Department of Nuclear RegulationDepartment of Nuclear RegulationAtomic Energy Council, R.O.C.Atomic Energy Council, R.O.C.
The Introduction of The Introduction of LungmenLungmen Nuclear Power PlantNuclear Power Plant
11
OutlineOutline
•• The current status of LMNPPThe current status of LMNPP•• Licensing and Inspection ActivitiesLicensing and Inspection Activities•• The unusual events during The unusual events during
constructionconstruction•• Major observation by authorityMajor observation by authority•• ConclusionConclusion
22
The Current Status of LMNPPThe Current Status of LMNPP
33
Progress of Progress of LungmenLungmen ProjectProjectLungmen Project proposed1980
GE ABWR Awarded1996.6
Construction Permit issued1999.3
LungmenLungmen Project Project Suspended by Suspended by DPP governmentDPP government
2000.10
Lungmen Project Resumed
2001.2
First Concrete pouring
2006.10
2005.3
Unit 1 RPV Sitting
Unit 2 RPV Sitting
2007.7
161kV Energized (only partial electric distribution systems installed)
Present
2008.11Unit 1 RPV
Hydro test
Pre-op tests start
2009.72010.4
ECCS Pre-op
2010.8
FIV
44
Turbine Building
Access Control Building
Radwaste Building
Auxiliary Fuel Building
Rx Building
Control Building
Switchyard
N
Pump House
BirdviewBirdview of Power Blockof Power Block55
Reactor BuildingReactor Building 66
Control BuildingControl Building 77
Turbine BuildingTurbine Building 88
Auxiliary Fuel BuildingAuxiliary Fuel Building 99
RadiwasteRadiwaste BuildingBuilding 1010
RCCV
FMCRD
Reactor Internal Pump
Main Control Room
Reactor Pressure Vessel
Turbine & Generator
ECCS
CutCut--away viewaway view
1111
Reactor BuildingReactor Building
BASE MAT
SUPPRESSION POOL
ACCESS TUNNEL
WET WELLVACUUM BREAKER * 8
RPV
LOWER DRYWELL
HORIZ. VENT
SRVMSIV
PRIMARY CONTAINMENT BOUNDARY
SECOND CONTAINMENT BOUNDARY
CLEAN ZONE
CLEA
N ZO
NE
DRYWELL CONNECTING VENT * 10
FUEL POOLD/S POOL
PRIMARY CONTAINMENT VESSEL
ACCESS
DRYWELL HEAD
UPPER DRYWELL
1212
Main Control RoomMain Control Room
MCC (Main ControlConsole)
AlarmIndication
WDP (Wide Display Panels)Fixed Mimic
Display
LargeVariable Display
Video Display UnitHard Switch
PanelsSSC( Shift Supervisor Console)
Plant status tiles
Raised FloorRaised Floor
1313
Process ScreenProcess Screen Overla y
1414
1515
Current StatusCurrent StatusThe Lungmen progress issued by Taipower Company (TPC) as follows: (As of 8/31/ 2013)
Total Accumulated Progress(%)
Category
(weight)Design(19%)
Procurement(15%)
Construction(58%)
Startup*(8%)
Total(100%)
Unit 1Unit 1 99.77 100 97.70 63.63 95.71
91.5Unit 2Unit 2 98.96 100 96.72 20.00
*Numbers under startup represent initial test activities(Post Construction Test, Pre-op test, procedures preparation)
1616
Current Status of #1 Current Status of #1 -- ConstructionConstruction
The construction of The construction of LungmenLungmen Project has Project has almost completed. But there are still some almost completed. But there are still some deficiencies that should be improved, such as:deficiencies that should be improved, such as:The 18 construction improvement action itemsThe 18 construction improvement action items
Currently Currently LungmenLungmen Project are working on the Project are working on the 18 construction improvement action items to fix 18 construction improvement action items to fix the identified problems, including those of the identified problems, including those of RCCV liner, surface mounting plate, cable tray RCCV liner, surface mounting plate, cable tray seismic enhancement, and fire protection.seismic enhancement, and fire protection.
1717
126 systems are to be tested126 systems are to be tested
Currently, 119 systems have been fully Currently, 119 systems have been fully turned over and 7 partially turned over for turned over and 7 partially turned over for prepre--operational testingoperational testing
In terms of preIn terms of pre--op test procedures, there op test procedures, there are 308 procedures that should be are 308 procedures that should be finished before fuel loading, 19 under finished before fuel loading, 19 under execution, 173execution, 173((56 % 56 % ))
finished testing finished testing
and are reviewed by SORCand are reviewed by SORC
Current Status of #1 Current Status of #1 -- TestingTesting
ECCSECCS--HPCF CHPCF C
1818
LPFL CLPFL C
LPFL ALPFL A
ECCSECCS--LPFLLPFL
1919
2020
Pre-FIV
Post-FIV Inspection
Flow Induced Vibration TestFlow Induced Vibration Test
2121
JNESJNES NRCNRC
International CooperationInternational Cooperation
2222
For the 308 preFor the 308 pre--op test procedures, there op test procedures, there are 187 preare 187 pre--op test reports which should op test reports which should be submitted to AEC, and 65 reports have be submitted to AEC, and 65 reports have been submitted.been submitted.
