245
SD18 KG (m) D SD18 (m) Homogeneous Departure 7.96 13.1 Container Departure 8.44 13.1 Grp 1 Design KG EST D (m) Homogeneous Departure 7.888 12.981 Container Departure 8.363 12.981 At draft: 9.972m Heel Angle 0 10 20 30 40 KN 0 1.606 3.207 4.515 5.537 GZ Homogeneous dep 0.000 0.236 0.509 0.571 0.467 GZ Container 0.000 0.154 0.347 0.334 0.161 GZ Homogeneous Heel Angle GZ SM F(A) 0 0 1 0.000 10 0.236 3 0.709 20 0.509 3 1.527 30 0.571 1 0.571 sum F(A) 2.807 Area (0-30) 10.527 m deg 0.184 m rad GZ Homogeneous Heel Angle GZ SM F(A) 0 0 1 0 10 0.236 4 0.945 20 0.509 2 1.018 30 0.571 4 2.284 40 0.467 1 0.467 Area ( 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0 10 20 30 40 50    G    Z    (   m    ) Heel Angle (Degrees) GZ Homogeneous dep Curve

TND Calculations

Embed Size (px)

Citation preview

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 1/245

SD18 KG (m) DSD18 (m)

Homogeneous Departure 7.96 13.1

Container Departure 8.44 13.1

Grp 1 Design KGEST D (m)

Homogeneous Departure 7.888 12.981Container Departure 8.363 12.981

At draft: 9.972m

Heel Angle 0 10 20 30 40

KN 0 1.606 3.207 4.515 5.537

GZHomogeneous dep 0.000 0.236 0.509 0.571 0.467

GZContainer 0.000 0.154 0.347 0.334 0.161

GZHomogeneous Heel Angle GZ SM F(A)

0 0 1 0.000

10 0.236 3 0.709

20 0.509 3 1.527

30 0.571 1 0.571

sum F(A) 2.807

Area (0-30) 10.527 m deg

0.184 m rad

GZHomogeneous Heel Angle GZ SM F(A)

0 0 1 0

10 0.236 4 0.945

20 0.509 2 1.018

30 0.571 4 2.284

40 0.467 1 0.467

Area (

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0 10 20 30 40 50

   G   Z   (  m   )

Heel Angle (Degrees)

GZHomogeneous dep Curve

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 2/245

sum F(A) 4.714

Area (0-40) 15.713 m deg

0.274 m rad

IMO Criteria GZHomogeneous dep GZContainer

Initial Stability Pass PassMax GZ Pass Pass

Angle of Max GZ Fail Fail

Area to 30 Pass Pass

Area to 40 Pass Pass

Area 30 to 40 Pass Pass

Load Condition KMT (m) KG (m) GMT (m)

Homogeneous Departure 9.462 7.888 1.574

Container Departure 9.462 8.363 1.099

Criteria Required Value Achieved Value Pass/Fail

A30 0.055 m rad 0.184 m rad PassA40 0.09 m rad 0.274 m rad Pass

A40-A30 0.03 m rad 0.090 m rad Pass

GZ30 0.20 m 0.571 m Pass

Angle of GZMAX 30° 29° Fail

Initial GMT 0.15 m 1.371 Pass

Criteria Required Value Achieved Value Pass/Fail

A30 0.055 m rad 0.120 m rad Pass

A40 0.09 m rad 0.163 m rad Pass

A40-A30 0.03 m rad 0.043 m rad Pass

GZ30 0.20 m 0.334 m Pass

Angle of GZMAX 30° 22° Fail

Initial GMT 0.15 m 0.883 Pass

Area (

Load Condition: Homogeneous Departure

Load Condition: Container Departure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 3/245

50 60

6.319 6.851

0.276 0.020

-0.087 -0.392

GZContainerHeel

AngleGZ SM F(A)

0 0 1 0.000

10 0.154 3 0.461

20 0.347 3 1.040

30 0.334 1 0.334

sum F(A) 1.835

6.881 m deg

0.120 m rad

GZContainerHeel

AngleGZ SM F(A)

0 0.000 1 0.000

10 0.154 4 0.615

20 0.347 2 0.693

30 0.334 4 1.334

40 0.161 1 0.161

0-30)

60 70

-0.500

-0.400

-0.300

-0.200

-0.100

0.000

0.100

0.200

0.300

0.400

0.500

0 10 20 30 40 5   G   Z   (  m   )

Heel Angle (Degrees)

GZContainer Curve

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 4/245

sum F(A) 2.804

9.346 m deg

0.163 m rad

0-40)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 5/245

0 60 70

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 6/245

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.029 m

3029 mm

2311.084 mm

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L 0.5L

I 0 5 10 15 23.5 32

II 0 6.3 12.7 19 27.5 36

0.243 L

0.3 L

0.2 L

130.059 mm

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Freeboard

Rule Freeboard

Tabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Superstructures

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

% Reduction of total

allowance12.155 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 7/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2380.211

753.217

-130.059

471.106 mm3474.475

13.446

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Aft Body, Standard Shear Profile:

Defficiency of Shear

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 8/245

149.822 m

13.426 m

9.972 m

0.724

28.8 m

7.622 m

0 m

0 m

0 m

0.02 m

3.474475 m

3474.475 mm

2311.084 mm

0.724

1.033

2386.440 mm

9.988 m

13.44647 m

864.585 mm

36.422 m

36.422 m

24.310 %

0.6L 0.7L 0.8L 0.9L 0

46 63 75.3 87.7 I 0

46 63 75.3 87.7 II 0

0.243 L

0.3 L

0.2 L

130.059 mm

nd Trunks

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Rule Freeboard

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction exce

covering 0.6L amidships, the free

CB

Correction

Corrected F/B

Correction for Depth

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Deduction for Superstructure

Total S

E

% LF/B

12.155 %

Deduction

Correction for Shear

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 9/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2386.440

864.585

-130.059

471.1063592.072

13.564

Excess of Shear Fwd

Mean defficiency

Correction

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

Deduction for S/S

Correction for ShearRule F/B

New Depth

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 10/245

CB 0.7104

Up to collision bulkhead

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

t where ship has an enclosed superstructure

oard is reduced at the above rate

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 11/245

mm

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 12/245

CB 0.7104

149.822 m

13.544 m

9.972 m

0.725

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.592072 m

3592.072 mm

2311.084 mm

0.725

1.033

2388.084 mm

9.988 m

13.56407 m

893.985 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.243 L

0.3 L

0.2 L

130.059 mm

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Freeboard

Rule Freeboard

Tabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Supers

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

% Reduction of total

allowance12.155 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 13/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.084

893.985

-130.059

471.106 mm3623.116

13.595

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Aft Body, Standard Shear Profile:

Defficiency of Shear

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 14/245

149.822

13.575

9.972

0.726

28.8

7.622

0

0

0

0.02

3.623116

3623.116

2311.084

0.726

1.034

2388.519

9.988

13.59512

901.746

36.422

36.422

24.310

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7 I

36 46 63 75.3 87.7 II

0.243

0.3

0.2

130.059

ructures and Trunks

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Rule Freeboard

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by dFreeboard

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no red

covering 0.6L amidshi

CB

Correction

Corrected F/B

Correction for Depth

Percentage of Deduction For

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Deduction for Superstructure

Total S

E

% LF/B

12.155

Deduction

Correction for Shear

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 15/245

STN ORD SM

AP 1498.517 1

1/6L 665.341 3

1/3L 167.834 3

CL 0.000 1

sumPROD

499.755

STN ORD SM

CL 0.000 1

1/3L 335.668 3

1/6L 1330.683 3

FP 2997.033 1

sum

PROD

999.511

749.633

471.106

Excess of Shear Fwd

Mean defficiency

Correction

Aft Body, Standard Shear Pr

Defficiency of Shear

Foward Body, Standard Shear

Deduction for S/S

Correction for ShearRule F/B

New Depth

Summary of FreeboBasic Tabular Freeboard

Correction for CB

Correction for Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 16/245

CB 0.7104

m

m

m

m

m Up to collision bulkhead

m

m

m

m

m

mm

mm

mm

m

m

mm

m

m

%

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L

0 5 10 15 23.5 32 46 63 75.3

0 6.3 12.7 19 27.5 36 46 63 75.3

L

L

L

mm

sign

ction except where ship has an enclosed superstructure

s, the freeboard is reduced at the above rate

ype 'B'

Total Effective Length of Superstructures and Trunks

%

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 17/245

PROD

1498.517

1996.024

503.502

0.000

3998.042

PROD

0.000

1007.003

3992.048

2997.033

7996.085

2311.084

2388.519

901.746

-130.059

471.106 mm3631.311

13.603

ofile:

Profile:

rd

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 18/245

CB 0.7104

149.822 m

13.583 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.631311 m

3631.311 mm

2311.084 mm

0.726

1.034

2388.633 mm

9.988 m

13.60331 m

903.794 mm

36.422 m

36.422 m

24.310 %

0.9L 0 0.1L 0.2L 0.3L

87.7 I 0 5 10 15

87.7 II 0 6.3 12.7 19

0.243 L

0.3 L

0.2 L

130.059 mm

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Freeboard

Rule Freeboard

Tabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Lengt

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

% Reduction of total

allowance12.155 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 19/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.633

903.794

-130.059

471.106 mm3633.474

13.605

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Aft Body, Standard Shear Profile:

Defficiency of Shear

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 20/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

Basis PaFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Rule Fr

Tabular Freeboard

Correction for

Start Shear from FP

tsp

Freeboard defiFreeboard

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than

covering 0.

