The Modern Power Grid,Eskom’s 765KV Super Grid & Planning Strategies

Presenters: Gavin Bruce & Ronald MaraisCo-author: Dr Dzevad Muftic

Eskom South Africa

Page 2: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Overview

� Transmission Tower Design Evolution

� Testing & line routing technology

� Conductor opt. & design software

� Construction & Live Line mtce.

� DCB , dead tank bkrs, Bkr & a half

� Lightning and fire tracking

� Smart substation information architecture

� 765KV Super Grid

Page 3: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Transmission Tower Design EvolutionTransmission Tower Design EvolutionTransmission Tower Design EvolutionTransmission Tower Design EvolutionSome specifics of the environmentSome specifics of the environmentSome specifics of the environmentSome specifics of the environment� High altitude (± 1600 m)

� Long distances

� High isocraunic level – lightning

� Cane / veld fires

� Bird protection

� Pollution (industrial and marine)

Page 4: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

+

Minimum Conductor clearance

SERVITUDE AND CONDUCTOR CLEARANCE400kV TRANSMISSION LINE

47.0m

7.8m++ +

++ + +

++ +

+

+ + +

+ + +

+ + +

+ + +

++

+ +++

+ + + + +

++ + +

+ + + +

+ + ++

+

Servitude

30.0m (average)

20.0m

+

8.8m

++

+

Self-Supporting type

+

Minimum Conductor clearance

++ +

++ + +

++ +

+

+ +

+ + +

+ + +

8.5m

V

V

V

V

V

V

+ + + ++++

+ + + + ++

+ ++

+

+ + + + + + +

++ +

+ ++

++

+ ++

+

++

+ +

+ +

SERVITUDE AND CONDUCTOR CLEARANCE

400kV TRANSMISSION LINE

Guyed suspension type

26.0m

Servitude

55.0m V

33.0m (average)

23.0mV V

+ ++

+++

+ + + + +

++

++ +

+ +

+

++

++

+

++

+

++

+

+ + +

++ +

+ ++

++

+

++

+

++

+

+ +

++

++

SERVITUDE AND CONDUCTOR CLEARANCE

suspension typeCross-Rope

+

+

400kV TRANSMISSION LINE

8.5m

Min. Conductor clearance

Servitude

21.0m

55.0m

28.0

V

V

V

V

V

V

V

V

36.0m (average)

+ ++

Transmission Lines - Overview

Page 5: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Evolution of EHV Structures in Eskom

100% Cost

Self - Supporting Suspension

Pre- 1985 1985

65% Cost

Guyed Vee Suspension

Page 6: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Evolution of EHV Structures in Eskom

50% CostCross-rope Suspension

1995

50% Cost

Cross-rope Suspension

1998

Compact Cross-rope Suspension

Page 7: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

2002 Athene – Pegasus 400KV Line

Angle guyed strain towers

Page 8: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Palmiet - Stikland 400KV line

“Invisible Tower”In place for 10 yrs

Page 9: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Design – Historical Perspective

0

25

50

75

100

125

150

1965 1986 1992 1996 2002

Line

Development cost

Towers

$x10

00/k

m

Year

Page 10: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

� Testing at high altitudes & industrial & marine pollution test sites

� Full scale testing to prove design before going into application - to minimise risk

� Improved confidence level – no failure to date from poor design

Testing facilities - motives

Page 11: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Dielectric Testing Facilities

SABS NETFA

full scale dielectric tests

Page 12: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Dielectric Testing Facilities

Corona Cageat MWP

ImpulseGenerator atUKZN

Page 13: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Insulation Pollution Testing Facilities

Koeberg SiteMarine Pollution

Sasol 1 SiteVanderbijlparkInd Pollution

Page 14: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Mechanical Tower Testing

Rosherville TowerTest Station

Page 15: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Vibration Testing Facilities

