Asbestos Hazard Emergency Response Act AHERATHREE-YEAR RE-INSPECTION 2018-2019 and ASBESTOS MANAGEMENT PLAN for the Vaux Big Picture High School ULCS# 2130/5180 Building # B213001-1 2300 W. Master Street Philadelphia, Pennsylvania 19121 Year Built: 1937 March 2019 Conducted by: Acer Associates, LLC Batta Environmental Associates, Inc. Criterion Laboratories, Inc. G&C Environmental Services, Inc. KEM Partners, Inc. React Environmental Professional Services Group, Inc. Synertech, Inc. USA Environmental Management, Inc. The Vertex Companies, Inc. Westchester Environmental LLC Management Plan Prepared by: School District of Philadelphia Batta Environmental Associates, Inc. Criterion Laboratories, Inc. This report must remain in the Main Office as mandated by the US EPA AHERA Regulations.

THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

Asbestos Hazard Emergency Response Act

“AHERA”

THREE-YEAR RE-INSPECTION 2018-2019 and

ASBESTOS MANAGEMENT PLAN

for the

Vaux Big Picture High School

ULCS# 2130/5180

Building # B213001-1

2300 W. Master Street

Philadelphia, Pennsylvania

19121

Year Built: 1937

March 2019

Conducted by:

Acer Associates, LLC

Batta Environmental Associates, Inc.

Criterion Laboratories, Inc.

G&C Environmental Services, Inc.

KEM Partners, Inc.

React Environmental Professional Services Group, Inc.

Synertech, Inc.

USA Environmental Management, Inc.

The Vertex Companies, Inc.

Westchester Environmental LLC

Management Plan Prepared by:

School District of Philadelphia

Batta Environmental Associates, Inc.

Criterion Laboratories, Inc.

This report must remain in the Main Office as mandated by the US EPA AHERA Regulations.

Page 2: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

AHERA THREE-YEAR REINSPECTION VOLUME X

Table of Contents

Transmittal Letter

Executive Summary

I. Summary list of Confirmed Asbestos Containing Building Materials

II. Summary list of Assumed Asbestos Contain Building Materials

III. Summary list of Non-Asbestos Containing Building Materials

IV. Summary list of Non Suspect Asbestos Containing Building Materials

V. Summary List of Auditorium DATA for this location

VI. Summary list of Attic and/or Crawlspace DATA for this location

VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location

Section I Report of Re-Inspection

A. Introduction

B. Three-Year Re-inspection X Overview

C. Post- Management Plan Activities and Changes

C.1 - Sampling and Analysis

C.2 - New Floor Tile Sampling

C.3 - Abatement Activity

C.4 - Periodic (Six-Month) Surveillance (Damaged Materials)

Section II Re-Inspection Data

A. Introduction

B. Re-Inspection Key Definitions

C. Room by Room Location Log Report

Section III Certificates

A. Management Planner/Building Inspector Certificates

Section IV Cross Reference Table Page 1-8

Asbestos Management Program Page 9-20

Page 3: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 4: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Executive Summary

This Asbestos Hazard Emergency Response Act (AHERA) Three-Year Re-inspection “Volume

# X” Management Plan at this location, has been completed and the report of re-inspection

submitted to the School District of Philadelphia. The re-inspections in all School District of

Philadelphia buildings of 2018-2019 were conducted and completed between May 2018 through

April 2019 as a joint project by Acer Associates, LLC., Batta Environmental Associates, Inc.,

Criterion Laboratories, Inc., G & C Environmental Services, Inc., KEM Partners, Inc., React

Environmental Professional Services Group, Inc., Synertech, Inc., USA Environmental

Management Inc., The Vertex Companies, Inc., and Westchester Environmental LLC.

In general, the School District of Philadelphia Office of Environmental Management and

Services conducts Environmental Impact Evaluations and provides Asbestos Inspection Reports

prior to any renovation, demolition and/or maintenance activities. The AHERA report must be

reviewed prior to any renovation, demolition and/or maintenance activities in order to avoid the

unknowing disturbance to Asbestos Containing Building Materials identified within this

location. In addition, prior to work activities above all drop ceilings this report should be

reviewed to avoid potential disturbances to Asbestos Containing Materials. Refer to Section IV

of the Cross Reference Table, for additional Asbestos Management Program information.

Contact the Office of Environmental Management and Services to have an Environmental

Impact Evaluation conducted prior to any renovation, demolition and/or maintenance activities

within this facility.

The information contained in this report was obtained from the original Asbestos Management

Plan for the school, from update reports on changes and activities since the completion of the 1st

Management Plan for each location and from all prior inspections performed and documented in

Volume # I through Volume IX (dated respectively 1992, 1995, 1998, 2001, 2004, 2007, 2010,

2013 and 2015) (if applicable) - and by this Three-Year Re-inspection of this school. The re-

inspection report/Management Plan of 2018-2019 were reviewed and prepared collectively by

Management Planner Megan Vala and Julie Mui, of Criterion Laboratories, Inc., Jennifer

Donovan of Batta Environmental Associates, Inc and under the direction of the District’s

AHERA Manager Monique Causley

Page 5: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

The 2018-2019 inspection process included the addition and/or an update of a comprehensive

Room by Room Inventory of all Thermal (T), Surfacing (S) and Miscellaneous (M) Materials

specific to each room of this facility. Inspections of each room’s thermal, ceilings, walls, floors

and miscellaneous items regardless of Asbestos Content are categorized on the Room by Room

Location Log Report for this location. Rooms or areas of the facility that were not accessible at

the time of the inspection are marked with an “X”. The Room by Room Location Log Report is

found in Section II C of this Management Plan.

All Presumed or Suspect Asbestos Containing Building Materials (ACBMs), listed in the

following summary charts are categorized as Confirmed, Assumed, Non-Asbestos, and/or Non-

Suspect (ACBMs) were identified in the original Management Plan, or in the Volume I through

Volume IX AHERA Three-Year Re-inspection reports, and were re-inspected as part of this

project.

As mandated by the U S EPA AHERA regulations, periodic Six-Month inspections and Three-

Year Re-inspections of this location will be performed and the Inspection Data in this report will

be updated accordingly.

Please feel free to contact the School District of Philadelphia’s Office of Environmental

Management and Services (OEMS) regarding any comments, questions, or concerns regarding

this report or any Environmental related topic. OEMS staff can be reached at (215) 400 4750, via

fax at (215) 400 4751 or via e-mail at [email protected] and/or [email protected].

Additional information can be found on our website. Here is the link to the OEMS website.

http://webgui.phila.k12.pa.us/offices/e/environmental

Page 6: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

I. Summary list of Confirmed Asbestos Containing Building Materials within this facility

These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos

Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at

this location. These materials have been sampled and Laboratory Analysis has CONFIRMED the presence of

Asbestos. Contact OEMS prior to the disturbance of any of the following materials.

Confirmed Asbestos Containing Building Materials for this location

Pipe Insulation 2-6 inch ACM Debris Floor Tile VAT 12" x 12"

Pipe Insulation > 6 inch Unit Ventilator Insulation Floor Tile VAT 9" x 9"

Pipe Fitting Insulation

* Always refer to the Room by Room Logs for each specific material classification as the material

classification findings may be different in various rooms throughout this facility.

** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within

this facility.

Page 7: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

II. Summary list of Assumed Asbestos Containing Building Materials within this facility

These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos

Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at

this location. These materials have not been sampled and should not be disturbed until verification of Asbestos

Content. Contact OEMS for assessment and sampling prior to the disturbance of these materials.

Assumed Asbestos Containing Building Materials for this location

Sectional Boilers Sheetrock Wall Fire Doors

Emergency Generator Exhaust

Insulation

Black Mastic behind AHU

Diffuser Grills Wire Insulation

Radiator Insulation Unit Ventilator Insulation Vibration Damper Cloth

Ornamental Light Fixture Heat

Shield Transite Pipe Insulation > 6 inch

Blackboard/Tackboard Glue

Dots Mirror Glue Dots Acoustic Ceiling Panels

Floor Tile VAT 12" x 12" Roof (field)

Black Damp-proofing/Vapor Barrier

applied to Brick Walls

Sink Undercoat Mastic Roof (flashing) Seam Caulking

Exterior Caulks and glazings

(window, expansion seam,

door, etc.)

Interior Caulks and glazings

(window, expansion seam,

door, etc.)

Black Damp-proofing/Vapor Barrier

applied to exterior walls inside Wall

Cavities Throughout

* Always refer to the Room by Room Logs for each specific material classification as the material

classification findings may be different in various rooms throughout this facility.

** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within

this facility.

Page 8: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

III. Summary list of Non-Asbestos Containing Building Materials within this facility

These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos

Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at

this location. These materials have been sampled and Laboratory Analysis has indicated NO Asbestos present

or NO ASBESTOS DETECTED (NAD).

Non- Asbestos Containing Building Materials for this location

Plaster Walls Floor Tile VAT 12" x 12" 1' x 1' Ceiling Tile Glue Dots

Plaster Ceiling Linoleum Ceiling Tile 2' x 2'

* Always refer to the Room by Room Logs for each specific material classification as the material

classification findings may be different in various rooms throughout this facility.

** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within

this facility.

Page 9: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

IV. Summary list of Non-Suspect Asbestos Containing Building Materials within this facility

These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos

Containing Materials during any and all Operations, Maintenance, Renovation, and/or Demolition activities at

this location. These materials are not typically known to contain Asbestos.

Non-Suspect Asbestos Containing Building Materials for this location

Concrete Floor Terrazzo Floor Concrete Block Wall

Ceiling Tile 2' x 4' Plastic Stall Partitions Neoprene Pipe Insulation

Granite Stall Partitions Carpet AHU Diffuser Grills

Fiberglass Pipe Insulation Concrete Ceiling Granite Walls

Epoxy Flooring Fiberglass Duct Insulation Ceramic Tile Floors

Ceramic Tile Walls Corrugated Metal Ceiling Deck Wood Floor

Partition Room Dividers Lab Table Tops/Sinks Particleboard Ceiling Tile 1' x 1'

Metal Walls Chiller Brick Wall

Metal Pan Ceiling Concrete Walls Terra Cotta Walls

Cement Floor AHU Switchgears/Transformers

Vinyl Vibration Damper Cloth Fiberglass Ceiling Tile 1' x 1' Rubber Tread Stairs

Elevator Equipment Obsolete Metal Tanks Wood Stairs

* Always refer to the Room by Room Logs for each specific material classification as the material

classification findings may be different in various rooms throughout this facility.

** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within

this facility.

Page 10: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

V. Summary list of Auditorium DATA for this location

These charts are to be used for a quick reference of the Auditorium DATA within this facility. Sampling of the

Auditorium Ceilings throughout the District is more difficult because of the various ceiling heights. As

sampling occurs this information is updated on a case by case basis for each specific location and facility.

This is a list of known materials for this location’s Auditorium

Auditorium

Auditorium Wood Floor Non Suspect ACM

Auditorium Plaster Walls NAD

Auditorium Plaster Ceiling NAD

Auditorium Radiator Insulation Assumed

Auditorium Pipe Insulation 2-6 inch Confirmed

Auditorium Pipe Fitting Insulation Confirmed

* Always refer to the Room by Room Logs for each specific material classification as the material

classification findings may be different in various rooms throughout this facility.

** Some Materials may have multiple classifications (Confirmed, Assumed, NAD and Non Suspect) within

this facility.

Page 11: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

VI. Summary list of Attic and/or Crawlspace DATA for this location

These charts are to be used for a quick reference regarding the Attics and/or Crawlspaces inspection DATA

within this facility. Contact OEMS prior to entering any attic or crawlspace within this facility and refer to the

below chart and legend for Category Rank determination. The Data relative to these spaces is updated as

conditions change regarding Abatement or Renovation activity on a case by case basis for each specific location

and facility. In general, Crawlspaces are below the basement or 1st floor and Attics are above the floor space.

Category Rank Legend "A" - No Asbestos Containing Materials - Sample Results indicate NO ACM on pipes, fittings, elbows, or equipment located within

this functional space, and NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "B" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this

functional space, HOWEVER, NO VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "C" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this

functional space, and LOCALIZED VISIBLE DEBRIS or DAMAGE observed at time of this inspection. "D" - Asbestos Containing Materials Exist - Sample Results indicate ACM on pipes, fittings, elbows, or equipment located within this

functional space and DISTRIBUTED VISIBLE DEBRIS or SIGNIFICANT DAMAGE observed at time of this inspection. "E" - No Bulk Sample Results Available SUSPECT ACM OBSERVED. Contact OEMS immediately for additional instructions.

Attic/Crawlspace

Access

Area Floor Surface

Category

Rank Comments

Attic X X X Needs to be assessed

Crawlspace X X X Needs to be assessed

Page 12: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

VII. Summary list of Pipe Chase/Pipe Shaft DATA for this location

These charts are to be used for a quick reference regarding the information known about the Pipe

Chases and/or Pipe Shafts inspection DATA within this facility. Contact OEMS prior to

performing renovation activities any Pipe Chase and/or Pipe Shaft within this facility and refer to

the below chart and legend for Asbestos Content of various materials identified within each

space. The Data relative to these spaces is updated as conditions change regarding Inspection,

Abatement and/or Renovation activity on a case by case basis for each specific location and

facility. In general, Pipe Chases are horizontal spaces and Pipe Shafts are vertical spaces.

Elem

ent

Flo

or On Site Room Name Material

Confirmed

/Assumed

NAD/Non

Suspect

Amount

of

Material

Amount

of

Damage

1 BS

Pipe Chase inside Women's Restroom

beside Auditorium Supply Plenum Concrete Floor Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase inside Women's Restroom

beside Auditorium Supply Plenum Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 BS

Pipe Chase inside Women's Restroom

beside Auditorium Supply Plenum Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase inside Women's Restroom

beside Auditorium Supply Plenum Pipe Insulation 2-6 inch Confirmed 20 LF 0 LF

1 2nd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 2nd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 2nd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 3rd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 3rd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 3rd

Pipe Chase inside Boys Restroom

beside East Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase below Stairwell inside East

Locker Room Concrete Floor Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase below Stairwell inside East

Locker Room Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 BS

Pipe Chase below Stairwell inside East

Locker Room Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 BS

Mechanical Pipe Shaft beside East

Stairwell Concrete Floor Non Suspect ACM 50 SF 0 SF

1 BS

Mechanical Pipe Shaft beside East

Stairwell Concrete Block Wall Non Suspect ACM 1500 SF 0 SF

1 BS

Mechanical Pipe Shaft beside East

Stairwell Metal Pan Ceiling Non Suspect ACM 50 SF 0 SF

1 BS

Mechanical Pipe Shaft beside East

Stairwell

Fiberglass Pipe

Insulation Non Suspect ACM 510 LF 0 LF

1 BS

Pipe Chase in Room between

Northwest AHU Room and Classroom

B6 Concrete Floor Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase in Room between

Northwest AHU Room and Classroom

B6 Concrete Floor Non Suspect ACM 40 SF 0 SF

Page 13: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Elem

ent

Flo

or On Site Room Name Material

Confirmed

/Assumed

NAD/Non

Suspect

Amount

of

Material

Amount

of

Damage

1 BS

Pipe Chase in Room between

Northwest AHU Room and

Classroom B6 Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 BS

Pipe Chase in Room between

Northwest AHU Room and

Classroom B6 Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase in Room between

Northwest AHU Room and

Classroom B6 Pipe Insulation 2-6 inch Confirmed 4 LF 0 LF

1 BS

Pipe Chase in Room between

Northwest AHU Room and

Classroom B6 Pipe Fitting Insulation Confirmed 3 EA 0 EA

1 BS

Pipe Chase below Stairwell beside

Classroom B6 Concrete Floor Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase below Stairwell beside

Classroom B6 Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 BS

Pipe Chase below Stairwell beside

Classroom B6 Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase below Southwest

Stairwell in Classroom B50 Concrete Floor Non Suspect ACM 40 SF 0 SF

1 BS

Pipe Chase below Southwest

Stairwell in Classroom B50 Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 BS

Pipe Chase below Southwest

Stairwell in Classroom B50 Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 2nd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 2nd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 2nd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 3rd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 3rd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 3rd

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 4th

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 4th

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 4th

Pipe Chase inside Girls Restroom

beside West Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 1st

Pipe Shaft - Travels 85' vertically

from Basement up to the 5th Floor Concrete Floor Non Suspect ACM X X

1 1st

Pipe Shaft - Travels 85' vertically

from Basement up to the 5th Floor Concrete Block Wall Non Suspect ACM X X

1 1st

Pipe Shaft - Travels 85' vertically

from Basement up to the 5th Floor Concrete Ceiling Non Suspect ACM X X

1 1st

Pipe Shaft - Travels 85' vertically

from Basement up to the 5th Floor Pipe Insulation 2-6 inch Confirmed 255 LF 0 LF

1 1st

Pipe Shaft - Travels 85' vertically

from Basement up to the 5th Floor Pipe Insulation > 6 inch Assumed 170 LF 0 LF

1 4th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

Page 14: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Elem

ent

Flo

or On Site Room Name Material

Confirmed

/Assumed

NAD/Non

Suspect

Amount

of

Material

Amount

of

Damage

1 4th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 4th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 5th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 5th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 5th

Pipe Chase beside Boys Restroom

beside East Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

1 5th

Pipe Chase beside Girls Restroom

beside West Stairwell Concrete Floor Non Suspect ACM 40 SF 0 SF

1 5th

Pipe Chase beside Girls Restroom

beside West Stairwell Concrete Block Wall Non Suspect ACM 160 SF 0 SF

1 5th

Pipe Chase beside Girls Restroom

beside West Stairwell Concrete Ceiling Non Suspect ACM 40 SF 0 SF

Page 15: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I Report of Re-Inspection

A. Introduction

B. Three-Year Re-Inspection X Overview

C. Post-Management Plan Activities and Changes

C.1 Sampling and Analysis

C.2 New Floor Tile Sampling

C.3 Abatement Activity

C.4 Periodic Six-Month Surveillance (Damaged Materials)

Page 16: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I - A

Report of Re-inspection Introduction

The Three-Year Re-inspection X was performed to fulfill the requirements of 40 CFR Part 763 -

the Asbestos Hazard Emergency Response Act (AHERA). As required by AHERA, each Local

Education Agency (LEA) must re-inspect all known confirmed or assumed Asbestos Containing

Building Material (ACBM) located in the LEA's facilities. This re-inspection is intended to

update the original Asbestos Management Plan for the LEA's facilities.

Multiple Building Inspectors of several firms performed the 2018-2019 re-inspection. The re-

inspection report/Management Plan of 2018-2019 were reviewed and prepared collectively by

Management Planner Megan Vala and Julie Mui, of Criterion Laboratories, Inc., Jennifer Donovan

of Batta Environmental Associates, Inc. and Monique Causley, of the School District of

Philadelphia.

All of the certificates can be found in Section III.

During the re-inspection of each School District of Philadelphia facility, all of the Management

Plans for that facility were reviewed. Information from the conclusions section of that report is

included in this report. Additionally, information on activities such as abatements, cleanings,

sampling and inspections, which have taken place since the completion of the original

Management Plan, were reviewed during the re-inspection. Information on those activities is

included in this report.

As mandated by the U S EPA AHERA regulations, all future periodic Six-Month inspections and

Three-Year Re-inspections of this location will be performed and the Inspection Data in this

report will be updated accordingly.

Page 17: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I - B

Three-Year Re-inspection X Overview

Each homogeneous area of Asbestos Containing Building Material (ACBM) listed in the

original Management Plan or in the 1992, 1995, 1998, 2001, etc., Three-Year Re-

inspection reports were inspected for the AHERA Three-Year Re-inspection Volume X,

and the information for that material verified. Any changes to a homogeneous area listed

in the updates to the Management Plans were verified. Any area of suspected ACBM

found in the course of the re-inspection, and not listed in the Management Plan or

updates, were either assumed to contain asbestos or sampled and analyzed to determine

their asbestos content. Any such new areas either assumed to contain asbestos or

determined through analysis to contain asbestos were included in the report of the Three-

Year Re-inspection. The results of the AHERA Three-Year Re-inspection X are

tabulated in the Room by Room log reports located in Section II-C of this report.

