C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY LIMITED SARDAR NAGAR ROAD CITY DIVISION NADIAD {3} ARC FOR PROVIDING EARTHING AT NEW/EXISTING CONUMERS AT NADIAD RURAL SUBDIVISION UNDER NADAID CITY DIVISION. TENDER NOTICE NO: 05/16 Tender issued To Shri / M/s ___________________________ __________________________________________________ Tender fee Rs.___500/-____paid vide R.No._______________ Date______________ EMD Rs.______ 5000/-______ paid vide R. No. _________________ Date _______________________

TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar-16

TENDER

MADHYA GUJARAT VIJ COMPANY LIMITED SARDAR NAGAR ROAD

CITY DIVISION NADIAD

{3}

ARC FOR PROVIDING EARTHING AT NEW/EXISTING

CONUMERS AT NADIAD RURAL SUBDIVISION UNDER

NADAID CITY DIVISION.

TENDER NOTICE NO: 05/16

Tender issued To Shri / M/s ___________________________

__________________________________________________

Tender fee Rs.___500/-____paid vide R.No._______________

Date______________ EMD Rs.______ 5000/-______ paid vide

R. No. _________________ Date _______________________

Page 2: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 2 of 11 23-Mar-16

MADHYA GUJARAT VIJ COMPANY LIMITED NADIAD CITY DIVISION OFFICE, SARDARNAGAR ROAD, NADIAD – 387 002

Ph. No-0268-2532906,Web Site : www.mgvcl.com E-mail : [email protected] Fax No : 0268 - 2556188

Sub: - ARC for providing earthing at New / Existing Consumers at Nadiad Rural S/dn under Nadiad City Division. Tender Notice No : 05/16

1 Earnest Money Rs. 5000/- by cash or by DD in the Name of MGVCL in local bank. Cheque will not be accepted.

2 Security deposit 5 % of the order value

3 Last date and time of issue tender.

31/03/2016 Time 12:00hrs.

4 Last date and Time of receiving of tender by RPAD

11/04/2016 Time: 15:00hrs.

5 Date & Time of Opening of Tender ( If possible)

11/04/2016 Time: 16:00hrs.

6 Tender fee (Not refundable)

Rs. 500/- ( by post ` 50/- Extra)

7 Time Limit 1 (One) Year

8 Page No. 1 to 10 & Schedule “B”

9 Estimated Cost `. 5,00,000/-

Issue to……………..………………………………………………………………………..…

……………...Tender Fee Rs………500/-...……….Paid vide R. No……………………...

Date…………………..Emd Paid Rs ….....5000/-.........R. No………………..……………

Date…………………

Superintendent (Exp) City Dn. Nadiad

Page 3: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 3 of 11 23-Mar-16

+ MADHYA GUJARAT VIJ COMPANY LIMITED CITY DIVISION OFFICE SARDARNAGAR ROAD.

P.O.NADIAD-387 002 Tel.No.0268-2532906: COM.FAX No.0268-2556188

General Conditions : a) The work entrusted as per the contract should be soundly constructed in accordance with the best practice

and should presents neat appearance when completed. All the works have to be carried out according to the drawing specifications. There should not be any damage or injury to material or other’s property during transport or erection.

b) The contractor should fulfill the conditions of contract of Labour regulations and Abolition Act 1970 & will have to furnish records failing which payment will not be made. The contractor should specify Licence no., Contractor should process the sales Tax Registration No. & should also intimate PF code No. & contractor are also bound to fulfill all the conditions as per the provision of EPF and MP Act 1952 & schemes framed there under. Contractor will have to submit full documents ser of all legal papers required.

c) Any liabilities arising in connection with Sales Tax will be of contractor. d) Order will be issued to the contractors who have carried out such type of ARC work successfully in any

Discom of GUVNL in addition to general tender documentation as per company rules. e) General documentation for ARC Works are as under.