Kroonstad Test Line

Indoor VibrationTest Lab at UKZN

Page 16: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

- Airborne LaserSurvey (ALS)

- 3D digital image

Line Routing

Page 17: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Conductor Optimisation

Page 18: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Line Design Software

Page 19: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Electric Field contours prediction

Line Design Software – 3D

Page 20: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Construction

� Construction technologies- Conventional- Using helicopter

Page 21: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Lifting of guyed-vee 765kV structure

Page 22: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Live Line Maintenance

Page 23: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Live Line Maintenance

Page 24: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Operation and Maintenance

Example - Increased power flow capability;

Real time monitoring system - RETMOS

Ambient Temperature•• Wind Speed• Wind Direction• Solar Radiation• Mechanical loading• Curren t

Control Ce ntre

••Available Capacity

•Line Clearances

Page 25: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Operation and MaintenancePerformance:New design vs old design – 2 to 3 times reduced number of faults!

1 2 1 1 1 2

HYDRA HYDRA PEGASUS WITKOP VENUS VENUS

DROERIVIER DROERIVIER TUTUKA TABOR GEORGEDALE GEORGEDALE

1 2 1 2 1 1 2

VENUS VENUS MIDAS MIDAS PLUTO SPITSKOP SPITSKOP

MAJUBA MAJUBA MATIMBA MATIMBA MATIMBA MATIMBA MATIMBA

1 1 1

PEGASUS VENUS PEGASUS

MAJUBA ARIADNE ATHENE

1 1 1 1 1 3 1 1

KOKERBOOM MAPUTO SPITSKOP DUVHA EDWALENI HYDRA MAPUTO WITKOP

ARIES ARNOT BIGHORN CAMDEN CAMDEN DROERIVIER EDWALENI SPENCER

AVERAGE VALUE

275k

V L

ine

275k

V L

ine

275k

V L

ine

275k

V L

ine

MINIMUM PORTION OF LINE FUALTS DUE TO PIGYBACK FAILURE

Self Supp. Guyed-vee x-rope Compact x-rope

Page 26: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

� Replaces the conventional combination of circuit breakerand separate disconnectors

ConventionalAIS equipment:

circuit breaker

disconnector

disconnector

busbar

disconn circuit breakerCombined

Disconnecting CBCombined

Optimized substation design

Improved availability

Safe, simple, fast and reliable installation

Disconnecting Circuit Breaker - DCB

Page 27: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Only one set of moving contacts/pole - DCB

LTB Combined 145

�The disconnection function for a Combined DCB is obtained by the circuit breaker contact set

�No additional contacts or other components for the disconnecting function in the breaking chamber

Highest reliability; the same as for a standard circuit breaker

Page 28: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

AIS 765KV Bkr at BETA

Page 29: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Dead Tank Bkr at 550/138KV Yukon S/S APS

Page 30: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Breaker and a Half

REACTOR 1

FDR 1

TRANSFORMER 1

TIE BREAKER

BUSBAR 1 BUSBAR 2

DIAMETER

TRANSFORMERBUS BREAKER

FEEDERBUS BREAKER

REACTORBREAKER

Page 31: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

SYSTEM HEALTHYMODIFIED 1½ CIRCUIT BREAKER SCHEME

REACTORTX BUSBAR

NO.1 BUSBARNO.2 BUSBAR

BUSBAR REACTOR 1

TRANSFORMER 1

FDR 1

FDR 1 REACTORTRANSFORMER 2

FDR 2 FDR 4

FDR 2 REACTOR FDR 4 REACTOR

FDR 3 FDR 5

FDR 3 REACTOR FDR 5 REACTOR

Page 32: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

DOUBLE BUSBAR SELECTIONWITH BYPASS

MODIFIED BREAKER AND A HALF

709m

382m

1306

m

455m

60Ha

27HaRELATIVESIZES

Page 33: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

ADVANTAGES OF MODIFIED 1½CIRCUIT BREAKER

� Busbar fault does not cause circuit interruption

� Power flow is automatically redirected

� Can carry out maintenance on all circuit breakers without removing circuit from service (not only feeders as in double bus selection with bypass)