As previously noted, all future periodic Six-Month inspections and Three-Year Re-

inspections of this location will be performed and the Inspection Data in this report will

be updated accordingly.

Page 18: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I – C.1

Post Management Plan Activities/Changes

Information on activities affecting Asbestos Containing Building Materials (ACBMs) at this

location is contained in updates to the Management Plan. These updates are kept on file by the

School District of Philadelphia and were reviewed for this project. Updates to the Management

Plan include the following: Sampling and Analysis, New Tile Installation, Abatement Activity

and Periodic Six-Month Surveillance Data.

Sampling and Analysis

In the event that sampling occurs, data will be listed here.

Page 19: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I – C.2

Information on the installation of new floor tiles/renovation activities affecting Asbestos

Containing Building Materials (ACBMs) at this location is contained in updates to the

Management Plan. These updates are kept on file by the School District of Philadelphia and

were reviewed for this project. Updates to the Management Plan include the following:

New Floor Tile Sampling

In the event that new tile is installed, the material must be tested prior to installation.

Page 20: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I – C.3

Information on the Asbestos Abatement and renovation activities affecting Asbestos Containing

Building Materials (ACBMs) at this location is contained in updates to the Management Plan.

These updates are kept on file by the School District of Philadelphia and were reviewed for this

project. Updates to the Management Plan include the following:

Abatement Activity

Date

Flo

or Location Material Color

Removed or

Encapsulated Quantity

11/18/2015 BS Hallway and Rooms Pipe Insulation 2-6 inch White Removed 1000 SF

08/21/2019 4th Cafeteria Pipe Insulation 2-6 inch N/A Removed 2 LF

Page 21: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section I – C.4

Information on the AHERA inspection that noted damage to various Building Materials at this

location is contained in updates to the Management Plan. These updates are kept on file by the

School District of Philadelphia and were reviewed for this project. Work orders are created for

Corrective Action responses and tracked for completion. Updates to the Management Plan

include the following:

Periodic (Six-Month) Surveillance (Damaged Materials)

Date

Elem

ent

Flo

or On Site Room Name Material

Amount

of

Material

Amount

of

Damage 10/24/2017 X X X No changes in the material were observed X X

03/11/2019 X X X No changes in the material were observed X X

08/20/2019 1 4th Cafeteria Pipe Insulation 2-6 inch 160 LF 2 LF

Page 22: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section II Re-Inspection Data

A. Introduction

B. Re-Inspection Key Definitions

C. Room by Room Location Log Report

Page 23: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section II - A

Re-inspection Data Introduction

The following information documents the Three-Year Re-inspection X of the subject

school/facility. The Homogeneous Area Reports were produced using the building

inspector's field data on the facility. The key to the Homogeneous Area Report is

outlined in the following pages of this report.

Page 24: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

Section II - B (page 1 of 4)

SCHOOL DISTRICT OF PHILADELPHIA

AHERA THREE YEAR RE-INSPECTION X

ITEM DEFINITION

__________________________________________________________________________________________________

ULCS# Individual identification number assigned to each school within the School District of

Philadelphia.

HOMOGENEOUS Identification number assigned to each homogeneous area in a

AREA ID# school/facility. Each section of the homogeneous area ID is significant.

1010/01/01/01

A B C D

A. Is the ULCS# for the school.

B. Designates the specific building/building area within the school.

C. Designates the floor or level within the building/building area.

D. Designates the homogeneous material within that floor or level.

Note: Item D may be a number or a letter.

SYSTEM Corresponds to the AHERA system for classifying materials.

AFFECTED T : Thermal System

S : Surfacing System

M : Miscellaneous

ITEM AFFECTED Is a description of the homogeneous material.

ORIGINAL This section contains the information found in the original INSPECTION Management Plan (1988-1989). DATA AMOUNT OF Quantity of material, and measuring unit.

MATERIAL/ Units include: Square Feet (SF) Each (EA) Linear Feet (LF) Cubic Feet (CF).

UNIT

Page 25: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

(page 2 of 4)

SCHOOL DISTRICT OF PHILADELPHIA

AHERA THREE YEAR RE-INSPECTION X

RE-INSPECTION FORM KEY

ITEM DEFINITION

__________________________________________________________________________________________________

CND Corresponds to AHERA condition rating for materials.

Condition 0 : No Damage

1 : Damage

2 : Significant Damage

DP Corresponds to the AHERA material assessment system.

Damage Potential 1 : Potential for Damage

2 : Potential for Significant Damage

ASMD This means that a material was not sampled for asbestos content

Assumed during the original Management Plan inspection.

Asbestos

RA This corresponds to the AHERA system of response action rating for materials.

Response Action 1 : Establish O&M Program

2 : Repair and Establish O&M Program

3 : Enclose

4 : Encapsulate

5 : Remove

6 : Partial Removal and Establish O&M Program

CHANGES This section describes changes to the homogeneous material in the twenty-four years since the

original AHERA inspection. The abbreviations are defined below.

RMVD : Removed

ENCL : Enclosed

ENCP : Encapsulated

DMGD : Damaged

SMPLD : Sampled

MTRL : Material

RPRD : Repaired

N/L : None Located

RPLCD : Replaced

Page 26: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

(page 3 of 4)

SCHOOL DISTRICT OF PHILADELPHIA

AHERA THREE-YEAR RE-INSPECTION X

RE-INSPECTION FORM KEY

ITEM DEFINITION

__________________________________________________________________________________________________

THREE YEAR

RE-INSPECTION

This section contains the information obtained from the Three-Year Re-inspection X. With three

exceptions, the information categories are identical in format and meaning to those found in the

original inspection data section. The three exceptions are defined below.

DMGD AMT This section gives the quantity of damaged material in a

Amount Damaged homogeneous area. The quantity is shown in the same format as the

amount of material/unit section.

NF This section identifies materials in the original Management Plan

Newly Friable which have since become friable.

RA This rating is based on the AHERA regulations, and is comparable

Response Action to the RA rating found in the "Original Inspection Data" section. The following table details the

response actions.

1. Establish O&M Program

2. Repair and Establish O&M Program

3. Enclose

4. Encapsulate

5. Remove

6. Partial Removal and Establish O&M Program

a. High Priority Response

The homogeneous material has been scheduled for abatement or other response action.

b. Medium Priority Response

The homogeneous material will be scheduled for abatement or other response action as

soon as the high priority responses have been addressed.

c. Low Priority Response The homogeneous material will be scheduled for abatement or other response action as

soon as the medium priority responses have been addressed.

d. On-Going Response/Operations and Maintenance

The homogeneous material does not require abatement or other response action at

present, and should be included in the facility's on-going operations and maintenance

program.

Page 27: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report

Vaux Big Picture High School

(page 4 of 4)

SCHOOL DISTRICT OF PHILADELPHIA

AHERA THREE-YEAR RE-INSPECTION X

RE-INSPECTION FORM KEY

__________________________________________________________________________________________________

The information presented in the changes section has been compiled from a variety of sources,

including the Re-inspection and the following:

* Quality Control/Quality Assurance Reports of asbestos abatement

projects, prepared by consultants to the School District.

* Permit and Notification Forms for asbestos abatement projects.

* Periodic Surveillance Forms

* Operations and Maintenance activities performed by School District personnel.

* Verbal information from School District personnel.

* Reports of sampling and analysis of suspected materials by both School District personnel and

outside consultants.

ROOM BY This section gives information, including damage amount and location,

ROOM for a specific homogeneous material on a room-by-room basis and

LOCATION LOG follows the Re-inspection form.

REPORT

NOTE: The disparate nature of the above sources of information prohibits the verification of much information within the scope of

the AHERA Three-Year Re-inspection. Discrepancies and omissions may exist in this information, and therefore is included on an

"as is" basis. The inspectors for the Three-Year Re-inspection X evaluated homogeneous areas based on the materials current

condition and location, as evidenced during the inspector's site visit.

.

Page 28: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

Section II - C

Room by Room Location Log Report

These charts are to be used for a quick reference* in order to avoid the unknowing disturbance of Asbestos Containing Materials

during any and all Operations, Maintenance, Renovation, and/or Demolition activities at this location.

NOTE:

Contact OEMS prior to the disturbance of any of the materials that are listed as Confirmed and/or Assumed.

The quantities listed for (NAD) non-asbestos containing materials and/or Non-Suspect Materials are only estimated and were not

measured for the purpose of this report. Field verification of quantities for renovation purposes would be necessary.

Page 29: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

1

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) M Sheetrock Wall 2130/01/02/SYN/RH/2100 Assumed x x x x 1 No 1/D

1 BRestroom above Boiler Room (accessed from Upper Catwalk) N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A

1 BElectrical Room (need water removed and switchgear de-energized) N/A Switchgears/Transformers Non Suspect ACM X X X X N/A N/A N/A

1 1 Girls Restroom beside East Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 1 Toilet beside East Vestibule to Exterior N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 2 Boys Restroom beside East Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Epoxy Flooring Non Suspect ACM X X X X X X X

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) M Floor Tile VAT 12" x 12" 2130/01/02/SYN/RH/2003 Assumed x x x x Various 1 No 1/D

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Concrete Block Wall Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Ceiling Tile 2' x 4' Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Fiberglass Pipe Insulation Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Fiberglass Duct Insulation Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Ceramic Tile Floors Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Ceramic Tile Walls Non Suspect ACM X X X X N/A N/A N/A

1 2Gymnasium and adjacent Locker Rooms, Restrooms and Office (Constructed in 2008) N/A Corrugated Metal Ceiling Deck Non Suspect ACM X X X X N/A N/A N/A

1 3 Girls Restroom beside East Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 3 Mens Restroom in Hallway between Rear of Auditorium N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 3 Womens Restroom in Hallway between Rear of Auditorium N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 B Rear Storage Room inside Classroom B10 N/A Granite Walls Non Suspect ACM X X X X N/A N/A N/A1 B East Boys' Locker Room N/A Granite Walls Non Suspect ACM X X X X N/A N/A N/A1 B Room across from West Stairwell N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 B West Locker Room N/A Granite Walls Non Suspect ACM X X X X N/A N/A N/A1 1 Girls Restroom beside West Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 2 Girls Restroom across from Classroom 212 N/A Plastic Stall Partitions Non Suspect ACM X X X X Doorway in Vestibule Locked N/A N/A N/A1 2 Girls Restroom beside West Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 3 Restroom beside Classroom 316 N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 3 Girls Restroom beside West Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 4 Mens Staff Restroom beside Classroom 413A N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 4 Northeast Storage Room inside Classroom 413A X x x x x x x x Locked - No Access X X X1 4 Restroom inside Room beside Classroom 420 N/A Granite Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 4 Girls Restroom beside West Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A

1 1Pipe Shaft - Travels 85' vertically from Basement up to the 5th Floor N/A Concrete Floor Non Suspect ACM X X X X N/A N/A N/A

1 1Pipe Shaft - Travels 85' vertically from Basement up to the 5th Floor N/A Concrete Block Wall Non Suspect ACM X X X X N/A N/A N/A

1 1Pipe Shaft - Travels 85' vertically from Basement up to the 5th Floor N/A Concrete Ceiling Non Suspect ACM X X X X N/A N/A N/A

1 4 Boys Restroom beside East Stairwell X x x x x x x x Locked - No Access X X X1 5 Boys Restroom beside East Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 5 Girls Restroom beside West Stairwell N/A Plastic Stall Partitions Non Suspect ACM X X X X N/A N/A N/A1 6 Penthouse # 2 N/A Elevator Equipment Non Suspect ACM X X X X N/A N/A N/A1 6 Penthouse # 1 N/A Elevator Equipment Non Suspect ACM X X X X N/A N/A N/A1 B West Hallway outside of West Stairwell N/A Concrete Floor Non Suspect ACM 950 SF 0 SF N/A N/A N/A1 B West Hallway outside of West Stairwell N/A Brick Wall Non Suspect ACM 2850 SF 0 SF N/A N/A N/A1 B West Hallway outside of West Stairwell N/A Concrete Ceiling/Floor Non Suspect ACM 950 SF 0 SF N/A N/A N/A1 B West Hallway outside of West Stairwell N/A Fiberglass Duct Insulation Non Suspect ACM 350 SF 0 SF N/A N/A N/A1 B West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 B West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 B West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Center Hallway outside of Boiler Room N/A Concrete Floor Non Suspect ACM 2700 SF 0 SF N/A N/A N/A1 B Center Hallway outside of Boiler Room N/A Brick Wall Non Suspect ACM 5400 SF 0 SF N/A N/A N/A1 B Center Hallway outside of Boiler Room N/A Concrete Ceiling Non Suspect ACM 2700 SF 0 SF N/A N/A N/A1 B Center Hallway outside of Boiler Room N/A Fiberglass Duct Insulation Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 BMechanical Room across from Electrical Room (beside Boiler Room) N/A Concrete Floor Non Suspect ACM 420 SF 0 SF N/A N/A N/A

Page 30: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

2

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 BMechanical Room across from Electrical Room (beside Boiler Room) N/A Brick Wall Non Suspect ACM 1260 SF 0 SF N/A N/A N/A

1 BMechanical Room across from Electrical Room (beside Boiler Room) N/A Concrete Ceiling Non Suspect ACM 420 SF 0 SF N/A N/A N/A

1 B Boiler Room N/A Concrete Floor Non Suspect ACM 4000 SF 0 SF N/A N/A N/A1 B Boiler Room N/A Brick Wall Non Suspect ACM 16000 SF 0 SF N/A N/A N/A1 B Boiler Room N/A Concrete Ceiling Non Suspect ACM 4000 SF 0 SF N/A N/A N/A1 B Elevator Lobby beside Boiler Room N/A Concrete Floor Non Suspect ACM 375 SF 0 SF N/A N/A N/A1 B Elevator Lobby beside Boiler Room N/A Concrete Walls Non Suspect ACM 1125 SF 0 SF N/A N/A N/A1 B Elevator Lobby beside Boiler Room N/A Concrete Ceiling Non Suspect ACM 375 SF 0 SF N/A N/A N/A

1 BRestroom above Boiler Room (accessed from Upper Catwalk) N/A Concrete Floor Non Suspect ACM 240 SF 0 SF N/A N/A N/A

1 BRestroom above Boiler Room (accessed from Upper Catwalk) N/A Plaster Walls NAD 720 SF 0 SF N/A N/A N/A

1 BRestroom above Boiler Room (accessed from Upper Catwalk) N/A Concrete Ceiling Non Suspect ACM 240 SF 0 SF N/A N/A N/A

1 B Water Meter Room N/A Concrete Floor Non Suspect ACM 1020 SF 0 SF N/A N/A N/A1 B Water Meter Room N/A Concrete Walls Non Suspect ACM 3060 SF 0 SF N/A N/A N/A1 B Water Meter Room N/A Concrete Ceiling Non Suspect ACM 1020 SF 0 SF N/A N/A N/A1 B Sump Pump Room N/A Concrete Floor Non Suspect ACM 820 SF 0 SF N/A N/A N/A1 B Sump Pump Room N/A Concrete Walls Non Suspect ACM 2460 SF 0 SF N/A N/A N/A1 B Sump Pump Room N/A Concrete Ceiling Non Suspect ACM 820 SF 0 SF N/A N/A N/A1 B Auditorium Supply Plenum N/A Concrete Floor Non Suspect ACM 8000 SF 0 SF below Auditorium N/A N/A N/A1 B Auditorium Supply Plenum N/A Concrete Walls Non Suspect ACM 20000 SF 0 SF N/A N/A N/A1 B Auditorium Supply Plenum N/A Concrete Ceiling Non Suspect ACM 8000 SF 0 SF N/A N/A N/A1 B Auditorium Supply Plenum T ACM Debris 2130/01/0B/SYN/BB/0101 Confirmed 8000 SF 0 SF 1 No 1/D

1 BElectrical Room (need water removed and switchgear de-energized) N/A Concrete Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A

1 BElectrical Room (need water removed and switchgear de-energized) N/A Brick Wall Non Suspect ACM 4000 SF 0 SF N/A N/A N/A

1 BElectrical Room (need water removed and switchgear de-energized) N/A Concrete Ceiling Non Suspect ACM 1500 SF 0 SF N/A N/A N/A

1 B IDF Room N/A Concrete Floor Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 B IDF Room N/A Brick Wall Non Suspect ACM 750 SF 0 SF N/A N/A N/A1 B IDF Room N/A Concrete Ceiling Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 B Gas Meter Room N/A Concrete Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Gas Meter Room N/A Brick Wall Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 B Gas Meter Room N/A Concrete Ceiling Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Office beside Gas Meter Room N/A Concrete Floor Non Suspect ACM 430 SF 0 SF N/A N/A N/A1 B Office beside Gas Meter Room N/A Plaster Walls NAD 1290 SF 0 SF N/A N/A N/A1 B Office beside Gas Meter Room N/A Concrete Ceiling Non Suspect ACM 430 SF 0 SF N/A N/A N/A1 B Restroom inside Office beside Gas Meter Room N/A Concrete Floor Non Suspect ACM 72 SF 0 SF N/A N/A N/A1 B Restroom inside Office beside Gas Meter Room N/A Plaster Walls NAD 216 SF 0 SF N/A N/A N/A1 B Restroom inside Office beside Gas Meter Room N/A Concrete Ceiling Non Suspect ACM 72 SF 0 SF N/A N/A N/A1 B Women's Restroom beside Auditorium Supply Plenum N/A Concrete Floor Non Suspect ACM 360 SF 0 SF N/A N/A N/A1 B Women's Restroom beside Auditorium Supply Plenum N/A Plaster Walls NAD 1080 SF 0 SF N/A N/A N/A1 B Women's Restroom beside Auditorium Supply Plenum N/A Concrete Ceiling Non Suspect ACM 360 SF 0 SF N/A N/A N/A

1 BPipe Chase inside Women's Restroom beside Auditorium Supply Plenum N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 BPipe Chase inside Women's Restroom beside Auditorium Supply Plenum N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A

1 BPipe Chase inside Women's Restroom beside Auditorium Supply Plenum N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 B Storage Room beside East Stairwell N/A Concrete Floor Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 B Storage Room beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 B Storage Room beside East Stairwell N/A Concrete Ceiling Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 B East Hallway outside of East Stairwell N/A Concrete Floor Non Suspect ACM 950 SF 0 SF N/A N/A N/A1 B East Hallway outside of East Stairwell N/A Brick Wall Non Suspect ACM 2850 SF 0 SF N/A N/A N/A1 B East Hallway outside of East Stairwell N/A Concrete Ceiling Non Suspect ACM 950 SF 0 SF N/A N/A N/A1 B East Hallway outside of East Stairwell N/A Fiberglass Duct Insulation Non Suspect ACM 350 SF 0 SF N/A N/A N/A1 B East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 B East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 B East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B AHU Room N/A Concrete Floor Non Suspect ACM 750 SF 0 SF N/A N/A N/A1 B AHU Room N/A Concrete Walls Non Suspect ACM 2250 SF 0 SF N/A N/A N/A1 B AHU Room N/A Concrete Ceiling Non Suspect ACM 750 SF 0 SF N/A N/A N/A