a. Copy of PAN No. from Income Tax Department. b. Copy of PF No. from Provident Fund Department. c. Insurance for the labours for valid time period.

f) Contractor not having separates P.F. Code number should not be considered for Acceptance of tender. g) Contractor having separate P.F. Code Number has to produce the certified Xerox copy of Challan remitted

to R.P.F.C., Ahmadabad or Recovery of Provident fund and other charges along with the list of Laborers of the Contractor for every month.

h) Contractor shall pay minimum wages to each laborer as per the minimum wages act 1948 and rules therein, as applicable from time to time in pursuance to the Govt. Notification and compensation Act applicable Workmen Compensation Act.

i) Contractor will have to carry out works in any area of Nadiad(R) Division if need be as per the instruction of Executive Engineer, Nadiad(R) Division Office.

j) Lowest Tendered have to execute the Final accident bond on the Court Stamped Paper of Rs. 100/- in all respects at his own cost.

k) Contractor has to finish the contract documents i.e. agreement on court stamp paper and contract Booklet etc. on demand of this office.

l) 5% Security Deposit amount should be paid within 7 days from the date of issue of acceptance order of the Tender. This amount will be payable either in cash or through Demand draft on any schedule bank drawn in favour of “MGVCL”. This amount will refundable after completion of work and upon submission of NOC of the Engineer-in-Charge.

m) 20% Solvency of revenue Authority Banker’s Solvency certificate will have to be produced by the Contractor on Demand of this office (i.e. 20% value of order amount).

n) Income Tax will be recovered from the bill of the Contractor as per rules.

Page 4: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 4 of 11 23-Mar-16

o) The rate is inclusive of any transporting to site from the above work “Execution and Getting Work”. p) Contractor is bound if any condition in Tender and condition of the contract is changed from time to

time. q) For any damage to the equipments or persons, working for the job, MGVCL will not be responsible. r) The contractor shall be responsible for breakage, loss or theft of materials during transit or erection, issued

to him from stores, till the time, the work is handed over and taken over by the company. s) The contractor must have adequate resources and gang of unskilled & skilled personnel to undertake the

work at the different places.

Special Terms and Conditions:- a) Contractor should produce evidence of having experience in executing similar nature of jobs of not less

than 60 % of tender amount and or quantity in a single contract along with the documentary evidence, preferably photo copy of orders secured from MGVCL and satisfactory completion certificate from respective department.

b) The rates are asked for only on percentage basis against estimated amount i.e. item wise rates stated in the Schedule „B_. The tender offer must be specify the percentage either above or, below to the estimated amount. And it should be clearly specified both in figures and words.

c) No conditional offer will be accepted in any circumstances. d) The contractor should sign all the tender documents wherever necessary & also produce experience

certificate failing which the offer is liable to be ignored. e) In case of any mistake in writing the percentage offer between the figures and words, the Company will

consider the most beneficial at its discretion and that will be binding to the Tenderer. f) In case of any mistake, in writing the derived net amount of the offer, the actual calculation as per

percentage offer of the tenderer will be taken in to consideration of comparison and shall be binding to the contractor.

g) The rates so accepted will be applicable, during the validity period of contract and no price variation will be considered during contract period.

h) The percentage rate offer must be offered in our tender documents only. There should not be any overwriting. If any correction, it must be made with initial signature of the tenderer.

i) The tenderer should not change the estimated rate. j) The Tender documents where signed, must be affixed with Rubber-Stamp of Firm/Company/Individual

with address. k) In case of any ambiguity, discrepancy or dispute the decision of Executive Engineer Nadiad® Division,

MGVCL, will be final and shall be binding to the tenderer. l) Wherever, there is an excess work carried out by the, contractor beyond the Technically sanctioned

amount against the work order, approval for the excess quantity of work done should-be obtained from- the competent authority as per Company's rules.

m) Madhya Gujarat Vij. Co. Ltd does not bind itself to accept first lowest or any tender.

