TO: Members of the School Board Lori White, Superintendent Mitsi Corcoran, Chief Financial Officer FROM: Pat Black, CPPB, Director of Materials Management TITLE: APPROVAL TO AWARD BID #11-0008 FOR DISTRICT-WIDE PAINTING
SERVICES Bids to provide District-Wide Painting Services' were received from eighteen vendors on December 14, 2010. The bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., were the best low bids meeting the advertised specifications based on a sealed scenario. This bid is for a period of one year with the option to renew for two additional one-year periods. The funds for these purchases are contained in the capital budget allocated to the Facilities Services Department. Not to exceed Requested by: Fiscal Impact: $900,000.00 Jody Dumas
“Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the protest bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120. Florida Statutes.” Posting Date: 02-08-11
Funding: Capital
Recommended Motion: That the bids of Above the Rest Contractors, Boro Building and Property Maintenance, GCSI-Paintscape, Inc., and Mailloux and Sons, Inc., to provide ‘District-Wide Painting Services’ in an amount not to exceed $900,000.00, be approved for award and purchase.
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.51 $0.20 $0.23
2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft. $0.25 $0.71 $0.18 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.51 $0.22 $0.24
3 Stucco Vertical Walls first coat - conditioner, per sq. ft. $0.25 $0.56 $0.17 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.38 $0.23 $0.24
4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.28 $0.34
5 Concrete Stack Block Walls (Elastomeric)
EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
( )first coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.30 $0.34
6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft. $0.25 $0.71 $0.15 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.31 $0.34
7Underside of Horizontal Surfaces (do not use elastomeric)
first coat - conditioner, per sq. ft. $0.25 $0.52 $0.15 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.55 $0.22 $0.34
8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft. $0.25 $0.68 $0.19 $0.13each additional coat - acrylic, per sq. ft. $0.07 $0.67 $0.19 $0.14non-skid additive (walkways), per sq. ft. $0.00 $0.24 $0.02 $0.30
1
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
5 Concrete Stack Block Walls (Elastomeric)
EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$0.28 $0.60 $0.29 $0.35$0.25 $0.42 $0.30 $0.21
$0.28 $0.60 $0.30 $0.35$0.25 $0.40 $0.36 $0.27
$0.28 $0.60 $0.30 $0.35$0.25 $0.42 $0.32 $0.23
$0.28 $0.76 $0.30 $0.35$0.26 $0.62 $0.40 $0.32
( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
7Underside of Horizontal Surfaces (do not use elastomeric)
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.
$0.28 $0.76 $0.30 $0.35$0.26 $0.52 $0.41 $0.34
$0.28 $0.72 $0.29 $0.35$0.26 $0.48 $0.41 $0.32
$0.28 $0.60 $0.29 $0.30$0.25 $0.50 $0.31 $0.22
$0.25 $0.75 $0.29 $0.30$0.26 $0.55 $0.29 $0.20$0.18 $0.50 $0.10 $0.14
2
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
5 Concrete Stack Block Walls (Elastomeric)
EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.16 $0.40 $0.15 $0.14$0.22 $0.35 $0.19 $0.20
$0.16 $0.40 $0.15 $0.17$0.22 $0.35 $0.19 $0.21
$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.19 $0.19
$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.25
( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
7Underside of Horizontal Surfaces (do not use elastomeric)
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.
$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.29
$0.16 $0.40 $0.15 $0.15$0.18 $0.40 $0.20 $0.29
$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.20 $0.21
$0.16 $0.40 $0.15 $0.19$0.20 $0.35 $0.15 $0.19$0.05 $0.00 $0.05 $0.03
3
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
5 Concrete Stack Block Walls (Elastomeric)
EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$1.00 $0.15 $0.13 $0.25$1.00 $0.20 $0.17 $0.10
$1.00 $0.18 $0.13 $0.25$1.00 $0.22 $0.19 $0.10
$1.00 $0.17 $0.13 $0.25$1.00 $0.23 $0.18 $0.10
$1.00 $0.15 $0.15 $0.25$1.00 $0.30 $0.28 $0.15
( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
7Underside of Horizontal Surfaces (do not use elastomeric)
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.
$1.00 $0.15 $0.15 $0.25$1.00 $0.32 $0.28 $0.15
$1.00 $0.17 $0.15 $0.25$1.00 $0.32 $0.28 $0.15
$1.00 $0.15 $0.13 $0.25$1.00 $0.22 $0.18 $0.10
$0.19 $0.15 $0.24$2.00 $0.19 $0.18 $0.13$2.00 $0.03 $0.08 $0.05
4
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
1 Concrete Block Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
2 Concrete Stack Block Wallsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
3 Stucco Vertical Walls first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
4 Concrete Block Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
5 Concrete Stack Block Walls (Elastomeric)
EXTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.23 $0.15$0.29 $0.19
$0.27 $0.18$0.33 $0.22
$0.22 $0.17$0.29 $0.23
$0.23 $0.15$0.48 $0.25
( )first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
6 Stucco Vertical Walls (Elastomeric)first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
7Underside of Horizontal Surfaces (do not use elastomeric)
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
8 Wood - Schedule for Repaint (Walkways & Soffits) first coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive (walkways), per sq. ft.
$0.23 $0.20$0.51 $0.20
$0.23 $0.15$0.48 $0.32
$0.23 $0.20$0.33 $0.15
$0.23 $0.20$0.29 $0.15$0.05 $0.05
5
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
9 Portable Buildings - Woodfirst coat - primer, per sq. ft. $0.25 $0.56 $0.20 $0.14each additional coat - acrylic, per sq. ft. $0.07 $0.44 $0.20 $0.15
10 Portable Ramps and Walkways first coat - acrylic, per sq. ft. $0.25 $0.86 $0.20 $0.14each additional coat - acrylic, per sq. ft. $0.07 $0.72 $0.20 $0.15non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.06
11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.
a. Doors door first coat - primer, per side $7.50 $18.00 $10.00 $10.00
OR door first coat - 2-part epoxy, per side $7.50 $16.00 $15.00 $10.00each additional coat - alkyd, per side $7.50 $14.00 $10.00 $10.00
OR each additional coat - acrylic enamel, per side $7.50 $14.00 $10.00 $10.00b. Jambs
EXTERIOR SPECIFICATIONS - Continued.