Because of the 2Because of the 2--stage system Turnover stage system Turnover of of LungmenLungmen Project, the preProject, the pre--op testing op testing had been progressing partly and had had been progressing partly and had lasted for a long time. lasted for a long time. Therefore, the Therefore, the public still query the effectiveness of the public still query the effectiveness of the prepre--op testing.op testing.
Current Status of #1 Current Status of #1 –– Testing Testing (cont.)(cont.)
2323
For verifying system function integrity and reliability, TPC promised to perform pre-op re-test for systems finishing pre- op test and approved, except ones that can’t re-build the test conditions in 2013.
TPC calls senior engineers from other 3 NPPs to form the Reinforced Safety Evaluation Task Force, to perform turn- over package review, walkdown, and pre- op re-test
Current Status of #1 Current Status of #1 –– Testing Testing (cont.)(cont.)
2424
The duties of Reinforced Safety Evaluation Task Force are reviewing the system turnover package and auditing the re-test.
Both of the pre-op test reports should be submitted to AEC. The first one is reference materials; the other is the formal documents.
Currently, 60 pre-op re-test procedures have been fully completed.
Current Status of #1 Current Status of #1 –– Testing Testing (cont.)(cont.)
Current Status of #1Current Status of #1 –– Improvement Action ItemsImprovement Action Items
The results of Post-Fukushima Safety Evaluation requires Lungmen to perform seismic and tsunami simulations, add two gas turbine generators, sea wall, and spent fuel pool instrumentation, … etc.
2525
2626
Fuel Loading PermitFuel Loading Permit
AEC required TPC to complete 75 tasks, including the approval of System Function Test Reports, before applying the fuel loading permit
Licensing and Inspection Licensing and Inspection ActivitiesActivities
2727
Basic Regulatory LawsBasic Regulatory Laws
Nuclear Reactor Facilities Regulation Act Nuclear Reactor Facilities Regulation Act Article 5Article 5For the construction of nuclear reactor facilities, an For the construction of nuclear reactor facilities, an application forapplication for construction permitconstruction permit shall be filed with the shall be filed with the competent authorities, and the construction shall not competent authorities, and the construction shall not commence until the application has been reviewed and commence until the application has been reviewed and approved by the competent authorities to meet with the approved by the competent authorities to meet with the following standards and requirements and the competent following standards and requirements and the competent authorities have issued a construction permitauthorities have issued a construction permit……
2828
Basic Regulatory Laws (cont.)Basic Regulatory Laws (cont.)
Article 6Article 6Even after the completion of construction of nuclear reactor Even after the completion of construction of nuclear reactor facilities, the facilitiesfacilities, the facilities shall not be loaded with the nuclear shall not be loaded with the nuclear fuel, unless the competent authorities have reviewed and fuel, unless the competent authorities have reviewed and approved its final safety analysis reportapproved its final safety analysis report, and the corrective , and the corrective actions of inspection findings during the construction and actions of inspection findings during the construction and the system functional tests thereof have been passedthe system functional tests thereof have been passed. . Unless the competent authorities haveUnless the competent authorities have reviewed and reviewed and approved the power testapproved the power test therefore and then issued an an operating licenseoperating license therefore, no nuclear reactor facilities, therefore, no nuclear reactor facilities, having been loaded with the nuclear fuel, shall be formally having been loaded with the nuclear fuel, shall be formally operated. operated.
2929
Basic Regulatory Laws (cont.)Basic Regulatory Laws (cont.)Article 14Article 14During the construction or the operation period of nuclear reactor facilities, the competent authorities may dispatch the the competent authorities may dispatch the inspector to inspect the facilities at anytimeinspector to inspect the facilities at anytime,, and may require the licensee to submit relevant materials; wherein, the licensee shall not evade, interfere with or refuse the same. If there is anything not conform to the prescription or if the public health/safety or environmental ecology may be endangered, the competent authorities shall order the licensee to improve the situation or take any other necessary measures within a prescribed time period. If the situation is serious, the licensee does not improve it nor take necessary measures within the prescribed period, the competent authorities may order the licensee to cease the working on cease the working on the scene, or operation thereof, or may revoke the license or the scene, or operation thereof, or may revoke the license or permit the operation only under a limited power. permit the operation only under a limited power. …….. 3030
• A two-step licensing review process is adopted for nuclear plant in Taiwan.
