MorpheusTetherTestReadinessReview(TRR)MorpheusIntegratedT&VJeremyHart/EG
4/20/11
7/28/2019 Tethered Test
2/30
TestObjecves TestPlan
Overview ConOps
TestMatrix/Cases TestArcleDescripon/Configuraon Pre-TestVerificaonCriteriaReview Openwork TestSafety TestStopandSuccessCriteria TestSchedule Backup
Agenda
2
7/28/2019 Tethered Test
3/30
PrimaryObjecves,Integrateddynamictestoffullvehicle:1. Closed-loop GNC with 3-axis attitude control (hover stability, vertical
translation)!a) Test of tank loading CG management and/or knowledge handoff to GNC!b) Test of throttle up stability !c) Test of hover stability!d) Test of navigation system in dynamic flight!e) Test of complete flight activation and shutdown sequence by AFM!f) Demonstration of robustness to wind and ground prop interaction!g) Roll control including roll control impulse bit!
2. Characterize slosh damping!3. Characterize CG management!4. Long duration engine burn (TT Day 2) and steady state engine temp!5. Wireless FTS end-to-end (TT Day 2+)!
TestObjecFves
3
7/28/2019 Tethered Test
4/30
Secondary Objectives:!1. GNC !
a) Possible test of soft abort command during hover flight condition!b) Possible test of hard abort command during hover flight condition!
2. Calibration of flight control propellant depletion estimator (TT day 2)
TestObjecFves
4
7/28/2019 Tethered Test
5/30
PadSetup:Crane,energyabsorber,vehicle,andGSE LOX/LNGFill VehicleHoist5
Openrollvalvesforli[ PadClear Pressurizetoflightpressure Performtethertesng(2X)
Ignion HandovertoGNC Vercaltranslaon(5upto+3) Hover(30seconds) Landattheendoftether
Depressurize Lowerandweightthevehicle Vent/Draintanks
TestPlan-Overview
5
7/28/2019 Tethered Test
6/30
Posioncrane,vehicle,energyabsorberandGSEatTethertestpad
FillvehiclewithLoxandLCH4,pressurizeto
7/28/2019 Tethered Test
7/30
TetherTestIniFalSet-up
7
Battery Cart
Helium tube trailer32 feet
100 feet
Bldg 18Control Center
1000 feet
Solenoid 12VPower Supply
APU Power Cable
GHe Disconnect
Power SupplyWiring and
GHe QDLanyard
LNG Trailer
Portable
GHe R-bottle
15 feet
Pressure Panel
15 feet
Lox Dewars and Trailer
Portable
GHe R-bottle
EnergyAbsorber
New Items:-100 ton crane-Energy Absorber-REMOVED straps
7/28/2019 Tethered Test
8/30
Raisevehicle5viacrane Openrollvalvesduringli[
Installcraneshieldovercranecab EvacuateCryodewarsandbaerycart TransfertofullGHetubeandsetsupply
regulatorto300psig
Clearpadcrewandriggersto>=1000[ Pressurizevehicletoflightpressure(~220
psigtarget)
TestPlan:
PadClearandGHePressurizaFon
8
5
GHe QD
Crane cabShield
7/28/2019 Tethered Test
9/30
IniateQuickDisconnectofGHEline EngineIgnion HandovertoGNCcontrol
TestPlan:
EngineIgniFon
9
5
Ghe QD
20
3
7/28/2019 Tethered Test
10/30
Vercaltranslaon,5withupto+3dispersion
Hover(20seconds) TerminalDescent
1m/sdescentrate Landattheendoftether
TestPlan:
VerFcalTranslaFon
10
5
~5
7/28/2019 Tethered Test
11/30
Landattheendofthetether Someamountofenergyabsorberstroke
distance(x)
Ventvehicleto
7/28/2019 Tethered Test
12/30
Lowervehicletothepad(ontovehiclescales?)