b. Jambsjamb first coat - primer, per side $2.50 $18.00 $6.50 $6.50
OR jamb first coat - 2-part epoxy primer, per side $2.50 $16.00 $10.00 $6.50each additional coat - alkyd, per side $2.50 $14.00 $6.50 $6.50
OR each additional coat - acrylic enamel, per side $2.50 $14.00 $6.50 $6.5012 Ferrous Metals (Miscellaneous) - Exterior
first coat - primer $0.25 $0.66 $0.32 $0.14OR first coat - 2-part epoxy $0.28 $0.95 $0.39 $0.14
each additional coat - alkyd $0.06 $0.59 $0.37 $0.20OR or acrylic enamel per coat $0.06 $0.59 $0.37 $0.2013 Non-Ferrous Metals - Galvanized - Aluminum, Exterior
first coat - conditioner/primer $0.25 $0.84 $0.39 $0.14each additional coat - acrylic $0.07 $0.69 $0.37 $0.20
14 Parking Bumperseach coat - acrylic, per bumper $20.00 $2.00 $5.45 $5.40
6
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.
10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.
11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.
a. Doors door first coat - primer, per side
OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per sideb. Jambs
EXTERIOR SPECIFICATIONS - Continued.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$0.25 $0.65 $0.29 $0.35$0.28 $0.45 $0.29 $0.20
$0.25 $0.75 $0.29 $0.35$0.28 $0.60 $0.29 $0.20$0.18 $0.25 $0.10 $0.17
$18.00 $12.00 $14.00 $15.00$28.00 $21.00 $16.00 $20.00$20.00 $13.60 $13.00 $10.00$13.00 $13.80 $13.00 $10.00
b. Jambsjamb first coat - primer, per side
OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior
first coat - primerOR first coat - 2-part epoxy
each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior
first coat - conditioner/primereach additional coat - acrylic
14 Parking Bumperseach coat - acrylic, per bumper
$7.00 $8.00 $10.00 $11.00$12.00 $9.10 $16.00 $10.00$7.00 $2.75 $14.00 $7.00$7.00 $3.00 $14.00 $7.00
$0.28 $0.60 $0.22 $0.60$0.48 $0.58 $0.30 $0.50$0.20 $0.50 $0.25 $0.40$0.15 $0.35 $0.25 $0.30
$0.25 $0.55 $0.22 $0.20$0.20 $0.40 $0.25 $0.22
$10.00 $10.00 $8.00 $10.00
7
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.
10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.
11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.
a. Doors door first coat - primer, per side
OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per sideb. Jambs
EXTERIOR SPECIFICATIONS - Continued.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.16 $0.40 $0.15 $0.20$0.22 $0.35 $0.20 $0.20
$0.16 $0.40 $0.28 $0.20$0.22 $0.35 $0.28 $0.20$0.05 $0.00 $0.05 $0.05
$6.50 $30.00 $8.00 $10.00$6.75 $30.00 $8.00 $15.00$6.50 $20.00 $8.00 $10.00$4.50 $20.00 $8.00 $10.00
b. Jambsjamb first coat - primer, per side
OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior
first coat - primerOR first coat - 2-part epoxy
each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior
first coat - conditioner/primereach additional coat - acrylic
14 Parking Bumperseach coat - acrylic, per bumper
$4.00 $5.00 $6.00 $9.50$4.25 $5.00 $6.00 $14.50$3.75 $5.00 $6.00 $9.50$3.75 $5.00 $6.00 $9.50
$0.16 $0.40 $0.15 $0.45$0.22 $0.40 $0.40 $0.60$0.24 $0.40 $0.20 $0.45$0.21 $0.40 $0.20 $0.45
$0.16 $0.40 $0.15 $0.42$0.22 $0.40 $0.20 $0.42
$10.00 $15.00 $2.00 $2.50
8
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.
10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.
11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.
a. Doors door first coat - primer, per side
OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per sideb. Jambs
EXTERIOR SPECIFICATIONS - Continued.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$1.50 $0.20 $0.18 $0.20$1.00 $0.20 $0.18 $0.15
$2.00 $0.19 $0.16 $0.18$1.00 $0.19 $0.16 $0.17$1.00 $0.03 $0.08 $0.05
$100.00 $10.00 $5.50 $15.00$50.00 $13.00 $6.50 $18.00$125.00 $10.00 $6.50 $5.00$75.00 $10.00 $6.50 $5.00
b. Jambsjamb first coat - primer, per side
OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior
first coat - primerOR first coat - 2-part epoxy
each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior
first coat - conditioner/primereach additional coat - acrylic
14 Parking Bumperseach coat - acrylic, per bumper
$50.00 $7.00 $5.50 $5.00$50.00 $10.00 $5.50 $7.00$50.00 $7.00 $5.50 $5.00$50.00 $7.00 $5.50 $7.00
$1.25 $0.40 $0.30 $0.20$1.50 $0.44 $0.32 $0.25$1.00 $0.35 $0.32 $0.15$1.00 $0.35 $0.32 $0.15
$1.00 $0.20 $0.20 $0.25$1.00 $0.21 $0.21 $0.10
$10.00 $5.45 $2.75 $10.00
9
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
9 Portable Buildings - Woodfirst coat - primer, per sq. ft.each additional coat - acrylic, per sq. ft.
10 Portable Ramps and Walkways first coat - acrylic, per sq. ft.each additional coat - acrylic, per sq. ft.non-skid additive, per sq. ft.
