
CTPSD
0
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total
(TPM
)USE
NAT
URA
LGA
S6LB/H
TURB
INE
SHUTD
OWN
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total&
10μ(TPM
10)
USE
NAT
URA
LGA
S6LB/H
TURB
INE
SHUTD
OWN
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(WAR
MSTAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total
(TPM
)USE
NAT
URA
LGA
S12
LB/H
WAR
MSTAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(WAR
MSTAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
matter,total
<
10μ
(TPM
10)
USE
NAT
URA
LGA
S12
LB/H
WAR
MSTAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(HOT
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total
(TPM
)USE
NAT
URA
LGA
S12
LB/H
HOTSTAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(HOT
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total
<
10μ
(TPM
10)
USE
NAT
URA
LGA
S12
LB/H
HOTSTAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(COLD
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,
filterable(FPM
)USE
NAT
URA
LGA
S12
LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(COLD
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
Particulate
matter,total&
10μ(TPM
10)
USE
NAT
URA
LGA
S12
LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
2MW
Particulate
matter,total&
10μ(TPM
10)
USE
NAT
URA
LGA
S13
.5LB/H
STAC
KTEST
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&
ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
2MW
Particulate
matter,
filterable(FPM
)USE
NAT
URA
LGA
S13
.5LB/H
STAC
KTEST
BACT
PSD
0(2)N
ATURA
LGA
SFIRE
DTU
RBINES.B
OTH
TURB
INES
EQUIPPEDWITHDU
CTBU
RNER
ANDHR
SG.
OR00
48CA
RTYPLAN
TPO
RTLANDGE
NER
ALELEC
TRIC
2500
16ST
0212
/29/20
10
COMBINED
CYCLE
NAT
URA
LGA
SFIRE
DELEC
TRIC
GENER
ATING
UNI T
NAT
URA
LGA
S28
66MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
CLEA
NFU
E L2.5LB/M
MCF
BACT
PSD
0
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*IL01
12NELSO
NEN
ERGY
CENTER
INVE
NER
GYNELSO
N,
LLC
9808
0039
12/28/20
10ElectricGe
neratio
nFacility
NaturalGa
s22
0MW
each
Particulate
matter,total
<
2.5μ
(TPM
2.5)
0.00
6LB/M
MBT
UHO
URLYAV
ERAG
EBA
CTPSD
02combine
dcyclecombu
stionturbines
followed
byHR
SGsu
singdu
ctbu
rners.
*IL01
12NELSO
NEN
ERGY
CENTER
INVE
NER
GYNELSO
N,
LLC
9808
0039
12/28/20
10ElectricGe
neratio
nFacility
NaturalGa
s22
0MW
each
Particulate
matter,total&
10μ(TPM
10)
0.01
2LB/M
MBT
UHO
URLYAV
ERAG
EBA
CTPSD
02combine
dcyclecombu
stionturbines
followed
byHR
SGsu
singdu
ctbu
rners.
AK00
73
INTERN
ATIONAL
STAT
IONPO
WER
PLAN
TCH
UGA
CHELEC
TRIC
ASSO
CIAT
ION
AQ01
64CP
T01
12/20/20
10FuelCo
mbu
stion
NaturalGa
s59
900HP
Particulate
matter,
filterable&10
μ(FPM
10)
Combu
stionTurbines
EUIDs5
8use
good
combu
stionpractices
involve
increasin
gtheresid
ence
timeand
excessoxygen
toen
sure
complete
combu
stionwhich
inturn
minim
izeparticulates
with
outa
naddon
control
0.00
66LB/M
MBT
U3HO
UR
BACT
PSD
0EU
IDs5
8Co
mbine
dCycleNaturalGa
sfired
Combu
stionTurbines
ratedat
59,900
hp(44.7MW)
VA03
15
WAR
RENCO
UNTY
POWER
PLAN
TDO
MINION
VIRG
INIA
ELEC
TRIC
ANDPO
WER
COMPA
NY
8139
100
712
/17/20
10
COMBINED
CYCLE
TURB
INE&am
p;DU
CTBU
RNER
,3NaturalGa
s29
96MMBT
U/H
Particulate
matter,total&
10μ(TPM
10)
NaturalGa
sonly,fuelhasm
axim
umsulfu
rcon
tent
of0.00
03%by
weight .
8LB/H
3HR
AVG.
(WITHO
UTDU
CTBU
RNER
FIRING)
BACT
PSD
0
Threeun
its(M
itsub
ishinaturalgasfired
combu
stion
turbine(CT)
gene
rator,M
odelM50
1GA
C),w
ithdu
ctbu
rner
VA03
15
WAR
RENCO
UNTY
POWER
PLAN
TDO
MINION
VIRG
INIA
ELEC
TRIC
ANDPO
WER
COMPA
NY
8139
100
712
/17/20
10
COMBINED
CYCLE
TURB
INE&am
p;DU
CTBU
RNER
,3NaturalGa
s29
96MMBT
U/H
Particulate
matter,total&
2.5μ(TPM
2.5)
NaturalGa
sonly,fuelhasm
axim
umsulfu
rcon
tent
of0.00
03%by
weight .
8LB/H
3HR
AVG.
(WITHO
UTDU
CTBU
RNER
FIRING)
BACT
PSD
0
Threeun
its(M
itsub
ishinaturalgasfired
combu
stion
turbine(CT)
gene
rator,M
odelM50
1GA
C),w
ithdu
ctbu
rner
TX05
90KINGPO
WER
STAT
ION
PONDE
RACA
PITA
LMAN
AGEM
ENTGP
INC
PSDT
X112
58/5/20
10Turbine
naturalgas
1350
MW
Particulate
matter,total
(TPM
)
uselowashfuel(naturalgaso
rlow
sulfu
rdieselasa
backup
)and
good
combu
stionpractices
11.1
LB/H
BACT
PSD
0
2configurationscen
arios:either
four
Siem
ensS
GT6
5000
FCT
Gsincombine
dcyclemod
e(Scenario
A)or
four
GEFram
e7FACT
Gsincombine
dcyclemod
e(Scenario
B).
TX05
90KINGPO
WER
STAT
ION
PONDE
RACA
PITA
LMAN
AGEM
ENTGP
INC
PSDT
X112
58/5/20
10Turbine
naturalgas
1350
MW
Particulate
matter,total&
10μ(TPM
10)
useof
lowashfuel(naturalgaso
rlow
sulfu
rdieselasa
backup
)11
.1LB/H
BACT
PSD
0
2configurationscen
arios:either
four
Siem
ensS
GT6
5000
FCT
Gsincombine
dcyclemod
e(Scenario
A)or
four
GEFram
e7FACT
Gsincombine
dcyclemod
e(Scenario
B).
TX05
90KINGPO
WER
STAT
ION
PONDE
RACA
PITA
LMAN
AGEM
ENTGP
INC
PSDT
X112
58/5/20
10Turbine
naturalgas
1350
MW
Particulate
matter,total&
2.5μ(TPM
2.5)
useof
lowashfuel(naturalgaso
rlow
sulfu
rdieselasa
backup
)11
.1LB/H
BACT
PSD
0
2configurationscen
arios:either
four
Siem
ensS
GT6
5000
FCT
Gsincombine
dcyclemod
e(Scenario
A)or
four
GEFram
e7FACT
Gsincombine
dcyclemod
e(Scenario
B).
*CO00
73
PUEB
LOAIRP
ORT
GENER
ATING
STAT
ION
BLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
7/22
/201
0Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
Particulate
matter,total
(TPM
)Use
ofpipe
linequ
ality
naturalgas
and
good
combu
stor
desig
n4.3LB/HR
AVEOVE
RSTAC
KTEST
LENGT
HBA
CTPSD
0
ThreeGE
,LMS600
0PF,naturalgasfired
,com
bine
dcycleCT
G,ratedat
373MMBtupe
rhou
reach,based
onHH
Vandon
e(1)H
RSGeach
with
noDu
ctBu
rners.
7CT
soverall.
*CO00
73
PUEB
LOAIRP
ORT
GENER
ATING
STAT
ION
BLAC
KHILLSELEC
TRIC
GENER
ATION,LL C
09PB
0591
7/22
/201
0Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
Particulate
matter,total&
10μ(TPM
10)
Use
ofpipe
linequ
ality
naturalgas
and
good
combu
stor
desig
n4.3LB/HR
AVEOVE
RSTAC
KTEST
LENGT
HBA
CTPSD
0
ThreeGE
,LMS600
0PF,naturalgasfired
,com
bine
dcycleCT
G,ratedat
373MMBtupe
rhou
reach,based
onHH
Vandon
e(1)H
RSGeach
with
noDu
ctBu
rners.
7CT
soverall.
ID00
18LANGL
EYGU
LCH
POWER
PLAN
TIDAH
OPO
WER
COMPA
NY
P20
09.009
26/25
/201
0
COMBU
STIONTU
RBINE,
COMBINED
CYCLEW/
DUCT
BURN
ERNAT
URA
LGA
S(ONLY)
2375
.28MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
GOODCO
MBU
STIONPR
ACTICE
S(GCP
)0
SEENOTE
BACT
PSD
0SIEM
ENSSG
T650
00FCO
MBU
STIONTU
RBINE(NGC
T,CC
GT),du
ctbu
rne r
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total
(TPM
)PU
CQUALITYNAT
URA
LGA
S12
LB/H
12MONTH
ROLLINGAV
G(NO
DUCT
BURN
ING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total&
2.5μ(TPM
2.5)
PUCQUALITYNAT
URA
LGA
S12
LB/H
PUCQUALITY
NAT
URA
LGA
SBA
CTPSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NaturalGa
s15
4MW
Particulate
matter,total
(TPM
)PU
CQUALITYNAT
URA
LGA
S12
LB/H
12MONTH
ROLLINGAV
G(NO
DUCT
BURN
ING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NaturalGa
s15
4MW
Particulate
matter,total&
2.5μ(TPM
2.5)
PUCQUALITYNAT
URA
LGA
S12
LB/H
12MONTH
ROLLINGAV
G(NO
DUCT
BURN
ING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total
(TPM
)PU
CQUALITYNAT
URA
LGA
S18
LB/H
12MONTH
ROLLINGAV
G(W
/DU
CTBU
RNING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total&
2.5μ(TPM
2.5)
PUCQUALITYNAT
URA
LGA
S18
LB/H
12MONTH
ROLLINGAV
G(W
/DU
CTBU
RNING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total
(TPM
)USE
PUCQUALITYNAT
URA
LGA
S18
LB/H
12MONTH
ROLLINGAV
G(W
/DU
CTBU
RNING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
CA11
91
VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
Particulate
matter,total&
2.5μ(TPM
2.5)
PUCQUALITYNAT
URA
LGA
S18
LB/H
12MONTH
ROLLINGAV
G(W
/DU
CTBU
RNING)
BACT
PSD
015
4MW
Combine
dCycleCo
mbu
stionTurbine
Gene
rator
NJ0
074
WESTDE
PTFO
RDEN
ERGY
LSPO
WER
5607
8BO
P080
001
5/6/20
09TU
RBINE,CO
MBINED
CYCLE
NAT
URA
LGA
S17
298MMFT3/YR
Particulate
matter,
filterable&10
μ(FPM
10)
CLEA
NFU
ELS
NAT
URA
LGA
SAN
DULTRA
LOW
SULFUR(15P
PMSU
LFUR)
DISTILLATE
OI L
18.66LB/H
Other
Case
byCase
0
NJ0
074
WESTDE
PTFO
RDEN
ERGY
LSPO
WER
5607
8BO
P080
001
5/6/20
09TU
RBINE,CO
MBINED
CYCLE
NAT
URA
LGA
S17
298MMFT3/YR
Particulate
matter,
filterable<
2.5μ(FPM
2.5)
USE
OFCLEA
NFU
ELS,NAT
URA
LGA
SAN
DULTRA
LOW
SULFURDISTILLATE
OIL
18.66LB/H
Other
Case
byCase
0
OK01
29CH
OUTEAU
POWER
PLAN
TAS
SOCIAT
EDELEC
TRIC
COOPERA
TIVE
INC
2007
115
C(M
1)PSD
1/23
/200
9
COMBINED
CYCLE
COGE
NER
ATION
>25M
WNAT
URA
LGA
S18
82MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
NAT
URA
LGA
SFU
E L6.59
LB/H
3HAV
GN/A
0SIEM
ENSV8
4.3A
TX05
42PEAR
SALL
POWER
PLAN
T
SOUTH
TEXA
SELEC
TRIC
COOPERA
TIVE
INC.
8482
41/23
/200
9ELEC
TRICAL
GENER
ATION
NAT
URA
LGA
S8.44
MW
Particulate
Matter(PM
)
TCEQ
¿SCU
RREN
TBA
CTGU
IDELINES
PROVIDE
NOGU
IDAN
CEFO
RPM
EMISSIONSFO
RTH
ISTYPE
OFEN
GINE.
LOW
ASHFU
ELAN
DCO
MBU
STION
CONTR
OLSAR
EUSEDAS
THECO
NTR
OL
METHO
D.STECWILLUSE
GOOD
0SEENOTE
BACT
PSD
0TW
ENTY
FOURSPAR
KIGNITIONINTERN
ALCO
MBU
STIONEN
GINES
CA11
98MORR
OBA
YPO
WER
PLAN
TDY
NER
GYMORR
OBA
YLLC
SCC20
0501
9/25
/200
8CO
MBU
STIONTU
RBINE
GENER
ATOR
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)
USE
PIPELINEQUALITYNAT
URA
LGA
S,OPERA
TEDU
CTBU
RNER
SNOMORE
THAN
4000
HRSPERYEAR
(12MONTH
ROLLINGAV
GBA
SIS)
11LB/H
6HR
ROLLINGAV
G(NODU
CTBU
RNING)
BACT
PSD
04GE
Fram
e7,Mod
elPG
7241
,180
MW
gasfired
turbines, twoHR
SGsw
ithdu
ctbu
rners
CA11
98MORR
OBA
YPO
WER
PLAN
TDY
NER
GYMORR
OBA
YLLC
SCC20
0501
9/25
/200
8CO
MBU
STIONTU
RBINE
GENER
ATOR
NAT
URA
LGA
S18
0MW
Particulate
matter,
filterable&10
μ(FPM
10)
USE
PIPELINEQUALITYNAT
URA
LGA
S,OPERA
TEDU
CTBU
RNER
SNOMORE
THAN
4000
HRSPERYEAR
(12MONTH
ROLLINGAV
GBA
SIS)
11LB/H
6HR
ROLLINGAV
G(NODU
CTBU
RNING)
BACT
PSD
04GE
Fram
e7,Mod
elPG
7241
,180
MW
gasfired
turbines,twoHR
SGsw
ithdu
ctbu
rners
CA11
98MORR
OBA
YPO
WER
PLAN
TDY
NER
GYMORR
OBA
YLLC
SCC20
0501
9/25
/200
8CO
MBU
STIONTU
RBINE
GENER
ATOR
NAT
URA
LGA
S18
0MW
Particulate
matter,total
(TPM
)
USE
PIPELINEQUALITYNAT
URA
LGA
S,OPERA
TEDU
CTBU
RNER
SNOMORE
THAN
4000
HRSPERYEAR
(12MONTH
ROLLINGAV
GBA
SIS)
11LB/H
6HR
ROLLINGAV
G(NODU
CTBU
RNING)
BACT
PSD
04GE
Fram
e7,Mod
elPG
7241
,180
MW
gasfired
turbines, twoHR
SGsw
ithdu
ctbu
rners
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
98MORR
OBA
YPO
WER
PLAN
TDY
NER
GYMORR
OBA
YLLC
SCC20
0501
9/25
/200
8CO
MBU
STIONTU
RBINE
GENER
ATOR
NAT
URA
LGA
S18
0MW
Particulate
matter,
filterable&10
μ(FPM
10)
USE
PIPELINEQUALITYNAT
URA
LGA
S,OPERA
TEDU
CTBU
RNER
SNOMORE
THAN
4000
HRSPERYEAR
(12MONTH
ROLLINGAV
GBA
SIS)
11LB/H
6HR
ROLLINGAV
G(NODU
CTBU
RNING)
BACT
PSD
04GE
Fram
e7,Mod
elPG
7241
,180
MW
gasfired
turbines,twoHR
SGsw
ithdu
ctbu
rners
FL03
04CA
NEISLAND
POWER
PARK
FLORIDA
MUNICIPAL
POWER
AGEN
CY(FMPA
PSDFL
400
(097
0043
014
AC)
9/8/20
08
300MW
COMBINED
CYCLECO
MBU
STION
TURB
INE
NAT
URA
LGA
S18
60MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
FUEL
SPEC
IFICAT
IONS:2
GRS/10
0SCF
OFGA
S2GR
S/10
0SCF
GAS
BACT
PSD
0
GASFU
ELED
GENER
ALELEC
TRIC
7241
FACT
,A
SUPP
LEMEN
TARY
FIRE
DHR
SGWITHNAT
URA
LGA
SFU
ELED
DUCT
BURN
ERS(DB)
FL03
03
FPLWESTCO
UNTY
ENER
GYCE
NTER
UNIT3
FLORIDA
POWER
AND
LIGH
TCO
MPA
NY
(FP&
L)
0990
64600
2AC
(PSD
FL39
6)7/30
/200
8
THRE
ENOMINAL
250
MW
CTG(EAC
H)WITH
SUPP
LEMEN
TARY
FIRE
DHR
SGNAT
URA
LGA
S23
33MMBT
U/H
Particulate
Matter(PM
)2GR
/100
SCF
GAS
BACT
PSD
03CO
MBU
STIONTU
RBINEELEC
TRICAL
GENER
ATORS
(CTG
)
LA01
36
PLAQ
UEM
INE
COGE
NER
ATION
FACILIT Y
THEDO
WCH
EMICAL
COMPA
NY
PSDLA
659(M2)
7/23
/200
8
(4)G
ASTU
RBINES/DUCT
BURN
ERS
NAT
URA
LGA
S28
76MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
USE
OFCLEA
NBU
RNINGFU
ELS
33.5
LB/H
HOURLY
MAX
IMUM
BACT
PSD
04NAT
URA
LGA
SFIRE
DGE
FRAM
E7FA
GASTU
RBINES,
DUCT
BURN
ERSYSTEM
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WEST
ELEC
TRIC
POWER
COMPA
NY(SWEPCO
)PSDLA
726
3/20
/200
8TW
OCO
MBINED
CYCLE
GASTU
RBINE S
NAT
URA
LGA
S21
10MMBT
U/H
Particulate
Matter(PM
)
GOODCO
MBU
STIONDE
SIGN
/PRO
PER
OPERA
TINGPR
ACTICE
S/PIPELINE
QUALITYNAT
URA
LGA
SAS
FUE L
24.23LB/H
MAX
BACT
PSD
0CTG1TU
RBINE/DU
CTBU
RNER
(EQT012
)CT
G2TU
RBINE/DU
CTBU
RNER
(EQT013
)
CT01
51KLEENEN
ERGY
SYSTEM
S,LLC
KLEENEN
ERGY
SYSTEM
S,LLC
10401
31AN
D10
401
332/25
/200
8
SIEM
ENSSG
T650
00F
COMBU
STIONTU
RBINE
#1AN
D#2
(NAT
URA
LGA
SFIRE
D)WITH44
5MMBT
U/HRNAT
URA
LGA
SDU
CTBU
RNE R
NAT
URA
LGA
S2.1MMCF/H
Particulate
matter,
filterable&10
μ(FPM
10)
11LB/H
W/O
UTDU
CTBU
RNER
BACT
PSD
02SIEM
ENSSG
T650
00FCO
MBU
STIONTU
RBINE,DU
CTBU
RNER
ANDAN
HRSG
.
MN00
71FA
IRBA
ULT
ENER
GYPA
RK
MINNESOTA
MUNICIPAL
POWER
AGEN
CY13
1000
7100
36/5/20
07
COMBINED
CYCLE
COMBU
STIONTU
RBINE
W/DUCT
BURN
ERNAT
URA
LGA
S17
58MMBT
U/H
Particulate
matter,
filterable<
10μ(FPM
10)
0.01
LB/M
MBT
UCT
GNGORCT
G&
DBNG
BACT
PSD
0.03
LB/M
MBT
U
CTGOIL&DB
NOT
OPERA
TEORDB
NG
OROIL
GE7FACO
MBU
STIONTU
RBINEGE
NER
ATORWITH
DUCT
BURN
ER.
CA11
44BLYTHE
ENER
GYPR
OJECT
IICA
ITHN
ESSBLYTHE
II,LLC
SE02
014/25
/200
72CO
MBU
STION
TURB
INES
NAT
URA
LGA
S17
0MW
Particulate
matter,
filterable<
10μ(FPM
10)
USE
PUBLICUTILITY
COMMISSION
QUALITYNAT
URA
LGA
SW/S
ULFUR
CONTENTLESS
THAN
OREQ
UAL
TO0.5GR
AINSPER10
0SCF
6LB/H
BACT
PSD
0
OK01
17
PSO
SOUTH
WESTERN
POWER
PLT
PUBLICSERV
ICECO
OFOKLAH
OMA
2003
403C
PSD
2/9/20
07GA
SFIRE
DTU
RBINE S
Particulate
matter,
filterable&10
μ(FPM
10)
USE
OFLO
WAS
HFU
EL(NAT
URA
LGA
S)AN
DEFFICIEN
TCO
MBU
STION
0.00
93LB/M
MBT
UBA
CTPSD
0
FL02
86FPLWESTCO
UNTY
ENER
GYCE
NTER
FLORIDA
POWER
AND
LIGH
TCO
MPA
NY
PSDFL
354
AND09
9064
600
1AC
1/10
/200
7
COMBINED
CYCLE
COMBU
STIONGA
STU
RBINES
6UNITS
NAT
URA
LGA
S23
33MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
2GS
/100
SCF
GAS
BACT
PSD
06MODE
L50
1GGA
STU
RBINEELEC
TRICAL
GENER
ATORSETS,D
UCT
BURN
E R
OK01
15LAWTO
NEN
ERGY
COGE
NFA
CILITY
ENER
GETIX
2001
205CM
1PSD
12/12/20
06CO
MBU
STIONTU
RBINE
ANDDU
CTBU
RNER
Particulate
matter,
filterable&10
μ(FPM
10)
GOODCO
MBU
STIONPR
ACTICE
S0.00
67LB/M
MBT
UBA
CTPSD
0
TX04
97INEO
SCH
OCO
LATE
BAYO
UFA
CILIT Y
INEO
SUSA
LLC
PSDTX
983
AND46
192
8/29
/200
6
COGE
NER
ATIONTR
AIN
2AN
D3(TURB
INEAN
DDU
CTBU
RNER
EMISSIONS)
NAT
URA
LGA
S35
MW
Particulate
matter,
filterable&10
μ(FPM
10)
THEUSE
OFPR
OPERCO
MBU
STION
CONTR
OLAN
DFIRINGONLY
GASEOUS
FUELSCO
NTA
ININGNOAS
HISBA
CTFO
RPA
RTICULATE
MAT
TERFROM
THE
GASFIRE
DTU
RBINES
AND
DUCT
BURN
ERS.
10.03LB/H
BACT
PSD
02TU
RBINES
ANDTW
OHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS,W
ITH3DU
CTBU
RNER
S .
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:Pa
rtic
ulat
es
Prop
osed
Part
icul
ate
Lim
it:11
.9lb
/hr=
0.00
4lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX05
02
NAC
OGD
OCH
ESPO
WER
STER
NE
GENER
ATING
FACILIT Y
NAC
OGD
OCH
ESPO
WER
LLC
PSDTX
1015
AND49
293
6/5/20
06
WESTINGH
OUSE/SIEME
NSMODE
LSW
501F
GASTU
RBINEW/4
16.5
MMBT
UDU
CTBU
RNER
SNAT
URA
LGA
S19
0MW
Particulate
matter,
filterable&10
μ(FPM
10)
STEA
GPO
WER
LLCRE
PRESEN
TSTH
EFIRINGOFPIPELINENAT
URA
LGA
SIN
THECO
MBU
STIONTU
RBINES
AND
DUCT
FIRE
DHR
SGSAS
BACT
FOR
PM10
.26
.9LB/H
BACT
PSD
0
3WESTINGH
OUSE/SIEMEN
SMODE
L50
1FCO
MBU
STIONTU
RBINES,THR
EEHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSGS
)WITH37
5MMBT
U/HR
DUCT
BURN
ERS
NY00
95
CAITHN
ESBE
LLPO
RTEN
ERGY
CENTER
CAITHN
ESSBE
LLPO
RT,
LLC
PSDNY00
015/10
/200
6CO
MBU
STIONTU
RBINE
NAT
URA
LGA
S22
21MMBU
T/H
Particulate
matter,
filterable&10
μ(FPM
10)
LOW
SULFURFU
E L0.00
55LB/M
MBT
UNODU
CTBU
RNING
BACT
PSD
0CO
MBINED
CYCLEWITHDU
CTFIRINGUPTO
494
MMBT
U/H
CO00
56
ROCK
YMOUNTA
INEN
ERGY
CENTER,
LLC
CALPINECO
RP.
05WE052
45/2/20
06
NAT
URA
LGA
SFIRE
D,CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S30
0MW
Particulate
matter,
filterable<
10μ(FPM
10)
NAT
URA
LGA
SQUALITYFU
ELONLY
ANDGO
ODCO
MBU
STIONCO
NTR
OL
PRAC
TICE
S.0.00
74LB/M
MBT
UBA
CTPSD
01CO
MBU
STIONTU
RBINE,GA
SFIRE
D,CO
MBINED
CYCLE.
TX05
16
CITY
PUBLIC
SERV
ICEJK
SPRU
CEELEC
TRICE
GENER
ATINGUNIT
2CITY
PUBLICSERV
ICE
PSDTX
1037
AND70
492
12/28/20
05SPRU
CEPO
WER
GENER
ATORUNITNO2
Particulate
Matter(PM
)26
4LB/H
BACT
PSD
0
NV00
35
TRAC
YSU
BSTA
TION
EXPA
NSION
PROJECT
SIER
RAPA
CIFIC
POWER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION#2
WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
Particulate
matter,
filterable&10
μ(FPM
10)
BEST
COMBU
STIONPR
ACTICE
S.0.01
1LB/M
MBT
U3HO
URRO
LLING
BACT
PSD
02TU
RBINEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
NV00
35
TRAC
YSU
BSTA
TION
EXPA
NSION
PROJECT
SIER
RAPA
CIFIC
POWER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION#1
WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
Particulate
matter,
filterable&10
μ(FPM
10)
BEST
COMBU
STIONPR
ACTICE
S.0.01
1LB/M
MBT
U3HO
URRO
LLING
BACT
PSD
02TU
RBINEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
OR00
41WAN
APAEN
ERGY
CENTER
DIAM
ONDWAN
APAI,
L.P.
R10P
SDOR
0501
8/8/20
05
COMBU
STIONTU
RBINE
&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S23
84.1
MMBT
U/H
Particulate
Matter(PM
)0
SEEPO
LUTA
NT
NOTE
BACT
PSD
0GE
7241
FATU
RBINEAN
DDU
CTBU
RNER
FL02
65HINES
POWER
BLOCK
4PR
OGR
ESSEN
ERGY
PSDFL
342
AND10
5023
401
0AC
6/8/20
05CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S53
0MW
Particulate
matter,
filterable&10
μ(FPM
10)
CLEA
NFU
ELS
10%OPA
CITY
6MIM
BLOCK
AVER
AGE
BACT
PSD
10%OPA
CITY
LA01
92CR
ESCE
NTCITY
POWER
CRESEN
TCITY
POWER
,LLC
PSDLA
704
6/6/20
05GA
STU
RBINES
187
MW
(2)
2006
MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
USE
OFCLEA
NBU
RNINGFU
ELAN
DGO
ODCO
MBU
STIONPR
ACTICE
S29
.4LB/H
HOURLY
MAX
IMUM
BACT
PSD
0NOTAV
AILABLE
MI0
366
BERR
IENEN
ERGY
,LLC
BERR
IENEN
ERGY
,LLC
32301
A4/13
/200
5
3CO
MBU
STION
TURB
INES
ANDDU
CTBU
RNER
SNAT
URA
LGA
S15
84MMBT
U/H
Particulate
matter,
filterable&10
μ(FPM
10)
STAT
EOFTH
EAR
TCO
MBU
STION
TECH
NIQUES
ANDUSE
OFNAT
URA
LGA
SAR
EBA
CTFO
RPM
10.
19LB/H
BACT
PSD
0Turbines
with
ductfiring
FL02
63FPLTU
RKEY
POINT
POWER
PLAN
TFLORIDA
POWER
AND
LIGH
TPSDFL
338
2/8/20
0517
0MW
COMBU
STION
TURB
INE,4UNITS
NAT
URA
LGA
S17
0MW
Particulate
Matter(PM
)
PM/PM10
WILLBE
MINIM
IZED
BYTH
EEFFICIEN
TCO
MBU
STIONOFNAT
URA
LGA
SAN
DDISTILLATE
OILAT
HIGH
TEMPERA
TURE
S.0
SEENOTE
BACT
PSD
04GA
STU
RBINES
with
ductbu
rne r
WA03
28
BPCH
ERRY
POINT
COGE
NER
ATION
PROJECT
BPWESTCO
AST
PRODU
CTS,LLC
EFSEC/20
0201
1/11
/200
5
GE7FACO
MBU
STION
TURB
INE&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S17
4MW
Particulate
matter,
filterable&10
μ(FPM
10)
LIMITFU
ELTYPE
TONAT
URA
LGA
S0
BACT
PSD
0*SEE
NOTES
3CT
&HS
RGUNITS,DU
CTBU
RNER
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX07
67LO
NC.HILL
POWER
STAT
ION
LONC.HILL,L.P.
1149
11AN
DPSDT
X138
010
/6/201
5Co
mbine
dCycle
Turbines
(>25
MW)
naturalgas
195MW
Oxidatio
nCatalyst
2PP
MRO
LLING24
HRAV
ERAG
EBA
CTPSD
Twopo
wer
configurationop
tions
authorize
dSiem
ens–
240MW
+25
0millionBritish
thermalun
itspe
rhou
r(M
MBtu/hr)d
uctb
urne
r GE–19
5MW
+67
0MMBtu/hr
ductbu
rner
*TX07
27CE
DARBA
YOUELEC
TRIC
GENER
ATINGSTAT
ION
NRG
TEXA
SPO
WER
LLC
8028
9&
PSDT
X108
2M1
3/31
/201
5Co
mbine
dcycle
turbines
NaturalGa
s18
7MW/turbine
Oxidatio
ncatalysts
15PP
MVD
15%O2
BACT
PSD
02naturalgas
fired
combu
stionturbines
*TX07
14SRBE
RTRO
NELEC
TRIC
GENER
ATINGSTAT
ION
NRG
TEXA
SPO
WER
LLC
1027
31PSDT
X129
412
/19/20
14(2)com
bine
dcycle
turbines
naturalgas
240MW
oxidationcatalyst
4PP
MVD
@15
%O2,ONE
HOUR
BACT
PSD
0
Thegasturbine
swillbe
oneof
threeop
tions:(1)
Two
Siem
ensM
odelF5
(SF5)C
TGsw
ithdu
ctfired
HRSG
,(2)
TwoGe
neralElectric
Mod
el7FA(GE7FA
)CTG
swith
adu
ctfired
HRSG
,(3)
TwoMitsub
ishiH
eavy
Indu
stry
GFram
e(M
HI50
1G)C
TGsw
ithadu
ctfired
HRSG
*CO00
76PU
EBLO
AIRP
ORT
GENER
ATINGSTAT
ION
BLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
12/11/20
14Four
combine
dcycle
combu
tionturbines
natural gas
373mmbtu/hr
each
Catalytic
Oxidatio
n.38
LB/HR
4HR
ROLLINGAV
E/
STAR
TUPAN
DSH
UTD
OWN
BACT
PSD
0
SU/SDLimit.
GE,LM60
00PF,naturalgasfire
d,combine
dcyclecombu
stionturbines,w
ithHR
SGandno
duct
burners.
*TX07
10VICT
ORIAPO
WER
STAT
ION
VICT
ORIAWLE
L.P.
1082
58PSDT
X134
812
/1/201
4combine
dcycleturbinenaturalgas
197MW
oxidationcatalyst
4PP
MVD
@15
%O2,3HR
ROLLINGAV
ERAG
EBA
CTPSD
0Ge
neralElectric
7FA.04
with
ductbu
rners.
*WV00
25
MOUNDS
VILLE
COMBINED
CYCLE
POWER
PLAN
TMOUNDS
VILLEPO
WER
,LLC
R1400
3011
/21/20
14Co
mbine
dCycle
Turbine/Du
ctBu
rner
NaturalGa
s21
59mmBtu/Hr
Oxidatio
nCatalyst+
Combu
stionCo
ntrols
9.2LB/HR
BACT
PSD
2PP
M@
15%O2
2Nom
inal19
7mW
Gene
ralElectric
Fram
e7FA.04
Turbinew/D
uctB
urne
r
*TX07
12TR
INIDAD
GENER
ATING
FACILITY
SOUTH
ERNPO
WER
COMPA
NY
1113
93PSDT
X136
811
/20/20
14combine
dcycleturbinenaturalgas
497MW
oxidationcatalyst
4PP
MVD
@15
%O2,24
HRRO
LLINGAV
ERAG
EBA
CTPSD
0AMitsub
ishiH
eavy
Indu
strie
s(MHI)J
mod
elgasfire
dcombu
stionturbineeq
uipp
edwith
aHR
SGandDB
*TX06
72CO
RPUSCH
RISTI
LIQUEFAC
TIONPLAN
TCO
RPUSCH
RISTI
LIQUEFAC
TIONLLC
PSDT
X130
610
5710
9/12
/201
4Re
frigeration
compressorturbine
snaturalgas
4000
0hp
drylowem
ission
combu
stors
29PP
MVD
@15
%O2,4HO
UR
ROLLINGAV
ERAG
EBA
CTPSD
0(6)G
ELM
2500
+DL
Eturbines
*TX06
89CE
DARBA
YOUELEC
TRIC
GENER
ATIONSTAT
ION
NRG
TEXA
SPO
WER
1058
10,
PSDT
X130
88/29
/201
4Co
mbine
dcyclenatural
gasturbine
sNaturalGa
s22
5MW
OC
2PP
MRO
LLING12
MONTH
SBA
CTPSD
0
2CT
Gwith
ductbu
rnersa
ndHR
SG.Three
optio
nswere
prop
osed
:Siemen
sMod
elF5,G
E7Fa,and
Mitsub
ishi
HeavyIndu
stry
GFram
e.
*TX06
78FREEPO
RTLN
GPR
ETRE
ATMEN
TFA
CILITY
FREEPO
RTLN
GDE
VELO
PMEN
TLP
1048
40N17
0PSDT
X130
27/16
/201
4Co
mbu
stionTurbine
naturalgas
87MW
oxidationcatalyst
4PP
MVD
@15
%O2,3HO
UR
ROLLINGAV
ERAG
EBA
CTPSD
0
*TX07
13TENAS
KABR
OWNSV
ILLE
GENER
ATINGSTAT
ION
TENAS
KABR
OWNSV
ILLE
PART
NER
S,LLC
1084
11PSDT
X135
04/29
/201
4(2)com
bine
dcycle
turbines
naturalgas
274MW
oxidationcatalyst
2PP
MVD
@15
%O2,24
HRRO
LLINGAV
ERAG
EBA
CTPSD
0
Usin
gcombine
dcyclegasturbine
(CCG
T)techno
logy
and
fueled
bypipe
linequ
ality
naturalgas.Theprop
osed
perm
itauthorize
stwoCT
s(2x1CC
GT),althou
ghthefin
alde
signselected
byTenaskamay
onlyconsist
ofon
eCT
(1x1
CCGT
).Includ
esdu
ctbu
rners
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#1
combine
dcycle
naturalgas
2258
mmBtu/hr
catalytic
oxidize
r2PP
M30
DAYRO
LLING
AVG.
@15
%O2
BACT
PSD
0
twoiden
ticalSiem
ensS
GT650
00Fcombine
dcycle
turbines
with
outd
uct firing,eachat
2258
mmBtu/hr
gene
ratin
gapprox.300
MW
each.
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine#2
combine
dcycle
naturalgas
2258
mmBtu/hr
COcatalyst
2PP
M30
DAYRO
LLING
AVER
AGE
BACT
PSD
0Tw
ocombine
dcycleturbines
with
outd
uctb
urning.
*TX06
60FG
ETEXA
SPO
WER
IAND
FGETEXA
SPO
WER
IIFG
EPO
WER
LLC
PSDT
X136
43/24
/201
4Alstom
Turbine
NaturalGa
s23
0.7MW
Oxidatio
ncatalyst
2PP
MVD
CORR
ECTEDTO
15%
O2,RO
LLING3HR
AVE
BACT
PSD
0Four
(4)A
lstom
GT24
CTGs
,eachwith
aHR
SGandDB
s,max
desig
ncapacity
409MMBtu/hr
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*OR00
50TR
OUTD
ALEEN
ERGY
CENTER,
LLC
TROUTD
ALEEN
ERGY
CENTER,
LLC
2602
353/5/20
14
Mitsub
ishiM
501GA
Ccombu
stionturbine,
combine
dcycle
configurationwith
duct
burner.
naturalgs
2988
MMBtu/hr
Oxida
oncatalyst;
Limitthetim
einstartupor
shutdo
wn.
3.3PP
MDV
AT15
%O2
3HR
ROLLING
AVER
AGEONNG
BACT
PSD
0
3naturalgas
fired
turbines,one
ofwhich
willbe
acombine
dcycleun
itwith
ductbu
rner
andhe
atrecovery
steam
gene
rator.
*PA02
98
FUTU
REPO
WER
PA/G
OODSPRINGS
NGC
CFA
CILITY
FUTU
REPO
WER
PAINC
5400
082A
3/4/20
14
Turbine,CO
MBINED
CYCLEUNIT(Siemen
s50
00)
NaturalGa
s22
67MMBtu/hr
COCatalyst
3PP
MVD
@15
%OXYGE
NBA
CTPSD
84.8
TPY
BASEDONA12
MONTH
ROLLING
TOTA
L
Combu
stionturbinegene
ratora
ndahe
atrecovery
steam
gene
ratorthatw
illprovidesteam
todriveasin
glesteam
turbinegene
rator.Each
heat
recovery
steam
gene
rator
willbe
equipp
edwith
adu
ctbu
rner
*PA02
96BE
RKSHO
LLOW
ENER
GYAS
SOCLLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and#2
NaturalGa
s30
46MMBtu/hr
COCatalyst
211.92
TPY
12MONTH
ROLLING
TOTA
LBA
CTPSD
02combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorswith
ductbu
rners
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Oxidatio
ncatalyst
techno
logy
andgood
combu
stionpractices.
4PP
M
24HRO
LL.A
VG.,
NOT
STAR
TUP/SH
UTD
OW
NBA
CTPSD
0
2combine
dcyclenaturalgas
fired
combu
stionturbine
gene
rators(CTG
s)with
Heat
Recovery
Steam
Gene
rators
(HRSGs
)equ
ippe
dwith
ductbu
rnersfor
supp
lemen
tal
firing.
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3FG
CTGH
RSG:
Startup
&am
p;Shutdo
wn
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Oxidatio
ncatalyst
techno
logy
andgood
combu
stionpractices.
247.3LB/H
OPERA
TINGHO
UR
DURINGSTAR
TUP
BACT
PSD
0
Thisprocessiside
ntified
sepe
ratelyforthe
startupand
shutdo
wnpe
riods
associated
with
theprocess
equipm
entinclude
dinFG
CTGH
RSG.
*TX06
41PINEC
REST
ENER
GYCE
NTER
PINEC
REST
ENER
GYCE
NTERLLC
PSDT
X129
811
/12/20
13combine
dcycleturbinenaturalgas
700MW
oxidationcatalyst
2PP
MVD
3HR
ROLL
AVG,
15%
OXYGE
N,8010
0%LO
ADBA
CTPSD
0
2naturalgas
fired
combu
stionturbines
(CTs),each
exhaustin
gto
afired
heat
recovery
steam
gene
rator
(HRSG)
toprod
ucesteam
todriveashared
steam
turbine
gene
rator.Threemod
elso
fcom
bustionturbines
are
beingconsidered
:Gen
eralElectric7FA.05
,the
Siem
ens
*TX07
09SA
NDHILL
ENER
GYCE
NTER
CITY
OFAU
STIN
4810
6,PSDT
X101
2M2
9/13
/201
3
Naturalgasfired
combine
dcycle
turbines
NaturalGa
s17
3.9MW
OC
2PP
M1H
RAV
G.BA
CTPSD
0GE
7FANaturalGa
sfired
Combine
dCycleTurbinewith
DBfired
HRSG
*TX06
98BA
YPORT
COMPLEX
AIRLIQUIDELARG
EINDU
STRIES
U.S.,L.P.
9346
PSDT
X612
M2
9/5/20
13(4)cogen
eration
turbines
naturalgas
90MW
DLNandClosed
Loop
Emissions
Controls(CLEC)
15PP
MVD
@15
%O2
BACT
PSD
0(4)G
E7EAturbines
providingpo
wer
andprocesssteam
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4
nat.gasfire
dCT
Gw/
DBforH
RSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
Efficient
combu
stion
controlplusc
atalytic
oxidationsystem
.4PP
MV
24HRO
LLAV
GDE
T.EA
CHHTU
RBINE
OPERA
TBA
CTPSD
0Naturalgasfire
dCT
Gwith
DBforH
RSG;
4total.
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B:4nat
gasfire
dCT
Gwith
DBforH
RSG:
Startup/shutdo
wn
even
tsnaturalgas
2587
MMBT
U/H
desig
nhe
atinpu
t,each
Efficient
combu
stion
controlplusc
atalytic
oxidationsystem
.69
4T/YR
12MORO
LLTIME
PERIOD
STAR
TUP/SH
UTD
OW
NBA
CTPSD
0
Four
(4)n
aturalgasfire
dcombine
dcyclecombu
stion
turbinegene
rators(CTG
)and
heat
recovery
steam
gene
rators(HRSG)
with
ductbu
rner
firingcapability;
ancillary
facilityeq
uipm
ent.
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
duct
burners
NaturalGa
s47
917MMSCF/rolling
12MO
oxidationcatalyst
12.7
LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
ductbu
rners.
Will
installeith
er2Siem
enso
r2Mitsub
ishi,no
t both(not
determ
ined
).
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
outd
uct
burners
NaturalGa
s51
5600
MMSCF/rolling
12mon
ths
oxidationcatalyst
13LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
ductbu
rners.
Will
installeith
er2Siem
enso
r2Mitsub
ishi,no
tboth(not
determ
ined
).
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
duct
burners
NaturalGa
s51
560MMSCF/rolling
12MO
oxidationcatalyst
13LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
ductbu
rners.
Will
installeith
er2Siem
enso
r2Mitsub
ishi,no
tboth(not
determ
ined
).
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
out
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
oxidationcatalyst
13.7
LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines
,bothwith
ductbu
rners.
Will
installeith
er2Siem
enso
r2Mitsub
ishi,no
tboth(not
determ
ined
).
*VA03
22
GREENEN
ERGY
PART
NER
S/STONEW
ALL,
LLC
GREENEN
ERGY
PART
NER
S/STONEW
ALL,
LLC
7382
600
14/30
/201
3
Largecombu
stion
turbines
CCT1
and
CCT2
NaturalGa
s2.23
MMBT
U/hr
Catalytic
Oxidizer
0BA
CTPSD
0
Thetw
ocombu
stionturbineconfigurationop
tions
curren
tlybe
ingconsidered
aretheGe
neralElectric
GE7FA.05
andSiem
ensS
GT650
00F5
units.Tthe
prop
osed
CTgene
ratorswilleither
beGe
neralElectric
GE7FA.05
orSiem
ensS
GT650
00F5
units.W
illinclud
edu
ctbu
rners
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Good
combu
stionpractices
9PP
MEA
CHCT
G;24
HRO
LLINGAV
G.BA
CTPSD
0
2naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG).Thetw
oCT
Gs(w
ithHR
SG)are
conn
ectedto
onesteam
turbine
gene
rator.
Each
CTGiseq
uppe
dwith
adrylowNOx
(DLN
)burne
r
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
(DB)
Naturalgas
2486
MMBT
U/H
Good
combu
stionpractices
10.5
PPM
EACH
CTG/
DB;24H
ROLLINGAV
G.BA
CTPSD
0
2naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)toop
eratein
combine
dcycle.
Thetw
oCT
Gs(w
ithHR
SG)are
conn
ectedto
onesteam
turbinegene
rator.HR
SGis
operatingwith
anaturalgas
fired
ductbu
rner
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Startup/Shutdo
wn
Naturalgas
2237
MMBT
U/H
each
Good
combu
stionpractices
3123
LB/H
HOURLYDU
RING
STAR
TUP
BACT
PSD
0
SU/SDLimitforT
wo(2)n
aturalgasfire
dCT
Gswith
each
turbinecontaining
ahe
atrecovery
steam
gene
rator
(HRSG)
toop
erateincombine
dcycle.
Thetw
oCT
Gs(w
ithHR
SG)are
conn
ectedto
onesteam
turbine
gene
rator.
*PA02
91HICK
ORY
RUNEN
ERGY
STAT
ION
HICK
ORY
RUNEN
ERGY
LLC
3733
7A4/23
/201
3CO
MBINED
CYCLE
UNITS#1
and#2
NaturalGa
s3.4MMCF/HR
COcatalyst
2PP
MVD
@15
%OXYGE
NWITHORWITHO
UT
DUCT
BURN
EROTH
ERCA
SEBY
CASE
0
2combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorsthat
willprovidesteam
todriveasin
gle
steam
turbinegene
rator.Each
heat
recovery
steam
gene
ratorw
illbe
equipp
edwith
adu
ctbu
rner.M
odels
considered
:Gen
eralElectric7FA(GE7FA,
Siem
ensS
GT6
5000
F(Siemen
sF),Mitsub
ishiM
501G
(Mitsub
ishiG
,Siem
ensS
GT680
00H(Siemen
sH)
*VA03
21BR
UNSW
ICKCO
UNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
5240
400
13/12
/201
3CO
MBU
STIONTU
RBINE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Oxidatio
ncatalyst;goo
dcombu
stionpractices.
1.5PP
MVD
3HAV
G/WITHO
UT
DUCT
BURN
ING
BACT
PSD
0Three(3)M
itsub
ishiM
501GA
Ccombu
stionturbine
gene
ratorswith
HRSG
ductbu
rners(naturalgas
fired
).
*TX07
08LA
PALO
MAEN
ERGY
CENTER
LAPA
LOMAEN
ERGY
CENTER,
LLC
1015
42PSDT
X128
82/7/20
13(2)com
bine
dcycle
turbines
naturalgas
650MW
oxidationcatalyst
2PP
MVD
@15
%O2,3HR
ROLLING,
8010
0%LO
ADBA
CTPSD
0
2combu
stionturbines
(CTs)con
nected
toelectric
gene
ratorswith
ductbu
rnersT
heapplicantisc
onsid
ering
threemod
elso
fCT:
(1)G
eneralElectric7FA.04
;(2)
Siem
ensS
GT650
00F(4);o
r(3)
Siem
ensS
GT650
00F(5).
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3Co
mbine
dCyclePo
wer
Blocks
472MW
(2)
NaturalGa
s0
COCatalyst
2PP
MDV
BACT
PSD
0
Twonaturalgas
fired
combine
dcyclepo
werblocks
whe
reeach
powerblockconsistso
facombu
stionturbine
andhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
*OH03
56DU
KEEN
ERGY
HANGING
ROCK
ENER
GYDU
KEEN
ERGY
HANGING
ROCK
,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
ffNAT
URA
LGA
S17
2MW
Good
combu
stionpractices
burningnaturalgas
25.7
LB/H
BACT
PSD
6PP
M
PPMVD
AT15
%O2
ON24
HBLOCK
AVER
AGE
Four
GE7FAcombine
dcycleturbines
with
thedu
ctbu
rners
*OH03
56DU
KEEN
ERGY
HANGING
ROCK
ENER
GYDU
KEEN
ERGY
HANGING
ROCK
,LLC
P011
0487
12/18/20
12Turbines
(4)(mod
elGE
7FA)
DuctBu
rnersO
nNAT
URA
LGA
S17
2MW
Good
combu
stionpractices
burningnaturalgas
45.9
LB/H
BACT
PSD
8PP
M
PPMVD
AT15
%O2
ON24
HBLOCK
AVER
AGE
Four
GE7FAcombine
dcycleturbines
with
thedu
ctbu
rners
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
00300
579
12/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
OXIDA
TIONCA
TALYST
2PP
MVD
3HO
URS
BACT
PSD
0
EACH
TURB
INEISEQ
UIPED
WITHNAT
URA
LGA
SFIRE
DDU
CTBU
RNER
S,AN
DAHE
ATRE
COVE
RYSTEA
MGE
NER
ATORIDEN
TIFIED
ASHR
SG#.
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
00300
579
12/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
STAR
TUP/SH
UTD
OWN
CYCLENAT
URA
LGA
S23
00MMBT
U/H
2125
LB*EVE
NT
BACT
PSD
0SU
/SDlim
iton
ly.
*DE00
23NRG
ENER
GYCE
NTER
DOVE
RNRG
ENER
GYCE
NTER
DOVE
RLLC
AQM
001/00
127(R
2)(REV
1)10
/31/20
12UNIT2
KD1
NaturalGa
s65
5MMBT
U/H
Oxidatio
nCatalystSystem
19.54LB/H
1HO
URAV
ERAG
EOTH
ERCA
SEBY
CASE
050
0MMBT
U/hrG
asTurbine(M
odel:G
ELM
6000
)
TX06
18CH
ANNEL
ENER
GYCE
NTERLLC
CHAN
NEL
ENER
GYCE
NTERLLC
PSDT
X955
M1
10/15/20
12Co
mbine
dCycle
Turbine
naturalgas
180MW
Good
combu
stion
4PP
MVD
@15
%O2ONA24
HRRO
LLINGAV
GBA
CTPSD
0TheturbineisaSiem
ens5
01Fratedat
ano
minal18
0megaw
attswith
DB
PA02
78
MOXIELIBE
RTY
LLC/AS
YLUM
POWER
PLT
MOXIEEN
ERGY
LLC
0800
045A
10/10/20
12
Combine
dcycle
Turbines
(2)
Natural
gasfire
dNaturalGa
s32
77MMBT
U/H
Oxidatio
nCatalyst
2PP
MVD
@15
%O2
BACT
PSD
2PP
MVD
@15
%O2
Twocombine
cycleTurbines,eachwith
acombu
stion
turbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX06
19DE
ERPA
RKEN
ERGY
CENTER
DEER
PARK
ENER
GYCE
NTERLLC
PSDT
X979
M2
9/26
/201
2Co
mbine
dCycle
Turbine
naturalgas
180MW
good
combu
stion
4PP
MVD
@15
%O2,24
HRRO
LLINGAV
GBA
CTPSD
0TheturbineisaSiem
ens5
01Fratedat
ano
minal18
0megaw
attswith
DB
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
good
combu
stion
4PP
MVD
@15
%O2,24
HRRO
LLINGAV
GBA
CTPSD
0Thethreecombu
stionturbinegene
rators(CTG
)willbe
theGe
neralElectric
7FA.
