41
ENC. ___ February 15, 2011 THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MATERIALS MANAGEMENT DEPARTMENT 101 OLD VENICE ROAD OSPREY, FLORIDA 34229 TELEPHONE (941) 486-2183 FAX (941) 486-2188 MEMORANDUM TO: Members of the School Board Lori White, Superintendent Mitsi Corcoran, Chief Financial Officer FROM: Pat Black, CPPB, Director of Materials Management TITLE: APPROVAL TO AWARD BID #11-0008 FOR DISTRICT-WIDE PAINTING SERVICES Bids to provide District-Wide Painting Services' were received from eighteen vendors on December 14, 2010. The bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., were the best low bids meeting the advertised specifications based on a sealed scenario. This bid is for a period of one year with the option to renew for two additional one-year periods. The funds for these purchases are contained in the capital budget allocated to the Facilities Services Department. Not to exceed Requested by: Fiscal Impact: $900,000.00 Jody Dumas “Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the protest bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120. Florida Statutes.” Posting Date: 02-08-11 Funding: Capital Recommended Motion: That the bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., to provide ‘District- Wide Painting Services’ in an amount not to exceed $900,000.00, be approved for award and purchase.

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

ENC. ___ February 15, 2011

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

MATERIALS MANAGEMENT DEPARTMENT

101 OLD VENICE ROAD OSPREY, FLORIDA 34229

TELEPHONE (941) 486-2183 • FAX (941) 486-2188

MEMORANDUM

TO: Members of the School Board Lori White, Superintendent Mitsi Corcoran, Chief Financial Officer FROM: Pat Black, CPPB, Director of Materials Management TITLE: APPROVAL TO AWARD BID #11-0008 FOR DISTRICT-WIDE PAINTING

SERVICES Bids to provide District-Wide Painting Services' were received from eighteen vendors on December 14, 2010. The bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., were the best low bids meeting the advertised specifications based on a sealed scenario. This bid is for a period of one year with the option to renew for two additional one-year periods. The funds for these purchases are contained in the capital budget allocated to the Facilities Services Department. Not to exceed Requested by: Fiscal Impact: $900,000.00 Jody Dumas

“Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the protest bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120. Florida Statutes.” Posting Date: 02-08-11

Funding: Capital

Recommended Motion: That the bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., to provide ‘District-Wide Painting Services’ in an amount not to exceed $900,000.00, be approved for award and purchase.

Page 2: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.51 $0.20 $0.23

2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft. $0.25 $0.71 $0.18 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.51 $0.22 $0.24

3 Stucco Vertical Walls first coat - conditioner, per sq. ft. $0.25 $0.56 $0.17 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.38 $0.23 $0.24

4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.28 $0.34

5 Concrete Stack Block Walls (Elastomeric)

EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

( )first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.30 $0.34

6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft. $0.25 $0.71 $0.15 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.31 $0.34

7Underside of Horizontal Surfaces (do not use elastomeric)

first coat - conditioner, per sq. ft. $0.25 $0.52 $0.15 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.22 $0.34

8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft. $0.25 $0.68 $0.19 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.67 $0.19 $0.14non-skid additive (walkways), per sq. ft. $0.00 $0.24 $0.02 $0.30

1

Page 3: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

5 Concrete Stack Block Walls (Elastomeric)

EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$0.28 $0.60 $0.29 $0.35$0.25 $0.42 $0.30 $0.21

$0.28 $0.60 $0.30 $0.35$0.25 $0.40 $0.36 $0.27

$0.28 $0.60 $0.30 $0.35$0.25 $0.42 $0.32 $0.23

$0.28 $0.76 $0.30 $0.35$0.26 $0.62 $0.40 $0.32

( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

7Underside of Horizontal Surfaces (do not use elastomeric)

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.

$0.28 $0.76 $0.30 $0.35$0.26 $0.52 $0.41 $0.34

$0.28 $0.72 $0.29 $0.35$0.26 $0.48 $0.41 $0.32

$0.28 $0.60 $0.29 $0.30$0.25 $0.50 $0.31 $0.22

$0.25 $0.75 $0.29 $0.30$0.26 $0.55 $0.29 $0.20$0.18 $0.50 $0.10 $0.14

2

Page 4: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

5 Concrete Stack Block Walls (Elastomeric)

EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.16 $0.40 $0.15 $0.14$0.22 $0.35 $0.19 $0.20

$0.16 $0.40 $0.15 $0.17$0.22 $0.35 $0.19 $0.21

$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.19 $0.19

$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.25

( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

7Underside of Horizontal Surfaces (do not use elastomeric)

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.

$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.29

$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.29

$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.20 $0.21

$0.16 $0.40 $0.15 $0.19$0.20 $0.35 $0.15 $0.19$0.05 $0.00 $0.05 $0.03

3

Page 5: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

5 Concrete Stack Block Walls (Elastomeric)

EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$1.00 $0.15 $0.13 $0.25$1.00 $0.20 $0.17 $0.10

$1.00 $0.18 $0.13 $0.25$1.00 $0.22 $0.19 $0.10

$1.00 $0.17 $0.13 $0.25$1.00 $0.23 $0.18 $0.10

$1.00 $0.15 $0.15 $0.25$1.00 $0.30 $0.28 $0.15

( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

7Underside of Horizontal Surfaces (do not use elastomeric)

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.