11 Doors & Door Jambs - Ferrous Metal - With or Without Lights - Interior and Exterior.
a. Doors door first coat - primer, per side
OR door first coat - 2-part epoxy, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per sideb. Jambs
EXTERIOR SPECIFICATIONS - Continued.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.29 $0.20$0.29 $0.20
$0.23 $0.15$0.29 $0.19$0.26 $0.17
$22.00 $10.00$35.00 $11.00$25.00 $10.00$25.00 $10.00
b. Jambsjamb first coat - primer, per side
OR jamb first coat - 2-part epoxy primer, per sideeach additional coat - alkyd, per side
OR each additional coat - acrylic enamel, per side12 Ferrous Metals (Miscellaneous) - Exterior
first coat - primerOR first coat - 2-part epoxy
each additional coat - alkydOR or acrylic enamel per coat13 Non-Ferrous Metals - Galvanized - Aluminum, Exterior
first coat - conditioner/primereach additional coat - acrylic
14 Parking Bumperseach coat - acrylic, per bumper
$10.00 $9.00$17.00 $10.00$10.00 $9.00$10.00 $6.50
$0.66 $0.20$0.66 $0.35$0.52 $0.30$0.52 $0.22
$0.30 $0.20$0.33 $0.20
$4.50 $4.00
10
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
15 Stripingeach coat - acrylic, per linear ft. $0.60 $0.29 $0.15 $0.15
16 Traffic Painteach coat - acrylic, per sq. ft. $0.45 $1.28 $0.24 $0.24
17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts
first coat - conditioner, per linear ft. $0.55 $0.80 $0.23 $0.22each additional coat - acrylic, per linear ft. $0.05 $0.81 $0.23 $0.22
18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)
first coat - conditioner, per linear ft. $0.60 $1.60 $0.28 $0.22each additional coat - acrylic, per linear ft. $0.05 $1.62 $0.28 $0.22
19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft. $0.25 $0.71 $0.14 $0.24each additional coat - acrylic, per sq ft. $0.08 $0.38 $0.20 $0.25
EXTERIOR SPECIFICATIONS - Continued.
y p q20 Exterior Sealant
1/4" to 1/2" - 1-part urethane, per linear ft. $0.10 $0.52 $1.85 $0.201/2" to 1" - 1-part urethane, per linear ft. $0.10 $0.76 $2.25 $0.231/4" to 1/2" - 2-part urethane, per linear ft. $0.10 $3.50 $1.95 $0.201/2" to 1" - 2-part urethane, per linear ft. $0.10 $4.50 $2.35 $0.231/4" to 1/2" - 1-part silicone, per linear ft. $0.10 $1.35 $2.10 $0.201/2" to 1" - 1-part silicone, per linear ft. $0.10 $1.95 $2.35 $0.23
21 Caulking1/8" or greater - urethane, per linear ft. $0.10 $0.69 $0.83 $0.40under 1/8" latex or urethane, per linear ft. $0.10 $0.52 $0.65 $0.35
22 Dry Wall Boardfirst coat - primer, per sq. ft. $0.25 $0.33 $0.18 $0.15
INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
11
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
15 Stripingeach coat - acrylic, per linear ft.
16 Traffic Painteach coat - acrylic, per sq. ft.
17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.
EXTERIOR SPECIFICATIONS - Continued.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$1.25 $0.20 $0.37 $0.50
$0.49 $0.28 $0.35 $0.35
$0.25 $0.60 $0.30 $0.40$0.22 $0.36 $0.30 $0.25
$0.25 $0.65 $0.32 $0.40$0.26 $0.45 $0.32 $0.39
$0.20 $0.65 $0.30 $0.30$0.26 $0.46 $0.30 $0.25y p q
20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.
21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.
22 Dry Wall Boardfirst coat - primer, per sq. ft.
INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
$1.25 $0.20 $0.80 $0.75$1.25 $1.76 $0.85 $0.90$1.50 $1.86 $0.85 $1.00$1.75 $1.88 $0.85 $1.25$1.25 $0.86 $0.85 $0.75$1.25 $0.86 $0.85 $0.80
$0.90 $0.24 $0.75 $0.83$0.90 $0.15 $0.60 $0.65
$0.25 $0.35 $0.29 $0.20
12
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
15 Stripingeach coat - acrylic, per linear ft.
16 Traffic Painteach coat - acrylic, per sq. ft.
17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.
EXTERIOR SPECIFICATIONS - Continued.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.15 $0.75 $0.15 $0.20
$0.23 $0.40 $0.15 $0.25
$0.18 $0.75 $0.15 $0.20$0.23 $0.75 $0.20 $0.20
$0.24 $1.00 $0.15 $0.30$0.29 $1.00 $0.20 $0.30
$0.16 $0.40 $0.15 $0.15$0.22 $0.35 $0.20 $0.15y p q
20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.
21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.
22 Dry Wall Boardfirst coat - primer, per sq. ft.
INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
$0.38 $0.40 $0.30 $0.30$1.24 $0.40 $0.35 $0.40$0.44 $0.50 $0.35 $0.60$1.39 $0.50 $0.40 $0.80$0.24 $0.40 $0.40 $0.40$1.07 $0.40 $0.45 $0.50
$0.36 $0.40 $0.35 $0.75$0.23 $0.40 $0.30 $0.65
$0.21 $0.40 $0.18 $0.18
13
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
15 Stripingeach coat - acrylic, per linear ft.
16 Traffic Painteach coat - acrylic, per sq. ft.
17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.
EXTERIOR SPECIFICATIONS - Continued.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$5.00 $0.30 $0.20 $0.25
$10.00 $0.30 $0.24 $0.20
$3.00 $0.23 $0.22 $0.28$1.00 $0.23 $0.22 $0.12
$4.00 $0.30 $0.27 $0.28$2.00 $0.35 $0.27 $0.12
$1.00 $0.15 $0.13 $0.30$1.00 $0.22 $0.19 $0.10y p q
20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.
21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.
22 Dry Wall Boardfirst coat - primer, per sq. ft.
INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
$2.00 $1.89 $0.35 $0.50$2.00 $2.95 $0.40 $0.65$2.00 $2.33 $0.50 $0.50$2.00 $3.41 $0.55 $0.65$2.00 $2.37 $0.30 $0.35$2.00 $4.14 $0.30 $0.45
$0.75 $0.83 $0.35 $0.30$0.50 $0.65 $0.25 $0.30
$1.00 $0.18 $0.16 $0.25
14
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
15 Stripingeach coat - acrylic, per linear ft.
16 Traffic Painteach coat - acrylic, per sq. ft.
17 Pipes - PVC, Aluminum & Galvanized (4"diameter or less), Aluminum Gutters and Downspouts
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
18 Pipes - PVC, Aluminum & Galvanized (4"diameter and up to and including 12" diameter)
first coat - conditioner, per linear ft.each additional coat - acrylic, per linear ft.