Vent/drainremainingLNG/LOX Flightsecurecallwhentanksaredrained
and
7/28/2019 Tethered Test
13/30
irstDayTestMatrixIgniFonTesFng
13
Sequence#
#ofruns
Config/TestVariables
SuccessCriteria
ControlMethod GN&CConfiguraFon Notes TankPressure
#0
GNC
handoff
1 Thrust/weightless
than1
Successful
handoverto
GNC
Nominalstartup
sequence.So[abortto
terminate(before10
seconds)
ClosedLoopGNC 220+/-5psig
#1
Nominal
TetherTest
1 TetherGuidanceI-
loads
Successful
startup,
hover,vercaltranslaon,
shutdown
Nominalstartup
sequence.25second
hoverduraona[ervercaltranslaon.
ClosedLoopGNCTetherGuidI-loads Vehiclewillremainon
tetherbetweentests
220+/-5
psig
7/28/2019 Tethered Test
14/30
irstDayTestMatrixIgniFonTesFng
14
Sequence#
#ofruns
Config/TestVariables
SuccessCriteria
ControlMethod GN&CConfiguraFon Notes TankPressure
#0
GNC
handoff
1 Thrust/weightless
than1
Successful
handoverto
GNC
Nominalstartup
sequence.So[abortto
terminate
ClosedLoopGNC 220+/-5psig
#1
Nominal
Tether
Test
1 TetherGuidanceI-
loads
Successful
startup,
hover,vercal
translaon,shutdown
Nominalstartup
sequence.20second
hoverduraona[er
vercaltranslaon.
ClosedLoopGNCTetherGuidI-loads Vehiclewillremainon
tether
betweentests
220+/-5
psig
#2
So[
Abort
Test
1 TetherGuidanceI-
loads
Successful
startup,
hover,vercal
translaon,
so[abort
Nominalstartup
sequence.20second
hoverduraona[er
vercaltranslaon.So[
abortat~15secondsof
hover.
ClosedLoopGNCTetherGuidI-loads So[abort,thenhard
abortto
terminate
thrust
220+/-5
psig
7/28/2019 Tethered Test
15/30
1515RafaelJimnez,(281)244-6681 NASA/JSC-EP4-Propulsion 03/23/11
Morpheus Configuration forTether Fire Test with NEW items
LOX Tanks (X2)
Methane Tanks (X2)
Primary
Structure
Landing Gear
(X4)
Lifting Points (X4)
Tank Support Struts (X8)
Landing Gear
Crushable Pads (X4)
Landing Gear
Accelerometers (X3)
New DFI Box
New Items:- FTS radios and batteries
-Latest FSW-Tether GNC i-loads-APU box h-bridge fix?
All OI and DFI in place
7/28/2019 Tethered Test
16/30
MorpheusVehicleDI
16
Top deck near avionics
HF triaxial accel (3 HF channels) 20 kHzLF triaxial accel (3 LF channels) 1000 Hz
Microphone (1 HF channel) 20 kHz
Pressure transducer (1 LF channel) 1000
Hz
Thermocouple (1 TC channel) 2.1 Hz
On frame
Microphone (1 HF channel) 20 kHz
Pressure transducer (1 LF channel) 1000 Hz
Thermocouple (1 TC channel) 2.1 Hz
On top of each footpad
4 LF triaxial accels
(12 LF channels) 1000 Hz
FT1 and FT3 (1 LOX & 1 LCH4 tank)
Strain gauges 100 Hz
(4 sets of full bridges each tank)
On frame at top and bottom of each tank
8 LF triaxial accels (24 LF channels) 1000
Hz
On each foot pad
4 load cells (4 LF channels) TBD Hz
Channel Count5 HF channels45 LF channels
30 TC channels8 strain gauge full
bridges
On all four tanks
7 TCs on each tank 2.1 Hz
Items in blue required for LN2 Inert TestingItems in blue and orange required for hot-fire and tethered test
Items in blue, orange, and green required for free flight
