17
1 THE TUNISIAN NATIONAL RAILWAYS COMPANY

THE TUNISIAN NATIONAL RAILWAYS COMPANY

Embed Size (px)

DESCRIPTION

THE TUNISIAN NATIONAL RAILWAYS COMPANY. SNCFT is the national railway of Tunisia and is under the direction of the Ministry of Transport. SNCFT was founded on December 27, 1956 , headquartered in Tunis capital. - PowerPoint PPT Presentation

Citation preview

Page 1: THE TUNISIAN NATIONAL RAILWAYS COMPANY

1

THE TUNISIAN NATIONAL

RAILWAYS COMPANY

Page 2: THE TUNISIAN NATIONAL RAILWAYS COMPANY

2

SNCFT is the national railway of Tunisia and is under the direction of the Ministry of Transport.

SNCFT was founded on December 27, 1956, headquartered in Tunis capital.

Tunisia inherited much of its rail transport system from the French. The Tunisian Government has developed the infrastructure further.

Page 3: THE TUNISIAN NATIONAL RAILWAYS COMPANY

3

History Construction of the northern network (standard gauge)

Between 1876 and1922, French corporation des Batignolles and its subsidiary, the Bône-Guelma railways compagny built the remain part of the standard gauge network and the link with Algeria.

The French company was granted

operational rights until 1922, after which it would be sold to the Tunisian state.

The first railway line in Tunisia linked Tunis with La Marsa - today's TGM line - and was inaugurated on August 2, 1872 by SADOK BEY.

Page 4: THE TUNISIAN NATIONAL RAILWAYS COMPANY

4

Construction of the central and southern network (metre-gauge)

In 1885, considerable deposits of phosphates were discovered in the region of Seldja.

In 1897 a concession was granted to the Phosphate Company and the railways Sfax-Gafsa (CPCFSG) to mine the mineral and to build rail transport to the port of Sfax.

The metre-gauge railway between Sfax and Métlaoui via Gafsa was completed by 1899. It was extended in 1913 to Tozeur and 1916 to Gabès

In addition, the company was granted a concession to construct The remain part of the southtern network where large holdings of phosphates and iron were found.

The southtern network was completed in 1930.

At the end of the concession, the lines where to be returned to the Tunisian State.

Page 5: THE TUNISIAN NATIONAL RAILWAYS COMPANY

5

Thus due to historical reasons, the country has two different rail gauge systems:

500 km of standard 1,435 mm (4 ft 8 1⁄2 in) gauge network in the northern part of the country.

1 700 km metre gauge network in the central and southern part.

8 km double gauged track.

Tunisia has a rail link with neighbouring Algeria via the border at Ghardimaou.

Otherwise two suburbain lines where electrified:

Sousse /Mahdia 70 km, 25 kv 50 Hz in1987.

Tunis/ Erriadh 25 km, 2x25 kv 50 Hz in 2012.

Page 6: THE TUNISIAN NATIONAL RAILWAYS COMPANY

6

SNCFT provides both passenger and freight services at a national level.

SNCFT employs 5400 staff to achieve annual transport :

Page 7: THE TUNISIAN NATIONAL RAILWAYS COMPANY

7

6 million on intercity passenger rail network

Page 8: THE TUNISIAN NATIONAL RAILWAYS COMPANY

8

40 million travelers in the suburbs

Page 9: THE TUNISIAN NATIONAL RAILWAYS COMPANY

8 million tons of phosphate

Page 10: THE TUNISIAN NATIONAL RAILWAYS COMPANY

3 million tons of various products

Page 11: THE TUNISIAN NATIONAL RAILWAYS COMPANY

BOARD OF DIRECTORS

President Director General

Deputy Director General

Management and finance management

Planning and Management Control Department

Management Communications and External Relations

Central Railways Directorate

Safety and quality department

Informatics department

Tunis Suburb Business Unit

Sahel Suburb Business Unit

Main Lines Business Unit

Freight Business Unit

Phosphate Business Unit

Industrial Maintenance

Business Unit

Central Railways Network Operation

Department

audit and control regulatory department

permenante secretairiat the procurement

committee

Page 12: THE TUNISIAN NATIONAL RAILWAYS COMPANY

12

SNCFT provides an average daily traffic of 326 trains with a rail fleet consists of:

130 mainline locomotives

41 shunting locomotives

262 passenger cars

25 EMUs

30 DMUs

3846 cars

1266 containers

Page 13: THE TUNISIAN NATIONAL RAILWAYS COMPANY

13

Main future projects1) RFR projects :

Consite to build four new electrified lines for trasport travelers in the suburbs of Tunis

Construction works in court for both D and E lines;

Page 14: THE TUNISIAN NATIONAL RAILWAYS COMPANY

14

2) Construction of a new line between Sousse-Kairouan-Hajeb Layoun (130 km)

Project is awaiting funding.

Page 15: THE TUNISIAN NATIONAL RAILWAYS COMPANY

15

3) Extension of the electrified railway line Tunis - Borj Cedria to:

Soliman (about 7.5 km), feasibility studies have been completed

Hammamet- Nabeul (about 53 km) Feasibility study underway.

4) Electrification of the line Tunis - Bizerte (53 km). Feasibility study underway.

Page 16: THE TUNISIAN NATIONAL RAILWAYS COMPANY

16

5) Creation of high-speed lines to connect the main cities of the Maghreb are: Casablanca, Algiers, Tunis and Tripoli.

This project is currently under study.

The total length of the high-speed lines In Tunisia is: 840 km.

Page 17: THE TUNISIAN NATIONAL RAILWAYS COMPANY

17

THANK YOU FOR YOUR ATTENTION