19 Exterior Masonry Soffitsfirst coat - conditioner, per sq. ft.each additional coat - acrylic, per sq ft.
EXTERIOR SPECIFICATIONS - Continued.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.52 $0.30
$0.52 $0.25
$0.30 $0.20$0.38 $0.20
$0.45 $0.28$0.58 $0.28
$0.23 $0.20$0.29 $0.20y p q
20 Exterior Sealant1/4" to 1/2" - 1-part urethane, per linear ft.1/2" to 1" - 1-part urethane, per linear ft.1/4" to 1/2" - 2-part urethane, per linear ft.1/2" to 1" - 2-part urethane, per linear ft.1/4" to 1/2" - 1-part silicone, per linear ft.1/2" to 1" - 1-part silicone, per linear ft.
21 Caulking1/8" or greater - urethane, per linear ft.under 1/8" latex or urethane, per linear ft.
22 Dry Wall Boardfirst coat - primer, per sq. ft.
INTERIOR SPECIFICATIONS - Includes all surface preparation excluding the special surface preparation services for Items 39-44 or specialized services for Items 45-47.
$0.40 $0.45$0.50 $0.55$0.80 $0.75$0.95 $0.80$0.40 $0.50$0.50 $0.60
$0.53 $0.50$0.38 $0.55
$0.27 $0.20
15
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft. $0.25 $0.37 $0.19 $0.15
each additional coat - acrylic, per sq. ft. $0.07 $0.39 $0.19 $0.15OR each additional coat - acrylic epoxy, per sq. ft. $0.07 $0.43 $0.25 $0.15OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.43 $0.25 $0.1523 Concrete Block
first coat - block filler/conditioner, per sq. ft. $0.25 $0.83 $0.25 $0.20each additional coat - acrylic, per sq. ft. $0.07 $0.52 $0.19 $0.20
OR each additional coat - acrylic epoxy, per sq. ft. $0.08 $0.57 $0.25 $0.20OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.57 $0.28 $0.1524 Concrete Stack Block
first coat - conditioner, per sq. ft. $0.25 $0.83 $0.21 $0.15each additional coat - acrylic, per sq. ft. $0.07 $0.52 $0.21 $0.15
OR each additional coat - acrylic epoxy, per sq. ft. $0.08 $0.52 $0.25 $0.15OR each additional coat pre cat epo per sq ft $0 10 $0 57 $0 28 $0 15
INTERIOR SPECIFICATIONS - Continued.
OR each additional coat - pre-cat epoxy, per sq. ft. $0.10 $0.57 $0.28 $0.1525 Non-Ferrous Metals - Galvanized - Aluminum, Interior
first coat - conditioner/primer, per sq. ft. $0.25 $0.84 $0.20 $0.19each additional coat - acrylic, per sq. ft. $0.06 $0.69 $0.21 $0.19
OR each additional coat - alkyd, per sq. ft. $0.06 $0.67 $0.19 $0.1926 Ferrous Metals (Miscellaneous) Interior
first coat - primer, per sq. ft. $0.25 $0.62 $0.30 $0.19OR first coat - 2-part epoxy, per sq. ft. $0.35 $0.80 $0.38 $0.19
each additional coat - alkyd, per sq. ft. $0.06 $0.65 $0.35 $0.19OR each additional coat acrylic enamel, per sq. ft. $0.06 $0.70 $0.35 $0.1927 Ferrous Metal Pipes 4" diameter or less
first coat - primer, per linear ft. $0.50 $0.85 $0.28 $0.19OR first coat - 2-part epoxy, per linear ft. $0.60 $0.85 $0.35 $0.19
each additional coat - alkyd, per linear ft. $0.05 $0.80 $0.30 $0.19OR each additional coat acrylic enamel, per linear ft. $0.05 $0.82 $0.28 $0.19
16
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.
each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block
first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft
INTERIOR SPECIFICATIONS - Continued.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$0.25 $0.45 $0.32 $0.20$0.20 $0.30 $0.32 $0.20$0.15 $0.54 $0.35 $0.25$0.45 $0.60 $0.37 $0.40
$0.20 $0.56 $0.30 $0.40$0.25 $0.40 $0.30 $0.20$0.20 $0.60 $0.35 $0.40$0.45 $0.70 $0.38 $0.40
$0.20 $0.61 $0.29 $0.20$0.25 $0.40 $0.29 $0.25$0.40 $0.54 $0.34 $0.40$0 45 $0 68 $0 37 $0 40OR each additional coat - pre-cat epoxy, per sq. ft.
25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior
first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.
each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.
$0.45 $0.68 $0.37 $0.40
$0.20 $0.56 $0.29 $0.20$0.25 $0.40 $0.29 $0.22$0.19 $0.45 $0.31 $0.24
$0.20 $0.50 $0.29 $0.44$0.45 $0.60 $0.35 $0.50$0.20 $0.45 $0.35 $0.40$0.20 $0.35 $0.30
$1.50 $0.23 $0.32 $0.35$2.00 $0.30 $0.37 $0.50$1.50 $0.20 $0.35 $0.40$1.25 $0.21 $0.35 $0.30
17
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.
each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block
first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft
INTERIOR SPECIFICATIONS - Continued.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.23 $0.40 $0.15 $0.19$0.23 $0.35 $0.20 $0.20$0.22 $0.40 $0.20 $0.25$0.25 $0.40 $0.22 $0.30
$0.20 $0.40 $0.18 $0.18$0.23 $0.35 $0.20 $0.19$0.24 $0.40 $0.20 $0.30$0.24 $0.40 $0.22 $0.30
$0.20 $0.40 $0.15 $0.18$0.23 $0.35 $0.20 $0.20$0.24 $0.40 $0.20 $0.30$0 24 $0 40 $0 20 $0 30OR each additional coat - pre-cat epoxy, per sq. ft.
25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior
first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.
each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.
