    The New Construction Act

    LOCAL DEMOCRACY, ECONOMIC DEVELOPMENT

    AND CONSTRUCTION ACT 2009

    THE NEW CONSTRUCTION ACT

    A GUIDE TO THE CHANGES

    FC Construction

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    2/24

    2011

    2011

    The New Construction Act

    Today:

    Reviewthechanges Consider what they mean for Mansell

    anditsbusiness

    AmyMorleyPartner

    FreethCartwrightLLP

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    3/24

    2011

    2011

    The New Construction Act

    Somecontext... Housing Grants, Construction and

    Regeneration1996(theOldAct). Amended by Local Democracy, Economic

    Developmentand

    Construction

    Act

    2009

    (the

    NewAct).

    NewSchemeforConstructionContracts. No opting out for qualifying constructioncontracts.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    4/24

    20112011

    The New Construction Act

    When:

    Appliestoallcontractsenteredintoaftertheeffectivedate. 01October2011(EnglandandWales) 01November2011(Scotland)

    Contracts that are entered into before theeffectivedatewillcontinuetooperateundertheOldAct.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    5/24

    20112011

    The New Construction Act

    Summaryofchanges: Adjudication:

    Oralcontracts; Costs;

    SlipRule. PaymentNotices:

    Section 111 Withholding Notices arereplaced;

    PaywhenCertifiedunenforceable; NewPaymentNoticeregime; Introduction of Notified Sum for

    payment.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    6/24

    20112011

    The New Construction Act

    Section110APaymentNotice Payment Notice required in respect of any

    payment.

    Contract must nominate who will serve theNotice:

    Payer;

    SpecifiedPerson; Payee.

    Noticemustbeservedwithin5daysoftheduedate.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    7/24

    20112011

    The New Construction Act

    Section110APaymentNotice Mustsetoutthesumdue. Must set out the basis on which it is

    calculated.

    Whatdoes

    calculated

    mean.

    Notice required even if the amount is0.

    The amount identified in the NoticebecomestheNotifiedSum tobepaid.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    8/24

    20112011

    The New Construction Act

    NopaymentNoticeserved? The New Act provides for a party receiving

    paymenttoserveaDefault Notice. WhataretherequirementsofaPayeeNotice

    indefault? Mustidentifythesumdue. Setoutthebasisonwhichitiscalculated. Incentivetoserveearlyduetopostponement

    ofthefinaldateforpayment.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    9/24

    20112011

    The New Construction Act

    PayeeNoticeindefault Ifthepayeeisrequiredtoserveanapplication

    thenaseparatePayeeNoticeindefaultisnotrequired.

    Silentbutdeadly... The amount identified as due in the

    application becomes the Notified Sum forpayment.

    Unless:

    APayLessNoticeisserved

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    10/24

    20112011

    The New Construction Act

    PayLessNotice NotifiedSummustbepaidcomewhatmay. UnlessaPayLessNoticeserved. Noticemustsetoutthesumdueandthebasis

    onwhich

    it

    is

    calculated.

    Thisbecomesthenotifiedsumtobepaid. AbatementandSetoffbothcovered. ItisnotaWithholdingNotice. Nogroundsforwithholdingtobeprovided?

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    11/24

    20112011

    The New Construction Act

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    12/24

    20112011

    The New Construction Act

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    13/24

    20112011

    The New Construction Act

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    14/24

    20112011

    The New Construction Act

    Suspension[Section112] Anyorallcontractualobligations Reasonable cost and expenses incurred as a

    consequence

    ExtensionofTimetocoverremobilisation

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    15/24

    20112011

    The New Construction Act

    Paywhencertified No longer possible to link performance and

    the issue of certificates on one contract topaymentunderanother.

    RetentionandSubcontractors.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    16/24

    20112011

    The New Construction Act

    Insolvency

    Theoneexceptiontopaywhenpaid The right to withhold payment only if the

    contractexpresslystatesthisright.

    Still required to comply with Noticeprovisions. So must serve a Pay Less Notice if the

    insolvency is after the Due Date but beforethelastdaytoserveaPayLessNotice.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    17/24

    20112011

    The New Construction Act

    Adjudication

    Contractsnolongerinwriting. Section107oftheOldActnolongerapplies. All the case law on what was and wasnt a

    contract evidenced in writing no longerapplies.

    Moreadjudication? Increased challenges and uncertainty in

    dealing with oral/part oral contracts inadjudication.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    18/24

    20112011

    The New Construction Act

    Adjudication

    The Agreement to refer disputes toadjudicationmustbeinwriting.

    IfnotthentheSchemewillapply.

    Adjudication Agreement must include a sliprule. IfnoslipruleisincludedthentheSchemewill

    apply.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    19/24

    20112011

    The New Construction Act

    AdjudicationCosts TheOldActsilentoncosts.

    NewAct

    says

    the

    Adjudicator

    must

    be

    able

    to

    decidewhowillpayhisfees.

    Only exception is if an agreement is made inwritingafter thegivingofaNoticeofIntentiontoRefertoAdjudication.

    Parties still able to allocate who should paypartycosts e.g.consultantorlawyertime.

    So called Tolent clauses only enforceable ifthey refer generically to Referring Party orRespondingParty.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    20/24

    20112011

    The New Construction Act

    NoticeProvisionsandcalculatingtimeperiods

    Expresscontractual

    provisions

    on

    service:

    How?

    Where?When?

    Expect any tribunal will uphold expressprovisionsinthecontract.

    Ifthecontractissilent:TheOldActapplies

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    21/24

    20112011

    The New Construction Act

    Reminder of the Old Act provisions onService

    Method:

    Byanyeffectivemeans

    Timeruns

    from

    receipt

    Considerhowyouevidencereceipt Recordeddeliveryandfax

    Email Outofofficereplies Deliveryfailures

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    22/24

    20112011

    The New Construction Act

    Calculatingtimeperiods TheOldActprovisions:

    When a period of days is specified thentime begins to run immediately after thepoint in action e.g. if Notice of Suspension is to begiven(7daysisrequired)theniftheNoticewasreceivedonMonday the 7 days starts on Tuesday and suspension cantakeplaceonthefollowingTuesday.

    BanksHolidaysarenotcounted.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    23/24

    20112011

    The New Construction Act

    Materialsavailable: TheNewConstructionAct FCGuidetotheChanges. LegalSurgerydayinyourBusinessUnit. Mansells Subcontract Conditions (amended to provided for

    SubcontractorserviceofthePaymentNotice) Mansell NEC Subcontract amendments with update to provide

    for the New Construction Act and Subcontractor service of thePaymentNotice.

    JCT Design & Build Subcontract 2011 version with bespokeamendments to provide for Subcontractor service of thePaymentNotice.

    JCT Standard Building Subcontract 2011 version with bespokeamendments

    to

    provide

    for

    Subcontractor

    service

    of

    the

    PaymentNotice.

    Track changed copy of the Old and New legislation to identifythechangesmade.

  • 8/3/2019 The New Construction Act - A Guide to the Changes

    24/24

    20112011

    The New Construction Act

    Thankyouforyourtime