THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN Brent Whitfield, P.E. Director of Water Resources & Patrick D. Kaimrajh, P.E. Senior Engineer December 8, 2017

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN

Brent Whitfield, P.E.Director of Water Resources

&Patrick D. Kaimrajh, P.E.

Senior Engineer

December 8, 2017

Page 2: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

ABOUT US

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Founded in 1986

SERVICES Stormwater Modeling &

Design Utility Engineering Design-Build Delivery Land Development Transportation Landscape Architecture Parks & Recreation Institutional & Educational

Page 3: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

ABOUT US

Brent Whitfield, P.E.Director of Water Resources

14+ Years of Water Resources, Hydrologic & Hydraulic Engineering, Design, Permitting, and Construction Experience

Patrick Kaimrajh, P.E.Senior Engineer

9+ Years of Stormwater, Utilities, and Land Development Engineering, Design, Permitting, and Construction Experience

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 4: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

PROJECT BACKGROUND: IN THE NEWS

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 5: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

City’s first Stormwater Management Master Plan (SWMMP) in 1997

Comprehensive SWMMP Update began in 2010

SWMMP completed in 2012, proposing a Capital Improvement Plan with ~$200M of improvements

PROJECT BACKGROUND: CITY OF MIAMI BEACH STORMWATER PROGRAM

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 6: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

FUNDING September 2014 – City Commission

approved increase in stormwater fees to issue bonds to fund projects

Three separate bonds issued for a total of $300M

PROJECT BACKGROUND: CITY OF MIAMI BEACH STORMWATER PROGRAM

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 7: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

CIP Plan Newest Cost Estimate $400M-$500M 80 Pumps Elevating Roads Raising Seawalls

Miami Herald Article http://www.miamiherald.com/news/local/community/miami-dade/miami-beach/article41141856.html

PROJECT BACKGROUND: CITY OF MIAMI BEACH STORMWATER PROGRAM

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 8: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

PROJECT BACKGROUND: SEA LEVEL RISE Sea Level Rise King Tides

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 9: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

PROJECT BACKGROUND: SEA LEVEL RISE

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 10: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

PROJECT BACKGROUND: LOCATION

Location

Florida Miami-Dade County

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 11: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

Location

Florida Miami-Dade County

City of Miami Beach

PROJECT BACKGROUND: LOCATION

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 12: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

Location

Florida Miami-Dade County

City of Miami Beach Sunset Islands 3 & 4

PROJECT BACKGROUND: LOCATION

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 13: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

PROJECT BACKGROUND: DESIGN-BUILD PROCUREMENT

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 14: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: DESIGN CRITERIA PACKAGE

SCOPE OF WORK Rebuild Roadways

New 8” Water Main

Line Sanitary Sewer Mains and Laterals

Underground Overhead Power and Telecom

New Stormwater System with Pump Stations

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 15: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: DESIGN CHALLENGES Low Elevations

Min. 1.20 - 1.40 ft-NAVD Soil Conditions

Muck

Narrow Rights-of-Way 50’ R/W with several

encroachments

Island Surrounded by water One road in and out

Stakeholders Ongoing residential

constructionTHE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 16: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: OUR APPROACH

Minimal roadway elevation changes

No Black Base

Relocate Pump Station for Island 3

Construction Phasing to avoid conflicts

Minimizing Impacts to Encroachments

and Residents

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 17: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: ROADWAY ELEVATIONSDCP Criteria Roads < El. 3.50 ft-NAVD Black Base Roads > 3.50 ft-NAVD Limerock BaseCMA and Contractor Proposed Alternate to black base of a GeotextileA woven polypropylene monofilament geotextile was selected. Provides: Separation Filtration ReinforcementRoads Raised 6” by Owner request via Change Order

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 18: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: RESILIENCYInfrastructure Hardening Pump Stations

Backflow Preventers

Pavement Strengthening

Elevated Seawalls

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 19: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN

Design Parameters

Collection and Conveyance

Water Quality Treatment

Pump Station Design

Outfall Design

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 20: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN Design Parameters

5-year, 24-hour rainfall with 1.25 Safety Factor – 7.5”

Tailwater of 2.70 ft-NAVD (~ 30” higher than Mean High Water)

Maintain 8’ width of road dry

Provide Water Quality for R/W

Serve all R/W and full landlocked lots and half of waterfront lots for Water Quantity

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 21: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN Collection and Conveyance

Interconnected catch basins

Island 3: 16.9 acres

Island 4: 14.8 acres

Pipe sizes ranging from 18” to 72”

Yard drains provided for swales

Harmonization of Driveways

Custom Valley Gutters

Overflow structures utilize existing outfalls with backflow prevention

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 22: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN

Water Quality Treatment

Existing System – No Treatment

Designed to treat Right-of-Way

Hydrodynamic Vortex Units

Offline configuration with bypass

Trash Rack provided upstream

10-ft Downstream Defenders for

each Island, treating approx. 13 cfs

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 23: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN

Pump Station

Components

Trash Rack/Bypass

Wet Well

Duplex Pumps

Stormwater Force Main

Energy Dissipater

Control Panel

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 24: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN Pump Station – By the Numbers

Item PS#3 PS#4

Design Flow 23,177 gpm 17,830 gpm

Motor 110 hp 90 hp

Motor Current 193A 112A

Force Main 30” 24”

Pump Tube 48” 32”

Access Hatch 84”x156” 72”x125”

Wet Well (WxLxD) 14’x19’x15’ 9’x14’x15’

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 25: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN Pump Station

Control Panel

Variable Frequency

Drive (VFD)

Bottom of Panel set

at BFE + 2 feet

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 26: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: STORMWATER DESIGN

Outfall Design

Energy Dissipaters

Flap Gates

Manatee Grates

Max. Discharge Velocity

of 1.75 ft/s

Rip-Rap and Seagrass

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 27: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: PERMITTING SFWMD

Army Corps of Engineers

Miami-Dade RER-DERM

Water Control

Outfalls

Dewatering

Coastal Resources

Urban Forestry

Miami-Dade County Traffic

Health Department

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 28: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: LESSONS LEARNED

These Pumps are Huge

Check and double check dimensions for pumps, flanges, hatches, etc.

Overhead clearance for cofferdams

Electrical Equipment

Outfall permitting is critical

Document, document, document!

Design-Build is sometimes Build-Design

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 29: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

SUNSET ISLANDS 3 & 4: FUTURE CONSIDERATIONS

Miami Beach now

requiring minimum crown

of road of 3.70 ft-NAVD

Now designing for 10-

year, 24-hour storm

Site considerations for

generator

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 30: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

QUESTIONS?

THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGNFSA WINTER CONFERENCE 2017

Page 31: THE FRONT LINES OF SEA LEVEL RISE: A RESILIENT DESIGN · 2017. 11. 28. · Miami-Dade RER-DERM Water Control Outfalls Dewatering Coastal Resources Urban Forestry Miami-Dade County

THANK YOU!