$0.24 $0.40 $0.20 $0.30
$0.16 $0.40 $0.20 $0.20$0.22 $0.35 $0.30 $0.21$0.22 $0.35 $0.30 $0.22
$0.16 $0.40 $0.40 $0.30$0.22 $0.40 $0.40 $0.40$0.23 $0.35 $0.30 $0.35$0.22 $0.35 $0.30 $0.35
$0.21 $0.75 $0.18 $0.28$0.25 $0.75 $0.20 $0.35$0.24 $0.75 $0.20 $0.30$0.23 $0.75 $0.20 $0.30
18
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.
each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block
first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft
INTERIOR SPECIFICATIONS - Continued.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$1.00 $0.20 $0.17 $0.25$1.00 $0.19 $0.18 $0.10$1.00 $0.25 $0.22 $0.20$1.20 $0.25 $0.24 $0.25
$1.00 $0.35 $0.15 $0.25$1.00 $0.19 $0.19 $0.10$1.50 $0.25 $0.24 $0.20$1.50 $0.25 $0.24 $0.25
$1.00 $0.19 $0.15 $0.25$1.00 $0.21 $0.20 $0.10$1.00 $0.25 $0.24 $0.20$1 00 $0 25 $0 24 $0 25OR each additional coat - pre-cat epoxy, per sq. ft.
25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior
first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.
each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.
$1.00 $0.25 $0.24 $0.25
$1.00 $0.20 $0.20 $0.25$1.00 $0.22 $0.21 $0.10$1.00 $0.22 $0.22 $0.10
$2.00 $0.35 $0.28 $0.20$2.00 $0.40 $0.30 $0.25$2.00 $0.35 $0.28 $0.15$2.00 $0.35 $0.28 $0.15
$3.00 $0.35 $0.28 $0.20$3.00 $0.40 $0.34 $0.25$2.00 $0.35 $0.32 $0.15$2.00 $0.35 $0.32 $0.15
19
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
22 Dry Wall Board - ContinuedOR first coat - stain block, per sq. ft.
each additional coat - acrylic, per sq. ft.OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.23 Concrete Block
first coat - block filler/conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.24 Concrete Stack Block
first coat - conditioner, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - acrylic epoxy, per sq. ft.OR each additional coat pre cat epo per sq ft
INTERIOR SPECIFICATIONS - Continued.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.27 $0.20$0.28 $0.15$0.38 $0.25$0.42 $0.25
$0.27 $0.25$0.29 $0.20$0.38 $0.25$0.42 $0.20
$0.28 $0.19$0.32 $0.21$0.40 $0.24$0 44 $0 24OR each additional coat - pre-cat epoxy, per sq. ft.
25 Non-Ferrous Metals - Galvanized - Aluminum, Interiorfirst coat - conditioner/primer, per sq. ft.each additional coat - acrylic, per sq. ft.
OR each additional coat - alkyd, per sq. ft.26 Ferrous Metals (Miscellaneous) Interior
first coat - primer, per sq. ft.OR first coat - 2-part epoxy, per sq. ft.
each additional coat - alkyd, per sq. ft.OR each additional coat acrylic enamel, per sq. ft.27 Ferrous Metal Pipes 4" diameter or less
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.
$0.44 $0.24
$0.30 $0.20$0.33 $0.21$0.33 $0.19
$0.66 $0.20$0.66 $0.30$0.52 $0.30$0.52 $0.25
$0.52 $0.25$0.52 $0.30$0.52 $0.20$0.52 $0.20
20
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter
first coat - primer, per linear ft. $0.60 $1.70 $0.30 $0.22OR first coat - 2-part epoxy, per linear ft. $0.75 $1.90 $0.35 $0.22
each additional coat - alkyd, per linear ft. $0.10 $1.60 $0.30 $0.22OR each additional coat acrylic enamel, per linear ft. $0.10 $1.64 $0.30 $0.2229 Plaster & Stucco
first coat - primer/conditioner, per sq. ft. $0.25 $0.61 $0.21 $0.17each additional coat acrylic, per sq. ft. $0.10 $0.42 $0.19 $0.17
OR each additional coat acrylic epoxy, per sq. ft. $0.12 $0.47 $0.25 $0.17OR each additional coat - pre-cat epoxy, per sq. ft. $0.15 $0.47 $0.28 $0.1730 Interior Wood Surfaces, Interior/Exterior Wood Doors
and Jambs, acrylica. Interior Wood Surfaces
first coat - acrylic primer, per sq. ft. $0.25 $0.68 $0.21 $0.17
INTERIOR SPECIFICATIONS - Continued.
each additional coat - acrylic, per sq. ft. $0.07 $0.73 $0.20 $0.19b. Interior/Exterior Wood Doors
door first coat - acrylic primer, per side $7.50 $16.00 $10.00 $10.15door each additional coat - acrylic, per side $7.50 $16.00 $10.00 $10.20
c. Interior/Exterior Jambsjamb first coat - acrylic primer, per side $2.50 $16.00 $6.50 $10.00jamb each additional coat - acrylic, per side $2.50 $16.00 $6.50 $10.00
31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin
each coat - polyurethane, per sq. ft. $0.25 $0.75 $0.29 $0.2032 Concrete Floor - Stained, Interior or Exterior
first coat - silicone acrylic, per sq. ft. $0.25 $0.65 $0.25 $0.20each additional coat - silicone acrylic, per sq. ft. $0.08 $0.57 $0.24 $0.17non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.05
21
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco
first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.
OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors
and Jambs, acrylica. Interior Wood Surfaces
first coat - acrylic primer, per sq. ft.
INTERIOR SPECIFICATIONS - Continued.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$1.50 $0.60 $0.35 $0.35$2.00 $0.65 $0.40 $0.50$1.50 $0.40 $0.40 $0.40$1.25 $0.40 $0.40 $0.30
$0.25 $0.50 $0.30 $0.35$0.25 $0.40 $0.30 $0.20$0.20 $0.48 $0.32 $0.20$0.50 $0.54 $0.35 $0.45
$0.25 $0.54 $0.30 $0.40
each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors
door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side
c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side
31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin
each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior
first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.
$0.25 $0.45 $0.30 $0.26
$10.00 $8.00 $12.00 $20.00$10.00 $8.00 $12.00 $10.00
$10.00 $9.00 $11.00$5.00 $9.00 $8.00
$0.60 $0.70 $0.35 $0.60
$0.50 $0.88 $0.38 $0.50$0.45 $0.67 $0.38 $0.23$0.20 $0.25 $0.10 $0.20
22
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco
first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.
OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors
and Jambs, acrylica. Interior Wood Surfaces
first coat - acrylic primer, per sq. ft.