Same as HF day 2
7/28/2019 Tethered Test
17/30
Prop Engineclean-up Gimbalperformanceevaluaon(rateseenduringHotFire?) Vehicledrymassbalanceevaluaon(addballastasneeded) Propellantmanagementplanconfirmtestmatrixcanbecompletedandsim
RiggingPlan Craneposioningandfinaldimensions(craneloadsetto20,000lb),pendulum
moondoesnotallowcontactwithcranecab(Bailey)
Loadtesngofstraps Protecngvehicletopdeckfromslacktether(PVC/bungee)testinb220 MarktheenergyabsorbersoanystrokecausedbyfirstruncanbeseenattheRC
shack Concurrencefromcranesafety(SteveDaniel)
EPS APUboxfix(ribboncablere-wiring,noFSWchangerequired)-tesng Almetersourcevoltagechangeto28Vneedtotestchange
FTShardwire
TetherTestOpenWork
17
7/28/2019 Tethered Test
18/30
GuidanceChanges Guidancefixfor20secondmeout(HotFireDay2issue) Guidancefixfornorebootupondouble-acvaon
EMAcalibraon Throle/Thrustdatacalibraoncurves EMAmeasurementsandcalibraoncurves
So[andHardAbortBoundariesundercrane(Values:?) Tesngoftetherrunsinsimulaonwithday-of-testprocedures OponalChanges:
Propnewtemperatureslook-uptable NewhardabortbehaviorforEMAcontrol(yes) Navmovetotablei-loads&commandtochangei-loads(NOinnovday) Makedecisiononlimitchecker(NOinnovday) Propnewloadingsequencemethanefirst(NOinnovday)
TetherTestOpenWorkSWandGNC
18
7/28/2019 Tethered Test
19/30
Sloshdamping.VerificaonthatMorpheusprovidesatanksloshdampingraoof>0.25overthefullrangeofliquidlevels.
Overpressureevaluaonis5feetlowenough?Li[-offfromground? Reachsteady-stateonenginetemp(TBDduraonis20secondsok?) FSWTetherDynamicTest.Verifyrequirementsrelatedtoenginetrustand
gimbalactuaonforGNCatudeandposioncontrol. R.RR2.FSW.062;R.RR2.FSW.063;R.RR2.GNC.05;R.RR2.FSW.149
MoonImagery.Verificaonthattheimagerysystemcaptureshi-defmoonimagerystarngwithignionsequenceandendingwithvehicletouchdown
Itemsthatwereinoriginalverificaonplanning: TrajectoryUpdates.VerificaonthatMorpheuswillacceptupdatestotheguidancereferencetrajectoryduringpoweredflight VehicleTurnaround:VerificaonthattheMorpheusvehicleiscapableofre-flight
within2hours
TetherTestVerificaFons
19
7/28/2019 Tethered Test
20/30
TestSafety
Phase Commodity Pressure Personnel
Distance
RaFonal
OverPressure
RaFonal
ragmentaFon
LeakCheck GHeorGN2 Lessthan50PSIG 32for10min
0a[er10min
Safe@32
ImprobableRupture
Ducle
NonCredible
ColdFlow LN2Loading
LN2w/GHe
0to25PSIG
Lessthan25PSIG
25to50PSIG
15
0a[erflowstop
32for10min
0a[er10min
Safe@15
ImprobableRupture
Safe@32
ImprobableRupture
Ducle
NonCredible
Ducle
NonCredible
HotFire LOXandLCH4Loading
GHePressLeakCheck
GheFlightPress
PostTest
Fillat25PSIGTank
Lessthan25PSIG
Pressto45PSIG
Pressto235PSIG
Depressto50PSIG
15
0a[erflowstop
32for10min
0a[er10min
1000
1000to0
Safe@15
ImprobableRupture
Safe@32
ImprobableRupture
Safe@1000
ImprobableRupture
Ducle
NonCredible
Ducle
NonCredible
Safe@1000
NonCredible
Note
Improbable Rupture due to quiescent linear strain in the membraneNon Credible due to unlikely rupture and unlikely shrapnel.
