Mr. Fawad Naseer (2011-MIN-14) Mr. Bilal Ahmed (2011-MIN-36) Mr. Rasool Bakhsh (2011-MIN-41) Mr. Sabir Shah (2011-MIN-43) Mr. Imtiaz Azam (2011-MIN-54) Mr. Mazhar Ali (2011-MIN-72)

Page 3: THAR COAL

THAR COAL PROJECT

INTRODUCTION

Thar Coal is located in Thar District, About 400 km east of Karachi, covers area of 9100 Square kilometers. Discovered in 1991 by Geological Survey of Pakistan. 4th largest coal reserves of the world Thar containing Lignite B coal with the quantity of 200 billion tons

Page 4: THAR COAL

Lignite

Coal

Combustion (Steam)

Gasification

AshTarNaphtaPhenolCatecholsCarbon DioxideDephenolized Cresylic Acid

CH4

CO2

H2

H2S

NH3

CO

H2

EthanolJet FuelDieselPetrolParaffinChemicals (Ethylene Polymers

AmmoniaFertilizerExplosives

Fisher Tropsch Synthesis

Crude Oil - Refinery

Electricity (Steam Turbines)

Coal to Liquid

Uses of Lignite

Page 5: THAR COAL

Share of Lignite in Power Generation COUNTRY Macedonia Greece Yugoslavia Bosnia Poland Romania Turkey Germany

Power Generation 78% 69% 66% 56% 34% 30% 28% 26%

Page 6: THAR COAL

Other Useful Minerals in Thar

Germanium: 338 samples from 32 drill holes.

Gallium: 357 samples from 32 drill holes.

Uranium: 193 samples from 33 drill holes.

Benzene: 228 samples from 28 drill holes.

Page 7: THAR COAL

THAR COAL ANALYSIS

Coal quality is Lignite A-B. Moisture is 46.77%. Ash is 6.24%. Volatile matter is 23.42%. Fixed Carbon is 16.66%. Sulphur is 1.16%.

Page 8: THAR COAL

BLOCKS IN THAR COAL

There are 4 blocks divided in the area of 9100 square kilometers. There are 4 different companies working on each block.Block-II is given to Sindh Engro Coal Mining Company.Block III-A is given to Cougar Energy (UK).Block V is also in the supervision of Cougar Energy. Oracle Field is working on Block-VI

Page 9: THAR COAL

THAR COAL FIELD (INVESTIGATED BLOCKS)Block Area

(Sq.Km)Drilling Holes Reserves

Million Tons

Block-I 122 41 3,566

Block-II 55 43 1,584

Block-III 99.5 41 2,006

Block-IV 80 42 2,599

Sub-Total 356.5 167 9,715

Rest of Coal Field

8,643.5 50 165,791

Total 9,000 217 175,506

Page 10: THAR COAL

www.sindhcoal.gos.pk10

Thar Coal Block Status

Block-II Sindh Engro Coal Mining Company(JV: 40% Sindh Government; 60% Engro)

2X600 Power Plant plannedOpen Pit Mining @ 6.5 Mtpa

Bankable Feasibility completed 31st August 2010Project financing activity continued.

Block III-ACougar Energy (UK) 400 MW PlannedUnder Ground Coal Gasification ProjectErgo Exergy Technology planned

Pilot Burn planned in 36 MonthsDesktop studies under process.

Block-VUCG ProjectUnder Ground Coal Gasification Project2X50 MW IGCC Power Plant Planned

Unit gasifier design prepared,Technical team mobilized and desktop studies under process. Drilling in Process by GSPTest Burn Planned April 2011

Block-VIOracle Coalfields, PLC (UK)Strip mining; MoU signed with KESC for 300MW

Geotechnical drilling in process through DRDBFS completion June 2011ESIA completed

Status of Blocks

Page 11: THAR COAL

Underground coal gasification is carried out in thar coal fields under the supervision of Dr Sumer Mubarik Mund.

Video of UGC .Underground Coal Gasification -

YouTube.webm

Page 12: THAR COAL

Field Location Map

Page 13: THAR COAL

Sindh Engro Coal Mining Company

It is working on the Block-II. They are working on Open Pit Mining Power Plant is Planned for this block. Project Financing activity is still

continues. They will generate electricity.

Page 14: THAR COAL

COUGAR ENERGY (UK)

It is working on Block III-A and Block-V. They are working on Underground Coal

Gasification Project. Unit gasify Design Prepared. Drilling in process by GSP.

Page 15: THAR COAL

ORACLE

It is the British Mining company, totally works on Coal Mines.

It is also working in Thar coal Project on Block-VI.

Working on Strip Mining. Geotechnical Drilling is in Process.

Page 16: THAR COAL

16

Coal Used in Electricity Generation & Lignite Reserves

% age of Electricity Generated from Coal

Lignite Reserves Billion tonnes

South Africa 94 30.15*Poland 93 1.37China 81 18.6

Australia 76 37.2Israel 71 -

Kazakhstan 70 12.1India 68 4.5

Czech Republic 62 0.98

Morocco 57 -Greece 55 3.02

USA 49 30.16Germany 49 40.6

World Average 41 195.38Pakistan 0.1 186.2**

( Source,2008, IEA)

Page 17: THAR COAL

Countries with Largest Coal Reserves

Page 18: THAR COAL

Thar Coal Findings-Chinese Report

Gas: Analysis reveal availability of no methane gas.