Page 31: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

3

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 B AHU Room N/A Fiberglass Duct Insulation Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 1 West Vestibule to Exterior N/A Terrazzo Floor Non Suspect ACM 480 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 West Vestibule to Exterior N/A Granite Walls Non Suspect ACM 480 SF 0 SF N/A N/A N/A1 1 West Vestibule to Exterior N/A Plaster Walls NAD 960 SF 0 SF N/A N/A N/A1 1 West Vestibule to Exterior N/A Plaster Ceiling NAD 480 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 West Vestibule to Exterior T Radiator Insulation 2130/01/01/SYN/BB/1600 Assumed 50 SF 0 SF 2 Recessed Radiators - 25 SF Each 1 No 1/D1 1 West Hallway outside of West Stairwell N/A Terrazzo Floor Non Suspect ACM 960 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 West Hallway outside of West Stairwell N/A Granite Walls Non Suspect ACM 960 SF 0 SF N/A N/A N/A1 1 West Hallway outside of West Stairwell N/A Plaster Walls NAD 1920 SF 0 SF N/A N/A N/A1 1 West Hallway outside of West Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 960 SF 0 SF N/A N/A N/A1 1 West Hallway outside of West Stairwell N/A Plaster Ceiling NAD 960 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 1 West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 1 West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 East Side Hallway N/A Terrazzo Floor Non Suspect ACM 2750 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 East Side Hallway N/A Granite Walls Non Suspect ACM 2750 SF 0 SF N/A N/A N/A1 1 East Side Hallway N/A Plaster Walls NAD 5500 SF 0 SF N/A N/A N/A1 1 East Side Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 2750 SF 0 SF N/A N/A N/A1 1 East Side Hallway N/A Plaster Ceiling NAD 2750 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 1 East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 1 East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 East Vestibule to Exterior N/A Terrazzo Floor Non Suspect ACM 480 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 East Vestibule to Exterior N/A Granite Walls Non Suspect ACM 480 SF 0 SF N/A N/A N/A1 1 East Vestibule to Exterior N/A Plaster Walls NAD 960 SF 0 SF N/A N/A N/A1 1 East Vestibule to Exterior N/A Plaster Ceiling NAD 480 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 East Vestibule to Exterior T Radiator Insulation 2130/01/01/SYN/BB/1600 Assumed 50 SF 0 SF 2 Recessed Radiators - 25 SF Each 1 No 1/D

1 1Hallway between Rear of Auditorium and Exterior Courtyard N/A Terrazzo Floor Non Suspect ACM 1315 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A

1 1Hallway between Rear of Auditorium and Exterior Courtyard N/A Granite Walls Non Suspect ACM 1315 SF 0 SF N/A N/A N/A

1 1Hallway between Rear of Auditorium and Exterior Courtyard N/A Plaster Walls NAD 2630 SF 0 SF N/A N/A N/A

1 1Hallway between Rear of Auditorium and Exterior Courtyard N/A Plaster Ceiling NAD 1315 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 1Hallway between Rear of Auditorium and Exterior Courtyard T Radiator Insulation 2130/01/01/SYN/BB/1600 Assumed 60 SF 0 SF 2 Recessed Radiators - 30 SF Each 1 No 1/D

1 1 Main Entrance Vestibule N/A Terrazzo Floor Non Suspect ACM 1015 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 Main Entrance Vestibule N/A Granite Walls Non Suspect ACM 1015 SF 0 SF N/A N/A N/A1 1 Main Entrance Vestibule N/A Plaster Walls NAD 2030 SF 0 SF N/A N/A N/A1 1 Main Entrance Vestibule N/A Plaster Ceiling NAD 1015 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Main Entrance Vestibule T Radiator Insulation 2130/01/01/SYN/BB/1600 Assumed 50 SF 0 SF 2 Recessed Radiators - 25 SF Each 1 No 1/D1 1 Main Entrance Vestibule M Ornamental Light Fixture Heat Shield 2130/01/01/SYN/BB/1616 Assumed 5 SF 0 SF assumed present 1 No 1/D1 1 Health Partner Room beside Main Entrance Vestibule N/A Wood Floor Non Suspect ACM 1350 SF 0 SF N/A N/A N/A1 1 Health Partner Room beside Main Entrance Vestibule N/A Terra Cotta Walls Non Suspect ACM 4050 SF 0 SF N/A N/A N/A1 1 Health Partner Room beside Main Entrance Vestibule N/A Ceiling Tile 2' x 4' Non Suspect ACM 1350 SF 0 SF N/A N/A N/A1 1 Health Partner Room beside Main Entrance Vestibule N/A Plaster Ceiling NAD 1350 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Health Partner Room beside Main Entrance Vestibule M Blackboard/Tackboard Glue Dots 2130/01/01/SYN/BB/2600 Assumed 80 SF 0 SF 1 No 1/D1 1 Health Partner Room beside Main Entrance Vestibule T Unit Ventilator Insulation 2130/01/01/SYN/BB/1680 Confirmed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D

1 1Front Kitchen inside Health Partner Room beside Main Entrance Vestibule M Floor Tile VAT 12" x 12" 2130/01/01/SYN/RH/2000 Assumed 60 SF 0 SF Tan 12"x12" VCT with Tread 1 No 1/D

1 1Front Kitchen inside Health Partner Room beside Main Entrance Vestibule N/A Terra Cotta Walls Non Suspect ACM 180 SF 0 SF N/A N/A N/A

1 1Front Kitchen inside Health Partner Room beside Main Entrance Vestibule N/A Concrete Ceiling Non Suspect ACM 60 SF 0 SF N/A N/A N/A

1 1Front Kitchen inside Health Partner Room beside Main Entrance Vestibule M Sink Undercoat Mastic 2130/01/01/SYN/BB/2602 Assumed 8 SF 0 SF 1 Sink - 8 SF 1 No 1/D

1 1Kitchen along Hallway Wall inside Health Partner Room beside Main Entrance Vestibule N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A

1 1Kitchen along Hallway Wall inside Health Partner Room beside Main Entrance Vestibule N/A Terra Cotta Walls Non Suspect ACM 180 SF 0 SF N/A N/A N/A

1 1Kitchen along Hallway Wall inside Health Partner Room beside Main Entrance Vestibule N/A Concrete Ceiling Non Suspect ACM 60 SF 0 SF N/A N/A N/A

1 1Health Partner Suite on the Corner of 23rd and Master Streets N/A Carpet Non Suspect ACM 1100 SF 0 SF Carpet over Wood Flooring N/A N/A N/A

Page 32: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

4

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 1Health Partner Suite on the Corner of 23rd and Master Streets N/A Floor Tile VAT 12" x 12" NAD 1500 SF 0 SF Blue VCT over Wood Flooring N/A N/A N/A

1 1Health Partner Suite on the Corner of 23rd and Master Streets N/A Floor Tile VAT 12" x 12" NAD 1500 SF 0 SF Tan Below 12"x12" Blue VCT N/A N/A N/A

1 1Health Partner Suite on the Corner of 23rd and Master Streets M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 7800 SF 0 SF 1 No 1/D

1 1Health Partner Suite on the Corner of 23rd and Master Streets N/A Ceiling Tile 2' x 2' NAD 2600 SF 0 SF N/A N/A N/A

1 1Janitors Closet beside Girls Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 1Janitors Closet beside Girls Restroom beside East Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 1Janitors Closet beside Girls Restroom beside East Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 1 Storage Room beside Janitors Closet N/A Concrete Floor Non Suspect ACM 15 SF 0 SF N/A N/A N/A1 1 Storage Room beside Janitors Closet N/A Plaster Walls NAD 45 SF 0 SF N/A N/A N/A1 1 Storage Room beside Janitors Closet N/A Plaster Ceiling NAD 15 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 1Storage Room in Hallway between Rear of Auditorium and Exterior Courtyard N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A

1 1Storage Room in Hallway between Rear of Auditorium and Exterior Courtyard N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A

1 1Storage Room in Hallway between Rear of Auditorium and Exterior Courtyard N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 1 Girls Restroom beside East Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 Girls Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 Girls Restroom beside East Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 1 Girls Restroom beside East Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Office beside Toilet beside East Vestibule to Exterior N/A Linoleum NAD 130 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 1 Office beside Toilet beside East Vestibule to Exterior N/A Plaster Walls NAD 390 SF 0 SF N/A N/A N/A1 1 Office beside Toilet beside East Vestibule to Exterior N/A Plaster Ceiling NAD 130 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Office beside Toilet beside East Vestibule to Exterior M Blackboard/Tackboard Glue Dots 2130/01/01/SYN/BB/2600 Assumed 20 SF 0 SF 1 No 1/D1 1 Toilet beside East Vestibule to Exterior N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 1 Toilet beside East Vestibule to Exterior N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 1 Toilet beside East Vestibule to Exterior N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Computer Lab 107 N/A Carpet Non Suspect ACM 825 SF 0 SF Carpet over Wood Flooring N/A N/A N/A1 1 Computer Lab 107 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 2475 SF 0 SF 1 No 1/D1 1 Computer Lab 107 N/A Ceiling Tile 2' x 4' Non Suspect ACM 825 SF 0 SF N/A N/A N/A1 1 Multipurpose Room 101 N/A Carpet Non Suspect ACM 3085 SF 0 SF Carpet over Wood Flooring N/A N/A N/A1 1 Multipurpose Room 101 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 9255 SF 0 SF 1 No 1/D1 1 Multipurpose Room 101 N/A Ceiling Tile 2' x 2' NAD 3085 SF 0 SF N/A N/A N/A

1 1 Multipurpose Room 101 M Black Mastic behind AHU Diffuser Grills 2130/01/01/SYN/BB/2500 Assumed 120 SF 0 SFBlack Damp-proofing/Vapor Barrier present behind 4 AHU Diffuser Grills on Exterior Wall - 30 SF Each Location 1 No 1/D

1 1 Conference Room 102 N/A Carpet Non Suspect ACM 145 SF 0 SF Carpet over Wood Flooring N/A N/A N/A1 1 Conference Room 102 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 435 SF 0 SF 1 No 1/D1 1 Conference Room 102 N/A Ceiling Tile 2' x 2' NAD 145 SF 0 SF N/A N/A N/A

1 1 Conference Room 102 M Black Mastic behind AHU Diffuser Grills 2130/01/01/SYN/BB/2500 Assumed 30 SF 0 SFBlack Damp-proofing/Vapor Barrier present behind 1 AHU Diffuser Grills on Exterior Wall - 30 SF 1 No 1/D

1 1 Storage 103 N/A Floor Tile VAT 12" x 12" NAD 80 SF 0 SF Tan VCT over Concrete N/A N/A N/A1 1 Storage 103 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 240 SF 0 SF 1 No 1/D1 1 Storage 103 N/A Ceiling Tile 2' x 4' Non Suspect ACM 80 SF 0 SF N/A N/A N/A1 1 Work Room 104 N/A Floor Tile VAT 12" x 12" NAD 520 SF 0 SF Tan VCT over Concrete N/A N/A N/A1 1 Work Room 104 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 1560 SF 0 SF 1 No 1/D1 1 Work Room 104 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 1 Office 105 N/A Floor Tile VAT 12" x 12" NAD 520 SF 0 SF Tan VCT over Concrete N/A N/A N/A1 1 Office 105 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 1560 SF 0 SF 1 No 1/D1 1 Office 105 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 1 Stairwell between Work Room 104 and Office 105 N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 1 Stairwell between Work Room 104 and Office 105 N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 Stairwell between Work Room 104 and Office 105 N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 1 Stairwell between Work Room 104 and Office 105 N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Temp Food Prep 106 N/A Carpet Non Suspect ACM 145 SF 0 SF Carpet over Wood Flooring N/A N/A N/A1 1 Temp Food Prep 106 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 435 SF 0 SF 1 No 1/D1 1 Temp Food Prep 106 N/A Ceiling Tile 2' x 2' NAD 145 SF 0 SF N/A N/A N/A

1 1 Temp Food Prep 106 M Black Mastic behind AHU Diffuser Grills 2130/01/01/SYN/BB/2500 Assumed 30 SF 0 SFBlack Damp-proofing/Vapor Barrier present behind 1 AHU Diffuser Grills on Exterior Wall - 30 SF 1 No 1/D

1 2 West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 2 West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A

Page 33: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

5

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2 West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 2 West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 East Half of Center Hallway N/A Terrazzo Floor Non Suspect ACM 3030 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 East Half of Center Hallway N/A Concrete Block Wall Non Suspect ACM 3030 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 East Half of Center Hallway N/A Plaster Walls NAD 6060 SF 0 SF N/A N/A N/A1 2 East Half of Center Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 3030 SF 0 SF N/A N/A N/A1 2 East Half of Center Hallway N/A Plaster Ceiling NAD 3030 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 East Half of Center Hallway T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 25 SF 0 SF 1 Unit Vent - 25 SF 1 No 1/D1 2 Office 208 N/A Floor Tile VAT 12" x 12" NAD 700 SF 0 SF Tan VCT over Wood Flooring N/A N/A N/A1 2 Office 208 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 2 Office 208 N/A Ceiling Tile 2' x 4' Non Suspect ACM 560 SF 0 SF N/A N/A N/A1 2 Office 208 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Office 208 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 25 SF 0 SF 1 No 1/D1 2 Storage Room inside Office 208 N/A Concrete Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 2 Storage Room inside Office 208 N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 2 Storage Room inside Office 208 N/A Plaster Ceiling NAD 120 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Office 207 N/A Floor Tile VAT 12" x 12" NAD 290 SF 0 SF Green VCT over Wood Flooring N/A N/A N/A1 2 Office 207 N/A Plaster Walls NAD 870 SF 0 SF N/A N/A N/A1 2 Office 207 N/A Ceiling Tile 2' x 4' Non Suspect ACM 290 SF 0 SF N/A N/A N/A1 2 Office 207 N/A Plaster Ceiling NAD 290 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Restroom inside Office 207 N/A Floor Tile VAT 12" x 12" NAD 25 SF 0 SF Tan VCT over Wood Flooring N/A N/A N/A1 2 Restroom inside Office 207 N/A Plaster Walls NAD 75 SF 0 SF N/A N/A N/A1 2 Restroom inside Office 207 N/A Plaster Ceiling NAD 25 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Carpet Non Suspect ACM 660 SF 0 SF Carpet over Faux Wood Linoleum over Wood Flooring N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Linoleum NAD 660 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Plaster Walls NAD 600 SF 0 SF N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) M Sheetrock Wall 2130/01/02/SYN/RH/2100 Assumed 1980 SF 0 SF 1 No 1/D1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Ceiling Tile 2' x 4' Non Suspect ACM 660 SF 0 SF N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Plaster Ceiling NAD 660 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Office 205 N/A Carpet Non Suspect ACM 300 SF 0 SF Carpet over Faux Wood Linoleum over Wood Flooring N/A N/A N/A1 2 Office 205 N/A Linoleum NAD 300 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 2 Office 205 N/A Plaster Walls NAD 900 SF 0 SF N/A N/A N/A1 2 Office 205 M Sheetrock Wall 2130/01/02/SYN/RH/2100 Assumed 100 SF 0 SF 1 No 1/D1 2 Office 205 N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 2 Office 205 N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Office 205 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 2 Restroom inside Office 205 N/A Floor Tile VAT 12" x 12" NAD 36 SF 0 SF Tan VCT over Wood Flooring N/A N/A N/A1 2 Restroom inside Office 205 N/A Plaster Walls NAD 60 SF 0 SF N/A N/A N/A1 2 Restroom inside Office 205 M Sheetrock Wall 2130/01/02/SYN/RH/2100 Assumed 100 SF 0 SF 1 No 1/D1 2 Restroom inside Office 205 N/A Ceiling Tile 2' x 4' Non Suspect ACM 36 SF 0 SF N/A N/A N/A1 2 Restroom inside Office 205 N/A Plaster Ceiling NAD 36 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 204 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 1400 SF 0 SF Green 1 No 1/D1 2 Classroom 204 N/A Plaster Walls NAD 4200 SF 0 SF N/A N/A N/A1 2 Classroom 204 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1400 SF 0 SF N/A N/A N/A1 2 Classroom 204 N/A Plaster Ceiling NAD 1400 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 204 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 45 SF 0 SF 3 Unit Vents - 15 SF Each 1 No 1/D1 2 Classroom 204 M Sink Undercoat Mastic 2130/01/02/SYN/BB/2602 Assumed 6 SF 0 SF 1 Sink - 6 SF 1 No 1/D1 2 Classroom 204 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 60 SF 0 SF 1 No 1/D1 2 Storage Room inside Classroom 204 N/A Linoleum NAD 60 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 2 Storage Room inside Classroom 204 N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 2 Storage Room inside Classroom 204 N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 203 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 1100 SF 0 SF Green 1 No 1/D1 2 Classroom 203 N/A Plaster Walls NAD 3300 SF 0 SF N/A N/A N/A1 2 Classroom 203 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1100 SF 0 SF N/A N/A N/A1 2 Classroom 203 N/A Plaster Ceiling NAD 1100 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 203 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 2 Classroom 203 M Sink Undercoat Mastic 2130/01/02/SYN/BB/2602 Assumed 6 SF 0 SF 1 Sink - 6 SF 1 No 1/D1 2 Classroom 203 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 60 SF 0 SF 1 No 1/D1 2 Storage Room inside Classroom 203 N/A Linoleum NAD 60 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 2 Storage Room inside Classroom 203 N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 2 Storage Room inside Classroom 203 N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 2 East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 2 East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

Page 34: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

6

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2 Boys Restroom beside East Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Boys Restroom beside East Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 2 Boys Restroom beside East Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2Janitors Closet beside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 2Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 2Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 2 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 2 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 2 Hallway behind Auditorium Balcony N/A Terrazzo Floor Non Suspect ACM 1255 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 Hallway behind Auditorium Balcony N/A Granite Walls Non Suspect ACM 1255 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Hallway behind Auditorium Balcony N/A Plaster Walls NAD 2510 SF 0 SF N/A N/A N/A1 2 Hallway behind Auditorium Balcony N/A Plaster Ceiling NAD 1255 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Hallway behind Auditorium Balcony T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 75 SF 0 SF 3 Unit Vents - 25 SF Each 1 No 1/D

1 2 Stairwell adjacent to Hallway behind Auditorium Balcony N/A Terrazzo Floor Non Suspect ACM 300 SF 0 SFTerrazzo Stairs; Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A

1 2 Stairwell adjacent to Hallway behind Auditorium Balcony N/A Plaster Walls NAD 900 SF 0 SF N/A N/A N/A1 2 Stairwell adjacent to Hallway behind Auditorium Balcony N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 3 West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 3 West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 IT Closet beside Office 310 N/A Concrete Floor Non Suspect ACM 140 SF 0 SF N/A N/A N/A1 3 IT Closet beside Office 310 N/A Plaster Walls NAD 420 SF 0 SF N/A N/A N/A1 3 IT Closet beside Office 310 N/A Plaster Ceiling NAD 140 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Office 310 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Office 310 N/A Plaster Walls NAD 1800 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Office 310 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Office 310 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Office 310 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Office 310 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 140 SF 0 SF 1 No 1/D1 3 Office 309 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Office 309 N/A Plaster Walls NAD 1800 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Office 309 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Office 309 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Office 309 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Office 309 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 140 SF 0 SF 1 No 1/D1 3 Classroom 308 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 308 N/A Plaster Walls NAD 2100 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Classroom 308 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 308 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 308 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 3 Classroom 308 M Transite 2130/01/03/GG Assumed 30 SF 0 SF Table Top/Sink 1 No 1/D1 3 Science Prep Room beside Science Lab 306 N/A Floor Tile VAT 12" x 12" NAD 365 SF 0 SF Tan VCT over Luan Plywood over Wood Flooring N/A N/A N/A1 3 Science Prep Room beside Science Lab 306 N/A Plaster Walls NAD 550 SF 0 SF N/A N/A N/A1 3 Science Prep Room beside Science Lab 306 M Sheetrock Wall 2130/01/03/SYN/RH/2100 Assumed 550 SF 0 SF 1 No 1/D1 3 Science Prep Room beside Science Lab 306 N/A Ceiling Tile 2' x 4' Non Suspect ACM 365 SF 0 SF N/A N/A N/A1 3 Science Prep Room beside Science Lab 306 N/A Plaster Ceiling NAD 365 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Science Prep Room beside Science Lab 306 N/A Lab Table Tops/Sinks Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 3 Science Prep Room beside Science Lab 306 M Transite 2130/01/03/GG Assumed 35 SF 0 SF Fume Hood 1 No 1/D1 3 Science Lab 306 N/A Wood Floor Non Suspect ACM 1680 SF 0 SF N/A N/A N/A1 3 Science Lab 306 N/A Plaster Walls NAD 5040 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Science Lab 306 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1680 SF 0 SF N/A N/A N/A