7/28/2019 Tethered Test
21/30
Operation PPE Notes
Crane/forklift lifting ops Hard hat, steel toe shoes,
safety glasses
PPE needed when working
inside lifting zone
Vehicle prep (pre-cryo
loading)
Safety glasses, work gloves
(recommended)
All vehicles parked behind
helium trailer (150 foot
minimum distance) to allow
room for lift/tow ops.
Cryo transfer hose
hookup & valve operation
Goggles, face shield, cryo
apron and gauntlet gloves,
cuffless trousers, sturdy shoes
Establish 15 foot safe
distance prior to flow
Post-cryo fill vehicle ops,
tank pressure
7/28/2019 Tethered Test
22/30
StopCriteria Anyunexpectedvehiclemoonparcularlylaterallytowardscrane Observedengineerosion(yellowflash) EngineredlinelimitsRobmonitoringandwillmakecall Lossofcertaininstrumentaonsensorsenginewillnotlightforcertainsensor
failures
Lossofenginevideofeed
TestStopCriteria
22
7/28/2019 Tethered Test
23/30
SuccessCriteria Stableengineignion HandovertoGNCFSW Stablevercaltranslaon Stablehoverwithacceptablegimbalposion Acceptableenginewear Steady-Stateenginetemperaturereached Acceptablesloshdamping(dampingraoof>0.25) Subsystemleadconcurrence
Allsubsystemleadsaresasfiedthattheirsubsystemisreadyfortetheredtesng FTShasbeenverifiedend-to-endduringanenginefiring Allhotfiremandatoryverificaonshavebeencompleted
SuccessCriteria
23
7/28/2019 Tethered Test
24/30
7/28/2019 Tethered Test
25/30
Tether#1scheduledfor4/25/2011 Tether#2scheduledfor4/27/2011
Addionalitemsfortest:WirelessFTS,Lateraltranslaon
TestSchedule
25
7/28/2019 Tethered Test
26/30
BACKUP
26
7/28/2019 Tethered Test
27/30
Safety-VCRangeDefiniFon1000Buffer
27*Scale, 1.29 = 640
b18
b14
**Center,4.56, 4.22
1500
Tower
Tether
Landing
Launch
Saturn Lane
1000
1000
1000
VFC Range Boundary
7/28/2019 Tethered Test
28/30
VCLaunchPadDistancestoLandmarks
28*Scale, 1.29 = 640
b18
b14
**Center,4.56, 4.22
2000
2040
1400
2080
2160
1500
1000
Tower
Tether
Landing
Launch
Saturn Lane
7/28/2019 Tethered Test
29/30
FTSverifyend-to-endperformance(sllopen) Prop
CGmanagement.VerificaonthattheMorpheusshallmaintainaCGrangeperrequirementthroughoutalloperaons.(balancetesng)
Gimbalenvelope(Hot-fireday2)VerificaonthatMorpheusmeetsperformancerequirementswhileoperangwithintheenginegimbalenvelope.
Verificaonthatthemainengineiscapableofa5degreepersecondangularrate Verificaonthatthegimbalpointisbelowthevehiclecenterofmass
Structures(seriesoftestatandaboveflightloads) EnergyAbsorber.Verificaonthatthegroundsystemshallprovideanenergy
absorbertoaenuatetetheredloadsatJSC
TetherTest
VerificaFonEntranceCriteria
29
7/28/2019 Tethered Test
30/30
GNC EMAperformancecharacterizaon.CalibrateencodersonTVCandthrole
actuatorsRunbandwidthresponsetesngonTVCandthroleactuators
Validate/updatesimulaonEMAmodelsValidateflightperformancewithmargin
insimulaon
GNCfunconaltesng,Nominalandoff-nominalperformanceevaluaon Status?
FSW HASTDynamicsimulaon.VerifyFSWrequirementsassociatedwithflight
corridorcondionsandGNCatudeperformanceboundaries.
HASTOff-nominaldynamicsimulaon.VerifyFSWrequirementsassociatedwithabortcondions.
Status?
TetherTest
VerificaFonEntranceCriteria(contd)
30