CB

Correction

Corrected F/B

Correction for D

Percentage of Ded

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Deduction for Super

Total S

E

% LF/B

Deduction

Correction for

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 21/245

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Excess of Shear Fwd

Mean defficiency

Correction

Aft Body, Standa

Defficiency of Shear

Foward Body, Stan

Deduction for

Correction for SRule F/B

New Depth

Summary oBasic Tabular Fre

Correction for

Correction for D

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 22/245

CB 0.7104

149.822 m

13.585 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.633474 m

3633.474 mm

2311.084 mm

0.726

1.034

2388.663 mm

9.988 m

13.60547 m

904.335 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L

I 0 5 10 15 23.5 32 46 63

II 0 6.3 12.7 19 27.5 36 46 63

0.243 L

0.3 L

0.2 L

130.059 mm

ameters

eboard

CB

ned by design

 /15 no reduction except where ship has an enclosed superstructure

6L amidships, the freeboard is reduced at the above rate

epth

ction For Type 'B'

Total Effective Length of Superstructures and Trunks

structure

12.155 %

hear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 23/245

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sumPROD

3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.663

904.335

-130.059

471.106 mm3634.045

13.606

rd Shear Profile:

dard Shear Profile:

/S

ear 

Freeboardboard

B

epth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 24/245

CB

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhea

0 m

0 m

0 m

0.02 m

3.634045 m

3634.045 mm

2311.084 mm

0.726

1.034

2388.671 mm

9.988 m

13.60605 m

904.478 mm

36.422 m

36.422 m

24.310 %

0.8L 0.9L 0 0.1L 0.2L

75.3 87.7 I 0 5 10

75.3 87.7 II 0 6.3 12.7

0.243 L

0.3 L

0.2 L

130.059 mm

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Freeboard

Rule Freeboard

Tabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effe

where 'D' is less than L/15 no reduction except where ship has an en

covering 0.6L amidships, the freeboard is reduced at the

Deduction for Superstructure

Total S

E

% Reduction of total

allowance12.155 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 25/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.671

904.478

-130.059

471.106 mm3634.196

13.606

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Aft Body, Standard Shear Profile:

Defficiency of Shear

New Depth

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 26/245

0.7104

0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

15 23.5 32 46 63 75.3 87.7

19 27.5 36 46 63 75.3 87.7

ctive Length of Superstructures and Trunks

closed superstructure

above rate

 Freeboard

Depth Moul

Draught MCB at 85%

Length of P

Length of FShear Aft

Shear Fwd

Start Shear

tsp

FreebFree

 

Tabular F

Cor

C

Corre

Correct

Corr

Depth (S

Depth (

Correction

where 'D' i

Deductio

Tot

%

Percent

Ships w

without d

Bri

Ships wit

Percen

Upper

Lower

% Reducti

allow

Dedu

Corr

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 27/245

STN

AP

1/6L

1/3L

CL

STN

CL

1/3L

1/6L

FP

Aft B

Defficienc

Foward

Excess of

Mean de

Corre

SuBasic

Co

Corr

De

Corr

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 28/245

CB 0.7104

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.634196 m

3634.196 mm

2311.084 mm

0.726

1.034

2388.673 mm

9.988 m

13.6062 m

904.516 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.243 L

0.3 L

0.2 L

130.059 mm

Basis ParametersLength

lded

ulded

MLD

oop

orecastle 

from FP

oard defined by designoard

Rule Freeboard

reeboard

rection for CB

B

ction

ed F/B

ction for Depth

tandard)

Actual)

DF/B > L/15

less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

for Superstructure

l S

  F/B

ge of Deduction For Type 'B'

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

h F'cle &

tage L

Limit

Limit

on of total

ance12.155 %

ction

ction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 29/245

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sumPROD

3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.673

904.516

-130.059

471.106 mm3634.236

13.606

dy, Standard Shear Profile:

of Shear

Body, Standard Shear Profile:

hear Fwd

fficiency

ction

mmary of Freeboardabular Freeboard

rection for CB

ection for Depth

uction for S/S

ection for ShearRule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 30/245

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m Up to collisi

0 m

0 m

0 m

0.02 m

3.634236 m

3634.236 mm

2311.084 mm

0.726

1.034

2388.674 mm

9.988 m

13.60624 m

904.526 mm

36.422 m

36.422 m

24.310 %

0.7L 0.8L 0.9L 0 0.1L

63 75.3 87.7 I 0 5

63 75.3 87.7 II 0 6.3

0.243 L

0.3 L

0.2 L

130.059 mm

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

Tabular Freeboard

Correction for CB

CB

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where shi

covering 0.6L amidships, the freeboard is red

Deduction for Superstructure

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

 

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance12.155 %

Deduction

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 31/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.674

904.526

-130.059

471.106 mm3634.246

13.606

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 32/245

CB 0.7104

ion bulkhead

0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

10 15 23.5 32 46 63 75.3 87.7

12.7 19 27.5 36 46 63 75.3 87.7

p has an enclosed superstructure

ced at the above rate

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 33/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 34/245

CB 0.7104

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.634246 m

3634.246 mm

2311.084 mm

0.726

1.034

2388.674 mm

9.988 m

13.60625 m

904.528 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L 0.5L

I 0 5 10 15 23.5 32

II 0 6.3 12.7 19 27.5 36

0.243 L

0.3 L

0.2 L

130.059 mm

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

Tabular Freeboard

Correction for CB

CB

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Superstructures an

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance12.155 %

Deduction

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 35/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.674

904.528

-130.059

471.106 mm3634.249

13.606

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 36/245

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m

0 m

0 m

0 m

0.02 m

3.634249 m

3634.249 mm

2311.084 mm

0.726

1.034

2388.674 mm

9.988 m

13.60625 m

904.529 mm

36.422 m

36.422 m

24.310 %

0.6L 0.7L 0.8L 0.9L 0

46 63 75.3 87.7 I 0

46 63 75.3 87.7 II 0

0.243 L

0.3 L

0.2 L

130.059 mm

d Trunks

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

Tabular Freeboard

Correction for CB

CB

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction exce

covering 0.6L amidships, the free

Deduction for Superstructure

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance12.155 %

Deduction

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 37/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.674

904.529

-130.059

471.1063634.250

13.606

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 38/245

CB 0.7104

Up to collision bulkhead

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

t where ship has an enclosed superstructure

oard is reduced at the above rate

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 39/245

mm

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 40/245

CB 0.7104

149.822 m

13.586 m

9.972 m

0.726

28.8 m

7.622 m Up to collision bulkhead

0 m

0 m

0 m

0.02 m

3.63425 m

3634.25 mm

2311.084 mm

0.726

1.034

2388.674 mm

9.988 m

13.60625 m

904.529 mm

36.422 m

36.422 m

24.310 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.243 L

0.3 L

0.2 L

130.059 mm

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

Tabular Freeboard

Correction for CB

CB

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Supers

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance12.155 %

Deduction

Correction for Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 41/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sumPROD

3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511

749.633

471.106

2311.084

2388.674

904.529

-130.059

471.106 mm3634.250

13.606

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

Excess of Shear Fwd

Mean defficiency

Correction

Summary of Freeboard

New Depth

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Correction for ShearRule F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 42/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

ructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 43/245

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.029 m

3029 mm

2311.084 mm

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.201 L

0.2 L0.1 L

107.320 mm

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Correction for CB

CB

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FPtsp

Freeboard defined by design ParticularsFreeboard

Rule FreeboardTabular Freeboard

% LF/B

Percentage of Deduction For Type 'B' Ships

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total SE

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

Ships with F'cle &

detached Bridge

Percentage L

Upper LimitLower Limit

% Reduction of total

allowance

Aft Body, Standard Shear Profile:

%

Deduction

Correction for Shear

10.030

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 44/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511749.633

487.037

2311.084

2380.211

753.217

-107.320

487.037 mm

3513.145

13.485New Depth

Defficiency of Shear

Foward Body, Standard Shear Profile:

Excess of Shear FwdMean defficiency

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 45/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

Tabular Freeboard

Correction for

Length of Poop

Length of Forecastle

Basis PaFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Freeboard defiFreeboard

Rule Fr

Shear Aft

Shear Fwd

Start Shear from FPtsp

E

% LF/B

CB

Correction

Corrected F/B

Correction for

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

where 'D' is less than

covering 0.

Deduction for Super

Total S

Percentage of Ded

Ships with F'cle

without detached

Bridge

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Aft Body, Standa

Deduction

Correction for S

tures and Trunks

Lower Limit

% Reduction of total

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 46/245

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Defficiency of Shear

Foward Body, Stan

Excess of Shear Fwd

Rule F/B

New Depth

Summary oBasic Tabular Fre

Deduction for

Correction for S

Mean defficiency

Correction

Correction for

Correction for D

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 47/245

CB 0.7104

149.822 m

13.465 m

9.972 m

0.725

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.513145 m

3513.145 mm

2311.084 mm

0.725

1.033

2386.981 mm

9.988 m

13.48515 m

874.253 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L

I 0 5 10 15 23.5 32 46 63

II 0 6.3 12.7 19 27.5 36 46 63

0.201 L

0.2 L0.1 L

107.320 mm

CB

rameters

ned by design

eboard

epth

/15 no reduction except where ship has an enclosed superstructure

6L amidships, the freeboard is reduced at the above rate

structure

ction For Type 'B'

Total Effective Length of Superstructures and Trunks

%

rd Shear Profile:

hear

10.030

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 48/245

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum

PROD3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2386.981

874.253

-107.320

487.037 mm

3640.951

13.613

dard Shear Profile:

 

f Freeboardboard

/S

hear

CB

epth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 49/245

149.822 m

13.593 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.640951 m

3640.951 mm

2311.084 mm

0.726

1.034

2388.768 mm

9.988 m

13.61295 m

906.204 mm

30.054 m30.054 m

20.060 %

0.8L 0.9L 0 0.1L

75.3 87.7 I 0 5

75.3 87.7 II 0 6.3

0.201 L

0.2 L0.1 L

107.320 mm

Correction for Shear

Aft Body, Standard Shear Profile:

% Reduction of total

allowance10.030 %

Deduction

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Shear Fwd

Start Shear from FP

Length of ForecastleShear Aft

CB at 85% DMLD

Length of Poop

tsp

Freeboard defined by designFreeboard

Rule FreeboardTabular Freeboard

Depth (Actual)Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

where 'D' is less than L/15 no reduction except where shi

covering 0.6L amidships, the freeboard is red

Deduction for Superstructure

Total SE

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

 

Ships with F'cle &

detached Bridge

Percentage L

Upper LimitLower Limit

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 50/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 51/245

CB 0.7104

0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

10 15 23.5 32 46 63 75.3 87.7

12.7 19 27.5 36 46 63 75.3 87.7

p has an enclosed superstructure

uced at the above rate

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 52/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 53/245

CB 0.7104

149.822 m

13.627 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.67469 m

3674.69 mm

2311.084 mm

0.726

1.034

2389.240 mm

9.988 m

13.64669 m

914.639 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.201 L

0.2 L0.1 L

107.320 mm

Aft Body, Standard Shear Profile:

10.030 %

Deduction

Correction for Shear

Percentage L

Upper LimitLower Limit

% Reduction of total

allowance

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Supers

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total SE

% LF/B

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

CB

Correction

Corrected F/B

Correction for Depth

Rule FreeboardTabular Freeboard

Correction for CB

Start Shear from FPtsp

Freeboard defined by designFreeboard

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 54/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum

PROD3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2389.240

914.639

-107.320

487.037 mm

3683.596

13.656

Deduction for S/S

Correction for Shear

Rule F/B

New Depth

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear FwdMean defficiency

Correction

Defficiency of Shear

Foward Body, Standard Shear Profile:

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 55/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

Correction for S

Aft Body, Standa

% Reduction of total

allowance

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper LimitLower Limit

% LF/B

Percentage of Ded

Ships with F'cle

without detached

Bridge

where 'D' is less than

covering 0.