Nodu
ctbu
rners.
*WY00
70CH
EYEN
NEPR
AIRIE
GENER
ATINGSTAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
1)NaturalGa
s40
MW
Oxidatio
nCatalyst
4PP
MVAT
15%
O2
1HO
UR
BACT
PSD
32TO
NSPER
YEAR
*WY00
70CH
EYEN
NEPR
AIRIE
GENER
ATINGSTAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
2)NaturalGa
s40
MW
Oxidatio
nCatalyst
4PP
MVAT
15%
O2
1HO
UR
BACT
PSD
32TO
NSPER
YEAR
LA02
57SA
BINEPA
SSLN
GTERM
INAL
SABINEPA
SSLN
G,LP
&SA
BINEPA
SSLIQUEFAC
TION,LL
PSDLA
703(M3)
12/6/201
1
Combine
dCycle
Refrigeration
CompressorT
urbine
s(8)
naturalgas
286MMBT
U/H
Good
combu
stionpractices
andfueled
bynaturalgas
43.6
LB/H
HOURLYMAX
IMUM
BACT
PSD
58.4
PPMV
AT15
%O2
*MI0
402
SUMPTER
POWER
PLAN
T
WOLVER
INEPO
WER
SUPP
LYCO
OPERA
TIVE
INC.
8111
11/17/20
11
Combine
dcycle
combu
stionturbinew/
HRSG
Naturalgas
130MW
electricalou
tput
0.04
8LB/M
MBT
U24
HRRO
LLING
AVER
AGE
OTH
ERCA
SEBY
CASE
0Thisisacombine
dcyclecombu
stionturbinewith
ano
nredhe
atrecovery
steam
gene
rator(HR
SG).
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
1.5PP
MVD
@15
%O2,1HR
AVG
(NODU
CTBU
RNING)
BACT
PSD
0
2NAT
URA
LGA
SFIRE
DCO
MBU
STIONTU
RBINE
GENER
ATORS
(CTG
S),TWOHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSG),O
NESTEA
MTU
RBINEGE
NER
ATOR
(STG
)
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S11
0MMBT
U/H
OXIDA
TIONCA
TALYST
SYSTEM
337LB/EVE
NT
SHUTD
OWNPERIODS
BACT
PSD
0
SU/SDLimiton
ly.2NAT
URA
LGA
SFIRE
DCO
MBU
STION
TURB
INEGE
NER
ATORS
(CTG
S),TWOHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSG),O
NESTEA
MTU
RBINE
GENER
ATOR(STG
)
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(STA
RTUP
PERIODS
)NAT
URA
LGA
S15
4MW
CATA
LYST
OXIDA
TION
SYSTEM
410LB/EVE
NT
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SU/SDlim
iton
ly.2
NAT
URA
LGA
SFIRE
DCO
MBU
STION
TURB
INEGE
NER
ATORS
(CTG
S),TWOHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSG),O
NESTEA
MTU
RBINE
GENER
ATOR(STG
)
TX06
00TH
OMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDT
X124
49/1/20
11Naturalgasfired
turbines
naturalgas
390MW
Good
combu
stionpractices
andoxidationcatalyst
4PP
MVD
ROLLING3HR
AT15
%OXYGE
N/LOAD
>=60
%BA
CTPSD
0
(2)G
E7FA
at195MW
each,
(1)steam
turbineat
200MW.
Each
turbineiseq
uipp
edwith
anun
fired
heat
recovery
steam
gene
rator(HR
SG),which
provides
steam
forthe
steam
turbine.
LA02
54
NINEM
ILEPO
INT
ELEC
TRIC
GENER
ATING
PLAN
TEN
TERG
YLO
UISIANALLC
PSDLA
752
8/16
/201
1
COMBINED
CYCLE
TURB
INEGE
NER
ATORS
(UNITS6A
&am
p;6B
)NAT
URA
LGA
S71
46MMBT
U/H
OXIDA
TIONCA
TALYST
AND
GOODCO
MBU
STION
PRAC
TICE
S3PP
MVD
@15
%O2
HOURLYAV
ERAG
EBA
CTPSD
3PP
MVD
@15
%O2
HOURLYAV
ERAG
ECO
MBINED
CYCLETU
RBINEGE
NER
ATORS
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
1.5PP
MVD
@15
%O2,1HR
AVG
BACT
PSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION, N
ODU
CTBU
RNING)
NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
1.5PP
MVD
@15
%O2,1HR
AVG
BACT
PSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
2PP
MVD
@15
%O2,1HR
AVG
BACT
PSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
2PP
MVD
@15
%O2,1HR
AVG
(W/D
UCT
FIRING)
BACT
PSD
0
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#1(STA
RTUP&am
p;SH
UTD
OWNPERIODS
)NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
1000
LB/H
EACH
TURB
INE&
HRSG
BACT
PSD
0SU
/SDLimiton
ly.
CA11
92AV
ENAL
ENER
GYPR
OJECT
AVEN
ALPO
WER
CENTER
LLC
SJ08
016/21
/201
1
COMBU
STIONTU
RBINE
#2(STA
RTUP&am
p;SH
UTD
OWNPERIODS
)NAT
URA
LGA
S18
0MW
OXIDA
TIONCA
TALYST
SYSTEM
1000
LB/H
EACH
TURB
INE&
HRSG
BACT
PSD
0SU
/SDLimiton
ly.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
2MW
CATA
LYTICOXIDA
TION
SYSTEM
3PP
MVD
@15
%O2,3HR
ROLLINGAV
GBA
CTPSD
0
TWO(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(HOT
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
CATA
LYTICOXIDA
TION
SYSTEM
370.3LB/H
HOTSTAR
TUP
PERIODS
BACT
PSD
0
HotS
tartup
limiton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPED
WITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(WAR
MSTAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
CATA
LYTICOXIDA
TION
SYSTEM
373.6LB/H
WAR
MSTAR
TUP
PERIODS
BACT
PSD
0
Warm
Startuplim
iton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPED
WITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(COLD
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
CATA
LYTICOXIDA
TION
SYSTEM
429.6LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0
ColdStartuplim
iton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPED
WITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11CO
LUSA
GENER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
2MW
CATA
LYTICOXIDA
TION
SYSTEM
483.5LB/H
TURB
INESH
UTD
OWN
PERIODS
BACT
PSD
0
Shutdo
wnlim
iton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPED
WITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
*IL01
12NELSO
NEN
ERGY
CENTER
INVE
NER
GYNELSO
N,LLC
9808
0039
12/28/20
10ElectricGe
neratio
nFacility
NaturalGa
s22
0MW
each
5PP
MVD
@15
%O2
HOURLYAV
GEXCE
PTDU
RINGSSM
OR
TUNING
BACT
PSD
0
Does
notinclude
SU/SDem
issions.Tw
onaturalgas
fired
combine
dcyclepo
werblocks
whe
reeach
powerblock
consistso
facombu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
VA03
15
WAR
RENCO
UNTY
POWER
PLAN
TDO
MINION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
8139
100
712
/17/20
10
COMBINED
CYCLE
TURB
INE&am
p;DU
CTBU
RNER
,3NaturalGa
s29
96MMBT
U/H
Oxidatio
ncatalystand
good
combu
stion
practices.
1.5PP
MVD
ONEHR
AVER
AGE
(W/O
DUCT
BURN
ERFIRING)
BACT
PSD
0
Does
notinclude
DBfiring.
Emissions
areforo
neof
threeun
its(M
itsub
ishinaturalgasfired
combu
stion
turbine(CT)
gene
rator,M
odelM50
1GA
C).W
ithdu
ctbu
rner
TX05
90KINGPO
WER
STAT
ION
PONDE
RACA
PITA
LMAN
AGEM
ENTGP
INC
PSDT
X112
58/5/20
10Turbine
naturalgas
1350
MW
good
combu
stionpractices
with
anoxidationcatalyst
2PP
MVD
AT15
%O2
THRE
EHO
UR
ROLLING
BACT
PSD
0
*CO00
73PU
EBLO
AIRP
ORT
GENER
ATINGSTAT
ION
BLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
7/22
/201
0Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
Good
combu
stioncontrol
andcatalytic
oxidation
4PP
MVD
AT15
%O2
1HR
AVE
BACT
PSD
0ThreeGE
,LMS600
0PF,naturalgasfired
,com
bine
dcycle
CTG,
(1)H
RSGeach
with
noDu
ctBu
rners
ID00
18LANGL
EYGU
LCHPO
WER
PLAN
TIDAH
OPO
WER
COMPA
NY
P20
09.009
26/25
/201
0
COMBU
STION
TURB
INE,CO
MBINED
CYCLEW/D
UCT
BURN
ERNAT
URA
LGA
S(ONLY)
2375
.28MMBT
U/H
CATA
LYTICOXIDA
TION
(CATOX
),DR
YLO
WNO
X(DLN
),GO
ODCO
MBU
STION
PRAC
TICE
S(GCP
)2PP
MVD
3HR
ROLLING/1
5%O2
BACT
PSD
2510
LB/H
1HR
/15%
O2
DURINGSU
/SD
Limitdo
esno
tapp
lydu
ringSU
/SD.
SIEM
ENSSG
T650
00F
COMBU
STIONTU
RBINE(NGC
T,CC
GT)FORELEC
TRICAL
GENER
ATION,N
OMINAL
269MW
AND2.14
66MMSCF/HR
.WITHDU
CTBU
RNER
GA01
38LIVE
OAK
SPO
WER
PLAN
TLIVE
OAK
SCO
MPA
NY,
LLC
4911
12700
75P
020
4/8/20
10
COMBINED
CYCLE
COMBU
STIONTU
RBINE
ELEC
TRIC
GENER
ATINGPLAN
TNAT
URA
LGA
S60
0MW
GOODCO
MBU
STION
PRAC
TICE
SAN
DCA
TALYTIC
OXIDA
TION
2PP
M@15
%02
3HO
URAV
ERAG
EWO/O
DUCT
FIRING/
CONDITIO
BACT
PSD
208T/YR
12CO
NSECU
TVE
MONTH
AVER
AGE/CO
NDITI
ON2.
L2CO
MBU
STIONTU
RBINES
ANDONESTEA
MTU
RBINE,
HRSG
with
ADU
CTBU
RNER
.CTs
SELECT
EDAR
ESIEM
ENS
MODE
LSG
T650
00F
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATORS
(NORM
ALOPERA
TION)NAT
URA
LGA
S19
0MW
OXIDA
TIONCA
TALYST
SYSTEM
4PP
MVD
@15
%O2,24
HRAV
GBA
CTPSD
0
THRE
E(3)C
OMBU
STIONTU
RBINEGE
NER
ATORS
AT19
0MW
EACH
ANDEQ
UIPPEDWITHA16
0MMBT
U/HRDU
CTBU
RNER
ANDHR
SG
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATOR(STA
RTUP
PERIODS
)NAT
URA
LGA
S19
0MW
OXIDA
TIONCA
TALYST
SYSTEM
183LB/COLD
STAR
TUP
COLD
STAR
TUP
PERIODS
BACT
PSD
0
Coldstartuplim
iton
ly.TH
REE(3)C
OMBU
STION
TURB
INEGE
NER
ATORS
AT19
0MW
EACH
ANDEQ
UIPPED
WITHA16
0MMBT
U/HRDU
CTBU
RNER
ANDHR
SG
CA12
09HIGH
DESERT
POWER
PROJECT
HIGH
DESERT
POWER
PROJECT
LLC
SE98
013/11
/201
0
COMBU
STIONTU
RBINE
GENER
ATOR
(SHU
TDOWNPERIODS
)NAT
URA
LGA
S19
0MW
OXIDA
TIONCA
TALYST
SYSTEM
239LB/SHU
TDOWN
SHUTD
OWNPERIODS
BACT
PSD
0
Shutdo
wnlim
iton
ly.TH
REE(3)C
OMBU
STIONTU
RBINE
GENER
ATORS
AT19
0MW
EACH
ANDEQ
UIPPEDWITHA
160MMBT
U/HRDU
CTBU
RNER
ANDHR
SG
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
2PP
MVD
@15
%O2,1HR
AVG
(NODU
CTBU
RNING)
BACT
PSD
0Do
esno
tinclude
SU/SDem
issions.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,N
ODU
CTBU
RNING)
NaturalGa
s15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
2PP
MVD
@15
%O2,1HR
AVG
(NODU
CTBU
RNING)
BACT
PSD
0Do
esno
tinclude
SU/SDem
issions.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
3PP
MVD
@15
%O2,1HR
AVG
(W/D
UCT
BURN
ING)
BACT
PSD
0Do
esno
tinclude
SU/SDem
issions.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(NORM
ALOPERA
TION,W
ITH
DUCT
BURN
ING)
NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
3PP
MVD
@15
%O2,1HR
AVG
(W/D
UCT
BURN
ING)
BACT
PSD
0Do
esno
tinclude
SU/SDem
issions.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(COLD
STAR
TUP
PERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
224LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0SU
/SDLimiton
ly.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(COLD
STAR
TUP
PERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
224LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0SU
/SDLimiton
ly.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(W
ARM
&am
p;HO
TSTAR
TUPPERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
247LB/H
WAR
M&HO
TSTAR
TUPPERIODS
BACT
PSD
0SU
/SDLimiton
ly.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(W
ARM
&am
p;HO
TSTAR
TUPPERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
247LB/H
WAR
M&HO
WSTAR
TUPPERIODS
BACT
PSD
0SU
/SDLimiton
ly.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#1(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
674LB/H
SHUTD
OWNPERIODS
BACT
PSD
0SU
/SDLimiton
ly.
CA11
91VICT
ORV
ILLE
2HY
BRID
POWER
PROJECT
CITY
OFVICT
ORV
ILLE
SE07
023/11
/201
0
COMBU
STIONTU
RBINE
#2(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S15
4MW
OXIDA
TIONCA
TALYST
SYSTEM
674LB/H
SHUTD
OWNPERIODS
BACT
PSD
0SU
/SDLimiton
ly.
TX05
48MAD
ISONBE
LLEN
ERGY
CENTER
MAD
ISONBE
LLPA
RTNER
SLP
8337
88/18
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S27
5MW
GOODCO
MBU
STION
PRAC
TICE
S17
.5PP
MVD
@15
%O2,1HR
ROLLINGAV
GBA
CTPSD
0
FOURGE
PG71
21(EA)
COMBINECY
CLETU
RBINES
FIRING
NAT
URA
LGA
SWITHDU
CTBU
RNER
ANDAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOR.
TX05
47
NAT
URA
LGA
SFIRE
DPO
WER
GENER
ATION
FACILITY
LAMAR
POWER
PART
NER
SIILLC
8320
76/22
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S25
0MW
GOODCO
MBU
STION
PRAT
ICES
15PP
MVD
@15
%O2,24
HRRO
LLINGAV
GBA
CTPSD
0
2CO
MBU
STIONTU
RBINES
(EITHE
R17
0MW
GENER
ALELEC
TRIC
7FAS
OR25
0MW
MITSU
BISH
I501
GS),TW
OHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
WITHDU
CTBU
RNER
SAN
DONESTEA
MTU
RBINE.
TX05
46PA
TTILLO
BRAN
CHPO
WER
PLAN
TPA
TTILLO
BRAN
CHPO
WER
COMPA
NYLLC
8364
26/17
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S35
0MW
OXIDA
TIONCA
TALYST
2PP
MVD
@15
%O2,3HR
ROLLINGAV
GBA
CTPSD
0TU
RBINES
BEINGCO
NSIDE
REDFO
RTH
EPR
OJECT
AREGE
7FA,
GE7FB,
ANDSIEM
ENSSG
T650
00F.
NJ0
074
WESTDE
PTFO
RDEN
ERGY
LSPO
WER
5607
8BO
P080
001
5/6/20
09TU
RBINE,CO
MBINED
CYCLE
NAT
URA
LGA
S17
298MMFT3/YR
COOXIDA
TIONCA
TALYST
0.01
LB/M
MBT
U3HR
ROLLING
AVER
AGE
BACT
PSD
0
OK01
29CH
OUTEAU
POWER
PLAN
TAS
SOCIAT
EDELEC
TRIC
COOPERA
TIVE
INC
2007
115C(M
1)PSD
1/23
/200
9
COMBINED
CYCLE
COGE
NER
ATION
>25M
WNAT
URA
LGA
S18
82MMBT
U/H
GOODCO
MBU
STION
8PP
MV
1HR
AVG
BACT
PSD
0SIEM
ENSV8
4.3A
TX05
42PEAR
SALL
POWER
PLAN
TSO
UTH
TEXA
SELEC
TRIC
COOPERA
TIVE
INC.
8482
41/23
/200
9ELEC
TRICAL
GENER
ATION
NAT
URA
LGA
S8.44
MW
OXIDA
TIONCA
TALYST
0.3G/
BHP
HBA
CTPSD
0
24SPAR
KIGNITIONINTERN
ALCO
MBU
STIONEN
GINES.
THEEN
GINES
(20V
34SG
BYWÄR
TSILÄ)
WILLBE
FUELED
BYNAT
URA
LGA
S
FL03
04CA
NEISLANDPO
WER
PARK
FLORIDA
MUNICIPAL
POWER
AGEN
CY(FMPA
PSDFL
400
(097
0043
014AC
)9/8/20
08
300MW
COMBINED
CYCLECO
MBU
STION
TURB
INE
NAT
URA
LGA
S18
60MMBT
U/H
GOODCO
MBU
STION
PRAC
TICE
S6PP
MVD
12MONTH
BACT
PSD
0
ANOMINAL
150MW
GASFU
ELED
GENER
ALELEC
TRIC
7241
FACT
G;ASU
PPLEMEN
TARY
FIRE
DHR
SGWITH
NAT
URA
LGA
SFU
ELED
DUCT
BURN
ERS(DB);
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
FL03
03FPLWESTCO
UNTY
ENER
GYCE
NTERUNIT3
FLORIDA
POWER
AND
LIGH
TCO
MPA
NY(FP&
L)09
9064
600
2AC
(PSD
FL39
6)7/30
/200
8
THRE
ENOMINAL
250
MW
CTG(EAC
H)WITH
SUPP
LEMEN
TARY
FIRE
DHR
SGNAT
URA
LGA
S23
33MMBT
U/H
GOODCO
MBU
STION
6PP
MVD
(GAS
)12
MONTH
BACT
PSD
03NOMINAL
250MEG
AWAT
T(M
W)G
CLAS
SCO
MBU
STIONTU
RBINEELEC
TRICAL
GENER
ATORS
(CTG
)
LA01
36PLAQ
UEM
INE
COGE
NER
ATIONFA
CILITY
THEDO
WCH
EMICAL
COMPA
NY
PSDLA
659(M2)
7/23
/200
8
(4)G
ASTU
RBINES/DUCT
BURN
ERS
NAT
URA
LGA
S28
76MMBT
U/H
GOODCO
MBU
STION
PRAC
TICE
S21
2.5LB/H
HOURLYMAX
IMUM
BACT
PSD
25PP
MVD
@15
%O2
ANNUAL
AVER
AGE
4NAT
URA
LGA
SFIRE
DGE
FRAM
E7FA
GASTU
RBINES,
SUPP
LEMEN
TARY
FIRE
DDU
CTBU
RNER
SYSTEM
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8TW
OCO
MBINED
CYCLE
GASTU
RBINES
NAT
URA
LGA
S21
10MMBT
U/H
PROPEROPERA
TING
PRAC
TICE
S14
3.31
LB/H
MAX
BACT
PSD
10PP
MVD
@15
%O2
ANNUAL
AVER
AGE
CTG1TU
RBINE/DU
CTBU
RNER
(EQT
012)
CTG2TU
RBINE/DU
CTBU
RNER
(EQT013
)
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8
SCN4HO
TSTAR
TUP
CTG1SCN8HO
TSTAR
TUPCT
G2
NAT
URA
LGA
S21
10MMBT
U/H
COMPLETEEV
ENTS
ASQUICKLYAS
POSSIBLE
ACCO
RDINGTO
MAN
UFA
CTURE
¿SRE
COMMEN
DED
PROCE
DURE
S.15
75.8
LB/H
MAX
BACT
PSD
0
CT01
51KLEENEN
ERGY
SYSTEM
S,LLC
KLEENEN
ERGY
SYSTEM
S,LLC
10401
31AN
D10
401
332/25
/200
8
SIEM
ENSSG
T650
00F
COMBU
STIONTU
RBINE
#1AN
D#2
(NAT
URA
LGA
SFIRE
D)WITH44
5MMBT
U/HRNAT
URA
LGA
SDU
CTBU
RNER
NAT
URA
LGA
S2.1MMCF/H
COCA
TLYST
4.3LB/H
W/O
UTDU
CTBU
RNER
BACT
PSD
0.9PP
MVD
@15
%O2
1HR
BLOCK
(W/O
UTDU
CTBU
RNER
)
Limitdo
esno
tinclude
ductbu
rner.2TU
RBINETR
AINS.
EACH
TURB
INETR
AINCO
NSISTSOFASIEM
ENSSG
T650
00FCO
MBU
STIONTU
RBINE,DU
CTBU
RNER
ANDAN
HRSG
.
GA01
27PLAN
TMCD
ONOUGH
COMBINED
CYCLE
SOUTH
ERN
COMPA
NY/GE
ORG
IAPO
WER
4911
06700
03V
022
1/7/20
08CO
MBINED
CYCLE
COMBU
STIONTU
RBINENAT
URA
LGA
S25
4MW
OXIDA
TIONCA
TALYST
1.8PP
M@
15%O2
3HO
UR
BACT
PSD
0
6TU
RBINES,LIM
ITSAR
EFO
REA
CHTU
RBINE(M
ITSU
BISH
IMODE
LM50
1G).
Thisisno
tthe
sametype
ofun
itas
Calpine,so
itisno
tcon
sidered
intheanalysis.
MN00
71FA
IRBA
ULT
ENER
GYPA
RKMINNESOTA
MUNICIPAL
POWER
AGEN
CY13
1000
7100
36/5/20
07
COMBINED
CYCLE
COMBU
STIONTU
RBINE
W/DUCT
BURN
ERNAT
URA
LGA
S17
58MMBT
U/H
GOODCO
MBU
STION
9PP
MVD
3HR
.AVG
CTGON
NGNODB
BACT
PSD
11PP
MVD
3HR
AVGCT
GNG
DBNGOROIL
COMBU
STIONTU
RBINEAN
DDU
CTBU
RNER
CA11
44BLYTHE
ENER
GYPR
OJECT
IICA
ITHN
ESSBLYTHE
II,LLC
SE02
014/25
/200
72CO
MBU
STION
TURB
INES
NAT
URA
LGA
S17
0MW
4PP
MVD
AT15
%O2,3HR
AVGBA
CTPSD
0
OK01
17PSOSO
UTH
WESTERN
POWER
PLT
PUBLICSERV
ICECO
OF
OKLAH
OMA
2003
403CPSD
2/9/20
07GA
SFIRE
DTU
RBINES
COMBU
STIONCO
NTR
OL
25PP
MVD
@15
%O2
BACT
PSD
0
FL02
85PR
OGR
ESSBA
RTOW
POWER
PLAN
TPR
OGR
ESSEN
ERGY
FLORIDA
(PEF)
PSDFL
381AN
D10
3001
101
0AC
1/26
/200
7
COMBINED
CYCLE
COMBU
STIONTU
RBINE
SYSTEM
(4ON1)
NAT
URA
LGA
S19
72MMBT
U/H
GOODCO
MBU
STION
8PP
MVD
24HR
BLOCK
AVER
AGECE
MS
BACT
PSD
0
4MODE
LSG
T650
00FCO
MBU
STIONTU
RBINE
ELEC
TRICAL
GENER
ATORS;FOURDU
CTFIRE
DHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSG¿
S)WITHDU
CTBU
RNER
FL02
86FPLWESTCO
UNTY
ENER
GYCE
NTER
FLORIDA
POWER
AND
LIGH
TCO
MPA
NY
PSDFL
354AN
D09
9064
600
1AC
1/10
/200
7
COMBINED
CYCLE
COMBU
STIONGA
STU
RBINES
6UNITS
NAT
URA
LGA
S23
33MMBT
U/H
8PP
MVD
@15
%O2
24HR
BACT
PSD
0
EACH
COMBINED
CYCLEUNITSYSTEM
WILLCO
NSIST
OF:
THRE
ENOMINAL
250MEG
AWAT
TMODE
L50
1GGA
STU
RBINEELEC
TRICAL
GENER
ATORSETS
WITHDU
CTBU
RNER
OK01
15LAWTO
NEN
ERGY
COGE
NFA
CILITY
ENER
GETIX
2001
205CM
1PSD
12/12/20
06CO
MBU
STIONTU
RBINE
ANDDU
CTBU
RNER
GOODCO
MBU
STION
PRAC
TICE
S16
.38PP
MVD
@15
%O2
BACT
PSD
0
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX04
97INEO
SCH
OCO
LATE
BAYO
UFA
CILITY
INEO
SUSA
LLC
PSDTX
983AN
D46
192
8/29
/200
6
COGE
NER
ATIONTR
AIN
2AN
D3(TURB
INEAN
DDU
CTBU
RNER
EMISSIONS)
NAT
URA
LGA
S35
MW
BPAM
OCO
PROPO
SES
PROPERCO
MBU
STION
CONTR
OLAS
BACT
FORCO
ANDVO
CEM
ISSIONS
FROM
THETU
RBINES
AND
DUCT
BURN
ERS.
COEM
ISSIONSFROM
EACH
TURB
INEWILLNOT
EXCE
ED15
PPMVD
AT85
%TO
100%
OFBA
SELO
AD.
COEM
ISSIONSFROM
EACH
TU66
.81LB/H
BACT
PSD
0
2NOMINALLY
RATED35
MW
GASFIRE
DTU
RBINES
AND
TWOHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS,EQUIPPED
WITHDU
CTBU
RNER
S.
TX05
02
NAC
OGD
OCH
ESPO
WER
STER
NEGE
NER
ATING
FACILITY
NAC
OGD
OCH
ESPO
WER
LLC
PSDTX
1015
AND
4929
36/5/20
06
WESTINGH
OUSE/SIEM
ENSMODE
LSW
501F
GASTU
RBINEW/ 4
16.5
MMBT
UDU
CTNAT
URA
LGA
S19
0MW
STEA
GPO
WER
LLC
REPR
ESEN
TSGO
OD
COMBU
STIONPR
ACTICE
SFO
RTH
ECO
NTR
OLOFCO
109.4LB/H
BACT
PSD
0
3WESTINGH
OUSE/SIEMEN
SMODE
L50
1FCO
MBU
STION
TURB
INES,THR
EEHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSGS
)WITHDU
CTBU
RNER
S,AN
DTH
REE14
0MW
STEA
MDR
IVEN
TURB
INEGE
NER
ATORS
MN00
66
NORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
RIVE
RSIDE
PLAN
T
NORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
0530
0015
004
5/16
/200
6TU
RBINE,CO
MBINED
CYCLE(2)
NAT
URA
LGA
S18
85mmbtu/h
GOODCO
MBU
STION
PRAC
TICE
S10
PPMVD
@15
%O2
3HR
BLOCK
BACT
PSD
10PP
M@
15%
O2
2NGFIRE
DFCLAS
SCO
MBU
STIONTU
RBINES
&HR
SG.
NODU
CTBU
RNER
.EITHE
RGE
ORMITSU
BISH
ITURB
INES.
NY00
95CA
ITHN
ESBE
LLPO
RTEN
ERGY
CENTER
CAITHN
ESSBE
LLPO
RT,
LLC
PSDNY00
015/10
/200
6CO
MBU
STIONTU
RBINENAT
URA
LGA
S22
21MMBU
T/H
OXIDA
TIONCA
TALYST
2PP
MVD
@15
%02
BACT
PSD
0
CO00
56RO
CKYMOUNTA
INEN
ERGY
CENTER,
LLC
CALPINECO
RP.
05WE052
45/2/20
06
NAT
URA
LGA
SFIRE
D,CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S30
0MW
USE
GOODCO
MBU
STION
CONTR
OLPR
ACTICE
SAN
DCA
TALISTICOXIDA
TION.
3PP
M@
15%O2
BACT
PSD
3PP
M@
15O2
THISISAN
ADDITIONOFONECO
MBU
STIONTU
RBINE,
GASFIRE
D,CO
MBINED
CYCLE.
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
COMBU
STIONTU
RBINE
GENER
ATOR,
2un
its(NormalOpe
ratio
n)NAT
URA
LGA
S16
6MW
SCRORSCONOX
4PP
MVD
@15
%O2,1HR
AVG
BACT
PSD
0
Eac h
CTGsystem
willgene
rate
166MW
unde
rdesign
ambien
tcon
ditio
nswith
steam
power
augm
entatio
nfrom
thedu
ctbu
rners,and15
3MW
with
outsteam
augm
entatio
n.
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
Combu
stionTurbine
Gene
rator,2un
its(Turbine
Shutdo
wn
Even
ts)
NaturalGa
s16
6MW
SCRORSCONOX
222LB/EVE
NT
TURB
INESH
UTD
OWN
EVEN
TSBA
CTPSD
0
LimitforS
hutdow
nlim
itson
ly.Each
CTGsystem
will
gene
rate
166MW
unde
rdesignam
bien
tcon
ditio
nswith
steam
power
augm
entatio
nfrom
thedu
ctbu
rners,and
153MW
with
outsteam
augm
entatio
n.
CA11
95ELKHILLSPO
WER
LLC
ELKHILLSPO
WER
LLC
SJ99
021/12
/200
6
COMBU
STIONTU
RBINE
GENER
ATOR,
2un
its(Exten
dedStartup
Even
ts)
NAT
URA
LGA
S16
6MW
SCRORSCONOX
3600
LB/EVE
NT
EXTENDE
DSTAR
TUP
EVEN
TSBA
CTPSD
0
Startuplim
iton
ly.Each
CTGsystem
willgene
rate
166
MW
unde
rdesignam
bien
tcon
ditio
nswith
steam
power
augm
entatio
nfrom
thedu
ctbu
rners,and15
3MW
with
outsteam
augm
entatio
n.
TX05
16
CITY
PUBLICSERV
ICEJK
SPRU
CEELEC
TRICE
GENER
ATINGUNIT2
CITY
PUBLICSERV
ICE
PSDTX
1037
AND
7049
212
/28/20
05SPRU
CEPO
WER
GENER
ATORUNITNO2
4480
LB/H
BACT
PSD
0
NV00
35TR
ACYSU
BSTA
TION
EXPA
NSIONPR
OJECT
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#2WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
OXIDA
TIONCA
TALYST
SYSTEM
3.5PP
M@
15%O2
3HO
URRO
LLING
BACT
PSD
3.5PP
M@
15%
O2
2NAT
URA
LGA
SFIRE
DCO
MBINED
CYCLECO
MBU
STION
TURB
INEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
S.
NV00
35TR
ACYSU
BSTA
TION
EXPA
NSIONPR
OJECT
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#1WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
OXIDA
TIONCA
TALYST
3.5PP
M@
15%O2
3HO
URRO
LLING
BACT
PSD
3.5PP
M@
15%
O2
2NAT
URA
LGA
SFIRE
DCO
MBINED
CYCLECO
MBU
STION
TURB
INEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
S.
MN00
60HIGH
BRIDGE
GENER
ATINGPLAN
T
NORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
1230
0012
004
8/12
/200
5
2CO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
SONLY
330MEG
AWAT
TSGO
ODCO
MBU
STION
PRAC
TICE
S10
PPM
@15
%O2
TURB
INEW/O
DUCT
BURN
ERBA
CTPSD
18PP
M@
15%
O2
INSTALLTW
INNAT
URA
LGA
SFIRE
DCO
MBINED
CYCLE
GASTU
RBINES
TORE
PLAC
EEXISTINGCO
ALFIRE
DELEC
RICUTILITY
BOILER
.
OR00
41WAN
APAEN
ERGY
CENTER
DIAM
ONDWAN
APAI,
L.P.
R10P
SDOR05
018/8/20
05
COMBU
STIONTU
RBINE
&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S23
84.1
MMBT
U/H
OXIDA
TIONCA
TALYST.
2PP
MDV
@15
%O2
3HO
URS
BACT
PSD
2PP
M@
15%
O2
GE72
41FA
TURB
INEAN
DDU
CTBU
RNER
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:C O
Prop
osed
COLi
mit:
4PP
MVD
@15
%O
2w
hile
oper
atin
gat
norm
altu
rbin
eba
selo
adco
nditi
ons;
Equi
vale
ntto
0.00
9lb
/MM
Btu
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
FL02
65HINES
POWER
BLOCK
4PR
OGR
ESSEN
ERGY
PSDFL
342AN
D10
5023
401
0AC
6/8/20
05CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S53
0MW
GOODCO
MBU
STION
8PP
MNAT
URA
LGA
SBA
CTPSD
8PP
M@
15%
O2
LA01
92CR
ESCE
NTCITY
POWER
CRESEN
TCITY
POWER
,LLC
PSDLA
704
6/6/20
05GA
STU
RBINES
187
MW
(2)
2006
MMBT
U/H
COOXIDA
TIONCA
TALYST
ANDGO
ODCO
MBU
STION
PRAC
TICE
S17
.7LB/H
HOURLYMAX
IMUM
BACT
PSD
4PP
M@
15%O2
ANNUAL
AVER
AGE
MI0
366
BERR
IENEN
ERGY
, LLC
BERR
IENEN
ERGY
,LLC
32301
A4/13
/200
5
3CO
MBU
STION
TURB
INES
ANDDU
CTBU
RNER
SNAT
URA
LGA
S15
84MMBT
U/H
CATA
LYTICOXIDA
TION.
2PP
MDV
@15
%O2
3HO
URBLOCK
BACT
PSD
2PP
M@
15%
O2
EACH
TURB
INEISEQ
UIPPEDWITHAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOR(HRSG).EA
CHHR
SGISEQ
UIPPED
WITHANAT
URA
LGA
SFIRE
DDU
CTBU
RNER
FL02
63FPLTU
RKEY
POINT
POWER
PLAN
TFLORIDA
POWER
AND
LIGH
TPSDFL
338
2/8/20
0517
0MW
COMBU
STION
TURB
INE,4UNITS
NAT
URA
LGA
S17
0MW
COWILLBE
MINIM
IZED
BYTH
EEFFICIEN
TCO
MBU
STIONOFNAT
URA
LGA
SAN
DDISTILLATE
OIL
ATHIGH
TEMPERA
TURE
S8PP
MVD
@15
%O2
24HR
AVG.
TIME(CT
&DU
CTBU
RNER
)BA
CTPSD
7.6PP
M@
15%
O2
STAC
KTEST
(CT&
DUCT
BURN
ER)
4GA
STU
RBINES
WA03
28
BPCH
ERRY
POINT
COGE
NER
ATION
PROJECT
BPWESTCO
AST
PRODU
CTS,LLC
EFSEC/2002
011/11
/200
5
GE7FACO
MBU
STION
TURB
INE&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S17
4MW
LEAN
PREMIXCT
BURN
ER&OXIDA
TIONCA
TALYST
2PP
MDV
3HR
@15
%O2
BACT
PSD
0PP
M@
15%
02
UNITSNOT
AVAILABLE*SEE
NOTES
3CO
MBU
STIONTU
RBINES
ANDHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
NC01
01FO
RSYTHEN
ERGY
PLAN
TFO
RSYTHEN
ERGY
PROJECT
S,LLC
4911
8/31
/200
412
.31
110.2MMBT
U/H
9.08
LB/H
basedon
3ho
uraverage
BACT
PSD
LB/M
MBT
U0.08
2395
644
0
NC01
01FO
RSYTHEN
ERGY
PLAN
TFO
RSYTHEN
ERGY
PROJECT
S,LLC
4911
8/31
/200
415
.21
1844
.3MMBT
U/H
naturalgas
fired
heat
recovery
steam
gene
ratora
nda
naturalgas
fired
duct
11.6
PPM
@15
%O2
3ho
uraverage
BACT
PSD
PPM
@15
%O2
0TU
RBINE,CO
MBINED
CYCLE,NAT
URA
LGA
S,(3)
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX07
67LO
NC.HILL
POWER
STAT
ION
LONC.HILL,L.P.
1149
11AN
DPSDT
X138
010
/6/201
5Co
mbine
dCycle
Turbines
(>25
MW)
naturalgas
195MW
Oxidatio
nCatalyst
2PP
MBA
CTPSD
Twopo
wer
configurationop
tions
authorize
dSiem
ens–
240MW
+25
0millionBritish
thermalun
itspe
rhou
r(M
MBtu/hr)d
uctb
urne
rGE–19
5MW
+67
0MMBtu/hr
ductbu
rner
*TX07
14
SRBE
RTRO
NELEC
TRIC
GENER
ATING
STAT
ION
NRG
TEXA
SPO
WER
LLC
1027
31PSDT
X129
412
/19/20
14(2)com
bine
dcycle
turbines
naturalgas
240MW
oxidationcatalyst
1PP
MVD
@15
%O2
BACT
PSD
0
Thegasturbine
swillbe
oneof
threeop
tions:(1)
Two
Siem
ensM
odelF5
(SF5)C
TGsw
ithadu
ctfired
HRSG
,(2)
TwoGe
neralElectric
Mod
el7FA(GE7FA
)CTG
swith
adu
ctfired
HRSG
,(3)
TwoMitsub
ishiH
eavy
Indu
stry
GFram
e(M
HI50
1G)C
TGsw
ithadu
ctfired
HRSG
*TX07
10VICT
ORIAPO
WER
STAT
ION
VICT
ORIAWLE
L.P.
1082
58PSDT
X134
812
/1/201
4combine
dcycle
turbine
naturalgas
197MW
oxidationcatalyst
4PP
MVD
@15
%O2,3HR
ROLLINGAV
ERAG
EBA
CTPSD
0Ge
neralElectric
7FA.04
with
ductbu
rners
*WV00
25
MOUNDS
VILLE
COMBINED
CYCLE
POWER
PLAN
TMOUNDS
VILLEPO
WER
,LLC
R1400
3011
/21/20
14Co
mbine
dCycle
Turbine/Du
ctBu
rner
NaturalGa
s21
59mmBtu/Hr
Oxidatio
nCatalyst&Go
odCo
mbu
stionPractices
5.3LB/HR
BACT
PSD
2PP
M@
15%O2
2Nom
inal19
7mW
Gene
ralElectric
Fram
e7FA.04
Turbinew/D
uctB
urne
r
*TX07
12
TRINIDAD
GENER
ATING
FACILITY
SOUTH
ERNPO
WER
COMPA
NY
1113
93PSDT
X136
811
/20/20
14combine
dcycle
turbine
naturalgas
497MW
oxidationcatalyst
4PP
MVD
@15
%O21HR
BACT
PSD
0AMitsub
ishiH
eavy
Indu
strie
s(MHI)J
mod
elgasfire
dcombu
stionturbinewith
aHR
SGandDB
*TX06
78
FREEPO
RTLN
GPR
ETRE
ATMEN
TFA
CILITY
FREEPO
RTLN
GDE
VELO
PMEN
TLP
1048
40N17
0PSDT
X130
27/16
/201
4Co
mbu
stionTurbine
naturalgas
87MW
oxidationcatalyst
2PP
MVD
1HO
URBA
SEDON
STAC
KTEST
BACT
PSD
0
*TX07
13
TENAS
KABR
OWNSV
ILLE
GENER
ATING
STAT
ION
TENAS
KABR
OWNSV
ILLE
PART
NER
S,LLC
1084
11PSDT
X135
04/29
/201
4(2)com
bine
dcycle
turbines
naturalgas
274MW
oxidationcatalyst
2PP
MVD
@15
%O2,3HR
AVER
AGE
BACT
PSD
02CT
Gs,twoHR
SGsw
ithfulldu
ctbu
rner
firing
*IA01
07
MAR
SHALLTOWN
GENER
ATING
STAT
ION
INTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#1combine
dcycle
naturalgas
2258
mmBtu/hr
catalytic
oxidize
r1PP
MAV
G.OF3ONE
HOURTEST
RUNS
BACT
PSD
02Siem
ensS
GT650
00Fcombine
dcycleturbines
with
out
ductfiring
*IA01
07
MAR
SHALLTOWN
GENER
ATING
STAT
ION
INTERSTA
TEPO
WER
AND
LIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#2combine
dcycle
naturalgas
2258
mmBtu/hr
1PP
MAV
ERAG
E0F
3ONE
HOURTEST
RUNS
BACT
PSD
0Tw
ocombine
dcycleturbines
with
outd
uctb
urning.
*TX06
60
FGETEXA
SPO
WER
IAN
DFG
ETEXA
SPO
WER
IIFG
EPO
WER
LLC
PSDT
X136
43/24
/201
4Alstom
Turbine
NaturalGa
s23
0.7MW
Oxidatio
ncatalyst,goo
dcombu
stionpractices
2PP
MVD
CORR
ECTEDTO
15%
O2,RO
LLING3HR
AVE
BACT
PSD
0Four
(4)A
lstom
GT24
CTGs
,eachwith
aHR
SGandDB
s,max
desig
ncapacity
409MMBtu/hr
*OR00
50TR
OUTD
ALEEN
ERGY
CENTER,
LLC
TROUTD
ALEEN
ERGY
CENTER,
LLC
2602
353/5/20
14
Mitsub
ishiM
501GA
Ccombu
stionturbine,
combine
dcycle
configurationwith
ductbu
rner.
naturalgs
2988
MMBtu/hr
Oxida
oncatalyst;
Limitthetim
einstartupor
shutdo
wn.
2PP
MDV
AT15
%O2
3HR
ROLLING
AVER
AGEONNG
BACT
PSD
0Mitsub
ishiM
501GA
Ccombu
stionturbine,combine
dcycleconfigurationwith
ductbu
rner.
*PA02
98
FUTU
REPO
WER
PA/G
OODSPRINGS
NGC
CFA
CILITY
FUTU
REPO
WER
PAINC
5400
082A
3/4/20
14
Turbine,CO
MBINED
CYCLEUNIT(Siemen
s50
00)
NaturalGa
s22
67MMBtu/hr
COCatalyst
2PP
MVD
@15
%OXYGE
NBA
CTPSD
34.1
TPY
ONA12
MONTH
ROLLINGTO
TALTurbine,CO
MBINED
CYCLEUNIT(Siemen
s500
0)with
ductbu
rner
*PA02
96
BERK
SHO
LLOW
ENER
GYAS
SOC
LLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and#2
NaturalGa
s30
46MMBtu/hr
93.85TPY
12MONTH
ROLLING
TOTA
L0.00
7lb/M
MBtu
2combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorswith
ductbu
rners
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOFPU
BLIC
WORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
naturalgas
647MMBT
U/H
for
each
CTGH
RSG
Oxidatio
ncatalysttechno
logy
and
good
combu
stionpractices.
4PP
MTEST
PROTO
COL
BACT
PSD
0
2combine
dcyclenaturalgas
fired
combu
stionturbine
gene
rators(CTG
s)with
Heat
Recovery
Steam
Gene
rators
(HRSGs
)equ
ippe
dwith
ductbu
rners
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5THSTRE
ETHO
LLAN
DBO
ARDOFPU
BLIC
WORK
S10
713
12/4/201
3
FGCT
GHRSG:
Startup&am
p;Shutdo
wn
naturalgas
647MMBT
U/H
for
each
CTGH
RSG
Oxidatio
ncatalysttechno
logy
and
good
combu
stionpractices.
198.9LB/H
EACH
,DURING
STAR
TUP
BACT
PSD
0.30
7lb/M
MBtu
*TX06
41PINEC
REST
ENER
GYCE
NTER
PINEC
REST
ENER
GYCE
NTER
LLC
PSDT
X129
811
/12/20
13combine
dcycle
turbine
naturalgas
700MW
oxidationcatalyst
2PP
MVD
INITIALSTAC
KTEST,
15%OXYGE
NBA
CTPSD
0
2naturalgas
fired
combu
stionturbines
(CTs),each
exhaustin
gto
afired
heat
recovery
steam
gene
rator
(HRSG).3
mod
elsu
nder
consideration:
theGe
neral
Electric7FA.05
,the
Siem
ensS
GT650
00F(4),and
the
Siem
ensS
GT650
00F(5).With
ductbu
rners
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX07
09SA
NDHILL
ENER
GYCE
NTER
CITY
OFAU
STIN
4810
6,PSDT
X101
2M2
9/13
/201
3
Naturalgasfired
combine
dcycle
turbines
NaturalGa
s17
3.9MW
2PP
M1H
R.AV
G.BA
CTPSD
0GE
7FANaturalGa
sfired
Combine
dCycleTurbinewith
DBfired
HRSG
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4
nat.gasfire
dCT
Gw/
DBforH
RSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
Efficient
combu
stioncontrolplus
catalytic
oxidationsystem
.0
BACT
PSD
0Naturalgasfire
dCT
Gwith
DBforH
RSG;
4total.
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
out
ductbu
rners
NaturalGa
s51
5600
MMSCF/rolling
12mon
ths
oxidationcatalyst
3.9LB/H
BACT
PSD
1PP
MPP
MVD
AT15
%O2
2Mitsub
ishi293
2MMBtu/Hcombine
dcyclecombu
stion
turbines,bothwith
ductbu
rners.
Willinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Siem
ens,with
duct
burners
NaturalGa
s51
560MMSCF/rolling
12MO
oxidationcatalyst
5.9LB/H
BACT
PSD
1.9PP
MPP
MVD
AT15
%O2
2Mitsub
ishi293
2MMBtu/Hcombine
dcyclecombu
stion
turbines,bothwith
ductbu
rners.
Willinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
duct
burners
NaturalGa
s47
917MMSCF/rolling
12MO
oxidationcatalyst
7.3LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
2Mitsub
ishi293
2MMBtu/Hcombine
dcyclecombu
stion
turbines,bothwith
ductbu
rners.
Willinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stionTurbines
Mitsub
ishi,with
out
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
oxidationcatalyst
7.9LB/H
BACT
PSD
2PP
MPP
MVD
AT15
%O2
2Mitsub
ishi293
2MMBtu/Hcombine
dcyclecombu
stion
turbines,bothwith
outd
uctb
urne
rs.Willinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
REMIDLANDCO
GENER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Good
combu
stionpractices
0.00
18LB/M
MBT
UEA
CHCT
G;TEST
PROTO
COL
BACT
PSD
02naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)
*MI0
405
MIDLAND
COGE
NER
ATION
VENTU
REMIDLANDCO
GENER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctNaturalgas
2486
MMBT
U/H
Good
combu
stionpractices
0.00
4LB/M
MBT
UTEST
PROTO
COL
BACT
PSD
02naturalgas
fired
CTGs
with
each
turbinecontaining
ahe
atrecovery
steam
gene
rator(HR
SG)w
ithdu
ctbu
rner
*PA02
91HICK
ORY
RUN
ENER
GYSTAT
ION
HICK
ORY
RUNEN
ERGY
LLC
3733
7A4/23
/201
3CO
MBINED
CYCLE
UNITS#1
and#2
NaturalGa
s3.4MMCF/HR
Oxidatio
nCatalyst
1.5PP
MVD
@15
%OXYGE
NWITHORWITHO
UT
DUCT
BURN
EROTH
ERCA
SEBY
CASE
0
With
ductbu
rners.Mod
elsu
nder
consideration:
1.Ge
neralElectric
7FA(GE7FA,
2.Siem
ensS
GT650
00F
(Siemen
sF),3.Mitsub
ishiM
501G
(Mitsub
ishiG
),4.
Siem
ensS
GT680
00H(Siemen
sH)
*VA03
21
BRUNSW
ICK
COUNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
5240
400
13/12
/201
3
COMBU
STION
TURB
INE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Oxidatio
ncatalyst;goo
dcombu
stionpractices.
0.7PP
MVD
3HAV
G/WITHO
UT
DUCT
BURN
ING
BACT
PSD
0Three(3)M
itsub
ishiM
501GA
Ccombu
stionturbine
gene
ratorswith
HRSG
ductbu
rners(naturalgas
fired
).
*TX07
08LA
PALO
MAEN
ERGY
CENTER
LAPA
LOMAEN
ERGY
CENTER,
LLC
1015
42PSDT
X128
82/7/20
13(2)com
bine
dcycle
turbines
naturalgas
650MW
oxidationcatalyst
2PP
MVD
@15
%O2,3HR
ROLLING
BACT
PSD
0
2combu
stionturbines
(CTs)con
nected
toelectric
gene
rators,w
ithdu
ctbu
rners.3mod
elso
fCTun
der
consideration:
(1)G
eneralElectric7FA.04
;(2)
Siem
ens
SGT6
5000
F(4);o
r(3)
Siem
ensS
GT650
00F(5).
*PA02
86
MOXIEEN
ERGY
LLC/PA
TRIOT
GENER
ATIONPLT
MOXIEEN
ERGY
LLC
4100
084A
1/31
/201
3
Combine
dCycle
Power
Blocks
472
MW
(2)
NaturalGa
s0
COCatalyst
1PP
MDV
WITHO
UTDU
CTBU
RNER
BACT
PSD
33.8
TPY
EACH
UNIT
Does
notinclude
ductbu
rner.2naturalgas
fired
combine
dcyclepo
werblocks
whe
reeach
powerblock
consistso
facombu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGING
ROCK
,LLC
P011
0487
12/18/20
12
Turbines
(4)(mod
elGE
7FA)
DuctBu
rners
Off
NAT
URA
LGA
S17
2MW
Usin
gefficient
combu
stion
techno
logy
3.2LB/H
BACT
PSD
0Four
GE7FAcombine
dcycleturbines
with
ductbu
rners
*OH03
56
DUKE
ENER
GYHA
NGINGRO
CKEN
ERGY
DUKE
ENER
GYHA
NGING
ROCK
,LLC
P011
0487
12/18/20
12
Turbines
(4)(mod
elGE
7FA)
DuctBu
rners
On
NAT
URA
LGA
S17
2MW
Usin
gefficient
combu
stion
techno
logy
7.3LB/H
BACT
PSD
0Four
GE7FAcombine
dcycleturbines
with
ductbu
rners
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLECO
MBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
OXIDIZEDCA
TALYST
1PP
MVD
3HO
URS
BACT
PSD
0FO
UR(4)N
ATURA
LGA
SCO
MBINED
CYCLECO
MBU
STION
TURB
INES
WITHDU
CTBU
RNER
S
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
003
0057
912
/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLECO
MBU
STION
TURB
INES
STAR
TUP/SH
UTD
OWN
NAT
URA
LGA
S23
00MMBT
U/H
22TO
NS
12CO
NSECU
TIVE
MONTH
PERIOD
BACT
PSD
0.00
2lb/M
MBtu
*DE00
23NRG
ENER
GYCE
NTERDO
VER
NRG
ENER
GYCE
NTERDO
VER
LLC
AQM
001/00
127(R
2)(REV
1)10
/31/20
12UNIT2
KD1
NaturalGa
s65
5MMBT
U/H
Oxidatio
ncatalystsystem
6.4LB/H
1HO
URAV
ERAG
EOTH
ERCA
SEBY
CASE
0.01
0lb/M
MBtu
500MMBT
U/hrG
asTurbine(M
odel:G
ELM
6000
)
TX06
18CH
ANNEL
ENER
GYCE
NTERLLC
CHAN
NEL
ENER
GYCE
NTER
LLC
PSDT
X955
M1
10/15/20
12Co
mbine
dCycle
Turbine
naturalgas
180MW
Good
combu
stion
2PP
MVD
@15
%O2
BACT
PSD
0
TheturbineisaSiem
ens5
01Fratedat
ano
minal18
0MW
andthedu
ctbu
rner
willhave
amaxim
umde
signhe
atinpu
tof4
75MMBtu/hr.