EMD:- Each tender must be accompanied by Earnest Money Equivalent to 1 % of the estimated value or Rs.500/- whichever is more of the contract. This amount will be payable either in cash or through Demand Draft in favour of MGVCL. Tenders without EMD will be liable to be considered void for awarding contract. The receipt of EMD/ DD should be posted in separate cover before opening of tender. Earnest Money Deposit paid shall be liable, to be forfeited in the event of failure accept the contract by successful tenderer's, EMD will

Page 5: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 5 of 11 23-Mar-16

be refundable to all unsuccessful tenderer's on demand and upon submission of the original money-receipt and after finalization of contract. The successful tenderer's will be eligible for refund EMD upon payment of Security Deposit. Security Deposit: Before placing order eligible tenderer must pay Security Deposit in advance in Division Office as per company’s rule.

The receipt of Tender fees & EMD or DD for the same should be sent in one cover and the tender documents should be in another cover and both the covers should be posted in one main cover addressed to the Executive Engineer, Nadiad City Division. And write on the top of the sealed cover “Tender for Consumer Earthing at Nadiad Rural S/dn S/dn & Nivida No. Item No: ”

Period of contract :- The contract will remain in force for the period of one year from commencement of the first work till completion of work whichever is later. The work should be commenced within seven days from the date specified in the offer to commence work, issued by the Deputy Engineer(O&M) of sub-division and should be completed within the prescribed period for each work. For annual contracts, the contractor will be given spate order for each work on the basis of the rate contract order. The date of commencement & completion of work will be stipulated in order which the contractor has to agree otherwise the penalty will be levy-able for late completion of work as per company’s standard conditions. Priority of Work:- Priority of work would be decided by the Deputy Engineer(O&M) and the contractor shall carry out the work within stipulated time for order issued by the under signed. Penalty:- For delay in work, occurring on account of reasons other than Force majeure as accepted by DGS & D, the contractor will be liable to of penalty at a rate of ½% per week subject to maximum 10% of value of uncompleted work. For condition delay, proof of existence of force majeure conditions will have to be given. Quantities:- The quantities mentioned in the accompanying schedule are only conditions. The company reserves the right of revising of delighting any of the quantities to be erected during the execution of the contract and the final quantities actually erected to the contractor will be calculated and paid the rate given in the contractor schedule of rates. Jurisdiction:- All disputes will be subject to town/village of respective S/dn office jurisdiction.

Page 6: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 6 of 11 23-Mar-16

Contractor’s Liability:- For any accident either fatal or non-fatal to the workers due to non-observances of the safety measures and line clearance procedure, MGVCL shall not be responsible. Minimum period guarantee: - If during 12 calendar months from the date of handing over charge after completion of earthing work, any of the earthing are found defective in any way the same should be rectified by the contractor free of cost. R.A.Bills & Final Bills Payment:- Bills should be prepared once a month looking to the progress of the work and payment will be made as under. (a) Running bill may be paid on the progress of work carried out and measurement recorded up to 70% on submission of material account. (b) Final bills for contractor will be paid after completion of works and recording measurements submitting material account. If contractor fails to be present for the purpose within reasonable time, MGVCL is free to proceed further and finalize the bill. No material of the company should be left on the line without supervision. The payment to the contractor through R.A.Bill will be made to extent of 100% of the value of the work done provided. The contractor furnishes the material account in respect of the previous R.A.Bills before the next R.A.Bill is paid. If this is not complied with by the contractor, the payment through R.A.Bill shall be made only to extent of 70% of the total value of the work done. The amount so with held will be released on furnishing the material account statement of the relative R.A.Bill by the contractor The contractor shall on completion of the work prepare R.A Bill and render the final detailed material account of the material received by him from the company’s Store within one month from the date of completion of work. If, however the contractor does not render the material account, a Regd. A.D. Notice shall be issued to the contractor to render the material account within 10 days from the date of notice, failing which the material Account will be finalized and recoveries made as per the company’s account which shall have to be accepted by the contractor and disputes if any raised shall not be Entertained. The Contractor is governed by the following clauses signed by him: a) Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms and provisions of

tender and contract for work as applicable and in default thereof to forfeit and pay the company the sums of money as may become due.