Deduction for Super

Total SE

Correction for

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

Correction forCB

Correction

Corrected F/B

Freeboard

Rule FrTabular Freeboard

Shear Fwd

Start Shear from FPtsp

Freeboard defi

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis PaFreeboard Length

Depth Moulded

Draught Moulded

tructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 56/245

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

New Depth

Correction for D

Deduction for

Correction for S

Rule F/B

Correction

Summary oBasic Tabular Fre

Correction for

Foward Body, Stan

Excess of Shear FwdMean defficiency

Defficiency of Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 57/245

CB 0.7104

149.822 m

13.636 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.683596 m

3683.596 mm

2311.084 mm

0.726

1.034

2389.364 mm

9.988 m

13.6556 m

916.866 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L

I 0 5 10 15 23.5 32 46 63

II 0 6.3 12.7 19 27.5 36 46 63

0.201 L

0.2 L0.1 L

107.320 mm

hear

rd Shear Profile:

10.030 %

ction For Type 'B'

Total Effective Length of Superstructures and Trunks

/15 no reduction except where ship has an enclosed superstructure

6L amidships, the freeboard is reduced at the above rate

structure

epth

CB

eboard

ned by design

rameters

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 58/245

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum

PROD3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2389.364

916.866

-107.320

487.037 mm

3685.947

13.658

epth

/S

hear

 

f Freeboardboard

CB

dard Shear Profile:

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 59/245

149.822 m

13.638 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.685947 m

3685.947 mm

2311.084 mm

0.726

1.034

2389.397 mm

9.988 m

13.65795 m

917.453 mm

30.054 m30.054 m

20.060 %

0.8L 0.9L 0 0.1L

75.3 87.7 I 0 5

75.3 87.7 II 0 6.3

0.201 L

0.2 L0.1 L

107.320 mm

Aft Body, Standard Shear Profile:

10.030 %

Deduction

Correction for Shear

Percentage L

Upper LimitLower Limit

% Reduction of total

allowance

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

 

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total SE

% LF/B

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where shi

covering 0.6L amidships, the freeboard is red

CB

Correction

Corrected F/B

Correction for Depth

Rule FreeboardTabular Freeboard

Correction for CB

Start Shear from FPtsp

Freeboard defined by designFreeboard

Basis ParametersFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 60/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum

PROD3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2389.397

917.453

-107.320

487.037 mm

3686.568

13.659

Deduction for S/S

Correction for Shear

Rule F/B

New Depth

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear FwdMean defficiency

Correction

Defficiency of Shear

Foward Body, Standard Shear Profile:

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 61/245

CB 0.7104

0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

10 15 23.5 32 46 63 75.3 87.7

12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

p has an enclosed superstructure

uced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 62/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 63/245

CB 0.7104

149.822 m

13.639 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.686568 m

3686.568 mm

2311.084 mm

0.726

1.034

2389.406 mm

9.988 m

13.65857 m

917.609 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.201 L

0.2 L0.1 L

107.320 mm

Correction for Shear

Aft Body, Standard Shear Profile:

% Reduction of total

allowance10.030 %

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper LimitLower Limit

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Length of Supers

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total SE

Correction for Depth

Depth (Standard)

Depth (Actual)Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FPtsp

Freeboard defined by design

CB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 64/245

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum

PROD3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2389.406

917.609

-107.320

487.037 mm

3686.732

13.659New Depth

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of FreeboardBasic Tabular Freeboard

Correction for CB

Foward Body, Standard Shear Profile:

Excess of Shear FwdMean defficiency

Defficiency of Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 65/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

tsp

Freeboard defi

Basis PaFreeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Length of Poop

Length of ForecastleShear Aft

Shear Fwd

Start Shear from FP

Depth (Actual)Correction DF/B > L/15

Freeboard

Rule FrTabular Freeboard

Correction forCB

Ships with F'cle

without detached

Bridge

Correction

Corrected F/B

Correction for

Depth (Standard)

where 'D' is less than

covering 0.

Deduction for Super

Total SE

% LF/B

Percentage of Ded

Ships with F'cle &

detached Bridge

Percentage L

Deduction

% Reduction of total

allowance

Upper LimitLower Limit

Correction for S

Aft Body, Standa

tructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 66/245

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Excess of Shear FwdMean defficiency

Defficiency of Shear

Foward Body, Stan

Correction

Summary oBasic Tabular Fre

Correction for

Correction for D

Deduction for

Correction for S

Rule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 67/245

CB 0.7104

149.822 m

13.640 m

9.972 m

0.726

0 m

30.054 m0 m

0 m

0 m

0.02 m

3.688 m

3688 mm

2311.084 mm

0.726

1.034

2389.426 mm

9.988 m

13.66 m

917.967 mm

30.054 m30.054 m

20.060 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L

I 0 5 10 15 23.5 32 46 63

II 0 6.3 12.7 19 27.5 36 46 63

0.201 L

0.2 L0.1 L

107.320 mm

ned by design

rameters

eboard

CB

Total Effective Length of Superstructures and Trunks

epth

/15 no reduction except where ship has an enclosed superstructure

6L amidships, the freeboard is reduced at the above rate

structure

ction For Type 'B'

%10.030

hear

rd Shear Profile:

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 68/245

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum

PROD3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum

PROD7996.085

999.511749.633

487.037

2311.084

2389.426

917.967

-107.320

487.037 mm

3687.110

13.659

dard Shear Profile:

f Freeboardboard

CB

epth

/S

hear

 

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 69/245

0.8L 0.9L

75.3 87.7

75.3 87.7

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 70/245

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.1L

0 m

2 m

74.911 m

0.02 m

3.029 m

3029 mm

2311.084 mm

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.100 L

0.1 L

0.1 L

With Shear (1st iteration)

% Reduction of total

Ships with F'cle & detached

Bridge

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

Correction

Corrected F/B

Freeboard

Rule FreeboardTabular Freeboard

Shear Aft

Length of Superstructure

Correction for CB

CB

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design Particulars

14.9822 m

CB at 85% DMLD

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 71/245

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.5171/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.0031/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2380.211

753.217

-53.500

174.914 mm

Correction for Depth

Deduction for S/S

Correction for Shear

Basic Tabular Freeboard

Correction for CB

Foward Body, Actual Shear Profile:

Excess of Shear Fwd

Mean defficiency

Correction

Summary of Freeboard Calculation

hs

1/3 L

1/6 L

gradient

Foward Body, Standard Shear Profile:

Area Shear Fwd

hs

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear Aft

 

allowance.

Deduction

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 72/245

3254.842

13.227 m

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.2L

0 m

2 m

74.911 m

0.02 m

3.029 m

3029 mm

2311.084 mm

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

29.9644 m

29.9644 m

20.000 %

New Depth

Deduction for Superstructure

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

CB

Correction

Corrected F/B

Correction for Depth

Rule FreeboardTabular Freeboard

Correction for CB

Freeboard defined by design ParticularsFreeboard

29.9644 m

Shear Aft

Shear Fwd

Basis ParametersFreeboard Length

Start Shear from FP

tsp

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of Superstructure

Rule F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 73/245

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

1/3 L

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

Aft Body, Standard Shear Profile:

Defficiency of Shear Aft

Foward Body, Standard Shear Profile:

10.000 %

Deduction

Correction for Shear

Percentage L

Upper Limit

Lower Limit

% Reduction of total

allowance

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

Ships with F'cle & detached

Bridge

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 74/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2380.211

753.217

-107.000

162.420 mm

3188.848

13.161 m

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.3L

0 m

2 m

74.911 m

0.02 m

3.029 m

3029 mm

2311.084 mm

New Depth

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design Particulars

Length of Superstructure 44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Deduction for S/S

Correction for Shear

Rule F/B

Basis Parameters

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear Fwd

Mean defficiency

Correction

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 75/245

0.721

1.030

2380.211 mm

9.988 m13.001 m

753.217 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear Aft

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle & detached

Bridge

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 76/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2380.211

753.217

-160.500

149.927 mm

3122.854

13.095 m

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.1L

0 m

0 m

0 m

0.02 m

Shear Aft

Shear Fwd

Start Shear from FP

tsp

CB at 85% DMLD

Length of Superstructure 14.9822 m

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Without Shear (1st iteration)

New Depth

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Foward Body, Actual Shear Profile:

Excess of Shear Fwd

Mean defficiency

hs

1/3 L1/6 L

gradient

Area Shear Fwd

hs

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 77/245

3.029 m

3029 mm

2311.084 mm

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.100 L

0.1 L

0.1 L

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.0241/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear Aft

% Reduction of total

allowance5.000 %

Deduction

Ships with F'cle & detached

Percentage L

Upper Limit

Lower Limit

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by design ParticularsFreeboard

Rule Freeboard

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 78/245

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2380.211

753.217

-53.500

524.743 mm

3604.67113.577 m

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.2L

0 m

0 m

0 m

0.02 m

3.029 m

3029 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by design ParticularsFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of Superstructure 29.9644

Freeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Defficiency of Shear Aft

Mean defficiency

New Depth

Basis Parameters

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 79/245

0.721

1.030

2380.211 mm

9.988 m

13.001 m

753.217 mm

29.9644 m

29.9644 m

20.000 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear Aft

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance10.000

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

Ships with F'cle & detached

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Correction

Corrected F/B

Correction for DepthDepth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 80/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2380.211

753.217

-107.000

487.261 mm

3513.689

13.486 m

CB 0.7104

149.822 m

12.981 m

9.972 m

0.721

S=0.3L

0 m

0 m

0 m

0.02 m

3.029 m

3029 mm

2311.084 mm

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design Particulars

Length of Superstructure 44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for Shear