INTERIOR SPECIFICATIONS - Continued.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.26 $1.00 $0.18 $0.40$0.34 $1.00 $0.30 $0.50$0.33 $1.00 $0.30 $0.40$0.34 $1.00 $0.30 $0.40
$0.21 $0.40 $0.15 $0.20$0.23 $0.35 $0.20 $0.20$0.22 $0.40 $0.22 $0.25$0.24 $0.40 $0.22 $0.30
$0.21 $0.40 $0.20 $0.20
each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors
door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side
c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side
31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin
each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior
first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.
$0.22 $0.35 $0.20 $0.20
$6.50 $30.00 $8.00 $10.00$4.50 $20.00 $8.00 $10.00
$4.00 $5.00 $6.00 $7.00$3.75 $5.00 $6.00 $7.00
$0.25 $0.50 $0.20 $0.28
$0.22 $0.50 $0.20 $0.25$0.21 $0.50 $0.20 $0.24$0.05 $0.00 $0.05 $0.03
23
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco
first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.
OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors
and Jambs, acrylica. Interior Wood Surfaces
first coat - acrylic primer, per sq. ft.
INTERIOR SPECIFICATIONS - Continued.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$4.00 $0.35 $0.28 $0.20$4.00 $0.40 $0.34 $0.25$3.00 $0.35 $0.32 $0.15$3.00 $0.35 $0.32 $0.15
$1.00 $0.21 $0.13 $0.25$1.00 $0.19 $0.16 $0.10$1.00 $0.25 $0.19 $0.15$1.00 $0.25 $0.21 $0.20
$1.00 $0.25 $0.19 $0.25
each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors
door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side
c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side
31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin
each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior
first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.
$1.00 $0.25 $0.19 $0.10
$100.00 $10.00 $5.50 $20.00$50.00 $10.00 $5.50 $5.00
$50.00 $7.00 $5.50 $5.00$25.00 $7.00 $5.50 $5.00
$26.00 $0.29 $0.25 $0.20
$5.00 $0.25 $0.19 $0.25$3.00 $0.25 $0.19 $0.15$1.50 $0.03 $0.08 $0.05
24
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
28 Ferrous Metal Pipes greater than 4" diameter and up to and including 12" diameter
first coat - primer, per linear ft.OR first coat - 2-part epoxy, per linear ft.
each additional coat - alkyd, per linear ft.OR each additional coat acrylic enamel, per linear ft.29 Plaster & Stucco
first coat - primer/conditioner, per sq. ft.each additional coat acrylic, per sq. ft.
OR each additional coat acrylic epoxy, per sq. ft.OR each additional coat - pre-cat epoxy, per sq. ft.30 Interior Wood Surfaces, Interior/Exterior Wood Doors
and Jambs, acrylica. Interior Wood Surfaces
first coat - acrylic primer, per sq. ft.
INTERIOR SPECIFICATIONS - Continued.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.52 $0.20$0.52 $0.20$0.52 $0.20$0.52 $0.22
$0.27 $0.18$0.29 $0.19$0.49 $0.20$0.52 $0.23
$0.39 $0.26
each additional coat - acrylic, per sq. ft.b. Interior/Exterior Wood Doors
door first coat - acrylic primer, per sidedoor each additional coat - acrylic, per side
c. Interior/Exterior Jambsjamb first coat - acrylic primer, per sidejamb each additional coat - acrylic, per side
31 Interior Wood Doors & Cabinets/Existing Clear Finish to be Refinished with gloss or satin
each coat - polyurethane, per sq. ft.32 Concrete Floor - Stained, Interior or Exterior
first coat - silicone acrylic, per sq. ft.each additional coat - silicone acrylic, per sq. ft.non-skid additive, per sq. ft.
$0.39 $0.26
$22.00 $10.00$25.00 $10.00
$10.00 $7.00$10.00 $7.00
$0.45 $0.26
$0.45 $0.25$0.45 $0.24$0.05 $0.02
25
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft. $0.25 $0.72 $0.26 $0.19each additional coat - acrylic epoxy, per sq. ft. $0.10 $0.72 $0.26 $0.19non-skid additive, per sq. ft. $0.00 $0.24 $0.02 $0.03
34 Ceramic Tileeach coat - epoxy enamel, per sq. ft. $0.25 $0.87 $0.29 $0.19
35 Skip Trowel, per sq. ft. $0.80 $1.00 $0.38 $0.3036 Orange Peel, per sq. ft. $0.80 $1.00 $0.38 $0.30
37 Knock-down, per sq. ft. $0.80 $1.00 $0.38 $0.3038 Popcorn, per sq. ft. $0.80 $1.20 $0.38 $0.29
TEXTURING FINISH - (includes, but is not limited to the following):
SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized
INTERIOR SPECIFICATIONS - Continued.
TEXTURING FINISH - Continued.
39 Standard Pressure Washing, per sq. ft. $0.10 $0.25 $0.08 $0.0340 Rotary Tip Pressure Washing, per sq. ft. $0.10 $0.28 $0.15 $0.0341 Sand Blasting, per sq. ft. $0.50 $5.00 $1.85 $0.0842 Bead Blasting, per sq. ft. $0.50 $7.00 $1.45 $0.1043 Sand Injected Blasting, per sq. ft. $0.50 $1.50 $1.85 $0.5044 Cementitious Skim Coat, per sq. ft. $0.75 $1.00 $0.58 $0.50
45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.
$14.00 $57.00 $27.00 $17.50
46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.
$15.00 $84.00 $40.00 $17.50
y p pprepresentative of the Facilities Services Department.
SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
26
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.
34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.
35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.
37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.
TEXTURING FINISH - (includes, but is not limited to the following):
SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized
INTERIOR SPECIFICATIONS - Continued.
TEXTURING FINISH - Continued.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
$0.45 $0.69 $0.35 $0.50$0.35 $0.45 $0.35 $0.24$0.20 $0.85 $0.10 $0.21
$0.45 $0.78 $0.35 $2.00
$1.90 $2.30 $1.00 $0.75$1.90 $2.20 $0.70 $0.50
$1.90 $1.85 $0.80 $0.60$1.90 $1.95 $1.00 $0.50
39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.
45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.
46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.
y p pprepresentative of the Facilities Services Department.
SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
$0.10 $0.15 $0.60 $0.10$0.10 $0.18 $0.65 $0.50$1.00 $3.10 $6.00 $2.10$1.25 $3.15 $6.20 $2.10$1.50 $4.10 $6.20 $1.00$1.75 $3.75 $1.80 $0.70
$28.00 $25.50 $31.00 $22.50
$37.00 $33.75 $35.00 $30.00
27
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.
34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.
35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.
37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.
TEXTURING FINISH - (includes, but is not limited to the following):
SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized
INTERIOR SPECIFICATIONS - Continued.
TEXTURING FINISH - Continued.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
$0.24 $0.50 $0.25 $0.25$0.23 $0.50 $0.25 $0.25$0.05 $0.00 $0.05 $0.03
$0.25 $0.50 $0.25 $0.29
$0.90 $0.75 $0.25 $0.25$0.08 $0.75 $0.25 $0.25
$0.90 $0.75 $0.28 $0.25$0.15 $0.50 $0.25 $0.20
39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.
45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.
46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.
y p pprepresentative of the Facilities Services Department.
SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
$0.08 $0.05 $0.04 $0.10$0.09 $0.05 $0.04 $0.15$0.85 $0.10 $0.25 $0.50$0.65 $0.10 $0.25 $0.65$0.85 $0.10 $0.15 $0.40$0.75 $0.50 $0.25 $0.50
$33.25 $20.00 $16.00 $25.00
$44.25 $20.00 $18.00 $40.00
28
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.
34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.
35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.
37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.
TEXTURING FINISH - (includes, but is not limited to the following):
SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized
INTERIOR SPECIFICATIONS - Continued.
TEXTURING FINISH - Continued.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
$5.00 $0.27 $0.25 $0.30$3.00 $0.27 $0.25 $0.15$1.50 $0.03 $0.08 $0.05
$6.00 $0.30 $0.32 $0.25
$10.00 $0.90 $3.00 $1.00$10.00 $1.18 $2.00 $0.50
$10.00 $1.18 $3.00 $0.75$10.00 $1.21 $2.00 $0.50
39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.
45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.
46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.
y p pprepresentative of the Facilities Services Department.
SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
$0.50 $0.10 $0.12 $0.10$0.70 $0.20 $1.25 $0.10$1.50 $1.30 $3.50 $3.00$3.00 $0.90 $0.90 $3.00$3.00 $0.40 $0.75 $2.00
$10.00 $2.50 $1.65 $5.00
$30.00 $33.00 $16.00 $20.00
$40.00 $49.50 $16.00 $25.00
29
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
33 Concrete Floor - Paintedfirst coat - acrylic epoxy, per sq. ft.each additional coat - acrylic epoxy, per sq. ft.non-skid additive, per sq. ft.
34 Ceramic Tileeach coat - epoxy enamel, per sq. ft.
35 Skip Trowel, per sq. ft.36 Orange Peel, per sq. ft.
37 Knock-down, per sq. ft.38 Popcorn, per sq. ft.
TEXTURING FINISH - (includes, but is not limited to the following):
SPECIAL SURFACE PREPARATION SERVICES - To be used only with prior written approval from the authorized
INTERIOR SPECIFICATIONS - Continued.
TEXTURING FINISH - Continued.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
$0.45 $0.25$0.45 $0.24$0.05 $0.03
$0.42 $0.29
$0.50 $0.25$0.50 $0.25
$0.50 $0.25$0.50 $0.25
39 Standard Pressure Washing, per sq. ft.40 Rotary Tip Pressure Washing, per sq. ft.41 Sand Blasting, per sq. ft.42 Bead Blasting, per sq. ft.43 Sand Injected Blasting, per sq. ft.44 Cementitious Skim Coat, per sq. ft.
45 STANDARD HOURS - 7:00 a.m. through 5:00 p.m., Monday through Friday. Hourly rate, including overhead and profit.
46 NON-STANDARD HOURS - prior to 7:00 am and after 5:00 pm. Monday through Friday, and Saturdays and Sundays. Hourly rate, including overhead and profit.
y p pprepresentative of the Facilities Services Department.
SPECIALIZED SERVICES HOURLY RATES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
$0.13 $0.10$0.30 $0.12no bid $1.50no bid $1.75no bid $1.50no bid $1.50
$30.00 $25.00
$45.00 $32.00
30
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.
7% 15% 10% 10%
48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will
7% 15% 10% 0%
SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
active use of equipment. Payment for inactive use will not be allowed.
Snorkel Lift 30 ft. $80/hr, $400/day,
$1200/wk
No extra charge for equipment owned by
Artristry Painting Company, Inc.
Lifts$20/hr, $100/day, $450/wk
Scissor Lift 20 ft. $40/hr, $160/day,
$480/wk
Cherry Picker with Truck$25/hr, $100/day, $450/wk
USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.
49
31
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.
48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will
SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
7% 15% 12% 10%
7% 15% 12% 10%
active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.
49 Truck Mounted Pressure Washer$35/hr, $110/day,
$410/wk
Power Paint Sprayer$5/hr, $40/day,
$160/wk
Pressure Washer up to 4000 psi 5GPM
$5/hr, $25/day, $100/wk
3500 psi Mobile Pressure Washer$22/hr, $175/day,
$230/wk
Pressure Washer 4000 psi
$5/hr, $40/day, $160/wk
Sand Blasting $24/hr, $150/day,
$750/wk
Boom Lift$125/hr, $150/day,
$820/wk
32
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.
48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will
SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
13% 0% 5% 10%
15% 0% 15% 10%
active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.
49Pressure Washer$2/hr, $14/day, $65/wk
None forseen. If we do use an item, there will be no additional
charge.
N/A33 ft. JLG Lift
$150/hr, $225/day, $550/wk
Paint Sprayer$3.50/hr, $24/day, $85/wk
40 ft. JLG Lift (3)$210/hr, $375/day,
$895/wk
Air Compressor Under 5 cm$1/hr, $7/day, $35/wk
60 ft. JLG Lift$215/hr, $565/day,
$1,395/wk
40 ft. Scissor Lift$150/hr, $225/day,
$550/wk
33
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.
48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will
SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
14.5% 10% 5% 10%
14.5% 10% 5% 10%
active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.