b) The full value of the “Earnest Money Deposit” paid herewith shall be absolutely forfeited to the Co., should I/We not deposit the full amount of specified Security Deposit in time.

c) The competent authority win delete any item in Schedule ’B’ in the Tender. d) The contractor will have to produce solvency certificate before commencement of work. e) For any accident either fatal or non fatal to the workers due to non observance of safety measures & line

clearance MGVCL shall not be responsible. f) Any loss, sustained due to this will have to be borne by the contractor. g) Contractor has to provide separate PF code No. from thr RPFO for their employee. h) Contractor will have to carry out works in any area under the jurisdiction of MGVCL,Nadiad(R) Divn.

Page 7: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 7 of 11 23-Mar-16

i) Executive Engineer, MGVCL, Nadiad(R) can discontinue contract any time – without assigning any reason / can take further actions as per Company’s rules against the contractor.

j) The above conditions are applicable to this tender in addition, to the specifications mentioned in the Tender and Contract booklet of MGVCL.

Termination of Contract:- The MGVCL upon written notice of default to the contractor, shall terminate in the circumstances detailed as under: If, in the opinion of the MGVCL, the contractor fails to complete the work specified in the scope of works given in Schedule-B within the time specified for the same in the contract or within the period for extension has been granted by MGVCL to the contractor. If, in the opinion of the MGVCL, the contractor fails to comply with any of the other provision of the contract. The MGVCL shall also be empowered to cancel the contract, if any deficiency in erection work and or bad performance is notice. The work specified in the scope of works given in schedule-B within the time specified for the same in the contract or within the period for extension has been granted by MGVCL to the contractor. SCOPE OF WORK 1. General:

a. The work entrusted as per the contract should be soundly constructed in accordance with the best practice and should presents neat appearance when completed. All the works have to be carried out according to the drawing specifications. There should not be any damage or injury to material or other’s property during transport or erection.

b. Before commencing erection of line, the contractor will be provided with the pole schedule and layout map if ready of the area, which will give one of the locations marked in the layout map. The pole guy and earthing locations will be shown by the Engineer in charge. Other drawing referred to the pole schedule will be available for consultation with the Company’s staff at site or at the Subdivision Office. Cutting of tree’s branches which come in the line will be arranged by the Company.

c. Marshy or water logged locations must be avoided as far as possible If it becomes invariable to locate at such point special precautions about foundation will have to be taken and work carried out as per instruction of the Engineer-in-charge.

d. The spans shall be specified in the pole schedule and the minimum spacing between the power conductors and conductors and conductors and neutral shall be as shown in approved drawing.

2. Supply of materials: All materials such as rail, RS joints, or other poles{except PSC} fabricated materials, copper, aluminum or A.C.S.R. conductor, V.I.R. wire insulators guy wire, etc. required for erections will be supplied from the Company’s Store at Nadiad. PSC poles for line supports will be transported and stacked by the Co's along road side for HT/LT line and at one place near the site of work within a range of 2 kms. The rates quoted should be inclusive of transportation and distribution to site from the above stores, erection and sorting to work. The line supports may be of rail P.S.C. wood or any other type and be 30 to 42 feet in length and weight 40 to 100 lbs/yds. The conductor will be copper, aluminum or A.C.S.R. and very in size from 075 Sq. in to -.-2 sq. in copper equivalent area. The conductors will supplied in coils or in drums as per standard packing received from the crates should be returned to the Stores and slacked at the directed place.

Page 8: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 8 of 11 23-Mar-16

The rolls should be returned to the Store and stacked at the directed place. For damaged or lost empty crates/drums of conductor recovery @ Rs.200/- for each will be effected. Anti-climbing device like GI barbed wire & Danger Company should be supplied by the contractor. Lugs will be supplied by the Co. Contractor must get the requisition, three working days well in advance, before they require the material on site, from Engineer-in-charge.