Rule F/B

New Depth

Basis Parameters

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Defficiency of Shear Aft

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 81/245

0.721

1.030

2380.211 mm

9.988 m13.001 m

753.217 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L

I 0 5 10 15 23.5

II 0 6.3 12.7 19 27.5

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

Foward Body, Standard Shear Profile:

Correction for ShearAft Body, Standard Shear Profile:

Defficiency of Shear Aft

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle & detached

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Total Effective Length of Superstru

where 'D' is less than L/15 no reduction except where ship has an enclosed superstructure covering

0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 82/245

999.511

749.633

449.780

2311.084

2380.211

753.217

-160.500

449.780 mm

3422.708

13.395 m

%L 10 20 30

With Shear 13.308 13.218 13.129

Without Shear 13.783 13.66 13.536

New Depth

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear Aft

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 83/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 84/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

Percentage L

Upper Limit

Lower Limit

% Reduction of total

Percentage of De

Ships with F'cle

without detached

Bridge

Ships with F'cle &

detached Bridge

Deduction for Supe

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15where 'D' is less tha

CB

Correction

Corrected F/B

Correction for

Rule FrTabular Freeboard

Correction fo

Start Shear from FP

tsp

Freeboard defFreeboard

Shear Aft

Shear Fwd

Length of

Superstructure

Basis PFreeboard Length

Depth Moulded

tures and Trunks

Draught Moulded

CB at 85% DMLD

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 85/245

STN ORD

AP 1498.5171/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.6681/6L 1330.683

FP 2997.033

STN ORD

CL 0.000

1/3L 666.340

1/6L 1332.681

FP 1999.021

Deduction for

Correction for

Summary of FreeBasic Tabular Fre

Correction for

Correction for

Excess of Shear Fwd

Mean defficiency

Correction

1/3 L

1/6 L

gradient

Foward Body, Ac

Area Shear Fwd

hs

hs

Aft Body, Stand

Defficiency of Shear

Foward Body, Sta

Deduction

Correction for

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 86/245

E

% LF/B

Correction DF/B > L/15

where 'D' is less tha

Deduction for Supe

Total S

Corrected F/B

Correction for

Depth (Standard)

Depth (Actual)

CB

Correction

Freeboard defFreeboard

Rule Fr

Shear Aft

Shear Fwd

Start Shear from FP

tsp

Tabular Freeboard

Correction fo

Basis PFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

Rule F/B

New Dept

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 87/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

STN ORD

CL 0.000

1/3L 666.340

1/6L 1332.681

FP 1999.021

Foward Body, Ac

hs

1/3 L

1/6 L

gradient

Foward Body, Sta

Area Shear Fwd

hs

Correction for

Aft Body, Stand

Defficiency of Shear

% Reduction of total

allowance

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Lower Limit

Percentage of De

Ships with F'cle

without detached

Bridge

tures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 88/245

Rule FrTabular Freeboard

tsp

Freeboard defFreeboard

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure

New Dept

Basis PFreeboard Length

Depth Moulded

Correction for

Deduction for

Correction for

Rule F/B

Correction

Summary of FreeBasic Tabular Fre

Correction for

Excess of Shear Fwd

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 89/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Defficiency of Shear

Foward Body, Sta

Deduction

Correction for

Aft Body, Stand

Upper Limit

Lower Limit

% Reduction of total

allowance

Ships with F'cle

without detached

Bridge

Ships with F'cle &

detached Bridge

Percentage L

Total S

E

% LF/B

Percentage of De

Depth (Actual)

Correction DF/B > L/15

where 'D' is less tha

Deduction for Supe

Correction

Corrected F/B

Correction for

Depth (Standard)

Correction fo

CB

tures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 90/245

STN ORD

CL 0.000

1/3L 666.340

1/6L 1332.681

FP 1999.021

Shear Aft

Shear Fwd

Start Shear from FP

tsp

Basis PFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

Correction for

Rule F/B

Correction for

Deduction for

New Dept

Basic Tabular Fre

Correction for

Correction

Summary of Free

1/6 L

gradient

Foward Body, Ac

Excess of Shear Fwd

Mean defficiency

Area Shear Fwd

hs

hs

1/3 L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 91/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

STN ORD

AP 1498.517

1/6L 665.3411/3L 167.834

CL 0.000

Foward Body, Sta

Correction for

Aft Body, Stand

Defficiency of Shear

% Reduction of total

allowance

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

E

% LF/B

Percentage of De

Ships with F'cle

without detached

Bridge

Correction DF/B > L/15

where 'D' is less tha

Deduction for Supe

Total S

Corrected F/B

Correction for

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction fo

CB

Correction

Freeboard defFreeboard

Rule Fr

tures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 92/245

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Rule FrTabular Freeboard

tsp

Freeboard defFreeboard

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure

New Dept

Basis PFreeboard Length

Depth Moulded

Correction for

Deduction for

Correction for

Rule F/B

Correction

Summary of FreeBasic Tabular Fre

Correction for

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 93/245

0.5L 0.6L 0.7L 0.8L 0.9L

32 46 63 75.3 87.7

36 46 63 75.3 87.7

STN ORD

AP 1498.517

1/6L 665.341

1/3L 167.834

CL 0.000

STN ORD

CL 0.000

1/3L 335.668

1/6L 1330.683

FP 2997.033

Defficiency of Shear

Foward Body, Sta

Deduction

Correction for

Aft Body, Stand

Upper Limit

Lower Limit

% Reduction of total

allowance

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Percentage L

Total S

E

% LF/B

Percentage of De

Depth (Actual)

Correction DF/B > L/15

where 'D' is less tha

Deduction for Supe

Correction

Corrected F/B

Correction forDepth (Standard)

Correction fo

CB

tures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 94/245

Freeboard

Rule FrTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard def

Length of

Superstructure

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for

Rule F/B

New Dept

Basis P

Basic Tabular Fre

Correction for

Correction for

Deduction for

Defficiency of Shear

Mean defficiency

Correction

Summary of Free

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 95/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 96/245

New Dept

Defficiency of Shear

Mean defficiency

Correction for

Rule F/B

Correction

Summary of FreeBasic Tabular Fre

Correction for

Correction for

Deduction for

13.1

13.2

13.3

13.4

13.5

13.6

13.7

13.8

13.9

   D  e  p   t   h   (  m   )

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 97/245

135 10 1

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 98/245

CB 0.7104

149.822 m

13.207 m

9.972 m

0.723

S=0.1L

0 m

2 m

74.911 m

0.02 m

3.2548422 m

3254.8422 mm

2311.084 mm

0.723

1.031

2383.369 mm

9.988 m

13.226842 m

809.677 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.100 L

0.1 L

0.1 L Without Shear 13.764 13.64 13.517

With Shear 13.289 13.199 13.109

uction For Type 'B'

Total Effective Length of Superstructures and Trunks

rstructure

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

epth

eeboard

r CB

ined by design

14.9822 m

With Shear (2nd iteration)

rameters

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 99/245

SS%L 0.1 0.2 0.3

53.500 mm

SM PROD

1 1498.5173 1996.024

3 503.502

1 0.000

sum PROD 3998.042

499.755

SM PROD

1 0.000

3 1007.0033 3992.048

1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

SM PROD

1 0.000

3 1999.021

3 3998.042

1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2383.369

809.677

-53.500

174.914 mm

S/S

hear

board Calculationeboard

CB

epth

tual Shear Profile:

rd Shear Profile:

dard Shear Profile:

.

hear

13

13.1

13.2

13.3

13.4

13.5

13.6

13.7

13.8

10.00% 20.00%

   D   m    /    d

S/S %L

Paramet

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 100/245

3314.461

13.286 m

CB 0.7104

149.822 m

13.141 m

9.972 m

0.722

S=0.2L

0 m

2 m

74.911 m

0.02 m

3.1888483 m

3188.8483 mm

2311.084 mm

0.722

1.031

2382.446 mm

9.988 m

13.160848 m

793.179 mm

29.9644 m

29.9644 m

20.000 %

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

rstructure

epth

ined by design

eeboard

r CB

29.9644 m

rameters

 

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 101/245

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.200 L

0.2 L

0.2 L

107.000 mm

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum PROD 3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

SM PROD

1 0.000

3 1999.021

3 3998.042

1 1999.021

tual Shear Profile:

dard Shear Profile:

hear

rd Shear Profile:

10.000 %

uction For Type 'B'

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 102/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2382.446

793.179

-107.000

162.420 mm

3231.046

13.203 m

CB 0.7104

149.822 m

13.075 m

9.972 m

0.721

S=0.3L

0 m

2 m

74.911 m

0.02 m

3.1228545 m

3122.8545 mm

2311.084 mm

eeboard

ined by design

m44.9466

 

rameters

epth

S/S

hear

 

board Calculationeboard

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 103/245

0.721

1.030

2381.524 mm

9.988 m13.094854 m

776.680 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.300 L

0.3 L

0.3 L

160.500 mm

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum PROD 3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

dard Shear Profile:

%

hear

rd Shear Profile:

15.000

Total Effective Length of Superstructures and Trunks

uction For Type 'B'

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

rstructure

epth

r CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 104/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

SM PROD

1 0.000

3 1999.021

3 3998.042

1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2381.524

776.680

-160.500

149.927 mm

3147.630

13.120 m

CB 0.7104

149.822 m

13.557 m

9.972 m

0.725

S=0.1L

0 m

0 m

0 m

0.02 m

Without Shear (2nd iteration)

rameters

14.9822 m

hear

 

epth

S/S

 

eboard

CB

board Calculation

tual Shear Profile:

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 105/245

3.6046709 m

3604.6709 mm

2311.084 mm

0.725

1.033

2388.261 mm

9.988 m

13.576671 m

897.134 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.100 L

0.1 L

0.1 L

53.500 mm

SM PROD

1 1498.517

3 1996.0243 503.502

1 0.000

sum PROD 3998.042

499.755

dard Shear Profile:

hear

rd Shear Profile:

5.000 %

uction For Type 'B'

Total Effective Length of Superstructures and Trunks

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

rstructure

epth

r CB

ined by design

eeboard

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 106/245

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2388.261

897.134

-53.500

524.743 mm

3756.63813.729 m

CB 0.7104

149.822 m

13.466 m

9.972 m

0.725

S=0.2L

0 m

0 m

0 m

0.02 m

3.5136893 m

3513.6893 mm

2311.084 mm

eeboard

ined by design

m29.9644

 

rameters

epth

S/S

hear

 

board Calculationeboard

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 107/245

0.725

1.033

2386.988 mm

9.988 m

13.485689 m

874.389 mm

29.9644 m

29.9644 m

20.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.200 L

0.2 L

0.2 L

107.000 mm

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum PROD 3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

dard Shear Profile:

%

hear

rd Shear Profile:

10.000

Total Effective Length of Superstructures and Trunksuction For Type 'B'

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

rstructure

epth

r CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 108/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2386.988

874.389

-107.000

487.261 mm

3641.639

13.614 m

CB 0.7104

149.822 m

13.375 m

9.972 m

0.724

S=0.3L

0 m

0 m

0 m

0.02 m

3.4227076 m

3422.7076 mm

2311.084 mm

eeboard

ined by design

44.9466 m

hear

 

rameters

eboard

CB

epth

S/S

board Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 109/245

0.724

1.032

2385.716 mm

9.988 m13.394708 m

851.644 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.300 L

0.3 L

0.3 L

160.500 mm

SM PROD

1 1498.517

3 1996.024

3 503.502

1 0.000

sum PROD 3998.042

499.755

SM PROD

1 0.000

3 1007.003

3 3992.048

1 2997.033

sum PROD 7996.085

dard Shear Profile:

hearrd Shear Profile:

15.000 %

uction For Type 'B'

Total Effective Length of Superstructures and Trunks

L/15 no reduction except where ship has an enclosed superstructure covering

.6L amidships, the freeboard is reduced at the above rate

rstructure

epth

r CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 110/245

999.511

749.633

449.780

2311.084

2385.716

851.644

-160.500

449.780 mm

3526.640

13.499 m

hear

 

board Calculationeboard

CB

epth

S/S

Design Chart

With She

Without S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 111/245

5 20 25 30 35

Superstructure(%L)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 112/245

149.822 m

13.266 m

9.972 m

0.723

0 m

2 m

74.911 m

0.02 m

3.31446066 m

3314.46066 mm

2311.084 mm

0.723

1.032

2384.203 mm

9.988 m

13.2864607 m

824.582 mm

14.9822 m

14.9822 m

10.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.100 L

0.1 L

0.1 L

Percentage L

Upper Limit

Lower Limit

% Reduction of total

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

CB

Correction

Corrected F/B

Correction for Depth

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by designFreeboard

14.9822 m

Shear Aft

Shear Fwd

Rule Freeboard

With Shear (3rd iter

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 113/245

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.5171/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.0031/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2384.203

824.582

-53.500

174.914

Deduction for S/S

Correction for Shear

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear Fwd

Mean defficiency

Correction

1/3 L

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

.

Deduction

Correction for Shear

 

allowance

30.00%

 

ic Study

Without

Shear

With Shear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 114/245

3330.199

13.302

149.822 m

13.183 m

9.972 m

0.722

0 m

2 m

74.911 m

0.02 m

3.23104553 m

3231.04553 mm

2311.084 mm

0.722

1.031

2383.036 mm

9.988 m

13.2030455 m

803.728 mm

29.9644 m

29.9644 m

20.000 %

E

% LF/B

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Shear Aft

Shear Fwd

Start Shear from FP

tsp

Tabular Freeboard

Correction for CB

29.9644 m

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

Rule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 115/245

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

Foward Body, Actual Shear Profile:

hs

1/3 L

1/6 L

gradient

Foward Body, Standard Shear Profile:

Area Shear Fwd

hs

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance10.000 %

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Lower Limit

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 116/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2383.036

803.728

-107.000

162.420

3242.185

13.214

149.822 m

13.100 m

9.972 m

0.722

0 m

2 m

74.911 m

0.02 m

3.14763041 m

3147.63041 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure44.9466

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Excess of Shear Fwd

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 117/245

0.722

1.031

2381.870 mm

9.988 m13.1196304 m

782.874 mm

44.9466 m

44.9466 m

30.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance15.000

Ships with F'cle

without detached

Bridge

Ships with F'cle &

detached Bridge

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 118/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2381.870

782.874

-160.500

149.927

3154.171

13.126

149.822 m

13.709 m

9.972 m

0.727

0 m

0 m

0 m

0.02 m

Without Shear (

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Shear Aft

Shear Fwd

Start Shear from FP

tsp

CB at 85% DMLD

Length of

Superstructure14.9822 m

Correction for Shear

Rule F/B

Correction for Depth

Deduction for S/S

New Depth

Basic Tabular Freeboard

Correction for CB

Correction

Summary of Freeboard Calculation

1/6 L

gradient

Foward Body, Actual Shear Profile:

Excess of Shear Fwd

Mean defficiency

Area Shear Fwd

hs

hs

1/3 L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 119/245

3.7566381 m

3756.6381 mm

2311.084 mm

0.727

1.034

2390.386 mm

9.988 m

13.7286381 m

935.126 mm

14.9822 m

14.9822 m

10.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.100 L

0.1 L

0.1 L

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.0241/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance5.000 %

Deduction

Upper Limit

Lower Limit

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Ships with F'cle &

Percentage L

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 120/245

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2390.386

935.126

-53.500

524.743

3796.75513.769

149.822 m

13.594 m

9.972 m

0.726

0 m

0 m

0 m

0.02 m

3.64163887 m

3641.63887 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure29.9644

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 121/245

0.726

1.034

2388.778 mm

9.988 m

13.6136389 m

906.376 mm

29.9644 m

29.9644 m

20.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance10.000

Ships with F'cle

without detached

Bridge

Ships with F'cle &

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Correction

Corrected F/B

Correction for DepthDepth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 122/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2388.778

906.376

-107.000

487.261

3675.415

13.647

149.822 m

13.479 m

9.972 m

0.725

0 m

0 m

0 m

0.02 m

3.52663964 m

3526.63964 mm

2311.084 mm

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Length of

Superstructure44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for Shear

Rule F/B

New Depth

Basis Parameters

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Defficiency of Shear

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 123/245

0.725

1.033

2387.170 mm

9.988 m13.4986396 m

877.627 mm

44.9466 m

44.9466 m

30.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

Foward Body, Standard Shear Profile:

Correction for ShearAft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'clewithout detached

Bridge

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 124/245

999.511

749.633

449.780

2311.084

2387.170

877.627

-160.500

449.780

3554.076

13.526New Depth

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

r

hear

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 125/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 126/245

CB 0.7104

S=0.1L

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

tion)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 127/245

mm

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 128/245

m

CB 0.7104

S=0.2L

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 129/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 130/245

mm

m

CB 0.7104

S=0.3L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 131/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 132/245

mm

m

CB 0.7104

S=0.1L

rd iteration)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 133/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 134/245

mm

m

CB 0.7104

S=0.2L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 135/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 136/245

mm

m

CB 0.7104

S=0.3L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 137/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 138/245

mm

m

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 139/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 140/245

CB 0.7104

149.822 m

13.282 m

9.972 m

0.723

S=0.1L

0 m

2 m

74.911 m

0.02 m

3.330198894 m

3330.198894 mm

2311.084 mm

0.723

1.032

2384.423 mm

9.988 m

13.30219889 m

828.516 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.100 L

0.1 L

0.1 L

Percentage L

Upper Limit

Lower Limit

% Reduction of total

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

Total Effective Length

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

CB

Correction

Corrected F/B

Correction for Depth

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by designFreeboard

14.9822 m

Shear Aft

Shear Fwd

Rule Freeboard

With Shear (4th iteration)

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 141/245

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.5171/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.0031/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2384.423

828.516

-53.500

174.914 mm

Deduction for S/S

Correction for Shear

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear Fwd

Mean defficiency

Correction

1/3 L

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

.

Deduction

Correction for Shear

 

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 142/245

3334.354

13.306 m

CB 0.7104

149.822 m

13.194 m

9.972 m

0.722

S=0.2L

0 m

2 m

74.911 m

0.02 m

3.242184862 m

3242.184862 mm

2311.084 mm

0.722

1.031

2383.192 mm

9.988 m

13.21418486 m

806.513 mm

29.9644 m

29.9644 m

20.000 %

E

% LF/B

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Shear Aft

Shear Fwd

Start Shear from FP

tsp

Tabular Freeboard

Correction for CB

29.9644 m

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure

Rule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 143/245

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

Foward Body, Actual Shear Profile:

hs

1/3 L

1/6 L

gradient

Foward Body, Standard Shear Profile:

Area Shear Fwd

hs

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance10.000 %

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Lower Limit

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

Total Effective Length

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 144/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2383.192

806.513

-107.000

162.420 mm

3245.125

13.217 m

CB 0.7104

149.822 m

13.106 m

9.972 m

0.722

S=0.3L

0 m

2 m

74.911 m

0.02 m

3.15417083 m

3154.17083 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure44.9466

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Excess of Shear Fwd

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 145/245

0.722

1.031

2381.961 mm

9.988 m13.12617083 m

784.509 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance15.000

Ships with F'cle

without detached

Bridge

Total Effective Length

Ships with F'cle &

detached Bridge

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 146/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 147/245

3.796754801 m

3796.754801 mm

2311.084 mm

0.727

1.035

2390.946 mm

9.988 m

13.7687548 m

945.155 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.100 L

0.1 L

0.1 L

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.0241/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance5.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle

without detached

Bridge

Total Effective Length

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 148/245

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2390.946

945.155

-53.500

524.743 mm

3807.34513.779 m

CB 0.7104

149.822 m

13.627 m

9.972 m

0.726

S=0.2L

0 m

0 m

0 m

0.02 m

3.675415347 m

3675.415347 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure29.9644

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 149/245

0.726

1.034

2389.250 mm

9.988 m

13.64741535 m

914.821 mm

29.9644 m

29.9644 m

20.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance10.000

Ships with F'cle

without detached

Bridge

Total Effective Length

Ships with F'cle &

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Correction

Corrected F/B

Correction for DepthDepth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 150/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2389.250

914.821

-107.000

487.261 mm

3684.332

13.656 m

CB 0.7104

149.822 m

13.506 m

9.972 m

0.725

S=0.3L

0 m

0 m

0 m

0.02 m

3.554075893 m

3554.075893 mm

2311.084 mm

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Length of

Superstructure44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for Shear

Rule F/B

New Depth

Basis Parameters

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Defficiency of Shear

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 151/245

0.725

1.033

2387.553 mm

9.988 m13.52607589 m

884.486 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

Foward Body, Standard Shear Profile:

Correction for ShearAft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'clewithout detached