1 3 Science Lab 306 N/A Particleboard Ceiling Tile 1' x 1' Non Suspect ACM 1680 SF 0 SF1'x1' Ceiling Tiles are comprised of Partical Board; ACPI assumed above 1'x1' Ceiling Tiles N/A N/A N/A

1 3 Science Lab 306 N/A Lab Table Tops/Sinks Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 3 Science Lab 306 M Transite 2130/01/03/GG Assumed 35 SF 0 SF Fume Hood 1 No 1/D1 3 Classroom 305 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 305 N/A Plaster Walls NAD 2100 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Classroom 305 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 305 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 305 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D

Page 35: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

7

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Classroom 305 M Transite 2130/01/03/GG Assumed 30 SF 0 SF Table Top/Sink 1 No 1/D1 3 Classroom 304 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 3 Classroom 304 N/A Plaster Walls NAD 2700 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Classroom 304 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 3 Classroom 304 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 304 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 3 Classroom 304 M Transite 2130/01/03/GG Assumed 140 SF 0 SF Table Top/Sink/Drying Rack 1 No 1/D1 3 Classroom 303 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 303 N/A Plaster Walls NAD 2100 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Classroom 303 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 303 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 303 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 3 Classroom 303 M Transite 2130/01/03/GG Assumed 30 SF 0 SF Table Top/Sink 1 No 1/D1 3 Classroom 302 N/A Wood Floor Non Suspect ACM 1100 SF 0 SF N/A N/A N/A1 3 Classroom 302 N/A Plaster Walls NAD 3300 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Classroom 302 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1100 SF 0 SF N/A N/A N/A1 3 Classroom 302 N/A Plaster Ceiling NAD 1100 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 302 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 3 Classroom 302 M Transite 2130/01/03/GG Assumed 110 SF 0 SF Table Top/Backsplash/Sink/Drying Rack 1 No 1/D

1 3Storage Room between Classroom 302 and Classroom 304 N/A Wood Floor Non Suspect ACM 220 SF 0 SF N/A N/A N/A

1 3Storage Room between Classroom 302 and Classroom 304 N/A Plaster Walls NAD 660 SF 0 SF N/A N/A N/A

1 3Storage Room between Classroom 302 and Classroom 304 N/A Ceiling Tile 2' x 4' Non Suspect ACM 220 SF 0 SF N/A N/A N/A

1 3Storage Room between Classroom 302 and Classroom 304 N/A Plaster Ceiling NAD 220 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3Storage Room between Classroom 302 and Classroom 304 M Transite 2130/01/03/GG Assumed 50 SF 0 SF Table Top/Backsplash/Sink 1 No 1/D

1 3 Art Classroom 301 N/A Wood Floor Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 3 Art Classroom 301 N/A Plaster Walls NAD 3000 SF 0 SF Newer Unit Ventilators N/A N/A N/A1 3 Art Classroom 301 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 3 Art Classroom 301 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Art Classroom 301 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 3 Art Classroom 301 M Transite 2130/01/03/GG Assumed 80 SF 0 SF Table Top/Sink/Drying Rack 1 No 1/D

1 3Storage Room between Art Classroom 301 and Classroom 303 N/A Wood Floor Non Suspect ACM 220 SF 0 SF N/A N/A N/A

1 3Storage Room between Art Classroom 301 and Classroom 303 N/A Plaster Walls NAD 660 SF 0 SF N/A N/A N/A

1 3Storage Room between Art Classroom 301 and Classroom 303 N/A Ceiling Tile 2' x 4' Non Suspect ACM 220 SF 0 SF N/A N/A N/A

1 3Storage Room between Art Classroom 301 and Classroom 303 N/A Plaster Ceiling NAD 220 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3Storage Room between Art Classroom 301 and Classroom 303 M Transite 2130/01/03/GG Assumed 50 SF 0 SF Table Top/Backsplash/Sink 1 No 1/D

1 3Storage Room between Art Classroom 301 and Classroom 303 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 12 SF 0 SF 1 No 1/D

1 3 Girls Restroom beside East Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 3 Girls Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Girls Restroom beside East Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 3 Girls Restroom beside East Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 3 East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 3 East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Concrete Floor Non Suspect ACM 3000 SF 0 SF N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Concrete Block Wall Non Suspect ACM 3000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Plaster Walls NAD 6000 SF 0 SF N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Ceiling Tile 2' x 4' Non Suspect ACM 3000 SF 0 SF N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Plaster Ceiling NAD 3000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium T Unit Ventilator Insulation 2130/01/03/SYN/BB/1680 Assumed 25 SF 0 SF 1 Unit Vent - 25 SF 1 No 1/D

Page 36: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

8

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 64 SF 0 SF 1 No 1/D

1 3Janitors Closet beside Girls Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 3Janitors Closet beside Girls Restroom beside East Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 3Janitors Closet beside Girls Restroom beside East Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 3 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 3 Pipe Chase inside Boys Restroom beside East Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 3Restroom Labeled 310B in Hallway between Rear of Auditorium N/A Linoleum NAD 175 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A

1 3Restroom Labeled 310B in Hallway between Rear of Auditorium N/A Plaster Walls NAD 525 SF 0 SF N/A N/A N/A

1 3Restroom Labeled 310B in Hallway between Rear of Auditorium N/A Ceiling Tile 2' x 4' Non Suspect ACM 175 SF 0 SF N/A N/A N/A

1 3Restroom Labeled 310B in Hallway between Rear of Auditorium N/A Plaster Ceiling NAD 175 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3Restroom Labeled 310B in Hallway between Rear of Auditorium M Mirror Glue Dots 2130/01/03/SYN/BB/2600 Assumed 10 SF 0 SF 1 No 1/D

1 3 Mens Restroom in Hallway between Rear of Auditorium N/A Concrete Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 3 Mens Restroom in Hallway between Rear of Auditorium N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 3 Mens Restroom in Hallway between Rear of Auditorium N/A Plaster Ceiling NAD 120 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Womens Restroom in Hallway between Rear of Auditorium N/A Concrete Floor Non Suspect ACM 105 SF 0 SF N/A N/A N/A1 3 Womens Restroom in Hallway between Rear of Auditorium N/A Plaster Walls NAD 315 SF 0 SF N/A N/A N/A1 3 Womens Restroom in Hallway between Rear of Auditorium N/A Plaster Ceiling NAD 105 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Stairwell between Classrooms 301 and 302 N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 3 Stairwell between Classrooms 301 and 302 N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Stairwell between Classrooms 301 and 302 N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 3 Stairwell between Classrooms 301 and 302 N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Center Hallway between East and West Stairwells N/A Concrete Floor Non Suspect ACM 4870 SF 0 SF N/A N/A N/A1 4 Center Hallway between East and West Stairwells N/A Concrete Block Wall Non Suspect ACM 4870 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Center Hallway between East and West Stairwells N/A Plaster Walls NAD 9740 SF 0 SF N/A N/A N/A1 4 Center Hallway between East and West Stairwells N/A Ceiling Tile 2' x 4' Non Suspect ACM 4870 SF 0 SF N/A N/A N/A1 4 Center Hallway between East and West Stairwells N/A Plaster Ceiling NAD 4870 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Center Hallway between East and West Stairwells T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 50 SF 0 SF 2 Unit Vents - 25 SF Each 1 No 1/D1 4 West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 4 West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 4 West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 4 East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 4 East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Cafeteria N/A Floor Tile VAT 12" x 12" NAD 8800 SF 0 SF Tan VCT over Concrete N/A N/A N/A1 4 Cafeteria N/A Concrete Block Wall Non Suspect ACM 20000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Cafeteria N/A Ceiling Tile 2' x 4' Non Suspect ACM 8800 SF 0 SF Rusted Ceiling Grid to be Painted or Replaced N/A N/A N/A1 4 Cafeteria N/A Concrete Ceiling Non Suspect ACM 8800 SF 0 SF N/A N/A N/A1 4 Cafeteria M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 20 SF 0 SF 1 No 1/D1 4 Kitchen N/A Ceramic Tile Floors Non Suspect ACM 1665 SF 0 SF N/A N/A N/A1 4 Kitchen N/A Linoleum NAD 150 SF 0 SF Brown Faux Wood Linoleum in Office N/A N/A N/A1 4 Kitchen N/A Concrete Block Wall Non Suspect ACM 3330 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A

1 4 Kitchen N/A Metal Walls Non Suspect ACM 450 SF 0 SFMetal Walls with wood core interiors around Office and Storage Rooms N/A N/A N/A

1 4 Kitchen N/A Plaster Ceiling NAD 1815 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Restroom inside Kitchen Office N/A Ceramic Tile Floors Non Suspect ACM 18 SF 0 SF N/A N/A N/A1 4 Restroom inside Kitchen Office N/A Concrete Block Wall Non Suspect ACM 54 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Restroom inside Kitchen Office N/A Plaster Ceiling NAD 18 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 Rooftop accessed from the 5th Floor East Hallway M Roof (field) 2130/01/05/SYN/BB/2614 Assumed Q/U SF 0 SF 1 No 1/D1 5 Rooftop accessed from the 5th Floor East Hallway M Roof (flashing) 2130/01/05/SYN/BB/2614 Assumed Q/U SF 0 SF 1 No 1/D

1 THO Throughout MBlack Damp-proofing/Vapor Barrier applied to exterior walls inside Wall Cavities Throughout 2130/01/00/SYN/BB/2624 Assumed Q/U SF 0 SF 1 No 1/D

1 THO Throughout M Roof (field and flashing) 2130/01/00/SYN/BB/2614 Assumed Q/U SF 0 SF 1 No 1/D1 B Southeast Stairwell N/A Concrete Floor Non Suspect ACM 175 SF 0 SF Concrete Stairs N/A N/A N/A1 B Southeast Stairwell N/A Concrete Block Wall Non Suspect ACM 175 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B Southeast Stairwell N/A Plaster Walls NAD 350 SF 0 SF N/A N/A N/A

Page 37: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

9

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 B Southeast Stairwell N/A Plaster Ceiling NAD 175 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Classroom B10 N/A Concrete Floor Non Suspect ACM 1080 SF 0 SF N/A N/A N/A1 B Classroom B10 N/A Brick Wall Non Suspect ACM 3240 SF 0 SF N/A N/A N/A1 B Classroom B10 N/A Concrete Ceiling Non Suspect ACM 1080 SF 0 SF N/A N/A N/A1 B Classroom B10 M Blackboard/Tackboard Glue Dots 2130/01/0B/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 B Classroom B10 N/A Fiberglass Duct Insulation Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Rear Storage Room inside Classroom B10 N/A Concrete Floor Non Suspect ACM 150 SF 0 SF N/A N/A N/A1 B Rear Storage Room inside Classroom B10 N/A Plaster Ceiling NAD 150 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Storage Room in Hallway outside of Classroom B10 N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 B Storage Room in Hallway outside of Classroom B10 N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 B Storage Room in Hallway outside of Classroom B10 N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Hallway outside of Classroom B10 N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 B Hallway outside of Classroom B10 N/A Brick Wall Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Hallway outside of Classroom B10 N/A Concrete Ceiling Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B20 - B30 N/A Concrete Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B20 - B30 N/A Brick Wall Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B20 - B30 N/A Concrete Ceiling Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B20 - B30 N/A Fiberglass Duct Insulation Non Suspect ACM 150 SF 0 SF N/A N/A N/A

1 B East Locker Room N/A Concrete Floor Non Suspect ACM 2000 SF 0 SFIncludes Locker Room, Restroom, Storage Rooms and Shower Areas N/A N/A N/A

1 B East Boys' Locker Room N/A Brick Wall Non Suspect ACM 4000 SF 0 SF N/A N/A N/A1 B East Boys' Locker Room N/A Concrete Ceiling Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 B East Boys' Locker Room N/A Fiberglass Duct Insulation Non Suspect ACM 850 SF 0 SF N/A N/A N/A1 B Stairwell inside East Locker Room N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 B Stairwell inside East Locker Room N/A Brick Wall Non Suspect ACM 650 SF 0 SF N/A N/A N/A1 B Stairwell inside East Locker Room N/A Concrete Ceiling Non Suspect ACM 325 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell inside East Locker Room N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell inside East Locker Room N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell inside East Locker Room N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B Classroom B20 M Floor Tile VAT 9" x 9" 2130/01/0B/08 Confirmed 600 SF 0 SF Green 1 No 1/D1 B Classroom B20 N/A Brick Wall Non Suspect ACM 1800 SF 0 SF N/A N/A N/A1 B Classroom B20 N/A Concrete Ceiling Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Classroom B20 N/A Fiberglass Duct Insulation Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 B Classroom B30 M Floor Tile VAT 9" x 9" 2130/01/0B/08 Confirmed 600 SF 0 SF Green 1 No 1/D1 B Classroom B30 N/A Brick Wall Non Suspect ACM 1800 SF 0 SF N/A N/A N/A1 B Classroom B30 N/A Concrete Ceiling Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Classroom B30 N/A Fiberglass Duct Insulation Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 B Classroom beside Stairwell inside East Locker Room N/A Concrete Floor Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 B Classroom beside Stairwell inside East Locker Room N/A Brick Wall Non Suspect ACM 1560 SF 0 SF N/A N/A N/A1 B Classroom beside Stairwell inside East Locker Room N/A Plaster Ceiling NAD 520 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Restroom beside Northeast AHU Room N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 B Restroom beside Northeast AHU Room N/A Concrete Block Wall Non Suspect ACM 600 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B Restroom beside Northeast AHU Room N/A Plaster Ceiling NAD 200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Classroom B1 N/A Floor Tile VAT 12" x 12" NAD 1080 SF 0 SF Brown N/A N/A N/A1 B Classroom B1 N/A Brick Wall Non Suspect ACM 3240 SF 0 SF N/A N/A N/A1 B Classroom B1 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1080 SF 0 SF N/A N/A N/A1 B Classroom B1 N/A Concrete Ceiling Non Suspect ACM 1080 SF 0 SF N/A N/A N/A1 B Classroom B1 M Blackboard/Tackboard Glue Dots 2130/01/0B/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D1 B Classroom B2 N/A Floor Tile VAT 12" x 12" NAD 600 SF 0 SF Brown N/A N/A N/A1 B Classroom B2 N/A Brick Wall Non Suspect ACM 1800 SF 0 SF N/A N/A N/A1 B Classroom B2 N/A Ceiling Tile 2' x 4' Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Classroom B2 N/A Concrete Ceiling Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Classroom B2 M Blackboard/Tackboard Glue Dots 2130/01/0B/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D1 B Mechanical Pipe Shaft beside East Stairwell N/A Concrete Floor Non Suspect ACM 50 SF 0 SF N/A N/A N/A1 B Mechanical Pipe Shaft beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 B Mechanical Pipe Shaft beside East Stairwell N/A Metal Pan Ceiling Non Suspect ACM 50 SF 0 SF N/A N/A N/A1 B Room adjacent to (west of) Electrical Room N/A Concrete Floor Non Suspect ACM 550 SF 0 SF N/A N/A N/A1 B Room adjacent to (west of) Electrical Room N/A Brick Wall Non Suspect ACM 1650 SF 0 SF N/A N/A N/A1 B Room adjacent to (west of) Electrical Room N/A Concrete Ceiling Non Suspect ACM 550 SF 0 SF N/A N/A N/A1 B Room across from West Stairwell N/A Concrete Floor Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Room across from West Stairwell N/A Plaster Walls NAD 1800 SF 0 SF N/A N/A N/A1 B Room across from West Stairwell N/A Concrete Ceiling Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Storage Room beside Northwest AHU Room B5 N/A Concrete Floor Non Suspect ACM 550 SF 0 SF N/A N/A N/A1 B Storage Room beside Northwest AHU Room B5 N/A Brick Wall Non Suspect ACM 1650 SF 0 SF N/A N/A N/A1 B Storage Room beside Northwest AHU Room B5 N/A Concrete Ceiling Non Suspect ACM 550 SF 0 SF N/A N/A N/A

Page 38: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

10

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 B Room between Northwest AHU Room and Classroom B6 N/A Concrete Floor Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Room between Northwest AHU Room and Classroom B6 N/A Concrete Block Wall Non Suspect ACM 1200 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B Room between Northwest AHU Room and Classroom B6 N/A Plaster Ceiling NAD 400 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 BPipe Chase in Room between Northwest AHU Room and Classroom B6 N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 BPipe Chase in Room between Northwest AHU Room and Classroom B6 N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A

1 BPipe Chase in Room between Northwest AHU Room and Classroom B6 N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A

1 B Classroom B6 N/A Concrete Floor Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 B Classroom B6 N/A Brick Wall Non Suspect ACM 1800 SF 0 SF N/A N/A N/A1 B Classroom B6 N/A Plaster Ceiling NAD 600 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B Stairwell beside Classroom B6 N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 B Stairwell beside Classroom B6 N/A Brick Wall Non Suspect ACM 650 SF 0 SF N/A N/A N/A1 B Stairwell beside Classroom B6 N/A Concrete Ceiling Non Suspect ACM 325 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell beside Classroom B6 N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell beside Classroom B6 N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 B Pipe Chase below Stairwell beside Classroom B6 N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B Classroom B7 N/A Concrete Floor Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 B Classroom B7 N/A Brick Wall Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 B Classroom B7 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B40 - B50 N/A Concrete Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B40 - B50 N/A Brick Wall Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B40 - B50 N/A Concrete Ceiling Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 B Hallway outside of Classrooms B40 - B50 N/A Fiberglass Duct Insulation Non Suspect ACM 150 SF 0 SF N/A N/A N/A1 B Hallway Vestibule outside of Southwest Stairwell N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 B Hallway Vestibule outside of Southwest Stairwell N/A Brick Wall Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Hallway Vestibule outside of Southwest Stairwell N/A Concrete Ceiling Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 B Southwest Stairwell N/A Concrete Floor Non Suspect ACM 175 SF 0 SF Concrete Stairs N/A N/A N/A1 B Southwest Stairwell N/A Concrete Block Wall Non Suspect ACM 175 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 B Southwest Stairwell N/A Plaster Walls NAD 350 SF 0 SF N/A N/A N/A1 B Southwest Stairwell N/A Plaster Ceiling NAD 175 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 B West Locker Room N/A Concrete Floor Non Suspect ACM 2000 SF 0 SFIncludes Locker Room, Restroom, Storage Rooms and Shower Areas N/A N/A N/A

1 B West Locker Room N/A Brick Wall Non Suspect ACM 4000 SF 0 SF N/A N/A N/A1 B West Locker Room N/A Concrete Ceiling Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 B West Locker Room N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 B West Locker Room N/A Fiberglass Duct Insulation Non Suspect ACM 850 SF 0 SF N/A N/A N/A1 B Classroom B40 N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 B Classroom B40 N/A Brick Wall Non Suspect ACM 2700 SF 0 SF N/A N/A N/A1 B Classroom B40 N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 B Classroom B40 M Blackboard/Tackboard Glue Dots 2130/01/0B/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 B Classroom B40 N/A Fiberglass Duct Insulation Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Classroom B50 N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 B Classroom B50 N/A Brick Wall Non Suspect ACM 2700 SF 0 SF N/A N/A N/A1 B Classroom B50 N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 B Classroom B50 M Blackboard/Tackboard Glue Dots 2130/01/0B/SYN/BB/2600 Assumed 250 SF 0 SF 1 No 1/D1 B Classroom B50 N/A Fiberglass Duct Insulation Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 B Pipe Chase below Southwest Stairwell in Classroom B50 N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B Pipe Chase below Southwest Stairwell in Classroom B50 N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 B Pipe Chase below Southwest Stairwell in Classroom B50 N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 B AHU Room # 2 N/A Concrete Floor Non Suspect ACM 750 SF 0 SF N/A N/A N/A1 B AHU Room # 2 N/A Concrete Walls Non Suspect ACM 2250 SF 0 SF N/A N/A N/A1 B AHU Room # 2 N/A Concrete Ceiling Non Suspect ACM 750 SF 0 SF N/A N/A N/A1 1 Auditorium N/A Wood Floor Non Suspect ACM 9500 SF 0 SF N/A N/A N/A1 1 Auditorium N/A Plaster Walls NAD 28500 SF 0 SF N/A N/A N/A1 1 Auditorium N/A Plaster Ceiling NAD 9500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Auditorium T Radiator Insulation 2130/01/01/SYN/BB/1600 Assumed 300 SF 0 SF 5 Recessed Radiators along the Exterior Wall - 60 SF Each 1 No 1/D1 1 Hallway outside Classrooms 107 - 108 N/A Terrazzo Floor Non Suspect ACM 1200 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 Hallway outside Classrooms 107 - 108 N/A Granite Walls Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 1 Hallway outside Classrooms 107 - 108 N/A Plaster Walls NAD 2400 SF 0 SF N/A N/A N/A1 1 Hallway outside Classrooms 107 - 108 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 1 Hallway outside Classrooms 107 - 108 N/A Plaster Ceiling NAD 1200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Girls Restroom beside West Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 1 Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 Girls Restroom beside West Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A