� Initially many single lines, cannot afford to lose circuits due to busbar faults (as will be the case with double bus selection)

� Transmitting large blocks of power

� High level of flexibility

Page 34: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

ADVANTAGES OF MODIFIED 1½CIRCUIT BREAKER (con’t)

� Proposed AIS more vulnerable to elements, need a change in philosophy

� Need high level of flexibility� Require to re-instate feeders when line reactors

become faulty, hence selectability of busbar reactor to any of the lines

� Layout is very clear and most switchgear in the longitudinal bay

� Longitudinal bay comprises 3x bus couplers in series

� Not far to walk for Isolating faulty subsection� In most cases can lose both busbars and still

maintain supply

Page 35: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

DISADVANTAGES OF MODIFIED 1½CIRCUIT BREAKER

� New layout concept

� System Operators need training on Switching procedures

� Field staff need training on switching procedures

� Labelling of primary Plant, especially circuit breakers and Isolators require precise identification

Page 36: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Remote sensing of fires(Active Fire Information System - AFIS)

Page 37: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

CSIR SAC

ArcIMSWeb

ServerInternet

Internet Users

MODIS

MSG

Internet Service Provider (IS )

Other users…

NDMC

Eskom

Email/SMS Fire AlertWeekly/monthly reports

Notification of info available on website

Page 38: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Query data

Navigation tools

MODIS observations

MSG observations

Data layers

Page 39: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Lightning and Storm Tracking

� Southern African Lightning Detection Network (SALDN)� Commissioned by SA Weather Service

� Installation started October 2005

� First useable data November 2005

� Vaisala thunderstorm system� National coverage - 19 sensor configuration

Page 40: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Lightning Strokes 21st and 22nd

Nov 2007

Strokes recorded – 579,665 in 24 hrs

Page 41: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Power Line Exposure – Ground Stroke Density

Page 42: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Power Line Incidents – Match Date & Time

Page 43: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Power Line Incidents – Match Date & Time

Page 44: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Information/monitoring data

� Data/Info’ at S/S level increasing eg:

� Disturbance recorders

� QOS metering

� Tariff metering

� Fault location (TWS & P531)

� Trfr oil monitoring (DGA)

� Security alarms etc.

� Data in silos & individual access only

� Need integration & open access for informed decision making

Page 45: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Proposed Architecture

Page 46: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Super Grid &

Planning Strategies for

the future

Page 47: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Overview

�What is a Super Grid?

�Why a Super Grid?

�What will the Super Grid look like?

�What is the progress?

�Where to from here?

Page 48: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What is a Super Grid?

Super Grid is proposed to be

� A high capacity, EHV electricity transmission system

� Incorporating new technologies, such as HVDC, and designed for high reliability and flexibility

Page 49: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Why a Super Grid?Business Environment

Environmental pressureswill continue to increase, including difficulties obtaining rights-of-way (servitudes)

Need to reduce CO2 emissions and improve energy efficiency

Concerted effort to increase and sustain economic growth through ASGISA

Increased power flows between Eskom power system & neighboring utilities

Page 50: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Why a Super Grid?Increased Power Transfer

Substantial increase in new Power

Generation

�20GW nuclear generation programme

�Increase renewable energy sources

�New clean coal generation technologies

Substantial increase load forecast

Position Forecast Load Demand of around

80GW by 2026

Page 51: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Generation Location Uncertainty

Inland & Coastal Generation scenarios.

The Inland Generation scenarios

Possible Base Loads (coal) power stations

The Coastal Generation scenarios

Nuclear generation power stations.