Bridge

Total Effective Length

where 'D' is less than L/15 no reduction except where ship has an enclosed super

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 152/245

999.511

749.633

449.780

2311.084

2387.553

884.486

-160.500

449.780 mm

3561.319

13.533 mNew Depth

Defficiency of Shear

Mean defficiency

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 153/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 154/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

Percen

Upper

Lower

% Reducti

Percentag

Ships w

without d

Bri

Ships wit

detache

Deducti

Tot

%

Depth (S

Depth (

Correctionwhere 'D'

C

Corre

Correct

Cor

Tabular F

C

Start Shear

tsp

FreeFree

Shear Aft

Shear Fwd

 

Freeboard

Depth Moul

Draught M

CB at 85%

Length of

Superstruct

f Superstructures and Trunks

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 155/245

STN

AP1/6L

1/3L

CL

STN

CL

1/3L1/6L

FP

STN

CL

1/3L

1/6L

FP

D

Co

SummaBasic

C

Co

Excess of

Mean de

Corre

1/ 

1/ 

grad

Fow

Area Sh

h

h

Aft

Defficienc

Fowar

Dedu

Cor

allow

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 156/245

%

Correction

where 'D'

Deducti

Tot

Correct

Cor

Depth (S

Depth (

Tabular F

C

C

Corre

FreeFree

 

Shear Aft

Shear Fwd

Start Shear

tsp

CB at 85%Length of

Superstruct

 Freeboard

Depth Moul

Draught M

 

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 157/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

STN

AP

1/6L

1/3L

CL

STN

CL

1/3L

1/6L

FP

STN

CL

1/3L

1/6L

FP

Fow

h

1/ 

1/ 

grad

Fowar

Area Sh

h

Cor

Aft

Defficienc

% Reducti

allow

Dedu

Ships wit

detache

Percen

Upper

Lower

Percentag

Ships w

without d

Bri

f Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 158/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 159/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

STN

AP

1/6L

1/3L

CL

STN

CL

1/3L

1/6L

FP

Defficienc

Fowar

Dedu

Cor

Aft

Upper

Lower

% Reducti

allow

Ships w

without d

Bri

Ships wit

detache

Percen

Tot

%

Percentag

Depth (

Correction

where 'D'

Deducti

Corre

Correct

Cor

Depth (S

C

C

f Superstructures and Trunks

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 160/245

STN

CL

1/3L

1/6L

FP

 Freeboard

Depth Moul

Draught M

Shear Aft

Shear Fwd

Start Shear

tsp

CB at 85%Length of

Superstruct

Co

Area Sh

h

h

1/ 

Basic

1/ 

grad

Fow

C

Co

D

Excess of

Mean de

Corre

Summa

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 161/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

STN

AP

1/6L1/3L

CL

Fowar

Cor

Aft

Defficienc

% Reducti

allow

Dedu

Upper

Lower

%

Percentag

Ships w

without d

Bri

Correct

Cor

Depth (S

Depth (

Ships wit

Percen

Tabular F

C

C

Corre

FreeFree

 

Correction

where 'D'

Deducti

Tot

f Superstructures and Trunks

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 162/245

STN

CL

1/3L

1/6L

FP

 Tabular F

tsp

FreeFree

Shear Aft

Shear Fwd

Start Shear

Draught MCB at 85%

Length of

Superstruct

 

Freeboard

Depth Moul

Co

D

Co

Corre

SummaBasic

C

Defficienc

Mean de

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 163/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

STN

AP

1/6L

1/3L

CL

STN

CL

1/3L

1/6L

FP

Defficienc

Fowar

Dedu

Cor

Aft

Upper

Lower

% Reducti

allow

Ships w

without d

Bri

Ships wit

Percen

Tot

%

Percentag

Depth (

Correction

where 'D'

Deducti

Corre

Correct

CorDepth (S

C

C

f Superstructures and Trunks

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 164/245

Free

 Tabular F

Shear Fwd

Start Shear

tsp

Free

Length of

Superstruct

Shear Aft

Freeboard

Depth Moul

Draught MCB at 85%

Co

Basic

C

Co

D

Defficienc

Mean de

Corre

Summa

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 165/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

STN

AP

1/6L

1/3L

CL

STN

CL

1/3L

1/6L

FP

Fowar

CorAft

Defficienc

% Reducti

allow

Dedu

Ships wit

Percen

Upper

Lower

%

Percentag

Ships wwithout d

Bri

where 'D'

Deducti

Tot

Cor

Depth (SDepth (

Correction

C

C

Corre

Correct

f Superstructures and Trunks

structure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 166/245

 

Co

D

Co

Corre

SummaBasic

C

Defficienc

Mean de

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 167/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 168/245

CB 0.7104

149.822 m

13.286 m

9.972 m

0.723

S=0.1L

0 m

2 m

74.911 m

0.02 m

3.33435352 m

3334.35352 mm

2311.084 mm

0.723

1.032

2384.481 mm

9.988 m

13.3063535 m

829.555 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.100 L

0.1 L

0.1 L

tage L

Limit

Limit

on of total

e of Deduction For Type 'B' Ships

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

h F'cle &

Bridge

n for Superstructure

l S

  F/B

tandard)

Actual)

DF/B > L/15is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

B

ction

ed F/B

rection for Depth

reeboard

rrection for CB

from FP

board defined by designoard

14.9822 m

 

Rule Freeboard

With Shear (5th iteration)

Basis ParametersLength

lded

ulded

MLD

 

ure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 169/245

53.500 mm

ORD SM PROD

1498.517 1 1498.517665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.0031330.683 3 3992.048

2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

ORD SM PROD

0.000 1 0.000

666.340 3 1999.021

1332.681 3 3998.042

1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2384.481

829.555

-53.500

174.914 mm

eduction for S/S

rrection for Shear

ry of Freeboard CalculationTabular Freeboard

orrection for CB

rrection for Depth

hear Fwd

fficiency

ction

L

L

ient

rd Body, Actual Shear Profile:

ear Fwd

s

s

ody, Standard Shear Profile:

of Shear

d Body, Standard Shear Profile:

.

ction

rection for Shear

ance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 170/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 171/245

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.200 L

0.2 L

0.2 L

107.000 mm

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

ORD SM PROD

0.000 1 0.000

666.340 3 1999.021

1332.681 3 3998.042

1999.021 1 1999.021

rd Body, Actual Shear Profile:

s

L

L

ient

d Body, Standard Shear Profile:

ear Fwd

s

rection for Shear

ody, Standard Shear Profile:

of Shear

on of total

ance10.000 %

ction

h F'cle &

Bridge

tage L

Limit

Limit

e of Deduction For Type 'B' Ships

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 172/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2383.233

807.248

-107.000

162.420 mm

3245.902

13.218 m

CB 0.7104

149.822 m

13.108 m

9.972 m

0.722

S=0.3L

0 m

2 m

74.911 m

0.02 m

3.15589739 m

3155.89739 mm

2311.084 mm

Rule Freeboardreeboard

board defined by designoard

m

 

from FP

ulded

MLD

 

ure44.9466

New Depth

Basis ParametersLength

lded

rrection for Depth

eduction for S/S

rrection for Shear

Rule F/B

ction

ry of Freeboard CalculationTabular Freeboard

orrection for CB

hear Fwd

fficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 173/245

0.722

1.031

2381.986 mm

9.988 m13.1278974 m

784.941 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.300 L

0.3 L

0.3 L

160.500 mm

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

of Shear

d Body, Standard Shear Profile:

%

ction

rection for Shear

ody, Standard Shear Profile:

Limit

Limit

on of total

ance15.000

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

h F'cle &

Bridge

tage L

l S

  F/B

e of Deduction For Type 'B' Ships

Actual)

DF/B > L/15

is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

n for Superstructure

ction

ed F/B

rection for Depth

tandard)

rrection for CB

B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 174/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

ORD SM PROD

0.000 1 0.000

666.340 3 1999.021

1332.681 3 3998.042

1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2381.986

784.941

-160.500

149.927 mm

3156.353

13.128 m

CB 0.7104

149.822 m

13.759 m

9.972 m

0.727

S=0.1L

0 m

0 m

0 m

0.02 m

Without Shear (5th iteration)

Basis ParametersLength

lded

ulded

 

from FP

MLD

 

ure14.9822 m

rrection for Shear

Rule F/B

New Depth

ear Fwd

s

s

L

Tabular Freeboard

L

ient

rd Body, Actual Shear Profile:

orrection for CB

rrection for Depth

eduction for S/S

hear Fwd

fficiency

ction

ry of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 175/245

3.80734492 m

3807.34492 mm

2311.084 mm

0.727

1.035

2391.095 mm

9.988 m

13.7793449 m

947.803 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.100 L

0.1 L

0.1 L

53.500 mm

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

d Body, Standard Shear Profile:

rection for Shear

ody, Standard Shear Profile:

of Shear

on of total

ance5.000 %

ction

Limit

Limit

  F/B

e of Deduction For Type 'B' Ships

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

ed F/B

rection for Depth

tandard)

Actual)

h F'cle &

tage L

reeboard

rrection for CB

B

ction

board defined by designoard

Rule Freeboard

DF/B > L/15

is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

n for Superstructure

l S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 176/245

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2391.095

947.803

-53.500

524.743 mm

3810.14113.782 m

CB 0.7104

149.822 m

13.636 m

9.972 m

0.726

S=0.2L

0 m

0 m

0 m

0.02 m

3.68433175 m

3684.33175 mm

2311.084 mm

Rule Freeboardreeboard

board defined by designoard

m

 

from FP

ulded

MLD

 

ure29.9644

New Depth

Basis ParametersLength

lded

rrection for Depth

eduction for S/S

rrection for Shear

Rule F/B

ction

ry of Freeboard CalculationTabular Freeboard

orrection for CB

of Shear

fficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 177/245

0.726

1.034

2389.374 mm

9.988 m

13.6563318 m

917.050 mm

29.9644 m

29.9644 m

20.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.200 L

0.2 L

0.2 L

107.000 mm

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

of Shear

d Body, Standard Shear Profile:

%

ction

rection for Shear

ody, Standard Shear Profile:

Limit

Limit

on of total

ance10.000

ith F'cle

etached

ge

Total Effective Length of Superstructures and Trunks

h F'cle &

tage L

l S

  F/B

e of Deduction For Type 'B' Ships

Actual)

DF/B > L/15

is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

n for Superstructure

ction

ed F/B

rection for Depthtandard)

rrection for CB

B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 178/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2389.374