Page 39: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

11

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 1 Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Classroom 107 M Floor Tile VAT 9" x 9" 2130/01/01/14 Confirmed 970 SF 0 SF Green 1 No 1/D1 1 Classroom 107 N/A Floor Tile VAT 12" x 12" NAD 30 SF 0 SF Tan N/A N/A N/A1 1 Classroom 107 N/A Terra Cotta Walls Non Suspect ACM 3000 SF 0 SF N/A N/A N/A1 1 Classroom 107 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 1 Classroom 107 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Classroom 107 T Unit Ventilator Insulation 2130/01/01/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 1 Classroom 107 M Sink Undercoat Mastic 2130/01/01/SYN/BB/2602 Assumed 6 SF 0 SF 1 Sink - 6 SF 1 No 1/D1 1 Classroom 107 M Blackboard/Tackboard Glue Dots 2130/01/01/SYN/BB/2600 Assumed 25 SF 0 SF 1 No 1/D1 1 Classroom 108 N/A Wood Floor Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 1 Classroom 108 N/A Terra Cotta Walls Non Suspect ACM 3000 SF 0 SF N/A N/A N/A1 1 Classroom 108 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 1 Classroom 108 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Classroom 108 T Unit Ventilator Insulation 2130/01/01/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 1 Classroom 108 M Blackboard/Tackboard Glue Dots 2130/01/01/SYN/BB/2600 Assumed 30 SF 0 SF 1 No 1/D1 1 West Storage Room inside Classroom 108 N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 1 West Storage Room inside Classroom 108 N/A Terra Cotta Walls Non Suspect ACM 600 SF 0 SF N/A N/A N/A1 1 West Storage Room inside Classroom 108 N/A Concrete Ceiling Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 108 N/A Concrete Floor Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 108 N/A Terra Cotta Walls Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 108 N/A Concrete Ceiling Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 Classroom 109 N/A Wood Floor Non Suspect ACM 1850 SF 0 SF N/A N/A N/A1 1 Classroom 109 N/A Terra Cotta Walls Non Suspect ACM 5550 SF 0 SF N/A N/A N/A1 1 Classroom 109 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1850 SF 0 SF N/A N/A N/A1 1 Classroom 109 N/A Plaster Ceiling NAD 1850 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Classroom 109 T Unit Ventilator Insulation 2130/01/01/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 30 SF 1 No 1/D1 1 Classroom 109 M Blackboard/Tackboard Glue Dots 2130/01/01/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D1 1 South Storage Room inside Classroom 109 N/A Concrete Floor Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 South Storage Room inside Classroom 109 N/A Terra Cotta Walls Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 1 South Storage Room inside Classroom 109 N/A Concrete Ceiling Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 109 N/A Concrete Floor Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 109 N/A Terra Cotta Walls Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 1 East Storage Room inside Classroom 109 N/A Concrete Ceiling Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 1 Classroom 119 N/A Carpet Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 1 Classroom 119 N/A Cement Floor Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 1 Classroom 119 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 6000 SF 0 SF 1 No 1/D1 1 Classroom 119 N/A Plaster Ceiling NAD 2000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Classroom 120 N/A Carpet Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 1 Classroom 120 N/A Cement Floor Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 1 Classroom 120 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 6000 SF 0 SF 1 No 1/D1 1 Classroom 120 N/A Plaster Ceiling NAD 2000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 1 Room 121 N/A Carpet Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 121 N/A Cement Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 121 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 210 SF 0 SF 1 No 1/D1 1 Room 121 N/A Ceiling Tile 2' x 4' Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 122 N/A Carpet Non Suspect ACM 175 SF 0 SF N/A N/A N/A1 1 Room 122 N/A Cement Floor Non Suspect ACM 175 SF 0 SF N/A N/A N/A1 1 Room 122 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 525 SF 0 SF 1 No 1/D1 1 Room 122 N/A Ceiling Tile 2' x 4' Non Suspect ACM 175 SF 0 SF N/A N/A N/A1 1 Room 124 N/A Carpet Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 124 N/A Cement Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 124 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 210 SF 0 SF 1 No 1/D1 1 Room 124 N/A Ceiling Tile 2' x 4' Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 125 N/A Carpet Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 125 N/A Cement Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 125 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 210 SF 0 SF 1 No 1/D1 1 Room 125 N/A Ceiling Tile 2' x 4' Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 126 N/A Carpet Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 126 N/A Cement Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 126 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 210 SF 0 SF 1 No 1/D1 1 Room 126 N/A Ceiling Tile 2' x 4' Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 1 Room 109 M Floor Tile VAT 12" x 12" 2130/01/01/SYN/RH/2000 Assumed 530 SF 0 SF Cream 1 No 1/D1 1 Room 109 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 1590 SF 0 SF 1 No 1/D1 1 Room 109 N/A Ceiling Tile 2' x 4' Non Suspect ACM 530 SF 0 SF N/A N/A N/A1 1 Room 110 M Floor Tile VAT 12" x 12" 2130/01/01/SYN/RH/2000 Assumed 530 SF 0 SF Cream 1 No 1/D

Page 40: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

12

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 1 Room 110 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 1590 SF 0 SF 1 No 1/D1 1 Room 110 N/A Ceiling Tile 2' x 4' Non Suspect ACM 530 SF 0 SF N/A N/A N/A1 1 Hallway outside of Rooms 109 and 110 N/A Carpet Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 1 Hallway outside of Rooms 109 and 110 N/A Cement Floor Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 1 Hallway outside of Rooms 109 and 110 M Sheetrock Wall 2130/01/01/SYN/RH/2100 Assumed 750 SF 0 SF 1 No 1/D1 1 Hallway outside of Rooms 109 and 110 N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 1 Stairwell between Rooms 109 and 110 N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 1 Stairwell between Rooms 109 and 110 N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 1 Stairwell between Rooms 109 and 110 N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 1 Stairwell between Rooms 109 and 110 N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Southeast Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 2 Southeast Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Southeast Stairwell N/A Plaster Walls NAD 975 SF 0 SF Entrance to Attic over Multipurpose Room 101 N/A N/A N/A1 2 Southeast Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 201 N/A Wood Floor Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 201 N/A Concrete Block Wall Non Suspect ACM 1560 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 201 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 201 N/A Plaster Ceiling NAD 520 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 201 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 2 Classroom 202 N/A Wood Floor Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 202 N/A Concrete Block Wall Non Suspect ACM 1560 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 202 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 202 N/A Plaster Ceiling NAD 520 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 202 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 2 Room 209 N/A Floor Tile VAT 12" x 12" NAD 240 SF 0 SF Tan N/A N/A N/A1 2 Room 209 N/A Plaster Walls NAD 720 SF 0 SF N/A N/A N/A1 2 Room 209 N/A Plaster Ceiling NAD 240 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Room 209 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 20 SF 0 SF 1 No 1/D1 2 Restroom inside Room 209 N/A Floor Tile VAT 12" x 12" NAD 35 SF 0 SF Tan N/A N/A N/A1 2 Restroom inside Room 209 N/A Plaster Walls NAD 105 SF 0 SF N/A N/A N/A1 2 Restroom inside Room 209 N/A Plaster Ceiling NAD 35 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Room 210 N/A Floor Tile VAT 12" x 12" NAD 270 SF 0 SF Tan N/A N/A N/A1 2 Room 210 N/A Plaster Walls NAD 810 SF 0 SF N/A N/A N/A1 2 Room 210 N/A Ceiling Tile 2' x 4' Non Suspect ACM 270 SF 0 SF N/A N/A N/A1 2 Room 210 N/A Plaster Ceiling NAD 270 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Restroom inside Room 210 N/A Floor Tile VAT 12" x 12" NAD 35 SF 0 SF Tan N/A N/A N/A1 2 Restroom inside Room 210 N/A Plaster Walls NAD 105 SF 0 SF N/A N/A N/A1 2 Restroom inside Room 210 N/A Plaster Ceiling NAD 35 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Room 211 N/A Floor Tile VAT 12" x 12" NAD 240 SF 0 SF Tan N/A N/A N/A1 2 Room 211 N/A Plaster Walls NAD 720 SF 0 SF N/A N/A N/A1 2 Room 211 N/A Plaster Ceiling NAD 240 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Room 211 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 20 SF 0 SF 1 No 1/D1 2 Restroom inside Room 211 N/A Floor Tile VAT 12" x 12" NAD 35 SF 0 SF Tan N/A N/A N/A1 2 Restroom inside Room 211 N/A Plaster Walls NAD 105 SF 0 SF N/A N/A N/A1 2 Restroom inside Room 211 N/A Plaster Ceiling NAD 35 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 212 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 1000 SF 0 SF Green 1 No 1/D1 2 Classroom 212 N/A Concrete Block Wall Non Suspect ACM 1000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 212 N/A Plaster Walls NAD 2000 SF 0 SF N/A N/A N/A1 2 Classroom 212 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 2 Classroom 212 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 212 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D1 2 Classroom 212 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 2 Storage Room inside Classroom 212 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 50 SF 0 SF Green 1 No 1/D1 2 Storage Room inside Classroom 212 N/A Plaster Walls NAD 150 SF 0 SF N/A N/A N/A1 2 Storage Room inside Classroom 212 N/A Plaster Ceiling NAD 50 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 213 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 1000 SF 0 SF Green 1 No 1/D1 2 Classroom 213 N/A Concrete Block Wall Non Suspect ACM 1000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 213 N/A Plaster Walls NAD 2000 SF 0 SF N/A N/A N/A1 2 Classroom 213 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 2 Classroom 213 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 213 M Sink Undercoat Mastic 2130/01/02/SYN/BB/2602 Assumed 60 SF 0 SF 6 Sinks - 10 SF Each 1 No 1/D1 2 Classroom 213 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 2 Classroom 213 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D1 2 Northwest Closet inside Classroom 213 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 15 SF 0 SF Green 1 No 1/D1 2 Northwest Closet inside Classroom 213 N/A Plaster Walls NAD 45 SF 0 SF N/A N/A N/A

Page 41: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

13

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2 Northwest Closet inside Classroom 213 N/A Plaster Ceiling NAD 15 SF 0 SF N/A N/A N/A1 2 Northwest Dining Room beside Classroom 213 N/A Wood Floor Non Suspect ACM 650 SF 0 SF N/A N/A N/A1 2 Northwest Dining Room beside Classroom 213 N/A Plaster Walls NAD 1950 SF 0 SF N/A N/A N/A1 2 Northwest Dining Room beside Classroom 213 N/A Plaster Ceiling NAD 650 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2Kitchen inside Northwest Dining Room beside Classroom 213 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 70 SF 0 SF Green 1 No 1/D

1 2Kitchen inside Northwest Dining Room beside Classroom 213 N/A Concrete Block Wall Non Suspect ACM 70 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A

1 2Kitchen inside Northwest Dining Room beside Classroom 213 N/A Plaster Walls NAD 140 SF 0 SF N/A N/A N/A

1 2Kitchen inside Northwest Dining Room beside Classroom 213 N/A Plaster Ceiling NAD 70 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2Kitchen inside Northwest Dining Room beside Classroom 213 M Sink Undercoat Mastic 2130/01/02/SYN/BB/2602 Assumed 10 SF 0 SF 1 Sink - 10 SF Each 1 No 1/D

1 2Closet inside Kitchen inside Northwest Dining Room beside Classroom 213 N/A Linoleum NAD 15 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A

1 2Closet inside Kitchen inside Northwest Dining Room beside Classroom 213 N/A Plaster Walls NAD 45 SF 0 SF N/A N/A N/A

1 2Closet inside Kitchen inside Northwest Dining Room beside Classroom 213 N/A Plaster Ceiling NAD 15 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2South Closet inside Northwest Dining Room beside Classroom 213 M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 20 SF 0 SF Green 1 No 1/D

1 2South Closet inside Northwest Dining Room beside Classroom 213 N/A Plaster Walls NAD 60 SF 0 SF N/A N/A N/A

1 2South Closet inside Northwest Dining Room beside Classroom 213 N/A Plaster Ceiling NAD 20 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2 Classroom 215 across from West Elevator M Floor Tile VAT 9" x 9" 2130/01/02/20 Confirmed 1000 SF 0 SF Green 1 No 1/D1 2 Classroom 215 across from West Elevator N/A Concrete Block Wall Non Suspect ACM 1000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 215 across from West Elevator N/A Plaster Walls NAD 2000 SF 0 SF N/A N/A N/A1 2 Classroom 215 across from West Elevator N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 2 Classroom 215 across from West Elevator N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 215 across from West Elevator M Sink Undercoat Mastic 2130/01/02/SYN/BB/2602 Assumed 60 SF 0 SF 6 Sinks - 10 SF Each 1 No 1/D1 2 Classroom 215 across from West Elevator T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 2 Classroom 215 across from West Elevator M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 100 SF 0 SF 1 No 1/D

1 2Small Closet outside of Classroom 215 across from West Elevator N/A Cement Floor Non Suspect ACM 20 SF 0 SF N/A N/A N/A

1 2Small Closet outside of Classroom 215 across from West Elevator N/A Plaster Walls NAD 60 SF 0 SF N/A N/A N/A

1 2Small Closet outside of Classroom 215 across from West Elevator N/A Plaster Ceiling NAD 20 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2Storage Room outside of Classroom 215 across from West Elevator N/A Cement Floor Non Suspect ACM 150 SF 0 SF N/A N/A N/A

1 2Storage Room outside of Classroom 215 across from West Elevator N/A Plaster Walls NAD 450 SF 0 SF N/A N/A N/A

1 2Storage Room outside of Classroom 215 across from West Elevator N/A Plaster Ceiling NAD 150 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 2 Hallway outside of Rooms 210 - 215 N/A Terrazzo Floor Non Suspect ACM 2000 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 Hallway outside of Rooms 210 - 215 N/A Concrete Block Wall Non Suspect ACM 2000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Hallway outside of Rooms 210 - 215 N/A Plaster Walls NAD 4000 SF 0 SF N/A N/A N/A1 2 Hallway outside of Rooms 210 - 215 N/A Ceiling Tile 2' x 4' Non Suspect ACM 2000 SF 0 SF N/A N/A N/A1 2 Hallway outside of Rooms 210 - 215 N/A Plaster Ceiling NAD 2000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Hallway outside of Rooms 210 - 215 T Unit Ventilator Insulation 2130/01/02/SYN/BB/1680 Assumed 25 SF 0 SF 1 Unit Vent - 25 SF 1 No 1/D1 2 Girls Restroom across from Classroom 212 N/A Terrazzo Floor Non Suspect ACM 130 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 Girls Restroom across from Classroom 212 N/A Plaster Walls NAD 390 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Girls Restroom across from Classroom 212 N/A Plaster Ceiling NAD 130 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Girls Restroom beside West Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 2 Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Girls Restroom beside West Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 2 Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 2 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 2 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 2 Classroom 216 N/A Wood Floor Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 216 N/A Concrete Block Wall Non Suspect ACM 1560 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 216 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 216 N/A Plaster Ceiling NAD 520 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 216 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 2 Classroom 217 N/A Wood Floor Non Suspect ACM 520 SF 0 SF N/A N/A N/A

Page 42: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

14

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2 Classroom 217 N/A Concrete Block Wall Non Suspect ACM 1560 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Classroom 217 N/A Ceiling Tile 2' x 4' Non Suspect ACM 520 SF 0 SF N/A N/A N/A1 2 Classroom 217 N/A Plaster Ceiling NAD 520 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 217 M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 2 Southwest Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 2 Southwest Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 2 Southwest Stairwell N/A Plaster Walls NAD 975 SF 0 SF Entrance to Attic over Rooms 119 and 120 N/A N/A N/A1 2 Southwest Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) N/A Floor Tile VAT 12" x 12" NAD 1000 SF 0 SF Tan N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) N/A Floor Tile VAT 12" x 12" NAD 1200 SF 0 SF Tan Tan Tread Floor Tile on Stairs N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) N/A Plaster Walls NAD 2200 SF 0 SF N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) N/A Ceiling Tile 2' x 4' Non Suspect ACM 2200 SF 0 SF N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) N/A Plaster Ceiling NAD 2200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 2 Classroom 206B (former Auditorium Balcony) M Blackboard/Tackboard Glue Dots 2130/01/02/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A Concrete Floor Non Suspect ACM 150 SF 0 SF N/A N/A N/A

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A Plaster Walls NAD 450 SF 0 SF N/A N/A N/A

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A Concrete Ceiling Non Suspect ACM 150 SF 0 SF N/A N/A N/A

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A Vinyl Vibration Damper Cloth Non Suspect ACM 8 SF 0 SF N/A N/A N/A

1 3 Small Hallway to Classroom 310C N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 3 Small Hallway to Classroom 310C N/A Concrete Block Wall Non Suspect ACM 100 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Small Hallway to Classroom 310C N/A Plaster Walls NAD 100 SF 0 SF Access Entrance to Auditorium Attic N/A N/A N/A1 3 Small Hallway to Classroom 310C N/A Plaster Ceiling NAD 200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 310C N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 3 Classroom 310C N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 3 Classroom 310C N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 3 Classroom 310C N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 310C M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 120 SF 0 SF 1 No 1/D1 3 Classroom 311 N/A Wood Floor Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 311 N/A Plaster Walls NAD 3600 SF 0 SF N/A N/A N/A1 3 Classroom 311 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 311 N/A Plaster Ceiling NAD 1200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 311 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 3 Southeast Storage Room inside Classroom 311 N/A Concrete Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 3 Southeast Storage Room inside Classroom 311 N/A Plaster Walls NAD 210 SF 0 SF N/A N/A N/A1 3 Southeast Storage Room inside Classroom 311 N/A Plaster Ceiling NAD 70 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 West Storage Room inside Classroom 311 N/A Concrete Floor Non Suspect ACM 70 SF 0 SF N/A N/A N/A1 3 West Storage Room inside Classroom 311 N/A Plaster Walls NAD 210 SF 0 SF N/A N/A N/A1 3 West Storage Room inside Classroom 311 N/A Plaster Ceiling NAD 70 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Northeast Storage Room inside Classroom 311 N/A Concrete Floor Non Suspect ACM 80 SF 0 SF N/A N/A N/A1 3 Northeast Storage Room inside Classroom 311 N/A Plaster Walls NAD 240 SF 0 SF N/A N/A N/A1 3 Northeast Storage Room inside Classroom 311 N/A Plaster Ceiling NAD 80 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Storage Room beside Classroom 312 N/A Concrete Floor Non Suspect ACM 240 SF 0 SF N/A N/A N/A1 3 Storage Room beside Classroom 312 N/A Plaster Walls NAD 720 SF 0 SF N/A N/A N/A1 3 Storage Room beside Classroom 312 N/A Plaster Ceiling NAD 240 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 312 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 312 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 3 Classroom 312 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Classroom 312 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 312 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 312 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 160 SF 0 SF 1 No 1/D1 3 Classroom 313 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 313 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 3 Classroom 313 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Classroom 313 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 313 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 313 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 160 SF 0 SF 1 No 1/D1 3 Classroom 314 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 314 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 3 Classroom 314 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 314 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 314 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 3 Classroom 315 N/A Wood Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A