FL03
37PO
LKPO
WER
STAT
ION
TAMPA
ELEC
TRIC
COMPA
NY
1050
23303
4AC
10/14/20
12Co
mbine
cyclepo
wer
block(4
on1)
naturalgas
1160
MW
fuelSulfu
rlim
its1.4PP
MVD
@15
%O2
BACT
PSD
04naturalgas
fueled
nominal16
5MW
simplecycle
combu
stionturbineelectricalgene
rators(CTG
s)
PA02
78
MOXIELIBE
RTY
LLC/AS
YLUM
POWER
PLT
MOXIEEN
ERGY
LLC
0800
045A
10/10/20
12
Combine
dcycle
Turbines
(2)
Natural
gasfire
dNaturalGa
s32
77MMBT
U/H
Oxidatio
nCatalyst
1PP
MVD
WITHO
UTDU
CTBU
RNER
LAER
02combine
cycleTurbines,eachwith
acombu
stionturbine
andhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner
TX06
19DE
ERPA
RKEN
ERGY
CENTER
DEER
PARK
ENER
GYCE
NTER
LLC
PSDT
X979
M2
9/26
/201
2Co
mbine
dCycle
Turbine
naturalgas
180MW
good
combu
stion,useof
natural
gas
2PP
MVD
@15
%O2
BACT
PSD
0
naturalgas
fired
combine
dcycleturbinegene
rator
Siem
ens5
01Fwith
ahe
atrecovery
steam
gene
rator
equipp
edwith
adu
ctbu
rner.
TX06
20ES
JOSLIN
POWER
PLAN
TCA
LHOUNPO
RTAU
THORITY
PSDT
X125
69/12
/201
2Co
mbine
dcyclegas
turbine
naturalgas
195MW
good
combu
stionandnaturalgas
asfuel
2PP
MVD
@15
%O2
BACT
PSD
0Thethreecombu
stionturbinegene
rators(CTG
)willbe
theGe
neralElectric
7FA.
Nodu
ctbu
rners.
*WY00
70
CHEYEN
NEPR
AIRIE
GENER
ATING
STAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
1)NaturalGa
s40
MW
Oxidatio
nCatalyst
3PP
MVAT
15%
O2
1HO
UR
BACT
PSD
14.7
TONSPERYEAR
(5)4
0MW
GELM
6000
combu
stionturbinegene
rators
*WY00
70
CHEYEN
NEPR
AIRIE
GENER
ATING
STAT
ION
BLAC
KHILLSPO
WER
,INC.
CT12
636
8/28
/201
2Co
mbine
dCycle
Turbine(EP0
2)NaturalGa
s40
MW
Oxidatio
nCatalyst
3PP
MVAT
15%
O2
3HO
URAV
ERAG
EBA
CTPSD
14.7
TONSPERYEAR
(5)4
0MW
GELM
6000
combu
stionturbinegene
rators
LA02
57SA
BINEPA
SSLN
GTERM
INAL
SABINEPA
SSLN
G,LP
&SA
BINEPA
SSLIQUEFAC
TION,
LLPSDLA
703(M3)
12/6/201
1
Combine
dCycle
Refrigeration
CompressorT
urbine
s(8)
naturalgas
286MMBT
U/H
Good
combu
stionpractices
and
fueled
bynaturalgas
0.66
LB/H
HOURLYMAX
IMUM
BACT
PSD
0.00
2lb/M
MBtu
GELM
2500
+G4
TX06
00
THOMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDT
X124
49/1/20
11Naturalgasfired
turbines
naturalgas
390MW
Naturalgas,good
combu
stion
practices
andoxidationcatalyst
2PP
MVD
3HR
AT15
%OXYGE
NBA
CTPSD
0Tw
onaturalgas
fired
combine
dcycleturbinegene
rators
(GE7FA)
with
unfired
HRSG
LA02
54
NINEM
ILEPO
INT
ELEC
TRIC
GENER
ATINGPLAN
TEN
TERG
YLO
UISIANALLC
PSDLA
752
8/16
/201
1
COMBINED
CYCLE
TURB
INE
GENER
ATORS
(UNITS
6A&am
p;6B
)NAT
URA
LGA
S71
46MMBT
U/H
GOODCO
MBU
STIONPR
ACTICE
S1.4PP
MVD
@15
%O2
HOURLYAV
ERAG
EW/O
DUCT
BURN
ERBA
CTPSD
02CO
MBINED
CYCLEGA
STU
RBINES
WITHDU
CTBU
RNER
S
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S17
2MW
2PP
MVD
@15
%O2,1HR
ROLLINGAV
GBA
CTPSD
0
TWO(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(SHU
TDOWN
PERIODS
)NAT
URA
LGA
S17
2MW
23.9
LB/H
TURB
INE
SHUTD
OWNPERIODS
BACT
PSD
0
SDlim
iton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(WAR
MSTAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
27.7
LB/H
WAR
MSTAR
TUP
PERIODS
BACT
PSD
0
SUlim
iton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(HOT
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
27.7
LB/H
HOTSTAR
TUP
PERIODS
BACT
PSD
0
SULimiton
ly.TW
O(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA
688MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
CA12
11
COLU
SAGE
NER
ATING
STAT
ION
PACIFICGA
S&ELEC
TRIC
COMPA
NY
SAC06
013/11
/201
1
COMBU
STION
TURB
INES
(COLD
STAR
TUPPERIODS
)NAT
URA
LGA
S17
2MW
27.7
LB/H
COLD
STAR
TUP
PERIODS
BACT
PSD
0
SULimiton
ly.TWO(2)N
ATURA
LGA
SFIRE
DTU
RBINES
AT17
2MW
EACH
.BOTH
TURB
INES
EQUIPPEDWITHA68
8MMBT
U/HRDU
CTBU
RNER
ANDHR
SG.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*IL01
12NELSO
NEN
ERGY
CENTER
INVE
NER
GYNELSO
N,LLC
9808
0039
12/28/20
10ElectricGe
neratio
nFacility
NaturalGa
s22
0MW
each
4PP
MVD
@15
%O2
HOURLYAV
GEXCE
PTDU
RINGSSM
OR
TUNING
BACT
PSD
0
Does
notinclude
SSM.Tw
ocombine
dcyclecombu
stion
turbines
followed
byHR
SGsw
ithcapabilityfor
supp
lemen
talfue
lfiring
inHR
SGfore
achcombu
stion
turbineusingdu
ctbu
rners.
VA03
15
WAR
RENCO
UNTY
POWER
PLAN
TDO
MINION
VIRG
INIA
ELEC
TRIC
AND
POWER
COMPA
NY
8139
100
712
/17/20
10
COMBINED
CYCLE
TURB
INE&am
p;DU
CTBU
RNER
,3NaturalGa
s29
96MMBT
U/H
Oxidatio
ncatalystandgood
combu
stionpractices.
2.6LB/H
3HR
AVG.
(WITHO
UT
DUCT
BURN
ERFIRING)
BACT
PSD
0.00
09lb/M
MBtu
3Mitsub
ishiM
odelM50
1GA
Cnaturalgas
fired
combine
dcylceturbines,w
ithdu
ctbu
rners
*CO00
73
PUEB
LOAIRP
ORT
GENER
ATING
STAT
ION
BLAC
KHILLSELEC
TRIC
GENER
ATION,LLC
09PB
0591
7/22
/201
0Four
combine
dcycle
combu
tionturbines
naturalgas
373mmbtu/hr
good
combu
stioncontroland
catalytic
oxidation
4PP
MVD
AT15
%O2
AVEOVE
RSTAC
KTEST
LENGT
HBA
CTPSD
0ThreeGE
,LMS600
0PF,naturalgasfired
,com
bine
dcycle
CTG,
with
noDu
ctBu
rners
ID00
18LANGL
EYGU
LCH
POWER
PLAN
TIDAH
OPO
WER
COMPA
NY
P20
09.009
26/25
/201
0
COMBU
STION
TURB
INE,CO
MBINED
CYCLEW/D
UCT
BURN
ERNAT
URA
LGA
S(ONLY)
2375
.28MMBT
U/H
CATALYTICOXIDA
TION(CATOX),
DRYLO
WNOX(DLN
),GO
ODCO
MBU
STIONPR
ACTICE
S(GCP
)2PP
MVD
3HR
ROLLING/1
5%O2
BACT
PSD
0SIEM
ENSSG
T650
00FCO
MBU
STIONTU
RBINE(NGC
T,CC
GT)W
ITHDU
CTBU
RNER
GA01
38LIVE
OAK
SPO
WER
PLAN
TLIVE
OAK
SCO
MPA
NY,LLC
4911
127
0075
P02
04/8/20
10
COMBINED
CYCLE
COMBU
STION
TURB
INE
ELEC
TRIC
GENER
ATINGPLAN
TNAT
URA
LGA
S60
0MW
GOODCO
MBU
STIONPR
ACTICE
S,CA
TALYTICOXIDA
TION
2PP
M@15
%02
3HO
UR
AVER
AGE/CO
NDITIO
N2.11
BACT
PSD
0
2CO
MBU
STIONTU
RBINES
ANDONESTEA
MTU
RBINE
WITHDU
CTBU
RNER
S.TH
ECO
MBU
STIONTU
RBINES
(CTs)SELEC
TEDAR
ESIEM
ENSMODE
LSG
T650
00F.
TX05
48MAD
ISONBE
LLEN
ERGY
CENTER
MAD
ISONBE
LLPA
RTNER
SLP
8337
88/18
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S27
5MW
GOODCO
MBU
STIONPR
ACTICE
S2.5PP
MVD
@15
%O2,1HR
ROLLINGAV
GBA
CTPSD
04GE
PG71
21(EA)
COMBINECY
CLETU
RBINES
FIRING
NAT
URA
LGA
SWITHDU
CTBU
RNER
CA11
77OTA
YMESAEN
ERGY
CENTERLLC
OTA
YMESAEN
ERGY
CENTER
LLC
9783
797/22
/200
9Ga
sturbine
combine
dcycle
Naturalgas
171.7MW
2PP
MVD
@15
%OXYGE
N1HO
UR
OTH
ERCA
SEBY
CASE
0
TX05
47
NAT
URA
LGA
SFIRE
DPO
WER
GENER
ATION
FACILITY
LAMAR
POWER
PART
NER
SII
LLC
8320
76/22
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S25
0MW
GOODCO
MBU
STIONPR
ACTICE
S4PP
MVD
@15
%O2,24
HRRO
LLINGAV
GBA
CTPSD
0
2CO
MBU
STIONTU
RBINES
(EITHE
R17
0MW
GENER
ALELEC
TRIC
7FAS
OR25
0MW
MITSU
BISH
I501
GS),TW
OHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
WITHDU
CTBU
RNER
SAN
DONESTEA
MTU
RBINE
TX05
46PA
TTILLO
BRAN
CHPO
WER
PLAN
TPA
TTILLO
BRAN
CHPO
WER
COMPA
NYLLC
8364
26/17
/200
9ELEC
TRICITY
GENER
ATION
NAT
URA
LGA
S35
0MW
OXIDA
TIONCA
TALYST
2PP
MVD
@15
%O2,3HR
ROLLINGAV
GBA
CTPSD
0TU
RBINES
BEINGCO
NSIDE
REDFO
RTH
EPR
OJECT
AREGE
7FA,
GE7FB,
ANDSIEM
ENSSG
T650
00F.
CA11
78AP
PLIEDEN
ERGY
LLCAP
PLIEDEN
ERGY
LLC
9874
943/20
/200
9Ga
sturbine
combine
dcycle
Naturalgas
0Oxidatio
ncatalyst
2PP
M1HO
UR
BACT
PSD
0
OK01
29CH
OUTEAU
POWER
PLAN
TAS
SOCIAT
EDELEC
TRIC
COOPERA
TIVE
INC
2007
115
C(M
1)PSD
1/23
/200
9
COMBINED
CYCLE
COGE
NER
ATION
>25M
WNAT
URA
LGA
S18
82MMBT
U/H
GOODCO
MBU
STION
0.3PP
M3HR
AVG@
15%O2
BACT
PSD
0SIEM
ENSV8
4.3A
FL03
03
FPLWESTCO
UNTY
ENER
GYCE
NTER
UNIT3
FLORIDA
POWER
ANDLIGH
TCO
MPA
NY(FP&
L)
0990
64600
2AC
(PSD
FL39
6)7/30
/200
8
THRE
ENOMINAL
250
MW
CTG(EAC
H)WITH
SUPP
LEMEN
TARY
FIRE
DHR
SGNAT
URA
LGA
S23
33MMBT
U/H
1.2PP
MVD
BACT
PSD
03NOMINAL
250MEG
AWAT
T(M
W)G
CLAS
SCO
MBU
STIONTU
RBINEELEC
TRICAL
GENER
ATORS
(CTG
)
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8TW
OCO
MBINED
CYCLEGA
STU
RBINES
NAT
URA
LGA
S21
10MMBT
U/H
PROPEROPERA
TINGPR
ACTICE
S12
.06LB/H
MAX
BACT
PSD
4.9PP
MVD
@15
%O2AN
NUAL
AVER
AGE
CTG1TU
RBINE/DU
CTBU
RNER
(EQT012
)CT
G2TU
RBINE/DU
CTBU
RNER
(EQT013
)
LA02
24AR
SENAL
HILL
POWER
PLAN
T
SOUTH
WESTELEC
TRIC
POWER
COMPA
NY
(SWEPCO
)PSDLA
726
3/20
/200
8
SCN4HO
TSTAR
TUP
CTG1SCN8HO
TSTAR
TUPCT
G2
NAT
URA
LGA
S21
10MMBT
U/H
COMPLETEEV
ENTS
ASQUICKLY
ASPO
SSIBLE
ACCO
RDINGTO
MAN
UFA
CTURE
¿SRE
COMMEN
DEDPR
OCE
DURE
S.21
4.07
LB/H
MAX
BACT
PSD
0.10
lb/M
MBtu
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
CT01
51KLEENEN
ERGY
SYSTEM
S,LLC
KLEENEN
ERGY
SYSTEM
S,LLC
10401
31AN
D10
401
332/25
/200
8
SIEM
ENSSG
T650
00F
COMBU
STION
TURB
INE#1
AND#2
(NAT
URA
LGA
SFIRE
D)WITH44
5MMBT
U/HR
NAT
URA
LGA
S2.1MMCF/H
SOMERE
DUCT
IONSOFVO
CAR
EGA
INED
FROM
COCA
TALYST
BUT
ARENOTGU
ARAN
TEED
.EM
ISSIONRA
TESDO
NOT
INCO
RPORA
TETH
ISPO
TENTIAL
REDU
CTION.
10LB/H
W/O
UTDU
CTBU
RNER
BACT
PSD
5PP
MVD
@15
%O2
1HR
BLOCK
2SIEM
ENSSG
T650
00FCO
MBU
STIONTU
RBINES,D
UCT
BURN
ERSAN
DAN
HRSG
S.
MN00
71FA
IRBA
ULT
ENER
GYPA
RKMINNESOTA
MUNICIPAL
POWER
AGEN
CY13
1000
7100
36/5/20
07
COMBINED
CYCLE
COMBU
STION
TURB
INEW/DUCT
BURN
ERNAT
URA
LGA
S17
58MMBT
U/H
1.5PP
MVD
CTGNGNODB
BACT
PSD
3.5PP
MVD
CTGOIL&DB
NOTOPERA
TEORDB
NGOR
OIL
COMBU
STIONTU
RBINEWITHDU
CTBU
RNER
FL02
85PR
OGR
ESSBA
RTOW
POWER
PLAN
TPR
OGR
ESSEN
ERGY
FLORIDA
(PEF)
PSDFL
381
AND10
3001
101
0AC
1/26
/200
7
COMBINED
CYCLE
COMBU
STION
TURB
INESYSTEM
(4ON1)
NAT
URA
LGA
S19
72MMBT
U/H
GOODCO
MBU
STION
1.2PP
MVD
@15
%O2FO
RCT
ONLY
GAS
BACT
PSD
0FO
URSIMPLECY
CLEUNITSDE
SIGN
ATED
ASGA
SCO
MBU
STIONTU
RBINEWITHDU
CTFIRE
DHR
SG
NY00
98AT
HENS
GENER
ATINGPLAN
TNEW
ATHE
NSGE
NER
ATING
CO.LLC
4192
2000
551/19
/200
7FU
ELCO
MBU
STION
(GAS
)NAT
URA
LGA
S31
00MMBT
U/H
GOODCO
MBU
STIONCO
NTR
OL
4PP
MVD
@15
%O2
3HO
URBLOCK
AVER
AGE/
STEA
DYSTAT
ELAER
4PP
MVD
@15
%O2
3HO
URBLOCK
AVER
AGE/
STEA
DYSTAT
E
3WESTINGH
OUSE
MODE
L50
1GGA
SCO
MBINED
CYCLE
TURB
INES,H
EATRE
COVE
RYSTEA
MGE
NER
ATORS,A
ND
STEA
MTU
RBINEGE
NER
ATORS
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
FL02
86FPLWESTCO
UNTY
ENER
GYCE
NTER
FLORIDA
POWER
ANDLIGH
TCO
MPA
NY
PSDFL
354
AND09
9064
600
1AC
1/10
/200
7
COMBINED
CYCLE
COMBU
STIONGA
STU
RBINES
6UNITS
NAT
URA
LGA
S23
33MMBT
U/H
1.5PP
MVD
@15
%O2
GAS
BACT
PSD
0
EACH
COMBINED
CYCLEUNITSYSTEM
WILLCO
NSIST
OF:
THRE
ENOMINAL
250MEG
AWAT
TMODE
L50
1GGA
STU
RBINEELEC
TRICAL
GENER
ATORSETS,3
HRSG
SWITH
DUCT
BURN
ER
TX04
97INEO
SCH
OCO
LATE
BAYO
UFA
CILITY
INEO
SUSA
LLC
PSDTX
983
AND46
192
8/29
/200
6
COGE
NER
ATION
TRAIN2AN
D3
(TURB
INEAN
DDU
CTBU
RNER
EMISSIONS)
NAT
URA
LGA
S35
MW
BPAM
OCO
PROPO
SESPR
OPER
COMBU
STIONCO
NTR
OLAS
BACT
FORCO
ANDVO
CEM
ISSIONS
FROM
THETU
RBINES
ANDDU
CTBU
RNER
S.6.14
LB/H
BACT
PSD
0
2NOMINALLY
RATED35
MW
GASFIRE
DTU
RBINES
AND
TWOHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS,EQUIPPED
WITHDU
CTBU
RNER
S.TH
EEM
ISSIONSAR
EPERTR
AIN.
TX05
02
NAC
OGD
OCH
ESPO
WER
STER
NE
GENER
ATING
FACILITY
NAC
OGD
OCH
ESPO
WER
LLC
PSDTX
1015
AND49
293
6/5/20
06
WESTINGH
OUSE/SIE
MEN
SMODE
LSW
501F
GAS
TURB
INEW/4
16.5
MMBT
UDU
CTBU
RNER
SNAT
URA
LGA
S19
0MW
STEA
GPO
WER
LLCRE
PRESEN
TSGO
ODCO
MBU
STIONPR
ACTICE
SFO
RTH
ECO
NTR
OLOFVO
LATILE
ORG
ANICCO
MPO
UND(VOC)
EMISSIONSFROM
THE
COMBU
STIONTU
RBINES
AND
DUCT
FIRE
DHR
SG.VO
CEM
ISSIONSFROM
THE
COMBU
STIONTU
RBINEWILLBE
4.3PP
MVD
13.8
LB/H
BACT
PSD
0
(3)1
90MEG
AWAT
T(M
W)W
ESTINGH
OUSE/SIEMEN
SMODE
L50
1FCO
MBU
STIONTU
RBINES,THR
EEHE
ATRE
COVE
RYSTEA
MGE
NER
ATORS
(HRSGS
)WITH
DUCT
BURN
ERS,AN
DTH
REE14
0MW
STEA
MDR
IVEN
TURB
INE
GENER
ATORS.
MN00
66
NORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
RIVE
RSIDEPLAN
TNORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
0530
0015
004
5/16
/200
6TU
RBINE,CO
MBINED
CYCLE(2)
NAT
URA
LGA
S18
85mmbtu/h
GOODCO
MBU
STIONPR
ACTICE
S4.6PP
MVD
15%
O2
3HR
BLOCK
BACT
PSD
02NGFIRE
DFCLAS
SCO
MBU
STIONTU
RBINES
&HR
SG.
NODU
CTBU
RNER
.EITHE
RGE
ORMITSU
BISH
ITURB
INES.
CO00
56
ROCK
YMOUNTA
INEN
ERGY
CENTER,
LLC
CALPINECO
RP.
05WE052
45/2/20
06
NAT
URA
LGA
SFIRE
D,CO
MBINED
CYCLE
TURB
INE
NAT
URA
LGA
S30
0MW
NAT
URA
LGA
SQUALITYGA
SONLY
FUEL,G
OODCO
MBU
STION
PRAT
ICES
ANDOXIDA
TION
CATA
LYST.
0.00
29LB/M
MBT
UBA
CTPSD
0TH
ISISAN
ADDITIONOFONECO
MBU
STIONTU
RBINE,
GASFIRE
D,CO
MBINED
CYCLE.
TX05
16
CITY
PUBLICSERV
ICE
JKSPRU
CEELEC
TRICE
GENER
ATINGUNIT2CITY
PUBLICSERV
ICE
PSDTX
1037
AND70
492
12/28/20
05
SPRU
CEPO
WER
GENER
ATORUNITNO
229
LB/H
BACT
PSD
0
NV00
35
TRAC
YSU
BSTA
TION
EXPA
NSION
PROJECT
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#2WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
OXIDA
TIONCA
TALYST
FORCO
ALSO
MINIM
IZES
VOC
EMISSIONS.
4PP
M@
15%
O2
3HO
URRO
LLING
BACT
PSD
0
2NAT
URA
LGA
SFIRE
DCO
MBINED
CYCLECO
MBU
STION
TURB
INEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
S
NV00
35
TRAC
YSU
BSTA
TION
EXPA
NSION
PROJECT
SIER
RAPA
CIFICPO
WER
COMPA
NY
AP49
1115
048/16
/200
5
TURB
INE,CO
MBINED
CYCLECO
MBU
STION
#1WITHHR
SGAN
DDU
CTBU
RNER
.NAT
URA
LGA
S30
6MW
OXIDA
TIONCA
TALYST
FORCO
ALSO
MINIM
IZES
VOC
EMISSIONS.
4PP
M@
15%
O2
3HO
URRO
LLING
BACT
PSD
0
2NAT
URA
LGA
SFIRE
DCO
MBINED
CYCLECO
MBU
STION
TURB
INEGE
NER
ATORS
WITHHR
SG''S
ANDDU
CTBU
RNER
S
MN00
60HIGH
BRIDGE
GENER
ATINGPLAN
TNORT
HERN
STAT
ESPO
WER
CO.D
BAXC
ELEN
ERGY
1230
0012
004
8/12
/200
5
2CO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
SONLY
330MEG
AWAT
TSGO
ODCO
MBU
STIONPR
ACTICE
S.2PP
M@
15%
O2
W/O
DUCT
BURN
ERBA
CTPSD
0
INSTALLTW
INNAT
URA
LGA
SFIRE
DCO
MBINED
CYCLE
GASTU
RBINES
TORE
PLAC
EEXISTINGCO
ALFIRE
DELEC
RICUTILITY
BOILER
.
OR00
41WAN
APAEN
ERGY
CENTER
DIAM
ONDWAN
APAI,L.P.
R10P
SDOR
0501
8/8/20
05
COMBU
STION
TURB
INE&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S23
84.1
MMBT
U/H
OXIDA
TIONCA
TALYST
0SEEPO
LUTA
NTNOTE
BACT
PSD
0GE
7241
FATU
RBINEAN
DDU
CTBU
RNER
NY01
00EM
PIRE
POWER
PLAN
TEM
PIRE
GENER
ATINGCO
.LLC
4381
4000
526/23
/200
5FU
ELCO
MBU
STION
(NAT
URA
LGA
S)NAT
URA
LGA
S20
99MMBT
U/H
OXIDA
TIONCA
TALYST
1PP
MVD
AT15
%O2
ASPEREPAMETHO
D25
ALAER
0
2GE
FRAM
E7FACO
MBU
STIONTU
RBINES,H
EAT
RECO
VERY
STEA
MGE
NER
ATORS
(HRSG'S),A
NDASTEA
MTU
RBINE.INCLUDE
SDU
CTBU
RNER
S
NY01
00EM
PIRE
POWER
PLAN
TEM
PIRE
GENER
ATINGCO
.LLC
4381
4000
526/23
/200
5
FUEL
COMBU
STION
(NAT
URA
LGA
S)DU
CTBU
RNING
NAT
URA
LGA
S64
6MMBT
U/H
OXIDA
TIONCA
TALYST
7PP
MDV
AT15
%O2
ASPEREPAMETHO
D25
ALAER
0
2GE
FRAM
E7FACO
MBU
STIONTU
RBINES,H
EAT
RECO
VERY
STEA
MGE
NER
ATORS
(HRSG'S),A
NDASTEA
MTU
RBINE.INCLUDE
SDU
CTBU
RNER
S
LA01
92CR
ESCE
NTCITY
POWER
CRESEN
TCITY
POWER
,LLC
PSDLA
704
6/6/20
05GA
STU
RBINES
187
MW
(2)
2006
MMBT
U/H
COOXIDA
TIONCA
TALYST
AND
GOODCO
MBU
STIONPR
ACTICE
S2.8LB/H
HOURLYMAX
IMUM
BACT
PSD
1.1PP
M@
15%O2
ANNUAL
AVER
AGE
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:VO
C
Prop
osed
VOC
Lim
it:3.
4PP
MVD
@15
%O
2;Eq
uiva
lent
to0.
004
lb/M
MBt
u
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
MI0
366
BERR
IENEN
ERGY
,LLC
BERR
IENEN
ERGY
,LLC
32301
A4/13
/200
5
3CO
MBU
STION
TURB
INES
ANDDU
CTBU
RNER
SNAT
URA
LGA
S15
84MMBT
U/H
CATA
LYTICOXIDIZERPR
OVIDE
SSO
MECO
NTR
OLFO
RVO
CS.
3.2LB/H
BACT
PSD
0
EACH
TURB
INEISEQ
UIPPEDWITHAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOR(HRSG).EA
CHHR
SGISEQ
UIPPED
WITHANAT
URA
LGA
SFIRE
DDU
CTBU
RNER
FL02
63FPLTU
RKEY
POINT
POWER
PLAN
TFLORIDA
POWER
ANDLIGH
TPSDFL
338
2/8/20
05
170MW
COMBU
STION
TURB
INE,4UNITS
NAT
URA
LGA
S17
0MW
MINIM
IZED
BYTH
EEFFICIEN
TCO
MBU
STIONOFNAT
URA
LGA
SAN
DDISTILLATE
OILAT
HIGH
1.3PP
MVD
@15
%O2
STAC
KTEST
(CT
NORM
AL)G
AS0
4GE
MODE
LFA
GASTU
RBINES,4
HEAT
RECO
VERY
STEA
MGE
NER
ATORS,A
SINGL
ESTEA
MTU
RBINE
ELEC
TRICAL
GENER
ATOR
WA03
28
BPCH
ERRY
POINT
COGE
NER
ATION
PROJECT
BPWESTCO
ASTPR
ODU
CTS,
LLC
EFSEC/20
0201
1/11
/200
5
GE7FACO
MBU
STION
TURB
INE&am
p;HE
ATRE
COVE
RYSTEA
MGE
NER
ATOR
NAT
URA
LGA
S17
4MW
LEAN
PREMIXCT
BURN
ER&
OXIDA
TIONCA
TALYST
0BA
CTPSD
0*SEE
NOTES
3IDEN
TICA
LCT
&HS
RGUNITS.WITHDU
CTBU
RNER
S
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:G
reen
hous
eG
ases
Prop
osed
GHG
Lim
it:7,
979
Btu/
KWh
(with
outd
uctf
iring
)
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*TX06
79CO
RPUSCH
RISTI
LIQUEFAC
TIONPLAN
TCO
RPUSCH
RISTI
LIQUEFAC
TIONLLC
GHGP
SDTX12
32/27
/201
5
Refrigeration
Compressor
Turbine
naturalgas
4000
0hp
installefficien
tturbine
s,follow
theturbinemanufacturer?s
emissionrelatedwritten
instructions
form
ainten
ance
activ
ities
includ
ingprescribed
mainten
ance
intervalstoassure
good
combu
stionandefficient
operation.
Compressorsshallbe
1467
54TPY
12MONTH
ROLLINGBA
SIS
BACT
PSD
0(6)G
ELM
2500
+DL
Eturbines
*WV00
25MOUNDS
VILLECO
MBINED
CYCLEPO
WER
PLAN
TMOUNDS
VILLE
POWER
,LLC
R1400
3011
/21/20
14
Combine
dCycle
Turbine/Du
ctBu
rner
NaturalGa
s21
59mmBtu/Hr
Use
ofGEFram
e7EACT
LowCarbon
Fuel
2543
15LB/HR
BACT
PSD
02Nom
inal19
7mW
Gene
ralElectric
Fram
e7FA.04
Turbinew/D
uctB
urne
r
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#1combine
dcyclenaturalgas
2258
mmBtu/hr
951LB/M
WH
12MONTH
ROLLINGAV
G.BA
CTPSD
0tw
oiden
ticalSiem
ensS
GT650
00Fcombine
dcycleturbines
with
outd
uctfiring
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#2combine
dcycle
natural gas
2258
mmBtu/hr
951LB/M
WHR
GROSS
12MONTH
ROLLINGAV
ERAG
EBA
CTPSD
0Tw
ocombine
dcycleturbines
with
outd
uct
burning.
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#1combine
dcyclenaturalgas
2258
mmBtu/hr
1318
647TO
N/YR
12MONTH
ROLLING
BACT
PSD
02Siem
ensS
GT650
00Fcombine
dcycleturbines
with
outd
uctfiring
*IA01
07MAR
SHALLTOWN
GENER
ATINGSTAT
ION
INTERSTA
TEPO
WER
ANDLIGH
T13
A49
9P
4/14
/201
4Co
mbu
stionturbine
#2combine
dcycle
naturalgas
2258
mmBtu/hr
1318
647TO
N/YR
12MONTH
ROLLINGTO
TAL
BACT
PSD
0Tw
ocombine
dcycleturbines
with
outd
uct
burning.
*OR00
50TR
OUTD
ALEEN
ERGY
CENTER,
LLC
TROUTD
ALEEN
ERGY
CENTER,
LLC
2602
353/5/20
14
Mitsub
ishiM
501
GACcombu
stion
turbine,combine
dcycleconfiguration
with
ductbu
rner.
naturalgs
2988
MMBtu/hr
Thermale
ciency
Cleanfuels
1000
PERGR
OSS
MWH
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Mitsub
ishiM
501GA
Ccombu
stionturbine,
combine
dcycleconfigurationwith
ductbu
rner.
*PA02
96BE
RKSHO
LLOW
ENER
GYAS
SOCLLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and#2
NaturalGa
s30
46MMBtu/hr
1000
LB/M
WHR
BACT
PSD
02combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorswith
adu
ctbu
rner
*PA02
96BE
RKSHO
LLOW
ENER
GYAS
SOCLLC/ONTELAUNEE
BERK
SHO
LLOW
ENER
GYAS
SOCLLC
0605
150A
12/17/20
13Turbine,Co
mbine
dCycle,#1
and#2
NaturalGa
s30
46MMBtu/hr
1380
899TPY
BACT
PSD
0
2combu
stionturbinegene
ratorsand2he
atrecovery
steam
gene
ratorsthat
willprovide
steam
todriveasin
glesteam
turbinegene
rator.
With
ductbu
rners
*MI0
412
HOLLAN
DBO
ARDOF
PUBLICWORK
SEA
ST5TH
STRE
ETHO
LLAN
DBO
ARDOF
PUBLICWORK
S10
713
12/4/201
3
FGCT
GHRSG:
2Co
mbine
dcycle
CTGs
with
HRSG
swith
ductbu
rners
naturalgas
647MMBT
U/H
fore
ach
CTGH
RSG
Energy
efficiencymeasuresa
ndtheuseof
alowcarbon
fuel
(pipelinequ
ality
naturalgas).
3391
25T/YR
12MORO
LLTIME
PERIOD
BACT
PSD
02Co
mbine
dcycleCT
Gswith
HRSG
swith
duct
burners
*MI0
410
THETFO
RDGE
NER
ATING
STAT
ION
CONSU
MER
SEN
ERGY
COMPA
NY
19112
7/25
/201
3
FGCC
Aor
FGCC
B4
nat.gasfire
dCT
Gw/D
BforH
RSG
naturalgas
2587
MMBT
U/H
heat
inpu
t,each
CTG
1386
286T/YR
12MORO
LLTIME
PERIODDE
TER
EACH
MONTH
BACT
PSD
0
Four
(4)n
aturalgasfire
dcombine
dcycle
combu
stionturbinegene
rators(CTG
)and
heat
recovery
steam
gene
rators(HRSG)
with
duct
burner
firingcapability
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stion
Turbines
Siem
ens,
with
outd
uct
burners
NaturalGa
s51
5600
MMSCF/rolling
12mon
ths
stateof
thearth
ighefficiency
combu
stiontechno
logy
3184
04LB/H
BACT
PSD
840LB/M
WH
GROSS
OUTPUT
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines.W
illinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth.Nodu
ctbu
rners
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stion
Turbines
Siem
ens,
with
ductbu
rners
NaturalGa
s51
560MMSCF/rolling
12MO
stateof
thearth
ighefficiency
combu
stiontechno
logy
3184
04LB/H
BACT
PSD
0SEENOTES
TwoSiem
ens2
932MMBtu/Hcombine
dcycle
combu
stionturbines.W
illinstall eith
er2
Siem
enso
r2Mitsub
ishi,no
tboth.Du
ctbu
rners
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stion
Turbines
Mitsub
ishi,with
out
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
stateof
thearth
ighefficiency
combu
stiontechno
logy
3184
04LB/H
BACT
PSD
0SEENOTES
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines.W
illinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth.Nodu
ctbu
rners
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:G
reen
hous
eG
ases
Prop
osed
GHG
Lim
it:7,
979
Btu/
KWh
(with
outd
uctf
iring
)
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
*OH03
52ORE
GONCLEA
NEN
ERGY
CENTER
ARCA
DIS,US,INC.
P011
0840
6/18
/201
3
2Co
mbine
dCycle
Combu
stion
Turbines
Mitsub
ishi,with
ductbu
rners
NaturalGa
s47
917MMSCF/rolling
12MO
stateof
thearth
ighefficiency
combu
stiontechno
logy
3184
04LB/H
BACT
PSD
0SEENOTES
TwoMitsub
ishi293
2MMBtu/Hcombine
dcycle
combu
stionturbines.W
illinstalleith
er2
Siem
enso
r2Mitsub
ishi,no
tboth.Du
ctbu
rners
*MI0
405
MIDLANDCO
GENER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
Naturalgas
2237
MMBT
U/H
Good
combu
stionpractices
and
energy
efficiency.
995LB/M
WH
12MO.R
OLLING
AVER
AGE
BACT
PSD
0
2naturalgas
fired
CTGs
with
each
turbine
containing
ahe
atrecovery
steam
gene
rator
(HRSG)
*MI0
405
MIDLANDCO
GENER
ATION
VENTU
RE
MIDLAND
COGE
NER
ATION
VENTU
RE10
312
4/23
/201
3
Naturalgasfue
led
combine
dcycle
combu
stionturbine
gene
rators(CTG
)with
HRSG
anddu
ctbu
rner
(DB)
Naturalgas
2486
MMBT
U/H
Good
combu
stionpractices
and
energy
efficiency
1071
LB/M
WH
12MONTH
ROLLINGAV
G.BA
CTPSD
0
2naturalgas
fired
CTGs
with
each
turbine
containing
ahe
atrecovery
steam
gene
rator
(HRSG)
with
anaturalgas
fired
ductbu
rner
*PA02
91HICK
ORY
RUNEN
ERGY
STAT
ION
HICK
ORY
RUNEN
ERGY
LLC
3733
7A4/23
/201
3CO
MBINED
CYCLE
UNITS#1
and#2
NaturalGa
s3.4MMCF/HR
3665
974TPY
12MONTH
ROLLINGTO
TAL
FORBO
THUNITS
OTH
ERCA
SEBY
CASE
0
With
ductbu
rning.Po
ssiblecombu
stion
turbines:1.G
eneralElectric7FA(GE7FA,
2.Siem
ensS
GT650
00F(Siemen
sF),3.Mitsub
ishi
M50
1G(M
itsub
ishiG
),4.Siem
ensS
GT680
00H
(Siemen
sH
*VA03
21BR
UNSW
ICKCO
UNTY
POWER
STAT
ION
VIRG
INIA
ELEC
TRIC
ANDPO
WER
COMPA
NY
5240
400
13/12
/201
3
COMBU
STION
TURB
INE
GENER
ATORS,(3)
NaturalGa
s34
42MMBT
U/H
Energy
efficient
combu
stion
practices
andlowGH
Gfuels.
7500
BTU/KW
HBA
CTPSD
0
Three(3)M
itsub
ishiM
501GA
Ccombu
stion
turbinegene
ratorswith
HRSG
ductbu
rners
(naturalgasfired
).
DE00
24GA
RRISONEN
ERGY
CENTER
GARR
ISONEN
ERGY
CENTER,
LLC/
CALPINE
CORP
ORA
TION
APC20
12/009
81/30
/201
3Unit1
NaturalGa
s22
60millionBT
Us
FuelUsage
Restrictio
nto
natural
gasa
ndlowsulfu
rdistillatefuel
1006
304TO
NS
12MONTH
ROLLINGAV
ERAG
EBA
CTPSD
0
(1)3
09MW
GECo
mbine
dCycleCo
mbu
stion
TurbineGe
neratin
gsystem
fired
principally
onNaturalGa
s
*IN01
58ST.JOSEPH
ENEG
RYCE
NTER,
LLC
ST.JOSEPH
ENER
GYCE
NTER,
LLC
14131
00300
579
12/3/201
2
FOUR(4)N
ATURA
LGA
SCO
MBINED
CYCLE
COMBU
STION
TURB
INES
NAT
URA
LGA
S23
00MMBT
U/H
HIGH
THER
MAL
EFFICIEN
CYDE
SIGN
7646
BTU/KW
HBA
CTPSD
0
EACH
TURB
INEISEQ
UIPED
WITHDR
YLO
WNOXBU
RNER
S,NAT
URA
LGA
SFIRE
DDU
CTBU
RNER
S
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/H
RSG5
(FD2
Serie
s)naturalgas
00.46
T/MW
H30
DAYRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Series
501F
Combu
stionTurbineGe
nerator(CT
G5)
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD2
Serie
s)InitialPh
aseNaturalGa
s0
1.82
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD3
Serie
s)FinalPhase
NaturalGa
s0
1.86
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/H
RSG5
(FD2
Serie
s)naturalgas
01.93
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Series
501F
Combu
stionTurbineGe
nerator(CT
G5)
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/HRSG5
(FD3
Serie
s)NaturalGa
s0
1.97
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s50IF
Combu
stionTurbineGe
nerator(CT
GS)
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:G
reen
hous
eG
ases
Prop
osed
GHG
Lim
it:7,
979
Btu/
KWh
(with
outd
uctf
iring
)
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD2
Serie
s)InitialPh
aseNaturalGa
s0
18.22T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD3
Serie
s)FinalPhase
NaturalGa
s0
18.55T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/H
RSG5
(FD2
Serie
s)naturalgas
019
.34T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Series
501F
Combu
stionTurbineGe
nerator(CT
G5)
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/HRSG5
(FD3
Serie
s)NaturalGa
s0
19.67T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s50IF
Combu
stionTurbineGe
nerator(CT
GS)
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD2
Serie
s)InitialPh
aseNaturalGa
s0
9843
93T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
2Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
TX06
32DE
ERPA
RKEN
ERGY
CENTERLLC
CALPIIN
ECO
DEER
PARK
ENER
GYCE
NTER(DP
EC)LLC
PSDTX
979GH
G11
/29/20
12CT
G5/HRSG5
(FD3
Serie
s)NaturalGa
s0
1062
627T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s50IF
Com
bustionTurbineGe
nerator(CT
GS)
TX06
33CH
ANNEL
ENER
GYEN
ERGY
CENTER,
LLC
CALPINE
CORP
ORA
TION
CHAN
NEL
ENER
GYCE
NTER,
LLC
PSDTX
955GH
G11
/29/20
12CT
G3/HRSG3
(FD3
Serie
s)FinalPhase
NaturalGa
s0
1002
0391
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0NaturalGa
sFiredSiem
enFD
3Serie
s501
FCo
mbu
stionTurbineGe
nerator(CT
G3)
*DE00
23NRG
ENER
GYCE
NTER
DOVE
RNRG
ENER
GYCE
NTER
DOVE
RLLC
AQM
001/00
127(R
2)(REV
1)10
/31/20
12UNIT2
KD1
NaturalGa
s65
5MMBT
U/H
1085
LB/G
ROSS
MWH
12MONTH
ROLLINGAV
ERAG
EBA
CTPSD
050
0MMBT
U/hrG
asTurbine(M
odel:G
ELM
6000
)rated
at52
MW
PA02
78MOXIELIBE
RTY
LLC/AS
YLUM
POWER
PLT
MOXIEEN
ERGY
LLC
0800
045A
10/10/20
12
Combine
dcycle
Turbines
(2)
Naturalgasfire
dNaturalGa
s32
77MMBT
U/H
Good
combu
stionpractices.
1480
086T/YR
468MW
POWER
BLOCK
BACT
PSD
0
Twocombine
cycleTurbines,eachwith
acombu
stionturbineandhe
atrecovery
steam
gene
ratorw
ithdu
ctbu
rner.
*VA03
19
GATEWAY
COGE
NER
ATION
1,LLC
SMAR
TWAT
ERPR
OJECT
GATEWAY
GREEN
ENER
GY52
37500
28/27
/201
2CO
MBU
STION
TURB
INES,(2)
NaturalGa
s59
3MMBT
U/H
Controlledby
theuseof
low
carbon
fuelsa
ndhigh
efficiency
desig
n.Thehe
atrate
shallbeno
greaterthan8,98
3Btu/kW
h(HHV
,gross).
2959
61T/YR
12MORO
LLING
AVG
BACT
PSD
0
LA02
56CO
GENER
ATIONPLAN
TWESTLAK
EVINYLS
COMPA
NYLP
PSDLA
754
12/6/201
1
COGE
NER
ATION
TRAINS13(1
10,2
10,3
10)
NAT
URA
LGA
S47
5MMBT
U/H
USE
OFNAT
URA
LGA
SAS
FUEL
ANDGO
ODCO
MBU
STION
PRAC
TICE
S55
576.77
LB/H
HOURLY
MAX
IMUM
BACT
PSD
0
EACH
COGE
NTR
AINCO
NSISTSOFA50
MW
GELM
6000
PFSPRINTTU
RBINEAN
DAHE
ATRE
COVE
RYSTEA
MGE
NER
ATOREQ
UIPPED
WITHA70
MM
BTU/HRDU
CTBU
RNER
.
LA02
57SA
BINEPA
SSLN
GTERM
INAL
SABINEPA
SSLN
G,LP
&SA
BINEPA
SSLIQUEFAC
TION,LL
PSDLA
703(M3)
12/6/201
1
Combine
dCycle
Refrigeration
Compressor
Turbines
(8)
naturalgas
286MMBT
U/H
Good
combu
stion/op
erating
practices
andfueled
bynatural
gas
useGE
LM25
00+G
4turbines
4872
107TO
NS/YEAR
ANNUAL
MAX
IMUM
FROM
THEFA
CILITYWIDE
BACT
PSD
0GE
LM25
00+G
4
*MI0
402
SUMPTER
POWER
PLAN
T
WOLVER
INEPO
WER
SUPP
LYCO
OPERA
TIVE
INC.
8111
11/17/20
11
Combine
dcycle
combu
stionturbine
w/H
RSG
Naturalgas
130MW
electricalou
tput
954LB/M
WH
12MONTH
ROLLINGAV
ERAG
EBA
CTPSD
0
Thisisacombine
dcyclecombu
stionturbine
with
ano
nfired
heat
recovery
steam
gene
rator
(HRSG).
TX06
12TH
OMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDTX
1244
GHG
11/10/20
11
COMBINED
CYCLE
TURB
INE
GENER
ATORU1
STK
NaturalGa
s17
46MMBT
U/H
1.7T/YR
360DA
YRO
LLING
AVER
AGE
BACT
PSD
0Naturalgasfired
GE7FAcombu
stionturbine
unit,
U1STK.
Calp
ine
Man
kato
Ener
gyCe
nter
RACT
/BAC
T/LA
ERCl
earin
ghou
seSe
arch
Sear
ch=
Jan
1,20
05Cu
rren
tSe
arch
Date
=O
ctob
er26
,201
5Co
mbu
stio
nTu
rbin
ePr
oces
sTyp
e15
.21
Pollu
tant
:G
reen
hous
eG
ases
Prop
osed
GHG
Lim
it:7,
979
Btu/
KWh
(with
outd
uctf
iring
)
RBLC
IDFa
cilit
yN
ame
Corp
orat
eor
Com
pany
Nam
ePe
rmit
Num
Perm
itIs
suan
ceDa
tePr
oces
sNam
ePr
imar
yFu
elTh
roug
hput
Thro
ughp
utU
nit
Cont
rolM
etho
dDe
scrip
tion
Emis
sion
Lim
itEm
issi
onLi
mit
Uni
tEm
issi
onLi
mit
Avg
Tim
eCo
nditi
onCa
seBy
Case
Basi
sSt
anda
rdEm
issi
onLi
mit
Stan
dard
Emis
sion
Lim
itU
nit
Stan
dard
Lim
itAv
erag
eTi
me
Cond
ition
Addi
tiona
lPer
mit
Lim
itN
otes
TX06
12TH
OMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDTX
1244
GHG
11/10/20
11
COMBINED
CYCLE
TURB
INE
GENER
ATORU1
STK
NaturalGa
s17
46MMBT
U/H
16.8
T/YR
365DA
YRO
LLING
AVER
AGE
BACT
PSD
0Naturalgasfired
GE7FAcombu
stionturbine
unit,
U1STK
TX06
12TH
OMAS
C.FERG
USO
NPO
WER
PLAN
TLO
WER
COLO
RADO
RIVE
RAU
THORITY
PSDTX
1244
GHG
11/10/20
11
COMBINED
CYCLE
TURB
INE
GENER
ATORU1
STK
NaturalGa
s17
46MMBT
U/H
Good
Combu
stionPractices
9089
57.6
LB/H
30DA
YRO
LLING
AVER
AGE
BACT
PSD
0Naturalgasfired
GE7FAcombu
stionturbine
unit,
U1STK.
CA12
12PA
LMDA
LEHY
BRID
POWER
PROJECT
CITY
OFPA
LMDA
LESE
0901
10/18/20
11
COMBU
STION
TURB
INES
(NORM
ALOPERA
TION)
NAT
URA
LGA
S15
4MW
774LB/M
WH
365DA
YRO
LLING
AVG
(FAC
ILITYW
IDE)
BACT
PSD
02NAT
URA
LGA
SFIRE
DCO
MBU
STIONTU
RBINE
GENER
ATORS
(CTG
S)
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*TX-
0728
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FA
CIL
ITY
BASF
TX11
8239
, N20
04/
1/20
15C
oolin
g to
wer
4000
0ga
llons
per
m
inut
e
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)dr
ift e
limin
ator
is 0
.000
5%
effic
ient
0.12
LB/H
RO
THE
R C
AS
E-
BY
-CA
SE
*TX-
0728
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FA
CIL
ITY
BASF
TX11
8239
, N20
04/
1/20
15C
oolin
g to
wer
4000
0ga
llons
per
m
inut
e
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
drift
elim
inat
or is
0.0
005%
ef
ficie
nt0.
31LB
/HR
OTH
ER
CA
SE
-B
Y-C
AS
E
*TX-
0728
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FA
CIL
ITY
BASF
TX11
8239
, N20
04/
1/20
15C
oolin
g to
wer
4000
0ga
llons
per
m
inut
e
Par
ticul
ate
mat
ter,
tota
l (T
PM
)dr
ift e
limin
ator
is 0
.000
5%
effic
ient
0.35
LB/H
RO
THE
R C
AS
E-
BY
-CA
SE
*AK
-008
3K
EN
AI N
ITR
OG
EN
O
PE
RA
TIO
NS
AG
RIU
M U
.S. I
NC
.A
KA
Q00
83C
PT0
61/
6/20
15
2 C
ell C
ross
-Fl
ow C
oolin
g To
wer
1500
0ga
llons
per
m
inut
eP
artic
ulat
e m
atte
r, fu
gitiv
eH
igh
Effi
cien
cy D
rift
Elim
inat
ors
0.00
2%
DR
IFT
BA
CT-
PS
D
*AK
-008
3K
EN
AI N
ITR
OG
EN
O
PE
RA
TIO
NS
AG
RIU
M U
.S. I
NC
.A
KA
Q00
83C
PT0
61/
6/20
15
2 C
ell C
ross
-Fl
ow C
oolin
g To
wer
1500
0ga
llons
per
m
inut
e
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
Hig
h E
ffici
ency
Drif
t E
limin
ator
s0.
002
% D
RIF
TB
AC
T-P
SD
*AK
-008
3K
EN
AI N
ITR
OG
EN
O
PE
RA
TIO
NS
AG
RIU
M U
.S. I
NC
.A
KA
Q00
83C
PT0
61/
6/20
15
2 C
ell C
ross
-Fl
ow C
oolin
g To
wer
1500
0ga
llons
per
m
inut
e
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
igh
Effi
cien
cy D
rift
Elim
inat
ors
0.00
2%
DR
IFT
BA
CT-
PS
D
*TX-
0714
S R
BE
RTR
ON
E
LEC
TRIC
G
EN
ER
ATI
NG
STA
TIO
NN
RG
TE
XAS
PO
WE
R L
LCTX
1027
31P
SD
TX12
9412
/19/
2014
cool
ing
tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)dr
ift e
limin
ator
s0.