917.050

-107.000

487.261 mm

3686.686

13.659 m

CB 0.7104

149.822 m

13.513 m

9.972 m

0.725

S=0.3L

0 m

0 m

0 m

0.02 m

3.56131859 m

3561.31859 mm

2311.084 mm

oard

Rule Freeboardreeboard

 

from FP

board defined by design

ure44.9466 m

 

Length

lded

ulded

MLD

rrection for Shear

Rule F/B

New Depth

Basis Parameters

Tabular Freeboard

orrection for CB

rrection for Depth

eduction for S/S

of Shear

fficiency

ction

ry of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 179/245

0.725

1.033

2387.654 mm

9.988 m13.5333186 m

886.296 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

I 0 5 10 15 23.5 32 46

II 0 6.3 12.7 19 27.5 36 46

0.300 L

0.3 L

0.3 L

160.500 mm

ORD SM PROD

1498.517 1 1498.517

665.341 3 1996.024

167.834 3 503.502

0.000 1 0.000

sum PROD 3998.042

499.755

ORD SM PROD

0.000 1 0.000

335.668 3 1007.003

1330.683 3 3992.048

2997.033 1 2997.033

sum PROD 7996.085

d Body, Standard Shear Profile:

rection for Shearody, Standard Shear Profile:

of Shear

on of total

ance15.000 %

ction

h F'cle &

tage L

Limit

Limit

  F/B

e of Deduction For Type 'B' Ships

ith F'cleetached

ge

Total Effective Length of Superstructures and Trunks

is less than L/15 no reduction except where ship has an enclosed superstructure

covering 0.6L amidships, the freeboard is reduced at the above rate

n for Superstructure

l S

rection for Depth

tandard)Actual)

DF/B > L/15

rrection for CB

B

ction

ed F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 180/245

999.511

749.633

449.780

2311.084

2387.654

886.296

-160.500

449.780 mm

3563.231

13.535 mNew Depth

rrection for Depth

eduction for S/S

rrection for Shear

Rule F/B

ction

ry of Freeboard CalculationTabular Freeboard

orrection for CB

of Shear

fficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 181/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 182/245

149.822 m

13.287 m

9.972 m

0.723

0 m

2 m

74.911 m

0.02 m

3.3354503 m

3335.4503 mm

2311.084 mm

0.723

1.032

2384.496 mm

9.988 m

13.30745 m

829.829 mm

14.9822 m

14.9822 m

10.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.100 L

0.1 L

0.1 L

Percentage L

Upper Limit

Lower Limit

% Reduction of total

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

CB

Correction

Corrected F/B

Correction for Depth

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

14.9822 m

Shear Aft

Shear Fwd

Length of

Superstructure

With Shear (6th iter

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 183/245

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.5171/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.0031/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2384.496

829.829

-53.500

174.914

Deduction for S/S

Correction for Shear

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear Fwd

Mean defficiency

Correction

1/3 L

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

.

Deduction

Correction for Shear

 

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 184/245

3335.740

13.308

149.822 m

13.198 m

9.972 m

0.722

0 m

2 m

74.911 m

0.02 m

3.2459017 m

3245.9017 mm

2311.084 mm

0.722

1.031

2383.244 mm

9.988 m

13.217902 m

807.442 mm

29.9644 m

29.9644 m

20.000 %

E

% LF/B

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Shear Aft

Shear Fwd

Start Shear from FP

tsp

CB at 85% DMLD

Length of

Superstructure29.9644 m

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Rule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 185/245

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

Foward Body, Actual Shear Profile:

hs

1/3 L

1/6 L

gradient

Foward Body, Standard Shear Profile:

Area Shear Fwd

hs

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance10.000 %

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Lower Limit

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 186/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2383.244

807.442

-107.000

162.420

3246.107

13.218

149.822 m

13.108 m

9.972 m

0.722

0 m

2 m

74.911 m

0.02 m

3.1563532 m

3156.3532 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure44.9466

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Excess of Shear Fwd

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 187/245

0.722

1.031

2381.992 mm

9.988 m13.128353 m

785.055 mm

44.9466 m

44.9466 m

30.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance15.000

Ships with F'cle without

detached Bridge

Ships with F'cle &

detached Bridge

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 188/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2381.992

785.055

-160.500

149.927

3156.473

13.128

149.822 m

13.762 m

9.972 m

0.727

0 m

0 m

0 m

0.02 m

Shear Aft

Shear Fwd

Start Shear from FP

tsp

Without Shear (

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

Length of

Superstructure14.9822 m

Correction for Shear

Rule F/B

New Depth

Area Shear Fwd

hs

hs

1/3 L

Basic Tabular Freeboard

1/6 L

gradient

Foward Body, Actual Shear Profile:

Correction for CB

Correction for Depth

Deduction for S/S

Excess of Shear Fwd

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 189/245

3.8101405 m

3810.1405 mm

2311.084 mm

0.727

1.035

2391.134 mm

9.988 m

13.782141 m

948.502 mm

14.9822 m

14.9822 m

10.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.100 L

0.1 L

0.1 L

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.0241/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance5.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 190/245

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2391.134

948.502

-53.500

524.743

3810.87913.783

149.822 m

13.639 m

9.972 m

0.726

0 m

0 m

0 m

0.02 m

3.6866855 m

3686.6855 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure29.9644

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 191/245

0.726

1.034

2389.407 mm

9.988 m

13.658686 m

917.638 mm

29.9644 m

29.9644 m

20.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance10.000

Ships with F'cle without

detached Bridge

Ships with F'cle &

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B' Ships

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Correction

Corrected F/B

Correction for DepthDepth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 192/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2389.407

917.638

-107.000

487.261

3687.307

13.659

149.822 m

13.515 m

9.972 m

0.725

0 m

0 m

0 m

0.02 m

3.5632305 m

3563.2305 mm

2311.084 mm

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Length of

Superstructure44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for Shear

Rule F/B

New Depth

Basis Parameters

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Defficiency of Shear

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 193/245

0.725

1.033

2387.681 mm

9.988 m13.535231 m

886.774 mm

44.9466 m

44.9466 m

30.000 %

0.7L 0.8L 0.9L 0

63 75.3 87.7 I 0

63 75.3 87.7 II 0

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

Foward Body, Standard Shear Profile:

Correction for ShearAft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B' Ships

Ships with F'cle without

detached Bridge

where 'D' is less than L/15 no reduction except

covering 0.6L amidships, the freeb

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 194/245

999.511

749.633

449.780

2311.084

2387.681

886.774

-160.500

449.780

3563.735

13.536New Depth

Defficiency of Shear

Mean defficiency

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 195/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 196/245

CB 0.7104

S=0.1L

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

ation)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 197/245

mm

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 198/245

m

CB 0.7104

S=0.2L

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 199/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 200/245

mm

m

CB 0.7104

S=0.3L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 201/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 202/245

mm

m

CB 0.7104

S=0.1L

6th iteration)

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 203/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 204/245

mm

m

CB 0.7104

S=0.2L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 205/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 206/245

mm

m

CB 0.7104

S=0.3L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 207/245

0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

5 10 15 23.5 32 46 63 75.3 87.7

6.3 12.7 19 27.5 36 46 63 75.3 87.7

Total Effective Length of Superstructures and Trunks

where ship has an enclosed superstructure

ard is reduced at the above rate

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 208/245

mm

m

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 209/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 210/245

CB 0.7104

149.822 m

13.289 m

9.972 m

0.723

S=0.1L

0 m

2 m

74.911 m

0.02 m

3.337 m

3337 mm

2311.084 mm

0.723

1.032

2384.518 mm

9.988 m

13.309 m

830.217 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.100 L

0.1 L

0.1 L

Percentage L

Upper Limit

Lower Limit

% Reduction of total

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Lengt

Ships with F'cle &

detached Bridge

Deduction for Superstructure

Total S

E

% LF/B

Depth (Standard)

Depth (Actual)

Correction DF/B > L/15where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

CB

Correction

Corrected F/B

Correction for Depth

Tabular Freeboard

Correction for CB

Start Shear from FP

tsp

Freeboard defined by designFreeboard

Rule Freeboard

14.9822 m

Shear Aft

Shear Fwd

Length of

Superstructure

With Shear (7th iteration)

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

CB at 85% DMLD

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 211/245

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.5171/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.0031/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

174.914

2311.084

2384.518

830.217

-53.500

174.914 mm

Deduction for S/S

Correction for Shear

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Correction for Depth

Excess of Shear Fwd

Mean defficiency

Correction

1/3 L

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

Aft Body, Standard Shear Profile:

Defficiency of Shear

Foward Body, Standard Shear Profile:

.

Deduction

Correction for Shear

 

allowance

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 212/245

3336.149

13.308 m

CB 0.7104

149.822 m

13.199 m

9.972 m

0.722

S=0.2L

0 m

2 m

74.911 m

0.02 m

3.247 m

3247 mm

2311.084 mm

0.722

1.031

2383.259 mm

9.988 m

13.219 m

807.717 mm

29.9644 m

29.9644 m

20.000 %

E

% LF/B

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Shear Aft

Shear Fwd

Start Shear from FP

tsp

CB at 85% DMLD

Length of

Superstructure29.9644 m

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Rule F/B

New Depth

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 213/245

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m

49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

Foward Body, Actual Shear Profile:

hs

1/3 L

1/6 L

gradient

Foward Body, Standard Shear Profile:

Area Shear Fwd

hs

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance10.000 %

Deduction

Ships with F'cle &

detached Bridge

Percentage L

Upper Limit

Lower Limit

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Lengt

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 214/245

sum PROD 7996.085

0.000

249.878

162.420

2311.084

2383.259

807.717

-107.000

162.420 mm

3246.397

13.218 m

CB 0.7104

149.822 m

13.109 m

9.972 m

0.722

S=0.3L

0 m

2 m

74.911 m

0.02 m

3.157 m

3157 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure44.9466

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Excess of Shear Fwd

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 215/245

0.722

1.031

2382.001 mm

9.988 m13.129 m

785.217 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance15.000

Ships with F'cle

without detached

Bridge

Total Effective Lengt

Ships with F'cle &

detached Bridge

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Correction

Corrected F/B

Correction for Depth

Depth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 216/245

sum PROD 7996.085

74874.340

1999.021 mm

1.999 m

24.970 m49.941 m

0.027

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 666.340 3 1999.021

1/6L 1332.681 3 3998.042

FP 1999.021 1 1999.021

sum PROD 7996.085

0.000

249.878

149.927

2311.084

2382.001

785.217

-160.500

149.927 mm

3156.644

13.129 m

CB 0.7104

149.822 m

13.764 m

9.972 m

0.727

S=0.1L

0 m

0 m

0 m

0.02 m

Without Shear (7th iteration)