Page 43: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

15

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Classroom 315 N/A Plaster Walls NAD 4500 SF 0 SF N/A N/A N/A1 3 Classroom 315 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 3 Classroom 315 N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 315 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 150 SF 0 SF 1 No 1/D1 3 Classroom 315 M Sink Undercoat Mastic 2130/01/03/SYN/BB/2602 Assumed 10 SF 0 SF 1 Sink - 10 SF 1 No 1/D1 3 Classroom 316 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 316 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 3 Classroom 316 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 3 Classroom 316 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 316 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 3 Men's Staff Restroom beside Classroom 316 N/A Concrete Floor Non Suspect ACM 150 SF 0 SF N/A N/A N/A1 3 Restroom beside Classroom 316 N/A Plaster Walls NAD 450 SF 0 SF N/A N/A N/A1 3 Restroom beside Classroom 316 N/A Plaster Ceiling NAD 150 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Storage Room beside Classroom 317 N/A Linoleum NAD 300 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 3 Storage Room beside Classroom 317 N/A Plaster Walls NAD 900 SF 0 SF N/A N/A N/A1 3 Storage Room beside Classroom 317 N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Storage Room beside Classroom 317 N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Storage Room beside Classroom 317 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 30 SF 0 SF 1 No 1/D1 3 Classroom 317 N/A Floor Tile VAT 12" x 12" NAD 1000 SF 0 SF Blue N/A N/A N/A1 3 Classroom 317 N/A Plaster Walls NAD 3000 SF 0 SF N/A N/A N/A1 3 Classroom 317 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 3 Classroom 317 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 317 M Sink Undercoat Mastic 2130/01/03/SYN/BB/2602 Assumed 6 SF 0 SF 1 Sink - 6 SF 1 No 1/D1 3 Classroom 318A N/A Wood Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 3 Classroom 318A N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 3 Classroom 318A N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Classroom 318A N/A Ceiling Tile 2' x 4' Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 3 Classroom 318A N/A Plaster Ceiling NAD 500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 318A M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 140 SF 0 SF 1 No 1/D1 3 Classroom 318B N/A Wood Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 3 Classroom 318B N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 3 Classroom 318B N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 3 Classroom 318B N/A Ceiling Tile 2' x 4' Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 3 Classroom 318B N/A Plaster Ceiling NAD 500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 318B M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 80 SF 0 SF 1 No 1/D1 3 Classroom 319 N/A Wood Floor Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 319 N/A Plaster Walls NAD 3600 SF 0 SF N/A N/A N/A1 3 Classroom 319 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 319 N/A Plaster Ceiling NAD 1200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 319 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 3 Classroom 319 M Sink Undercoat Mastic 2130/01/03/SYN/BB/2602 Assumed 10 SF 0 SF 1 Sink - 10 SF 1 No 1/D1 3 Classroom 320 N/A Wood Floor Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 320 N/A Plaster Walls NAD 3600 SF 0 SF N/A N/A N/A1 3 Classroom 320 N/A Fiberglass Ceiling Tile 1' x 1' Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 3 Classroom 320 N/A 1' x 1' Ceiling Tile Glue Dots NAD 1200 SF 0 SF N/A N/A N/A1 3 Classroom 320 N/A Plaster Ceiling NAD 1200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 N/A Concrete Floor Non Suspect ACM 4500 SF 0 SF N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 N/A Concrete Block Wall Non Suspect ACM 4500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 N/A Plaster Walls NAD 4500 SF 0 SF N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 N/A Ceiling Tile 2' x 4' Non Suspect ACM 4500 SF 0 SF N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 N/A Plaster Ceiling NAD 4500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 T Unit Ventilator Insulation 2130/01/03/SYN/BB/1680 Assumed 25 SF 0 SF 1 Unit Vent - 25 SF 1 No 1/D1 3 Hallway outside of Rooms 310 - 320 M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 64 SF 0 SF 1 No 1/D1 3 Girls Restroom beside West Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 3 Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Girls Restroom beside West Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 3 Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3Janitors Closet beside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 3Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 3Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 3 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 3 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 3 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A

Page 44: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

16

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Classroom 312A M Floor Tile VAT 9" x 9" 2130/01/03/25 Confirmed 300 SF 0 SF Green 1 No 1/D1 3 Classroom 312A N/A Concrete Block Wall Non Suspect ACM 300 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Classroom 312A N/A Plaster Walls NAD 600 SF 0 SF Access Entrance to Pipe Shaft N/A N/A N/A1 3 Classroom 312A N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom 312A M Blackboard/Tackboard Glue Dots 2130/01/03/SYN/BB/2600 Assumed 80 SF 0 SF 1 No 1/D1 3 Classroom Suite 312B/C M Floor Tile VAT 9" x 9" 2130/01/03/25 Confirmed 1500 SF 0 SF Green 1 No 1/D1 3 Classroom Suite 312B/C N/A Cement Floor Non Suspect ACM 100 SF 0 SF N/A N/A N/A1 3 Classroom Suite 312B/C N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Classroom Suite 312B/C N/A Plaster Walls NAD 3000 SF 0 SF Access Entrance to Pipe Shaft N/A N/A N/A1 3 Classroom Suite 312B/C N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 3 Classroom Suite 312B/C T Unit Ventilator Insulation 2130/01/03/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 3 Southwest Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 3 Southwest Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 3 Southwest Stairwell N/A Plaster Walls NAD 975 SF 0 SF Entrance to Attic over Rooms 119 and 120 N/A N/A N/A1 3 Southwest Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 East Hallway N/A Concrete Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 4 East Hallway N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 East Hallway N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 4 East Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 4 East Hallway N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 West Hallway N/A Concrete Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 4 West Hallway N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 West Hallway N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 4 West Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 4 West Hallway N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Southeast Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 4 Southeast Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Southeast Stairwell N/A Plaster Walls NAD 975 SF 0 SF Entrance to Attic over Rooms 119 and 120 N/A N/A N/A1 4 Southeast Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Southwest Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 4 Southwest Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Southwest Stairwell N/A Plaster Walls NAD 975 SF 0 SF Entrance to Attic over Rooms 119 and 120 N/A N/A N/A1 4 Southwest Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 401 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 401 N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 4 Classroom 401 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 401 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 401 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 401 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 4 Classroom 402 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 402 N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 4 Classroom 402 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 402 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 402 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 402 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 4 Classroom 403 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 403 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 403 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 403 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 403 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 403 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 404 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 404 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 404 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 4 Classroom 404 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 404 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 404 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 4 Classroom 404 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 405 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 405 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 405 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 405 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 405 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 405 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 406 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A

Page 45: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

17

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 4 Classroom 406 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 406 N/A Partition Room Dividers Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 4 Classroom 406 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 406 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 406 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 4 Classroom 406 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 1 East Elevator N/A Floor Tile VAT 12" x 12" NAD 60 SF 0 SF Yellow N/A N/A N/A1 1 West Elevator N/A Floor Tile VAT 12" x 12" NAD 60 SF 0 SF N/A N/A N/A1 4 Classroom 407 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 407 N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 4 Classroom 407 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 407 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 407 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 407 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 4 Classroom 408 N/A Floor Tile VAT 12" x 12" NAD 2500 SF 0 SF Cream Includes Entire Room 408 Suite N/A N/A N/A1 4 Classroom 408 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 1500 SF 0 SF 1 No 1/D1 4 Classroom 408 N/A Plaster Walls NAD 1000 SF 0 SF N/A N/A N/A1 4 Classroom 408 N/A Ceiling Tile 2' x 4' Non Suspect ACM 2500 SF 0 SF N/A N/A N/A1 4 Classroom 408 N/A Plaster Ceiling NAD 2500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 408 M Sink Undercoat Mastic 2130/01/04/SYN/BB/2602 Assumed 6 SF 0 SF 1 Sink - 6 SF 1 No 1/D1 4 Classroom 411 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 411 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 411 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 411 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 411 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 411 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Womens Staff Restroom beside Classroom 411 N/A Concrete Floor Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 4 Womens Staff Restroom beside Classroom 411 N/A Concrete Block Wall Non Suspect ACM 900 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Womens Staff Restroom beside Classroom 411 N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 4 Womens Staff Restroom beside Classroom 411 N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 IT MDF Room besidee Mens Restroom N/A Concrete Floor Non Suspect ACM 50 SF 0 SF N/A N/A N/A1 4 IT MDF Room besidee Mens Restroom N/A Plaster Walls NAD 150 SF 0 SF N/A N/A N/A1 4 IT MDF Room besidee Mens Restroom N/A Plaster Ceiling NAD 50 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Mens Staff Restroom beside Classroom 413A N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 4 Mens Staff Restroom beside Classroom 413A N/A Plaster Walls NAD 600 SF 0 SF N/A N/A N/A1 4 Mens Staff Restroom beside Classroom 413A N/A Plaster Ceiling NAD 200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Storage Room beside Classroom 413A N/A Concrete Floor Non Suspect ACM 50 SF 0 SF N/A N/A N/A1 4 Storage Room beside Classroom 413A N/A Plaster Walls NAD 150 SF 0 SF N/A N/A N/A1 4 Storage Room beside Classroom 413A N/A Plaster Ceiling NAD 50 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 413A M Floor Tile VAT 9" x 9" 2130/01/04/28 Confirmed 1200 SF 0 SF Green 1 No 1/D1 4 Classroom 413A N/A Plaster Walls NAD 3600 SF 0 SF N/A N/A N/A1 4 Classroom 413A N/A Ceiling Tile 2' x 4' Non Suspect ACM 1200 SF 0 SF N/A N/A N/A1 4 Classroom 413A N/A Plaster Ceiling NAD 1200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 413A T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 15 SF Each 1 No 1/D1 4 Southeast Storage Room inside Classroom 413A N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 4 Southeast Storage Room inside Classroom 413A N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 4 Southeast Storage Room inside Classroom 413A N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 West Storage Room inside Classroom 413A N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 4 West Storage Room inside Classroom 413A N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 4 West Storage Room inside Classroom 413A N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Kitchen beside Classroom 413A N/A Ceramic Tile Floors Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 4 Kitchen beside Classroom 413A N/A Concrete Block Wall Non Suspect ACM 1200 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Kitchen beside Classroom 413A N/A Ceiling Tile 2' x 4' Non Suspect ACM 400 SF 0 SF N/A N/A N/A1 4 Kitchen beside Classroom 413A N/A Plaster Ceiling NAD 400 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Storage Room beside Classroom 414 N/A Concrete Floor Non Suspect ACM 200 SF 0 SF N/A N/A N/A1 4 Storage Room beside Classroom 414 N/A Plaster Walls NAD 600 SF 0 SF N/A N/A N/A1 4 Storage Room beside Classroom 414 N/A Plaster Ceiling NAD 200 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 414 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 414 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 414 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 414 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 414 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 414 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 415/416 N/A Floor Tile VAT 12" x 12" NAD 1100 SF 0 SF Cream N/A N/A N/A1 4 Classroom 415/416 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 1100 SF 0 SF 1 No 1/D

Page 46: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

18

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 4 Classroom 415/416 N/A Plaster Walls NAD 1100 SF 0 SF N/A N/A N/A1 4 Classroom 415/416 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1100 SF 0 SF N/A N/A N/A1 4 Classroom 415/416 N/A Plaster Ceiling NAD 1100 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Storage Room 4151 inside Classroom 415/416 N/A Floor Tile VAT 12" x 12" NAD 35 SF 0 SF Cream N/A N/A N/A1 4 Storage Room 4151 inside Classroom 415/416 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 105 SF 0 SF 1 No 1/D1 4 Storage Room 4151 inside Classroom 415/416 N/A Ceiling Tile 2' x 4' Non Suspect ACM 35 SF 0 SF N/A N/A N/A1 4 Storage Room 4151 inside Classroom 415/416 N/A Plaster Ceiling NAD 35 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Lab Prep Room 4152 inside Classroom 415/416 N/A Floor Tile VAT 12" x 12" NAD 300 SF 0 SF Cream N/A N/A N/A1 4 Lab Prep Room 4152 inside Classroom 415/416 N/A Plaster Walls NAD 200 SF 0 SF N/A N/A N/A1 4 Lab Prep Room 4152 inside Classroom 415/416 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 400 SF 0 SF 1 No 1/D1 4 Lab Prep Room 4152 inside Classroom 415/416 N/A Ceiling Tile 2' x 4' Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 4 Lab Prep Room 4152 inside Classroom 415/416 N/A Plaster Ceiling NAD 300 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Lab Prep Room 4152 inside Classroom 415/416 N/A Lab Table Tops/Sinks Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 4 Classroom 417 N/A Floor Tile VAT 12" x 12" NAD 1000 SF 0 SF Cream N/A N/A N/A1 4 Classroom 417 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 1000 SF 0 SF 1 No 1/D1 4 Classroom 417 N/A Plaster Walls NAD 1000 SF 0 SF N/A N/A N/A1 4 Classroom 417 N/A Ceiling Tile 2' x 4' Non Suspect ACM 1000 SF 0 SF N/A N/A N/A1 4 Classroom 417 N/A Plaster Ceiling NAD 1000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Storage Room 4171 inside Classroom 417 N/A Floor Tile VAT 12" x 12" NAD 35 SF 0 SF Cream N/A N/A N/A1 4 Storage Room 4171 inside Classroom 417 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 105 SF 0 SF 1 No 1/D1 4 Storage Room 4171 inside Classroom 417 N/A Ceiling Tile 2' x 4' Non Suspect ACM 35 SF 0 SF N/A N/A N/A1 4 Storage Room 4171 inside Classroom 417 N/A Plaster Ceiling NAD 35 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 418 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 418 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 418 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 418 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 418 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 418 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Room beside Classroom 420 N/A Linoleum NAD 250 SF 0 SF Brown Faux Wood Linoleum N/A N/A N/A1 4 Room beside Classroom 420 N/A Plaster Walls NAD 750 SF 0 SF N/A N/A N/A1 4 Room beside Classroom 420 N/A Ceiling Tile 2' x 4' Non Suspect ACM 250 SF 0 SF N/A N/A N/A1 4 Room beside Classroom 420 N/A Plaster Ceiling NAD 250 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Room beside Classroom 420 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 20 SF 0 SF 1 No 1/D1 4 Restroom inside Room beside Classroom 420 N/A Concrete Floor Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 4 Restroom inside Room beside Classroom 420 N/A Plaster Walls NAD 180 SF 0 SF N/A N/A N/A1 4 Restroom inside Room beside Classroom 420 N/A Ceiling Tile 2' x 4' Non Suspect ACM 60 SF 0 SF N/A N/A N/A1 4 Restroom inside Room beside Classroom 420 N/A Plaster Ceiling NAD 60 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Book Storage Room beside Classroom 418 N/A Concrete Floor Non Suspect ACM 50 SF 0 SF N/A N/A N/A1 4 Book Storage Room beside Classroom 418 N/A Plaster Walls NAD 150 SF 0 SF N/A N/A N/A1 4 Book Storage Room beside Classroom 418 N/A Plaster Ceiling NAD 50 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 419 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 419 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 419 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 419 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 419 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 419 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 420 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 420 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 420 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 200 SF 0 SF 1 No 1/D1 4 Classroom 420 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 420 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 420 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D1 4 Classroom 420 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 421 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 421 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 421 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 421 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 421 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 421 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 30 SF 1 No 1/D1 4 Classroom 422 N/A Wood Floor Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 422 N/A Plaster Walls NAD 2100 SF 0 SF N/A N/A N/A1 4 Classroom 422 M Sheetrock Wall 2130/01/04/SYN/RH/2100 Assumed 200 SF 0 SF 1 No 1/D1 4 Classroom 422 N/A Ceiling Tile 2' x 4' Non Suspect ACM 700 SF 0 SF N/A N/A N/A1 4 Classroom 422 N/A Plaster Ceiling NAD 700 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 422 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 200 SF 0 SF 1 No 1/D

Page 47: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

19

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 4 Classroom 422 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 15 SF 0 SF 1 Unit Vent - 15 SF 1 No 1/D1 4 Classroom 423 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 423 N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 4 Classroom 423 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 423 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 423 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 423 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 30 SF 1 No 1/D1 4 Classroom 424 N/A Wood Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 424 N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 4 Classroom 424 N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 4 Classroom 424 N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 4 Classroom 424 M Blackboard/Tackboard Glue Dots 2130/01/04/SYN/BB/2600 Assumed 300 SF 0 SF 1 No 1/D1 4 Classroom 424 T Unit Ventilator Insulation 2130/01/04/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 30 SF 1 No 1/D1 4 Girls Restroom beside West Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 4 Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 4 Girls Restroom beside West Stairwell N/A Ceiling Tile 2' x 4' Non Suspect ACM 335 SF 0 SF N/A N/A N/A1 4 Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 4Janitors Closet beside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 4Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 4Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 4 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 4 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 4 Pipe Chase inside Girls Restroom beside West Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 4 Storage Room across from Classroom 414 N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A1 4 Storage Room across from Classroom 414 N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A1 4 Storage Room across from Classroom 414 N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 4Janitors Closet beside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 4Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 4Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 4 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 4 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 4 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 5 East Hallway N/A Concrete Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 5 East Hallway N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 East Hallway N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 5 East Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 5 East Hallway N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 Center Hallway N/A Concrete Floor Non Suspect ACM 3000 SF 0 SF N/A N/A N/A1 5 Center Hallway N/A Concrete Block Wall Non Suspect ACM 3000 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 Center Hallway N/A Plaster Walls NAD 3000 SF 0 SF N/A N/A N/A1 5 Center Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 3000 SF 0 SF N/A N/A N/A1 5 Center Hallway N/A Plaster Ceiling NAD 3000 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 Large Foyer in Center Hallway to Outdoor Play Deck N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 5 Large Foyer in Center Hallway to Outdoor Play Deck N/A Concrete Block Wall Non Suspect ACM 900 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 Large Foyer in Center Hallway to Outdoor Play Deck N/A Plaster Walls NAD 900 SF 0 SF N/A N/A N/A1 5 Large Foyer in Center Hallway to Outdoor Play Deck N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 5 Large Foyer in Center Hallway to Outdoor Play Deck N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 West Hallway N/A Concrete Floor Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 5 West Hallway N/A Concrete Block Wall Non Suspect ACM 1500 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 West Hallway N/A Plaster Walls NAD 1500 SF 0 SF N/A N/A N/A1 5 West Hallway N/A Ceiling Tile 2' x 4' Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 5 West Hallway N/A Plaster Ceiling NAD 1500 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 West Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 5 West Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 West Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 5 West Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 East Stairwell N/A Concrete Floor Non Suspect ACM 325 SF 0 SF Concrete Stairs N/A N/A N/A1 5 East Stairwell N/A Concrete Block Wall Non Suspect ACM 2850 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 East Stairwell N/A Plaster Walls NAD 975 SF 0 SF N/A N/A N/A1 5 East Stairwell N/A Plaster Ceiling NAD 325 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

Page 48: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

20

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 5 Boys Restroom beside East Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 5 Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 Boys Restroom beside East Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 5Janitors Closet beside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 5Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 5Janitors Closet beside Boys Restroom beside East Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 5 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 5 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 5 Pipe Chase beside Boys Restroom beside East Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 5 Fan Room # 1 N/A Concrete Floor Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 5 Fan Room # 1 N/A Terra Cotta Walls Non Suspect ACM 1500 SF 0 SF N/A N/A N/A1 5 Fan Room # 1 N/A Concrete Ceiling Non Suspect ACM 500 SF 0 SF N/A N/A N/A1 5 Fan Room # 1 M Vibration Damper Cloth 2130/01/05/42 Assumed 30 SF 0 SF 1 No 1/D1 5 Fan Room # 1 M Seam Caulking 2130/01/05/SYN/BB/2608 Assumed 1 SF 0 SF Inside Primary Heating Chamber 1 No 1/D1 5 Large Center Music Classroom N/A Floor Tile VAT 12" x 12" NAD 450 SF 0 SF Blue N/A N/A N/A1 5 Large Center Music Classroom N/A Floor Tile VAT 12" x 12" NAD 450 SF 0 SF White N/A N/A N/A1 5 Large Center Music Classroom N/A Plaster Walls NAD 2700 SF 0 SF N/A N/A N/A1 5 Large Center Music Classroom N/A Ceiling Tile 2' x 4' Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 5 Large Center Music Classroom N/A Plaster Ceiling NAD 900 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 Large Center Music Classroom T Unit Ventilator Insulation 2130/01/05/SYN/BB/1680 Assumed 30 SF 0 SF 2 Unit Vents - 30 SF 1 No 1/D1 5 Large Center Music Classroom M Blackboard/Tackboard Glue Dots 2130/01/05/SYN/BB/2600 Assumed 75 SF 0 SF 1 No 1/D1 5 Stairs to Large Center Music Classroom N/A Rubber Tread Stairs Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 5 Stairs to Large Center Music Classroom N/A Wood Stairs Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 5 Stairs to Large Center Music Classroom N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 5 Stairs to Large Center Music Classroom N/A Plaster Ceiling NAD 120 SF 0 SF N/A N/A N/A1 5 Storage Room inside Large Center Music Classroom N/A Concrete Floor Non Suspect ACM 120 SF 0 SF N/A N/A N/A1 5 Storage Room inside Large Center Music Classroom N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 5 Storage Room inside Large Center Music Classroom N/A Plaster Ceiling NAD 120 SF 0 SF N/A N/A N/A1 5 Foyer to Stairwell to Upper Tank Room N/A Concrete Floor Non Suspect ACM 80 SF 0 SF N/A N/A N/A1 5 Foyer to Stairwell to Upper Tank Room N/A Plaster Walls NAD 240 SF 0 SF N/A N/A N/A1 5 Foyer to Stairwell to Upper Tank Room N/A Plaster Ceiling NAD 80 SF 0 SF N/A N/A N/A1 6 Room above the Large Center Music Classroom N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 6 Room above the Large Center Music Classroom N/A Brick Wall Non Suspect ACM 2700 SF 0 SF N/A N/A N/A