Coal Dust: Each coal bed possess explosive natural dust explosion.

Self Combustion Trial of Coal: All the coals are self combustion types.

Stripping Ratio: 5.30 upwards

Page 19: THAR COAL

Vision of Thar Coal Project

To develop Thar Coal as a major source of power generation for Energy & Economic Security of the country and as a Hub of Petro Chemical Industry.

To generate at least 10,000 MW by 2020. Huge proven reserves with attractive

incentives and Higher returns for investors Business friendly policies & environment Excellent incentives, concessions &

protections for investors

Page 20: THAR COAL

COST OF ELECTRICITY

Cost of electricity is different for every method.

Hydro Electricity = 2.3 dollar per watt Wind = 2.7 dollar per watt Solar = 3.2 dollar per watt Nuclear = 3.5 dollar per watt After Production of Electricity Price of

Unit is 4.00 Rs.

Page 21: THAR COAL

ECONOMICAL IMPACT OF PROJECT

Thar desert contains the world 4th largest coal reserves.

According to Sindh Engro Coal Mining Company:

175 Billion Ton total Thar coal reserves are more than Saudi arabian & Iranian Oil Reserves and equal to Pakistan’s total gas reserves.

Page 22: THAR COAL

1percent coal reserve have 25%power generation capacity.

Entire Thar Coal Reserves can be used to generate 100,000 MW of electricity for over 200 years.

Thar project brings largest investment in the history of Pakistan.

Thar coal project creates 60000 jobs.

Page 23: THAR COAL

CURRENT STATUS OF THE PROJECT

Mine Lease has been issued to SECMC for Block II. Mine construction is targeted to start by 2013 & lignite production by 2016.

GoP has declared Thar Coal fields as Special Economic Zone and Thar Coal Projects are exempted for 30 years from all taxes.

Page 24: THAR COAL

INITIATIVES BY SINDH GOVERNMENT FOR THAR COAL PROJECT

Zero percent customs duties on import of coal mining equipment and machinery including vehicles for site use.

Exemption on withholding tax to shareholders on dividend for initial 30 years.

Page 25: THAR COAL

Exemption on withholding tax obtaining of goods and services during project construction and operations.

Provision of facilitation to investors and provide them security for investment.

Page 26: THAR COAL

Highlights of Thar Coal Field

Thar desert area is approximately 22,000 sq.km.

Coal field area is 9,100 sq.km.

Total Drill Holes is 217.

Coal deposit is 175.506 billion tons

Page 27: THAR COAL

INFRASTRUCTURE AVAILABLE AT THARROAD NETWORK

70 tonnes load carrying capacity metalled road is available up to Coal field area.

ELECTRICITY

11 KV feeder originate from Islamkot to Thar Coal Project areas with 200 watts transformer is available.

COMMUNICATION

Telephone & Internet communication through Optic fiber cable is available up to Thar Coalfield area.

DRINKING WATER

29 Reverse Osmosis Plants in Thar are available for provision of portable water to residents as well as project staff free of cost.

RESCUE STATION

Rescue Station in coal mining area at Thar coalfield covering an area of 8,200 sq. ft. is completed

LIBRARY

A Coal library is situated at office of Sindh Coal Authority, Karachi.

27

Page 28: THAR COAL

TRANSMISSION LINE

NTDC(National transmission and dispatch company limited) is conducting feasibility study for lying of Transmission Line for evacuation of 10,000 MW from Thar. In the first Phase they are planning evacuate 1200 MW.

AIRPORT

The GoS has approved a scheme at the cost of Rs.972.070 million for the construction of Airport at Thar for Coal Fields of Sindh by the Civil Aviation Authority.

PROVISION OF HEAVY DUTY ROAD

The national highway Deptt. is upgrading the road from Karachi to Islamkot through Hyderabad- Mirpurkhas- Naukot for facilitating transportation of heavy mining machinery.

INFRASTRUCTURE PLANNED AT THAR

Page 29: THAR COAL

RAILWAY LINKPakistan railway has been engaged by GoS to prepare feasibility for broad gauge rail link from Port Qasim to Islamkot.

LODGE AT THARLodge at Thar with 20-bedded accommodation to facilitate foreign and local investors is being constructed at Islamkot.

PROVISION OF CANAL WATER: The GoS has planned to construct a water carrier to provide 300 Cusecs water to Thar.

Page 30: THAR COAL

Composition of the Board is:

i. Chief Minister Sindh Chairmanii. Federal Minister for Water & Power Vice-Chairmaniii. Federal Minister for Finance Memberiv. Federal Minister for Law and Justice Memberv. Deputy Chairman, Planning Commission Membervi. Provincial Minister (Irrigation & Power) Membervii. Provincial Minister (Revenue & Relief) Memberviii. Female MNA from Thar Region Memberix. Federal Secretary, Ministry of Water and Power Memberx. Chief Secretary, Govt. of Sindh Memberxi. Secretary, Coal & Energy Development Dept. Memberxii. One eminent Person Memberxiii. Managing Director, TCEB

Member/Secretary

Thar Coal & Energy Board

Page 31: THAR COAL

Thar today

Page 32: THAR COAL

www.sindhcoal.gos.pk 32

Thar Tomorrow

We have documentry of Thar let watch it.Thanks

Page 33: THAR COAL

Thar Coal Documentary by Imran Sultan (Part 2) - YouTube.webm