49 250 CFM Compressor Gas
$25/hr, $120/day, $475/wk
300 lb. Pot with Air Hood & Accessories
$15/hr, $70/day, $275/wk
All lifts rented. Siesta key Décor owns all
other specialty equipment, scaffolding,
sandblasting, chipping hammers, texturing machines, power
hand tools, and many misc. equipment to do
jobs.$0/hr, $0/day, $0/wk
UHP-Ultra High Pressure Water
Blasting Machine-Minimum 1 day rental. Includes operator and
safety equipment-PPE.
$68/hr, $544/day, $2,720/wk
34
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
47 Materials/chemicals for specialized services billed at net cost plus a mark-up for overhead and profit. Maximum of 15%. (No mark-up of sales tax allowed). A copy of the itemized materials invoice from the supplier will be required at time of billing to the SBSC.
48 RENTAL OF EQUIPMENT PERCENTAGE MARK-UP - For equipment that is not used in the regular course of painting services. Billed at net cost plus mark-up for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A Copy of the rental invoice will be required at time of billing to the SBSC. Rental is for active use of equipment. Payment for inactive use will
SPECIAL EQUIPMENT - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
MATERIALS FOR SPECIALIZED SERVICES PERCENTAGE MARK-UP - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Superior Painting, Inc. Universal Paint & Design Services, Inc.
10% 10%
10% 10%
active use of equipment. Payment for inactive use will not be allowed.USE OF CONTRACTOR OWNED EQUIPMENT - This is equipment that is used on occasion, not in the regular course of painting services. List type of special equipment and rates. Rate is for active use of equipment. Payment for inactive use will not be allowed.
49Pressure Washer (up to 4000 psi)
n/c
Airless Paint Sprayer
n/c
35
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
Above the Rest Contractors
Apollo Construction & Engineering Services, Inc.
Artistry Painting Company, Inc.
Boro Building and Property
Maintenance
50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.
7% 15% 10% 10%
Fredrick Ferrer Thomas G. Kamprath Nicholas Cahoo Ryan Skzypkowski301B Whitehall
Court PO Box 5848 633 East Venice Avenue
7053 South Tamiami Trail, Suite F
Tampa, FL 33604 Sun City Center, FL 33571 Venice, FL 34285 Sarasota, FL 34231
813-810-9703 813-645-4926 941-374-2679 941-556-9027
866-914-8250 813-645-3351 941-484-3937 941-556-9028264998021 592811166 271185600 273414287frednang
@ iltkamprath@apollo-constr ction com
office.artistry@ eri on net [email protected]
Contact
SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Federal I.D.
Address
Phone:
Fax:
@gmail.com construction.com @verizon.net [email protected]:
36
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.
Contact
SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Federal I.D.
Address
Phone:
Fax:
CMK Construction, Inc.
Construction Specialists
of Palm Beach
Dimitri and Yanni, Inc.
Diversity Painters, Inc.
9% 15% 14% 10%
Manuel Kavouklis Stephen Sanguinetti Chris Alexakis Andrew Hendriksen
5761 Dolores Drive 16800 Orange Boulevard
121 Triple Diamond Boulevard, Unit 9
2739 NE Hickory Ridge Avenue
Holiday, FL 34690 Loxahatchee, FL 33470
North Venice, FL 34275
Jensen Beach, FL 34947
727-243-9234 561-818-3120 941-223-1319 772-408-6521
727-848-2026 561-793-4169 941-484-1954 772-419-8017
201609262 651157986 651032907 270647869cmkinc
@ eri on net [email protected] csacontractor @gmail com
paintingjob@hotmail comEmail: @verizon.net [email protected] @gmail.com @hotmail.com
37
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.
Contact
SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Federal I.D.
Address
Phone:
Fax:
GCSI - Paintscape, Inc.
K & K Painting & Waterproofing, LLC
Mailloux and Sons, Inc.
P. J. Goldman Painting
15% 0% 0% 10%
Glenn J. Shecter Ron King Jade Mailloux Philip J. Goldman
8251 Blaikie Court 4475 Hamwood Street 1500 15th Avenue Drive East #103
2840 21st Street Court East
Sarasota, FL 34240 North Port, FL 34287 Palmetto, FL 34221 Palmetto, FL 34221
941-377-0899 941-228-1743 941-723-1955 941-722-0444
941-377-1055 941-966-7228 941-723-1956 941-723-3325
203274108 830385113 208413979 650209926
[email protected] maksuten@msn com
jade-jmsinc@ i t
pjgoldman@ ahoo comEmail: [email protected] @msn.com @verizon.net @yahoo.com
38
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.
Contact
SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Federal I.D.
Address
Phone:
Fax:
Royal Crest Builders
Service Painting of Florida Siesta Key Décor Sourini Painting,
Inc.
15% 15% 5% 15%
Andrew George Burt Whitenight Jim Kernan Jim Sourini12510 Strathmore
Loop 6215 Clarity Court 8466 North Lockwood Ridge Road
12800 44th Street North
Fort Myers, FL 33912 Sarasota, FL 34240 Sarasota, FL 34243 Clearwater, FL
33762239-768-9888 941-371-8182 941-349-3276 727-573-0666
239-768-0338 941-371-0563 941-378-2292 727-572-9338
030469806 743030989 270020479 593363228andrew@royal-
crest comburtwhitenight
@ser icepainting netsiestakeydecor
@aol comjim@sourinipainting comEmail: crest.com @servicepainting.net @aol.com painting.com
39
Tabulation for Painting Services-District - Bid #11-0008SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
Opened December 14, 2010 at 2:00 p.m.
Item # Description
50 Subcontracted services to be billed at net cost plus markup for overhead and profit. Maximum of 15%. No mark-up of sales tax allowed. A copy of the itemized subcontracted services invoice from the Subcontractor will be required at time of billing to the SBSC.
Contact
SUBCONTRACTED SERVICES - To be used only with prior written approval from the authorized representative of the Facilities Services Department.
Federal I.D.
Address
Phone:
Fax:
Superior Painting, Inc. Universal Paint & Design Services, Inc.
10% 10%
Gene Glidden Eileen Kuntz155 South McCall
Road PO Box 20004
Englewood, FL 34223
Bradenton, FL 34204
941-474-9091 941-751-0700
941-475-4326 941-751-9977
432047287 208154397superiorpaint1@da star net [email protected]: @daystar.net [email protected]
Recorded by: Peggy Long
Witnessed by: Carol A. Lichon
40