$1.00 $0.15 $0.15 $0.25$1.00 $0.32 $0.28 $0.15

$1.00 $0.17 $0.15 $0.25$1.00 $0.32 $0.28 $0.15

$1.00 $0.15 $0.13 $0.25$1.00 $0.22 $0.18 $0.10

$0.19 $0.15 $0.24$2.00 $0.19 $0.18 $0.13$2.00 $0.03 $0.08 $0.05

4

Page 6: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

5 Concrete Stack Block Walls (Elastomeric)

EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.23 $0.15$0.29 $0.19

$0.27 $0.18$0.33 $0.22

$0.22 $0.17$0.29 $0.23

$0.23 $0.15$0.48 $0.25

( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

7Underside of Horizontal Surfaces (do not use elastomeric)

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.

$0.23 $0.20$0.51 $0.20

$0.23 $0.15$0.48 $0.32

$0.23 $0.20$0.33 $0.15

$0.23 $0.20$0.29 $0.15$0.05 $0.05

5

Page 7: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

9 Portable Buildings - Woodfirst coat - primer, per sq. ft. $0.25 $0.56 $0.20 $0.14each additional coat - acrylic, per sq. ft. $0.07 $0.44 $0.20 $0.15

10 Portable Ramps and Walkways first coat - acrylic, per sq. ft. $0.25 $0.86 $0.20 $0.14each additional coat - acrylic, per sq. ft. $0.07 $0.72 $0.20 $0.15non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.06

11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.

a. Doors door first coat - primer, per side $7.50 $18.00 $10.00 $10.00

OR door first coat - 2-part epoxy, per side $7.50 $16.00 $15.00 $10.00each additional coat - alkyd, per side $7.50 $14.00 $10.00 $10.00

OR each additional coat - acrylic enamel, per side $7.50 $14.00 $10.00 $10.00b. Jambs

EXTERIOR SPECIFICATIONS - Continued.

b. Jambsjamb first coat - primer, per side $2.50 $18.00 $6.50 $6.50

OR jamb first coat - 2-part epoxy primer, per side $2.50 $16.00 $10.00 $6.50each additional coat - alkyd, per side $2.50 $14.00 $6.50 $6.50

OR each additional coat - acrylic enamel, per side $2.50 $14.00 $6.50 $6.5012 Ferrous Metals (Miscellaneous) - Exterior

first coat - primer $0.25 $0.66 $0.32 $0.14OR first coat - 2-part epoxy $0.28 $0.95 $0.39 $0.14

each additional coat - alkyd $0.06 $0.59 $0.37 $0.20OR or acrylic enamel per coat $0.06 $0.59 $0.37 $0.2013 Non-Ferrous Metals - Galvanized - Aluminum, Exterior

first coat - conditioner/primer $0.25 $0.84 $0.39 $0.14each additional coat - acrylic $0.07 $0.69 $0.37 $0.20

14 Parking Bumperseach coat - acrylic, per bumper $20.00 $2.00 $5.45 $5.40

6

Page 8: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.

10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.

11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.

a. Doors door first coat - primer, per side

OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per sideb. Jambs

EXTERIOR SPECIFICATIONS - Continued.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$0.25 $0.65 $0.29 $0.35$0.28 $0.45 $0.29 $0.20

$0.25 $0.75 $0.29 $0.35$0.28 $0.60 $0.29 $0.20$0.18 $0.25 $0.10 $0.17

$18.00 $12.00 $14.00 $15.00$28.00 $21.00 $16.00 $20.00$20.00 $13.60 $13.00 $10.00$13.00 $13.80 $13.00 $10.00

b. Jambsjamb first coat - primer, per side

OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior

first coat - primerOR first coat - 2-part epoxy

each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior

first coat - conditioner/primereach additional coat - acrylic

14 Parking Bumperseach coat - acrylic, per bumper

$7.00 $8.00 $10.00 $11.00$12.00 $9.10 $16.00 $10.00$7.00 $2.75 $14.00 $7.00$7.00 $3.00 $14.00 $7.00

$0.28 $0.60 $0.22 $0.60$0.48 $0.58 $0.30 $0.50$0.20 $0.50 $0.25 $0.40$0.15 $0.35 $0.25 $0.30

$0.25 $0.55 $0.22 $0.20$0.20 $0.40 $0.25 $0.22

$10.00 $10.00 $8.00 $10.00

7

Page 9: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.

10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.

11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.

a. Doors door first coat - primer, per side

OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per sideb. Jambs

EXTERIOR SPECIFICATIONS - Continued.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.16 $0.40 $0.15 $0.20$0.22 $0.35 $0.20 $0.20

$0.16 $0.40 $0.28 $0.20$0.22 $0.35 $0.28 $0.20$0.05 $0.00 $0.05 $0.05

$6.50 $30.00 $8.00 $10.00$6.75 $30.00 $8.00 $15.00$6.50 $20.00 $8.00 $10.00$4.50 $20.00 $8.00 $10.00

b. Jambsjamb first coat - primer, per side

OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior

first coat - primerOR first coat - 2-part epoxy

each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior

first coat - conditioner/primereach additional coat - acrylic

14 Parking Bumperseach coat - acrylic, per bumper

$4.00 $5.00 $6.00 $9.50$4.25 $5.00 $6.00 $14.50$3.75 $5.00 $6.00 $9.50$3.75 $5.00 $6.00 $9.50

$0.16 $0.40 $0.15 $0.45$0.22 $0.40 $0.40 $0.60$0.24 $0.40 $0.20 $0.45$0.21 $0.40 $0.20 $0.45

$0.16 $0.40 $0.15 $0.42$0.22 $0.40 $0.20 $0.42

$10.00 $15.00 $2.00 $2.50

8

Page 10: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.

10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.