Basis ParametersFreeboard Length

Depth Moulded

Draught Moulded

Shear Aft

Shear Fwd

Start Shear from FP

tsp

CB at 85% DMLD

Length of

Superstructure14.9822 m

Correction for Shear

Rule F/B

New Depth

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Excess of Shear Fwd

Mean defficiency

Correction

Summary of Freeboard Calculation

1/6 L

gradient

Foward Body, Actual Shear Profile:

Area Shear Fwd

hs

hs

1/3 L

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 217/245

3.812 m

3812 mm

2311.084 mm

0.727

1.035

2391.160 mm

9.988 m

13.784 m

948.967 mm

14.9822 m

14.9822 m

10.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.100 L

0.1 L

0.1 L

53.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.0241/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

Foward Body, Standard Shear Profile:

Correction for Shear

Aft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance5.000 %

Deduction

Upper Limit

Lower Limit

E

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'cle

without detached

Bridge

Total Effective Lengt

Corrected F/B

Correction for Depth

Depth (Standard)

Depth (Actual)

Ships with F'cle &

Percentage L

Tabular Freeboard

Correction for CB

CB

Correction

Freeboard defined by designFreeboard

Rule Freeboard

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 218/245

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

999.511

749.633

524.743

2311.084

2391.160

948.967

-53.500

524.743 mm

3811.36913.783 m

CB 0.7104

149.822 m

13.640 m

9.972 m

0.726

S=0.2L

0 m

0 m

0 m

0.02 m

3.688 m

3688 mm

2311.084 mm

Rule FreeboardTabular Freeboard

tsp

Freeboard defined by designFreeboard

m

Shear Aft

Shear Fwd

Start Shear from FP

Draught MouldedCB at 85% DMLD

Length of

Superstructure29.9644

New Depth

Basis ParametersFreeboard Length

Depth Moulded

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 219/245

0.726

1.034

2389.426 mm

9.988 m

13.66 m

917.967 mm

29.9644 m

29.9644 m

20.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.200 L

0.2 L

0.2 L

107.000 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

Defficiency of Shear

Foward Body, Standard Shear Profile:

%

Deduction

Correction for Shear

Aft Body, Standard Shear Profile:

Upper Limit

Lower Limit

% Reduction of total

allowance10.000

Ships with F'cle

without detached

Bridge

Total Effective Lengt

Ships with F'cle &

Percentage L

Total S

E

% LF/B

Percentage of Deduction For Type 'B'

Depth (Actual)

Correction DF/B > L/15

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Correction

Corrected F/B

Correction for DepthDepth (Standard)

Correction for CB

CB

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 220/245

sum PROD 7996.085

999.511

749.633

487.261

2311.084

2389.426

917.967

-107.000

487.261 mm

3687.654

13.660 m

CB 0.7104

149.822 m

13.517 m

9.972 m

0.725

S=0.3L

0 m

0 m

0 m

0.02 m

3.565 m

3565 mm

2311.084 mm

Freeboard

Rule FreeboardTabular Freeboard

Shear Fwd

Start Shear from FP

tsp

Freeboard defined by design

Length of

Superstructure44.9466 m

Shear Aft

Freeboard Length

Depth Moulded

Draught MouldedCB at 85% DMLD

Correction for Shear

Rule F/B

New Depth

Basis Parameters

Basic Tabular Freeboard

Correction for CB

Correction for Depth

Deduction for S/S

Defficiency of Shear

Mean defficiency

Correction

Summary of Freeboard Calculation

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 221/245

0.725

1.033

2387.706 mm

9.988 m13.537 m

887.217 mm

44.9466 m

44.9466 m

30.000 %

0 0.1L 0.2L 0.3L

I 0 5 10 15

II 0 6.3 12.7 19

0.300 L

0.3 L

0.3 L

160.500 mm

STN ORD SM PROD

AP 1498.517 1 1498.517

1/6L 665.341 3 1996.024

1/3L 167.834 3 503.502

CL 0.000 1 0.000

sum PROD 3998.042

499.755

STN ORD SM PROD

CL 0.000 1 0.000

1/3L 335.668 3 1007.003

1/6L 1330.683 3 3992.048

FP 2997.033 1 2997.033

sum PROD 7996.085

Foward Body, Standard Shear Profile:

Correction for ShearAft Body, Standard Shear Profile:

Defficiency of Shear

% Reduction of total

allowance15.000 %

Deduction

Ships with F'cle &

Percentage L

Upper Limit

Lower Limit

% LF/B

Percentage of Deduction For Type 'B'

Ships with F'clewithout detached

Bridge

Total Effective Lengt

where 'D' is less than L/15 no reduction except where ship has an enclosed sup

covering 0.6L amidships, the freeboard is reduced at the above rate

Deduction for Superstructure

Total S

E

Correction for Depth

Depth (Standard)Depth (Actual)

Correction DF/B > L/15

Correction for CB

CB

Correction

Corrected F/B

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 222/245

999.511

749.633

449.780

2311.084

2387.706

887.217

-160.500

449.780 mm

3564.202

13.536 mNew Depth

Correction for Depth

Deduction for S/S

Correction for Shear

Rule F/B

Correction

Summary of Freeboard CalculationBasic Tabular Freeboard

Correction for CB

Defficiency of Shear

Mean defficiency

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 223/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 224/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 225/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 226/245

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 227/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 228/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 229/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 230/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 231/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 232/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 233/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 234/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 235/245

0.4L 0.5L 0.6L 0.7L 0.8L 0.9L

23.5 32 46 63 75.3 87.7

27.5 36 46 63 75.3 87.7

of Superstructures and Trunks

rstructure

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 236/245

Collison Bulkhead

Min Max

142.331 137.836 from AP

7.491 11.986 aft of FP

Frames required for collison bulkhead

Calc. Min Calc. Max Rounded Min Rounded Max

12.485 19.976 13 20

Hold length

Min Max

109.036 113.531

Frames required to accommodate TEUs

Rounded up Actual hatch length Required hold length

1 TEU 8.86 9 6.3 7.56

2 TEU 17.71 18 12.6 15.12

3 TEU 26.57 27 18.9 22.68

4 TEU 35.43 36 25.2 30.24

1 FFEU(45) 19.71 20 14 16.8

Distance of aft end of bedplate from AP

19.942 m First Iteration

Distance of first bulkhead from AP Hold length

7.8 m No. of frames

Rounded up

Distance of aft end of bedplate from first bulkhead Frame no.of fwd bh

12.142 m Actual hold length

Distance of fwd end of engine from first bulkhead

19.349 m Consider other possi

Required E/R length with clearance of 1.5m

20.849 m

Frames required

Calculated Actual

29.78 30 34.75714286

Actual E/R length

21 m

Distance E/R bulkhead fwd of AP

28.8 m

Location of collision bulkhead

7.622 m aft of FP142.2 m from AP

Frames for collision bulkhead

Calculated

12.70

Our Vessel

Frames AP-Fr.13 13-43 43-205 205-FP

Frame Spacing 600 700 700 600

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 237/245

Length 7.8 21 113.4 7.622

149.822

Hatch Breadth 15.016252 Permission acquired for hatch breadth of 71.8%B

Containers 6.0065008

Rounded 6

137.3

DB Height for cargo hold 1: 1.235m Same as centreline girder height

Tribon data shows we can put 2 containers in first bay , hold 1

22.473 29.964

5.078 7.08

-5.078 -7.08

-8

-6

-4

-2

0

2

4

6

8

0

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 238/245

Data

Length between perpendic 149.822

Length of bedplate 6.485

Size of overhang(fwd end 0.722

Hold 5 Hold 4 Hold 3 Hold 2 Hold 1

24.58 24.33 24.33 18.2 20.1

35.11 34.76 34.76 26.00 28.71

36 36 35 26 29

79 115 150 176 205

25.2 25.2 24.5 18.2 20.3 113.4

Total

ible combinations!!

Units

mm

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 239/245

m

m

5 10 15 20 2

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 240/245

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 241/245

5 30 35

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 242/245

at 1.572m

0.000 5.400 7.800 10.600 13.400 16.200 19.000

0.000 0.244 0.908 1.032 1.307 1.791 2.291

0.000 -0.244 -0.908 -1.032 -1.307 -1.791 -2.291

0.000 5.400 7.800 10.600 13.400 16.200 19.000

0.000 0.244 0.908 1.032 1.307 1.791 2.2910.000 -0.244 -0.908 -1.032 -1.307 -1.791 -2.291

Section WP

37.455 7.082

29.964 5.080

22.473 2.962

14.982 1.559

7.491 0.888

0.000 0.000

0.000 0.000

7.491 -0.888

14.982 -1.55922.473 -2.962

29.964 -5.080

37.455 -7.082

37.455

Waterline (Stbd)

Waterplane Area at Engine Room floor

Section

Waterline (Port)

Waterline (Stbd)

Section

Waterline (Port)

-6

-4

-2

0

2

4

6

0 5 10 15

   O   f   f  s  e   t  s   (  m

   )

L (

Area Profile of Engi

AP Bulkhead

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 243/245

21.800 24.600 27.400 28.800

2.806 3.580 4.356 4.793

-2.806 -3.580 -4.356 -4.793

21.800 24.600 27.400 28.800

2.806 3.580 4.356 4.793-2.806 -3.580 -4.356 -4.793

20 25 30 35

m)

e Room Floor

M/C Bulkhead

Engine

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 244/245

Height 6 decks

Length 21m

Width 12 m at AP Bulkhead

14 m fwd of Funnel Boundary14.5 m at E/R Bulkhead

Sections 0 7.8 14.8 28.8

16.086 (p) 7.997 9.596 10.247 10.457

16.086 (s) -7.997 -9.596 -10.247 -10.457

With clearance of 1.5 m 6.497 8.096 8.747 8.95716.192 17.494 17.914

8/3/2019 TND Calculations

http://slidepdf.com/reader/full/tnd-calculations 245/245

Depth Moulded (m) 12.968Length of Poop (m) 28.477Design Freeboard (mm) 3056Rule Freeboard (mm) 3055.979Difference (mm) 0.021

With F'stle and Poop Deck

(sheer fwd)