0005
%D
RIF
TB
AC
T-P
SD
*TX-
0710
VIC
TOR
IA P
OW
ER
S
TATI
ON
VIC
TOR
IA W
LE L
.P.
TX10
8258
PS
DTX
1348
12/1
/201
4co
olin
g to
wer
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)m
ist e
limin
ator
s0.
001
%D
RIF
TB
AC
T-P
SD
*WV
-002
5
MO
UN
DS
VIL
LE
CO
MB
INE
D C
YC
LE
PO
WE
R P
LAN
TM
OU
ND
SV
ILLE
PO
WE
R, L
LCW
VR
14-0
030
11/2
1/20
14C
oolin
g To
wer
1590
00gp
m
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)0.
01LB
/HR
BA
CT-
PS
D
*WV
-002
5
MO
UN
DS
VIL
LE
CO
MB
INE
D C
YC
LE
PO
WE
R P
LAN
TM
OU
ND
SV
ILLE
PO
WE
R, L
LCW
VR
14-0
030
11/2
1/20
14C
oolin
g To
wer
1590
00gp
m
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
0.5
LB/H
RB
AC
T-P
SD
*WV
-002
5
MO
UN
DS
VIL
LE
CO
MB
INE
D C
YC
LE
PO
WE
R P
LAN
TM
OU
ND
SV
ILLE
PO
WE
R, L
LCW
VR
14-0
030
11/2
1/20
14C
oolin
g To
wer
1590
00gp
m
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift E
limin
ator
0.72
LB/H
RB
AC
T-P
SD
*TX-
0712
TRIN
IDA
D G
EN
ER
ATI
NG
FA
CIL
ITY
SO
UTH
ER
N P
OW
ER
CO
MP
AN
YTX
1113
93P
SD
TX13
6811
/20/
2014
cool
ing
tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)m
ist e
limin
ator
s0.
001
%D
RIF
TB
AC
T-P
SD
*IL-
0114
CR
ON
US
CH
EM
ICA
LS,
LLC
CR
ON
US
CH
EM
ICA
LS, L
LCIL
1306
0007
9/5/
2014
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
drift
elim
inat
ors;
TD
S o
f w
ater
not
to e
xcee
d 20
00
mg/
l0.
0005
% L
OS
S
FRO
M C
IRC
.B
AC
T-P
SD
*IL-
0114
CR
ON
US
CH
EM
ICA
LS,
LLC
CR
ON
US
CH
EM
ICA
LS, L
LCIL
1306
0007
9/5/
2014
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
drift
elim
inat
ors;
TD
S o
f w
ater
not
to e
xcee
d 20
00
mg/
l0.
0005
% L
OS
S
FRO
M C
IRC
.B
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IL-
0114
CR
ON
US
CH
EM
ICA
LS,
LLC
CR
ON
US
CH
EM
ICA
LS, L
LCIL
1306
0007
9/5/
2014
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)
drift
elim
inat
ors;
TD
S o
f w
ater
not
to e
xcee
d 20
00
mg/
l0.
0005
% L
OS
S
FRO
M C
IRC
.B
AC
T-P
SD
*TX-
0703
LOW
DE
NS
ITY
P
OLY
ETH
YLE
NE
(LD
PE
) P
LAN
TFO
RM
OS
A P
LAS
TIC
S
CO
RP
OR
ATI
ON
TX10
7520
,PS
DTX
1384
8/8/
2014
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)C
oolin
g To
wer
will
hav
e dr
ift e
limin
ator
s0.
001
%B
AC
T-P
SD
*AL-
0275
NU
CO
R S
TEE
L TU
SC
ALO
OS
A, I
NC
.N
UC
OR
STE
EL
TUS
CA
LOO
SA
, IN
C.
AL
413-
0033
7/22
/201
4
Vac
uum
D
egas
ser w
ith
flare
and
co
olin
g to
wer
s0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)W
ith fl
are
0.00
8G
R/D
SC
FB
AC
T-P
SD
*AL-
0271
GE
OR
GIA
PA
CIF
IC
BR
ETO
N L
LCG
EO
RG
IA P
AC
IFIC
LLC
AL
502-
0001
-X04
96/
11/2
014
Coo
ling
Tow
er -
No.
4 P
ower
B
oile
r42
5m
mbt
u/hr
Par
ticul
ate
mat
ter,
fugi
tive
0.00
1% D
rift E
limin
ater
0.23
LBS
/HR
BA
CT-
PS
D
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
DR
IFT
LOS
SC
ON
TIN
UO
US
BA
CT-
PS
D
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
DR
IFT
LOS
SC
ON
TIN
UO
US
BA
CT-
PS
D
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
DR
IFT
LOS
SC
ON
TIN
UO
US
BA
CT-
PS
D
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
TEN
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
1479
37G
PM
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
DR
IFT
LOS
SC
ON
TIN
UO
US
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
MID
WE
ST
FER
TILI
ZER
C
OR
PO
RA
TIO
NIN
129-
3357
6-00
059
6/4/
2014
SIX
CE
LL
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
8876
2G
PM
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
T LO
SS
CO
NTI
NU
OU
SB
AC
T-P
SD
*OK
-016
2E
NID
NIT
RO
GE
N P
LAN
TK
OC
H N
ITR
OG
EN
CO
LLC
OK
2011
-441
-C(M
-2)
PS
D5/
29/2
014
Coo
ling
Tow
ers
0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Drif
t Elim
inat
ors
0.00
09%
DR
IFT
BA
CT-
PS
D
*OK
-016
2E
NID
NIT
RO
GE
N P
LAN
TK
OC
H N
ITR
OG
EN
CO
LLC
OK
2011
-441
-C(M
-2)
PS
D5/
29/2
014
Coo
ling
Tow
ers
0
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)D
rift E
limin
ator
s0.
0009
% D
RIF
TB
AC
T-P
SD
*TX-
0657
BE
AU
MO
NT
GA
S T
O
GA
SO
LIN
E P
LAN
TN
ATG
AS
OLI
NE
LLC
TXP
SD
TX13
40 A
ND
10
7764
5/16
/201
4co
olin
g to
wer
9900
0000
gallo
ns/y
r
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
Drif
t elim
inat
ors
(lim
it 0.
001
% d
rift)a
nd m
onito
ring
of
TD
S o
r con
duct
ivity
Em
issi
on L
imit
for P
M is
82.5
7 tp
yE
mis
sion
Lim
it fo
r PM
10 is
1.28
tpy
Em
issi
on L
imit
for P
M2.
5 is
0.
03 tp
y0.
001
% D
RIF
TD
RIF
TB
AC
T-P
SD
*MS
-009
2E
MB
ER
CLE
AR
GTL
MS
EM
BE
RC
LEA
R G
TL M
S L
LCM
S00
40-0
0055
5/8/
2014
Indu
ced
draf
t co
olin
g to
wer
1420
gpm
Par
ticul
ate
mat
ter,
tota
l (T
PM
)hi
gh e
ffici
ency
drif
t el
imin
ator
s0.
001
%D
RIF
T R
ATE
BA
CT-
PS
D
*MS
-009
2E
MB
ER
CLE
AR
GTL
MS
EM
BE
RC
LEA
R G
TL M
S L
LCM
S00
40-0
0055
5/8/
2014
Indu
ced
draf
t co
olin
g to
wer
1420
gpm
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
high
effi
cien
cy d
rift
elim
inat
ors
0.00
1%
DR
IFT
RA
TEB
AC
T-P
SD
*MS
-009
2E
MB
ER
CLE
AR
GTL
MS
EM
BE
RC
LEA
R G
TL M
S L
LCM
S00
40-0
0055
5/8/
2014
Indu
ced
draf
t co
olin
g to
wer
1420
gpm
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)hi
gh e
ffici
ency
drif
t el
imin
ator
s0.
001
%D
RIF
T R
ATE
BA
CT-
PS
D
*TX-
0713
TEN
AS
KA
B
RO
WN
SV
ILLE
G
EN
ER
ATI
NG
STA
TIO
NTE
NA
SK
A B
RO
WN
SV
ILLE
P
AR
TNE
RS
, LLC
TX10
8411
PS
DTX
1350
4/29
/201
4co
olin
g to
wer
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)m
ist e
limin
ator
s0.
0005
%D
RIF
TB
AC
T-P
SD
*IN
-018
5M
AG
PE
LLE
T LL
CM
AG
PE
LLE
T LL
CIN
181-
3396
5-00
054
4/24
/201
4C
OO
LIN
G
TOW
ER
S46
00
GA
L/M
IN O
F C
IRC
ULA
TIO
N
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
0.07
LB/H
BA
CT-
PS
D
*IN
-018
5M
AG
PE
LLE
T LL
CM
AG
PE
LLE
T LL
CIN
181-
3396
5-00
054
4/24
/201
4C
OO
LIN
G
TOW
ER
S46
00
GA
L/M
IN O
F C
IRC
ULA
TIO
N
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)0.
07LB
/HB
AC
T-P
SD
*IN
-018
5M
AG
PE
LLE
T LL
CM
AG
PE
LLE
T LL
CIN
181-
3396
5-00
054
4/24
/201
4C
OO
LIN
G
TOW
ER
S46
00
GA
L/M
IN O
F C
IRC
ULA
TIO
N
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)0.
07LB
/HB
AC
T-P
SD
*IA
-010
7M
AR
SH
ALL
TOW
N
GE
NE
RA
TIN
G S
TATI
ON
INTE
RS
TATE
PO
WE
R A
ND
LIG
HT
IA13
-A-4
99-P
4/14
/201
4co
olin
g to
wer
1600
00ga
llons
/min
ute
Par
ticul
ate
mat
ter,
tota
l (T
PM
)m
ist e
limin
ator
1.2
LB/H
R3-
HO
UR
A
VE
RA
GE
BA
CT-
PS
D
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
EN
ER
GY
AN
SW
ER
S A
RE
CIB
O,
LLC
PR
R2-
PS
D 1
4/10
/201
4W
et C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)
Drif
t Elim
inat
or d
esig
ned
to
limit
circ
ulat
ing
wat
er fl
ow
drift
loss
to 0
.000
5% o
r les
s.0.
005
LB/H
R24
-HO
UR
DA
ILY
A
VE
RA
GE
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
EN
ER
GY
AN
SW
ER
S A
RE
CIB
O,
LLC
PR
R2-
PS
D 1
4/10
/201
4W
et C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Drif
t Elim
inat
or d
esig
ned
to
limit
circ
ulat
ing
wat
er fl
ow
drift
loss
to 0
.000
5% o
r les
s.1.
3LB
/HR
24-H
OU
R D
AIL
Y
AV
ER
AG
EB
AC
T-P
SD
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
EN
ER
GY
AN
SW
ER
S A
RE
CIB
O,
LLC
PR
R2-
PS
D 1
4/10
/201
4W
et C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
Dirf
t Elim
inat
or d
esig
ned
to
limit
circ
ulat
ing
wat
er fl
ow
drift
loss
to 0
.000
5% o
r les
s.2.
48LB
/HR
24-H
OU
R D
AIL
Y
AV
ER
AG
EB
AC
T-P
SD
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4C
oolin
g To
wer
2205
000
Par
ticul
ate
mat
ter,
tota
l (T
PM
)A
coo
ling
tow
er w
ith a
drif
t lo
ss o
f 0.0
005%
.0.
0005
DR
IFT
LOS
SB
AC
T-P
SD
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4C
oolin
g To
wer
2205
000
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
A c
oolin
g to
wer
with
a d
rift
loss
of 0
.000
5%.
0.00
05D
RIF
T LO
SS
BA
CT-
PS
D
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4C
oolin
g To
wer
2205
000
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)A
coo
ling
tow
er w
ith a
drif
t lo
ss o
f 0.0
005%
.0.
0005
DR
IFT
LOS
SB
AC
T-P
SD
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4
HB
I Coo
ling
Con
veyo
r No.
1
and
No.
222
0500
0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
Hig
h en
ergy
wet
scr
ubbe
r ha
ving
an
OLG
L no
t gre
ater
th
an 0
.007
9 gr
/dsc
f for
co
ntro
l of P
M.
0.00
79G
R/D
SC
FB
AC
T-P
SD
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4
HB
I Coo
ling
Con
veyo
r No.
1
and
No.
222
0500
0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Hig
h en
ergy
wet
scr
ubbe
r ha
ving
an
OLG
L no
t gre
ater
th
an 0
.007
9 gr
/dsc
f for
co
ntro
l of P
M.
0.00
79G
R/D
SC
FB
AC
T-P
SD
*TX-
0725
DIR
EC
T R
ED
UC
ED
IRO
N
AN
D H
OT
BR
IQU
ETT
ING
FA
CIL
ITY
VO
ES
TALP
INE
TE
XAS
LLC
TXP
SD
TX13
44 A
ND
10
8113
3/18
/201
4
HB
I Coo
ling
Con
veyo
r No.
1
and
No.
222
0500
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)
Hig
h en
ergy
wet
scr
ubbe
r ha
ving
an
OLG
L no
t gre
ater
th
an 0
.007
9 gr
/dsc
f for
co
ntro
l of P
M.
0.00
79G
R/D
SC
FB
AC
T-P
SD
*NJ-
0081
PS
EG
FO
SS
IL L
LC
SE
WA
RE
N
GE
NE
RA
TIN
G S
TATI
ON
PS
EG
FO
SS
IL L
LCN
J18
068
-(B
OP
1200
02)
3/7/
2014
3 C
ell W
et
Mec
hani
cal
Coo
ling
Tow
er13
000
GP
M
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)0.
16LB
/HQ
UA
RTE
RLY
BA
CT-
PS
D
*NJ-
0081
PS
EG
FO
SS
IL L
LC
SE
WA
RE
N
GE
NE
RA
TIN
G S
TATI
ON
PS
EG
FO
SS
IL L
LCN
J18
068
-(B
OP
1200
02)
3/7/
2014
3 C
ell W
et
Mec
hani
cal
Coo
ling
Tow
er13
000
GP
M
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
0.16
LB/H
QU
AR
TER
LYB
AC
T-P
SD
*NJ-
0081
PS
EG
FO
SS
IL L
LC
SE
WA
RE
N
GE
NE
RA
TIN
G S
TATI
ON
PS
EG
FO
SS
IL L
LCN
J18
068
-(B
OP
1200
02)
3/7/
2014
3 C
ell W
et
Mec
hani
cal
Coo
ling
Tow
er13
000
GP
M
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)0.
16LB
/HQ
UA
RTE
RLY
OTH
ER
CA
SE
-B
Y-C
AS
E
*MI-0
412
HO
LLA
ND
BO
AR
D O
F P
UB
LIC
WO
RK
S -
EA
ST
5TH
STR
EE
TH
OLL
AN
D B
OA
RD
OF
PU
BLI
C
WO
RK
SM
I10
7-13
12/4
/201
3
Coo
ling
Tow
er --
W
et M
echa
nica
l D
raft
(EU
CO
OLT
WR
)0
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
Mis
t/drif
t elim
inat
ors.
2.37
T/Y
R
12-M
O
RO
LLIN
G T
IME
P
ER
IOD
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*MI-0
412
HO
LLA
ND
BO
AR
D O
F P
UB
LIC
WO
RK
S -
EA
ST
5TH
STR
EE
TH
OLL
AN
D B
OA
RD
OF
PU
BLI
C
WO
RK
SM
I10
7-13
12/4
/201
3
Coo
ling
Tow
er --
W
et M
echa
nica
l D
raft
(EU
CO
OLT
WR
)0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)M
ist/d
rift e
limin
ator
s2.
37T/
YR
12-M
O
RO
LLIN
G T
IME
P
ER
IOD
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCO
HIO
VA
LLE
Y R
ES
OU
RC
ES
, LLC
IN14
7-32
322-
0006
29/
25/2
013
TWO
(2)
CO
OLI
NG
TO
WE
RS
1797
20G
PM
, C
OM
BIN
ED
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
TC
ON
TIN
UO
US
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCO
HIO
VA
LLE
Y R
ES
OU
RC
ES
, LLC
IN14
7-32
322-
0006
29/
25/2
013
TWO
(2)
CO
OLI
NG
TO
WE
RS
1797
20G
PM
, C
OM
BIN
ED
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S0.
0005
% D
RIF
TC
ON
TIN
UO
US
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCO
HIO
VA
LLE
Y R
ES
OU
RC
ES
, LLC
IN14
7-32
322-
0006
29/
25/2
013
TWO
(2)
CO
OLI
NG
TO
WE
RS
1797
20G
PM
, C
OM
BIN
ED
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
5%
DR
IFT
CO
NTI
NU
OU
SB
AC
T-P
SD
*TX-
0711
CE
LAN
ES
E C
LEA
R
LAK
E P
LAN
TC
ELA
NE
SE
LTD
TX10
3626
, N16
4,
PS
DTX
1296
9/16
/201
3C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)D
rift E
limin
ator
s w
ith a
drif
f fa
ctor
of 0
001%
is u
sed
0.00
1P
ER
CE
NT
DR
IFF
FAC
TOR
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
N
CO
MP
LEX
CF
IND
US
TRIE
S N
ITR
OG
EN
, LLC
IAP
N 1
3-03
77/
12/2
013
Coo
ling
Tow
ers
0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)dr
ift e
limin
ator
0.00
05%
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
N
CO
MP
LEX
CF
IND
US
TRIE
S N
ITR
OG
EN
, LLC
IAP
N 1
3-03
77/
12/2
013
Coo
ling
Tow
ers
0
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
drift
elim
inat
or0.
0005
%B
AC
T-P
SD
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
N
CO
MP
LEX
CF
IND
US
TRIE
S N
ITR
OG
EN
, LLC
IAP
N 1
3-03
77/
12/2
013
Coo
ling
Tow
ers
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)dr
ift e
limin
ator
0.00
05%
BA
CT-
PS
D
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RA
RC
AD
IS, U
S, I
NC
.O
HP
0110
840
6/18
/201
3
Mec
hani
cal
draf
t wet
co
olin
g to
wer
, 16
cel
l32
2000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)0.
0034
LB/H
BA
CT-
PS
D
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RA
RC
AD
IS, U
S, I
NC
.O
HP
0110
840
6/18
/201
3
Mec
hani
cal
draf
t wet
co
olin
g to
wer
, 16
cel
l32
2000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
1.03
LB/H
BA
CT-
PS
D
*WY
-007
2G
RA
NG
ER
FA
CIL
ITY
FMC
WY
OM
ING
CO
RP
OR
ATI
ON
WY
MD
-124
876/
12/2
013
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)dr
ift ra
te li
mite
d to
0.0
005%
0B
AC
T-P
SD
AK
-008
0
AN
CH
OR
AG
E
MU
NIC
IPA
L LI
GH
T &
P
OW
ER
MU
NIC
IPA
LITY
OF
AN
CH
OR
AG
EA
KA
Q02
03C
PT0
26/
6/20
13C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)
Inst
all,
oper
ate,
and
m
aint
ain
a hi
gh e
ffici
ency
dr
ift e
limin
ator
with
a
max
imum
drif
t of 0
.000
5 pe
rcen
t of c
ircul
atin
g w
ater
.0
OTH
ER
CA
SE
-B
Y-C
AS
E
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IN
-016
7M
AG
NE
TATI
ON
LLC
MA
GN
ETA
TIO
N L
LCIN
181-
3208
1-00
054
4/16
/201
3C
OO
LIN
G
TOW
ER
4600
GA
L/M
IN O
F C
IRC
ULA
TIN
G
WA
TER
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
1%
MA
X D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-016
7M
AG
NE
TATI
ON
LLC
MA
GN
ETA
TIO
N L
LCIN
181-
3208
1-00
054
4/16
/201
3C
OO
LIN
G
TOW
ER
4600
GA
L/M
IN O
F C
IRC
ULA
TIN
G
WA
TER
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)D
RIF
T E
LIM
INA
TOR
S0.
001
% M
AXI
MU
M
DR
IFT
RA
TEB
AC
T-P
SD
*IN
-016
7M
AG
NE
TATI
ON
LLC
MA
GN
ETA
TIO
N L
LCIN
181-
3208
1-00
054
4/16
/201
3C
OO
LIN
G
TOW
ER
4600
GA
L/M
IN O
F C
IRC
ULA
TIN
G
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
RIF
T E
MIL
INA
TOR
S0.
001
% M
AXI
MU
M
DR
IFT
RA
TEB
AC
T-P
SD
*TX-
0708
LA P
ALO
MA
EN
ER
GY
C
EN
TER
LA P
ALO
MA
EN
ER
GY
CE
NTE
R,
LLC
TX10
1542
PS
DTX
1288
2/7/
2013
cool
ing
tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)m
ist e
limin
ator
s0.
001
%D
RIF
TB
AC
T-P
SD
*MI-0
404
GE
RD
AU
MA
CS
TEE
L,
INC
.G
ER
DA
U M
AC
STE
EL,
INC
.M
I10
2-12
1/4/
2013
Cas
ter C
oolin
g To
wer
(E
UC
AS
TER
CO
OLT
WR
)16
30G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
Drif
t elim
inat
or0.
0005
% D
RIF
T LO
SS
TES
T P
RO
TOC
OL/
PS
D B
AC
TB
AC
T-P
SD
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
CA
STE
R
SP
RA
YS
(C
ON
TAC
T)
ID#1
5F35
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
CA
STE
R
SP
RA
YS
(C
ON
TAC
T)
ID#1
5F35
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
(CO
NTA
CT)
ID
#15A
8000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
(CO
NTA
CT)
ID
#15A
8000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
(CO
NTA
CT)
ID
#15B
4000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-
BA
SE
D W
ATE
RTR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
0.00
1%
DR
IFT
RA
TEB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
(CO
NTA
CT)
ID
#15B
4000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-
BA
SE
D W
ATE
RTR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
0.00
1%
DR
IFT
RA
TEB
AC
T-P
SD
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
ID#1
5C
(NO
NC
ON
TAC
T)81
250
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G M
ILL
ID#1
5C
(NO
NC
ON
TAC
T)81
250
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R: #
1 C
AS
T ID
#15D
(C
ON
TAC
T)50
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
0.00
1%
DR
AFT
R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R: #
1 C
AS
T ID
#15D
(C
ON
TAC
T)50
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
001
% D
RA
FT
RA
TEB
AC
T-P
SD
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G
MIL
L/C
AS
TER
(N
ON
-C
ON
TAC
T)
ID#1
5E18
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
003
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R:
RO
LLIN
G
MIL
L/C
AS
TER
(N
ON
-C
ON
TAC
T)
ID#1
5E18
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
003
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R: L
VD
B
OIL
ER
(C
ON
TAC
T)
ID#1
5G25
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
005
% D
RIF
T R
ATE
BA
CT-
PS
D
*IN
-015
6
STE
EL
DY
NA
MIC
S, I
NC
. -S
TRU
CTU
RA
L A
ND
RA
IL
DIV
ISIO
NS
TEE
L D
YN
AM
ICS
, IN
C. -
STR
UC
TUR
AL
AN
D R
AIL
DIV
ISIO
NIN
183-
2714
5-00
030
12/2
1/20
12
CO
OLI
NG
TO
WE
R: L
VD
B
OIL
ER
(C
ON
TAC
T)
ID#1
5G25
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
D
RIF
T E
LIM
INAT
OR
;D
O N
OT
US
E C
HR
OM
IUM
-B
AS
ED
WA
TER
TR
EA
TME
NT
CH
EM
ICA
LS
IN A
NY
OF
THE
CO
OLI
NG
TO
WE
RS
.0.
005
% D
RIF
T R
ATE
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCS
T. J
OS
EP
H E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
CO
OLI
NG
TO
WE
RS
1700
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
RIF
T E
LIM
INA
TOR
0.00
05%
DR
IFT
LOS
SB
AC
T-P
SD
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCS
T. J
OS
EP
H E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
CO
OLI
NG
TO
WE
RS
1700
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R0.
0005
% D
RIF
T LO
SS
BA
CT-
PS
D
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCS
T. J
OS
EP
H E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
CO
OLI
NG
TO
WE
RS
1700
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)D
RIF
T E
LIM
INA
TOR
0.00
05%
DR
IFT
LOS
SB
AC
T-P
SD
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IOW
A F
ER
TILI
ZER
CO
MP
AN
YIA
12-2
1910
/26/
2012
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)dr
ift e
limin
ator
0.00
05%
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IOW
A F
ER
TILI
ZER
CO
MP
AN
YIA
12-2
1910
/26/
2012
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
drift
elim
inat
or0.
0005
%B
AC
T-P
SD
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IOW
A F
ER
TILI
ZER
CO
MP
AN
YIA
12-2
1910
/26/
2012
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)dr
ift e
limin
ator
0.00
05%
BA
CT-
PS
D
LA-0
264
NO
RC
O H
YD
RO
GE
N
PLA
NT
AIR
PR
OD
UC
TS A
ND
CH
EM
ICA
LS,
INC
.LA
PS
D-L
A-7
50(M
1)9/
4/20
12C
oolin
g To
wer
(E
QT0
004)
1120
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift e
limin
ator
s0.
78LB
/HH
OU
RLY
M
AXI
MU
MB
AC
T-P
SD
*VA
-031
9
GA
TEW
AY
C
OG
EN
ER
ATI
ON
1, L
LC -
SM
AR
T W
ATE
R
PR
OJE
CT
GA
TEW
AY
GR
EE
N E
NE
RG
YV
A52
375-
002
8/27
/201
2C
OO
LIN
G
TOW
ER
5500
0G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Use
of d
rift e
limin
ator
s to
a
drift
rate
of 0
.001
% o
f the
ci
rcul
atin
g w
ater
flow
and
a
tota
l dis
solv
ed s
olid
s co
nten
t of t
he c
oolin
g w
ater
of
no
mor
e th
an 1
200
mg/
l.0.
1LB
/HB
AC
T-P
SD
*VA
-031
9
GA
TEW
AY
C
OG
EN
ER
ATI
ON
1, L
LC -
SM
AR
T W
ATE
R
PR
OJE
CT
GA
TEW
AY
GR
EE
N E
NE
RG
YV
A52
375-
002
8/27
/201
2C
OO
LIN
G
TOW
ER
5500
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)
Use
of d
rift e
limin
ator
s to
a
drift
rate
of 0
.001
% o
f the
ci
rcul
atin
g w
ater
flow
and
a
tota
l dis
solv
ed s
olid
s co
nten
t of t
he c
oolin
g w
ater
of
no
mor
e th
an 1
200
mg/
l.0.
1LB
/HB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
G
AS
IFIC
ATI
ON
, LLC
IND
IAN
A G
AS
IFIC
ATI
ON
, LLC
INT1
47-3
0464
-00
060
6/27
/201
2A
SU
CO
OLI
NG
TO
WE
R54
960
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
DE
SIG
NE
D
WIT
H A
DR
IFT
LOS
S
RA
TE O
F LE
SS
TH
AN
0.
0005
%15
00P
PM
DA
ILY
AV
EB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
G
AS
IFIC
ATI
ON
, LLC
IND
IAN
A G
AS
IFIC
ATI
ON
, LLC
INT1
47-3
0464
-00
060
6/27
/201
2A
SU
CO
OLI
NG
TO
WE
R54
960
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
DE
SIG
NE
D
WIT
H A
DR
IFT
LOS
S
RA
TE O
F LE
SS
TH
AN
0.
0005
%15
00P
PM
DA
ILY
AV
EB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
*IN
-016
6IN
DIA
NA
G
AS
IFIC
ATI
ON
, LLC
IND
IAN
A G
AS
IFIC
ATI
ON
, LLC
INT1
47-3
0464
-00
060
6/27
/201
2A
SU
CO
OLI
NG
TO
WE
R54
960
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
DE
SIG
NE
D
WIT
H A
DR
IFT
LOS
S
RA
TE O
F LE
SS
TH
AN
0.
0005
%15
00P
PM
DA
ILY
AV
EB
AC
T-P
SD
*MI-0
401
MID
LAN
D P
OW
ER
S
TATI
ON
VC
EN
ER
GY
LLC
MID
LAN
D
PO
WE
R S
TATI
ON
LLC
MI
24-1
1B12
/21/
2011
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)H
igh
effic
ienc
y dr
ift
elim
inat
ors
0.00
05%
DR
IFT
LOS
S R
ATE
DE
SIG
N
STA
ND
AR
DB
AC
T-P
SD
PA
-027
5
CR
AW
FOR
D
RE
NE
WA
BLE
EN
ER
GY
LL
C/G
RE
EN
WO
OD
TW
PC
RA
WFO
RD
RE
NE
WA
BLE
E
NE
RG
YP
A20
-305
A10
/24/
2011
Mat
eria
l H
andl
ing,
Pla
nt
Roa
dway
s, a
nd
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Eac
h si
lo w
ill b
e eq
uipp
ed
with
a b
in v
ent d
ust
colle
ctio
n sy
stem
. Aqu
eous
19
% a
mm
onia
will
be
deliv
ered
by
eith
er ra
il or
tru
ck a
nd s
tore
d in
195
00
gallo
n ta
nk e
quip
ped
with
a
pres
sure
relie
f val
ve. A
five
cy
cle
wet
mec
hani
cal d
raft
cool
ing
tow
er u
tiliz
ing
drift
el
imin
ator
s to
min
imiz
e dr
ift
of p
artic
ulat
e en
traile
d in
w
ater
dro
plet
s is
use
d.7.
29T/
YR
8760
BA
CT-
PS
D
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CIT
Y O
F P
ALM
DA
LEC
AS
E 0
9-01
10/1
8/20
11C
OO
LIN
G
TOW
ER
1300
00
GA
L/M
IN
CIR
CU
LATI
ON
R
ATE
Par
ticul
ate
mat
ter,
tota
l (T
PM
)1.
6LB
/HB
AC
T-P
SD
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CIT
Y O
F P
ALM
DA
LEC
AS
E 0
9-01
10/1
8/20
11C
OO
LIN
G
TOW
ER
1300
00
GA
L/M
IN
CIR
CU
LATI
ON
R
ATE
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
1.6
LB/H
BA
CT-
PS
D
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CIT
Y O
F P
ALM
DA
LEC
AS
E 0
9-01
10/1
8/20
11C
OO
LIN
G
TOW
ER
1300
00
GA
L/M
IN
CIR
CU
LATI
ON
R
ATE
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)1.
6LB
/HB
AC
T-P
SD
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
IC
GE
NE
RA
TIN
G P
LAN
TE
NTE
RG
Y L
OU
ISIA
NA
LLC
LAP
SD
-LA
-752
8/16
/201
1
UN
IT 6
C
OO
LIN
G
TOW
ER
1158
47G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
MIS
T E
LIM
INA
TOR
0.00
05P
ER
CE
NT
DR
IFT
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
IC
GE
NE
RA
TIN
G P
LAN
TE
NTE
RG
Y L
OU
ISIA
NA
LLC
LAP
SD
-LA
-752
8/16
/201
1
UN
IT 6
C
OO
LIN
G
TOW
ER
1158
47G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y M
IST
ELI
MIN
ATO
R0.
0005
PE
RC
EN
T D
RIF
TA
NN
UA
L A
VE
RA
GE
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
IC
GE
NE
RA
TIN
G P
LAN
TE
NTE
RG
Y L
OU
ISIA
NA
LLC
LAP
SD
-LA
-752
8/16
/201
1
CH
ILLE
R
CO
OLI
NG
TO
WE
R (C
HIL
L C
T)12
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
HIG
H E
FFIC
IEN
CY
MIS
T E
LIM
INA
TOR
0.00
1P
ER
CE
NT
DR
IFT
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
IC
GE
NE
RA
TIN
G P
LAN
TE
NTE
RG
Y L
OU
ISIA
NA
LLC
LAP
SD
-LA
-752
8/16
/201
1
CH
ILLE
R
CO
OLI
NG
TO
WE
R (C
HIL
L C
T)12
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l <
2.
5 μ
(TP
M2.
5)H
IGH
EFF
ICIE
NC
Y M
IST
ELI
MIN
ATO
R0.
001
PE
RC
EN
T D
RIF
TA
NN
UA
L A
VE
RA
GE
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P30
- D
IRE
CT
CO
NTA
CT
SC
RU
BB
ER
W
ITH
C
OO
LIN
G
TOW
ER
515
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
HIG
H E
FFIC
IEN
CY
MIS
T /
DR
IFT
ELI
MIN
ATO
R
(WIT
H A
DD
ITIO
NA
L LA
YE
R),
LIM
ITS
ON
%
SO
LID
S0.
0005
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P30
- D
IRE
CT
CO
NTA
CT
SC
RU
BB
ER
W
ITH
C
OO
LIN
G
TOW
ER
515
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
R (W
/ AD
DIT
ION
AL L
AYER
)0.
0005
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P40
, P50
- C
OO
LIN
G
TOW
ER
S70
0G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)
HIG
H E
FFIC
IEN
CY
MIS
T /
DR
IFT
ELI
MIN
ATO
RS
(W/
ADD
ITIO
NAL
LAY
ER)
0.00
05
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P40
, P50
- C
OO
LIN
G
TOW
ER
S70
0G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)
HIG
H E
FFIC
IEN
CY
MIS
T /
DR
IFT
ELI
MIN
ATO
R (W
/ AD
DIT
ON
AL L
AYER
)0.
0005
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P60
- C
OO
LIN
G
TOW
ER
200
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
HIG
H E
FFIC
IEN
CY
MIS
T /
DR
IFT
ELI
MIN
ATO
RS
(W/
AD
DIT
ION
AL
LAY
ER
); D
ISS
OLV
ED
SO
LID
S L
IMIT
0.00
05
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
WI-0
252
SP
EC
IALT
Y M
INE
RA
LS
INC
. - S
UPE
RIO
RSP
ECIA
LTY
MIN
ERAL
S IN
C. (
SMI)
WI
09-D
CF-
251
7/22
/201
1
P60
- C
OO
LIN
G
TOW
ER
200
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)
HIG
H E
FFIC
IEN
CY
MIS
T /
DR
IFT
ELI
MIN
ATO
RS
(W/
AD
DIT
ION
AL
LAY
ER
); D
ISS
OLV
ED
SO
LID
S L
IMIT
0.00
05
% CIR
CU
LATI
ON
DR
IFT
BA
CT-
PS
D
*MI-0
400
WO
LVE
RIN
E P
OW
ER
WO
LVE
RIN
E P
OW
ER
SU
PP
LY
CO
OP
ER
ATI
VE
, IN
C.
MI
317-
076/
29/2
011
Coo
ling
Tow
er
(EU
CO
OLI
NG
TW
R)
0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
rift e
limin
ator
s0.
0005
%B
AC
T-P
SD
LA-0
251
FLO
PA
M IN
C. F
AC
ILIT
YFL
OP
AM
INC
.LA
PS
D-L
A-7
47(M
1)4/
26/2
011
cool
ing
tow
ers
(10
units
)36
40G
/MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
No
addi
tiona
l con
trol
0.01
LB/H
BA
CT-
PS
D
LA-0
248
DIR
EC
T R
ED
UC
TIO
N
IRO
N P
LAN
T
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
- N
UC
OR
LAP
SD
-LA
-751
1/27
/201
1
DR
I-114
- D
RI
Uni
t #1
Cle
an
Wat
er C
oolin
g To
wer
1761
1G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
CT
is a
com
bina
tion
of
less
than
or e
qual
to 1
,000
m
illig
ram
s pe
r lite
r TD
S
conc
entra
tion
in th
e co
olin
g w
ater
and
drif
t elim
inat
ors
empl
oyin
g a
drift
max
imum
of
0.0
005%
.0.
07LB
/HB
AC
T-P
SD
LA-0
248
DIR
EC
T R
ED
UC
TIO
N
IRO
N P
LAN
T
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
- N
UC
OR
LAP
SD
-LA
-751
1/27
/201
1
DR
I-214
- D
RI
Uni
t #1
Cle
an
Wat
er C
oolin
g To
wer
1761
1G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
CT
is a
com
bina
tion
of
less
than
or e
qual
to 1
,000
m
illig
ram
s pe
r lite
r TD
S
conc
entra
tion
in th
e co
olin
g w
ater
and
drif
t elim
inat
ors
empl
oyin
g a
drift
max
imum
of
0.0
005%
.0.
07LB
/HB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
LA-0
248
DIR
EC
T R
ED
UC
TIO
N
IRO
N P
LAN
T
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
- N
UC
OR
LAP
SD
-LA
-751
1/27
/201
1
DR
I-113
- D
RI
Uni
t #1
Pro
cess
W
ater
Coo
ling
Tow
er26
857
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
CT
is a
com
bina
tion
of
less
than
or e
qual
to 1
,000
m
illig
ram
s pe
r lite
r TD
S
conc
entra
tion
in th
e co
olin
g w
ater
and
drif
t elim
inat
ors
empl
oyin
g a
drift
max
imum
of
0.0
005%
.0.
11LB
/HB
AC
T-P
SD
LA-0
248
DIR
EC
T R
ED
UC
TIO
N
IRO
N P
LAN
T
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
- N
UC
OR
LAP
SD
-LA
-751
1/27
/201
1
DR
I-213
- D
RI
Uni
t #2
Pro
cess
W
ater
Coo
ling
Tow
er26
857
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
CT
is a
com
bina
tion
of
less
than
or e
qual
to 1
,000
m
illig
ram
s pe
r lite
r TD
S
conc
entra
tion
in th
e co
olin
g w
ater
and
drif
t elim
inat
ors
empl
oyin
g a
drift
max
imum
of
0.0
005%
.0.
11LB
/HB
AC
T-P
SD
LA-0
246
ST.
CH
AR
LES
R
EFI
NE
RY
VA
LER
O R
EFI
NIN
G -
NE
W
OR
LEA
NS
, LLC
LAP
SD
-LA
-619
(M6)
12/3
1/20
10
EQ
T024
4 - N
ew
Wes
t Coo
ling
Tow
er40
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
drift
elim
inat
ors
0.08
LB/H
HO
UR
LY
MA
XIM
UM
BA
CT-
PS
D
LA-0
246
ST.
CH
AR
LES
R
EFI
NE
RY
VA
LER
O R
EFI
NIN
G -
NE
W
OR
LEA
NS
, LLC
LAP
SD
-LA
-619
(M6)
12/3
1/20
10
EQ
T003
5 -
Coo
ling
Tow
er
CT-
600
4500
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
Drif
t elim
inat
ors
0.09
LB/H
HO
UR
LY
MA
XIM
UM
BA
CT-
PS
D
LA-0
246
ST.
CH
AR
LES
R
EFI
NE
RY
VA
LER
O R
EFI
NIN
G -
NE
W
OR
LEA
NS
, LLC
LAP
SD
-LA
-619
(M6)
12/3
1/20
10
EQ
T024
3 -
HC
U C
oolin
g To
wer
5000
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
Drif
t elim
inat
ors
0.1
LB/H
HO
UR
LY
MA
XIM
UM
BA
CT-
PS
D
LA-0
246
ST.
CH
AR
LES
R
EFI
NE
RY
VA
LER
O R
EFI
NIN
G -
NE
W
OR
LEA
NS
, LLC
LAP
SD
-LA
-619
(M6)
12/3
1/20
10
EQ
T001
0 -
Coo
ling
Tow
er
403
6125
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
Drif
t elim
inat
ors
1.2
LB/H
HO
UR
LY
MA
XIM
UM
BA
CT-
PS
D
GA
-014
2O
SC
EO
LA S
TEE
L C
O.
OS
CE
OLA
STE
EL
CO
.G
A33
12-0
75-0
024-
P-
01-0
12/2
9/20
10
Coo
ling
Tow
ers,
C
T1, C
T21,
C
T22,
and
C
T23
0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Drif
t Elim
inat
ors
0.00
05%
MA
SS
FL
OW
RA
TEB
AC
T-P
SD
FL-0
323
GA
INE
SV
ILLE
R
EN
EW
AB
LE E
NE
RG
Y
CE
NTE
RG
AIN
ES
VIL
LE R
EG
ION
AL
UTI
LITY
(G
RU
) DE
ER
HA
VE
NFL
PS
D-F
L-41
1 (0
0101
31-0
01-A
C)
12/2
8/20
10
Mec
hani
cal
draf
t coo
ling
tow
er78
000
Gal
/Min
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
The
tow
er w
ill b
e eq
uipp
ed
with
drif
t elim
inat
ores
to
mee
t a p
ropo
sed
drift
rate
of
0.0
005%
1T/
YRSE
E N
OTE
SBA
CT-
PSD
OH
-034
1N
UC
OR
STE
EL
MA
RIO
N,
INC
.N
UC
OR
STE
EL
OH
P01
0528
312
/23/
2010
Mel
t Sho
p S
pray
Con
tact
C
oolin
g To
wer
1983
60G
AL/
H
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)0.
04LB
/HB
AC
T-P
SD
OH
-034
1N
UC
OR
STE
EL
MA
RIO
N,
INC
.N
UC
OR
STE
EL
OH
P01
0528
312
/23/
2010
Rol
ling
Mill
C
onta
ct C
oolin
g To
wer
2250
00G
AL/
H
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)0.
07LB
/HB
AC
T-P
SD
OH
-034
1N
UC
OR
STE
EL
MA
RIO
N,
INC
.N
UC
OR
STE
EL
OH
P01
0528
312
/23/
2010
Mel
t Sho
p S
pray
Con
tact
C
oolin
g To
wer
1983
60G
AL/
H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)0.
22LB
/HB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
OH
-034
1N
UC
OR
STE
EL
MA
RIO
N,
INC
.N
UC
OR
STE
EL
OH
P01
0528
312
/23/
2010
Rol
ling
Mill
C
onta
ct C
oolin
g To
wer
2250
00G
AL/
H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)0.
46LB
/HB
AC
T-P
SD
GA
-014
1
WA
RR
EN
CO
UN
TY
BIO
MA
SS
EN
ER
GY
FA
CIL
ITY
OG
ETH
OR
PE
PO
WE
R
CO
RP
ER
ATI
ON
GA
4911
-301
-001
6-P
-01
-012
/17/
2010
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
rift E
limin
ator
s0.
0005
% EFF
EC
TIV
EN
ES
SC
ON
DIT
ION
2.
17B
AC
T-P
SD
CA
-120
8B
UR
NE
Y M
OU
NTA
IN
PO
WE
RC
OV
AN
TA E
NE
RG
Y
CO
RP
OR
ATI
ON
CA
SA
C 0
8-01
10/2
1/20
10
EV
AP
OR
ATI
VE
C
OO
LIN
G
TOW
ER
7600
GA
L/M
INP
artic
ulat
e m
atte
r, fu
gitiv
e
SE
E W
OR
K P
RA
CTI
CE
R
EQ
UIR
EM
EN
TS IN
N
OTE
S0
BA
CT-
PS
D
NH
-001
8B
ER
LIN
BIO
PO
WE
RLA
IDLA
W B
ER
LIN
BIO
PO
WE
R,
LLC
NH
TP-0
054
7/26
/201
0
EU
02 4
-CE
LL
WE
T C
OO
LIN
G
TOW
ER
6000
0G
AL/
MIN
Par
ticul
ate
mat
ter,
fugi
tive
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
BY
WG
T O
F FL
OW
STA
CK
TE
ST
BA
CT-
PS
D
ID-0
018
LAN
GLE
Y G
ULC
H
PO
WE
R P
LAN
TID
AH
O P
OW
ER
CO
MP
AN
YID
P-2
009.
0092
6/25
/201
0C
OO
LIN
G
TOW
ER
6320
0G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)
D
RIF
T E
LIM
INAT
OR
S,
GO
OD
OP
ER
ATI
NG
P
RA
CTI
CE
S0
SE
E N
OTE
BA
CT-
PS
D
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-304
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
S
EC
ON
DA
RY
C
RU
SH
ER
6.83
T/H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
005
LB/H
BA
CT-
PS
D
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-301
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
LO
AD
BIN
6.83
LB/H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
01LB
/HB
AC
T-P
SD
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-303
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
P
RIM
AR
Y
SC
RE
EN
ING
6.83
T/H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
019
LB/H
BA
CT-
PS
D
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
TWR
-103
- A
ir S
epar
atio
n P
lant
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
BA
CT
is s
elec
ted
to b
e a
com
bina
tion
of le
ss th
an
1,00
0 m
illig
ram
s pe
r lite
r TD
S c
once
ntra
tion
in th
e co
olin
g w
ater
and
drif
t el
imin
ator
s em
ploy
ing
a dr
ift
max
imum
of 0
.000
5%.
0.02
6LB
/HB
AC
T-P
SD
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-305
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
S
EC
ON
DA
RY
S
CR
EE
N6.
83T/
H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
031
LB/H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-302
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
P
RIM
AR
Y
CR
US
HE
R6.
83T/
H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
04LB
/HB
AC
T-P
SD
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
TWR
-102
- Iro
n S
olid
ifica
tion
Coo
ling
Tow
er0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
BA
CT
is s
elec
ted
to b
e a
com
bina
tion
of le
ss th
an
1,00
0 m
illig
ram
s pe
r lite
r TD
S c
once
ntra
tion
in th
e co
olin
g w
ater
and
drif
t el
imin
ator
s em
ploy
ing
a dr
ift
max
imum
of 0
.000
5%.
0.04
2LB
/HB
AC
T-P
SD
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
SLG
-306
- A
IR-
CO
OLE
D S
LAG
P
RO
CE
SS
ING
S
TOC
KP
ILE
S6.
83T/
H
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
BA
CT
is s
elec
ted
to b
e w
et
supp
ress
ion
of d
ust
gene
ratin
g so
urce
s (s
lag
gran
ulat
ion)
by
wat
er
spra
ys.
This
tech
nolo
gy is
in
here
nt to
the
gran
ulat
ed
slag
pro
cess
.0.
27LB
/HB
AC
T-P
SD
LA-0
239
NU
CO
R S
TEE
L LO
UIS
IAN
A
CO
NS
OLI
DA
TED
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
INC
LAP
SD
-LA
-740
5/24
/201
0
TWR
-101
- B
last
Fur
nace
C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
BA
CT
is s
elec
ted
to b
e a
com
bina
tion
of le
ss th
an
1,00
0 m
illig
ram
s pe
r lite
r TD
S c
once
ntra
tion
in th
e co
olin
g w
ater
and
drif
t el
imin
ator
s em
ploy
ing
a dr
ift
max
imum
of 0
.000
5%.
0.32
LB/H
BA
CT-
PS
D
CA
-119
1V
ICTO
RV
ILLE
2 H
YB
RID
P
OW
ER
PR
OJE
CT
CIT
Y O
F V
ICTO
RV
ILLE
CA
SE
07-
023/
11/2
010
CO
OLI
NG
TO
WE
R13
0000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l (T
PM
)1.
6LB
/HB
AC
T-P
SD
CA
-119
1V
ICTO
RV
ILLE
2 H
YB
RID
P
OW
ER
PR
OJE
CT
CIT
Y O
F V
ICTO
RV
ILLE
CA
SE
07-
023/
11/2
010
CO
OLI
NG
TO
WE
R13
0000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)1.
6LB
/HB
AC
T-P
SD
TX-0
552
WO
LF H
OLL
OW
P
OW
ER
PLA
NT
NO
. 2S
TAR
K P
OW
ER
GE
NE
RA
TIO
N II
H
OLD
ING
S, L
LCTX
PS
DTX
1110
3/3/
2010
Coo
ling
tow
er0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift e
limin
ator
s0.
0005
% D
RIF
TB
AC
T-P
SD
TX-0
551
PA
ND
A S
HE
RM
AN
P
OW
ER
STA
TIO
NP
AN
DA
SH
ER
MA
N P
OW
ER
LLC
TXP
SD
TX11
982/
3/20
10C
oolin
g to
wer
0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift e
limin
ator
s0.
0005
% D
RIF
TB
AC
T-P
SD
TX-0
553
LIN
DA
LE R
EN
EW
AB
LE
EN
ER
GY
LIN
DA
LE R
EN
EW
AB
LE E
NE
RG
Y
LLC
TXP
SD
TX11
841/
8/20
10C
oolin
g to
wer
0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift e
limin
ator
s0.
0005
% D
RIF
TB
AC
T-P
SD
NV
-005
0M
GM
MIR
AG
EM
GM
MIR
AG
EN
V82
511
/30/
2009
CO
OLI
NG
TO
WE
RS
- U
NIT
S C
C02
6,
CC
027,
AN
D
CC
028
AT
CIT
Y
CE
NTE
R10
890
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
EA
CH
UN
IT IS
EQ
UIP
PE
D
WIT
H A
DR
IFT
ELI
MIN
ATO
R L
IMIT
ING
TH
E D
RIF
T R
ATE
TO
0.
001%
AN
D T
HE
TO
TAL
DIS
SO
LVE
D S
OLI
DS
IN
THE
CU
RC
ULA
TIO
N
WA
TER
IS L
IMIT
ED
TO
3,
600
PP
M.
0.09
1LB
/HLA
ER
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
LA-0
213
ST.
CH
AR
LES
R
EFI
NE
RY
VA
LER
O R
EFI
NIN
G -
NE
W
OR
LEA
NS
, LLC
LAP
SD
-LA
-619
(M5)
11/1
7/20
09
CO
OLI
NG
TO
WE
RS
(13-
81, 2
004-
6,
2005
-42,
200
5-43
, 200
8-35
)
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0S
EE
NO
TEB
AC
T-P
SD
MN
-007
8SA
PPI C
LOQ
UET
LLC
SAPP
I FIN
E PA
PER
PLC
MN
0170
0002
-011
10/2
8/20
09C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
tota
l 2.5
μ
(TP
M2.
5)D
RIF
T E
LIM
INA
TOR
S0.
01LB
/HB
AC
T-P
SD
AL-
0246
TUS
CA
LOO
SA
HU
NT
RE
FIN
ER
Y C
O.
AL
X063
A, X
066A
, X0
67A
& X
070A
9/28
/200
9C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
DR
IFT
ELI
MIN
ATO
RS
W
ILL
BE
INS
TALL
ED
, NO
T M
INIM
IZE
EM
ISS
ION
S.
0.4
T/Y
R P
M10
PR
OJE
CTE
D
EM
ISS
ION
S
FRO
M
AP
PLI
CA
TIO
NB
AC
T-P
SD
NV
-004
9H
AR
RA
H'S
OP
ER
ATI
NG
C
OM
PA
NY
, IN
C.
HA
RR
AH
'S O
PE
RA
TIN
G
CO
MP
AN
Y, I
NC
.N
V25
78/
20/2
009
CO
OLI
NG
TO
WE
R -
UN
IT
HA
1972
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
A D
RIF
T E
LIM
INA
TOR
C
ON
TRO
LS D
RIF
T R
ATE
TO
0.0
05%
, AN
D T
HE
P
ER
MIT
TEE
IS R
EQ
UIR
ED
TO
MA
INTA
IN T
SD
C
ON
TEN
T IN
TH
E
CO
OLI
NG
WA
TER
TO
A
MA
XIM
UM
OF
2,52
0 P
PM
.0.
215
LB/H
Oth
er C
ase-
by-
Cas
e
NV
-004
9H
AR
RA
H'S
OP
ER
ATI
NG
C
OM
PA
NY
, IN
C.