11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.

a. Doors door first coat - primer, per side

OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per sideb. Jambs

EXTERIOR SPECIFICATIONS - Continued.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$1.50 $0.20 $0.18 $0.20$1.00 $0.20 $0.18 $0.15

$2.00 $0.19 $0.16 $0.18$1.00 $0.19 $0.16 $0.17$1.00 $0.03 $0.08 $0.05

$100.00 $10.00 $5.50 $15.00$50.00 $13.00 $6.50 $18.00$125.00 $10.00 $6.50 $5.00$75.00 $10.00 $6.50 $5.00

b. Jambsjamb first coat - primer, per side

OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior

first coat - primerOR first coat - 2-part epoxy

each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior

first coat - conditioner/primereach additional coat - acrylic

14 Parking Bumperseach coat - acrylic, per bumper

$50.00 $7.00 $5.50 $5.00$50.00 $10.00 $5.50 $7.00$50.00 $7.00 $5.50 $5.00$50.00 $7.00 $5.50 $7.00

$1.25 $0.40 $0.30 $0.20$1.50 $0.44 $0.32 $0.25$1.00 $0.35 $0.32 $0.15$1.00 $0.35 $0.32 $0.15

$1.00 $0.20 $0.20 $0.25$1.00 $0.21 $0.21 $0.10

$10.00 $5.45 $2.75 $10.00

9

Page 11: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.

10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.

11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.

a. Doors door first coat - primer, per side

OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per sideb. Jambs

EXTERIOR SPECIFICATIONS - Continued.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.29 $0.20$0.29 $0.20

$0.23 $0.15$0.29 $0.19$0.26 $0.17

$22.00 $10.00$35.00 $11.00$25.00 $10.00$25.00 $10.00

b. Jambsjamb first coat - primer, per side

OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side

OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior

first coat - primerOR first coat - 2-part epoxy

each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior

first coat - conditioner/primereach additional coat - acrylic

14 Parking Bumperseach coat - acrylic, per bumper

$10.00 $9.00$17.00 $10.00$10.00 $9.00$10.00 $6.50

$0.66 $0.20$0.66 $0.35$0.52 $0.30$0.52 $0.22

$0.30 $0.20$0.33 $0.20

$4.50 $4.00

10

Page 12: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

15 Stripingeach coat - acrylic, per linear ft. $0.60 $0.29 $0.15 $0.15

16 Traffic Painteach coat - acrylic, per sq. ft. $0.45 $1.28 $0.24 $0.24

17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts

first coat - conditioner, per linear ft. $0.55 $0.80 $0.23 $0.22each additional coat - acrylic, per linear ft. $0.05 $0.81 $0.23 $0.22

18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)

first coat - conditioner, per linear ft. $0.60 $1.60 $0.28 $0.22each additional coat - acrylic, per linear ft. $0.05 $1.62 $0.28 $0.22

19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.24each additional coat - acrylic, per sq ft. $0.08 $0.38 $0.20 $0.25

EXTERIOR SPECIFICATIONS - Continued.

y p q20 Exterior Sealant

1/4" to 1/2" - 1-part urethane, per linear ft. $0.10 $0.52 $1.85 $0.201/2" to 1" - 1-part urethane, per linear ft. $0.10 $0.76 $2.25 $0.231/4" to 1/2" - 2-part urethane, per linear ft. $0.10 $3.50 $1.95 $0.201/2" to 1" - 2-part urethane, per linear ft. $0.10 $4.50 $2.35 $0.231/4" to 1/2" - 1-part silicone, per linear ft. $0.10 $1.35 $2.10 $0.201/2" to 1" - 1-part silicone, per linear ft. $0.10 $1.95 $2.35 $0.23

21 Caulking1/8" or greater - urethane, per linear ft. $0.10 $0.69 $0.83 $0.40under 1/8" latex or urethane, per linear ft. $0.10 $0.52 $0.65 $0.35

22 Dry Wall Boardfirst coat - primer, per sq. ft. $0.25 $0.33 $0.18 $0.15

INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

11

Page 13: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

15 Stripingeach coat - acrylic, per linear ft.

16 Traffic Painteach coat - acrylic, per sq. ft.

17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.

EXTERIOR SPECIFICATIONS - Continued.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$1.25 $0.20 $0.37 $0.50

$0.49 $0.28 $0.35 $0.35

$0.25 $0.60 $0.30 $0.40$0.22 $0.36 $0.30 $0.25

$0.25 $0.65 $0.32 $0.40$0.26 $0.45 $0.32 $0.39

$0.20 $0.65 $0.30 $0.30$0.26 $0.46 $0.30 $0.25y p q

20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.

21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.

22 Dry Wall Boardfirst coat - primer, per sq. ft.

INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

$1.25 $0.20 $0.80 $0.75$1.25 $1.76 $0.85 $0.90$1.50 $1.86 $0.85 $1.00$1.75 $1.88 $0.85 $1.25$1.25 $0.86 $0.85 $0.75$1.25 $0.86 $0.85 $0.80

$0.90 $0.24 $0.75 $0.83$0.90 $0.15 $0.60 $0.65

$0.25 $0.35 $0.29 $0.20

12

Page 14: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

15 Stripingeach coat - acrylic, per linear ft.

16 Traffic Painteach coat - acrylic, per sq. ft.

17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.

EXTERIOR SPECIFICATIONS - Continued.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.15 $0.75 $0.15 $0.20

$0.23 $0.40 $0.15 $0.25

$0.18 $0.75 $0.15 $0.20$0.23 $0.75 $0.20 $0.20

$0.24 $1.00 $0.15 $0.30$0.29 $1.00 $0.20 $0.30

$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.20 $0.15y p q

20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.

21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.