• For Lungmen Project, a construction permit was issued following a preliminary safety analysis report (PSAR) being satisfactorily reviewed in March 1999.
• AEC started the construction inspection, including resident inspection, after issuing construction permit.
The Process of licensing to LMNPP
3131
• Taipower Company submitted first version of FSAR in August 2007 for AEC’s review.
• After over 3 years of review, AEC is currently preparing a draft safety evaluation report (SER).
• AEC will conduct readiness inspections for Lungmen plant to confirm the FSAR commitment before issuing fuel loading permit.
The Process of licensing to The Process of licensing to LMNPP LMNPP (cont.)(cont.)
3232
1st check point
The Process of licensing to LMNPP
Site selectionPreliminary design(PSAR)
Construction, PCT, Pre-OP Start-up testingFSAR
TPC
AE
C
NOW
2nd check point
3rd check point
4th check pointReview PSARIssue PSAR SERIssue Construction License
Review FSARIssue FSAR SER
Review 75 tasks Issue Fuel loading permit
Review Startup testing ReportIssue Operation License
3333
• As plant operators play a key role in their dynamic responses to normal operations and anomalies, their qualification and ability are among the main themes for nuclear safety.
• Plant operators and senior operators are required to pass stringent tests, including written examination, plant walk-through and simulator operation, before they are allowed to work at the main control room of the plant.
The Qualification of The Qualification of LMNPPLMNPP’’ss OperatorOperator
3434
Construction Tests
Pre-Operational TestsStartup Tests
- Construction Program Inspection- Design Change Process Inspection
- Construction testing Inspection
- Pre-Op Testing Inspection
- Operation Program Inspection - Lo-Power testing Inspection
- Power ascension Insp.- Operation Readiness Inspection - Operation Readiness Insp.
-- ROP transition Insp.
Construction Inspection FrameworkConstruction Inspection Framework
(Initial Test Program)
Construction Post Construction Test
Pre-Op Test Startup TestPhase Ⅰ Phase Ⅱ Phase Ⅲ
Commercial
(Construction / Installation/ Test
Procedure )
(Startup Administrative Manual, SAM) (In-service Procedure)
JTG
TPC Nuclear Project Quality Assurance ProgramThe Taipower Nuclear
Operation Quality Assurance Program
Construction Office
LMNPP
3535
Overview of Regulatory ActivitiesOverview of Regulatory Activities(1) Routine Inspection(1) Routine Inspection
The resident inspection, periodic inspection, and The resident inspection, periodic inspection, and special taskforce inspectionspecial taskforce inspection
(2) Quality Control Inspection(2) Quality Control InspectionTPC NED,NSD, and AETPC NED,NSD, and AE----S&W , etcS&W , etc
(3) Quality Inspection of Contractors /Vendors(3) Quality Inspection of Contractors /Vendors Domestic Contractors /Vendors Domestic Contractors /Vendors ––New Asia Co., New Asia Co.,
CSBC, and CTCI, etcCSBC, and CTCI, etc Oversea Contractors/Vendors Oversea Contractors/Vendors ---- Hitachi, IHI, and Hitachi, IHI, and
Toshiba, etc. (Japan)Toshiba, etc. (Japan)General General Electric,DRSElectric,DRS, and Invensys , etc. (USA), and Invensys , etc. (USA)
3636
(4) Safety Analysis Review(4) Safety Analysis Review Review of 119 followReview of 119 follow--up items of PSAR up items of PSAR
Review of PSAR Amendments, andReview of PSAR Amendments, and
Review of FSAR. Review of FSAR.
(5)(5) LungmenLungmen Regulatory MeetingRegulatory Meeting
(6)(6) Other Special Regulatory ActivitiesOther Special Regulatory Activities Review of Seismic AnalysisReview of Seismic Analysis digital I & Cdigital I & C
Overview of Regulatory Activities Overview of Regulatory Activities (cont.)(cont.)
3737
PlacePlace::Job Site ofJob Site ofLMNPPLMNPP
ActivityActivity::Periodic Periodic inspection, specialinspection, specialtaskforce inspectiontaskforce inspection
3838
PlacePlace::Toshiba/Toshiba/IHI Factory IHI Factory (Japan) (Japan)
ActivityActivity::Quality Quality Inspection ofInspection ofOverseas Vendors Overseas Vendors
3939
PlacePlace::CTCI & CSBCCTCI & CSBCFactory Factory
ActivityActivity::Quality Quality Inspection ofInspection ofDomestic Vendors Domestic Vendors
4040