3. PoleErection: The work includes shifting of supports particularly PSC poles from the stacking place as mentioned in Clause No.2, to the site of actual work excavation of pit, fixing of top insulator fitting, cross arms, clamps numbering etc. complete inclusive of painting, fixing of danger company caution plates and fitting anti-climbing devices for double or four, pole structures, Railway or River crossing or transformer structures etc. The work further includes fixing cross arms packing cross bracing etc., mounting of AB switch DO or HG type fuse units. The pole are to be set in good hard earth, the depth of pit shall be one sixth the height of the pole and if the ground is soft, depth of the pit shall be 6 inches more than the Pole. Poles must not be erected along the edge of cutting or embankments or where the soil is liable to be washed away, unless, special precautions are taken to ensure durable foundation when setting the pole. The pit shall be of ample size to allow easy entrance of the pole and base plate without any damage to it. After pole is erected vertically the pit is to be refilled with the excavated earth and properly rammed. The erection, cost, of single or double pole structures, stay sets and pipe or plate type earthing is inclusive of excavation of pit refilling of excavated earth and cost of coke & salt in earthing arrangement as specified. All the poles must be in plumb, fabrication fitting on pole must be tight. Fabrication fitting on pole must be tight. All single pole structure special structures and netting of cross arms Earthing etc. should be carried out accordingly to standard drawing the reference of which will be given by the Company

4. Painting and Numbering: Rail poles, RSJ, Steel Tubular Poles or all the steel mounting shall be given one cost of approved red oxide paint and two coats of approved aluminum paint. There should be sufficient interval between every cost of painting in order to allow for drying. The bolts and nuts shall be dipped in anticorrosive oil before insertion and all over lapping surface of steel should be given a fine coat of red oxide paint before Bolting. For the rails and R.S.J./ Steel tubular the lower portion up to three fit above ground level shall be cleared or rust. Where concrete is not being done this surface should be given a base coat of red oxide and an additional coat of black bitumistic paint, which should extend up to 3ft, above ground level of muffing before inserting in ground. The rest of the surface of the rails of R.S.J. shall be cleaned of all rust and painted with one coat of red oxide and two finishing coats of approved aluminium paint. The paint should be got approved by the Engineer-in-charge of works before using on works and will have to be arranged by the tenders, as painting is included in the offer. Every pole after erection shall be numbered in bold black figures both in English and Gujarati at a height of about 8 ft from the ground level as per instruction of the Engineer in charge P.S.C. Poles need not be painted but they should be properly cleaned and fabricated on PSC need be only painted as specified above.

5. Concreting / muffing: The proportion of concrete mixture and the quality of the sand and metal or brick bat should be as below. a. Cement concrete proportion for concreting of Rail/RSJ/Steel Tubular or P.S.C. poles and stay rods

when ever Necessary should be cement one part, sand three parts 1.½” metal or well burnt brickbat six parts (1:3:6)

b. The sand shall be clean, grippe and composed of hard, strong and durable grains. It shall be free from clay or organic matter. If there is any trace of earthy matter the sand must be washed, before using sand for concreting work it should be got approved from the engineer in-charge.

c. Metal should be hard and durable stone, to pass through a mesh of 1.½” as far as possible. All metal must be perfectly clean, being washed necessary, and free from any sulphur. Size of metal must be got approved from the engineer in-charge.