22 Dry Wall Boardfirst coat - primer, per sq. ft.

INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

$0.38 $0.40 $0.30 $0.30$1.24 $0.40 $0.35 $0.40$0.44 $0.50 $0.35 $0.60$1.39 $0.50 $0.40 $0.80$0.24 $0.40 $0.40 $0.40$1.07 $0.40 $0.45 $0.50

$0.36 $0.40 $0.35 $0.75$0.23 $0.40 $0.30 $0.65

$0.21 $0.40 $0.18 $0.18

13

Page 15: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

15 Stripingeach coat - acrylic, per linear ft.

16 Traffic Painteach coat - acrylic, per sq. ft.

17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.

EXTERIOR SPECIFICATIONS - Continued.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$5.00 $0.30 $0.20 $0.25

$10.00 $0.30 $0.24 $0.20

$3.00 $0.23 $0.22 $0.28$1.00 $0.23 $0.22 $0.12

$4.00 $0.30 $0.27 $0.28$2.00 $0.35 $0.27 $0.12

$1.00 $0.15 $0.13 $0.30$1.00 $0.22 $0.19 $0.10y p q

20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.

21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.

22 Dry Wall Boardfirst coat - primer, per sq. ft.

INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

$2.00 $1.89 $0.35 $0.50$2.00 $2.95 $0.40 $0.65$2.00 $2.33 $0.50 $0.50$2.00 $3.41 $0.55 $0.65$2.00 $2.37 $0.30 $0.35$2.00 $4.14 $0.30 $0.45

$0.75 $0.83 $0.35 $0.30$0.50 $0.65 $0.25 $0.30

$1.00 $0.18 $0.16 $0.25

14

Page 16: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

15 Stripingeach coat - acrylic, per linear ft.

16 Traffic Painteach coat - acrylic, per sq. ft.

17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)

first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.

19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.

EXTERIOR SPECIFICATIONS - Continued.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.52 $0.30

$0.52 $0.25

$0.30 $0.20$0.38 $0.20

$0.45 $0.28$0.58 $0.28

$0.23 $0.20$0.29 $0.20y p q

20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.

21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.

22 Dry Wall Boardfirst coat - primer, per sq. ft.

INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.

$0.40 $0.45$0.50 $0.55$0.80 $0.75$0.95 $0.80$0.40 $0.50$0.50 $0.60

$0.53 $0.50$0.38 $0.55

$0.27 $0.20

15

Page 17: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft. $0.25 $0.37 $0.19 $0.15

each additional coat - acrylic, per sq. ft. $0.07 $0.39 $0.19 $0.15OR each additional coat - acrylic epoxy, per sq. ft. $0.07 $0.43 $0.25 $0.15OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.43 $0.25 $0.1523 Concrete Block

first coat - block filler/conditioner, per sq. ft. $0.25 $0.83 $0.25 $0.20each additional coat - acrylic, per sq. ft. $0.07 $0.52 $0.19 $0.20

OR each additional coat - acrylic epoxy, per sq. ft. $0.08 $0.57 $0.25 $0.20OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.57 $0.28 $0.1524 Concrete Stack Block

first coat - conditioner, per sq. ft. $0.25 $0.83 $0.21 $0.15each additional coat - acrylic, per sq. ft. $0.07 $0.52 $0.21 $0.15

OR each additional coat - acrylic epoxy, per sq. ft. $0.08 $0.52 $0.25 $0.15OR each additional coat pre cat epo per sq ft $0 10 $0 57 $0 28 $0 15

INTERIOR SPECIFICATIONS - Continued.

OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.57 $0.28 $0.1525 Non-Ferrous Metals - Galvanized - Aluminum, Interior

first coat - conditioner/primer, per sq. ft. $0.25 $0.84 $0.20 $0.19each additional coat - acrylic, per sq. ft. $0.06 $0.69 $0.21 $0.19

OR each additional coat - alkyd, per sq. ft. $0.06 $0.67 $0.19 $0.1926 Ferrous Metals (Miscellaneous) Interior

first coat - primer, per sq. ft. $0.25 $0.62 $0.30 $0.19OR first coat - 2-part epoxy, per sq. ft. $0.35 $0.80 $0.38 $0.19

each additional coat - alkyd, per sq. ft. $0.06 $0.65 $0.35 $0.19OR each additional coat acrylic enamel, per sq. ft. $0.06 $0.70 $0.35 $0.1927 Ferrous Metal Pipes 4" diameter or less

first coat - primer, per linear ft. $0.50 $0.85 $0.28 $0.19OR first coat - 2-part epoxy, per linear ft. $0.60 $0.85 $0.35 $0.19

each additional coat - alkyd, per linear ft. $0.05 $0.80 $0.30 $0.19OR each additional coat acrylic enamel, per linear ft. $0.05 $0.82 $0.28 $0.19

16

Page 18: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.

each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block

first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft

INTERIOR SPECIFICATIONS - Continued.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$0.25 $0.45 $0.32 $0.20$0.20 $0.30 $0.32 $0.20$0.15 $0.54 $0.35 $0.25$0.45 $0.60 $0.37 $0.40

$0.20 $0.56 $0.30 $0.40$0.25 $0.40 $0.30 $0.20$0.20 $0.60 $0.35 $0.40$0.45 $0.70 $0.38 $0.40

$0.20 $0.61 $0.29 $0.20$0.25 $0.40 $0.29 $0.25$0.40 $0.54 $0.34 $0.40$0 45 $0 68 $0 37 $0 40OR each additional coat - pre-cat epoxy, per sq. ft.

25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior

first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.

each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.