HA
RR
AH
'S O
PE
RA
TIN
G
CO
MP
AN
Y, I
NC
.N
V25
78/
20/2
009
CO
OLI
NG
TO
WE
R -
UN
IT
FL17
6900
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R T
O
RE
DU
CE
DR
IFT
RA
TE T
O
LESS
TH
AN 0
.005
% A
ND
M
AIN
TAIN
ING
TO
TAL
DIS
SO
LVE
D S
OLI
DS
C
ON
TEN
T IN
TH
E
CO
OLI
NG
WA
TER
TO
B
ELO
W 3
,000
PP
M.
0.42
5LB
/HO
ther
Cas
e-by
-C
ase
NV
-004
9H
AR
RA
H'S
OP
ER
ATI
NG
C
OM
PA
NY
, IN
C.
HA
RR
AH
'S O
PE
RA
TIN
G
CO
MP
AN
Y, I
NC
.N
V25
78/
20/2
009
CO
OLI
NG
TO
WE
R -
UN
IT
BA
1420
400
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
CT
CO
NS
ISTS
OF
THE
TW
O R
EQ
UIR
EM
EN
TS
DE
SC
RIB
ED
IN T
HE
P
RO
CE
SS
.0.
744
LB/H
Oth
er C
ase-
by-
Cas
e
TX-0
549
CH
OC
OLA
TE B
AY
OU
FA
CIL
ITY
INE
OS
LLC
TX95
6/30
/200
9C
OO
LIN
G
TOW
ER
1650
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
2%
BA
CT-
PS
D
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
N
FAC
ILIT
YLA
KE
CH
AR
LES
CO
GE
NE
RA
TIO
N,
LLC
LAP
SD
-LA
-742
6/22
/200
9C
OO
LIN
G
TOW
ER
S43
6000
GA
L/M
IN
Par
ticul
ate
mat
ter,
tota
l <
10
μ (T
PM
10)
DR
IFT
ELI
MIN
ATO
RS
1.64
LB/H
MA
XIM
UM
BA
CT-
PS
D
FL-0
317
FPL
TUR
KE
Y P
OIN
T N
UC
LEA
R P
LAN
TFL
OR
IDA
PO
WE
R A
ND
LIG
HT
FL02
5000
3-01
3-A
C5/
30/2
009
Indu
stria
l C
oolin
g To
wer
s21
0367
GA
L/M
IN/T
OW
ER
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
Coo
ling
tow
er d
esig
n pl
us
high
effi
cien
cy d
rift
elim
inat
ors
0.00
05%
BA
CT-
PS
D
FL-0
317
FPL
TUR
KE
Y P
OIN
T N
UC
LEA
R P
LAN
TFL
OR
IDA
PO
WE
R A
ND
LIG
HT
FL02
5000
3-01
3-A
C5/
30/2
009
Indu
stria
l C
oolin
g To
wer
s21
0367
GA
L/M
IN/T
OW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Coo
ling
Tow
er d
esig
n pl
us
high
effi
cien
cy d
rift
elim
inat
ors;
hig
her
conc
entra
tions
of s
olid
s in
co
olin
g w
ater
resu
lts in
fo
ram
tion
of P
M/P
M10
.0.
0005
%B
AC
T-P
SD
MA
-003
6B
RA
YTO
N P
OIN
T S
TATI
ON
DO
MIN
ION
EN
ER
GY
BR
AY
TON
P
OIN
T, L
LCM
A05
2-12
0-M
A14
4/12
/200
9
NA
TUR
AL
DR
AFT
C
OO
LIN
G
TOW
ER
S (2
)40
0000
GA
L/M
IN
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
1066
LB/H
24 H
OU
RS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
MA
-003
6B
RA
YTO
N P
OIN
T S
TATI
ON
DO
MIN
ION
EN
ER
GY
BR
AY
TON
P
OIN
T, L
LCM
A05
2-12
0-M
A14
4/12
/200
9
NA
TUR
AL
DR
AFT
C
OO
LIN
G
TOW
ER
S (2
)40
0000
GA
L/M
IN
WA
TER
Par
ticul
ate
mat
ter,
filte
rabl
e 2.
5 μ
(FP
M2.
5)D
RIF
T E
LIM
INA
TOR
S10
66LB
/H24
HO
UR
SB
AC
T-P
SD
OH
-032
8V
& M
STA
RV
& M
STA
RO
HP
0103
995
4/10
/200
9
PIP
E M
ILL
CO
OLI
NG
TO
WE
R18
0000
0G
AL/
H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R W
ITH
A
MA
XIM
UM
DR
IFT
RA
TE
OF
0.00
5% O
F C
IRC
ULA
TIN
G W
ATE
R
FLO
W R
ATE
INTO
TH
E
EM
ISS
ION
S U
NIT
.0.
75LB
/HB
AC
T-P
SD
OH
-032
8V
& M
STA
RV
& M
STA
RO
HP
0103
995
4/10
/200
9
ME
LT S
HO
P
CO
OLI
NG
TO
WE
R30
0000
0G
AL/
H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R W
ITH
0.
005%
DR
IFT
LOS
S O
F C
IRC
ULA
TIN
G W
ATE
R
FLO
W R
ATE
1.25
LB/H
IF E
AF
RE
PLA
CE
D/3
,00
0,00
0 G
AL/
HR
BA
CT-
PS
D
LA-0
204
PLA
QU
EM
INE
PV
C
PLA
NT
SH
INTE
CH
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
09(M
-1)
2/27
/200
9C
OO
LIN
G
TOW
ER
(P-1
5)43
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
GO
OD
DE
SIG
N,
MA
INTE
NA
NC
E, A
ND
IN
TEG
RA
TED
DR
IFT
ELI
MIN
ATO
RS
0.05
7LB
/MM
GA
LH
OU
RLY
A
VE
RA
GE
BA
CT-
PS
D
LA-0
204
PLA
QU
EM
INE
PV
C
PLA
NT
SH
INTE
CH
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
09(M
-1)
2/27
/200
9V
CM
CO
OLI
NG
TO
WE
R (M
-7)
1060
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
GO
OD
DE
SIG
N,
MA
INTE
NA
NC
E, A
ND
IN
TEG
RA
TED
DR
IFT
ELI
MIN
ATO
RS
0.06
LB/M
M G
AL
HO
UR
LY
AV
ER
AG
EB
AC
T-P
SD
LA-0
204
PLA
QU
EM
INE
PV
C
PLA
NT
SH
INTE
CH
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
09(M
-1)
2/27
/200
9C
/A C
OO
LIN
G
TOW
ER
(C-4
)38
750
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
GO
OD
DE
SIG
N,
MA
INTE
NA
NC
E, A
ND
IN
TEG
RA
TED
DR
IFT
ELI
MIN
ATO
RS
0.08
LB/M
M G
AL
HO
UR
LY
AV
ER
AG
EB
AC
T-P
SD
OH
-030
8S
UN
CO
MP
AN
Y, I
NC
., TO
LED
O R
EFI
NE
RY
SU
NO
CO
, IN
C.
OH
04-0
1447
2/23
/200
9C
OO
LIN
G
TOW
ER
2000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
RIF
T E
LIM
INA
TOR
0.12
LB/H
N/A
OK
-013
5P
RY
OR
PLA
NT
CH
EM
ICA
LP
RY
OR
PLA
NT
CH
EM
ICA
L C
OM
PA
NY
OK
2008
-100
-C P
SD
2/23
/200
9C
OO
LIN
G
TOW
ER
#1
1.47
MM
GA
L/H
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
MIS
T E
LIM
INA
TOR
S1.
18LB
/H24
-HB
AC
T-P
SD
OK
-013
5P
RY
OR
PLA
NT
CH
EM
ICA
LP
RY
OR
PLA
NT
CH
EM
ICA
L C
OM
PA
NY
OK
2008
-100
-C P
SD
2/23
/200
9C
OO
LIN
G
TOW
ER
#2
2.4
MM
GA
L/H
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
MIS
T E
LIM
INA
TOR
S1.
92LB
/H24
-HO
UR
BA
CT-
PS
D
FL-0
316
LEVY
NU
CLE
AR P
LAN
TP
RO
GR
ESS
ENER
GY
FLO
RID
AFL
PS
D-F
L-40
3 (0
7500
88-0
01-A
C)
2/20
/200
9
Indu
stria
l P
roce
ss C
oolin
g To
wer
6000
00G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
rift e
limin
ator
s0.
0005
% D
RIF
T R
ATE
BA
CT-
PS
D
LA-0
230
FOR
MO
SA
PLA
STI
CS
- B
ATO
N R
OU
GE
PLA
NT
FOR
MO
SA
PLA
STI
CS
CO
RP
LAP
SD
-LA
-546
(M2)
2/18
/200
9
VC
M U
NIT
C
OO
LIN
G
TOW
ER
1540
00G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
GO
OD
DE
SIG
N,
MA
INTE
NA
NC
E A
ND
D
RIF
T E
LIM
INA
TOR
S0.
0006
LB/1
000
GA
LB
AC
T-P
SD
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CEN
TER
SOU
THEA
ST ID
AHO
EN
ERG
Y, L
LCID
P-20
08.0
066
2/10
/200
9
CO
OLI
NG
TO
WE
R,
SR
C22
1210
00G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T/M
IST
ELI
MIN
ATO
RS
0.00
05%
OF
TOTA
L C
IRC
FLO
WB
AC
T-P
SD
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CEN
TER
SOU
THEA
ST ID
AHO
EN
ERG
Y, L
LCID
P-20
08.0
066
2/10
/200
9
CO
OLI
NG
TO
WE
R,
SR
C22
1210
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT/
MIS
T E
LIM
INA
TOR
S0.
0005
% O
F TO
TAL
CIR
C F
LOW
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CEN
TER
SOU
THEA
ST ID
AHO
EN
ERG
Y, L
LCID
P-20
08.0
066
2/10
/200
9
ZLD
S
CO
OLI
NG
TO
WE
R,
SR
C30
985
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
DR
IFT/
MIS
T E
LIM
INA
TOR
S0.
001
% O
F TO
TAL
CIR
C F
LOW
BA
CT-
PS
D
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CEN
TER
SOU
THEA
ST ID
AHO
EN
ERG
Y, L
LCID
P-20
08.0
066
2/10
/200
9
ZLD
S
CO
OLI
NG
TO
WE
R,
SR
C30
985
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT/
MIS
T E
LIM
INA
TOR
S0.
001
% O
F TO
TAL
CIR
C F
LOW
BA
CT-
PS
D
OK
-012
9C
HO
UTE
AU
PO
WE
R
PLA
NT
AS
SO
CIA
TED
ELE
CTR
IC
CO
OP
ER
ATI
VE
INC
OK
2007
-115
-C(M
-1)
PS
D1/
23/2
009
CO
OLI
NG
TO
WE
R9
CE
LLS
Par
ticul
ate
mat
ter,
tota
l (T
PM
)D
RIF
T E
LIM
INA
TOR
S0.
4LB
/H/C
ELL
24-H
OU
R A
VB
AC
T-P
SD
*MO
-008
1A
ME
RIC
AN
EN
ER
GY
P
RO
DU
CE
RS
, IN
C.
AM
ER
ICA
N E
NE
RG
Y
PR
OD
UC
ER
S, I
NC
.M
O01
2009
-008
1/22
/200
9
Asp
irato
r, ca
scad
e dr
yer,
casc
ade
cool
er,
jet d
ryer
, hu
llose
nato
r, be
an c
rack
er,
seco
ndar
y as
pira
tor a
nd
hull
pelle
t co
oler
0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Con
trolle
d by
one
or m
ore
cycl
ones
. Th
ese
exha
usts
an
d ex
haus
t fro
m th
e fin
es
aspi
rato
r will
be
rout
ed to
th
e pl
ant e
xhau
st b
agho
use.
0.00
3G
R/D
SC
FTE
ST
ME
THO
D
AV
ER
AG
E
*MO
-008
1A
ME
RIC
AN
EN
ER
GY
P
RO
DU
CE
RS
, IN
C.
AM
ER
ICA
N E
NE
RG
Y
PR
OD
UC
ER
S, I
NC
.M
O01
2009
-008
1/22
/200
9
Mea
l dry
ing
deck
s (3
) and
m
eal c
oolin
g de
ck0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
Eac
h de
ck is
con
trolle
d by
a
min
imum
of o
ne c
yclo
ne.
0.00
5G
R/D
SC
FTE
ST
ME
THO
D
AV
ER
AG
EB
AC
T-P
SD
*MO
-008
1A
ME
RIC
AN
EN
ER
GY
P
RO
DU
CE
RS
, IN
C.
AM
ER
ICA
N E
NE
RG
Y
PR
OD
UC
ER
S, I
NC
.M
O01
2009
-008
1/22
/200
9C
oolin
g To
wer
s0
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
The
cool
ing
tow
ers
shal
l be
equi
pped
with
hig
h ef
ficie
ncy
drift
ele
imin
ator
s th
at a
re d
esig
ned
to re
duce
dr
ift to
less
than
0.0
01
perc
ent.
1050
PP
M T
DS
MO
NTH
LYB
AC
T-P
SD
OH
-031
7O
HIO
RIV
ER
CLE
AN
FU
ELS
, LLC
OH
IO R
IVE
R C
LEA
N F
UE
LS, L
LCO
H02
-228
9611
/20/
2008
CO
OLI
NG
TO
WE
RS
1204
25T/
H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
2.4
LB/H
FOR
EA
CH
OF
2 C
OO
LIN
G
TOW
ER
SB
AC
T-P
SD
MD
-004
0C
PV
ST
CH
AR
LES
CO
MP
ETI
TIV
E P
OW
ER
V
EN
TUR
ES
, IN
C./C
PV
MA
RY
LAN
D,
LLC
MD
CP
CN
CA
SE
NO
. 91
2911
/12/
2008
CO
OLI
NG
TO
WE
RP
artic
ulat
e M
atte
r (P
M)
0S
EE
NO
TEB
AC
T-P
SD
MD
-004
0C
PV
ST
CH
AR
LES
CO
MP
ETI
TIV
E P
OW
ER
V
EN
TUR
ES
, IN
C./C
PV
MA
RY
LAN
D,
LLC
MD
CP
CN
CA
SE
NO
. 91
2911
/12/
2008
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
0S
EE
NO
TEB
AC
T-P
SD
MD
-004
0C
PV
ST
CH
AR
LES
CO
MP
ETI
TIV
E P
OW
ER
V
EN
TUR
ES
, IN
C./C
PV
MA
RY
LAN
D,
LLC
MD
CP
CN
CA
SE
NO
. 91
2911
/12/
2008
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0S
EE
NO
TELA
ER
AR
-009
4JO
HN
W. T
UR
K J
R.
PO
WE
R P
LAN
TS
OU
THW
ES
T E
LEC
TRIC
PO
WE
R
CO
MP
AN
YA
R21
23-A
OP
-R0
11/5
/200
8C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.
0005
% D
RIF
T R
ATE
5.2
LB/H
3 H
OU
RB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S0.
0005
%
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8
GLU
TEN
N
EG
ATI
VE
C
ON
VE
Y /
CO
OLE
R31
250
LB/H
Par
ticul
ate
Mat
ter (
PM
)D
US
T C
OLL
EC
TOR
0.00
4G
R/D
SC
F
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8
GLU
TEN
N
EG
ATI
VE
C
ON
VE
Y /
CO
OLE
R31
250
LB/H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DU
ST
CO
LLE
CTO
R0.
004
GR
/DS
CF
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8
FIB
ER
FIR
ED
B
OIL
ER
S A
ND
G
ER
M
DR
YE
RS
/CO
OLE
R20
0M
MB
TU/H
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)FA
BR
IC F
ILTE
R0.
008
LB/M
MB
TU
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SO
ther
Cas
e-by
-C
ase
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8
FIB
ER
FIR
ED
B
OIL
ER
S A
ND
G
ER
M
DR
YE
RS
/CO
OLE
R20
0M
MB
TU/H
Par
ticul
ate
Mat
ter (
PM
)W
ET
SC
RU
BB
ER
AN
D
FAB
RIC
FIL
TER
0.01
2LB
/MM
BTU
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
A
ME
RIC
AS
, IN
C.
IAP
RO
JEC
T 08
-126
9/19
/200
8
FIB
ER
FIR
ED
B
OIL
ER
S A
ND
G
ER
M
DR
YE
RS
/CO
OLE
R20
0M
MB
TU/H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
SC
RU
BB
ER
AN
D F
AB
RIC
FI
LTE
R0.
012
LB/M
MB
TU
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
FL-0
304
CA
NE
ISLA
ND
PO
WE
R
PA
RK
FLO
RID
A M
UN
ICIP
AL
PO
WE
R
AG
EN
CY
(FM
PA
FLP
SD
-FL-
400
(097
0043
-014
-AC
)9/
8/20
08
AN
EIG
HT-
CE
LL
ME
CH
AN
ICA
L C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
0S
EE
NO
TEB
AC
T-P
SD
OK
-012
8M
ID A
ME
RIC
AN
STE
EL
RO
LLIN
G M
ILL
MID
AM
ER
ICA
N S
TEE
L A
ND
WIR
E
CO
MP
AN
YO
K20
03-1
06-C
(M-1
) P
SD
9/8/
2008
Coo
ling
Tow
ers
3000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
high
-effi
cien
cy d
raft
elim
inat
ors
0S
EE
NO
TEB
AC
T-P
SD
FL-0
303
FPL
WE
ST
CO
UN
TY
EN
ER
GY
CE
NTE
R U
NIT
3
FLO
RID
A P
OW
ER
AN
D L
IGH
T C
OM
PA
NY
(FP
&L)
FL09
9064
6-00
2-A
C
(PS
D-F
L-39
6)7/
30/2
008
ON
E 2
6-C
ELL
M
EC
HA
NIC
AL
DR
AFT
C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)
THE
PE
RM
ITTE
E S
HA
LL
CE
RTI
FY T
HA
T TH
E
CO
OLI
NG
TO
WE
R W
AS
C
ON
STR
UC
TED
TO
A
CH
IEV
E T
HE
SP
EC
IFIE
D
DR
IFT
RA
TE O
F N
O
MO
RE
TH
AN
0.0
005
PE
RC
EN
T O
F TH
E
CIR
CU
LATI
NG
WA
TER
FL
OW
RA
TE.
0.00
05%
WA
TER
FLO
W
RA
TEB
AC
T-P
SD
LA-0
136
PLA
QU
EM
INE
C
OG
EN
ER
ATI
ON
FA
CIL
ITY
THE
DO
W C
HE
MIC
AL
CO
MP
AN
YLA
PS
D-L
A-6
59(M
2)7/
23/2
008
CO
OLI
NG
TO
WE
R0.
01%
DR
IFT
RA
TE
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
GO
OD
OP
ER
ATI
NG
P
RA
CTI
CE
S1.
4LB
/HH
OU
RLY
M
AXI
MU
MB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
LA-0
229
SH
INTE
CH
P
LAQ
UE
MIN
E P
LAN
T 2
SH
INTE
CH
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
317/
10/2
008
EQ
T128
- C
OO
LIN
G
TOW
ER
(2M
-7)
1060
00G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
GO
OD
DE
SIG
N, G
OO
D
MA
INTE
NA
NC
E, A
ND
M
IST
ELI
MIN
ATO
RS
0.06
LB/M
MG
AL
BA
CT-
PS
D
LA-0
229
SH
INTE
CH
P
LAQ
UE
MIN
E P
LAN
T 2
SH
INTE
CH
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
317/
10/2
008
EQ
T120
C
OO
LIN
G
TOW
ER
(2C
-4)
3875
0G
AL/
MIN
Par
ticul
ate
mat
ter,
tota
l 10
μ (T
PM
10)
GO
OD
DE
SIG
NS
, GO
OD
M
AIN
TEN
AN
CE
, AN
D
MIS
T E
LIM
INA
TOR
S0.
08LB
/MM
GA
LB
AC
T-P
SD
LA-0
148
AC
TIV
ATE
D C
AR
BO
N
FAC
ILIT
YR
ED
RIV
ER
EN
VIR
ON
ME
NTA
L P
RO
DU
CTS
LLC
LAP
SD
-LA
-727
5/28
/200
8C
OO
LIN
G
TOW
ER
S10
750
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATI
ON
S
YS
TEM
0.41
LB/H
BA
CT-
PS
D
AL-
0242
TUS
CA
LOO
SA
R
EFI
NE
RY
HU
NT
RE
FIN
ING
CO
MP
AN
YA
LX0
63 T
HR
OU
GH
X0
725/
20/2
008
CO
OLI
NG
TO
WE
R &
amp;
S
TOR
AG
E
TAN
KS
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
US
E D
RIF
T E
LIM
INA
TOR
S
AS
OU
TLIN
ED
IN T
HE
R
BLC
.0
SE
E N
OTE
BA
CT-
PS
D
OH
-031
5
NE
W S
TEE
L IN
TER
NA
TIO
NA
L, IN
C.,
HA
VE
RH
ILL
NE
W S
TEE
L IN
TER
NA
TIO
NA
L,
INC
.O
H07
-005
875/
6/20
08C
OO
LIN
G
TOW
ER
S (1
2)14
4000
0G
AL/
HP
artic
ulat
e M
atte
r (P
M)
DR
IFT
ELI
MIN
ATO
RS
3.42
LB/H
FOR
ALL
12
CO
OLI
NG
TO
WE
RS
TO
GE
THE
RB
AC
T-P
SD
OH
-031
5
NE
W S
TEE
L IN
TER
NA
TIO
NA
L, IN
C.,
HA
VE
RH
ILL
NE
W S
TEE
L IN
TER
NA
TIO
NA
L,
INC
.O
H07
-005
875/
6/20
08C
OO
LIN
G
TOW
ER
S (1
2)14
4000
0G
AL/
H
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
DR
IFT
ELI
MIN
ATO
RS
3.42
LB/H
FOR
ALL
12
CO
OLI
NG
TO
WE
RS
TO
GE
THE
RLA
ER
OK
-012
4E
NID
NIT
RO
GE
N P
LAN
TK
OC
H N
ITR
OG
EN
CO
MP
AN
YO
K99
-092
-C(M
-2)
PS
D5/
1/20
08C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)H
IGH
-EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
0S
EE
NO
TEB
AC
T-P
SD
LA-0
224
AR
SE
NA
L H
ILL
PO
WE
R
PLA
NT
SO
UTH
WE
ST
ELE
CTR
IC P
OW
ER
C
OM
PA
NY
(SW
EP
CO
)LA
PS
D-L
A-7
263/
20/2
008
CO
OLI
NG
TO
WE
R14
0000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
US
E O
F M
IST
ELI
MIN
ATO
RS
1.4
LB/H
MA
XB
AC
T-P
SD
NV
-004
7N
ELL
IS A
IR F
OR
CE
B
AS
E99
CIV
IL E
NG
INE
ER
SQ
UA
DR
ON
O
F U
SA
FN
V11
42/
26/2
008
CO
OLI
NG
TO
WE
RS
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
LIM
IT O
F TO
TAL
DIS
SO
LVE
D S
OLI
DS
IN
THE
CIR
CU
LATI
NG
W
ATE
R T
O 0
.03
LBS
/GA
L,
LIM
IT O
F TH
RO
UG
HP
UT
TO 1
,200
GA
L/M
IN, A
ND
LI
MIT
OF
DR
IFT
PE
RC
EN
T TO
0.0
050.
051
LB/H
Oth
er C
ase-
by-
Cas
e
*MO
-007
9A
ME
RIC
AN
EN
ER
GY
P
RO
DU
CE
RS
, IN
C.
AM
ER
ICA
N E
NE
RG
Y
PR
OD
UC
ER
S, I
NC
.M
O01
2008
-011
1/25
/200
8C
oolin
g To
wer
0
Par
ticul
ate
mat
ter,
tota
l (T
PM
)
Hig
h ef
ficie
ncy
drift
el
imin
ator
s w
ith a
drif
t de
sign
to le
ss th
an 0
.001
pe
rcen
t. R
ecirc
ulat
ion
cann
ot e
xcee
d 99
0,00
0 ga
llons
per
hou
r and
TD
S
cann
ot e
xcee
d 10
50 p
pm.
0B
AC
T-P
SD
LA-0
221
LITT
LE G
YP
SY
G
EN
ER
ATI
NG
PLA
NT
EN
TER
GY
LO
UIS
IAN
A L
LCLA
PS
D-L
A-7
2011
/30/
2007
CO
OLI
NG
TO
WE
R50
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R W
ITH
A
99.
999%
CO
NTR
OL
EFF
ICIE
NC
Y0.
05LB
/HH
OU
RLY
M
AXI
MU
MB
AC
T-P
SD
WY
-006
4D
RY
FO
RK
STA
TIO
NB
AS
IN E
LEC
TRIC
PO
WE
R
CO
OP
ER
ATI
VE
WY
CT-
4631
10/1
5/20
07C
OO
LIN
G
TOW
ER
S
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
MIS
T E
LIM
INA
TOR
S-
0.00
5% D
RIF
T LO
SS
0.00
5%
DR
IFT
LOS
SB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
FL-0
299
CR
YS
TAL
RIV
ER
P
OW
ER
PLA
NT
PR
OG
RE
SS
EN
ER
GY
FLO
RID
A,
INC
FL01
7000
4-01
8-A
C
AN
D P
SD
-FL-
392
10/1
2/20
07C
OO
LIN
G
TOW
ER
S34
2306
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
0.00
05P
ER
CE
NT
BA
CT-
PS
D
AR
-010
0LI
ON
OIL
CO
MP
AN
YLI
ON
OIL
CO
MP
AN
YA
R86
8-A
OP
-R5
10/1
/200
7
#9 C
OO
LIN
G
TOW
ER
, SN
-85
3-9
10.5
BIL
LIO
N G
AL/
12-
MO
NTH
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S,
0.00
5%30
00
MG
/L T
DS
C
ON
CE
NTR
ATI
AN
NU
AL
AV
ER
AG
E,
MO
NIT
OR
ED
W
EE
KLY
BA
CT-
PS
D
NE
-004
6
AV
EN
TIN
E R
EN
EW
AB
LE
EN
ER
GY
- A
UR
OR
A
WE
ST
LLC
AV
EN
TIN
E R
EN
EW
AB
LE E
NE
RG
Y -
AU
RO
RA
WE
ST,
LLC
NE
CP
06-0
048
9/27
/200
7C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)M
IST
ELI
MIN
ATO
R0.
0005
%D
RIF
T LO
SS
BA
CT-
PS
D
ND
-002
4S
PIR
ITW
OO
D S
TATI
ON
GR
EA
T R
IVE
R E
NE
RG
YN
DP
TC07
026
9/14
/200
7C
OO
LIN
G
TOW
ER
8000
0G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)D
RIF
T E
LIM
INA
TOR
0.00
05
% C
OO
LIN
G
WA
TER
FL
OW
BA
CT-
PS
D
MN
-007
0M
INN
ES
OTA
STE
EL
IND
US
TRIE
S, L
LCM
N06
1000
67-0
019/
7/20
07C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)D
ES
IGN
ED
TO
MIN
IMIZ
E
DR
IFT
0.00
5%
DR
IFT
RA
TEB
AC
T-P
SD
MN
-007
0M
INN
ES
OTA
STE
EL
IND
US
TRIE
S, L
LCM
N06
1000
67-0
019/
7/20
07C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DE
SIG
NE
D T
O M
INIM
IZE
D
RIF
T0.
005
% D
RIF
T R
ATE
BA
CT-
PS
D
IA-0
089
HO
ME
LAN
D E
NE
RG
Y
SO
LUTI
ON
S, L
LC, P
N 0
6-67
2H
OM
ELA
ND
EN
ER
GY
S
OLU
TIO
NS
, LLC
, PN
06-
672
IA07
-A-9
55P
TO
07-
A-9
82P
8/8/
2007
CO
OLI
NG
TO
WE
R, F
80
(07-
A-9
79P
)50
000
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
DR
IFT
ELI
MIN
ATO
R /
DE
MIS
TER
0.00
05%
DR
IFT
LOS
SB
AC
TB
AC
T-P
SD
IA-0
089
HO
ME
LAN
D E
NE
RG
Y
SO
LUTI
ON
S, L
LC, P
N 0
6-67
2H
OM
ELA
ND
EN
ER
GY
S
OLU
TIO
NS
, LLC
, PN
06-
672
IA07
-A-9
55P
TO
07-
A-9
82P
8/8/
2007
CO
OLI
NG
TO
WE
R, F
80
(07-
A-9
79P
)50
000
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
R /
DE
MIS
TER
0.00
05%
DR
IFT
LOS
SB
AC
TB
AC
T-P
SD
IA-0
089
HO
ME
LAN
D E
NE
RG
Y
SO
LUTI
ON
S, L
LC, P
N 0
6-67
2H
OM
ELA
ND
EN
ER
GY
S
OLU
TIO
NS
, LLC
, PN
06-
672
IA07
-A-9
55P
TO
07-
A-9
82P
8/8/
2007
DD
GS
C
OO
LER
, S70
(0
7-A
-978
P)
80T/
H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
GH
OU
SE
0.00
4G
R/D
SC
FB
AC
TB
AC
T-P
SD
IA-0
089
HO
ME
LAN
D E
NE
RG
Y
SO
LUTI
ON
S, L
LC, P
N 0
6-67
2H
OM
ELA
ND
EN
ER
GY
S
OLU
TIO
NS
, LLC
, PN
06-
672
IA07
-A-9
55P
TO
07-
A-9
82P
8/8/
2007
DD
GS
C
OO
LER
, S70
(0
7-A
-978
P)
80T/
HP
artic
ulat
e M
atte
r (P
M)
BA
GH
OU
SE
0.00
4G
R/D
SC
FB
AC
TB
AC
T-P
SD
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
IND
US
TRIA
L C
OO
LIN
G
TOW
ER
1500
00G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S0.
0005
%
EFF
. DR
IFT
ELI
MIN
A
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
IND
US
TRIA
L C
OO
LIN
G
TOW
ER
1500
00G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
05%
EFF
. DR
IFT
ELI
MIN
AV
ER
AG
E O
F 3
TES
T R
UN
SB
AC
T-P
SD
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
DD
GS
C
OO
LER
140
T/H
OF
DR
Y
FEE
DP
artic
ulat
e M
atte
r (P
M)
BA
GH
OU
SE
0.00
4G
R/D
SC
FA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
DD
GS
C
OO
LER
140
T/H
OF
DR
Y
FEE
D
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
GH
OU
SE
0.00
4G
R/D
SC
FA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
GE
RM
D
RY
ER
S A
ND
C
OO
LER
S15
T/H
Par
ticul
ate
Mat
ter (
PM
)C
YC
LON
E A
ND
WE
T S
CR
UB
BE
R0.
01G
R/D
SC
FA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SA
RC
HE
R D
AN
IELS
MID
LAN
DIA
57-0
1-08
06/
29/2
007
GE
RM
D
RY
ER
S A
ND
C
OO
LER
S15
T/H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
CY
CLO
NE
AN
D W
ET
SC
RU
BB
ER
0.01
GR
/DS
CF
AV
ER
AG
E O
F 3
TES
T R
UN
SB
AC
T-P
SD
IA-0
092
SO
UTH
WE
ST
IOW
A
RE
NE
WA
BLE
EN
ER
GY
SO
UTH
WE
ST
IOW
A R
EN
EW
AB
LE
EN
ER
GY
IA06
-A-5
71P
TH
RU
06
-A-5
90P
4/19
/200
7D
DG
S
CO
OLE
R50
T/H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
BA
GH
OU
SE
0.00
4G
R/D
SC
F3-
HO
UR
A
VE
RA
GE
BA
CT-
PS
D
IA-0
092
SO
UTH
WE
ST
IOW
A
RE
NE
WA
BLE
EN
ER
GY
SO
UTH
WE
ST
IOW
A R
EN
EW
AB
LE
EN
ER
GY
IA06
-A-5
71P
TH
RU
06
-A-5
90P
4/19
/200
7C
OO
LIN
G
TOW
ER
S30
0000
0G
AL/
H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
MIS
T E
LIM
INA
TOR
0.0
05%
3.12
LB/H
3-H
OU
R
AV
ER
AG
EB
AC
T-P
SD
LA-0
211
GA
RY
VIL
LE R
EFI
NE
RY
MA
RA
THO
N P
ETR
OLE
UM
CO
LLC
LAP
SD
-LA
-719
12/2
7/20
06
CO
OLI
NG
TO
WE
R N
OS
. 1
&am
p; 2
(24-
08 &
amp;
32-
08) &
amp;
H
YD
RO
GE
N
PLA
NT
CO
OLI
NG
TO
WE
R (5
3-08
)
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
HIG
H E
FFIC
IEN
CY
DR
IFT
ELI
MIN
ATO
RS
0.00
5P
ER
CE
NT
DR
IFT
RA
TEB
AC
T-P
SD
FL-0
294
AN
CLO
TE P
OW
ER
PL
ANT
PR
OG
RES
S EN
ERG
Y F
LOR
IDA
FL10
1001
7-00
8-AC
12/2
2/20
06C
OO
LIN
G
TOW
ER
S66
0000
GA
L/M
INP
artic
ulat
e M
atte
r (P
M)
DR
IFT
ELI
MIN
ATO
RS
108
T/Y
RB
AC
T-P
SD
FL-0
284
HIL
LSB
OR
OU
GH
C
OU
NTY
RE
SO
UR
CE
R
EC
OV
ER
Y F
AC
ILIT
YD
EP
AR
TME
NT
OF
SO
LID
WA
STE
M
AN
AG
EM
EN
TFL
PS
D-F
L-36
9 A
ND
05
7026
1-00
7-A
C11
/3/2
006
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
1%
DR
IFT
RA
TEB
AC
T-P
SD
OH
-030
3A
SA
BLO
OM
ING
BU
RG
, LL
CA
SA
LLIA
NC
E B
IOFU
ELS
, LLC
OH
01-0
1306
8/10
/200
6C
OO
LIN
G
TOW
ER
3300
000
GA
L/H
Par
ticul
ate
Mat
ter (
PM
)
PA
RA
ME
TRIC
M
ON
ITO
RIN
G O
F TH
E
D
RIF
T E
LIM
INAT
OR
.M
AXI
MU
M D
RIF
T LO
SS
FA
CTO
R O
F 0.
005%
2.64
LB/H
BA
T (N
on-U
S
ON
LY)
WV
-002
4
WE
STE
RN
G
RE
EN
BR
IER
CO
-G
EN
ER
ATI
ON
, LLC
WE
STE
RN
GR
EE
NB
RIE
R C
O-
GE
NE
RA
TIO
N, L
LCW
VR
14-0
028
4/26
/200
6C
OO
LIN
G
TOW
ER
5500
0G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S @
0.
0005
% D
RIF
T R
ATE
0.79
LB/H
BA
CT-
PS
D
IA-0
082
GO
LDE
N G
RA
IN
EN
ER
GY
GO
LDE
N G
RA
IN E
NE
RG
YIA
03-A
-600
P-S
24/
19/2
006
DD
GS
C
OO
LER
5000
LB/H
Par
ticul
ate
Mat
ter (
PM
)C
YC
LON
E0.
54LB
/H3
HO
UR
A
VE
RA
GE
BA
CT-
PS
D
IA-0
082
GO
LDE
N G
RA
IN
EN
ER
GY
GO
LDE
N G
RA
IN E
NE
RG
YIA
03-A
-600
P-S
24/
19/2
006
DD
GS
C
OO
LER
5000
LB/H
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
CY
CLO
NE
0.54
LB/H
3 H
OU
R
AV
ER
AG
EB
AC
T-P
SD
IA-0
082
GO
LDE
N G
RA
IN
EN
ER
GY
GO
LDE
N G
RA
IN E
NE
RG
YIA
03-A
-600
P-S
24/
19/2
006
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
MIS
T E
LIM
INA
TOR
1.33
LB/H
3 H
OU
R
AV
ER
AG
EB
AC
T-P
SD
TX-0
507
NR
G C
OA
L H
AN
DLI
NG
P
LAN
TN
RG
TE
XAS
TXP
SD
-TX
371M
4 A
ND
857
94/
13/2
006
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
5.78
LB/H
BA
CT-
PS
D
FL-0
293
CR
YS
TAL
RIV
ER
PO
WE
R P
LAN
TP
RO
GR
ESS
ENER
GY
FLO
RID
AFL
0710
004-
010
4/4/
2006
PO
RTA
BLE
C
OO
LIN
G
TOW
ER
1800
00G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S0.
0015
% D
RIF
T R
ATE
2920
HO
UR
S
PE
R Y
EA
RB
AC
T-P
SD
IL-0
102
AV
EN
TIN
E R
EN
EW
AB
LE
EN
ER
GY
, IN
C.
AV
EN
TIN
E R
EN
EW
AB
LE E
NE
RG
Y,
INC
.IL
5010
062
11/1
/200
5C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
0.00
5%
DR
IFT
LOS
SB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
IL-0
102
AV
EN
TIN
E R
EN
EW
AB
LE
EN
ER
GY
, IN
C.
AV
EN
TIN
E R
EN
EW
AB
LE E
NE
RG
Y,
INC
.IL
5010
062
11/1
/200
5
FEE
D
CO
OLI
NG
/ TR
AN
SP
OR
T S
YS
TEM
Par
ticul
ate
Mat
ter (
PM
)B
AG
HO
US
E0.
005
GR
/SC
FB
AC
T-P
SD
OR
-004
1W
AN
AP
A E
NE
RG
Y
CE
NTE
RD
IAM
ON
D W
AN
AP
A I,
L.P
.O
RR
10P
SD
-OR
-05-
018/
8/20
05C
OO
LIN
G
TOW
ER
6.2
CF/
SE
CP
artic
ulat
e M
atte
r (P
M)
INS
TALL
ATI
ON
OF
HIG
H
EFF
ICIE
NC
Y 0
.000
5%
DR
IFT
ELI
MIN
ATO
RS
. LI
MIT
TO
TAL
DIS
SO
LVE
D
SO
LID
S IN
TH
E W
ATE
R
TO L
ESS
THAN
3,5
32
PP
MW
.35
32P
PM
WS
OLI
DS
IN
MIS
TB
AC
T-P
SD
CO
-005
7C
OM
AN
CH
E S
TATI
ON
PU
BLI
C S
ER
VIC
E C
OM
PA
NY
OF
CO
LOR
AD
OC
O04
UN
ITP
B10
157/
5/20
05C
OO
LIN
G
TOW
ER
1406
50G
AL/
MIN
Par
ticul
ate
Mat
ter (
PM
)
DR
IFT
ELI
MIN
ATO
RS
TO
AC
HIE
VE 0
.000
5 %
DR
IFT
OR
LE
SS
.0
SE
E N
OTE
BA
CT-
PS
D
CO
-005
7C
OM
AN
CH
E S
TATI
ON
PU
BLI
C S
ER
VIC
E C
OM
PA
NY
OF
CO
LOR
AD
OC
O04
UN
ITP
B10
157/
5/20
05C
OO
LIN
G
TOW
ER
1406
50G
AL/
MIN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
TO
AC
HIE
VE 0
.000
5% D
RIF
T O
R L
ES
S0
SE
E N
OTE
BA
CT-
PS
D
LA-0
192
CR
ES
CE
NT
CIT
Y
POW
ER
CR
ESEN
T C
ITY
PO
WER
, LLC
LAPS
D-L
A-70
46/
6/20
05
CH
ILLE
R
CO
OLI
NG
TO
WE
R35
000
GA
L H
20/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
1.75
LB/H
HO
UR
LY
MA
XIM
UM
BA
CT-
PS
D
LA-0
192
CR
ES
CE
NT
CIT
Y
POW
ER
CR
ESEN
T C
ITY
PO
WER
, LLC
LAPS
D-L
A-70
46/
6/20
05
MA
IN
CO
OLI
NG
TO
WE
R29
0200
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
MA
RLE
Y E
XCE
L D
RIF
T E
LIM
INA
TOR
S2.
61LB
/HH
OU
RLY
M
AXI
MU
MB
AC
T-P
SD
IN-0
119
AU
BU
RN
NU
GG
ET
AU
BU
RN
NU
GG
ET
IN03
3-19
475-
0009
25/
31/2
005
CO
OLI
NG
TO
WE
R23
450
GA
L/M
IN
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)0.
005
% O
F TH
RO
UG
HP
UT
BA
CT-
PS
D
NV
-003
6TS
PO
WE
R P
LAN
TN
EW
MO
NT
NE
VA
DA
EN
ER
GY
IN
VEST
MEN
T, L
LCN
VAP
4911
-134
95/
5/20
05C
OO
LIN
G
TOW
ER
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
DR
IFT
ELI
MIN
ATO
RS
0.00
05P
ER
CE
NT
DR
IFT
BA
CT-
PS
D
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
RIZ
ON
A C
LEA
N F
UE
LS Y
UM
A
LLC
AZ
1001
205
4/14
/200
5C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)H
IGH
EFF
ICIE
NC
Y D
RIF
T E
LIM
INA
TOR
S1.
6LB
/HB
AC
T-P
SD
NY
-009
3
TRIG
EN
-NA
SS
AU
E
NE
RG
Y
CO
RP
OR
ATI
ON
TRIG
EN
-NA
SS
AU
EN
ER
GY
C
OR
PO
RA
TIO
NN
Y1-
2820
-01
015/
0000
93/
31/2
005
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
0.00
05%
DR
IFT
BA
CT-
PS
D
TX-0
487
RO
HM
AN
D H
AA
S
CH
EM
ICA
LS L
LC L
ON
E
STA
R P
LAN
TR
OH
M A
ND
HA
AS
TE
XAS
IN
CO
RP
OR
ATI
ON
TXP
SD
-TX-
828M
13/
24/2
005
N-5
CO
OLI
NG
TO
WE
R
NO
RTH
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S2.
04LB
/HB
AC
T-P
SD
TX-0
487
RO
HM
AN
D H
AA
S
CH
EM
ICA
LS L
LC L
ON
E
STA
R P
LAN
TR
OH
M A
ND
HA
AS
TE
XAS
IN
CO
RP
OR
ATI
ON
TXP
SD
-TX-
828M
13/
24/2
005
N-5
CO
OLI
NG
TO
WE
R
SO
UTH
Par
ticul
ate
Mat
ter (
PM
)D
RIF
T E
LIM
INA
TOR
S2.
84LB
/HB
AC
T-P
SD
TX-0
487
RO
HM
AN
D H
AA
S
CH
EM
ICA
LS L
LC L
ON
E
STA
R P
LAN
TR
OH
M A
ND
HA
AS
TE
XAS
IN
CO
RP
OR
ATI
ON
TXP
SD
-TX-
828M
13/
24/2
005
N-7
CO
OLI
NG
TO
WE
RP
artic
ulat
e M
atte
r (P
M)
DR
IFT
ELI
MIN
ATO
RS
7.65
LB/H
BA
CT-
PS
D
NE
-003
1O
PP
D -
NE
BR
AS
KA
C
ITY
STA
TIO
NO
MA
HA
PU
BLI
C P
OW
ER
D
ISTR
ICT
NE
5834
3C01
3/9/
2005
CO
OLI
NG
TO
WE
R
Par
ticul
ate
mat
ter,
filte
rabl
e 10
μ (F
PM
10)
0.00
1LB
/HB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
ACT/
BAC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
3, 2
015
Coo
ling
Tow
erPr
oces
s Ty
pe 9
9.10
0 an
d 99
.999
Prop
osed
Em
issi
on L
imit:
Mis
t Elim
inat
or w
ith 0
.000
5% d
rift r
ate
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or C
ompa
ny N
ame
Faci
lity
Stat
ePe
rmit
Num
ber
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on
Lim
itEm
issi
on
Lim
it U
nit
Emis
ison
Lim
it Av
erag
ing
Tim
eC
ase
By
Cas
e B
asis
WA
-032
9
DA
RR
ING
TON
EN
ER
GY
C
OG
EN
ER
ATI
ON
P
OW
ER
PLA
NT
DA
RR
ING
TON
EN
ER
GY
LLC
WA
PS
D 0
3-04
2/11
/200
5C
OO
LIN
G
TOW
ER
Par
ticul
ate
Mat
ter (
PM
)
INS
TALL
ATI
ON
OF
DR
IFT
ELI
MIN
ATO
RS
WIT
H
DR
IFT
LOS
S O
F LE
SS
TH
AN
0.0
01%
OF
THE
R
EC
IRC
ULA
TIN
G W
ATE
R
FLO
W R
ATE
.0
SE
E N
OTE
BA
CT-
PS
D
WA
-032
8
BP
CH
ER
RY
PO
INT
CO
GE
NE
RA
TIO
N
PR
OJE
CT
BP
WE
ST
CO
AS
T P
RO
DU
CTS
, LL
CW
AE
FSE
C/2
002-
011/
11/2
005
CO
OLI
NG
TO
WE
RP
artic
ulat
e M
atte
r (P
M)
INS
TALL
ATI
ON
OF
DR
IFT
ELI
MIN
ATO
RS
WIT
H
DR
IFT
LOS
S O
F LE
SS
TH
AN
0.0
01%
OF
THE
R
EC
IRC
ULA
TIN
G W
ATE
R
FLO
W R
ATE
.0
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
*TX
-067
1P
RO
JEC
TJU
MB
OTX
TEX
AS
CO
MM
ISS
ION
O
N E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1084
46/P
SD
TX
1352
12/1
/201
4E
ngin
es
ultra
low
su
lfur d
iese
l fu
el0
Nitr
ogen
Oxi
des
(NO
x)
Eac
h em
erge
ncy
gene
rato
r's
emis
sion
fact
or is
bas
ed o
n E
PA
's
Tier
2 s
tand
ards
at 4
0CFR
89.1
12
for N
Ox
5.43
G/K
W-H
RB
AC
T-P
SD
2.39
TPY
*AK
-008
2
PO
INT
THO
MS
ON
PR
OD
UC
TIO
NFA
CIL
ITY
AK
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5Fi
ne W
ater
P
umps
Ultr
a Lo
w
Sul
fur D
iese
l61
0hp
Nitr
ogen
Oxi
des
(NO
x)3
GR
AM
S/H
P-
HR
BA
CT-
PS
D0
*AK
-008
2
PO
INT
THO
MS
ON
PR
OD
UC
TIO
NFA
CIL
ITY
AK
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5E
mer
genc
y C
amp
Gen
erat
ors
Ultr
a Lo
w
Sul
fur D
iese
l26
95hp
Nitr
ogen
Oxi
des
(NO
x)4.
8G
RA
MS
/HP
-H
RB
AC
T-P
SD
0
*AK
-008
2
PO
INT
THO
MS
ON
PR
OD
UC
TIO
NFA
CIL
ITY
AK
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5
Bul
k Ta
nk
Gen
erat
orE
ngin
esU
ltra
Low
S
ulfu
r Die
sel
891
hpN
itrog
en O
xide
s (N
Ox)
4.8
GR
AM
S/H
P-
HR
BA
CT-
PS
D0
*WV
-002
5
MO
UN
DS
VIL
LEC
OM
BIN
ED
CY
CLE
PO
WE
R
PLA
NT
WV
WE
ST
VIR
GIN
IA D
EP
T.
OF
EN
VR
ION
ME
NTA
L P
RO
TEC
TIO
N; D
IV. O
F A
IR Q
UA
LITY
R14
-003
011
/21/
2014
Em
erge
ncy
Gen
erat
orD
iese
l20
15.7
HP
Nitr
ogen
Oxi
des
(NO
x)0
BA
CT-
PS
D0
*IL-
0114
CR
ON
US
CH
EM
ICA
LS,
LLC
ILIL
LIN
OIS
EP
A, B
UR
EA
U
OF
AIR
1306
0007
9/5/
2014
Em
erge
ncy
Gen
erat
ordi
still
ate
fuel
oi
l37
55H
PN
itrog
en O
xide
s (N
Ox)
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Ta
ble
7.0.
67G
/KW
-HR
BA
CT-
PS
D0
*PR
-000
9
EN
ER
GY
AN
SW
ER
SA
RE
CIB
OP
UE
RTO
RIC
O
RE
NE
WA
BLE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oi
l # 2
0N
itrog
en O
xide
s (N
Ox)
2.85
G/B
HP
-HR
BA
CT-
PS
D4.
2LB
/HR
*IN
-018
0
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
4.46
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
0
*IN
-018
5M
AG
PE
LLE
T LL
CIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IR18
1-33
965-
0005
44/
24/2
014
DIE
SE
L FI
RE
P
UM
PD
IES
EL
300
HP
Nitr
ogen
Oxi
des
(NO
x)3
G/H
P-H
BA
CT-
PS
D50
0H
*IN
-017
9
OH
IO V
ALL
EY
R
ES
OU
RC
ES
,LL
CIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IR14
7-32
322-
0006
29/
25/2
013
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Nitr
ogen
Oxi
des
(NO
x)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S4.
46G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D0
*IN
-017
3
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
4.46
G/B
HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
0
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
tD
rille
r 1D
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
turb
ocha
rger
w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
inje
ctio
n w
ith a
fterc
oole
r.12
.1G
/KW
-HR
24-H
OU
RR
OLL
ING
BA
CT-
PS
D0
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
C.R
. Lu
igs
Die
sel
5875
hpN
itrog
en O
xide
s (N
Ox)
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
turb
ocha
rger
w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
inje
ctio
n w
ith a
fterc
oole
r.18
.1G
/KW
-HR
24-H
OU
RR
OLL
ING
BA
CT-
PS
D0
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
*PA
-029
1
HIC
KO
RY
RU
N
EN
ER
GY
STA
TIO
NP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY37
-337
A4/
23/2
013
EM
ER
GE
NC
YG
EN
ER
ATO
R
Ultr
a Lo
w
sulfu
rD
istil
late
7.8
MM
BTU
/HN
itrog
en O
xide
s (N
Ox)
9.89
LB/H
OTH
ER
CA
SE
-B
Y-C
AS
E0.
49T/
YR
12-M
ON
TH R
OLL
ING
TO
TAL
*IN
-016
6
IND
IAN
AG
AS
IFIC
ATI
ON
,LL
CIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IRT1
47-3
0464
-00
060
6/27
/201
2
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R,
EA
CH
Nitr
ogen
Oxi
des
(NO
x)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D L
IMIT
ED
H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
O
PE
RA
TIO
N0
BA
CT-
PS
D0
*IN
-016
6
IND
IAN
AG
AS
IFIC
ATI
ON
,LL
CIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IRT1
47-3
0464
-00
060
6/27
/201
2
THR
EE
(3)
FIR
EW
ATE
RP
UM
P E
NG
INE
SD
IES
EL
575
HO
RS
EP
OW
ER
,E
AC
HN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D L
IMIT
ED
H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
O
PE
RA
TIO
N0
BA
CT-
PS
D0
*PA
-029
2
ML
35
LLC
/PH
ILA
CY
BE
RC
EN
TER
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY09
-014
2B6/
1/20
12
DIE
SE
LG
EN
ER
ATO
R(2
.25
MW
EA
CH
) - 5
UN
ITS
#2 O
il0
Nitr
ogen
Oxi
des
(NO
x)S
CR
0.67
GR
AM
S/K
W-H
OTH
ER
CA
SE
-B
Y-C
AS
E0.