1 6 Room above the Large Center Music Classroom MBlack Damp-proofing/Vapor Barrier applied to

Brick Walls 2130/01/06/SYN/BB/2624 Assumed 2700 SF 0 SF 1 No 1/D1 6 Room above the Large Center Music Classroom N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A

1 7Tank Room above Room above the Large Center Music Classroom N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A

1 7Tank Room above Room above the Large Center Music Classroom N/A Brick Wall Non Suspect ACM 2700 SF 0 SF N/A N/A N/A

1 7Tank Room above Room above the Large Center Music Classroom M

Black Damp-proofing/Vapor Barrier applied to Brick Walls 2130/01/07/SYN/BB/2624 Assumed 2700 SF 0 SF 1 No 1/D

1 7Tank Room above Room above the Large Center Music Classroom N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A

1 5 Classroom 502 M Floor Tile VAT 12" x 12" 2130/01/05/SYN/RH/2002 Confirmed 320 SF 0 SF Brown Black Mastic confirmed non-asbestos 1 No 1/D1 5 Classroom 502 N/A Plaster Walls NAD 960 SF 0 SF N/A N/A N/A1 5 Classroom 502 N/A Ceiling Tile 2' x 4' Non Suspect ACM 320 SF 0 SF N/A N/A N/A1 5 Classroom 502 N/A Concrete Ceiling Non Suspect ACM 320 SF 0 SF N/A N/A N/A1 5 Fan Room # 2 N/A Concrete Floor Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 5 Fan Room # 2 N/A Terra Cotta Walls Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 5 Fan Room # 2 N/A Concrete Ceiling Non Suspect ACM 300 SF 0 SF N/A N/A N/A1 5 Fan Room # 2 M Vibration Damper Cloth 2130/01/05/42 Assumed 30 SF 0 SF 1 No 1/D1 5 Girls Restroom beside West Stairwell N/A Terrazzo Floor Non Suspect ACM 335 SF 0 SF Vapor Barrier below Terrazzo Floor assumed ACM N/A N/A N/A1 5 Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 1005 SF 0 SF Glazed Face Concrete Block Walls N/A N/A N/A1 5 Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 335 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 5Janitors Closet beside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 30 SF 0 SF N/A N/A N/A

1 5Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Walls NAD 90 SF 0 SF N/A N/A N/A

1 5Janitors Closet beside Girls Restroom beside West Stairwell N/A Plaster Ceiling NAD 30 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A

1 5 Pipe Chase beside Girls Restroom beside West Stairwell N/A Concrete Floor Non Suspect ACM 40 SF 0 SF N/A N/A N/A1 5 Pipe Chase beside Girls Restroom beside West Stairwell N/A Concrete Block Wall Non Suspect ACM 160 SF 0 SF N/A N/A N/A1 5 Pipe Chase beside Girls Restroom beside West Stairwell N/A Concrete Ceiling Non Suspect ACM 40 SF 0 SF N/A N/A N/A

Page 49: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

21

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 5 Book Storage Room beside Fan Room # 2 N/A Concrete Floor Non Suspect ACM 20 SF 0 SF N/A N/A N/A1 5 Book Storage Room beside Fan Room # 2 N/A Plaster Walls NAD 60 SF 0 SF N/A N/A N/A1 5 Book Storage Room beside Fan Room # 2 N/A Plaster Ceiling NAD 20 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 5 Stairwell to Penthouse # 2 N/A Concrete Floor Non Suspect ACM 120 SF 0 SF Concrete Stairs N/A N/A N/A1 5 Stairwell to Penthouse # 2 N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 5 Stairwell to Penthouse # 2 N/A Plaster Ceiling NAD 120 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 6 Penthouse # 2 N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 6 Penthouse # 2 N/A Terra Cotta Walls Non Suspect ACM 2700 SF 0 SF Fan System Fresh Air Intake Present N/A N/A N/A1 6 Penthouse # 2 N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 6 Penthouse # 2 M Vibration Damper Cloth 2130/01/06/C6 Assumed 10 SF 0 SF 1 No 1/D1 5 Stairwell to Penthouse # 1 N/A Concrete Floor Non Suspect ACM 120 SF 0 SF Concrete Stairs N/A N/A N/A1 5 Stairwell to Penthouse # 1 N/A Plaster Walls NAD 360 SF 0 SF N/A N/A N/A1 5 Stairwell to Penthouse # 1 N/A Plaster Ceiling NAD 120 SF 0 SF ACPI assumed above Plaster Ceiling N/A N/A N/A1 6 Penthouse # 1 N/A Concrete Floor Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 6 Penthouse # 1 N/A Terra Cotta Walls Non Suspect ACM 2700 SF 0 SF Fan System Fresh Air Intake Present N/A N/A N/A1 6 Penthouse # 1 N/A Concrete Ceiling Non Suspect ACM 900 SF 0 SF N/A N/A N/A1 6 Penthouse # 1 M Vibration Damper Cloth 2130/01/06/C6 Assumed 10 SF 0 SF 1 No 1/D1 B West Hallway outside of West Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 85 LF 0 LF N/A N/A N/A1 B West Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 2 LF 0 LF N/A N/A N/A1 B Center Hallway outside of Boiler Room N/A Fiberglass Pipe Insulation Non Suspect ACM 210 LF 0 LF N/A N/A N/A1 B Boiler Room N/A Fiberglass Pipe Insulation Non Suspect ACM 700 LF 0 LF N/A N/A N/A

1 BAbove Doorway to Upper Catwalk Entrance to Boiler Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed Q/U LF 0 LF Repair TSI Ends; Seal Opening to Enclose 1 No 1/D

1 BAbove Doorway to Upper Catwalk Entrance to Boiler Room T Pipe Insulation > 6 inch 2130/01/0B/03 Confirmed Q/U LF 0 LF Repair TSI Ends; Seal Opening to Enclose 1 No 1/D

1 B Water Meter Room N/A Fiberglass Pipe Insulation Non Suspect ACM 150 LF 0 LF N/A N/A N/A1 B Sump Pump Room N/A Fiberglass Pipe Insulation Non Suspect ACM 250 LF 0 LF N/A N/A N/A1 B Auditorium Supply Plenum T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 400 LF 0 LF Quantity includes Pipe Fitting Insulation 1 No 1/D1 B Auditorium Supply Plenum N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF N/A N/A N/A

1 BElectrical Room (need water removed and switchgear de-energized) M Emergency Generator Exhaust Insulation 2130/01/0B/SYN/RH/2604 Assumed 20 LF 0 LF 1 No 1/D

1 BElectrical Room (need water removed and switchgear de-energized) N/A Vinyl Vibration Damper Cloth Non Suspect ACM 8 LF 0 LF Associated with Generator N/A N/A N/A

1 BElectrical Room (need water removed and switchgear de-energized) T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 26 LF 0 LF Towards Ceiling 1 No 1/D

1 B IDF Room T Pipe Insulation > 6 inch 2130/01/0B/03 Confirmed 10 LF 0 LF 1 No 1/D1 B Gas Meter Room N/A Fiberglass Pipe Insulation Non Suspect ACM 45 LF 0 LF N/A N/A N/A

1 BPipe Chase inside Women's Restroom beside Auditorium Supply Plenum T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 20 LF 0 LF 1 No 1/D

1 B East Hallway outside of East Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 60 LF 0 LF N/A N/A N/A1 B East Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 1 LF 0 LF N/A N/A N/A1 B AHU Room N/A Fiberglass Pipe Insulation Non Suspect ACM 250 LF 0 LF N/A N/A N/A1 1 West Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 2 LF 0 LF N/A N/A N/A1 1 East Side Hallway T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 East Side Hallway T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Health Partner Room beside Main Entrance Vestibule N/A Fiberglass Pipe Insulation Non Suspect ACM 72 LF 0 LF N/A N/A N/A

1 1Front Kitchen inside Health Partner Room beside Main Entrance Vestibule T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 16 LF 0 LF 1 No 1/D

1 1Kitchen along Hallway Wall inside Health Partner Room beside Main Entrance Vestibule T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 16 LF 0 LF 1 No 1/D

1 1Janitors Closet beside Girls Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 10 LF 0 LF 1 No 1/D

1 1 Girls Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Girls Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Office beside Toilet beside East Vestibule to Exterior N/A Neoprene Pipe Insulation Non Suspect ACM 8 LF 0 LF N/A N/A N/A1 1 Toilet beside East Vestibule to Exterior T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 8 LF 0 LF 1 No 1/D1 1 Multipurpose Room 101 N/A Fiberglass Pipe Insulation Non Suspect ACM 150 LF 0 LF Painted Black; Travels along Ceiling N/A N/A N/A1 2 East Half of Center Hallway T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 East Half of Center Hallway T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 East Half of Center Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 LF N/A N/A N/A1 2 Office 208 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 35 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Office 208 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 3 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Office 208 N/A Fiberglass Pipe Insulation Non Suspect ACM 25 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Office 208 N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Office 207 N/A Fiberglass Pipe Insulation Non Suspect ACM 75 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Restroom inside Office 207 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 LF N/A N/A N/A1 2 Office Suite 206 (including corridor & 2 storage rooms) N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF N/A N/A N/A

Page 50: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

22

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 2 Office 205 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Office 205 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 204 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 45 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 204 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 24 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 204 N/A Fiberglass Pipe Insulation Non Suspect ACM 150 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Storage Room inside Classroom 204 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 10 LF 0 LF 1 No 1/D1 2 Storage Room inside Classroom 204 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 LF N/A N/A N/A1 2 Classroom 203 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 40 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 203 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 24 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 203 N/A Fiberglass Pipe Insulation Non Suspect ACM 150 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Boys Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Boys Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 1 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 2Janitors Closet beside Boys Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 16 LF 0 LF 1 No 1/D

1 2Janitors Closet beside Boys Restroom beside East Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 6 LF 0 LF N/A N/A N/A

1 2Janitors Closet beside Boys Restroom beside East Stairwell N/A Neoprene Pipe Insulation Non Suspect ACM 8 LF 0 LF N/A N/A N/A

1 3 IT Closet beside Office 310 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 40 LF 0 LF above Plaster Ceiling 1 No 1/D1 3 Office 310 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Office 310 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 28 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Office 310 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Office 309 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Office 309 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 4 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Office 309 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 308 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 308 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 6 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 308 N/A Fiberglass Pipe Insulation Non Suspect ACM 6 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Science Lab 306 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Science Lab 306 N/A Fiberglass Pipe Insulation Non Suspect ACM 250 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 305 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 305 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 304 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 36 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 304 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 14 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 303 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 303 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 17 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 302 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 36 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 302 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 40 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 302 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 LF N/A N/A N/A

1 3Storage Room between Classroom 302 and Classroom 304 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 12 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D

1 3Storage Room between Classroom 302 and Classroom 304 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 6 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3 Art Classroom 301 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 36 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Art Classroom 301 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 40 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3Storage Room between Art Classroom 301 and Classroom 303 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D

1 3Storage Room between Art Classroom 301 and Classroom 303 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3 Girls Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Girls Restroom beside East Stairwell T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 1 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 1 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF N/A N/A N/A

1 3 Mens Restroom in Hallway between Rear of Auditorium T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 5 LF 0 LF Below metal jacketing; below 2'x4' suspended ceiling 1 No 1/D1 4 Center Hallway between East and West Stairwells T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 24 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Center Hallway between East and West Stairwells T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Cafeteria T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 42 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Cafeteria T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 160 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Storage Room beside Classroom 317 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 317 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 30 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 317 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 15 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 318A T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 318A T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

Page 51: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

23

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Classroom 318B T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 318B T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 12 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 319 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 40 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 319 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 15 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 319 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 320 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 42 LF 0 LF below 1' x 1' Ceiling Tiles 1 No 1/D1 3 Classroom 320 N/A Fiberglass Pipe Insulation Non Suspect ACM 28 LF 0 LF below 1' x 1' Ceiling Tiles N/A N/A N/A1 3 Hallway outside of Rooms 310 - 320 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 30 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Hallway outside of Rooms 310 - 320 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 3 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Hallway outside of Rooms 310 - 320 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 LF N/A N/A N/A1 3 Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 7 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D

1 3Janitors Closet beside Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 9 LF 0 LF above plaster ceiling 1 No 1/D

1 3 Classroom 312A T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 115 LF 0 LF 1 No 1/D1 3 Classroom Suite 312B/C T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 330 LF 0 LF 1 No 1/D1 4 East Hallway T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 East Hallway T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 West Hallway T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 West Hallway T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 401 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 24 LF 0 LF 1 No 1/D1 4 Classroom 402 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 36 LF 0 LF 1 No 1/D1 4 Classroom 402 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF N/A N/A N/A1 4 Classroom 404 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Classroom 405 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Classroom 406 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Classroom 407 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 24 LF 0 LF 1 No 1/D1 4 Classroom 408 N/A Fiberglass Pipe Insulation Non Suspect ACM 60 LF 0 LF N/A N/A N/A1 4 Classroom 411 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Mens Staff Restroom beside Classroom 413A T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Classroom 413A T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 413A T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 413A N/A Fiberglass Pipe Insulation Non Suspect ACM 5 LF 0 LF N/A N/A N/A1 4 Kitchen beside Classroom 413A T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Kitchen beside Classroom 413A T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Storage Room beside Classroom 414 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D1 4 Classroom 415/416 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A1 4 Classroom 417 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF N/A N/A N/A1 4 Room beside Classroom 420 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Room beside Classroom 420 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 419 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 419 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 421 N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 4 Classroom 421 N/A Fiberglass Pipe Insulation Non Suspect ACM 2 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 4 Classroom 422 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 422 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 4 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 423 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 423 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 4 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 424 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 4 Classroom 424 T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 4 Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/04/30 Confirmed 12 LF 0 LF 1 No 1/D

1 1Pipe Shaft - Travels 85' vertically from Basement up to the 5th Floor T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 255 LF 0 LF 1 No 1/D

1 1Pipe Shaft - Travels 85' vertically from Basement up to the 5th Floor T Pipe Insulation > 6 inch 2130/01/01/SYN/BB/1110 Assumed 170 LF 0 LF Main Steam Header 1 No 1/D

1 5 East Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF Chilled Water Supply Piping N/A N/A N/A1 5 Center Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 250 LF 0 LF Chilled Water Supply Piping N/A N/A N/A1 5 Center Hallway T Pipe Insulation > 6 inch 2130/01/05/37 Confirmed 6 LF 0 LF 1 No 1/D1 5 West Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF Chilled Water Supply Piping N/A N/A N/A1 5 Fan Room # 1 N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF N/A N/A N/A1 5 Large Center Music Classroom T Pipe Insulation 2-6 inch 2130/01/05/36 Confirmed 20 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 5 Large Center Music Classroom T Pipe Insulation > 6 inch 2130/01/05/37 Confirmed 10 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 5 Storage Room inside Large Center Music Classroom T Pipe Insulation > 6 inch 2130/01/05/37 Confirmed 1 LF 0 LF Penetrates and extends above plaster ceiling 1 No 1/D1 6 Room above the Large Center Music Classroom T Pipe Insulation 2-6 inch 2130/01/06/46 Confirmed 300 LF 0 LF 1 No 1/D

1 7Tank Room above Room above the Large Center Music Classroom N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 LF N/A N/A N/A

Page 52: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

24

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 B West Stairwell N/A AHU Diffuser Grills Non Suspect ACM 1 EA 0 EA Present on the Basement to 1st Floor Landing N/A N/A N/A

1 B Boiler Room T Sectional Boilers 2130/01/01/SYN/BB/1620 Assumed 4 EA 0 EAEach Boiler is approximately 6'x10'x6' high - 18 Sections; Uninsulated Breeching 1 No 1/D

1 BAbove Doorway to Upper Catwalk Entrance to Boiler Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed Q/U EA 0 EA Repair TSI Ends; Seal Opening to Enclose 1 No 1/D

1 BElectrical Room (need water removed and switchgear de-energized) T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 14 EA 0 EA Towards Ceiling 1 No 1/D

1 B IDF Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 6 EA 0 EA 1 No 1/D1 B East Stairwell N/A AHU Diffuser Grills Non Suspect ACM 1 EA 0 EA Present on the Basement to 1st Floor Landing N/A N/A N/A

1 1 West Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the Basement to 1st Floor Landing and 1st to 2nd Floor Landing N/A N/A N/A

1 1 East Side Hallway T Pipe Fitting Insulation 2130/01/01/13 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 1 East Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the Basement to 1st Floor Landing and 1st to 2nd Floor Landing N/A N/A N/A

1 1 Girls Restroom beside East Stairwell T Pipe Fitting Insulation 2130/01/01/13 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Toilet beside East Vestibule to Exterior T Pipe Fitting Insulation 2130/01/01/13 Confirmed 7 EA 0 EA 1 No 1/D1 1 Computer Lab 107 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EA N/A N/A N/A1 1 Multipurpose Room 101 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EA N/A N/A N/A

1 1 Stairwell between Work Room 104 and Office 105 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the Basement to 1st Floor Landing and 1st to 2nd Floor Landing N/A N/A N/A

1 2 West Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 1st to 2nd Floor Landing and 2nd to 3rd Floor Landing N/A N/A N/A

1 2 East Half of Center Hallway T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Office 208 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 10 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Office 205 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 2 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 204 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 2 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 204 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 203 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 2 East Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 1st to 2nd Floor Landing and 2nd to 3rd Floor Landing N/A N/A N/A

1 2 Boys Restroom beside East Stairwell T Pipe Fitting Insulation 2130/01/02/09 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3 West Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 2nd to 3rd Floor Landing and 3rd to 4th Floor Landing N/A N/A N/A

1 3 Office 310 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 15 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Office 309 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 308 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 6 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 305 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 3 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 304 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 304 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 303 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 302 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 20 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3Storage Room between Classroom 302 and Classroom 304 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3 Art Classroom 301 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 20 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3Storage Room between Art Classroom 301 and Classroom 303 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 5 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3 Girls Restroom beside East Stairwell T Pipe Fitting Insulation 2130/01/03/24 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3 East Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 2nd to 3rd Floor Landing and 3rd to 4th Floor Landing N/A N/A N/A

1 3East Hallway from Classroom 301 to Stairwell leading to Hallway between Rear of Auditorium T Pipe Fitting Insulation 2130/01/03/24 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3 Stairwell between Classrooms 301 and 302 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 2nd to 3rd Floor Landing and 3rd to 4th Floor Landing N/A N/A N/A

1 4 West Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 3rd to 4th Floor Landing and 4th to 5th Floor Landing N/A N/A N/A

1 4 East Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 3rd to 4th Floor Landing and 4th to 5th Floor Landing N/A N/A N/A

