Wastewater Treatment Technologies at BWWTP in the Light of Extreme Conditions of Climate Change Enikő Szabolcs Budapest Waterworks Pristina, Kosovo, 6-8 November 2019

Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Wastewater Treatment Technologies at BWWTP in the Light of Extreme Conditions of

Climate Change

Enikő SzabolcsBudapest Waterworks

Pristina, Kosovo, 6-8 November 2019

Page 2: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

History of Budapest Waterworks

2

Foundation Privatization Repurchasing

Water tower in Margit-sziget

Budapest CentralWastewater Treatment Plant

1868

1913

1997 2012

1945 2013Undisturbed water supply during World War II in Budapest

Tradition and Innovation

Page 3: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Key Indicators of the Company

3

• 5380 km water network• 1 million m3 daily capacity• 756 wells• 2 water treatment plants

• 550 km sewer network • 98 million m3/year treatment• 370 000 m3 daily capacity • 7 wastewater treatment plants

Drinking water Sewage

• 2 426 000population served

Clients Revenue137 million USD revenue*, of which:• 87 million USD portable water• 30 million USD wastewater• 20 million USD export and other* 2018

Page 4: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Key Competencies

4

• Work Force Management

• Development of Operation Center

• SCADA system installation

• Contact Center

• Non revenue water

Operational processes Construction activities Engineering activities

• Water treatment plantconstruction

• Installation of Mobil Water Purification Equipment

• Pressure management

• Water loss analysis

• Water quality projects

ENTERPRISE MODERNIZATION

Page 5: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

International Activites

5

Page 6: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Overseas Partners

6

ALBANIA - Tirana Water Utility Company (Ukt)AUSTRIA - Aqua EngineeringCUBA - National Water Resources InstituteECUADOR - Empas - Aqua De QuitoGrundfos - South East Europe Ltd.HUNGARY - MOLINDIA - Tecton Engineering And ConstructionINDONESIA, Jakarta - Regional Drinking Water Supply CompanyINDONESIA, Jakarta - Regional Waste Water Management CompanyINDONESIA, Jakarta - The Pt Jakarta Utilitas Propertindo (Jakpro)ISRAEL - Booky Oren Global Water TechnologiesISRAEL - Tel Aviv Mekorot Water Company Group LtdJORDAN - Taff Contracting Establishment CompanyLAOSZ - Vientiane Water Authority, Department Of Public Works And Transportation (Dpwt) Of Vientiane CapitalMACEDONIA - Water and Land Solutions DooelMEXICO - Tabasco - Dasur S.A. De C.V., And AneasSERBIA – Belgrade Waterworks And SewerageSERBIA - Subotica WaterworksSINGAPORE - Public Utilities Board (Singapore's National Water Agency).SRI LANKA - National Water Supply And Drainage BoardTHE GLOBAL WATER OPERATORS’ PARTNERSHIPS ALLIANCE

THE UNITED NATIONS HUMAN SETTLEMENTS PROGRAMMETURKEY - Ankara Disaster And Emergency Management Presidency Of Turkey (AFAD)TURKEY - Ankara Water And Sewerage AdministrationTURKEY - Istanbul Water And Sewerage AdministrationVIETNAM - Hanoi - HawacoWORLD BANK

Page 7: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

WWTP of Budapest Waterworks

7

• The Budapest Waterworks operates 7 wastewater treatment plants

• The Budapest Central Waste Water Treatment Plant (BCWWTP) is located in Budapest, and this is the biggest plant

Page 8: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Fővárosi Vízművek Zártkörűen Működő Részvénytársaság • www.vizmuvek.hu • [email protected]

Ke

len

föld

Pu

mp

ing

station

Fere

ncváros

Pu

mp

ing

station

FINE SCREENS (3 mm)6+2 units

SEDIPAC 3D®

Grit removal, grease flotation,Primary sedimentation)