$0.45 $0.68 $0.37 $0.40

$0.20 $0.56 $0.29 $0.20$0.25 $0.40 $0.29 $0.22$0.19 $0.45 $0.31 $0.24

$0.20 $0.50 $0.29 $0.44$0.45 $0.60 $0.35 $0.50$0.20 $0.45 $0.35 $0.40$0.20 $0.35 $0.30

$1.50 $0.23 $0.32 $0.35$2.00 $0.30 $0.37 $0.50$1.50 $0.20 $0.35 $0.40$1.25 $0.21 $0.35 $0.30

17

Page 19: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.

each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block

first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft

INTERIOR SPECIFICATIONS - Continued.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.23 $0.40 $0.15 $0.19$0.23 $0.35 $0.20 $0.20$0.22 $0.40 $0.20 $0.25$0.25 $0.40 $0.22 $0.30

$0.20 $0.40 $0.18 $0.18$0.23 $0.35 $0.20 $0.19$0.24 $0.40 $0.20 $0.30$0.24 $0.40 $0.22 $0.30

$0.20 $0.40 $0.15 $0.18$0.23 $0.35 $0.20 $0.20$0.24 $0.40 $0.20 $0.30$0 24 $0 40 $0 20 $0 30OR each additional coat - pre-cat epoxy, per sq. ft.

25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior

first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.

each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.

$0.24 $0.40 $0.20 $0.30

$0.16 $0.40 $0.20 $0.20$0.22 $0.35 $0.30 $0.21$0.22 $0.35 $0.30 $0.22

$0.16 $0.40 $0.40 $0.30$0.22 $0.40 $0.40 $0.40$0.23 $0.35 $0.30 $0.35$0.22 $0.35 $0.30 $0.35

$0.21 $0.75 $0.18 $0.28$0.25 $0.75 $0.20 $0.35$0.24 $0.75 $0.20 $0.30$0.23 $0.75 $0.20 $0.30

18

Page 20: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.

each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block

first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft

INTERIOR SPECIFICATIONS - Continued.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$1.00 $0.20 $0.17 $0.25$1.00 $0.19 $0.18 $0.10$1.00 $0.25 $0.22 $0.20$1.20 $0.25 $0.24 $0.25

$1.00 $0.35 $0.15 $0.25$1.00 $0.19 $0.19 $0.10$1.50 $0.25 $0.24 $0.20$1.50 $0.25 $0.24 $0.25

$1.00 $0.19 $0.15 $0.25$1.00 $0.21 $0.20 $0.10$1.00 $0.25 $0.24 $0.20$1 00 $0 25 $0 24 $0 25OR each additional coat - pre-cat epoxy, per sq. ft.

25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior

first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.

each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.

$1.00 $0.25 $0.24 $0.25

$1.00 $0.20 $0.20 $0.25$1.00 $0.22 $0.21 $0.10$1.00 $0.22 $0.22 $0.10

$2.00 $0.35 $0.28 $0.20$2.00 $0.40 $0.30 $0.25$2.00 $0.35 $0.28 $0.15$2.00 $0.35 $0.28 $0.15

$3.00 $0.35 $0.28 $0.20$3.00 $0.40 $0.34 $0.25$2.00 $0.35 $0.32 $0.15$2.00 $0.35 $0.32 $0.15

19

Page 21: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.

each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block

first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block

first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft

INTERIOR SPECIFICATIONS - Continued.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.27 $0.20$0.28 $0.15$0.38 $0.25$0.42 $0.25

$0.27 $0.25$0.29 $0.20$0.38 $0.25$0.42 $0.20

$0.28 $0.19$0.32 $0.21$0.40 $0.24$0 44 $0 24OR each additional coat - pre-cat epoxy, per sq. ft.

25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.

OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior

first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.

each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.

$0.44 $0.24

$0.30 $0.20$0.33 $0.21$0.33 $0.19

$0.66 $0.20$0.66 $0.30$0.52 $0.30$0.52 $0.25

$0.52 $0.25$0.52 $0.30$0.52 $0.20$0.52 $0.20

20

Page 22: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter

first coat - primer, per linear ft. $0.60 $1.70 $0.30 $0.22OR first coat - 2-part epoxy, per linear ft. $0.75 $1.90 $0.35 $0.22

each additional coat - alkyd, per linear ft. $0.10 $1.60 $0.30 $0.22OR each additional coat acrylic enamel, per linear ft. $0.10 $1.64 $0.30 $0.2229 Plaster & Stucco

first coat - primer/conditioner, per sq. ft. $0.25 $0.61 $0.21 $0.17each additional coat acrylic, per sq. ft. $0.10 $0.42 $0.19 $0.17

OR each additional coat acrylic epoxy, per sq. ft. $0.12 $0.47 $0.25 $0.17OR each additional coat - pre-cat epoxy, per sq. ft. $0.15 $0.47 $0.28 $0.1730 Interior Wood Surfaces, Interior/Exterior Wood Doors

and Jambs, acrylica. Interior Wood Surfaces

first coat - acrylic primer, per sq. ft. $0.25 $0.68 $0.21 $0.17

INTERIOR SPECIFICATIONS - Continued.

each additional coat - acrylic, per sq. ft. $0.07 $0.73 $0.20 $0.19b. Interior/Exterior Wood Doors

door first coat - acrylic primer, per side $7.50 $16.00 $10.00 $10.15door each additional coat - acrylic, per side $7.50 $16.00 $10.00 $10.20

c. Interior/Exterior Jambsjamb first coat - acrylic primer, per side $2.50 $16.00 $6.50 $10.00jamb each additional coat - acrylic, per side $2.50 $16.00 $6.50 $10.00

31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin

each coat - polyurethane, per sq. ft. $0.25 $0.75 $0.29 $0.2032 Concrete Floor - Stained, Interior or Exterior

first coat - silicone acrylic, per sq. ft. $0.25 $0.65 $0.25 $0.20each additional coat - silicone acrylic, per sq. ft. $0.08 $0.57 $0.24 $0.17non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.05

21

Page 23: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco

first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.

OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors

and Jambs, acrylica. Interior Wood Surfaces

first coat - acrylic primer, per sq. ft.

INTERIOR SPECIFICATIONS - Continued.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$1.50 $0.60 $0.35 $0.35$2.00 $0.65 $0.40 $0.50$1.50 $0.40 $0.40 $0.40$1.25 $0.40 $0.40 $0.30

$0.25 $0.50 $0.30 $0.35$0.25 $0.40 $0.30 $0.20$0.20 $0.48 $0.32 $0.20$0.50 $0.54 $0.35 $0.45

$0.25 $0.54 $0.30 $0.40

each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors

door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side

c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side

31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin

each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior

first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.

$0.25 $0.45 $0.30 $0.26

$10.00 $8.00 $12.00 $20.00$10.00 $8.00 $12.00 $10.00

$10.00 $9.00 $11.00$5.00 $9.00 $8.00

$0.60 $0.70 $0.35 $0.60

$0.50 $0.88 $0.38 $0.50$0.45 $0.67 $0.38 $0.23$0.20 $0.25 $0.10 $0.20

22

Page 24: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco

first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.

OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors

and Jambs, acrylica. Interior Wood Surfaces

first coat - acrylic primer, per sq. ft.

INTERIOR SPECIFICATIONS - Continued.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.26 $1.00 $0.18 $0.40$0.34 $1.00 $0.30 $0.50$0.33 $1.00 $0.30 $0.40$0.34 $1.00 $0.30 $0.40

$0.21 $0.40 $0.15 $0.20$0.23 $0.35 $0.20 $0.20$0.22 $0.40 $0.22 $0.25$0.24 $0.40 $0.22 $0.30

$0.21 $0.40 $0.20 $0.20

each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors

door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side

c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side

31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin

each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior

first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.

$0.22 $0.35 $0.20 $0.20

$6.50 $30.00 $8.00 $10.00$4.50 $20.00 $8.00 $10.00

$4.00 $5.00 $6.00 $7.00$3.75 $5.00 $6.00 $7.00

$0.25 $0.50 $0.20 $0.28

$0.22 $0.50 $0.20 $0.25$0.21 $0.50 $0.20 $0.24$0.05 $0.00 $0.05 $0.03

23

Page 25: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco

first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.

OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors

and Jambs, acrylica. Interior Wood Surfaces

first coat - acrylic primer, per sq. ft.

INTERIOR SPECIFICATIONS - Continued.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$4.00 $0.35 $0.28 $0.20$4.00 $0.40 $0.34 $0.25$3.00 $0.35 $0.32 $0.15$3.00 $0.35 $0.32 $0.15

$1.00 $0.21 $0.13 $0.25$1.00 $0.19 $0.16 $0.10$1.00 $0.25 $0.19 $0.15$1.00 $0.25 $0.21 $0.20

$1.00 $0.25 $0.19 $0.25

each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors

door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side

c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side

31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin

each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior

first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.

$1.00 $0.25 $0.19 $0.10

$100.00 $10.00 $5.50 $20.00$50.00 $10.00 $5.50 $5.00

$50.00 $7.00 $5.50 $5.00$25.00 $7.00 $5.50 $5.00

$26.00 $0.29 $0.25 $0.20

$5.00 $0.25 $0.19 $0.25$3.00 $0.25 $0.19 $0.15$1.50 $0.03 $0.08 $0.05

24

Page 26: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter

first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.

each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco

first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.

OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors

and Jambs, acrylica. Interior Wood Surfaces

first coat - acrylic primer, per sq. ft.

INTERIOR SPECIFICATIONS - Continued.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.52 $0.20$0.52 $0.20$0.52 $0.20$0.52 $0.22

$0.27 $0.18$0.29 $0.19$0.49 $0.20$0.52 $0.23

$0.39 $0.26

each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors

door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side

c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side

31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin

each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior

first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.

$0.39 $0.26

$22.00 $10.00$25.00 $10.00

$10.00 $7.00$10.00 $7.00

$0.45 $0.26

$0.45 $0.25$0.45 $0.24$0.05 $0.02

25

Page 27: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft. $0.25 $0.72 $0.26 $0.19each additional coat - acrylic epoxy, per sq. ft. $0.10 $0.72 $0.26 $0.19non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.03

34 Ceramic Tileeach coat - epoxy enamel, per sq. ft. $0.25 $0.87 $0.29 $0.19

35 Skip Trowel, per sq. ft. $0.80 $1.00 $0.38 $0.3036 Orange Peel, per sq. ft. $0.80 $1.00 $0.38 $0.30

37 Knock-down, per sq. ft. $0.80 $1.00 $0.38 $0.3038 Popcorn, per sq. ft. $0.80 $1.20 $0.38 $0.29

TEXTURING FINISH - (includes, but is not limited to the following):

SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized

INTERIOR SPECIFICATIONS - Continued.

TEXTURING FINISH - Continued.

39 Standard Pressure Washing, per sq. ft. $0.10 $0.25 $0.08 $0.0340 Rotary Tip Pressure Washing, per sq. ft. $0.10 $0.28 $0.15 $0.0341 Sand Blasting, per sq. ft. $0.50 $5.00 $1.85 $0.0842 Bead Blasting, per sq. ft. $0.50 $7.00 $1.45 $0.1043 Sand Injected Blasting, per sq. ft. $0.50 $1.50 $1.85 $0.5044 Cementitious Skim Coat, per sq. ft. $0.75 $1.00 $0.58 $0.50

45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.

$14.00 $57.00 $27.00 $17.50

46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.

$15.00 $84.00 $40.00 $17.50

y p pprepresentative of the Facilities Services Department.

SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

26

Page 28: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.

34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.

35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.

37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.

TEXTURING FINISH - (includes, but is not limited to the following):

SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized

INTERIOR SPECIFICATIONS - Continued.

TEXTURING FINISH - Continued.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

$0.45 $0.69 $0.35 $0.50$0.35 $0.45 $0.35 $0.24$0.20 $0.85 $0.10 $0.21

$0.45 $0.78 $0.35 $2.00

$1.90 $2.30 $1.00 $0.75$1.90 $2.20 $0.70 $0.50

$1.90 $1.85 $0.80 $0.60$1.90 $1.95 $1.00 $0.50

39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.

45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.

46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.

y p pprepresentative of the Facilities Services Department.

SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

$0.10 $0.15 $0.60 $0.10$0.10 $0.18 $0.65 $0.50$1.00 $3.10 $6.00 $2.10$1.25 $3.15 $6.20 $2.10$1.50 $4.10 $6.20 $1.00$1.75 $3.75 $1.80 $0.70

$28.00 $25.50 $31.00 $22.50

$37.00 $33.75 $35.00 $30.00

27

Page 29: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.

34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.

35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.

37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.

TEXTURING FINISH - (includes, but is not limited to the following):

SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized

INTERIOR SPECIFICATIONS - Continued.

TEXTURING FINISH - Continued.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

$0.24 $0.50 $0.25 $0.25$0.23 $0.50 $0.25 $0.25$0.05 $0.00 $0.05 $0.03

$0.25 $0.50 $0.25 $0.29

$0.90 $0.75 $0.25 $0.25$0.08 $0.75 $0.25 $0.25

$0.90 $0.75 $0.28 $0.25$0.15 $0.50 $0.25 $0.20

39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.

45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.

46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.

y p pprepresentative of the Facilities Services Department.

SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

$0.08 $0.05 $0.04 $0.10$0.09 $0.05 $0.04 $0.15$0.85 $0.10 $0.25 $0.50$0.65 $0.10 $0.25 $0.65$0.85 $0.10 $0.15 $0.40$0.75 $0.50 $0.25 $0.50

$33.25 $20.00 $16.00 $25.00

$44.25 $20.00 $18.00 $40.00

28

Page 30: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.

34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.

35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.

37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.

TEXTURING FINISH - (includes, but is not limited to the following):

SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized

INTERIOR SPECIFICATIONS - Continued.

TEXTURING FINISH - Continued.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

$5.00 $0.27 $0.25 $0.30$3.00 $0.27 $0.25 $0.15$1.50 $0.03 $0.08 $0.05

$6.00 $0.30 $0.32 $0.25

$10.00 $0.90 $3.00 $1.00$10.00 $1.18 $2.00 $0.50

$10.00 $1.18 $3.00 $0.75$10.00 $1.21 $2.00 $0.50

39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.

45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.

46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.

y p pprepresentative of the Facilities Services Department.

SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

$0.50 $0.10 $0.12 $0.10$0.70 $0.20 $1.25 $0.10$1.50 $1.30 $3.50 $3.00$3.00 $0.90 $0.90 $3.00$3.00 $0.40 $0.75 $2.00

$10.00 $2.50 $1.65 $5.00

$30.00 $33.00 $16.00 $20.00

$40.00 $49.50 $16.00 $25.00

29

Page 31: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.

34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.

35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.

37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.

TEXTURING FINISH - (includes, but is not limited to the following):

SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized

INTERIOR SPECIFICATIONS - Continued.

TEXTURING FINISH - Continued.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

$0.45 $0.25$0.45 $0.24$0.05 $0.03

$0.42 $0.29

$0.50 $0.25$0.50 $0.25

$0.50 $0.25$0.50 $0.25

39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.

45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.

46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.

y p pprepresentative of the Facilities Services Department.

SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

$0.13 $0.10$0.30 $0.12no bid $1.50no bid $1.75no bid $1.50no bid $1.50

$30.00 $25.00

$45.00 $32.00

30

Page 32: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.

7% 15% 10% 10%

48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will

7% 15% 10% 0%

SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

active use of equipment. Payment for inactive use will not be allowed.

Snorkel Lift 30 ft. $80/hr, $400/day,

$1200/wk

No extra charge for equipment owned by

Artristry Painting Company, Inc.

Lifts$20/hr, $100/day, $450/wk

Scissor Lift 20 ft. $40/hr, $160/day,

$480/wk

Cherry Picker with Truck$25/hr, $100/day, $450/wk

USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.

49

31

Page 33: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.

48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will

SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

7% 15% 12% 10%

7% 15% 12% 10%

active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.

49 Truck Mounted Pressure Washer$35/hr, $110/day,

$410/wk

Power Paint Sprayer$5/hr, $40/day,

$160/wk

Pressure Washer up to 4000 psi 5GPM

$5/hr, $25/day, $100/wk

3500 psi Mobile Pressure Washer$22/hr, $175/day,

$230/wk

Pressure Washer 4000 psi

$5/hr, $40/day, $160/wk

Sand Blasting $24/hr, $150/day,

$750/wk

Boom Lift$125/hr, $150/day,

$820/wk

32

Page 34: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.

48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will

SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

13% 0% 5% 10%

15% 0% 15% 10%

active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.

49Pressure Washer$2/hr, $14/day, $65/wk

None forseen. If we do use an item, there will be no additional

charge.

N/A33 ft. JLG Lift

$150/hr, $225/day, $550/wk

Paint Sprayer$3.50/hr, $24/day, $85/wk

40 ft. JLG Lift (3)$210/hr, $375/day,

$895/wk

Air Compressor Under 5 cm$1/hr, $7/day, $35/wk

60 ft. JLG Lift$215/hr, $565/day,

$1,395/wk

40 ft. Scissor Lift$150/hr, $225/day,

$550/wk

33

Page 35: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.