41T/
YR
12-M
ON
TH R
OLL
ING
S
UM
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
YC
EN
TER
, LLC
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Nitr
ogen
Oxi
des
(NO
x)C
OM
BU
STI
ON
DE
SIG
N
CO
NTR
OLS
AN
D U
SA
GE
LIM
ITS
4.8
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D50
0H
OU
RS
OF
OP
ER
ATI
ON
YE
ALR
Y
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
YC
EN
TER
, LLC
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
PN
itrog
en O
xide
s (N
Ox)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E L
IMIT
S4.
8G
/HP
-H3
HO
UR
SB
AC
T-P
SD
500
HO
UR
S O
F O
PE
RA
TIO
NY
EA
RLY
*OH
-035
2
OR
EG
ON
CLE
AN
EN
ER
GY
C
EN
TER
OH
OH
IO E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1084
06/
18/2
013
Em
erge
ncy
gene
rato
rdi
esel
2250
KW
Nitr
ogen
Oxi
des
(NO
x)P
urch
ased
cer
tifie
d to
the
stan
dard
s in
NS
PS
Sub
part
IIII
27.8
LB/H
BA
CT-
PS
D6.
95T/
YR
PE
R R
OLL
ING
12-
MO
NTH
S
*CA
-121
9
CIT
Y O
F S
AN
D
IEG
O P
UD
(P
UM
P S
TATI
ON
1)
CA
SA
N D
IEG
O C
OU
NTY
A
PC
D, C
A20
12--
AP
P-
0020
097/
9/20
12IC
eng
ine
dies
el27
22bh
pN
itrog
en O
xide
s (N
Ox)
Tier
2 c
ertif
ied
engi
ne a
nd 5
0 hr
/yr
for M
&T
4G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E0
*CA
-122
1P
AC
IFIC
BE
LLC
AS
AN
DIE
GO
CO
UN
TY
AP
CD
, CA
2011
-AP
P-
0017
7612
/5/2
011
ICE
:Em
erge
ncy-
Com
pres
sion
Igni
tion
dies
el36
34bh
pN
itrog
en O
xide
s (N
Ox)
Tier
2 c
ertif
ied
and
50 h
r/yr f
or
M&
T lim
it3.
5G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E0
*CA
-122
0
SA
N D
IEG
O
INTE
RN
ATI
ON
AL
AIR
PO
RT
CA
SA
N D
IEG
O C
OU
NTY
A
PC
D, C
A20
11-A
PP
-00
1787
10/3
/201
1
ICE
:Em
erge
ncy-
Com
pres
sion
Igni
tion
dies
el18
81B
HP
Nitr
ogen
Oxi
des
(NO
x)Ti
er 2
cer
tifie
d an
d 50
hr/y
M&
T lim
it3.
9G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E0
PA
-027
8
MO
XIE
LIB
ER
TY
LLC
/AS
YLU
MP
OW
ER
PL
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY08
·000
45A
10/1
0/20
12E
mer
genc
yG
ener
ator
Die
sel
0N
itrog
en O
xide
s (N
Ox)
4.93
G/B
-HP
-HO
THE
R C
AS
E-
BY
-CA
SE
0
*MI-0
402
SU
MP
TER
PO
WE
R P
LAN
TM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne (R
ICE
)D
iese
l73
2H
PN
itrog
en O
xide
s (N
Ox)
Goo
d co
mbu
stio
n pr
actic
es4.
85G
/HP
-HTE
ST
BA
CT-
PS
D0
CA
-121
2
PA
LMD
ALE
HY
BR
ID P
OW
ER
P
RO
JEC
TC
AE
PA
RE
GIO
N IX
SE
09-
0110
/18/
2011
EM
ER
GE
NC
Y IC
E
NG
INE
DIE
SE
L26
83H
PN
itrog
en O
xide
s (N
Ox)
6.4
G/K
W-H
3-H
R A
VG
BA
CT-
PS
D4.
8G
/HP
-H3-
HR
AV
G
CA
-121
3
MO
UN
TAIN
VIE
W P
OW
ER
C
OM
PA
NY
LLC
CA
EP
A R
EG
ION
IXS
E 0
4-01
4/21
/200
6
EM
ER
GE
NC
YP
OW
ER
IC
EN
GIN
ED
IES
EL
2155
BH
PN
itrog
en O
xide
s (N
Ox)
0B
AC
T-P
SD
0
*SC
-013
2
AR
GO
SH
AR
LEY
VIL
LEP
LAN
TS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0900
-000
4-E
F-R
212
/14/
2007
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
1000
KW
Nitr
ogen
Oxi
des
(NO
x)0
BA
CT-
PS
D0
CA
-119
1
VIC
TOR
VIL
LE 2
H
YB
RID
PO
WE
R
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
7-02
3/11
/201
0E
ME
RG
EN
CY
EN
GIN
ED
IES
EL
2000
KW
Nitr
ogen
Oxi
des
(NO
x)O
PE
RA
TIO
NA
L R
ES
TRIC
TIO
N
OF
50 H
R/Y
R6
G/K
W-H
BA
CT-
PS
D4.
5G
/HP
-H
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
IA-0
105
IOW
AFE
RTI
LIZE
RC
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
HN
itrog
en O
xide
s (N
Ox)
good
com
bust
ion
prac
tices
6G
/KW
-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D6.
61TO
NS
/YR
RO
LLIN
G 1
2 M
ON
TH
TOTA
L
MI-0
395
WA
RR
EN
TEC
HN
ICA
LC
EN
TER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
160-
11A
7/13
/201
2
Nin
e (9
) DR
UP
S
Em
erge
ncy
Gen
erat
ors
Die
sel
3010
KW
Nitr
ogen
Oxi
des
(NO
x)
No
add-
on c
ontro
ls, b
ut ig
nitio
n tim
ing
reta
rdat
ion
(ITR
) is
good
de
sign
. E
ngin
es a
re tu
ned
for l
ow-
NO
x op
erat
ion
vers
us lo
w C
O
oper
atio
n.5.
98G
/KW
-H
EA
CH
GE
NE
RA
TOR
EN
GIN
EB
AC
T-P
SD
0
MI-0
395
WA
RR
EN
TEC
HN
ICA
LC
EN
TER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
160-
11A
7/13
/201
2
Four
(4)
Em
erge
ncy
Gen
erat
ors
Die
sel
2500
KW
Nitr
ogen
Oxi
des
(NO
x)
No
add-
on c
ontro
l, bu
t ign
ition
tim
ing
reta
rdat
ion
(ITR
) is
good
de
sign
. E
ngin
es a
re tu
ned
for l
ow-
NO
x op
erat
ion
vers
us lo
w C
O
oper
atio
n.7.
13G
/KW
-H
EA
CH
GE
NE
RA
TOR
EN
GIN
EB
AC
T-P
SD
0
*WY
-007
0
CH
EY
EN
NE
PR
AIR
IEG
EN
ER
ATI
NG
STA
TIO
NW
YW
YO
MIN
G A
IR Q
UA
L D
IVIS
ION
, AIR
QU
ALI
TYC
T-12
636
8/28
/201
2D
iese
l Em
erge
ncy
Gen
erat
or (E
P15
)U
ltra
Low
S
ulfu
r Die
sel
839
hpN
itrog
en O
xide
s (N
Ox)
EP
A T
ier 2
rate
d0
BA
CT-
PS
D0
AK
-007
6
PO
INT
THO
MS
ON
PR
OD
UC
TIO
NFA
CIL
ITY
AK
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T01
8/20
/201
2C
ombu
stio
n of
D
iese
l by
ICE
sU
LSD
1750
kWN
itrog
en O
xide
s (N
Ox)
6.4
G/K
W-H
BA
CT-
PS
D0
MI-0
394
WA
RR
EN
TEC
HN
ICA
LC
EN
TER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
160-
112/
29/2
012
Nin
e (9
) DR
UP
S
Em
erge
ncy
Gen
erat
ors
Die
sel
3010
KW
Nitr
ogen
Oxi
des
(NO
x)
No
add-
on c
ontro
ls, b
ut ig
nitio
n tim
ing
reta
rdat
ion
(ITR
) is
good
de
sign
. E
ngin
es a
re tu
ned
for l
ow-
NO
x op
erat
ion
vers
us lo
w C
O
oper
atio
n.5.
98G
/KW
-H
EA
CH
GE
NE
RA
TOR
EN
GIN
EB
AC
T-P
SD
0
MI-0
394
WA
RR
EN
TEC
HN
ICA
LC
EN
TER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
160-
112/
29/2
012
Four
(4)
Em
erge
ncy
Gen
erat
ors
Die
sel
2280
KW
Nitr
ogen
Oxi
des
(NO
x)
No
add-
on c
ontro
ls, b
ut ig
nitio
n tim
ing
reta
rdat
ion
(ITR
) is
good
de
sign
. E
ngin
es a
re tu
ned
for l
ow-
NO
x op
erat
ion
vers
us lo
w C
O
oper
atio
n.6.
93G
/KW
-H
EA
CH
GE
NE
RA
TOR
EN
GIN
EB
AC
T-P
SD
0
SC
-011
5G
PC
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0680
-004
6-C
B2/
10/2
009
FIR
E W
ATE
R
DIE
SE
L P
UM
PD
IES
EL
525
HP
Nitr
ogen
Oxi
des
(NO
x)
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E
PLA
N.
5.9
LB/H
BA
CT-
PS
D1.
47T/
YR
SC
-011
5G
PC
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0680
-004
6-C
B2/
10/2
009
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PN
itrog
en O
xide
s (N
Ox)
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E
PLA
N.
11.4
1LB
/HB
AC
T-P
SD
2.85
T/Y
R
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
0-C
B11
/25/
2008
FIR
E W
ATE
R
DIE
SE
L P
UM
PD
IES
EL
525
HP
Nitr
ogen
Oxi
des
(NO
x)
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E
PLA
N.
5.9
LB/H
BA
CT-
PS
D1.
47T/
YR
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
0-C
B11
/25/
2008
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PN
itrog
en O
xide
s (N
Ox)
11.4
1LB
/HB
AC
T-P
SD
2.85
T/Y
R
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
DC
OG
EN
ER
ATI
ON
PLA
NT
FL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
600
HP
E
mer
genc
yE
quip
men
tU
ltra-
Low
Sul
fur O
il0
Nitr
ogen
Oxi
des
(NO
x)S
ee P
ollu
tant
Not
es.
3G
/HP
-HB
AC
T-P
SD
0
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
DC
OG
EN
ER
ATI
ON
PLA
NT
FL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
2000
KW
E
mer
genc
yE
quip
men
t0
Nitr
ogen
Oxi
des
(NO
x)S
ee P
ollu
tant
Not
es.
6.4
G/K
W-H
BA
CT-
PS
D0
SC
-011
3P
YR
AM
AX
CE
RA
MIC
S, L
LCS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
32/
8/20
12
EM
ER
GE
NC
YG
EN
ER
ATO
RS
1
THR
U 8
DIE
SE
L75
7H
PN
itrog
en O
xide
s (N
Ox)
EN
GIN
ES
MU
ST
BE
CE
RTI
FIE
D
TO C
OM
PLY
WIT
H N
SP
S,
SU
BP
AR
T III
I.4
GR
/KW
-HB
AC
T-P
SD
0
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
AK
-007
3
INTE
RN
ATI
ON
AL
STA
TIO
N
PO
WE
R P
LAN
TA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q01
64C
PT0
112
/20/
2010
Fuel
Com
bust
ion
Die
sel
1500
kW-e
Nitr
ogen
Oxi
des
(NO
x)
Bla
ck S
tart
dies
el fi
red
engi
ne E
U
13 s
hall
be e
quip
ped
with
turb
o ch
argi
ng a
nd a
fter c
oolin
g. T
he
turb
o ch
arge
r red
uces
NO
x em
issi
ons
by b
oost
ing
the
pres
sure
an
d te
mpe
ratu
re o
f the
air
ente
ring
the
engi
ne a
llow
ing
mor
e fu
el to
be
adde
d to
incr
ease
pow
er o
utpu
t. Th
is tr
ansl
ates
into
hig
her
com
bust
ion
effic
ienc
y an
d re
duce
d em
issi
ons.
6.4
G/K
W-H
BA
CT-
PS
D0
*FL-
0328
EN
I - H
OLY
C
RO
SS
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y Fi
re
Pum
p E
ngin
eD
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e0.
02TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D0
*FL-
0328
EN
I - H
OLY
C
RO
SS
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
yE
ngin
eD
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e0.
4TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D0
*FL-
0328
EN
I - H
OLY
C
RO
SS
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
1 a
nd 2
)D
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of c
ertif
ied
EP
A T
ier 1
eng
ines
an
d go
od c
ombu
stio
n pr
actic
es
base
d on
the
curr
ent
man
ufac
ture
r?s
spec
ifica
tions
for
this
eng
ine.
9.5
TON
S P
ER
Y
EA
R12
-MO
NTH
RO
LLIN
GB
AC
T-P
SD
0
*FL-
0328
EN
I - H
OLY
C
RO
SS
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
3 a
nd 4
)D
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e9.
7T/
YR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D0
*FL-
0328
EN
I - H
OLY
C
RO
SS
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0N
itrog
en O
xide
s (N
Ox)
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
ies e
Eng
ines
with
Tur
boch
arge
rs
(DE
WT)
mea
sure
men
t sys
tem
.12
.7G
/KW
-H24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
0
FL-0
327
AN
AD
AR
KO
- P
HE
ON
IXP
RO
SP
EC
TFL
EP
A R
EG
ION
IVO
CS
-EP
A-
R40
056/
13/2
011
Em
erge
ncy
Eng
ine
Die
sel
0N
itrog
en O
xide
s (N
Ox)
Lim
ited
use
of 2
4 ho
urs/
wee
k an
d re
cord
keep
ing
of o
pera
tion.
9.4
TON
S P
ER
P
RO
JEC
TB
AC
T-P
SD
0
FL-0
327
AN
AD
AR
KO
- P
HE
ON
IXP
RO
SP
EC
TFL
EP
A R
EG
ION
IVO
CS
-EP
A-
R40
056/
13/2
011
Mai
n P
ropu
lsio
n E
ngin
esD
iese
l0
Nitr
ogen
Oxi
des
(NO
x)
Use
of g
ood
com
bust
ion
and
mai
nten
ance
pra
ctic
es, P
ower
M
anag
emen
t Sys
tem
, and
NO
x C
once
ntra
tion
Mai
nten
ance
Sys
tem
as d
escr
ibed
in th
e O
CS
per
mit
appl
icat
ion.
12.7
G/K
W-H
24-H
OU
RR
OLL
ING
BA
CT-
PS
D0
AK
-007
2
DU
TCH
HA
RB
OR
PO
WE
R P
LAN
TA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q02
15C
PT0
37/
14/2
011
EU
15
Cat
erpi
llar
C-2
80-1
6U
LSD
4400
KW
Nitr
ogen
Oxi
des
(NO
x)
Eng
ine
has
turb
o ch
arge
r and
afte
r co
oler
inst
alle
d as
par
t of t
he
desi
gn9.
8G
/KW
-HIN
STA
NTA
NE
OU
SB
AC
T-P
SD
0
*SD
-000
5D
EE
R C
RE
EK
S
TATI
ON
SD
SO
UTH
DA
KO
TA D
EP
T O
F W
ATE
R &
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0E
mer
genc
yG
ener
ator
Dis
tilla
te O
il20
00K
ilow
atts
Nitr
ogen
Oxi
des
(NO
x)0
BA
CT-
PS
D0
*SD
-000
5D
EE
R C
RE
EK
S
TATI
ON
SD
SO
UTH
DA
KO
TA D
EP
T O
F W
ATE
R &
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0Fi
re W
ater
Pum
pD
istil
late
Oil
577
hors
epow
erN
itrog
en O
xide
s (N
Ox)
0B
AC
T-P
SD
0
AL-
0251
HIL
LAB
EE
EN
ER
GY
CE
NTE
RA
L
ALA
BA
MA
DE
PT
OF
EN
VIR
ON
ME
NTA
LM
GM
T31
0-00
22-
X00
19/
24/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
600
EK
WN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0B
AC
T-P
SD
0
FL-0
322
SW
EE
TS
OR
GH
UM
-TO
-E
THA
NO
LA
DV
AN
CE
DB
IOR
EFI
NE
RY
FL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
2(0
5100
32-0
01-
AC
)12
/23/
2010
Em
erge
ncy
Gen
erat
ors,
Tw
o 26
82 H
P E
AU
LSD
0N
itrog
en O
xide
s (N
Ox)
6.4
G/K
W-H
BA
CT-
PS
D0
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
ID-0
018
LAN
GLE
YG
ULC
H P
OW
ER
P
LAN
TID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
009.
0092
6/25
/201
0
EM
ER
GE
NC
YG
EN
ER
ATO
RE
NG
INE
DIE
SE
L75
0K
WN
itrog
en O
xide
s (N
Ox)
TI
ER
2 E
NG
INE
-BA
SE
D,
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
(GC
P)
6.4
G/K
W-H
NO
X+N
MH
CB
AC
T-P
SD
0
NV
-005
0M
GM
MIR
AG
EN
VC
LAR
K C
O. D
EP
T. O
F A
IR Q
UA
LITY
825
11/3
0/20
09
EM
ER
GE
NC
YG
EN
ER
ATO
RS
- U
NIT
S L
X02
4 A
ND
LX
025
AT
LUX
OR
DIE
SE
L O
IL22
06H
PN
itrog
en O
xide
s (N
Ox)
TUR
BO
CH
AR
GIN
G, A
FTE
R-
CO
OLI
NG
, AN
D L
EA
N-B
UR
N
TEC
HN
OLO
GY
0.01
31LB
/HP
-HO
ther
Cas
e-by
-C
ase
28.9
8LB
/H
NV
-004
9
HA
RR
AH
'SO
PE
RA
TIN
GC
OM
PA
NY
, IN
C.
NV
CLA
RK
CO
. DE
PT.
OF
AIR
QU
ALI
TY25
78/
20/2
009
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S(&
gt;6
00 H
P) -
U
NIT
HA
13D
IES
EL
OIL
1232
HP
Nitr
ogen
Oxi
des
(NO
x)TH
E U
NIT
IS E
QU
IPP
ED
WIT
H A
TU
RB
OC
HA
RG
ER
.0.
024
LB/H
P-H
BA
CT-
PS
D29
.57
LB/H
OK
-012
9C
HO
UTE
AU
PO
WE
R P
LAN
TO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2007
-115
-C(M
-1)
PS
D1/
23/2
009
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
(220
0 H
P)
LOW
SU
LFU
RD
IES
EL
2200
HP
Nitr
ogen
Oxi
des
(NO
x)23
.15
LB/H
BA
CT-
PS
D6.
4G
/KW
-HN
SP
S
ID-0
017
PO
WE
RC
OU
NTY
AD
VA
NC
ED
EN
ER
GY
CE
NTE
RID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
2 M
W
EM
ER
GE
NC
YG
EN
ER
ATO
R,
SR
C25
AS
TM #
1, 2
, D
IES
EL
2000
KW
Nitr
ogen
Oxi
des
(NO
x)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
. EP
A C
ER
TIFI
ED
P
ER
NS
PS
IIII
0B
AC
T-P
SD
0
ID-0
017
PO
WE
RC
OU
NTY
AD
VA
NC
ED
EN
ER
GY
CE
NTE
RID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
500
KW
E
ME
RG
EN
CY
GE
NE
RA
TOR
,FI
RE
PU
MP
, S
RC
26A
STM
#1,
2,
DIE
SE
L50
0K
WN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
. EP
A
CE
RTI
FIC
ATI
ON
PE
R N
SP
S II
II.0
SE
E N
OTE
BA
CT-
PS
D0
FL-0
310
SH
AD
Y H
ILLS
G
EN
ER
ATI
NG
STA
TIO
NFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-40
21/
12/2
009
2.5
MW
E
ME
RG
EN
CY
GE
NE
RA
TOR
ULT
RA
LOW
S O
IL2.
5M
WN
itrog
en O
xide
s (N
Ox)
PU
RC
HA
SE
MO
DE
L IS
AT
LEA
ST
AS
STR
ING
EN
T A
S T
HE
B
AC
T V
ALU
ES
, UN
DE
R E
PA
C
ER
TIFI
CA
TIO
N.
6.9
G/H
P-H
3 O
NE
HO
UR
TE
ST
BA
CT-
PS
D0
PA
-027
1M
ER
CK
& C
O.
WE
STP
OIN
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY46
-000
5AB
2/23
/200
7
MO
BIL
EE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
LN
itrog
en O
xide
s (N
Ox)
6.8
G/B
-HP
-HO
THE
R C
AS
E-
BY
-CA
SE
8.3
T/Y
R
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
NFA
CIL
ITY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
426/
22/2
009
FIR
E W
ATE
R
DIE
SE
L P
UM
PS
(3
)D
IES
EL
575
HP
EA
CH
Nitr
ogen
Oxi
des
(NO
x)C
OM
PLY
WIT
H 4
0 C
FR 6
0 S
UB
PA
RT
IIII
6.02
LB/H
MA
XIM
UM
(EA
CH
)B
AC
T-P
SD
0
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
NFA
CIL
ITY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
426/
22/2
009
EM
ER
GE
NC
YD
IES
EL
PO
WE
R
GE
NE
RA
TOR
EN
GIN
ES
(2)
DIE
SE
L13
41H
P E
AC
HN
itrog
en O
xide
s (N
Ox)
CO
MP
LY W
ITH
40
CFR
60
SU
BP
AR
T III
I17
.09
LB/H
MA
XIM
UM
(EA
CH
)B
AC
T-P
SD
0
AK
-006
6
EN
DIC
OTT
PR
OD
UC
TIO
NFA
CIL
ITY
,LI
BE
RTY
DE
VE
LOP
ME
NT
PR
OJE
CT
AK
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
0181
CP
T06,
RE
VIS
ION
2
6/15
/200
9E
U ID
58,
CA
MP
E
NG
INE
3D
ISTI
LLA
TE10
41H
PN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
4.7
G/H
P-H
BA
CT-
PS
D0
OK
-012
8
MID
AM
ER
ICA
N
STE
EL
RO
LLIN
G
MIL
LO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2003
-106
-C(M
-1)
PS
D9/
8/20
08E
mer
genc
yG
ener
ator
No.
2 d
iese
l12
00H
PN
itrog
en O
xide
s (N
Ox)
500
hour
s pe
r yea
r ope
ratio
ns15
.6LB
/HB
AC
T-P
SD
3.9
T/Y
R
OH
-031
7
OH
IO R
IVE
R
CLE
AN
FU
ELS
, LL
CO
HO
HIO
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N A
GE
NC
Y02
-228
9611
/20/
2008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
FUE
L O
IL29
22H
PN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
, GO
OD
EN
GIN
E
DE
SIG
N, I
GN
ITIO
N T
IMIN
G
RE
TAR
D, T
UR
BO
CH
AR
GE
R,
AN
D L
OW
-TE
MP
ER
ATU
RE
A
FTE
RC
OO
LER
26.4
7LB
/HB
AC
T-P
SD
6.61
T/Y
RP
ER
RO
LLIN
G 1
2-M
ON
TH P
ER
IOD
NV
-004
7N
ELL
IS A
IR
FOR
CE
BA
SE
NV
CLA
RK
CO
. DE
PT.
OF
AIR
QU
ALI
TY11
42/
26/2
008
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S(&
gt;5
00 H
P)
DIE
SE
L O
ILN
itrog
en O
xide
s (N
Ox)
TUR
BO
CH
AR
GE
R A
ND
A
FTE
RC
OO
LER
7.58
G/B
-HP
-HB
AC
T-P
SD
23.8
7LB
/H
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
FIR
E P
UM
P
EN
GIN
ED
IES
EL
575
HP
Nitr
ogen
Oxi
des
(NO
x)3.
9G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
0.92
T/Y
R12
-MO
NTH
RO
LLIN
G
TOTA
L
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
700
KW
Nitr
ogen
Oxi
des
(NO
x)6.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
2.39
T/Y
R12
-MO
NTH
RO
LLIN
G
AV
ER
AG
E
NJ-
0073
TRIG
EN
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
PR
OTE
CTI
ON
, D
IVIS
ION
OF
AIR
Q
UA
LITY
BO
P 0
6000
13/
8/20
08
DU
AL
FUE
L E
NG
INE
S O
N
100
%
DIS
TILL
ATE
FUE
L O
ILD
ISTI
LLA
TEFU
EL
OIL
1M
MG
AL/
YR
Nitr
ogen
Oxi
des
(NO
x)12
G/B
-HP
-H3-
HO
UR
AV
ER
AG
ER
AC
T0
MN
-007
1FA
IRB
AU
LTE
NE
RG
Y P
AR
KM
NM
INN
ES
OTA
PO
LL C
TRL
AG
CY
, AIR
QU
AL
DIV
1310
0071
-003
6/5/
2007
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
1750
KW
Nitr
ogen
Oxi
des
(NO
x)0.
024
LB/H
P-H
3 H
OU
R
AV
ER
AG
EB
AC
T-P
SD
0
VA
-030
5IN
GE
NC
O K
&O
FA
CIL
ITY
VA
VIR
GIN
IA D
EP
T. O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY; D
IVIS
ION
OF
AIR
QU
ALI
TY52
148
9/26
/200
7E
LEC
TRIC
GE
NE
RA
TIO
ND
ISTI
LLA
TEO
IL55
0H
HP
Nitr
ogen
Oxi
des
(NO
x)
CH
AR
GE
AIR
CO
OLI
NG
S
YS
TEM
S A
ND
GO
OD
C
OM
BU
STI
ON
PR
AC
TIC
ES
240
T/Y
RN
/A0
LA-0
219
CR
EO
LE T
RA
IL
LNG
IMP
OR
T TE
RM
INA
LLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
525
HP
Nitr
ogen
Oxi
des
(NO
x)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D G
OO
D
EN
GIN
E D
ES
IGN
IN
CO
RP
OR
ATI
NG
FU
EL
INJE
CTI
ON
TIM
ING
R
ETA
RD
ATI
ON
(ITR
)6.
74LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D1.
69T/
YR
AN
NU
AL
MA
XIM
UM
LA-0
219
CR
EO
LE T
RA
IL
LNG
IMP
OR
T TE
RM
INA
LLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
660
HP
Nitr
ogen
Oxi
des
(NO
x)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D G
OO
D
EN
GIN
E D
ES
IGN
IN
CO
RP
OR
ATI
NG
FU
EL
INJE
CTI
ON
TIM
ING
R
ETA
RD
ATI
ON
(ITR
)10
.07
LB/H
HO
UR
LYM
AX
IMU
MB
AC
T-P
SD
2.52
T/Y
RA
NN
UA
L M
AX
IMU
M
LA-0
219
CR
EO
LE T
RA
IL
LNG
IMP
OR
T TE
RM
INA
LLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
S. 1
&am
p; 2
DIE
SE
L21
68H
P E
AC
HN
itrog
en O
xide
s (N
Ox)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D G
OO
D
EN
GIN
E D
ES
IGN
IN
CO
RP
OR
ATI
NG
FU
EL
INJE
CTI
ON
TIM
ING
R
ETA
RD
ATI
ON
(ITR
)37
.95
LB/H
HO
UR
LYM
AX
IMU
MB
AC
T-P
SD
9.49
T/Y
RA
NN
UA
L M
AX
IMU
M
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY57
-01-
080
6/29
/200
7FI
RE
PU
MP
DIE
SE
L #2
540
HP
Nitr
ogen
Oxi
des
(NO
x)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS S
PE
CIF
ED
.E
NG
INE
IS R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S B
AC
T (T
IER
3 N
ON
RO
AD
). T
HIS
C
OU
LD R
EQ
UIR
E A
NY
NU
MB
ER
O
F C
ON
TRO
L TE
CH
NO
LOG
IES
A
ND
OP
ER
ATI
ON
AL
RE
Q. T
O
ME
ET
THE
BA
CT
STA
ND
AR
D.
2.8
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D0.
83T/
YR
12-M
ON
TH R
OLL
ING
TO
TAL
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY57
-01-
080
6/29
/200
7E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L15
00K
WN
itrog
en O
xide
s (N
Ox)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS S
PE
CIF
ED
.E
NG
INE
IS R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S B
AC
T (T
IER
2 N
ON
RO
AD
). T
HIS
C
OU
LD R
EQ
UIR
E A
NY
NU
MB
ER
O
F C
ON
TRO
L TE
CH
NO
LOG
IES
A
ND
OP
ER
ATI
ON
AL
RE
Q. T
O
ME
ET
THE
BA
CT
STA
ND
AR
D.
4.5
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D5.
29T/
YR
12-M
ON
TH R
OLL
ING
TO
TAL
MS
-008
6
CH
EV
RO
NP
RO
DU
CTS
CO
MP
AN
Y,
PA
SC
AG
OU
LAR
EFI
NE
RY
MS
MIS
SIS
SIP
PI D
EP
T O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY12
80-0
0058
5/8/
2007
TEM
PO
RA
RY
,P
OR
TAB
LEC
RU
DE
I G
EN
ER
ATO
RD
IES
EL
Nitr
ogen
Oxi
des
(NO
x)S
ELE
CTI
VE
CA
TALY
TIC
R
ED
UC
TIO
N (S
CR
)1.
3LB
/H3-
HR
RO
LLIN
G
AV
ER
AG
EB
AC
T-P
SD
0
AK
-006
4
DU
TCH
HA
RB
OR
PO
WE
R P
LAN
TA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q02
15C
PT0
21/
31/2
007
I.C.
FUE
L O
IL50
00K
WN
itrog
en O
xide
s (N
Ox)
RE
DU
CE
NO
X B
Y 9
0%1.
36G
/KW
-H3
HO
UR
SB
AC
T-P
SD
0
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Em
issi
on L
imit:
100
hou
rs/y
ear o
pera
tion
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
onLi
mit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
isEm
issi
onLi
mit
2Em
issi
on L
imit
2 U
nit
Emis
sion
Lim
it 2
Avg
Tim
e C
ondi
tion
NV
-004
5S
LOA
N Q
UA
RR
YN
VC
LAR
K C
O. D
EP
T. O
F A
IR Q
UA
LITY
372
12/1
1/20
06
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
DIE
SE
L O
IL12
GA
L/H
Nitr
ogen
Oxi
des
(NO
x)N
/A0.
058
LB/T
BA
CT-
PS
D26
.1LB
/H
OK
-011
8
HU
GO
GE
NE
RA
TIN
GS
TAO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
97-0
58-C
M-2
P
SD
2/9/
2007
EM
ER
GE
NC
YD
IES
EL
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
SN
itrog
en D
ioxi
de
(NO
2)
US
E O
F LO
W S
ULF
UR
NO
.2
FUE
L O
IL C
OM
BIN
ED
WIT
H
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D L
IMIT
ED
A
NN
UA
L O
PE
RA
TIO
N0
SE
E N
OTE
BA
CT-
PS
D0
LA-0
211
GA
RY
VIL
LER
EFI
NE
RY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
1912
/27/
2006
EM
ER
GE
NC
YG
EN
ER
ATO
RS
(DO
CK
&am
p;
TAN
K F
AR
M) (
21-
08 &
amp;
22-
08)
DIE
SE
LN
itrog
en O
xide
s (N
Ox)
US
E O
F D
IES
EL
WIT
H A
S
ULF
UR
CO
NTE
NT
OF
15 P
PM
V
OR
LE
SS
0.03
1LB
/HP
-HA
NN
UA
LA
VE
RA
GE
BA
CT-
PS
D0
LA-0
204
PLA
QU
EM
INE
PV
C P
LAN
TLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-
709(
M-1
)2/
27/2
009
LAR
GE
EM
ER
GE
NC
YE
NG
INE
SD
IES
EL
Nitr
ogen
Oxi
des
(NO
x)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D G
AS
EO
US
FU
EL
BU
RN
ING
3.2
LB/M
MB
TUB
AC
T-P
SD
0
WA
-032
9
DA
RR
ING
TON
EN
ER
GY
CO
GE
NE
RA
TIO
N P
OW
ER
P
LAN
TW
A
WA
SH
ING
TON
STA
TE
DE
PA
RTM
EN
T O
F E
CO
LOG
Y (E
CY
); A
IR
QU
ALI
TY P
RO
GR
AM
PS
D 0
3-04
2/11
/200
5S
TAN
DB
YG
EN
ER
ATO
RD
IES
EL
FUE
L1
MW
Nitr
ogen
Oxi
des
(NO
x)
EN
GIN
E M
US
T B
E N
EW
AN
D
SA
TIS
FY F
ED
ER
AL
STA
ND
AR
DS
@ 4
0 C
FR 8
90
SE
E N
OTE
BA
CT-
PS
D0
WA
-032
8
BP
CH
ER
RY
P
OIN
TC
OG
EN
ER
ATI
ON
PR
OJE
CT
WA
EP
A R
EG
ION
XE
FSE
C/2
002-
011/
11/2
005
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
FUE
L1.
5M
WN
itrog
en O
xide
s (N
Ox)
THE
EN
GIN
E M
US
T B
E N
EW
A
ND
MU
ST
SA
TIS
FY T
HE
FE
DE
RA
L E
NG
INE
STA
ND
AR
DS
O
F 40
CFR
89
FOR
YE
AR
OF
PU
RC
HA
SE
.0
BA
CT-
PS
D0
KS
-002
8
NE
AR
MA
NC
RE
EK
PO
WE
R
STA
TIO
NK
S
KA
NS
AS
CIT
Y/W
YA
ND
OTT
E C
O
HE
ALT
H D
EP
T, K
SC
-578
010
/18/
2005
EM
ER
GE
NC
YB
LAC
K S
TAR
T G
EN
ER
ATO
RN
O. 2
FU
EL
OIL
24.1
MM
BTU
/HN
itrog
en O
xide
s (N
Ox)
EM
ER
GE
NC
Y D
IES
EL
GE
NE
RA
TOR
S H
AV
E N
OT
BE
EN
RE
QU
IRE
D T
O IN
STA
LL
AD
DIT
ION
AL
NO
X C
ON
TRO
LS
BE
CA
US
E O
F IN
TER
MIT
TEN
T O
PE
RA
TIO
N.
84.8
LB/H
FULL
LO
AD
O
PE
RA
TIO
NS
BA
CT-
PS
D0
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
ZA
RIZ
ON
A D
EP
T O
F E
NV
Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5
FIR
E W
ATE
R
PU
MP
S N
OS
1
AN
D 2
NO
. 2
DIE
SE
LFU
EL
5.46
MM
BTU
/HN
itrog
en O
xide
s (N
Ox)
4G
/KW
-HB
AC
T-P
SD
0
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
ZA
RIZ
ON
A D
EP
T O
F E
NV
Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2
DIE
SE
LFU
EL
10.9
MM
BTU
/HN
itrog
en O
xide
s (N
Ox)
6.4
G/K
W-H
BA
CT-
PS
D0
IA-0
076
JOH
N D
EE
RE
P
RO
DU
CT
EN
GIN
EE
RIN
GC
EN
TER
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY
PR
OJE
CT
NU
MB
ER
00-
648
3/23
/200
5TE
ST
CE
LLD
IES
EL
24.5
GA
L/H
Nitr
ogen
Oxi
des
(NO
x)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S.
1.52
LB/M
MB
TUA
VE
RA
GE
OF
3-1
HR
TE
ST
RU
NS
BA
CT-
PS
D0.
86LB
/HA
VE
RA
GE
OF
3-1
HR
TE
ST
RU
NS
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*TX
-072
8
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FAC
ILIT
YTX
TEX
AS
CO
MM
ISS
ION
ON
E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1182
39, N
200
4/1/
2015
Em
erge
ncy
Die
sel
Gen
erat
orD
iese
l15
00hp
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)M
inim
ized
hou
rs o
f ope
ratio
n sTi
er II
eng
ine
0.15
LB/H
RO
THE
R C
AS
E-
BY
-CA
SE
*TX
-072
8
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FAC
ILIT
YTX
TEX
AS
CO
MM
ISS
ION
ON
E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1182
39, N
200
4/1/
2015
Em
erge
ncy
Die
sel
Gen
erat
orD
iese
l15
00hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)M
inim
ized
hou
rs o
f ope
ratio
n sTi
er II
eng
ine
0.15
LB/H
RO
THE
R C
AS
E-
BY
-CA
SE
*TX
-072
8
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FAC
ILIT
YTX
TEX
AS
CO
MM
ISS
ION
ON
E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1182
39, N
200
4/1/
2015
Em
erge
ncy
Die
sel
Gen
erat
orD
iese
l15
00hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
Min
imiz
ed h
ours
of o
pera
tion s
Tier
II e
ngin
e0.
15LB
/HR
OTH
ER
CA
SE
-B
Y-C
AS
E
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5E
mer
genc
y C
amp
Gen
erat
ors
Ultr
a Lo
w
Sul
fur D
iese
l26
95hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
15G
RA
MS
/HP
-HR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5E
mer
genc
y C
amp
Gen
erat
ors
Ultr
a Lo
w
Sul
fur D
iese
l26
95hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0.15
GR
AM
S/H
P-H
RB
AC
T-P
SD
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5Fi
ne W
ater
Pum
psU
ltra
Low
S
ulfu
r Die
sel
610
hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
15G
RA
MS
/HP
-HR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5Fi
ne W
ater
Pum
psU
ltra
Low
S
ulfu
r Die
sel
610
hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0.15
GR
AM
S/H
P-H
RB
AC
T-P
SD
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5B
ulk
Tank
Gen
erat
or
Eng
ines
Ultr
a Lo
w
Sul
fur D
iese
l89
1hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
15G
RA
MS
/HP
-HR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5B
ulk
Tank
Gen
erat
or
Eng
ines
Ultr
a Lo
w
Sul
fur D
iese
l89
1hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0.15
GR
AM
S/H
P-H
RB
AC
T-P
SD
*FL-
0346
LAU
DE
RD
ALE
PLA
NT
FL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
0110
037-
011-
AC
9/25
/201
3
Four
310
0 kW
bla
ck
star
t em
erge
ncy
gene
rato
rsU
LSD
2.32
MM
Btu
/hr (
HH
V)
per e
ngin
eP
artic
ulat
e m
atte
r, to
tal (
TPM
)G
ood
com
bust
ion
prac
tice
0.2
GR
AM
S P
ER
K
W-H
RB
AC
T-P
SD
*WV
-002
5
MO
UN
DS
VIL
LEC
OM
BIN
ED
CY
CLE
P
OW
ER
PLA
NT
WV
WE
ST
VIR
GIN
IA
DE
PT.
OF
EN
VR
ION
ME
NTA
LP
RO
TEC
TIO
N; D
IV.
OF
AIR
QU
ALI
TYR
14-0
030
11/2
1/20
14E
mer
genc
y G
ener
ator
Die
sel
2015
.7H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0B
AC
T-P
SD
*IL-
0114
CR
ON
US
CH
EM
ICA
LS, L
LCIL
ILLI
NO
IS E
PA
, B
UR
EA
U O
F A
IR13
0600
079/
5/20
14E
mer
genc
y G
ener
ator
dist
illat
e fu
el
oil
3755
HP
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Ta
ble
7.0.
1G
/KW
-HR
BA
CT-
PS
D
*IL-
0114
CR
ON
US
CH
EM
ICA
LS, L
LCIL
ILLI
NO
IS E
PA
, B
UR
EA
U O
F A
IR13
0600
079/
5/20
14E
mer
genc
y G
ener
ator
dist
illat
e fu
el
oil
3755
HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Ta
ble
7.0.
1G
/KW
-HR
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*IL-
0114
CR
ON
US
CH
EM
ICA
LS, L
LCIL
ILLI
NO
IS E
PA
, B
UR
EA
U O
F A
IR13
0600
079/
5/20
14E
mer
genc
y G
ener
ator
dist
illat
e fu
el
oil
3755
HP
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Ta
ble
7.0.
1G
/KW
-HR
BA
CT-
PS
D
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0P
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
0.15
G/B
HP
-HR
BA
CT-
PS
D
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
15G
/BH
P-H
RB
AC
T-P
SD
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)0.
15G
/BH
P-H
RB
AC
T-P
SD
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
147-
3232
2-00
062
9/25
/201
3
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
147-
3232
2-00
062
9/25
/201
3
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
147-
3232
2-00
062
9/25
/201
3
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15LB
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-018
0
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.15
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-018
0
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
P
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-018
0
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
P
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-018
5M
AG
PE
LLE
T LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
181-
3396
5-00
054
4/24
/201
4D
IES
EL
FIR
E P
UM
PD
IES
EL
300
HP
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)0.
15G
/HP
-HB
AC
T-P
SD
*IN
-018
5M
AG
PE
LLE
T LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
181-
3396
5-00
054
4/24
/201
4D
IES
EL
FIR
E P
UM
PD
IES
EL
300
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
15G
/HP
-HB
AC
T-P
SD
*IN
-018
5M
AG
PE
LLE
T LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
181-
3396
5-00
054
4/24
/201
4D
IES
EL
FIR
E P
UM
PD
IES
EL
300
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
0.15
G/H
P-H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*IN
-017
3
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.15
G/B
HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-017
3
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
P
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/BH
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-017
3
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
P
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
15G
/BH
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
t Dril
ler 1
Die
sel
0
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
tu
rboc
harg
er w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
in
ject
ion
with
afte
rcoo
ler.
0.24
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
t Dril
ler 1
Die
sel
0
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
tu
rboc
harg
er w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
in
ject
ion
with
afte
rcoo
ler.
0.24
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2M
ain
Pro
puls
ion
Eng
ines
- C
.R. L
uigs
Die
sel
5875
hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
mea
sure
men
t sy
stem
, pos
itive
cra
nkca
se
vent
ilatio
n, tu
rboc
harg
er a
nd
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
afte
rcoo
ler.
0.24
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2M
ain
Pro
puls
ion
Eng
ines
- C
.R. L
uigs
Die
sel
5875
hp
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
mea
sure
men
t sy
stem
, pos
itive
cra
nkca
se
vent
ilatio
n, tu
rboc
harg
er a
nd
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
afte
rcoo
ler.
0.24
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
t Dril
ler 1
Die
sel
0P
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
tu
rboc
harg
er w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
in
ject
ion
with
afte
rcoo
ler.
0.43
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2M
ain
Pro
puls
ion
Eng
ines
- C
.R. L
uigs
Die
sel
5875
hpP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
mea
sure
men
t sy
stem
, pos
itive
cra
nkca
se
vent
ilatio
n, tu
rboc
harg
er a
nd
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
afte
rcoo
ler.
0.43
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*OH
-035
5
GE
NE
RA
LE
LEC
TRIC
AV
IATI
ON
,E
VE
ND
ALE
PLA
NT
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13Te
st C
ell 1
for A
ircra
ft E
ngin
es a
nd T
urbi
nes
JET
FUE
L0
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
038
LB/M
MB
TUN
/A
*OH
-035
5
GE
NE
RA
LE
LEC
TRIC
AV
IATI
ON
,E
VE
ND
ALE
PLA
NT
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13Te
st C
ell 2
for A
ircra
ft E
ngin
es a
nd T
urbi
nes
JET
FUE
L0
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
038
LB/M
MB
TUN
/A
AK
-008
1
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T02
6/12
/201
3C
ombu
stio
nU
LSD
610
hp
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)G
ood
oper
atio
n an
d co
mbu
stio
n pr
actic
es0.
15G
/KW
-HO
THE
R C
AS
E-
BY
-CA
SE
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*PA
-029
1H
ICK
OR
Y R
UN
E
NE
RG
Y S
TATI
ON
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
37-3
37A
4/23
/201
3E
ME
RG
EN
CY
GE
NE
RA
TOR
Ultr
a Lo
w
sulfu
r Dis
tilla
te7.
8M
MB
TU/H
Par
ticul
ate
mat
ter,
tota
l (TP
M)
0.02
TPY
12-M
ON
THR
OLL
ING
TO
TAL
OTH
ER
CA
SE
-B
Y-C
AS
E
*PA
-029
2M
L 35
LLC
/PH
ILA
C
YB
ER
CE
NTE
RP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
09-0
142B
6/1/
2012
DIE
SE
LG
EN
ER
ATO
R (2
.25
MW
EA
CH
) - 5
UN
ITS
#2 O
il0
Par
ticul
ate
mat
ter,
tota
l (TP
M)
0.28
LB/H
OTH
ER
CA
SE
-B
Y-C
AS
E
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
US
E O
F LO
W-S
DIE
SE
L A
ND
LIM
ITE
D H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
OP
ER
ATI
ON
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)U
SE
OF
LOW
-S D
IES
EL
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
US
E O
F LO
W-S
DIE
SE
L A
ND
LIM
ITE
D H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
OP
ER
ATI
ON
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
THR
EE
(3)
FIR
EW
ATE
R P
UM
P
EN
GIN
ES
DIE
SE
L57
5H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
US
E O
F LO
W-S
DIE
SE
L A
ND
LIM
ITE
D H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
OP
ER
ATI
ON
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
THR
EE
(3)
FIR
EW
ATE
R P
UM
P
EN
GIN
ES
DIE
SE
L57
5H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
US
E O
F LO
W-S
DIE
SE
L A
ND
LIM
ITE
D H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
OP
ER
ATI
ON
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
THR
EE
(3)
FIR
EW
ATE
R P
UM
P
EN
GIN
ES
DIE
SE
L57
5H
OR
SE
PO
WE
R,
EA
CH
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)
US
E O
F LO
W-S
DIE
SE
L A
ND
LIM
ITE
D H
OU
RS
OF
NO
N-E
ME
RG
EN
CY
OP
ER
ATI
ON
15P
PM
SU
LFU
RB
AC
T-P
SD
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
BA
CT-
PS
D
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
PP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E
LIM
ITS
0.15
G/H
P-H
3 H
OU
RS
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
HP
artic
ulat
e m
atte
r, to
tal (
TPM
)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E (3
) STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
H
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E (3
) STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
H
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E (3
) STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RO
H
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1084
06/
18/2
013
Em
erge
ncy
gene
rato
rdi
esel
2250
KW
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
Pur
chas
ed c
ertif
ied
to th
e st
anda
rds
in N
SP
S S
ubpa
rt III
I0.
99LB
/HB
AC
T-P
SD
NJ-
0080
HE
SS
NE
WA
RK
E
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY08
857/
BO
P11
0001
11/1
/201
2E
mer
genc
y G
ener
ator
ULS
D20
0H
/YR
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
use
of U
LSD
, a lo
w s
ulfu
r cl
ean
fuel
0B
AC
T-P
SD
NJ-
0080
HE
SS
NE
WA
RK
E
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY08
857/
BO
P11
0001
11/1
/201
2E
mer
genc
y G
ener
ator
ULS
D20
0H
/YR
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)us
e of
ULS
D, a
low
sul
fur
clea
n fu
el0.
59LB
/HN
/A
NJ-
0080
HE
SS
NE
WA
RK
E
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY08
857/
BO
P11
0001
11/1
/201
2E
mer
genc
y G
ener
ator
ULS
D20
0H
/YR
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
66LB
/HB
AC
T-P
SD
PA
-027
8
MO
XIE
LIB
ER
TY
LLC
/AS
YLU
MP
OW
ER
PL
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
08·0
0045
A10
/10/
2012
Em
erge
ncy
Gen
erat
orD
iese
l0
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
02G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E
PA
-027
8
MO
XIE
LIB
ER
TY
LLC
/AS
YLU
MP
OW
ER
PL
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
08·0
0045
A10
/10/
2012
Em
erge
ncy
Gen
erat
orD
iese
l0
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)0.
02G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*MI-0
402
SU
MP
TER
PO
WE
R
PLA
NT
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne
(RIC
E)
Die
sel
732
HP
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)G
ood
com
bust
ion
prac
tices
0.05
G/H
P-H
TES
TB
AC
T-P
SD
*MI-0
402
SU
MP
TER
PO
WE
R
PLA
NT
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne
(RIC
E)
Die
sel
732
HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)G
ood
com
bust
ion
prac
tices
0.05
73LB
/MM
BTU
TES
TB
AC
T-P
SD
*MI-0
402
SU
MP
TER
PO
WE
R
PLA
NT
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne
(RIC
E)
Die
sel
732
HP
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)G
ood
com
bust
ion
prac
tices
0.05
73LB
/MM
BTU
TES
TB
AC
T-P
SD
NJ-
0079
WO
OD
BR
IDG
EE
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY18
940
- B
OP
1100
037/
25/2
012
Em
erge
ncy
Gen
erat
or
Ultr
a Lo
w
Sul
fur d
istil
lat e
Die
sel
100
H/Y
R
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)U
se o
f ULS
D o
il0.
13LB
/HO
THE
R C
AS
E-
BY
-CA
SE
NJ-
0079
WO
OD
BR
IDG
EE
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY18
940
- B
OP
1100
037/
25/2
012
Em
erge
ncy
Gen
erat
or
Ultr
a Lo
w
Sul
fur d
istil
lat e
Die
sel
100
H/Y
R
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)U
se o
f ULS
D o
il0.
13LB
/HO
THE
R C
AS
E-
BY
-CA
SE
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
9-01
10/1
8/20
11E
ME
RG
EN
CY
IC
EN
GIN
ED
IES
EL
2683
HP
Par
ticul
ate
mat
ter,
tota
l (TP
M)
US
E U
LTR
A L
OW
SU
LFU
R
FUE
L0.
2G
/KW
-HB
AC
T-P
SD
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
9-01
10/1
8/20
11E
ME
RG
EN
CY
IC
EN
GIN
ED
IES
EL
2683
HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)U
SE
ULT
RA
LO
W S
ULF
UR
FU
EL
0.2
G/K
W-H
BA
CT-
PS
D
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
9-01
10/1
8/20
11E
ME
RG
EN
CY
IC
EN
GIN
ED
IES
EL
2683
HP
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)U
SE
ULT
RA
LO
W S
ULF
UR
FU
EL
0.2
G/K
W-H
BA
CT-
PS
D
CA
-119
1
VIC
TOR
VIL
LE 2
H
YB
RID
PO
WE
R
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
7-02
3/11
/201
0E
ME
RG
EN
CY
EN
GIN
ED
IES
EL
2000
KW
Par
ticul
ate
mat
ter,
tota
l (TP
M)
OP
ER
ATI
ON
AL
RE
STR
ICTI
ON
OF
50
HR
/YR
; US
E O
F U
LTR
A
LOW
SU
LFU
R F
UE
L N
OT
TO E
XC
EE
D 1
5 P
PM
VD
FU
EL
SU
LFU
R0.
2G
/KW
-HB
AC
T-P
SD
CA
-119
1
VIC
TOR
VIL
LE 2
H
YB
RID
PO
WE
R
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
7-02
3/11
/201
0E
ME
RG
EN
CY
EN
GIN
ED
IES
EL
2000
KW
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)
OP
ER
ATI
ON
AL
RE
STR
ICTI
ON
OF
50
HR
/YR
; US
E O
F U
LTR
A
LOW
SU
LFU
R F
UE
L N
OT
TO E
XC
EE
D 1
5 P
PM
VD
0.2
G/K
W-H
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
y G
ener
ator
dies
el fu
el14
2G
AL/
HP
artic
ulat
e m
atte
r, to
tal (
TPM
)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
y G
ener
ator
dies
el fu
el14
2G
AL/
H
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
y G
ener
ator
dies
el fu
el14
2G
AL/
H
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)go
od c
ombu
stio
n pr
actic
es0.