7 (+1 standby) units

CLARIFIERS17 (+1 standby) units

BIOLOGICAL TREATMENT(pre-anoxic,anaerobic,

aerobic/anoxic zone)17 (+1 standby) units

Slu

dg

e, N

O3

Rec

ircu

lati

on

4 375 m3/h21 875 m3/h

37 500 m3/h

11 250 m3/h26 250 m3/h

Flow meters

Outlet to Danube

Greaseevacuation

Conveyor2+

Compactor2

Gritclassifier

2 db

Grit

Sludge

Screenings

Grit Deposition

Deposition

Greace

Sludge

GRITREMOVAL

3 Units

DRAINING TABLES5 (+1 standby)

GRAVITATY THICKENERS2 (+1 standby)

TERMOFIL ANAEROBIC DIGESTERS3 reactors

DEWATEREDSLUDGE TANKS

4 TANKS

MIXED SLUDGETANK1 tank

Biogasholder

2

PASTEURISATION2 (+1 standby) lines

1 line = 3 tanks

DIGESTED SLUDGETANK

CENTRIFUGES3 (+1 standby)

Recultivation (Mun)

COGENERATION2 (+1 standby) lines

Polymerisation2 units

Ferric-chloridedosing

FeCl3

BIOLOGICAL SLUDGE THICKENER

StormWaterClarifier(4 Units) NITROGEN

REMOVAL (DEMON®)(2 units)

FeCl3

Poly

Ferric-chloridedosing

POLYMERISATION2 units

Archimedes screw generator

Page 9: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Introduction of the Technology

Grit, grease removal + primary sedimentation 26 250 m3/h

Secondary clarifiers Σ 105 000 m3

Activated sludge technology (18 parallel lines ) 21

875 m3/h

Finescreens (3 mm) 37 500 m3/h

Page 10: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Climate change’s relation to wastewater

• Reduced precipitation -drought

• Long periods without precipitation followed by extreme strong flash rains

• Increase of average temperature

• Phosporus problems in the plant in parallel phosporusproblem in the world

Page 11: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Impact of the dry period on the sanitation system

• Accumulation of solid waste sediments and incrustation in sewerage conduits that can cause its clogging

• Water rotting in the system attended bybad sedimentationcapacity

• Inflow wastewater will be more dense

Page 12: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Impact of the storms and heavy rains on the sanitation system

• Larger body of water will arrive at the sites

• More TSS content

• More aeration is needed

Page 13: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Increasing air temperature affects processes of UWWT

• Warm wastewaterincreases the bacterial reaction rate which reduces the density of settled sludge

• Lower oxygen solubility in warmer water cause higher consumption of compressed air in biological treatment

0

2

4

6

8

10

12

14

16

0 5 10 15 20 25 30 35 40 45 50

Oxy

gen

So

lub

ility

(m

g/l)

Temperature (C°)

Oxygen Solubility (mg/l)

Page 14: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Solutions

• Periodically clean pipelines / roads

• New facilitiesspearate storm waterfrom wastewater

• Green rooftops

Page 15: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Phosporus removal

• Phosphorus is an irreplaceable building block in all living cells

• Phosphorousremoval from wastewater can be a source of phosphorous recovery in long term

Page 16: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

How we reduce footprint at BCWWTP 1/2

• Covered and ventilated process structures• Extracted air treated by biological and

chemical odour treatment units• Architecture and Landscaping fits to

surrounding area (70% of the surface area is GREEN)

• Biogas used for energy production and heating (by termophilic digestion)

• Solar powered water heater in the office building

Page 17: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

How we reduce footprint atBCWWTP 2/2

Reduced footprint due to the technology:

• Primary Treatment: (lamellar primary settler)

• Biological Treatment:Anaerobic zone under the clarifier

BCWWTP Conventionalsolution

Mechanical PretreatmentUnits(Footprint 3-4 times less)

Wastewater

Primary sludge

Grease

Grit

Primary sludge

Page 18: Title of Presentationbalkansjointconference.org/wp-content/uploads/2019/... · MEXICO -Tabasco -Dasur S.A. De C.V., And Aneas SERBIA –Belgrade Waterworks And Sewerage SERBIA -Subotica

Questions?We warmly welcome You at BCWWTP

Budapest Waterworks Wastewater Operation Division

Enikő Szabolcs

Operation EngineerMobil: +36 30 515 0265E-mail: [email protected]: www.vizmuvek.hu