Upload
chastity-hicks
View
215
Download
0
Embed Size (px)
Citation preview
TEIN & APII Update and
New Agenda & Initiative
APAN-17/North Asia Net Group
29 Jan 2004, East West Center, HNL
Bo-Hyun SEODirector of APIICC, KISDI
KOREA INFORMATION STRATEGY DEVELOPMENT INSTITUTE
2
Contents
KR & Int’l Links Overview
APII & TEIN
New Agenda & Initiative TEIN & TEIN2CJK G+ Triangle
3
Seoul
Daejun
Daegu
Busan
Gwangju
Suwon
GSR
GSR
GSR
GSR
STARTAP(USA)
155 M
JGN(JP)
1 G
ATM Switch
155Mbps
2.5Gbps
Router
Remark
DWDM
40 Gbps
Gigabit Switch
Over 2.5Gbps(planned)
GSR
GSR
GEANT(EU)
8 M
34M
SingAREN(SG)
Backbone: 2.5~40G Access: 155M~1G
KR & Int’l Links
4
KR-CN
Both Gov’t agreed to open KR-CN Link in 1H2004
Strengthen CJK IT-cooperation thru the LINK & R&A activities
KR-MY Both Gov’t agreed to open KR-M
Y Link in [45]Mbs in 1H2004 to support SEA thru TEIN
Funding by both parties, half & half
Linkage for KR-CN, KR-MY
5
4Q2000: ASEM Summit endorsed TEIN Initiative4Q2001: TEIN Link opened w/ 2Mbs (KR-FR)1Q2002: TEIN Link Upgraded to 10Mbs 3Q2003: EC announced TEIN2 Action4Q2003: TEIN Link upgraded to 34Mbs 1Q2004: TEIN2 Information Day (14 Jan 2004)
TEIN Link to be upgraded with equal cost sharing For TEIN2 Action, DANTE is to start feasibility study
TEIN Update
6
KOREAKOREAJAPAN
Singapore
USAUSA
45M45M
1Gbps
155Mbps155MbpsCHINA
MALAYSIA
NEA
SEA
TEIN Link Topology as of now … Before TEIN2 Action comes up
GEANT
FranceUK
Spain Italy
RomaniaAustriaPolandLithuania
Sweden
Germany
TEIN 34Mbs
7
Budget Max 10 Mil. Euro
Min 20% from Asian participating countries
Direct Beneficiary: ASEM Asia LDCs
Implementation by DANTE
in consultation w/PC, subject to EC requirements
Time Schedule (1Q2004-4Q2007)
1Q2004 Feasibility, Procurement …
3Q2005 Link in operation until 4Q2007
Candidate Stakeholders from North Asia
ASEM Asia Members: CN, JP, KR … though not direct beneficiary
TEIN2 Action… Relation w/ North Asia
8
Understanding on TEIN &TEIN2… TEIN2 Info Day (Brief 14J04)
Current TEIN Link (KR-FR) The KR-FR Linkage is to be continued The willingness to upgrade the link has been expressed b
y KR, EU NRENs & EC, sharing the cost half & half
TEIN2 Action Support in designating DANTE to do activities for TEIN
2 Action… technical, commercial and institutional
Next Meeting for TEIN May 2004, KL, MY A type of PC is expected
Refer to www.transeurasia.org
9
TEIN New Agenda … Understanding to Action 2004
Current TEIN Link (KR-FR)
Present TEIN Link will be upgraded to [155/622] Mbs in 1H2004
The Link cost is to be shared equally by KR & EU from this Year (EC decision)
Previous plan of TEIN Expansion to SEA might be affected & modified by the progress of TEIN2 Action, considering also the demand of SEA
10
TEIN New Agenda … Understanding to Action 2004
TEIN2 Action (~ 2Q2004)
Cooperate with EC & DANTE for Feasibility Study Deliver Stakeholders’ preliminary views Submit Commitment for TEIN2 through Gov’t Purpose, Scope, Membership… of PC drafted Compose PC and hold 1st meeting
11
New Initiative in North Asia…CJK G+ Triangle (Rec)
Respond to increasing demands of R&A 6T as well as next generation network among CJK Divergent social application & HRD
Function as Common Triangle Hub for global connectivity
Connect links intra-region and/or inter-continental Collaborate R&A activities therewith
Bridge the digital divide & promote co-prosperity CJK + TEIN2 Action CJK + ASEAN
12
JPJP
KRKR
CNCN
New Initiative in North Asia…CJK G+ Triangle (Rec)
2Q2004 45M ~1Gbs
3Q2005 1Gbs+
4Q2006 2.5/10Gbs
Strengthen R&A
CollaborationBridge the
Digital Divide
Enhance Global Connectivity
13
Thank [email protected]