Combination scenario

Combination of Inland & Coastal scenarios

Page 52: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Current Tx Network Grids

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

CENTRAL

765kV400kV

CAPECORRIDOR

NORTHWEST

WESTERN

SOUTHERN

EASTERN

NORTH EAST

NORTHERN

Page 53: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Current Tx Network Main Generation

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

CentralNorth-East Power Pool

Matimba

P/Storage

Koeberg (Nuclear)

Page 54: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Relative Network Forecasted Loading

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

Current Load

Future Load

Page 55: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Current Tx Network Power Flows

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

Page 56: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Inland Scenario Power Flows

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

Coal Generation

Pump Storage Generation

Nuclear Generation

New Generation Pools

Page 57: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Coastal Scenario Power Flows

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

Coal Generation

Pump Storage Generation

Nuclear Generation

New Generation Pools

Page 58: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Why is a Super Grid? Combination Scenario Power Flows

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

Coal Generation

Pump Storage Generation

Nuclear Generation

New Generation Pools

Page 59: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Super Grid Backbone Corridors

MATIMBA VENDA

WITBANK

KZN EAST COAST

CAPE

WELKOM

GENERATION POOL

TX SUPPLY NODE

PORT ELIZABETH

1

2

3

45

6

CENTRAL

Page 60: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Major Regional Corridors - North

MATIMBA

LOWVELD

JHB CENTRAL

PRETORIA

RUSTENBURG

JHB NORTH

POLOKWANE

GENERATION POOL

TX SUPPLY NODE

KLERKSDORP

Page 61: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What will the Super Grid look like?Major Regional Corridors - South

CAPE PENINSULA

PORT ELIZABETH

PINETOWN

EMPANGENI

WITBANKCENTRAL

GAMMA

BETA/PERSEUS

WELKOM

FERRUM

20

16

17

18

19

6

5

GENERATION POOL

TX SUPPLY NODE

Page 62: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What is the progress?Forecasted Generation till 2018

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

765kV400kV

Central

North-East Power Pool

Matimba

P/Storage

Koeberg (Nuclear)

Ingula

Bravo

Mmamabula

Medupi

Ankerlig

Gourikwa

Potential site

Confirmed site

Steelpoort

CCGT1 / Nuclear 1

Page 63: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

What is the progress? 765kV Super Grid

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfonteinUpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

BLOEMFONTEIN

DE AAR

KOMATIPOORT

RICHARD'S BAY

WITBANK

Namibia

Botswana

Mozambique

Swaziland

CAPE TOWN

DURBAN

EAST LONDON

PORT ELIZABETH

PRETORIA

DE AAR

765 kV400 kV

BEAUFORT WEST

Bloemfontein

Medupi P/S

Marang

Dinaledi

MokopaneDelta

Epsilon

Mogwase

Ferrum

Vryburg

Delphi

Mercury

Perseus

Hydra

Gamma

Omega

Grassridge

Beta

Kappa

MajubaZeus

Eros

Ariadne

Melmoth

Umtata

Ingula P/S

Venus

Page 64: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Where to from here? Super Grid Requirement

Design least regret networkNot an optimized networkFlexibility to adapt to changing gen & load

Maximize capacity through exiting servitudes

HVAC to HVDC conversionsExpanded bundle (increase SIL)Restring new conductor technology

HVDC applicationExpand application of HVDCFlexible HVAC line used for upgrading

Page 65: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

Acknowledgements

� Dr Dzevad Muftic ,Consultant,TAP� Gavin Bruce, Eskom Transmission

(Acting) General Manager Services� Ronald Marais, Eskom Transmission

Strategic Grid Planning Manager

Tel +27 11 871 3496Fax +27 11 871 2508

ESKOM SOUTH AFRICAwebsite: www.eskom.co.za

Page 66: The Modern Power Grid, Eskom’s765KV Super Grid & Planning ... · •Line Clearances. Operation and Maintenance Performance: New design vsold design –2 to 3 times reduced ... Power

THANK YOU !THANK YOU !

QUESTIONS ?QUESTIONS ?