Page 9: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 9 of 11 23-Mar-16

d. The brickbats should be made of well burnt bricks and should be of 1.½ ” size as far a possible Size of Brick Bats must be got approved from the engineer in-charge.

e. Unless otherwise specified the concrete shall be mixed in the above proportions and should be thoroughly mixed at least three times in a dry state, before water is added, and are far as possible finally wet mixture must be used. All concrete must be mixed on a water tight platform. In vessel any case, finished work, must be absolutely true inline and level finished off smooth. One finishing coat of cements past should be applied on another surface of the muffing. (As soon as the surface cannot be rubbed off by the figures watering of block must be commenced.) The concrete block must be kept wet continuously for period of seven days.

f. If the Engineer in charge of the works or the Supervisor finds that cement concrete is no of the above quality and as specified the same will be rejected.

g. The contractor should procure metal, and sand himself as specified above. All poles and stays along the rods and in the village area are to be muffed, and size of the muffing for poles should be 12”above ground level and 12” below ground level.) stay roads should be provided with cement concrete muffing of 12” dia x 24” total high ( 12” below ground level and 12” above ground level) For muffing only metal is to be used and not brickbats are gravel.

6. Stringing of Conductor: Stringing of standard ACSR/Aluminum/All. Alloy conductor include, the erection of necessary HT & LT strain and pin insulators, jumpering & binding wire jointing etc. complete inclusive of providing guard loops in L.T Lines. The rate quoted, should be per conductor route kilometer inclusive of the above. Appropriate, tools should be used and proper scientific methods are to be applied to protect against cuts, scratches or kinks, He should particularly follow the instructions of Engineer-in-charge while making jumper, joints and bindings. While executing this work equipments & tools like turn table or draw vice etc, should be arranged by the contractor. For stringing of aluminum or ACSR conductor, aluminum or wooden pulley must be used for supporting contact on poles. Generally 30-40 meter span should be kept on HT/LT line. All conductor earth wire and stay wire must be tight. Stringing of V.I.R. wires Stringing of V.I.R. wires of different sizes varies from 3/20 to 19/16 should be complete worth G.I. bearer wire and reel insulators interspaced 3 ft. as supports. All road crossing must be provided guarding arrangement and minimum 22 ft. clearance must be kept betwean conductor and road level.

7. Erection of Stay Set. The erection of stay set may be A or b type complete with stay clamp, binding of G.I. stay wire at either end, turn buckle, anchor plate with road, binding of Guy Insulator. The binding of stay wire for guy insulator at both the ends should be done properly. The stay shall be erected suitable for local condition. The rate should be quoted for erection of complete, inclusive of excavation of pit and refilling of earth and painting. Stay Rod pit must be as per instruction.

8. Earthing. The earthing device shall be of the coil type or pipe type or plate type as indicated in the pole schedule. The work of earthing must be carried out as per instructions of Engineer-in-charge and at the places selected by the field Engineer. The coke or charcoal powder and salt will have to be procured by the contractor should preferably use earth augur excavation of earth pit. The contractor should satisfy himself as well as to supervisor for satisfactory earthing by carrying out test using earth tester. All earthing is to be covered up to 2.5 mtr {8feet} from ground-level by earthing sleeves which will be provided by the Co., the earthing to be provided in a separate pit i.e. other than that of pole. All conductors, earth wire and stay sets must be tight.

9. Guarding. Guard cradle will be provided below HT line/LT line. The guarding must also be provided where railway trucks, telephone line, and licensees HT, LT lines are passing below Co’s HT lines. The guarding for the above comprises of fixing of guard cross arm eye bolts. and guard cable consisting of GI main bearer wire GI lacing wire and GI binding wire, etc, complete. The work has to be carried out as per instruction of

Page 10: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 10 of 11 23-Mar-16

Engineer-in-charge. The cradle guard consists of 2 Nos., of SWG No.8 GI wire for binding, guarding for railway crossing is to be carried out as per instruction of the Engineer-incharge.

10. Erection of Distribution Sub Station. Transformer sub station will be of the outdoor type and will consist of the following erection. 1. One 25 to 200 KVA Transformer complete with is accessories. The transformer is to be repainted with

one coat of battleship gray paint of approved make 2. One set of L.T. Switches with fuse. 3. One set of H.T. Switches with fuse. 4. One set of L.T. Distribution type lightening arrestors. 5. One distribution Box of M.S. Sheet and suitable iron clad three. Nos. L.T. takes off. One No incoming

ironclad triple pole switch with fuse and neutral link, fuse carriage and necessary wising inclusive of 2” to 3” dia. G.I. pipe for coming leads from transformer side to Distribution Box and 1” top 3” dia. G.I. Pipes for L.T. take offs with suitable V .R. cables.