1 4 Cafeteria T Pipe Fitting Insulation 2130/01/04/34 Confirmed 20 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 5 Rooftop accessed from the 5th Floor East Hallway N/A Chiller Non Suspect ACM 1 EA 0 EA N/A N/A N/A1 THO Throughout M Fire Doors 2130/01/00/NN Assumed 20 EA 0 EA ACM Fire Doors must be receive proper disposal 1 No 1/D1 B Southeast Stairwell N/A AHU Diffuser Grills Non Suspect ACM 1 EA 0 EA Present on the Basement to 1st Floor Landing N/A N/A N/A1 B East Boys' Locker Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 50 EA 0 EA 1 No 1/D1 B Stairwell inside East Locker Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 1 EA 0 EA 1 No 1/D1 B Classroom B20 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 15 EA 0 EA 1 No 1/D1 B Classroom B30 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 18 EA 0 EA 1 No 1/D1 B Restroom beside Northeast AHU Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 2 EA 0 EA above Plaster Ceiling 1 No 1/D1 B Room adjacent to (west of) Electrical Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 6 EA 0 EA 1 No 1/D1 B Room across from West Stairwell T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 12 EA 0 EA 1 No 1/D

Page 53: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

25

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 B Storage Room beside Northwest AHU Room B5 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 4 EA 0 EA 1 No 1/D

1 BPipe Chase in Room between Northwest AHU Room and Classroom B6 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 3 EA 0 EA 1 No 1/D

1 B Stairwell beside Classroom B6 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 1 EA 0 EA 1 No 1/D1 B Stairwell beside Classroom B6 T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 6 EA 0 EA 1 No 1/D1 B Southwest Stairwell N/A AHU Diffuser Grills Non Suspect ACM 1 EA 0 EA Present on the Basement to 1st Floor Landing N/A N/A N/A1 B West Locker Room T Pipe Fitting Insulation 2130/01/0B/05 Confirmed 25 EA 0 EA 1 No 1/D1 1 Auditorium T Pipe Fitting Insulation 2130/01/01/13 Confirmed 25 EA 0 EA 1 No 1/D1 1 Hallway outside Classrooms 107 - 108 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Girls Restroom beside West Stairwell T Pipe Fitting Insulation 2130/01/01/13 Confirmed 1 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 1 Girls Restroom beside West Stairwell T Pipe Fitting Insulation 2130/01/01/13 Confirmed 14 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 107 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 24 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 108 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 32 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 West Storage Room inside Classroom 108 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 11 EA 0 EA 1 No 1/D1 1 East Storage Room inside Classroom 108 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 8 EA 0 EA 1 No 1/D1 1 Classroom 109 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 42 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 South Storage Room inside Classroom 109 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 19 EA 0 EA 1 No 1/D1 1 East Storage Room inside Classroom 109 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 20 EA 0 EA 1 No 1/D1 1 Classroom 119 N/A AHU Diffuser Grills Non Suspect ACM 4 EA 0 EA N/A N/A N/A1 1 Classroom 120 N/A AHU Diffuser Grills Non Suspect ACM 4 EA 0 EA N/A N/A N/A1 1 Room 109 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Room 110 T Pipe Fitting Insulation 2130/01/01/13 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 1 Hallway outside of Rooms 109 and 110 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EA N/A N/A N/A

1 1 Stairwell between Rooms 109 and 110 N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the Basement to 1st Floor Landing and 1st to 2nd Floor Landing N/A N/A N/A

1 2 Southeast Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 1st to 2nd Floor Landing and 2nd to 3rd Floor Landing N/A N/A N/A

1 2 Classroom 201 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 25 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 202 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 14 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Room 209 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 6 EA 0 EA below plaster ceiling 1 No 1/D1 2 Room 209 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 7 EA 0 EA above plaster ceiling 1 No 1/D1 2 Classroom 212 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 7 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Storage Room inside Classroom 212 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 2 EA 0 EA 1 No 1/D1 2 Classroom 213 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Northwest Dining Room beside Classroom 213 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA 1 No 1/D

1 2Kitchen inside Northwest Dining Room beside Classroom 213 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 2 EA 0 EA 1 No 1/D

1 2 Classroom 215 across from West Elevator T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Hallway outside of Rooms 210 - 215 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 3 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 2 Hallway outside of Rooms 210 - 215 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Girls Restroom across from Classroom 212 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 4 EA 0 EA 1 No 1/D1 2 Classroom 216 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 16 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 217 T Pipe Fitting Insulation 2130/01/02/09 Confirmed 1 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 2 Southwest Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 1st to 2nd Floor Landing and 2nd to 3rd Floor Landing N/A N/A N/A

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A AHU Non Suspect ACM 2 EA 0 EA N/A N/A N/A

1 3 Classroom 310C T Pipe Fitting Insulation 2130/01/03/24 Confirmed 7 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 310C T Pipe Fitting Insulation 2130/01/03/24 Confirmed 13 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 311 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 311 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Northeast Storage Room inside Classroom 311 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 16 EA 0 EA 1 No 1/D1 3 Storage Room beside Classroom 312 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 12 EA 0 EA 1 No 1/D1 3 Classroom 312 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 315 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 315 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 316 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Restroom beside Classroom 316 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 7 EA 0 EA 1 No 1/D1 3 Storage Room beside Classroom 317 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 1 EA 0 EA below 2'x4' suspended ceiling 1 No 1/D1 3 Storage Room beside Classroom 317 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 4 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 317 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 318A T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 318B T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 319 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 6 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 320 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 2 EA 0 EA below 1' x 1' Ceiling Tiles 1 No 1/D1 3 Hallway outside of Rooms 310 - 320 T Pipe Fitting Insulation 2130/01/03/24 Confirmed 12 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

Page 54: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

26

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Girls Restroom beside West Stairwell T Pipe Fitting Insulation 2130/01/03/24 Confirmed 8 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D

1 3Janitors Closet beside Girls Restroom beside West Stairwell T Pipe Fitting Insulation 2130/01/03/24 Confirmed 3 EA 0 EA above plaster ceiling 1 No 1/D

1 3 Classroom 312A T Pipe Fitting Insulation 2130/01/03/24 Confirmed 12 EA 0 EA 1 No 1/D1 3 Classroom Suite 312B/C T Pipe Fitting Insulation 2130/01/03/24 Confirmed 52 EA 0 EA 1 No 1/D

1 3 Southwest Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 2nd to 3rd Floor Landing and 3rd to 4th Floor Landing N/A N/A N/A

1 4 Southeast Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 3rd to 4th Floor Landing and 4th to 5th Floor Landing N/A N/A N/A

1 4 Southwest Stairwell N/A AHU Diffuser Grills Non Suspect ACM 2 EA 0 EAPresent on the 3rd to 4th Floor Landing and 4th to 5th Floor Landing N/A N/A N/A

1 5 Center Hallway T Pipe Fitting Insulation 2130/01/05/39 Confirmed 1 EA 0 EA 1 No 1/D1 5 Large Center Music Classroom T Pipe Fitting Insulation 2130/01/05/39 Confirmed 6 EA 0 EA above 2'x4' suspended ceiling 1 No 1/D1 5 Large Center Music Classroom T Pipe Fitting Insulation 2130/01/05/39 Confirmed 1 EA 0 EA below 2'x4' suspended ceiling - along floor feeding unit-vent 1 No 1/D1 6 Room above the Large Center Music Classroom T Pipe Fitting Insulation 2130/01/06/45 Confirmed 50 EA 0 EA 1 No 1/D

1 7Tank Room above Room above the Large Center Music Classroom N/A Obsolete Metal Tanks Non Suspect ACM 2 EA 0 EA N/A N/A N/A

1 5 Rooftop accessed from the 5th Floor East Hallway N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF N/A N/A N/A

1 THO Throughout M Wire Insulation 2130/01/00/SYN/BB/1626 Assumed Q/U LF 0 LF10 LF of white woven wire insulation assumed within all wall mounted electric panels 1 No 1/D

1 THO Throughout MInterior Caulks and glazings (window, expansion seam, door, etc.) 2130/01/00/SYN/BB/2609 Assumed Q/U LF 0 LF 1 No 1/D

1 THO Throughout MExterior Caulks and glazings (window,

expansion seam, door, etc.) 2130/01/00/SYN/BB/2609 Assumed Q/U LF 0 LF 1 No 1/D1 B Classroom B10 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF N/A N/A N/A1 B Hallway outside of Classroom B10 N/A Fiberglass Pipe Insulation Non Suspect ACM 50 LF 0 LF N/A N/A N/A1 B Hallway outside of Classrooms B20 - B30 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 14 LF 0 LF 1 No 1/D1 B Hallway outside of Classrooms B20 - B30 N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 LF N/A N/A N/A1 B East Boys' Locker Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 260 LF 0 LF 1 No 1/D1 B East Boys' Locker Room N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 LF N/A N/A N/A1 B Stairwell inside East Locker Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 8 LF 0 LF 1 No 1/D1 B Classroom B20 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 85 LF 0 LF 1 No 1/D1 B Classroom B30 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 105 LF 0 LF 1 No 1/D1 B Classroom B30 N/A Fiberglass Pipe Insulation Non Suspect ACM 11 LF 0 LF N/A N/A N/A1 B Restroom beside Northeast AHU Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 24 LF 0 LF above Plaster Ceiling 1 No 1/D1 B Classroom B1 N/A Fiberglass Pipe Insulation Non Suspect ACM 38 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 B Classroom B1 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 B Classroom B2 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 B Mechanical Pipe Shaft beside East Stairwell N/A Fiberglass Pipe Insulation Non Suspect ACM 510 LF 0 LF N/A N/A N/A1 B Room adjacent to (west of) Electrical Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 35 LF 0 LF 1 No 1/D1 B Room adjacent to (west of) Electrical Room N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF N/A N/A N/A1 B Room across from West Stairwell T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 53 LF 0 LF 1 No 1/D1 B Storage Room beside Northwest AHU Room B5 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 14 LF 0 LF 1 No 1/D1 B Storage Room beside Northwest AHU Room B5 T Pipe Insulation > 6 inch 2130/01/0B/03 Confirmed 20 LF 0 LF 1 No 1/D1 B Storage Room beside Northwest AHU Room B5 N/A Fiberglass Pipe Insulation Non Suspect ACM 15 LF 0 LF On Ground N/A N/A N/A1 B Storage Room beside Northwest AHU Room B5 N/A Neoprene Pipe Insulation Non Suspect ACM 10 LF 0 LF On Ground N/A N/A N/A1 B Northwest AHU Room X x x x x 0 x x Locked - No Access X X X

1 BPipe Chase in Room between Northwest AHU Room and Classroom B6 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 4 LF 0 LF 1 No 1/D

1 B Classroom B6 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 24 LF 0 LF 1 No 1/D1 B Stairwell beside Classroom B6 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 8 LF 0 LF 1 No 1/D1 B Stairwell beside Classroom B6 T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 27 LF 0 LF 1 No 1/D1 B Hallway outside of Classrooms B40 - B50 N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF N/A N/A N/A1 B West Locker Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 100 LF 0 LF 1 No 1/D1 B West Locker Room T Pipe Insulation 2-6 inch 2130/01/0B/02 Confirmed 20 LF 0 LF Loose 1 No 1/D1 B AHU Room # 2 N/A Fiberglass Pipe Insulation Non Suspect ACM 250 LF 0 LF N/A N/A N/A1 B AHU Room # 2 M Vibration Damper Cloth 2130/01/0B/71 Assumed 40 LF 0 LF 1 No 1/D1 1 Auditorium T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 230 LF 0 LF 1 No 1/D1 1 Hallway outside Classrooms 107 - 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Hallway outside Classrooms 107 - 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 2 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Girls Restroom beside West Stairwell T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 22 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 107 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 40 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 107 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 24 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 160 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 West Storage Room inside Classroom 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 50 LF 0 LF 1 No 1/D

Page 55: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

27

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 1 West Storage Room inside Classroom 108 T Pipe Insulation > 6 inch 2130/01/01/SYN/BB/1110 Assumed 6 LF 0 LF 1 No 1/D1 1 East Storage Room inside Classroom 108 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 32 LF 0 LF 1 No 1/D1 1 East Storage Room inside Classroom 108 T Pipe Insulation > 6 inch 2130/01/01/SYN/BB/1110 Assumed 4 LF 0 LF 1 No 1/D1 1 Classroom 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 70 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Classroom 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 115 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 South Storage Room inside Classroom 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 35 LF 0 LF 1 No 1/D1 1 East Storage Room inside Classroom 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 55 LF 0 LF 1 No 1/D1 1 East Storage Room inside Classroom 109 T Pipe Insulation > 6 inch 2130/01/01/SYN/BB/1110 Assumed 25 LF 0 LF 1 No 1/D1 1 Storage Room beside West Vestibule to Exterior X x x x x 0 LF x Locked - No Access X X X1 1 Classroom 119 M Acoustic Ceiling Panels 2130/01/01/SYN/RH/1701 Assumed x x 0 LF 1 No 1/D1 1 Classroom 120 M Acoustic Ceiling Panels 2130/01/01/SYN/RH/1701 Assumed x x 0 LF 1 No 1/D1 1 Room 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 16 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Room 109 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 10 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Room 109 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 1 Room 109 N/A Fiberglass Pipe Insulation Non Suspect ACM 3 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 1 Room 110 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 16 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 1 Room 110 T Pipe Insulation 2-6 inch 2130/01/01/09 Confirmed 14 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 1 Hallway outside of Rooms 109 and 110 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 LF N/A N/A N/A1 2 Classroom 201 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 201 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 125 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 201 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Classroom 202 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 202 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 16 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 202 N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Classroom 202 N/A Fiberglass Pipe Insulation Non Suspect ACM 60 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Room 209 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 18 LF 0 LF below plaster ceiling 1 No 1/D1 2 Room 209 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 6 LF 0 LF above plaster ceiling 1 No 1/D1 2 Room 209 N/A Fiberglass Pipe Insulation Non Suspect ACM 36 LF 0 LF below plaster ceiling N/A N/A N/A1 2 Room 209 N/A Fiberglass Pipe Insulation Non Suspect ACM 16 LF 0 LF above plaster ceiling N/A N/A N/A1 2 Room 210 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Room 210 N/A Fiberglass Pipe Insulation Non Suspect ACM 36 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Room 211 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 12 LF 0 LF 1 No 1/D1 2 Room 211 N/A Fiberglass Pipe Insulation Non Suspect ACM 45 LF 0 LF N/A N/A N/A1 2 Classroom 212 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 212 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 14 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 212 N/A Fiberglass Pipe Insulation Non Suspect ACM 120 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Classroom 212 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Storage Room inside Classroom 212 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 13 LF 0 LF Travels through Bookshelves 1 No 1/D1 2 Storage Room inside Classroom 212 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF N/A N/A N/A1 2 Classroom 213 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 213 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 8 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 213 N/A Fiberglass Pipe Insulation Non Suspect ACM 120 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Classroom 213 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 2 Northwest Closet inside Classroom 213 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 8 LF 0 LF Travels through Bookshelves 1 No 1/D1 2 Northwest Dining Room beside Classroom 213 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 32 LF 0 LF 1 No 1/D1 2 Northwest Dining Room beside Classroom 213 N/A Fiberglass Pipe Insulation Non Suspect ACM 110 LF 0 LF N/A N/A N/A

1 2Kitchen inside Northwest Dining Room beside Classroom 213 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 10 LF 0 LF 1 No 1/D

1 2Kitchen inside Northwest Dining Room beside Classroom 213 N/A Fiberglass Pipe Insulation Non Suspect ACM 75 LF 0 LF N/A N/A N/A

1 2 Classroom 215 across from West Elevator T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 40 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 215 across from West Elevator T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 24 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 215 across from West Elevator N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 2 Classroom 215 across from West Elevator N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A

1 2Storage Room outside of Classroom 215 across from West Elevator N/A Fiberglass Pipe Insulation Non Suspect ACM 30 LF 0 LF N/A N/A N/A

1 2 Hallway outside of Rooms 210 - 215 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 32 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Hallway outside of Rooms 210 - 215 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Girls Restroom across from Classroom 212 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 13 LF 0 LF 1 No 1/D1 2 Classroom 216 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 216 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 36 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 217 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 217 T Pipe Insulation 2-6 inch 2130/01/02/16 Confirmed 4 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 2 Classroom 217 N/A Fiberglass Pipe Insulation Non Suspect ACM 50 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A

1 2Mechanical Room behind Classroom 206B (former Auditorium Balcony Projection Booth) N/A Neoprene Pipe Insulation Non Suspect ACM 26 LF 0 LF N/A N/A N/A

Page 56: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for

28

School District of Philadelphia AHERA Three-Year Reinspection 2018-2019 Reinspection Date: 03/11/2019

Vaux Big Picture High School Room by Room Location Log Report Building Inspector: Ryan Hutsell

2300 W. Master Street, Philadelphia, PA 19121 Certificate Number: ACC-0218-6-025

ULCS #2130 Management Planner: Jennifer Donovan

Year Built: 1937 Certificate Number: ACC-0119-7-005Element

Floor On Site Room Name

System Affected Material Description HID#

Confirmed/Assumed/ NADNon Suspect ACM

Amount of Material

SF LF EA

Amount of Damage

SF LF EA

Color required for

VAT Comments/Description/Notes

Attic/ Crawl Space

Ranking

Damage Potential

(DP)

Newly Friable

(NF)Response Action (RA)

1 3 Classroom 310C T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 90 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 310C T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 16 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 311 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 26 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 311 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 6 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 311 N/A Fiberglass Pipe Insulation Non Suspect ACM 40 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 311 N/A Fiberglass Pipe Insulation Non Suspect ACM 24 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Northeast Storage Room inside Classroom 311 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF 1 No 1/D1 3 Northeast Storage Room inside Classroom 311 T Pipe Insulation > 6 inch 2130/01/03/SYN/BB/1110 Assumed 9 LF 0 LF 1 No 1/D1 3 Storage Room beside Classroom 312 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF Travels through Bookshelves 1 No 1/D1 3 Storage Room beside Classroom 312 N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF N/A N/A N/A1 3 Classroom 312 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 20 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 312 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 6 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 312 N/A Fiberglass Pipe Insulation Non Suspect ACM 12 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 312 N/A Fiberglass Pipe Insulation Non Suspect ACM 10 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 313 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 313 N/A Fiberglass Pipe Insulation Non Suspect ACM 8 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 314 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 314 N/A Fiberglass Pipe Insulation Non Suspect ACM 9 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 314 N/A Fiberglass Pipe Insulation Non Suspect ACM 20 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 315 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 75 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 315 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 22 LF 0 LF above 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 315 N/A Fiberglass Pipe Insulation Non Suspect ACM 200 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 315 N/A Fiberglass Pipe Insulation Non Suspect ACM 100 LF 0 LF above 2'x4' suspended ceiling N/A N/A N/A1 3 Classroom 316 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 1 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D1 3 Classroom 316 N/A Fiberglass Pipe Insulation Non Suspect ACM 50 LF 0 LF below 2'x4' suspended ceiling N/A N/A N/A1 3 Restroom beside Classroom 316 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 42 LF 0 LF 1 No 1/D1 3 Storage Room beside Classroom 317 T Pipe Insulation 2-6 inch 2130/01/03/22 Confirmed 10 LF 0 LF below 2'x4' suspended ceiling 1 No 1/D

Page 57: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 58: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 59: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 60: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 61: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 62: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 63: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 64: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 65: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 66: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 67: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 68: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 69: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 70: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 71: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 72: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 73: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 74: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 75: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 76: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 77: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 78: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 79: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 80: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 81: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 82: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 83: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 84: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 85: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 86: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 87: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 88: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 89: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 90: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 91: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 92: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 93: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 94: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 95: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 96: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 97: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 98: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 99: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 100: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 101: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 102: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 103: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 104: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for
Page 105: THREE-YEAR RE-INSPECTION 2018-2019...2018/2019 Asbestos Hazard Emergency Response Act (AHERA) Management Report Vaux Big Picture High School V. Summary list of Auditorium DATA for