14
The Draw 7 Park Site By Himanshu Dubey & Chris Cumming

The Draw 7 Park Site

  • Upload
    lethia

  • View
    52

  • Download
    0

Embed Size (px)

DESCRIPTION

The Draw 7 Park Site. By Himanshu Dubey & Chris Cumming. The Area. Fellsway. Orange Line & Commuter Rail. Draw 7 Park. I-93. Commuter Rail. Fellsway. Assembly Square site o f redevelopment. Orange Line & Commuter Rail. I-93. What is there already?. - PowerPoint PPT Presentation

Citation preview

Page 1: The Draw 7 Park Site

The Draw 7 Park Site

ByHimanshu Dubey

&Chris Cumming

Page 2: The Draw 7 Park Site

The Area

Draw 7 Park

Assembly Square siteof redevelopment

I-93

Fellsway

Orange Line & Commuter Rail

Commuter Rail

I-93

Orange Line & Commuter RailFellsway

Page 3: The Draw 7 Park Site

What is there already?The park itself already exists, but it is hidden and does

not see many visitors. Existing elements include:Trees and bushesPaved footpathsBenchesOpen field

Page 4: The Draw 7 Park Site

What can be added?Draw 7 Park has great potential and can be improved

with various elements:Designated soccer fieldBasketball courtPlayground for kidsFountainAdditional points of pedestrian accessGarbage and recycling receptacles

Best of all:Improved access to, and quality of, the waterfront

Page 5: The Draw 7 Park Site

What can be added? (cont.)

Page 6: The Draw 7 Park Site

The Mystic River WaterfrontNo features exist to attract people to the waterfront.The riverbank is ravaged by erosion, sediment, and

debris.A damaged and rusted chainlink fence runs the length of

the bank. It currently serves no purpose.

Page 7: The Draw 7 Park Site

Solutions to the WaterfrontCreation of salt marshes along the shoreMore treesVegetation to control stormwater runoffPlaces to fish

Page 8: The Draw 7 Park Site

Solutions (cont.)

Page 9: The Draw 7 Park Site

Who will hang out here?Some residents from surrounding neighborhoods already

visit the park to play soccer.With the redevelopment of Assembly Square, there will

be an influx of new visitors:Residents ShoppersOrange Line passengers who see the park from the train

Page 10: The Draw 7 Park Site

How do you get there?The only way into the park is a hidden access road that

crosses under the Orange Line bridge.Even so, it is not the most inviting entrance. It is meant

for vehicles.The embankment of the Orange Line approaching the

bridge acts as a giant wall between the park and Assembly Square.

The only good way to see the park is from the train.

Page 11: The Draw 7 Park Site

New & Improved AccessThere should be at least one visible pedestrian crossing

over or under the tracks to the park.Assembly Square Station should also have stairs on the

other side of the mezzanine, providing direct T access to the park.

In East Boston, there is a footbridge crossing over the Blue Line to Constitution Beach. This is a perfect example of attractive pedestrian access.

The removal of the boats at the Winter Hill Yacht Club will open up the existing entrance for more space and visibility.

Page 12: The Draw 7 Park Site

Noise PollutionThe greatest source of noise pollution comes from the

Orange Line trains, which pass frequently.This will be a problem for both park visitors on one side,

and residents and office workers on the other.The loud rumble from trains crossing the bridge is

especially loud.Commuter trains with loud diesel locomotives pass on

either side of the park.

Page 13: The Draw 7 Park Site

Noise AbatementSound walls could be constructed on either side of the

tracks.There may be some kinds of walls that are transparent,

so the park is still visible from the train.The bridge will remain loud to cross under, another

important reason for alternative crossings.

Page 14: The Draw 7 Park Site

THE END