48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will

SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

14.5% 10% 5% 10%

14.5% 10% 5% 10%

active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.

49 250 CFM Compressor Gas

$25/hr, $120/day, $475/wk

300 lb. Pot with Air Hood & Accessories

$15/hr, $70/day, $275/wk

All lifts rented. Siesta key Décor owns all

other specialty equipment, scaffolding,

sandblasting, chipping hammers, texturing machines, power

hand tools, and many misc. equipment to do

jobs.$0/hr, $0/day, $0/wk

UHP-Ultra High Pressure Water

Blasting Machine-Minimum 1 day rental. Includes operator and

safety equipment-PPE.

$68/hr, $544/day, $2,720/wk

34

Page 36: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.

48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will

SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Superior Painting, Inc. Universal Paint & Design Services, Inc.

10% 10%

10% 10%

active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.

49Pressure Washer (up to 4000 psi)

n/c

Airless Paint Sprayer

n/c

35

Page 37: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

Above the Rest Contractors

Apollo Construction & Engineering Services, Inc.

Artistry Painting Company, Inc.

Boro Building and Property

Maintenance

50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.

7% 15% 10% 10%

Fredrick Ferrer Thomas G. Kamprath Nicholas Cahoo Ryan Skzypkowski301B Whitehall

Court PO Box 5848 633 East Venice Avenue

7053 South Tamiami Trail, Suite F

Tampa, FL 33604 Sun City Center, FL 33571 Venice, FL 34285 Sarasota, FL 34231

813-810-9703 813-645-4926 941-374-2679 941-556-9027

866-914-8250 813-645-3351 941-484-3937 941-556-9028264998021 592811166 271185600 273414287frednang

@ iltkamprath@apollo-constr ction com

office.artistry@ eri on net [email protected]

Contact

Email

SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Federal I.D.

Address

Phone:

Fax:

@gmail.com construction.com @verizon.net [email protected]:

36

Page 38: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.

Contact

Email

SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Federal I.D.

Address

Phone:

Fax:

CMK Construction, Inc.

Construction Specialists

of Palm Beach

Dimitri and Yanni, Inc.

Diversity Painters, Inc.

9% 15% 14% 10%

Manuel Kavouklis Stephen Sanguinetti Chris Alexakis Andrew Hendriksen

5761 Dolores Drive 16800 Orange Boulevard

121 Triple Diamond Boulevard, Unit 9

2739 NE Hickory Ridge Avenue

Holiday, FL 34690 Loxahatchee, FL 33470

North Venice, FL 34275

Jensen Beach, FL 34947

727-243-9234 561-818-3120 941-223-1319 772-408-6521

727-848-2026 561-793-4169 941-484-1954 772-419-8017

201609262 651157986 651032907 270647869cmkinc

@ eri on net [email protected] csacontractor @gmail com

paintingjob@hotmail comEmail: @verizon.net [email protected] @gmail.com @hotmail.com

37

Page 39: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.

Contact

Email

SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Federal I.D.

Address

Phone:

Fax:

GCSI - Paintscape, Inc.

K & K Painting & Waterproofing, LLC

Mailloux and Sons, Inc.

P. J. Goldman Painting

15% 0% 0% 10%

Glenn J. Shecter Ron King Jade Mailloux Philip J. Goldman

8251 Blaikie Court 4475 Hamwood Street 1500 15th Avenue Drive East #103

2840 21st Street Court East

Sarasota, FL 34240 North Port, FL 34287 Palmetto, FL 34221 Palmetto, FL 34221

941-377-0899 941-228-1743 941-723-1955 941-722-0444

941-377-1055 941-966-7228 941-723-1956 941-723-3325

203274108 830385113 208413979 650209926

[email protected] maksuten@msn com

jade-jmsinc@ i t

pjgoldman@ ahoo comEmail: [email protected] @msn.com @verizon.net @yahoo.com

38

Page 40: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.

Contact

Email

SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Federal I.D.

Address

Phone:

Fax:

Royal Crest Builders

Service Painting of Florida Siesta Key Décor Sourini Painting,

Inc.

15% 15% 5% 15%

Andrew George Burt Whitenight Jim Kernan Jim Sourini12510 Strathmore

Loop 6215 Clarity Court 8466 North Lockwood Ridge Road

12800 44th Street North

Fort Myers, FL 33912 Sarasota, FL 34240 Sarasota, FL 34243 Clearwater, FL

33762239-768-9888 941-371-8182 941-349-3276 727-573-0666

239-768-0338 941-371-0563 941-378-2292 727-572-9338

030469806 743030989 270020479 593363228andrew@royal-

crest comburtwhitenight

@ser icepainting netsiestakeydecor

@aol comjim@sourinipainting comEmail: crest.com @servicepainting.net @aol.com painting.com

39

Page 41: THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA 15, 2011 Board... · 2011-03-07 · Tabulation for Painting Services-District - Bid #11-0008 SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA

Opened December 14, 2010 at 2:00 p.m.

Item # Description

50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.

Contact

Email

SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.

Federal I.D.

Address

Phone:

Fax:

Superior Painting, Inc. Universal Paint & Design Services, Inc.

10% 10%

Gene Glidden Eileen Kuntz155 South McCall

Road PO Box 20004

Englewood, FL 34223

Bradenton, FL 34204

941-474-9091 941-751-0700

941-475-4326 941-751-9977

432047287 208154397superiorpaint1@da star net [email protected]: @daystar.net [email protected]

Recorded by: Peggy Long

Witnessed by: Carol A. Lichon

40