6. Pipe earthing to be provided on either side of the substation providing earth wire for lightening arrestors transformer tank and Distribution Box and two separate wire if distinct earthng for neutral with 8 S.W.G. copper or G.I wire. The rate should be quoted inclusive of painting (Where require) transportation and distribution to site from the Company’s Stores to the site of erection.

11. Fixing of St. Light fixture.

The St.Light fixture of ‘A’ or ‘A’ type consists ¾” G.I. pipe. This should be properly fitted with clamps on the poles. The brass holder, Brass-nipple, reflectors are also to be fitted properly on one end of fixture. T W bush should be provided. The V.I.R. wire should be kept in sufficient length to provide jumper etc. the height of the fixture from the ground level should be kept as per the instructions of Engineer in-charge. The actual fuse one kit kate fuse should be fixed on the wooden board which is to be fixed on the pole by clamp and bolt. This would be supplied by the Company.

12. Laying of one phase service lines and three phase lines. This will consists of laying overheads V.I.R. Line with G.I. Bearer wire, pipe wiring, or batten wiring, fixing of I, Cut-outs or switch, one phase meter, meter Board etc. The twin or single phase wire available in existing stock should have to be utilized. The G.I. Wire No. 8 to 10. Would be provided at equal intervals of Suitable size as per drawing. The aril or kit kate fuses should be provided on wooden Board. Which is to be fixed on the pole by clamps and bolts and same would be supplied by department, Sufficient V .I.R. wire should be kept at terminal pole and for jumpering. The G.I. bearer wire should be connected with main earth to get the continues earthing.

i. There should not be joint in the service line. ii. Conduit pipe should be fixed in decent way in the premises of the consumer any damaged occurred to

the premises due to fixation of pipe or taking the service line into premises should borne by the contractor.

iii. Meter, cut-outs pipe should be earthed properly, Earthing clip for earth wire end T.W. Bush should be inserted in either end of pipe.

iv. The measurement would be taken not as per actual length of line but it will be taken on the projector of the line and accordingly the payment would be made.

In case of three phase S.C. the service line would have to be laid up to metering point only and meter will be installed by department. The steel meter Box Should be fixed up as per directive of Engineer in-charge. Signature of Supplier EXECUTIVE ENGINEER With stamp M.G.V.C.L, NADIAD (CITY) DIVISION.

Page 11: TENDER Tender of...C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 1 of 11 23-Mar- 16 TENDER MADHYA GUJARAT VIJ COMPANY

C:\Users\dzmeda6557\Desktop\NADIAD CITYN DIVISION 05.16\(3) Tender of Earthing at Nadiad Rural Sdn.doc Page 11 of 11 23-Mar-16

MADHYA GUJARAT VIJ COMPANY LIMITED

NADIAD CITY DIVISION OFFICE, SARDARNAGAR ROAD, NADIAD – 387 002 Ph. No-0268-2532503,Web Site : www.mgvcl.com E-mail : [email protected]

Fax No : 0268 - 2556188

Schedule " B "

Sr. No. Iteam Code

Detail of Work Unit Rate

1 9902040002

Providing earthing terminal at New / Existing LT consumer's premises, which includes erection of coil type earthing including cost of coal, salt, etc. but without cost of GI Wire PVC pipe. Earthing as per REC standard drawing (J-1). 10kg coal and 10kg salt to be used. G.I. wire to be terminated at earthing bolt of meter box.

Nos 357.00

Total Amount in Rs. 500000.00

I am ready to work ……….. % below / above or at company’s rate.

Contractor Sign Executive Engineer

MGVCL, Nadiad City