2G
/KW
-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*MI-0
400
WO
LVE
RIN
EP
OW
ER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
317-
076/
29/2
011
Em
erge
ncy
gene
rato
rD
iese
l40
00H
PP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
0.15
G/H
P-H
TES
T P
RO
TOC
OL;
B
AC
T/S
IP/N
SP
SB
AC
T-P
SD
*MI-0
400
WO
LVE
RIN
EP
OW
ER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
317-
076/
29/2
011
Em
erge
ncy
gene
rato
rD
iese
l40
00H
P
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)1.
76LB
/HTE
ST
PR
OTO
CO
L;
BA
CT
BA
CT-
PS
D
*MI-0
400
WO
LVE
RIN
EP
OW
ER
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
317-
076/
29/2
011
Em
erge
ncy
gene
rato
rD
iese
l40
00H
P
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)1.
76LB
/HTE
ST
PR
OTO
CO
L;
BA
CT
BA
CT-
PS
D
AK
-007
6
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T01
8/20
/201
2C
ombu
stio
n of
Die
sel
by IC
Es
ULS
D17
50kW
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)0.
2G
/KW
-HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
2LB
/HB
AC
T-P
SD
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
2LB
/HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PP
artic
ulat
e m
atte
r, to
tal (
TPM
)0.
25LB
/HB
AC
T-P
SD
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PP
artic
ulat
e m
atte
r, to
tal (
TPM
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
25LB
/HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
PP
artic
ulat
e m
atte
r, to
tal (
TPM
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
41LB
/HB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
41LB
/HB
AC
T-P
SD
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
PP
artic
ulat
e m
atte
r, to
tal (
TPM
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
41LB
/HB
AC
T-P
SD
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
P
ER
FOR
ME
D A
S
OU
TLIN
ED
IN T
HE
GO
OD
M
AN
AG
EM
EN
T P
RA
CTI
CE
P
LAN
.0.
41LB
/HB
AC
T-P
SD
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
D
CO
GE
NE
RA
TIO
NP
LAN
TFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
600
HP
Em
erge
ncy
Equ
ipm
ent
Ultr
a-Lo
wS
ulfu
r Oil
0P
artic
ulat
e m
atte
r, to
tal (
TPM
)S
ee P
ollu
tant
Not
es.
0.15
G/H
P-H
BA
CT-
PS
D
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
D
CO
GE
NE
RA
TIO
NP
LAN
TFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
2000
KW
Em
erge
ncy
Equ
ipm
ent
0P
artic
ulat
e m
atte
r, to
tal (
TPM
)S
ee P
ollu
tant
Not
es.
0.2
G/K
W-H
BA
CT-
PS
D
AK
-007
3
INTE
RN
ATI
ON
AL
STA
TIO
N P
OW
ER
P
LAN
TA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
0164
CP
T01
12/2
0/20
10Fu
el C
ombu
stio
nD
iese
l15
00kW
-e
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
Bla
ck S
tart
dies
el fi
red
engi
ne
EU
13
shal
l be
equi
pped
with
tu
rbo
char
ging
and
afte
r co
olin
g. T
he tu
rbo
char
ger
redu
ces
NO
x em
issi
ons
by
boos
ting
the
pres
sure
and
te
mpe
ratu
re o
f the
air
ente
ring
the
engi
ne a
llow
ing
mor
e fu
el to
be
adde
d to
in
crea
se p
ower
out
put.
This
tra
nsla
tes
into
hig
her
com
bust
ion
effic
ienc
y an
d re
duce
d em
issi
ons.
0.03
G/H
P-H
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y Fi
re P
ump
Eng
ine
Die
sel
0P
artic
ulat
e m
atte
r, to
tal (
TPM
)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
002
TON
S P
ER
Y
EA
R12
-MO
NTH
RO
LLIN
GB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y E
ngin
eD
iese
l0
Par
ticul
ate
mat
ter,
tota
l (TP
M)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
03TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
(DE
WT)
m
easu
rem
ent s
yste
m.
0.24
G/K
W-H
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
(DE
WT)
m
easu
rem
ent s
yste
m.
0.24
G/K
W-H
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0P
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
tm
anuf
actu
rer?
s sp
ecifi
catio
ns
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
(DE
WT)
m
easu
rem
ent s
yste
m.
0.43
G/K
W-H
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(uni
ts 1
and
2)D
iese
l0
Par
ticul
ate
mat
ter,
tota
l (TP
M)
Use
of c
ertif
ied
EP
A T
ier 1
en
gine
s an
d go
od c
ombu
stio
npr
actic
es b
ased
on
the
curr
ent
man
ufac
ture
r?s
spec
ifica
tions
fo
r thi
s en
gine
.0.
6TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(uni
ts 3
and
4)D
iese
l0
Par
ticul
ate
mat
ter,
tota
l (TP
M)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne1.
3TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
P
Par
ticul
ate
mat
ter,
tota
l <
2.5
μ
(TP
M2.
5)
ULT
RA
LO
W S
ULF
UR
D
IES
EL
AN
D G
OO
D
CO
MB
US
TIO
N P
RA
CTI
CE
S0.
15G
/HP
-HA
NN
UA
LA
VE
RA
GE
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
P
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
ULT
RA
LO
W S
ULF
UR
D
IES
EL
AN
D G
OO
D
CO
MB
US
TIO
N P
RA
CTI
CE
S0.
15G
/HP
-HA
NN
UA
LA
VE
RA
GE
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
LA-0
251
FLO
PA
M IN
C.
FAC
ILIT
YLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-74
7(M
1)4/
26/2
011
Larg
e G
ener
ator
E
ngin
es (1
7 un
its)
Die
sel
0
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
01LB
/HB
AC
T-P
SD
AK
-007
2D
UTC
H H
AR
BO
R
PO
WE
R P
LAN
TA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
0215
CP
T03
7/14
/201
1E
U 1
5 C
ater
pilla
r C-
280-
16U
LSD
4400
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
Pos
itive
Cra
nkca
se
Ven
tilat
ion
Inst
alle
d as
par
t of
the
desi
gn0.
5G
/KW
-HIN
STA
NTA
NE
OU
SB
AC
T-P
SD
*SD
-000
5D
EE
R C
RE
EK
S
TATI
ON
SD
SO
UTH
DA
KO
TA
DE
PT
OF
WA
TER
&
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0E
mer
genc
y G
ener
ator
Dis
tilla
te O
il20
00K
ilow
atts
Par
ticul
ate
mat
ter,
filte
rabl
e (F
PM
)0
BA
CT-
PS
D
*SD
-000
5D
EE
R C
RE
EK
S
TATI
ON
SD
SO
UTH
DA
KO
TA
DE
PT
OF
WA
TER
&
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0Fi
re W
ater
Pum
pD
istil
late
Oil
577
hors
epow
erP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
0B
AC
T-P
SD
AL-
0251
HIL
LAB
EE
EN
ER
GY
C
EN
TER
AL
ALA
BA
MA
DE
PT
OF
EN
VIR
ON
ME
NTA
LM
GM
T31
0-00
22-
X00
19/
24/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
600
EK
WP
artic
ulat
e m
atte
r, to
tal (
TPM
)LO
W S
ULF
UR
DIE
SE
L FU
EL
0B
AC
T-P
SD
FL-0
322
SW
EE
T S
OR
GH
UM
-TO
-ETH
AN
OL
AD
VA
NC
ED
BIO
RE
FIN
ER
YFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
2(0
5100
32-0
01-
AC
)12
/23/
2010
Em
erge
ncy
Gen
erat
ors,
Tw
o 26
82
HP
EA
ULS
D0
Par
ticul
ate
mat
ter,
tota
l (TP
M)
0.2
G/K
W-H
BA
CT-
PS
D
ID-0
018
LAN
GLE
Y G
ULC
H
PO
WE
R P
LAN
TID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
009.
0092
6/25
/201
0
EM
ER
GE
NC
YG
EN
ER
ATO
RE
NG
INE
DIE
SE
L75
0K
WP
artic
ulat
e M
atte
r (P
M)
TI
ER
2 E
NG
INE
-BA
SE
D,
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
(GC
P)
0.2
G/K
W-H
BA
CT-
PS
D
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
EM
ER
GE
NC
YG
EN
ER
ATO
R
ULT
RA
LO
W
SU
LFU
RD
IES
EL
2000
KW
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M
SU
LFU
R F
UE
L.0.
0573
LB/M
MB
TUTE
ST
ME
THO
DB
AC
T-P
SD
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
FIR
E P
UM
P
ULT
RA
LO
W
SU
LFU
RD
IES
EL
525
HP
Par
ticul
ate
mat
ter,
tota
l (TP
M)
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M
SU
LFU
R F
UE
L.0.
15G
/HP
-HTE
ST
ME
THO
DB
AC
T-P
SD
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
EM
ER
GE
NC
YG
EN
ER
ATO
R
ULT
RA
LO
W
SU
LFU
RD
IES
EL
2000
KW
Par
ticul
ate
mat
ter,
tota
l (TP
M)
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M
SU
LFU
R F
UE
L.0.
2G
/KW
-HTE
ST
ME
THO
DB
AC
T-P
SD
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
FIR
E P
UM
P
ULT
RA
LO
W
SU
LFU
RD
IES
EL
525
HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M
SU
LFU
R F
UE
L.0.
31LB
/MM
BTU
TES
T M
ETH
OD
BA
CT-
PS
D
NV
-005
0M
GM
MIR
AG
EN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY82
511
/30/
2009
EM
ER
GE
NC
YG
EN
ER
ATO
RS
- U
NIT
S L
X02
4 A
ND
LX
025
AT
LUX
OR
DIE
SE
L O
IL22
06H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
TUR
BO
CH
AR
GE
R A
ND
G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S0.
0001
LB/H
P-H
Oth
er C
ase-
by-
Cas
e
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
NV
-004
9
HA
RR
AH
'SO
PE
RA
TIN
GC
OM
PA
NY
, IN
C.
NV
CLA
RK
CO
. DE
PT.
O
F A
IR Q
UA
LITY
257
8/20
/200
9
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S (&
gt;6
00
HP
) - U
NIT
HA
13D
IES
EL
OIL
1232
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)TH
E U
NIT
IS E
QU
IPP
ED
W
ITH
A T
UR
BO
CH
AR
GE
R.
0.00
07LB
/HP
-HO
ther
Cas
e-by
-C
ase
OK
-012
9C
HO
UTE
AU
PO
WE
R P
LAN
TO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2007
-115
-C(M
-1)
PS
D1/
23/2
009
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
(220
0 H
P)
LOW
SU
LFU
RD
IES
EL
2200
HP
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
72LB
/HB
AC
T-P
SD
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
DE
NE
RG
Y C
EN
TER
ID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
2 M
W E
ME
RG
EN
CY
G
EN
ER
ATO
R,
SR
C25
AS
TM #
1, 2
, D
IES
EL
2000
KW
Par
ticul
ate
Mat
ter
(PM
)
ULS
D F
UE
L, G
OO
D
CO
MB
US
TIO
N P
RA
CTI
CE
S,
EP
A C
ER
TIFI
ED
PE
R N
SP
S
IIII
0S
EE
NO
TEB
AC
T-P
SD
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
DE
NE
RG
Y C
EN
TER
ID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
2 M
W E
ME
RG
EN
CY
G
EN
ER
ATO
R,
SR
C25
AS
TM #
1, 2
, D
IES
EL
2000
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
ULS
D F
UE
L, G
OO
D
CO
MB
US
TIO
N P
RA
CTI
CE
S,
EP
A C
ER
TIFI
ED
PE
R N
SP
S
IIII
0S
EE
NO
TEB
AC
T-P
SD
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
DE
NE
RG
Y C
EN
TER
ID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
500
KW
E
ME
RG
EN
CY
GE
NE
RA
TOR
, FIR
E
PU
MP
, SR
C26
AS
TM #
1, 2
, D
IES
EL
500
KW
Par
ticul
ate
Mat
ter
(PM
)
ULS
D F
UE
L, E
PA
C
ER
TIFI
CA
TIO
N P
ER
NS
PS
III
I0
SE
E N
OTE
BA
CT-
PS
D
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
DE
NE
RG
Y C
EN
TER
ID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
500
KW
E
ME
RG
EN
CY
GE
NE
RA
TOR
, FIR
E
PU
MP
, SR
C26
AS
TM #
1, 2
, D
IES
EL
500
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
ULS
D F
UE
L, E
PA
C
ER
TIFI
CA
TIO
N P
ER
NS
PS
III
I0
SE
E N
OTE
BA
CT-
PS
D
FL-0
310
SH
AD
Y H
ILLS
G
EN
ER
ATI
NG
STA
TIO
NFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-40
21/
12/2
009
2.5
MW
E
ME
RG
EN
CY
GE
NE
RA
TOR
ULT
RA
LO
W
S O
IL2.
5M
W
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
FIR
ING
ULS
O W
ITH
A
MA
XIM
UM
SU
LFU
R
CO
NTE
NT
OF
0.00
15%
BY
W
EIG
HT
AN
D A
MA
XIM
UM
H
OU
RS
OF
OP
ER
ATI
ON
OF
500
HO
UR
/YR
.0.
4G
/HP
-H
NA
/RE
CO
RD
KE
EP
ING
BA
CT-
PS
D
FL-0
310
SH
AD
Y H
ILLS
G
EN
ER
ATI
NG
STA
TIO
NFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-40
21/
12/2
009
2.5
MW
E
ME
RG
EN
CY
GE
NE
RA
TOR
ULT
RA
LO
W
S O
IL2.
5M
W
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
FIR
ING
ULS
O W
ITH
A
MA
XIM
UM
SU
LFU
R
CO
NTE
NT
OF
0.00
15%
BY
W
EIG
HT
AN
D A
MA
XIM
UM
H
OU
RS
OF
OP
ER
ATI
ON
OF
500
HO
UR
/YR
.0.
4G
/HP
-H
NA
/RE
CO
RD
KE
EP
ING
BA
CT-
PS
D
PA
-027
1M
ER
CK
& C
O.
WE
STP
OIN
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
46-0
005A
B2/
23/2
007
MO
BIL
EE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
LP
artic
ulat
e m
atte
r, fil
tera
ble
(FP
M)
0.16
G/B
-HP
-HO
THE
R C
AS
E-
BY
-CA
SE
PA
-027
1M
ER
CK
& C
O.
WE
STP
OIN
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
46-0
005A
B2/
23/2
007
MO
BIL
EE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
16G
/B-H
P-H
OTH
ER
CA
SE
-B
Y-C
AS
E
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
NFA
CIL
ITY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-742
6/22
/200
9
EM
ER
GE
NC
YD
IES
EL
PO
WE
R
GE
NE
RA
TOR
EN
GIN
ES
(2)
DIE
SE
L13
41H
P E
AC
H
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)C
OM
PLY
WIT
H 4
0 C
FR 6
0 S
UB
PA
RT
IIII
0.06
LB/H
MA
XIM
UM
(EA
CH
)B
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
NFA
CIL
ITY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-742
6/22
/200
9FI
RE
WA
TER
D
IES
EL
PU
MP
S (3
)D
IES
EL
575
HP
EA
CH
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)C
OM
PLY
WIT
H 4
0 C
FR 6
0 S
UB
PA
RT
IIII
0.08
LB/H
MA
XIM
UM
(EA
CH
)B
AC
T-P
SD
OK
-012
8
MID
AM
ER
ICA
N
STE
EL
RO
LLIN
G
MIL
LO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2003
-106
-C(M
-1)
PS
D9/
8/20
08E
mer
genc
y G
ener
ator
No.
2 d
iese
l12
00H
P
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)0.
84LB
/HB
AC
T-P
SD
OH
-031
7O
HIO
RIV
ER
CLE
AN
FU
ELS
, LLC
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
02-2
2896
11/2
0/20
08E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
LFU
EL
OIL
2922
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D G
OO
D
EN
GIN
E D
ES
IGN
0.87
LB/H
BA
CT-
PS
D
NV
-004
7N
ELL
IS A
IR F
OR
CE
B
AS
EN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY11
42/
26/2
008
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S (&
gt;5
00
HP
)D
IES
EL
OIL
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)TU
RB
OC
HA
RG
ER
AN
D
AFT
ER
CO
OLE
R0.
084
G/B
-HP
-HO
THE
R C
AS
E-
BY
-CA
SE
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
700
KW
Par
ticul
ate
Mat
ter
(PM
)0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
700
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
FIR
E P
UM
P E
NG
INE
DIE
SE
L57
5H
PP
artic
ulat
e M
atte
r (P
M)
0.2
G/K
W-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
FIR
E P
UM
P E
NG
INE
DIE
SE
L57
5H
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
2G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
NY
-010
1
CO
RN
ELL
CO
MB
INE
D H
EA
T &
P
OW
ER
PR
OJE
CT
NY
NE
W Y
OR
K D
EP
T.
OF
EN
VIR
ON
ME
NTA
LC
ON
SE
RV
ATI
ON
NY
-000
13/
12/2
008
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
S (2
)
LOW
SU
LFU
RD
IES
EL
1000
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
ULT
RA
LO
W S
ULF
UR
D
IES
EL
AT
15 P
PM
S0.
19LB
/H1
HO
UR
AV
GB
AC
T-P
SD
NY
-010
1
CO
RN
ELL
CO
MB
INE
D H
EA
T &
P
OW
ER
PR
OJE
CT
NY
NE
W Y
OR
K D
EP
T.
OF
EN
VIR
ON
ME
NTA
LC
ON
SE
RV
ATI
ON
NY
-000
13/
12/2
008
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
S (2
)
LOW
SU
LFU
RD
IES
EL
1000
KW
Par
ticul
ate
Mat
ter
(PM
)U
LTR
A L
OW
SU
LFU
R
DIE
SE
L A
T 15
PP
M S
.0.
19LB
/H1
HO
UR
AV
GB
AC
T-P
SD
NY
-010
1
CO
RN
ELL
CO
MB
INE
D H
EA
T &
P
OW
ER
PR
OJE
CT
NY
NE
W Y
OR
K D
EP
T.
OF
EN
VIR
ON
ME
NTA
LC
ON
SE
RV
ATI
ON
NY
-000
13/
12/2
008
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
S (2
)
LOW
SU
LFU
RD
IES
EL
1000
KW
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)U
LTR
A L
OW
SU
LFU
R
DIE
SE
L A
T 15
PP
M S
0.19
LB/H
1 H
OU
R A
VG
BA
CT-
PS
D
MN
-007
1FA
IRB
AU
LTE
NE
RG
Y P
AR
KM
N
MIN
NE
SO
TA P
OLL
C
TRL
AG
CY
, AIR
Q
UA
L D
IV13
1000
71-0
036/
5/20
07E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 217
50K
W
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)0.
0004
LB/H
P-H
3 H
OU
RB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
MN
-007
1FA
IRB
AU
LTE
NE
RG
Y P
AR
KM
N
MIN
NE
SO
TA P
OLL
C
TRL
AG
CY
, AIR
Q
UA
L D
IV13
1000
71-0
036/
5/20
07E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 217
50K
WP
artic
ulat
e M
atte
r (P
M)
0.00
07LB
/HP
-H3
HO
UR
BA
CT-
PS
D
VA
-030
5IN
GE
NC
O K
&O
FA
CIL
ITY
VA
VIR
GIN
IA D
EP
T. O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY; D
IVIS
ION
O
F A
IR Q
UA
LITY
5214
89/
26/2
007
ELE
CTR
ICG
EN
ER
ATI
ON
DIS
TILL
ATE
OIL
550
HH
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
GO
OD
CO
MB
US
TIO
NS
P
RA
CTI
CE
S A
ND
C
ON
TIN
UO
US
MO
NIT
OR
ING
DE
VIC
ES
115.
9T/
YR
N/A
VA
-030
5IN
GE
NC
O K
&O
FA
CIL
ITY
VA
VIR
GIN
IA D
EP
T. O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY; D
IVIS
ION
O
F A
IR Q
UA
LITY
5214
89/
26/2
007
ELE
CTR
ICG
EN
ER
ATI
ON
DIS
TILL
ATE
OIL
550
HH
P
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 2
.5 μ
(F
PM
2.5)
GO
OD
CO
MB
US
TIO
NS
P
RA
CTI
CE
S A
ND
C
ON
TIN
UO
US
MO
NIT
OR
ING
DE
VIC
ES
115.
9T/
YR
N/A
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7FI
RE
WA
TER
PU
MP
D
IES
EL
EN
GIN
ED
IES
EL
525
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
, GO
OD
E
NG
INE
DE
SIG
N, A
ND
US
E
OF
LOW
SU
LFU
R A
ND
LO
W A
SH
DIE
SE
L0.
28LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7FI
RE
WA
TER
PU
MP
D
IES
EL
EN
GIN
ED
IES
EL
660
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
, GO
OD
E
NG
INE
DE
SIG
N, A
ND
US
E
OF
LOW
SU
LFU
R A
ND
LO
W A
SH
DIE
SE
L0.
64LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
S. 1
&
amp;
2D
IES
EL
2168
HP
EA
CH
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
, GO
OD
E
NG
INE
DE
SIG
N, A
ND
US
E
OF
LOW
SU
LFU
R A
ND
LO
W A
SH
DIE
SE
L0.
69LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7FI
RE
PU
MP
DIE
SE
L #2
540
HP
Par
ticul
ate
Mat
ter
(PM
)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS
SP
EC
IFE
D.
EN
GIN
E IS
R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S
BA
CT
(TIE
R 3
NO
NR
OA
D).
THIS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S
AN
D O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.15
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7FI
RE
PU
MP
DIE
SE
L #2
540
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS
SP
EC
IFE
D.
EN
GIN
E IS
R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S
BA
CT
(TIE
R 3
NO
NR
OA
D).
THIS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S
AN
D O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.15
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L15
00K
WP
artic
ulat
e M
atte
r (P
M)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS
SP
EC
IFE
D.
EN
GIN
E IS
R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S
BA
CT
(TIE
R 2
NO
NR
OA
D).
THIS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S
AN
D O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.15
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L15
00K
W
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS
SP
EC
IFE
D.
EN
GIN
E IS
R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S
BA
CT
(TIE
R 2
NO
NR
OA
D).
THIS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S
AN
D O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.15
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
NV
-004
5S
LOA
N Q
UA
RR
YN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY37
212
/11/
2006
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
DIE
SE
L O
IL12
GA
L/H
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)U
SE
OF
LOW
-SU
LFU
R
DIE
SE
L O
IL0.
0049
LB/T
LAE
R
OK
-011
8H
UG
OG
EN
ER
ATI
NG
STA
OK
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
97-0
58-C
M-2
P
SD
2/9/
2007
EM
ER
GE
NC
YD
IES
EL
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
US
E O
F LO
W S
ULF
UR
N
O.2
FU
EL
OIL
CO
MB
INE
D
WIT
H G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S A
ND
LIM
ITE
D
AN
NU
AL
OP
ER
ATI
ON
0S
EE
NO
TEB
AC
T-P
SD
LA-0
211
GA
RY
VIL
LER
EFI
NE
RY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-719
12/2
7/20
06
EM
ER
GE
NC
YG
EN
ER
ATO
RS
(DO
CK
&am
p; T
AN
K
FAR
M) (
21-0
8 &
amp;
22
-08)
DIE
SE
L
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)
US
E O
F D
IES
EL
WIT
H A
S
ULF
UR
CO
NTE
NT
OF
15
PP
MV
OR
LE
SS
0.00
22LB
/HP
-HA
NN
UA
LA
VE
RA
GE
BA
CT-
PS
D
LA-0
204
PLA
QU
EM
INE
PV
C
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-70
9(M
-1)
2/27
/200
9
LAR
GE
EM
ER
GE
NC
YE
NG
INE
SD
IES
EL
Par
ticul
ate
mat
ter,
tota
l <
10 μ
(TP
M10
)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
GA
SE
OU
S F
UE
L B
UR
NIN
G0.
1LB
/MM
BTU
BA
CT-
PS
D
CO
-005
5
LAM
AR
LIG
HT
&
PO
WE
R P
OW
ER
P
LAN
TC
O
CO
LOR
AD
O D
EP
T O
F H
EA
LTH
- A
IR
PO
LL C
TRL
05P
R00
272/
3/20
06
DIE
SE
L E
NG
INE
S
FOR
SW
ITC
HIN
G,
LOC
OM
OTI
VE
&am
p;
FIR
E P
UM
PD
IES
EL
1500
HP
Par
ticul
ate
mat
ter,
filte
rabl
e &
lt; 1
0 μ
(FP
M10
)LO
W S
ULF
UR
FU
EL
- %0.
05
BY
WE
IGH
T0.
016
LB/M
MB
TUD
UR
ATI
ON
OF
TES
TSB
AC
T-P
SD
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
YU
MA
AZ
AR
IZO
NA
DE
PT
OF
EN
V Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2
DIE
SE
LFU
EL
10.9
MM
BTU
/HP
artic
ulat
e M
atte
r (P
M)
0.02
G/K
W-H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
it Is
suan
ce
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
1Em
issi
on L
imit
1 U
nit
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
YU
MA
AZ
AR
IZO
NA
DE
PT
OF
EN
V Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5
FIR
E W
ATE
R
PU
MP
S N
OS
1 A
ND
2
NO
. 2
DIE
SE
LFU
EL
5.46
MM
BTU
/HP
artic
ulat
e M
atte
r (P
M)
0.2
G/K
W-H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*TX
-072
8
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FAC
ILIT
YTX
TEX
AS
CO
MM
ISS
ION
ON
E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1182
39, N
200
4/1/
2015
Em
erge
ncy
Die
sel
Gen
erat
orD
iese
l15
00hp
Car
bon
Mon
oxid
eM
inim
ized
hou
rs o
f ope
ratio
ns T
ier I
I en
gine
0.01
26G
/HP
HR
OTH
ER
CA
SE
-BY
-C
AS
E
*AK
-008
2P
OIN
T TH
OM
SO
N
PR
OD
UC
TIO
N F
AC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5E
mer
genc
y C
amp
Gen
erat
ors
Ultr
a Lo
w
Sul
fur D
iese
l26
95hp
Car
bon
Mon
oxid
e2.
6G
RA
MS
/HP
-H
RB
AC
T-P
SD
*AK
-008
2P
OIN
T TH
OM
SO
N
PR
OD
UC
TIO
N F
AC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5Fi
ne W
ater
Pum
psU
ltra
Low
S
ulfu
r Die
sel
610
hpC
arbo
n M
onox
ide
2.6
GR
AM
S/H
P-
HR
BA
CT-
PS
D
*AK
-008
2P
OIN
T TH
OM
SO
N
PR
OD
UC
TIO
N F
AC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5B
ulk
Tank
G
ener
ator
Eng
ines
Ultr
a Lo
w
Sul
fur D
iese
l89
1hp
Car
bon
Mon
oxid
e2.
6G
RA
MS
/HP
-H
RB
AC
T-P
SD
*FL-
0346
LAU
DE
RD
ALE
PLA
NT
FL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
0110
037-
011-
AC
4/22
/201
4
Four
310
0 kW
bla
ck
star
t em
erge
ncy
gene
rato
rsU
LSD
2.32
MM
Btu
/hr (
HH
V)
per e
ngin
eC
arbo
n M
onox
ide
Goo
d co
mbu
stio
n pr
actic
e3.
5G
RA
MS
PE
R
KW
-HR
BA
CT-
PS
D
*WV
-002
5
MO
UN
DS
VIL
LEC
OM
BIN
ED
CY
CLE
P
OW
ER
PLA
NT
WV
WE
ST
VIR
GIN
IA
DE
PT.
OF
EN
VR
ION
ME
NTA
LP
RO
TEC
TIO
N; D
IV.
OF
AIR
QU
ALI
TYR
14-0
030
11/2
1/20
14E
mer
genc
yG
ener
ator
Die
sel
2015
.7H
PC
arbo
n M
onox
ide
0B
AC
T-P
SD
*IL-
0114
CR
ON
US
CH
EM
ICA
LS,
LLC
ILIL
LIN
OIS
EP
A,
BU
RE
AU
OF
AIR
1306
0007
9/5/
2014
Em
erge
ncy
Gen
erat
ordi
still
ate
fuel
oi
l37
55H
PC
arbo
n M
onox
ide
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Tab
le
7.3.
5G
/KW
-HR
BA
CT-
PS
D
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0C
arbo
n M
onox
ide
2.6
G/B
HP
-HR
BA
CT-
PS
D
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S2.
61G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
147-
3232
2-00
062
9/25
/201
3
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Car
bon
Mon
oxid
eG
OO
D C
OM
BU
STI
ON
PR
AC
TIC
ES
2.61
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S2.
61G
/BH
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
t Dril
ler
1D
iese
l0
Car
bon
Mon
oxid
e
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce m
anag
emen
t sys
tem
, po
sitiv
e cr
ankc
ase
vent
ilatio
n,
turb
ocha
rger
with
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
af
terc
oole
r.1.
98G
/KW
-HR
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2M
ain
Pro
puls
ion
Eng
ines
- C
.R. L
uigs
Die
sel
5875
hpC
arbo
n M
onox
ide
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce m
anag
emen
t sys
tem
an
d th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
mea
sure
men
t sys
tem
, po
sitiv
e cr
ankc
ase
vent
ilatio
n,
turb
ocha
rger
and
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
af
terc
oole
r.2.
42G
/KW
-HR
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
*OH
-035
5
GE
NE
RA
L E
LEC
TRIC
A
VIA
TIO
N, E
VE
ND
ALE
P
LAN
TO
H
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13
Test
Cel
l 1 fo
r A
ircra
ft E
ngin
es a
nd
Turb
ines
JET
FUE
L0
Car
bon
Mon
oxid
e5.
1LB
/MM
BTU
N/A
*OH
-035
5
GE
NE
RA
L E
LEC
TRIC
A
VIA
TIO
N, E
VE
ND
ALE
P
LAN
TO
H
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13
Test
Cel
l 2 fo
r A
ircra
ft E
ngin
es a
nd
Turb
ines
JET
FUE
L0
Car
bon
Mon
oxid
e7.
3LB
/MM
BTU
N/A
*PA
-029
1H
ICK
OR
Y R
UN
EN
ER
GY
S
TATI
ON
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
37-3
37A
4/23
/201
3E
ME
RG
EN
CY
GE
NE
RA
TOR
Ultr
a Lo
w
sulfu
r Dis
tilla
te7.
8M
MB
TU/H
Car
bon
Mon
oxid
e5.
79LB
/HO
THE
R C
AS
E-B
Y-
CA
SE
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N,
LLC
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R, E
AC
HC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
AN
D L
IMIT
ED
HO
UR
S O
F N
ON
-E
ME
RG
EN
CY
OP
ER
ATI
ON
0B
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N,
LLC
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
THR
EE
(3)
FIR
EW
ATE
RP
UM
P E
NG
INE
SD
IES
EL
575
HO
RS
EP
OW
ER
, EA
CH
Car
bon
Mon
oxid
e
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
AN
D L
IMIT
ED
HO
UR
S O
F N
ON
-E
ME
RG
EN
CY
OP
ER
ATI
ON
0B
AC
T-P
SD
*PA
-029
2M
L 35
LLC
/PH
ILA
C
YB
ER
CE
NTE
RP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
09-0
142B
6/1/
2012
DIE
SE
LG
EN
ER
ATO
R (2
.25
MW
EA
CH
) - 5
U
NIT
S#2
Oil
0C
arbo
n M
onox
ide
CO
Oxi
datio
n C
atal
yst
3.5
GR
AM
S/K
W-H
OTH
ER
CA
SE
-BY
-C
AS
E
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Car
bon
Mon
oxid
eC
OM
BU
STI
ON
DE
SIG
N
CO
NTR
OLS
AN
D U
SA
GE
LIM
ITS
2.6
G/H
P-H
BA
CT-
PS
D
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
PC
arbo
n M
onox
ide
CO
MB
US
TIO
N D
ES
IGN
C
ON
TRO
LS A
ND
US
AG
E L
IMIT
S2.
6G
/HP
-H3
HO
UR
SB
AC
T-P
SD
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
N
CO
MP
LEX
IA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
HC
arbo
n M
onox
ide
good
com
bust
ion
prac
tices
3.5
G/K
W-H
AV
ER
AG
E O
F TH
RE
E (3
) S
TAC
K T
ES
T R
UN
SB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RO
H
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1084
06/
18/2
013
Em
erge
ncy
gene
rato
rdi
esel
2250
KW
Car
bon
Mon
oxid
eP
urch
ased
cer
tifie
d to
the
stan
dard
s in
NS
PS
Sub
part
IIII
17.3
5LB
/HB
AC
T-P
SD
NJ-
0080
HE
SS
NE
WA
RK
E
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY08
857/
BO
P11
0001
11/1
/201
2E
mer
genc
yG
ener
ator
ULS
D20
0H
/YR
Car
bon
Mon
oxid
e11
.56
LB/H
BA
CT-
PS
D
PA
-027
8
MO
XIE
LIB
ER
TY
LLC
/AS
YLU
M P
OW
ER
P
L T
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
08·0
0045
A10
/10/
2012
Em
erge
ncy
Gen
erat
orD
iese
l0
Car
bon
Mon
oxid
e0.
13G
/B-H
P-H
OTH
ER
CA
SE
-BY
-C
AS
E
*MI-0
402
SU
MP
TER
PO
WE
R
PLA
NT
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne
(RIC
E)
Die
sel
732
HP
Car
bon
Mon
oxid
eG
ood
com
bust
ion
prac
tices
0.31
G/H
P-H
TES
TB
AC
T-P
SD
NJ-
0079
WO
OD
BR
IDG
E E
NE
RG
Y
CE
NTE
RN
J
NE
W J
ER
SE
Y D
EP
T O
F E
NV
P
RO
TEC
TIO
N,
DIV
ISIO
N O
F A
IR
QU
ALI
TY18
940
- B
OP
1100
037/
25/2
012
Em
erge
ncy
Gen
erat
or
Ultr
a Lo
w
Sul
fur d
istil
late
Die
sel
100
H/Y
RC
arbo
n M
onox
ide
Use
of U
LSD
oil
1.99
LB/H
BA
CT-
PS
D
CA
-121
2P
ALM
DA
LE H
YB
RID
P
OW
ER
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
9-01
10/1
8/20
11E
ME
RG
EN
CY
IC
EN
GIN
ED
IES
EL
2683
HP
Car
bon
Mon
oxid
e3.
5G
/KW
-HB
AC
T-P
SD
*SC
-013
2A
RG
OS
HA
RLE
YV
ILLE
P
LAN
TS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY09
00-0
004-
EF -
R2
12/1
4/20
07E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L10
00K
WC
arbo
n M
onox
ide
0B
AC
T-P
SD
CA
-119
1V
ICTO
RV
ILLE
2 H
YB
RID
P
OW
ER
PR
OJE
CT
CA
EP
A R
EG
ION
IXS
E 0
7-02
3/11
/201
0E
ME
RG
EN
CY
EN
GIN
ED
IES
EL
2000
KW
Car
bon
Mon
oxid
eO
PE
RA
TIO
NA
L R
ES
TRIC
TIO
N O
F 50
HR
/YR
3.5
G/K
W-H
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
HC
arbo
n M
onox
ide
good
com
bust
ion
prac
tices
3.5
G/K
W-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*WY
-007
0C
HE
YE
NN
E P
RA
IRIE
G
EN
ER
ATI
NG
STA
TIO
NW
Y
WY
OM
ING
AIR
Q
UA
L D
IVIS
ION
, AIR
Q
UA
LITY
CT-
1263
68/
28/2
012
Die
sel E
mer
genc
y G
ener
ator
(EP
15)
Ultr
a Lo
w
Sul
fur D
iese
l83
9hp
Car
bon
Mon
oxid
eE
PA
Tie
r 2 ra
ted
0B
AC
T-P
SD
AK
-007
6P
OIN
T TH
OM
SO
N
PR
OD
UC
TIO
N F
AC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T01
8/20
/201
2C
ombu
stio
n of
D
iese
l by
ICE
sU
LSD
1750
kWC
arbo
n M
onox
ide
3.5
G/K
W-H
BA
CT-
PS
D
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
PC
arbo
n M
onox
ide
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.1.
27LB
/HB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY06
80-0
046-
CB
2/10
/200
9
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PC
arbo
n M
onox
ide
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.3.
03LB
/HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08FI
RE
WA
TER
D
IES
EL
PU
MP
DIE
SE
L52
5H
PC
arbo
n M
onox
ide
TUN
E-U
PS
AN
D IN
SP
EC
TIO
NS
W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E G
OO
D
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.1.
27LB
/HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
020-
CB
11/2
5/20
08
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
PC
arbo
n M
onox
ide
3.03
LB/H
BA
CT-
PS
D
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
D
CO
GE
NE
RA
TIO
N P
LAN
TFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
600
HP
Em
erge
ncy
Equ
ipm
ent
Ultr
a-Lo
wS
ulfu
r Oil
0C
arbo
n M
onox
ide
See
Pol
luta
nt N
otes
.2.
6G
/HP
-HB
AC
T-P
SD
FL-0
332
HIG
HLA
ND
SB
IOR
EFI
NE
RY
AN
D
CO
GE
NE
RA
TIO
N P
LAN
TFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
6,05
5006
3-00
1-A
C9/
23/2
011
2000
KW
E
mer
genc
yE
quip
men
t0
Car
bon
Mon
oxid
eS
ee P
ollu
tant
Not
es.
3.5
G/K
W-H
BA
CT-
PS
D
SC
-011
3P
YR
AM
AX
CE
RA
MIC
S,
LLC
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U
OF
AIR
QU
ALI
TY01
60-0
023
2/8/
2012
EM
ER
GE
NC
YG
EN
ER
ATO
RS
1
THR
U 8
DIE
SE
L75
7H
PC
arbo
n M
onox
ide
EN
GIN
ES
MU
ST
BE
CE
RTI
FIE
D T
O
CO
MP
LY W
ITH
NS
PS
, SU
BP
AR
T III
I.3.
5G
R/K
W-H
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y Fi
re
Pum
p E
ngin
eD
iese
l0
Car
bon
Mon
oxid
e
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
005
TON
S P
ER
Y
EA
R12
-MO
NTH
RO
LLIN
GB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y E
ngin
eD
iese
l0
Car
bon
Mon
oxid
e
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
09TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0C
arbo
n M
onox
ide
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
eng
ines
, and
ad
ditio
nal e
nhan
ced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce m
anag
emen
t sys
tem
an
d th
e D
iese
l Eng
ines
with
Tu
rboc
harg
ers
(DE
WT)
m
easu
rem
ent s
yste
m.
3.3
G/K
W-H
24-H
OU
RR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
3 a
nd 4
)D
iese
l0
Car
bon
Mon
oxid
e
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne4
TON
S P
ER
Y
EA
R12
-MO
NTH
RO
LLIN
GB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
1 a
nd 2
)D
iese
l0
Car
bon
Mon
oxid
e
Use
of c
ertif
ied
EP
A T
ier 1
eng
ines
an
d go
od c
ombu
stio
n pr
actic
es
base
d on
the
curr
ent m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r thi
s en
gine
.11
.8TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
PC
arbo
n M
onox
ide
ULT
RA
LO
W S
ULF
UR
DIE
SE
L A
ND
G
OO
D C
OM
BU
STI
ON
PR
AC
TIC
ES
2.6
G/H
P-H
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
LA-0
251
FLO
PA
M IN
C. F
AC
ILIT
YLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-74
7(M
1)4/
26/2
011
Larg
e G
ener
ator
E
ngin
es (1
7 un
its)
Die
sel
0C
arbo
n M
onox
ide
no a
dditi
onal
con
trol
0.03
LB/H
(591
HP
UN
ITS
)B
AC
T-P
SD
*SD
-000
5D
EE
R C
RE
EK
STA
TIO
NS
D
SO
UTH
DA
KO
TA
DE
PT
OF
WA
TER
&
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0E
mer
genc
yG
ener
ator
Dis
tilla
te O
il20
00K
ilow
atts
Car
bon
Mon
oxid
e0
BA
CT-
PS
D
*SD
-000
5D
EE
R C
RE
EK
STA
TIO
NS
D
SO
UTH
DA
KO
TA
DE
PT
OF
WA
TER
&
NA
T'L
RE
S28
.050
5-P
SD
6/29
/201
0Fi
re W
ater
Pum
pD
istil
late
Oil
577
hors
epow
erC
arbo
n M
onox
ide
0B
AC
T-P
SD
AL-
0251
HIL
LAB
EE
EN
ER
GY
C
EN
TER
AL
ALA
BA
MA
DE
PT
OF
EN
VIR
ON
ME
NTA
LM
GM
T31
0-00
22-
X00
19/
24/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
600
EK
WC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S0
BA
CT-
PS
D
FL-0
322
SW
EE
T S
OR
GH
UM
-TO
-E
THA
NO
L A
DV
AN
CE
D
BIO
RE
FIN
ER
YFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-41
2(0
5100
32-0
01-
AC
)12
/23/
2010
Em
erge
ncy
Gen
erat
ors,
Tw
o 26
82 H
P E
AU
LSD
0C
arbo
n M
onox
ide
3.5
G/K
W-H
BA
CT-
PS
D
ID-0
018
LAN
GLE
Y G
ULC
H
PO
WE
R P
LAN
TID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
009.
0092
6/25
/201
0
EM
ER
GE
NC
YG
EN
ER
ATO
RE
NG
INE
DIE
SE
L75
0K
WC
arbo
n M
onox
ide
TI
ER
2 E
NG
INE
-BA
SE
D,
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
(GC
P)
3.5
G/K
W-H
BA
CT-
PS
D
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
FIR
E P
UM
P
ULT
RA
LO
W
SU
LFU
RD
IES
EL
525
HP
Car
bon
Mon
oxid
e
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M S
ULF
UR
FU
EL
2.6
G/H
P-H
TES
T M
ETH
OD
BA
CT-
PS
D
MI-0
389
KA
RN
WE
AD
OC
K
GE
NE
RA
TIN
GC
OM
PLE
XM
I
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
341-
0712
/29/
2009
EM
ER
GE
NC
YG
EN
ER
ATO
R
ULT
RA
LO
W
SU
LFU
RD
IES
EL
2000
KW
Car
bon
Mon
oxid
e
EN
GIN
E D
ES
IGN
AN
D
OP
ER
ATI
ON
. 15
PP
M S
ULF
UR
FU
EL.
3.5
G/K
W-H
TES
T M
ETH
OD
BA
CT-
PS
D
NV
-005
0M
GM
MIR
AG
EN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY82
511
/30/
2009
EM
ER
GE
NC
YG
EN
ER
ATO
RS
- U
NIT
S L
X02
4 A
ND
LX
025
AT
LUX
OR
DIE
SE
L O
IL22
06H
PC
arbo
n M
onox
ide
TUR
BO
CH
AR
GE
R A
ND
GO
OD
C
OM
BU
STI
ON
PR
AC
TIC
ES
0.00
18LB
/HP
-HLA
ER
NV
-004
9H
AR
RA
H'S
OP
ER
ATI
NG
C
OM
PA
NY
, IN
C.
NV
CLA
RK
CO
. DE
PT.
O
F A
IR Q
UA
LITY
257
8/20
/200
9
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S (&
gt;6
00
HP
) - U
NIT
HA
13D
IES
EL
OIL
1232
HP
Car
bon
Mon
oxid
eTH
E U
NIT
IS E
QU
IPP
ED
WIT
H A
TU
RB
OC
HA
RG
ER
.0.
0055
LB/H
P-H
Oth
er C
ase-
by-
Cas
e
OK
-012
9C
HO
UTE
AU
PO
WE
R
PLA
NT
OK
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2007
-115
-C(M
-1)
PS
D1/
23/2
009
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
(220
0 H
P)
LOW
SU
LFU
RD
IES
EL
2200
HP
Car
bon
Mon
oxid
e12
.66
LB/H
BA
CT-
PS
D
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CE
NTE
RID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
2 M
W
EM
ER
GE
NC
YG
EN
ER
ATO
R,
SR
C25
AS
TM #
1, 2
, D
IES
EL
2000
KW
Car
bon
Mon
oxid
eG
OO
D C
OM
BU
STI
ON
PR
AC
TIC
ES
. E
PA
CE
RTI
FIE
D P
ER
NS
PS
IIII
0S
EE
NO
TEB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
ID-0
017
PO
WE
R C
OU
NTY
A
DV
AN
CE
D E
NE
RG
Y
CE
NTE
RID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
008.
0066
2/10
/200
9
500
KW
E
ME
RG
EN
CY
GE
NE
RA
TOR
,FI
RE
PU
MP
, S
RC
26A
STM
#1,
2,
DIE
SE
L50
0K
WC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S.
EP
A C
ER
TIFI
CA
TIO
N P
ER
NS
PS
III
I.0
SE
E N
OTE
BA
CT-
PS
D
FL-0
310
SH
AD
Y H
ILLS
G
EN
ER
ATI
NG
STA
TIO
NFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-40
21/
12/2
009
2.5
MW
E
ME
RG
EN
CY
GE
NE
RA
TOR
ULT
RA
LO
W
S O
IL2.
5M
WC
arbo
n M
onox
ide
PU
RC
HA
SE
D M
OD
EL
IS A
T LE
AS
T A
S S
TRIN
GE
NT
AS
TH
E B
AC
T V
ALU
ES
UN
DE
R E
PA
'S
CE
RTI
FIC
ATI
ON
.8.
5G
/HP
-H
3 O
NE
HO
UR
TE
ST
RU
NS
BY
E
PA
ME
THO
D 1
0B
AC
T-P
SD
PA
-027
1M
ER
CK
& C
O.
WE
STP
OIN
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
46-0
005A
B2/
23/2
007
MO
BIL
EE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
LC
arbo
n M
onox
ide
0.78
G/B
-HP
-HO
THE
R C
AS
E-B
Y-
CA
SE
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
N F
AC
ILIT
YLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-742
6/22
/200
9FI
RE
WA
TER
D
IES
EL
PU
MP
S (3
)D
IES
EL
575
HP
EA
CH
Car
bon
Mon
oxid
eC
OM
PLY
WIT
H 4
0 C
FR 6
0 S
UB
PA
RT
IIII
0.37
LB/H
MA
XIM
UM
(EA
CH
)B
AC
T-P
SD
LA-0
231
LAK
E C
HA
RLE
S
GA
SIF
ICA
TIO
N F
AC
ILIT
YLA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-742
6/22
/200
9
EM
ER
GE
NC
YD
IES
EL
PO
WE
R
GE
NE
RA
TOR
EN
GIN
ES
(2)
DIE
SE
L13
41H
P E
AC
HC
arbo
n M
onox
ide
CO
MP
LY W
ITH
40
CFR
60
SU
BP
AR
T III
I0.
62LB
/HM
AX
IMU
N(E
AC
H)
BA
CT-
PS
D
AK
-006
6
EN
DIC
OTT
PR
OD
UC
TIO
N F
AC
ILIT
Y,
LIB
ER
TYD
EV
ELO
PM
EN
TP
RO
JEC
TA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
0181
CP
T06,
RE
VIS
ION
2
6/15
/200
9E
U ID
58,
CA
MP
E
NG
INE
3D
ISTI
LLA
TE10
41H
PC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S2.
6G
/HP
-HB
AC
T-P
SD
OK
-012
8M
ID A
ME
RIC
AN
STE
EL
RO
LLIN
G M
ILL
OK
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2003
-106
-C(M
-1)
PS
D9/
8/20
08E
mer
genc
yG
ener
ator
No.
2 d
iese
l12
00H
PC
arbo
n M
onox
ide
6.6
LB/H
BA
CT-
PS
D
OH
-031
7O
HIO
RIV
ER
CLE
AN
FU
ELS
, LLC
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
02-2
2896
11/2
0/20
08E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L FU
EL
OIL
2922
HP
Car
bon
Mon
oxid
eG
OO
D C
OM
BU
STI
ON
PR
AC
TIC
ES
A
ND
GO
OD
EN
GIN
E D
ES
IGN
15.1
8LB
/HB
AC
T-P
SD
NV
-004
7N
ELL
IS A
IR F
OR
CE
B
AS
EN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY11
42/
26/2
008
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S (&
gt;5
00
HP
)D
IES
EL
OIL
Car
bon
Mon
oxid
eTU
RB
OC
HA
RG
ER
AN
D
AFT
ER
CO
OLE
R0.
22G
/B-H
P-H
Oth
er C
ase-
by-
Cas
e
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
700
KW
Car
bon
Mon
oxid
e3.
5G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
FIR
E P
UM
P
EN
GIN
ED
IES
EL
575
HP
Car
bon
Mon
oxid
e3.
5G
/KW
-H
AV
ER
AG
E O
F TH
RE
E S
TAC
K
TES
T R
UN
SB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
MN
-007
1FA
IRB
AU
LT E
NE
RG
Y
PA
RK
MN
MIN
NE
SO
TA P
OLL
C
TRL
AG
CY
, AIR
Q
UA
L D
IV13
1000
71-0
036/
5/20
07E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 217
50K
WC
arbo
n M
onox
ide
0.00
55LB
/HP
-H3
HO
UR
A
VE
RA
GE
BA
CT-
PS
D
VA
-030
5IN
GE
NC
O K
&O
FA
CIL
ITY
VA
VIR
GIN
IA D
EP
T. O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY; D
IVIS
ION
O
F A
IR Q
UA
LITY
5214
89/
26/2
007
ELE
CTR
ICG
EN
ER
ATI
ON
DIS
TILL
ATE
OIL
550
HH
PC
arbo
n M
onox
ide
EN
GIN
E C
ON
TRO
L M
OD
ULE
240
T/Y
RN
/A
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
660
HP
Car
bon
Mon
oxid
e
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
AN
D G
OO
D E
NG
INE
DE
SIG
N
INC
OR
PO
RA
TIN
G F
UE
L IN
JEC
TIO
N T
IMIN
G R
ETA
RD
ATI
ON
(IT
R)
0.3
LB/H
HO
UR
LYM
AX
IMU
MB
AC
T-P
SD
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
525
HP
Car
bon
Mon
oxid
e
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
AN
D G
OO
D E
NG
INE
DE
SIG
N
INC
OR
PO
RA
TIN
G F
UE
L IN
JEC
TIO
N T
IMIN
G R
ETA
RD
ATI
ON
(IT
R)
1.6
LB/H
HO
UR
LYM
AX
IMU
MB
AC
T-P
SD
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-714
8/15
/200
7
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
S. 1
&am
p; 2
DIE
SE
L21
68H
P E
AC
HC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N P
RA
CTI
CE
S
AN
D G
OO
D E
NG
INE
DE
SIG
N
INC
OR
PO
RA
TIN
G F
UE
L IN
JEC
TIO
N T
IMIN
G R
ETA
RD
ATI
ON
(IT
R)
12.2
4LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SIA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7FI
RE
PU
MP
DIE
SE
L #2
540
HP
Car
bon
Mon
oxid
e
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS S
PE
CIF
ED
.E
NG
INE
IS R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S B
AC
T (T
IER
3 N
ON
RO
AD
). T
HIS
CO
ULD
R
EQ
UIR
E A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S A
ND
O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
2.6
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R
RA
PID
SIA
IOW
AD
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY57
-01-
080
6/29
/200
7E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L15
00K
WC
arbo
n M
onox
ide
NO
SP
EC
IFIC
CO
NTR
OL
TEC
HN
OLO
GY
IS S
PE
CIF
ED
.E
NG
INE
IS R
EQ
UIR
ED
TO
ME
ET
LIM
ITS
ES
TAB
LIS
HE
D A
S B
AC
T (T
IER
2 N
ON
RO
AD
). T
HIS
CO
ULD
R
EQ
UIR
E A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S A
ND
O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
2.6
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
MS
-008
6
CH
EV
RO
N P
RO
DU
CTS
C
OM
PA
NY
,P
AS
CA
GO
ULA
RE
FIN
ER
YM
S
MIS
SIS
SIP
PI D
EP
T O
FE
NV
IRO
NM
EN
TAL
QU
ALI
TY12
80-0
0058
5/8/
2007
TEM
PO
RA
RY
,P
OR
TAB
LEC
RU
DE
I G
EN
ER
ATO
RD
IES
EL
Car
bon
Mon
oxid
e2.
16LB
/H3-
HR
RO
LLIN
G
AV
ER
AG
EB
AC
T-P
SD
NV
-004
5S
LOA
N Q
UA
RR
YN
VC
LAR
K C
O. D
EP
T.
OF
AIR
QU
ALI
TY37
212
/11/
2006
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
DIE
SE
L O
IL12
GA
L/H
Car
bon
Mon
oxid
e
OP
ER
ATI
NG
AC
CO
RD
ING
TO
TH
E
MA
NU
FAC
TUR
ER
'SS
PE
CIF
ICA
TIO
N0.
1LB
/TB
AC
T-P
SD
OK
-011
8H
UG
O G
EN
ER
ATI
NG
S
TAO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
97-0
58-C
M-2
P
SD
2/9/
2007
EM
ER
GE
NC
YD
IES
EL
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
SC
arbo
n M
onox
ide
US
E O
F LO
W S
ULF
UR
NO
.2 F
UE
L O
IL C
OM
BIN
ED
WIT
H G
OO
D
CO
MB
US
TIO
N P
RA
CTI
CE
S A
ND
LI
MIT
ED
AN
NU
AL
OP
ER
ATI
ON
0S
EE
NO
TEB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
utU
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
LA-0
211
GA
RY
VIL
LE R
EFI
NE
RY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-719
12/2
7/20
06
EM
ER
GE
NC
YG
EN
ER
ATO
RS
(DO
CK
&am
p;
TAN
K F
AR
M) (
21-
08 &
amp;
22-
08)
DIE
SE
LC
arbo
n M
onox
ide
US
E O
F D
IES
EL
WIT
H A
SU
LFU
R
CO
NTE
NT
OF
15 P
PM
V O
R L
ES
S0.
0067
LB/H
P-H
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
LA-0
204
PLA
QU
EM
INE
PV
C
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-70
9(M
-1)
2/27
/200
9
LAR
GE
EM
ER
GE
NC
YE
NG
INE
SD
IES
EL
Car
bon
Mon
oxid
eG
OO
D C
OM
BU
STI
ON
PR
AC
TIC
ES
A
ND
GA
SE
OU
S F
UE
L B
UR
NIN
G0.
85LB
/MM
BTU
BA
CT-
PS
D
CO
-005
5LA
MA
R L
IGH
T &
P
OW
ER
PO
WE
R P
LAN
TC
O
CO
LOR
AD
O D
EP
T O
F H
EA
LTH
- A
IR
PO
LL C
TRL
05P
R00
272/
3/20
06
DIE
SE
L E
NG
INE
S
FOR
SW
ITC
HIN
G,
LOC
OM
OTI
VE
&am
p; F
IRE
PU
MP
DIE
SE
L15
00H
PC
arbo
n M
onox
ide
GO
OD
CO
MB
US
TIO
N
MA
NA
GE
ME
NT
PR
AC
TIC
E0.
61LB
/MM
BTU
DU
RA
TIO
N O
F TE
STS
BA
CT-
PS
D
KS
-002
8N
EA
RM
AN
CR
EE
K
PO
WE
R S
TATI
ON
KS
KA
NS
AS
CIT
Y/W
YA
ND
OTT
EC
O H
EA
LTH
DE
PT,
K
SC
-578
010
/18/
2005
EM
ER
GE
NC
YB
LAC
K S
TAR
T G
EN
ER
ATO
RN
O. 2
FU
EL
OIL
24.1
MM
BTU
/HC
arbo
n M
onox
ide
GO
OD
EN
GIN
E D
ES
IGN
IS
PR
OP
OS
ED
AS
BA
CT
7.01
LB/H
FULL
LO
AD
O
PE
RA
TIO
NS
BA
CT-
PS
D
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
Z
AR
IZO
NA
DE
PT
OF
EN
V Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5
FIR
E W
ATE
R
PU
MP
S N
OS
1
AN
D 2
NO
. 2
DIE
SE
L FU
EL
5.46
MM
BTU
/HC
arbo
n M
onox
ide
3.5
G/K
W-H
BA
CT-
PS
D
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
Z
AR
IZO
NA
DE
PT
OF
EN
V Q
UA
L, O
FC O
F A
IR Q
UA
1001
205
4/14
/200
5E
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2
DIE
SE
L FU
EL
10.9
MM
BTU
/HC
arbo
n M
onox
ide
3.5
G/K
W-H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*TX
-072
8
PE
ON
Y C
HE
MIC
AL
MA
NU
FAC
TUR
ING
FAC
ILIT
YTX
TEX
AS
CO
MM
ISS
ION
O
N E
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1182
39, N
200
4/1/
2015
Em
erge
ncy
Die
sel
Gen
erat
orD
iese
l15
00hp
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Min
imiz
ed h
ours
of
oper
atio
ns T
ier I
I eng
ine
0.7
LB/H
RO
THE
R C
AS
E-B
Y-
CA
SE
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q12
01C
PT0
31/
23/2
015
Em
erge
ncy
Cam
p G
ener
ator
sU
ltra
Low
S
ulfu
r Die
sel
2695
hp
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.00
07LB
/HP
-HR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q12
01C
PT0
31/
23/2
015
Fine
Wat
er P
umps
Ultr
a Lo
w
Sul
fur D
iese
l61
0hp
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.00
07LB
/HP
-HR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
KA
LAS
KA
DE
PT
OF
EN
VIR
ON
ME
NTA
L C
ON
SA
Q12
01C
PT0
31/
23/2
015
Bul
k Ta
nk
Gen
erat
or E
ngin
esU
ltra
Low
S
ulfu
r Die
sel
891
hp
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.00
07LB
/HP
-HR
BA
CT-
PS
D
*WV
-002
5
MO
UN
DS
VIL
LEC
OM
BIN
ED
CY
CLE
P
OW
ER
PLA
NT
WV
WE
ST
VIR
GIN
IA D
EP
T.
OF
EN
VR
ION
ME
NTA
L P
RO
TEC
TIO
N; D
IV. O
F A
IR Q
UA
LITY
R14
-003
011
/21/
2014
Em
erge
ncy
Gen
erat
orD
iese
l20
15.7
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
1.24
LB/H
RB
AC
T-P
SD
*IL-
0114
CR
ON
US
CH
EM
ICA
LS, L
LCIL
ILLI
NO
IS E
PA
, BU
RE
AU
O
F A
IR13
0600
079/
5/20
14E
mer
genc
yG
ener
ator
dist
illat
e fu
el o
il37
55H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Tier
IV s
tand
ards
for
non-
road
eng
ines
at 4
0 C
FR 1
039.
102,
Tab
le 7
.0.
4G
/KW
-HR
BA
CT-
PS
D
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.15
G/B
HP
-HR
BA
CT-
PS
D
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IR14
7-32
322-
0006
29/
25/2
013
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.31
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-018
0M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, DIE
SE
L36
00B
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.31
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-017
3M
IDW
ES
T FE
RTI
LIZE
R
CO
RP
OR
ATI
ON
ININ
DIA
NA
DE
PT
OF
EN
V
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
9/25
/201
3
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, DIE
SE
L36
00B
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.31
G/B
HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
tD
rille
r 1D
iese
l0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
en
gine
s, a
nd a
dditi
onal
en
hanc
ed w
ork
prac
tice
stan
dard
s in
clud
ing
an
engi
ne p
erfo
rman
ce
man
agem
ent s
yste
m,
posi
tive
cran
kcas
e ve
ntila
tion,
turb
ocha
rger
w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
in
ject
ion
with
af
terc
oole
r.0.
39G
/KW
-HR
24-H
OU
R R
OLL
ING
BA
CT-
PS
D
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
C.R
. Lu
igs
Die
sel
5875
hp
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
en
gine
s, a
nd a
dditi
onal
en
hanc
ed w
ork
prac
tice
stan
dard
s in
clud
ing
an
engi
ne p
erfo
rman
ce
man
agem
ent s
yste
m
and
the
Die
sel E
ngin
es
with
Tur
boch
arge
rs
mea
sure
men
t sys
tem
, po
sitiv
e cr
ankc
ase
vent
ilatio
n, tu
rboc
harg
er
and
afte
rcoo
ler,
and
high
pre
ssur
e fu
el
inje
ctio
n w
ith
afte
rcoo
ler.
0.39
G/K
W-H
R24
-HO
UR
RO
LLIN
G
SC
-015
9U
S10
FA
CIL
ITY
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0200
-022
5-C
A7/
9/20
12
EM
ER
GE
NC
YG
EN
ER
ATO
RS
,G
EN
1, G
EN
2D
IES
EL
1000
KW
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
BA
CT
HA
S B
EE
N
DE
TER
MIN
ED
TO
BE
C
OM
PLI
AN
CE
WIT
H
NS
PS
, SU
BP
AR
T III
I, 40
CFR
60.4
202
AN
D
40 C
FR60
.420
5.6.
4G
/KW
-HB
AC
T-P
SD
*OH
-035
5
GE
NE
RA
L E
LEC
TRIC
A
VIA
TIO
N, E
VE
ND
ALE
P
LAN
TO
HO
HIO
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N A
GE
NC
YP
0112
127
5/7/
2013
Test
Cel
l 1 fo
r A
ircra
ft E
ngin
es
and
Turb
ines
JET
FUE
L0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.7
LB/M
MB
TUN
/A
*OH
-035
5
GE
NE
RA
L E
LEC
TRIC
A
VIA
TIO
N, E
VE
ND
ALE
P
LAN
TO
HO
HIO
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N A
GE
NC
YP
0112
127
5/7/
2013
Test
Cel
l 2 fo
r A
ircra
ft E
ngin
es
and
Turb
ines
JET
FUE
L0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.7
LB/M
MB
TUN
/A
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*PA
-029
2M
L 35
LLC
/PH
ILA
C
YB
ER
CE
NTE
RP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY09
-014
2B6/
1/20
12
DIE
SE
LG
EN
ER
ATO
R(2
.25
MW
EA
CH
) -5
UN
ITS
#2 O
il0
Hyd
roca
rbon
s,To
tal
CO
Oxi
datio
n C
atal
yst
0.08
LB/H
OTH
ER
CA
SE
-BY
-C
AS
E
*PA
-029
1H
ICK
OR
Y R
UN
E
NE
RG
Y S
TATI
ON
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY37
-337
A4/
23/2
013
EM
ER
GE
NC
YG
EN
ER
ATO
RU
ltra
Low
su
lfur D
istil
late
7.8
MM
BTU
/H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.7
LB/H
OTH
ER
CA
SE
-BY
-C
AS
E
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IR14
1-31
003-
0057
912
/3/2
012
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
CO
MB
US
TIO
ND
ES
IGN
CO
NTR
OLS
A
ND
US
AG
E L
IMIT
S1.
04LB
/HB
AC
T-P
SD
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
M
GM
T, O
FC O
F A
IR14
1-31
003-
0057
912
/3/2
012
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
CO
MB
US
TIO
ND
ES
IGN
CO
NTR
OLS
A
ND
US
AG
E L
IMIT
S1.
04LB
/H3
HO
UR
SB
AC
T-P
SD
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
N C
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
good
com
bust
ion
prac
tices
4G
/KW
-H
AV
ER
AG
E O
F TH
RE
E
(3) S
TAC
K T
ES
T R
UN
SB
AC
T-P
SD
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RO
HO
HIO
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N A
GE
NC
YP
0110
840
6/18
/201
3E
mer
genc
yge
nera
tor
dies
el22
50K
W
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Pur
chas
ed c
ertif
ied
to
the
stan
dard
s in
NS
PS
S
ubpa
rt III
I3.
93LB
/HB
AC
T-P
SD
NJ-
0080
HE
SS
NE
WA
RK
E
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
PR
OTE
CTI
ON
, D
IVIS
ION
OF
AIR
Q
UA
LITY
0885
7/B
OP
110
001
11/1
/201
2E
mer
genc
yG
ener
ator
ULS
D20
0H
/YR
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
use
of U
LSD
, a lo
w
sulfu
r cle
an fu
el2.
62LB
/HLA
ER
PA
-027
8
MO
XIE
LIB
ER
TY
LLC
/AS
YLU
M P
OW
ER
P
L T
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY08
·000
45A
10/1
0/20
12E
mer
genc
yG
ener
ator
Die
sel
0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.01
G/B
-HP
-HO
THE
R C
AS
E-B
Y-
CA
SE
NJ-
0079
WO
OD
BR
IDG
EE
NE
RG
Y C
EN
TER
NJ
NE
W J
ER
SE
Y D
EP
T O
F E
NV
PR
OTE
CTI
ON
, D
IVIS
ION
OF
AIR
Q
UA
LITY
1894
0 -
BO
P11
0003
7/25
/201
2E
mer
genc
yG
ener
ator
Ultr
a Lo
w
Sul
fur d
istil
late
D
iese
l10
0H
/YR
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of U
LSD
oil
0.49
LB/H
LAE
R
*SC
-013
2A
RG
OS
HA
RLE
YV
ILLE
P
LAN
TS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0900
-000
4-E
F-R
212
/14/
2007
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
1000
KW
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0B
AC
T-P
SD
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
good
com
bust
ion
prac
tices
0.4
G/K
W-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
0-C
B11
/25/
2008
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.32
LB/H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0680
-004
6-C
B2/
10/2
009
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L14
00H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E
GO
OD
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.0.
32LB
/HB
AC
T-P
SD
SC
-011
4G
P A
LLE
ND
ALE
LP
SC
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
0-C
B11
/25/
2008
FIR
E W
ATE
R
DIE
SE
L P
UM
PD
IES
EL
525
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E
GO
OD
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.0.
47LB
/HB
AC
T-P
SD
SC
-011
5G
P C
LAR
EN
DO
N L
PS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0680
-004
6-C
B2/
10/2
009
FIR
E W
ATE
R
DIE
SE
L P
UM
PD
IES
EL
525
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TUN
E-U
PS
AN
D
INS
PE
CTI
ON
S W
ILL
BE
PE
RFO
RM
ED
AS
O
UTL
INE
D IN
TH
E
GO
OD
MA
NA
GE
ME
NT
PR
AC
TIC
E P
LAN
.0.
47LB
/HB
AC
T-P
SD
SC
-011
3P
YR
AM
AX
CE
RA
MIC
S, L
LCS
C
SO
UTH
CA
RO
LIN
A
DE
PT
OF
HE
ALT
H &
E
NV
CTR
L, B
UR
EA
U O
F A
IR Q
UA
LITY
0160
-002
32/
8/20
12
EM
ER
GE
NC
YG
EN
ER
ATO
RS
1
THR
U 8
DIE
SE
L75
7H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
PU
RC
HA
SE
EN
GIN
ES
C
ER
TIFI
ED
TO
C
OM
PLY
WIT
H N
SP
S,
SU
BP
AR
T III
I.4
GR
/KW
-HB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y Fi
re
Pum
p E
ngin
eD
iese
l0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
002
TON
S P
ER
Y
EA
R12
-MO
NTH
RO
LLIN
GB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
yE
ngin
eD
iese
l0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne0.
03TO
NS
PE
R
YE
AR
12-M
ON
TH R
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
hese
en
gine
s, a
nd a
dditi
onal
en
hanc
ed w
ork
prac
tice
stan
dard
s in
clud
ing
an
engi
ne p
erfo
rman
ce
man
agem
ent s
yste
m
and
the
Die
sel E
ngin
es
with
Tur
boch
arge
rs
(DE
WT)
mea
sure
men
t sy
stem
.0.
39G
/KW
-H24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
1 a
nd 2
)D
iese
l0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of c
ertif
ied
EP
A
Tier
1 e
ngin
es a
nd g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
ssp
ecifi
catio
ns fo
r thi
s en
gine
.1.
3TO
NS
PE
R
YE
AR
12-M
ON
TH R
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
3 a
nd 4
)D
iese
l0
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
Use
of g
ood
com
bust
ion
prac
tices
, bas
ed o
n th
e cu
rren
t man
ufac
ture
r?s
spec
ifica
tions
for t
his
engi
ne1.
5TO
NS
PE
R
YE
AR
12-M
ON
TH R
OLL
ING
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
528/
16/2
011
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
ULT
RA
LO
W S
ULF
UR
D
IES
EL
AN
D G
OO
D
CO
MB
US
TIO
NP
RA
CTI
CE
S1
G/H
P-H
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
AL-
0251
HIL
LAB
EE
EN
ER
GY
C
EN
TER
AL
ALA
BA
MA
DE
PT
OF
EN
VIR
ON
ME
NTA
LM
GM
T31
0-00
22-
X00
19/
24/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
600
EK
W
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0B
AC
T-P
SD
ID-0
018
LAN
GLE
Y G
ULC
H
PO
WE
R P
LAN
TID
IDA
HO
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
P-2
009.
0092
6/25
/201
0
EM
ER
GE
NC
YG
EN
ER
ATO
RE
NG
INE
DIE
SE
L75
0K
W
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TIE
R 2
EN
GIN
E-
B
AS
ED
,G
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S (G
CP
)6.
4G
/KW
-HN
OX
+NM
HC
BA
CT-
PS
D
NV
-005
0M
GM
MIR
AG
EN
VC
LAR
K C
O. D
EP
T. O
F A
IR Q
UA
LITY
825
11/3
0/20
09
EM
ER
GE
NC
YG
EN
ER
ATO
RS
- U
NIT
S L
X02
4 A
ND
LX
025
AT
LUX
OR
DIE
SE
L O
IL22
06H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TUR
BO
CH
AR
GE
RA
ND
GO
OD
C
OM
BU
STI
ON
PR
AC
TIC
ES
0.00
03LB
/HP
-HO
ther
Cas
e-by
-C
ase
NV
-004
9
HA
RR
AH
'SO
PE
RA
TIN
GC
OM
PA
NY
, IN
C.
NV
CLA
RK
CO
. DE
PT.
OF
AIR
QU
ALI
TY25
78/
20/2
009
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S(&
gt;6
00 H
P) -
U
NIT
HA
13D
IES
EL
OIL
1232
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
THE
UN
IT IS
E
QU
IPP
ED
WIT
H A
TU
RB
OC
HA
RG
ER
.0.
0007
LB/H
P-H
Oth
er C
ase-
by-
Cas
e
OK
-012
9C
HO
UTE
AU
PO
WE
R
PLA
NT
OK
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2007
-115
-C
(M-1
)PS
D1/
23/2
009
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
(220
0 H
P)
LOW
SU
LFU
R
DIE
SE
L22
00H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N1.
55LB
/HB
AC
T-P
SD
FL-0
310
SH
AD
Y H
ILLS
G
EN
ER
ATI
NG
STA
TIO
NFL
FLO
RID
A D
EP
T. O
F E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
PS
D-F
L-40
21/
12/2
009
2.5
MW
E
ME
RG
EN
CY
GE
NE
RA
TOR
ULT
RA
LO
W
S O
IL2.
5M
WH
ydro
carb
ons,
Tota
l
FIR
ING
OF
ULT
RA
LO
W S
ULF
UR
OIL
(U
LSO
).1
G/H
P-H
BA
CT-
PS
D
PA
-027
1M
ER
CK
& C
O.
WE
STP
OIN
TP
A
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
L P
RO
TEC
TIO
N, B
UR
EA
U
OF
AIR
QU
ALI
TY46
-000
5AB
2/23
/200
7
MO
BIL
EE
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.32
G/B
-HP
-HO
THE
R C
AS
E-B
Y-
CA
SE
OK
-012
8M
ID A
ME
RIC
AN
S
TEE
L R
OLL
ING
MIL
LO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
2003
-106
-C
(M-1
) PS
D9/
8/20
08E
mer
genc
yG
ener
ator
No.
2 d
iese
l12
00H
P
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.77
LB/H
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
OH
-031
7O
HIO
RIV
ER
CLE
AN
FU
ELS
, LLC
OH
OH
IO E
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
02-2
2896
11/2
0/20
08E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L FU
EL
OIL
2922
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
GO
OD
EN
GIN
E
DE
SIG
N1.
39LB
/HB
AC
T-P
SD
NV
-004
7N
ELL
IS A
IR F
OR
CE
B
AS
EN
VC
LAR
K C
O. D
EP
T. O
F A
IR Q
UA
LITY
114
2/26
/200
8
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S(&
gt;5
00 H
P)
DIE
SE
L O
IL
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
TUR
BO
CH
AR
GE
RA
ND
AFT
ER
CO
OLE
R0.
2G
/B-H
P-H
Oth
er C
ase-
by-
Cas
e
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
FIR
E P
UM
P
EN
GIN
ED
IES
EL
575
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.1
G/K
W-H
AV
ER
AG
E O
F TH
RE
E
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
IA-0
095
TATE
& L
YLE
IN
DG
RE
DIE
NTS
AM
ER
ICA
S, I
NC
.IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TYP
RO
JEC
T 08
-12
69/
19/2
008
EM
ER
GE
NC
YG
EN
ER
ATO
RD
IES
EL
700
KW
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.2
G/K
W-H
AV
ER
AG
E O
F TH
RE
E
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
MN
-007
1FA
IRB
AU
LT E
NE
RG
Y
PA
RK
MN
MIN
NE
SO
TA P
OLL
CTR
L A
GC
Y, A
IR Q
UA
L D
IV13
1000
71-
003
6/5/
2007
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
1750
KW
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
0.00
07LB
/HP
-H3
HO
UR
AV
ER
AG
EB
AC
T-P
SD
VA
-030
5IN
GE
NC
O K
&O
FA
CIL
ITY
VA
VIR
GIN
IA D
EP
T. O
F E
NV
IRO
NM
EN
TAL
QU
ALI
TY; D
IVIS
ION
OF
AIR
QU
ALI
TY52
148
9/26
/200
7E
LEC
TRIC
GE
NE
RA
TIO
ND
ISTI
LLA
TEO
IL55
0H
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
NS
PR
AC
TIC
ES
AN
D
CO
NTI
NU
OU
SM
ON
ITO
RIN
GD
EV
ICE
S15
4.5
T/Y
RN
/A
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
660
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
GO
OD
EN
GIN
E
DE
SIG
N0.
04LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
FIR
EW
ATE
RP
UM
P D
IES
EL
EN
GIN
ED
IES
EL
525
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
GO
OD
EN
GIN
E
DE
SIG
N0.
09LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
LA-0
219
CR
EO
LE T
RA
IL L
NG
IM
PO
RT
TER
MIN
AL
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
148/
15/2
007
DIE
SE
LE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
S. 1
&am
p; 2
DIE
SE
L21
68H
P E
AC
H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
GO
OD
EN
GIN
E
DE
SIG
N1.
67LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
tEm
issi
on L
imit
1 A
vg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY57
-01-
080
6/29
/200
7FI
RE
PU
MP
DIE
SE
L #2
540
HP
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
NO
SP
EC
IFIC
C
ON
TRO
LTE
CH
NO
LOG
Y IS
S
PE
CIF
ED
. E
NG
INE
IS
RE
QU
IRE
D T
O
ME
ET
LIM
ITS
E
STA
BLI
SH
ED
AS
B
AC
T (T
IER
3
NO
NR
OA
D).
TH
IS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S A
ND
O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.2
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
IA-0
088
AD
M C
OR
N
PR
OC
ES
SIN
G -
CE
DA
R R
AP
IDS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY57
-01-
080
6/29
/200
7E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L15
00K
W
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
NO
SP
EC
IFIC
C
ON
TRO
LTE
CH
NO
LOG
Y IS
S
PE
CIF
ED
. E
NG
INE
IS
RE
QU
IRE
D T
O
ME
ET
LIM
ITS
E
STA
BLI
SH
ED
AS
B
AC
T (T
IER
2
NO
NR
OA
D).
TH
IS
CO
ULD
RE
QU
IRE
A
NY
NU
MB
ER
OF
CO
NTR
OL
TEC
HN
OLO
GIE
S A
ND
O
PE
RA
TIO
NA
L R
EQ
. TO
ME
ET
THE
BA
CT
STA
ND
AR
D.
0.3
G/B
-HP
-HA
VE
RA
GE
OF
3 TE
ST
RU
NS
BA
CT-
PS
D
NV
-004
5S
LOA
N Q
UA
RR
YN
VC
LAR
K C
O. D
EP
T. O
F A
IR Q
UA
LITY
372
12/1
1/20
06
LAR
GE
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
DIE
SE
L O
IL12
GA
L/H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
N/A
0.03
2LB
/TB
AC
T-P
SD
OK
-011
8H
UG
O G
EN
ER
ATI
NG
S
TAO
K
OK
LAH
OM
AD
EP
AR
TME
NT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
97-0
58-C
M-2
P
SD
2/9/
2007
EM
ER
GE
NC
YD
IES
EL
INTE
RN
AL
CO
MB
US
TIO
NE
NG
INE
S
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
US
E O
F LO
W S
ULF
UR
N
O.2
FU
EL
OIL
C
OM
BIN
ED
WIT
H
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
AN
D
LIM
ITE
D A
NN
UA
L O
PE
RA
TIO
N0
SE
E N
OTE
BA
CT-
PS
D
LA-0
211
GA
RY
VIL
LER
EFI
NE
RY
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
Q
UA
LITY
PS
D-L
A-7
1912
/27/
2006
EM
ER
GE
NC
YG
EN
ER
ATO
RS
(DO
CK
&am
p;
TAN
K F
AR
M) (
21-
08 &
amp;
22-
08)
DIE
SE
L
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
US
E O
F D
IES
EL
WIT
H
A S
ULF
UR
CO
NTE
NT
OF
15 P
PM
V O
R L
ES
S0.
0025
LB/H
P-H
AN
NU
AL
AV
ER
AG
EB
AC
T-P
SD
IA-0
084
AD
M P
OLY
ME
RS
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S
AIR
QU
ALI
TY
PR
OJE
CT
NU
MB
ER
06-
203
11/3
0/20
06E
ME
RG
EN
CY
GE
NE
RA
TOR
DIE
SE
L FU
EL
74.3
GA
L/H
Vol
atile
Org
anic
C
ompo
unds
(VO
C)
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
4.8
GA
L/B
-HP
-HA
VE
RA
GE
OF
THR
EE
(3
) 1-H
TE
ST
RU
NS
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*TX
-076
6G
OLD
EN
PA
SS
LN
G
EX
PO
RT
TER
MIN
AL
TX
TEX
AS
CO
MM
ISS
ION
O
NE
NV
IRO
NM
EN
TAL
QU
ALI
TY (T
CE
Q)
1160
55,
PS
DTX
1386
,G
HG
PS
DTX
100
09/
11/2
015
Em
erge
ncy
Eng
ine
Gen
erat
orD
iese
l75
0hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)
Equ
ipm
ent s
peci
ficat
ions
& w
ork
prac
tices
- G
ood
com
bust
ion
prac
tices
and
lim
ited
oper
atio
nal
hour
s40
HR
/YR
BA
CT-
PS
D
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5Fi
ne W
ater
Pum
psU
ltra
Low
S
ulfu
r Die
sel
610
hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)56
5TO
NS
/YE
AR
CO
MB
INE
DB
AC
T-P
SD
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5E
mer
genc
y C
amp
Gen
erat
ors
Ultr
a Lo
w
Sul
fur D
iese
l26
95hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)23
32TO
NS
/YE
AR
CO
MB
INE
DB
AC
T-P
SD
*AK
-008
2
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T03
1/23
/201
5B
ulk
Tank
G
ener
ator
Eng
ines
Ultr
a Lo
w
Sul
fur D
iese
l89
1hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)71
94TO
NS
/YE
AR
CO
MB
INE
DB
AC
T-P
SD
*WV
-002
5
MO
UN
DS
VIL
LEC
OM
BIN
ED
CY
CLE
P
OW
ER
PLA
NT
WV
WE
ST
VIR
GIN
IA
DE
PT.
OF
EN
VR
ION
ME
NTA
LP
RO
TEC
TIO
N; D
IV.
OF
AIR
QU
ALI
TYR
14-0
030
11/2
1/20
14E
mer
genc
yG
ener
ator
Die
sel
2015
.7H
P
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)24
16LB
/HR
BA
CT-
PS
D
*IL-
0114
CR
ON
US
CH
EM
ICA
LS, L
LCIL
ILLI
NO
IS E
PA
, B
UR
EA
U O
F A
IR13
0600
079/
5/20
14E
mer
genc
yG
ener
ator
dist
illat
e fu
el
oil
3755
HP
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)
Tier
IV s
tand
ards
for n
on-r
oad
engi
nes
at 4
0 C
FR 1
039.
102,
Ta
ble
7.43
2TP
YB
AC
T-P
SD
*PR
-000
9
EN
ER
GY
AN
SW
ER
S
AR
EC
IBO
PU
ER
TO
RIC
O R
EN
EW
AB
LE
EN
ER
GY
PR
OJE
CT
PR
EP
A R
EG
ION
IIR
2-P
SD
14/
10/2
014
Em
erge
ncy
Die
sel
Gen
erat
orU
LSD
Fue
l oil
# 2
0
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)18
3TO
NS
/YE
AR
BA
CT-
PS
D
*CO
-006
7LA
NC
AS
TER
PLA
NT
CO
CO
LOR
AD
O D
EP
T O
F H
EA
LTH
- A
IR
PO
LL C
TRL
12W
E14
926/
4/20
13E
mer
genc
yG
ener
ator
dies
el19
950
gal p
er y
ear
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)N
SP
S II
II co
mpl
iant
.0
BA
CT-
PS
D
*IN
-018
5M
AG
PE
LLE
T LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
181-
3396
5-00
054
4/24
/201
4D
IES
EL
FIR
E
PU
MP
DIE
SE
L30
0H
P
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)31
.11
CO
2EB
AC
T-P
SD
*IN
-017
9O
HIO
VA
LLE
Y
RE
SO
UR
CE
S, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
147-
3232
2-00
062
9/25
/201
3
DIE
SE
L-FI
RE
DE
ME
RG
EN
CY
GE
NE
RA
TOR
NO
. 2 F
UE
L O
IL46
90B
-HP
Car
bon
Dio
xide
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
526.
39G
/B-H
P-H
3-H
R A
VE
RA
GE
BA
CT-
PS
D
*IN
-018
0
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PC
arbo
n D
ioxi
deG
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S52
6.39
G/B
-HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
*IN
-017
3
MID
WE
ST
FER
TILI
ZER
CO
RP
OR
ATI
ON
IN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
129-
3357
6-00
059
6/4/
2014
DIE
SE
L FI
RE
D
EM
ER
GE
NC
YG
EN
ER
ATO
RN
O. 2
, D
IES
EL
3600
BH
PC
arbo
n D
ioxi
deG
OO
D C
OM
BU
STI
ON
P
RA
CTI
CE
S52
6.39
G/B
HP
-H3-
HR
AV
ER
AG
EB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
Dev
elop
men
tD
rille
r 1D
iese
l0
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m, p
ositi
ve
cran
kcas
e ve
ntila
tion,
turb
ocha
rger
w
ith a
fterc
oole
r, an
d hi
gh p
ress
ure
fuel
inje
ctio
n w
ith a
fterc
oole
r.1.
16G
/KW
-HR
24-H
OU
R R
OLL
ING
BA
CT-
PS
D
*FL-
0338
SA
KE
PR
OS
PE
CT
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4008
5/30
/201
2
Mai
n P
ropu
lsio
n E
ngin
es -
C.R
. Lu
igs
Die
sel
5875
hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tur
boch
arge
rs
mea
sure
men
t sys
tem
, pos
itive
cr
ankc
ase
vent
ilatio
n, tu
rboc
harg
er
and
afte
rcoo
ler,
and
high
pre
ssur
e fu
el in
ject
ion
with
afte
rcoo
ler.
705
G/K
W-H
R24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*OH
-035
5
GE
NE
RA
LE
LEC
TRIC
AV
IATI
ON
,E
VE
ND
ALE
PLA
NT
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13
Test
Cel
l 1 fo
r A
ircra
ft E
ngin
es
and
Turb
ines
JET
FUE
L0
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)74
000
T/Y
R
TOTA
L FO
R 2
TE
ST
CE
LLS
AN
D
4 P
RE
HE
ATE
RS
N/A
*OH
-035
5
GE
NE
RA
LE
LEC
TRIC
AV
IATI
ON
,E
VE
ND
ALE
PLA
NT
OH
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1212
75/
7/20
13
Test
Cel
l 2 fo
r A
ircra
ft E
ngin
es
and
Turb
ines
JET
FUE
L0
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)74
000
T/Y
R
TOTA
L FO
R 2
TE
ST
CE
LLS
AN
D
4 P
RE
HE
ATE
RS
N/A
AK
-008
1
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T02
6/12
/201
3C
ombu
stio
nU
LSD
610
hp
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)G
ood
Com
bust
ion
and
Ope
ratin
g P
ract
ices
0O
THE
R C
AS
E-B
Y-
CA
SE
*PA
-029
1H
ICK
OR
Y R
UN
E
NE
RG
Y S
TATI
ON
PA
PE
NN
SY
LVA
NIA
DE
PT
OF
EN
VIR
ON
ME
NTA
LP
RO
TEC
TIO
N,
BU
RE
AU
OF
AIR
Q
UA
LITY
37-3
37A
4/23
/201
3E
ME
RG
EN
CY
GE
NE
RA
TOR
Ultr
a Lo
w
sulfu
r Dis
tilla
te7.
8M
MB
TU/H
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)80
.5TP
Y12
-MO
NTH
RO
LLIN
G B
AS
ISO
THE
R C
AS
E-B
Y-
CA
SE
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
TWO
(2)
EM
ER
GE
NC
YG
EN
ER
ATO
RS
DIE
SE
L13
41H
OR
SE
PO
WE
R,
EA
CH
Car
bon
Dio
xide
US
E O
F G
OO
D E
NG
INE
ER
ING
D
ES
IGN
AN
D E
FFIC
IEN
T E
NG
INE
S M
EE
TIN
G
AP
PLI
CA
BLE
NS
PS
AN
D M
AC
T S
TAN
DA
RD
S84
T/Y
R
TWE
LVE
CO
NS
EC
UTI
VE
MO
NTH
SB
AC
T-P
SD
*IN
-016
6IN
DIA
NA
GA
SIF
ICA
TIO
N, L
LCIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
T147
-304
64-
0006
06/
27/2
012
THR
EE
(3)
FIR
EW
ATE
RP
UM
P E
NG
INE
SD
IES
EL
575
HO
RS
EP
OW
ER
,E
AC
HC
arbo
n D
ioxi
de
US
E O
F G
OO
D E
NG
INE
ER
ING
D
ES
IGN
AN
D E
FFIC
IEN
T E
NG
INE
S M
EE
TIN
G
AP
PLI
CA
BLE
NS
PS
AN
D M
AC
T S
TAN
DA
RD
S84
T/Y
R
TWE
LVE
CO
NS
EC
UTI
VE
MO
NTH
SB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
TWO
(2)
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
SD
IES
EL
1006
HP
EA
CH
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)G
OO
D E
NG
INE
ER
ING
DE
SIG
N
AN
D F
UE
L E
FFIC
IEN
T D
ES
IGN
1186
TON
S12
CO
NS
EC
UTI
VE
M
ON
TH P
ER
IOD
BA
CT-
PS
D
*IN
-015
8
ST.
JO
SE
PH
E
NE
GR
Y C
EN
TER
, LL
CIN
IND
IAN
A D
EP
T O
F E
NV
MG
MT,
OFC
OF
AIR
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L20
12H
P
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)
GO
OD
EN
GIN
EE
RIN
G D
ES
IGN
A
ND
FU
EL
EFF
ICIE
NT
DE
SIG
NP
OS
T C
OM
BU
STI
ON
CA
RB
ON
C
AP
TUR
E11
86TO
NS
12 C
ON
SE
CU
TIV
E
MO
NTH
PE
RIO
DB
AC
T-P
SD
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
HM
etha
nego
od c
ombu
stio
n pr
actic
es0.
0001
G/K
W-H
AV
ER
AG
E O
F TH
RE
E (3
) STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
HC
arbo
n D
ioxi
dego
od c
ombu
stio
n pr
actic
es1.
55LB
/KW
-HR
AV
ER
AG
E O
F TH
RE
E (3
) STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
*IA
-010
6
CF
IND
US
TRIE
S
NIT
RO
GE
N, L
LC -
PO
RT
NE
AL
NIT
RO
GE
NC
OM
PLE
XIA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TYP
N 1
3-03
77/
12/2
013
Em
erge
ncy
Gen
erat
ors
dies
el fu
el18
0G
AL/
H
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)go
od c
ombu
stio
n pr
actic
es50
9TO
NS
/YR
RO
LLIN
G T
WE
LVE
(1
2) M
ON
TH
TOTA
LB
AC
T-P
SD
*OH
-035
2O
RE
GO
N C
LEA
N
EN
ER
GY
CE
NTE
RO
H
OH
IOE
NV
IRO
NM
EN
TAL
PR
OTE
CTI
ON
AG
EN
CY
P01
1084
06/
18/2
013
Em
erge
ncy
gene
rato
rdi
esel
2250
KW
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)87
8T/
YR
PE
R R
OLL
ING
12-
MO
NTH
SB
AC
T-P
SD
*MI-0
402
SU
MP
TER
PO
WE
R
PLA
NT
MI
MIC
HIG
AN
DE
PT
OF
EN
VIR
ON
ME
NTA
LQ
UA
LITY
81-1
111
/17/
2011
Die
sel f
uel-f
ired
com
bust
ion
engi
ne
(RIC
E)
Die
sel
732
HP
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)G
ood
com
bust
ion
prac
tices
716.
6LB
/HTE
ST
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
HM
etha
nego
od c
ombu
stio
n pr
actic
es0.
0001
G/K
W-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
HC
arbo
n D
ioxi
dego
od c
ombu
stio
n pr
actic
es1.
55G
/KW
-H
AV
ER
AG
E O
F 3
STA
CK
TE
ST
RU
NS
BA
CT-
PS
D
IA-0
105
IOW
A F
ER
TILI
ZER
C
OM
PA
NY
IA
IOW
A D
EP
AR
TME
NT
OF
NA
TUR
AL
RE
SO
UR
CE
S A
IR
QU
ALI
TY12
-219
10/2
6/20
12E
mer
genc
yG
ener
ator
dies
el fu
el14
2G
AL/
H
Car
bon
Dio
xide
E
quiv
alen
t(C
O2e
)go
od c
ombu
stio
n pr
actic
es78
8.5
TON
S/Y
RR
OLL
ING
12
MO
NTH
TO
TAL
BA
CT-
PS
D
AK
-007
6
PO
INT
THO
MS
ON
P
RO
DU
CTI
ON
FAC
ILIT
YA
K
ALA
SK
A D
EP
T O
F E
NV
IRO
NM
EN
TAL
CO
NS
AQ
1201
CP
T01
8/20
/201
2C
ombu
stio
n of
D
iese
l by
ICE
sU
LSD
1750
kWC
arbo
n D
ioxi
de
Goo
d C
ombu
stio
n P
ract
ices
and
40
CFR
60
Sub
part
IIII
requ
irem
ents
0B
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
y Fi
re
Pum
p E
ngin
eD
iese
l0
Car
bon
Dio
xide
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e2.
4TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Emer
genc
y G
ener
ator
Proc
ess
Type
17.
110
Prop
osed
Lim
it: 1
00 h
ours
/yea
r ope
ratio
n
RB
LCID
Faci
lity
Nam
eFa
cilit
y St
ate
Age
ncy
Nam
ePe
rmit
Num
Perm
itIs
suan
ce D
ate
Proc
ess
Nam
ePr
imar
y Fu
elTh
roug
hput
Thro
ughp
ut U
nit
Pollu
tant
Con
trol
Met
hod
Des
crip
tion
Emis
sion
Lim
it 1
Emis
sion
Lim
it 1
Uni
t
Emis
sion
Lim
it 1
Avg
Tim
e C
ondi
tion
Cas
e-B
y-C
ase-
Bas
is
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11E
mer
genc
yE
ngin
eD
iese
l0
Car
bon
Dio
xide
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e14
.6TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
3 a
nd 4
)D
iese
l0
Car
bon
Dio
xide
Use
of g
ood
com
bust
ion
prac
tices
, ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e68
7TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11M
ain
Pro
puls
ion
Eng
ines
Die
sel
0C
arbo
n D
ioxi
de
Use
of g
ood
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
ese
engi
nes,
and
add
ition
al
enha
nced
wor
k pr
actic
e st
anda
rds
incl
udin
g an
eng
ine
perfo
rman
ce
man
agem
ent s
yste
m a
nd th
e D
iese
l Eng
ines
with
Tur
boch
arge
rs
(DE
WT)
mea
sure
men
t sys
tem
.70
0G
/KW
-H24
-HO
UR
RO
LLIN
GB
AC
T-P
SD
*FL-
0328
EN
I - H
OLY
CR
OS
S
DR
ILLI
NG
PR
OJE
CT
FLE
PA
RE
GIO
N IV
OC
S-E
PA
-R
4007
10/2
7/20
11C
rane
Eng
ines
(u
nits
1 a
nd 2
)D
iese
l0
Car
bon
Dio
xide
Use
of c
ertif
ied
EP
A T
ier 1
eng
ines
and
good
com
bust
ion
prac
tices
ba
sed
on th
e cu
rren
t m
anuf
actu
rer?
s sp
ecifi
catio
ns fo
r th
is e
ngin
e.72
2TO
NS
PE
R
YE
AR
12-M
ON
THR
OLL
ING
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
PN
itrou
s O
xide
(N
2O)
PR
OP
ER
OP
ER
ATI
ON
AN
D
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.00
14LB
/MM
BTU
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
PM
etha
ne
PR
OP
ER
OP
ER
ATI
ON
AN
D
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
0.00
61LB
/MM
BTU
BA
CT-
PS
D
LA-0
254
NIN
EM
ILE
PO
INT
ELE
CTR
ICG
EN
ER
ATI
NG
PLA
NT
LA
LOU
ISIA
NA
DE
PA
RTM
EN
T O
F E
NV
QU
ALI
TYP
SD
-LA
-752
8/16
/201
1
EM
ER
GE
NC
YD
IES
EL
GE
NE
RA
TOR
DIE
SE
L12
50H
PC
arbo
n D
ioxi
de
PR
OP
ER
OP
ER
ATI
ON
AN
D
GO
OD
CO
MB
US
TIO
N
PR
AC
TIC
ES
163
LB/M
MB
TUB
AC
T-P
SD
Cal
pine
- M
anka
to E
nerg
y C
ente
rR
AC
T/B
AC
T/LA
ER C
lear
ingh
ouse
Sea
rch
Sear
ch =
Jan
1, 2
005
- Cur
rent
Sear
ch D
ate
= O
ctob
er 2
6, 2
015
Petr
oleu
m F
ixed
Roo
f Tan
ksPr
oces
s Ty
pe 4
2.00
5
RB
LCID
Faci
lity
Nam
eC
orpo
rate
or
Com
pany
Nam
eFa
cilit
y St
ate
Perm
it N
umbe
rPe
rmit
Issu
ance
Dat
ePr
oces
s N
ame
Prim
ary
Fuel
Thro
ughp
utTh
roug
hput
Uni
tPo
lluta
ntC
ontr
ol M
etho
d D
escr
iptio
nEm
issi
on L
imit
Emis
sion
Lim
it U
nit
Emis
sion
Lim
it A
vera
ging
Tim
e C
ondi
tion
Cas
e-by
-Cas
eB
asis
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
RIZ
ON
A C
LEA
N
FUE
LS Y
UM
A L
LCA
Z10
0120
54/
14/2
005
GR
OU
P A
S
TOR
AG
ETA
NK
S
Vol
atile
Org
anic
Com
poun
ds(V
OC
)
THE
EM
ISS
ION
S F
RO
M G
RO
UP
A S
TOR
AG
E
TAN
KS
MU
ST
BE
CO
LLE
CTE
D B
Y A
VA
PO
R
CO
MP
RE
SS
ION
SY
STE
M A
ND
RO
UTE
D T
O
THE
RE
FIN
ER
Y F
UE
L G
AS
SY
STE
M.
NO
E
MIS
SIO
NS
AR
E P
ER
MIT
TED
TO
BE
R
ELE
AS
ED
INTO
TH
E A
IR E
XC
EP
T FO
R
EQ
UIP
ME
NT
LEA
KS
.0
SE
E T
HE
P
OLL
UTA
NT
NO
TES
BA
CT-
PS
D
AZ-
0046
AR
IZO
NA
CLE
AN
FU
ELS
Y
UM
AA
RIZ
ON
A C
LEA
N
FUE
LS Y
UM
A L
LCA
Z10
0120
54/
14/2
005
GR
OU
P D
S
TOR
AG
ETA
NK
S
Vol
atile
Org
anic
Com
poun
ds(V
OC
)
THE
TA
NK
S A
RE
RE
QU
IRE
D T
O B
E U
ND
ER
P
RE
SS
UR
E S
O T
HA
T N
O E
MIS
SIO
NS
AR
E
EM
ITTE
D T
O T
HE
ATM
OS
PH
ER
E.
0S
EE
PO
LLU
TAN
T N
OTE
SB
AC
T-P
SD
FL-0
285
PR
OG
RE
SS
BA
RTO
W
PO
WE
R P
LAN
T
PR
OG
RE
SS
EN
ER
GY
FLO
RID
A
(PE
F)FL
PS
D-F
L-38
1A
ND
103
0011
-01
0-A
C1/
26/2
007
TWO
NO
MIN
AL
3.5
MIL
LIO
N
GA
LLO
ND
ISTI
LLA
TEFU
EL
OIL
S
TOR
AG
ETA
NK
SFU
EL
OIL
Vol
atile
Org
anic
Com
poun
ds(V
OC
)0
SE
E N
OTE
BA
CT-
PS
D
FL-0
286
FPL
WE
ST
CO
UN
TY
EN
ER
GY
CE
NTE
R
FLO
RID
A P
OW
ER
A
ND
LIG
HT
CO
MP
AN
YFL
PS
D-F
L-35
4A
ND
099
0646
-00
1-A
C1/
10/2
007
TWO
NO
MIN
AL
6.3
MIL
LIO
N
GA
LLO
ND
ISTI
LLA
TEFU
EL
OIL
S
TOR
AG
ETA
NK
SD
ISTI
LLA
TEFU
EL
OIL
Vol
atile
Org
anic
Com
poun
ds(V
OC
)0
SE
E N
OTE
BA
CT-
PS
D
*FL-
0346
LAU
DE
RD
ALE
PLA
NT
FLO
RID
A P
OW
ER
&
LIG
HT
FL01
1003
7-01
1-A
C4/
22/2
014
Thre
e U
LSD
fuel
oi
l sto
rage
tank
s0
Vol
atile
Org
anic
Com
poun
ds(V
OC
)
The
Dep
artm
ent s
ets
BA
CT
for t
hese
sto
rage
ta
nks
to m
inim
ize
VO
C e
mis
sion
s as
the
use
of
pres
sure
relie
f val
ves/
vapo
r con
dens
ers.
In
lieu
of p
ress
ure
relie
f val
ves/
vapo
r con
dens
ers,
FP
L as
an
alte
rnat
ive,
can
use
tank
s w
ith in
tern
al
float
ing
roof
s or
the
equi
vale
nt to
min
imiz
e V
OC
em
issi
ons.
0B
AC
T-P
SD
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LC
ST.
JO
SE
PH
E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YG
EN
ER
ATO
RU
LSD
TA
NK
S55
0G
ALL
ON
SE
AC
H
Vol
atile
Org
anic
Com
poun
ds(V
OC
)G
OO
D D
ES
IGN
AN
D O
PE
RA
TIN
G P
RA
CTI
CE
S0
BA
CT-
PS
D
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LC
ST.
JO
SE
PH
E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
FIR
E P
UM
P
EN
GIN
E U
LSD
TA
NK
S70
GA
LLO
NS
EA
CH
Vol
atile
Org
anic
Com
poun
ds(V
OC
)G
OO
D C
UM
BU
STI
ON
PR
AC
TIC
E A
ND
FU
EL
SP
EC
IFIC
ATI
ON
0B
AC
T-P
SD
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LC
ST.
JO
SE
PH
E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2V
EH
ICLE
DIE
SE
L TA
NK
650
GA
LLO
NS
Vol
atile
Org
anic
Com
poun
ds(V
OC
)G
OO
D C
UM
BU
STI
ON
PR
AC
TIC
E A
ND
FU
EL
SP
EC
IFIC
ATI
ON
0B
AC
T-P
SD
*IN
-015
8S
T. J
OS
EP
H E
NE
GR
Y
CE
NTE
R, L
LC
ST.
JO
SE
PH
E
NE
RG
Y C
EN
TER
, LL
CIN
141-
3100
3-00
579
12/3
/201
2
EM
ER
GE
NC
YG
EN
ER
ATO
RU
LSD
TA
NK
300
GA
LLO
NS
Vol
atile
Org
anic
Com
poun
ds(V
OC
)G
OO
D C
UM
BU
STI
ON
PR
AC
TIC
E A
ND
FU
EL
SP
EC
IFIC
ATI
ON
0B
AC
T-P
SD
LA-0
203
OA
KD
ALE
OS
B P
LAN
TM
AR
TCO
LIM
ITE
D
PA
RTN
ER
SH
IPLA
PS
D-L
A-7
106/
13/2
005
10,0
00 G
AL
DIE
SE
L TA
NK
Vol
atile
Org
anic
Com
poun
ds(V
OC
)S
UB
ME
RG
ED
FIL
L P
IPE
0.00
1LB
/HH
OU
RLY
MA
XIM
UM
BA
CT-
PS
D
LA-0
211
GA
RY
VIL
LE R
EFI
NE
RY
MA
RA
THO
NP
ETR
OLE
UM
CO
LL
CLA
PS
D-L
A-7
1912
/27/
2006
FIX
ED
RO
OF
STO
RA
GE
TAN
KS
Vol
atile
Org
anic
Com
poun
ds(V
OC
)C
OM
PLY
WIT
H 4
0 C
FR 6
3 S
UB
PA
RT
CC
0S
EE
NO
TEB
AC
T-P
SD