SOLUTION ON THE CONTAMINATION PROBLEM SOLUTION ON THE CONTAMINATION PROBLEM IN THE VELIKI BA IN THE VELIKI BA ČKI KANAL ČKI KANAL Tomislav Djivuljskij, Engineering Department Head Tomislav Djivuljskij, Engineering Department Head Public Company “Directorate for Construction” Public Company “Directorate for Construction” Vrbas Vrbas Serbia DREPR Project – REGIONAL CONFERENCE 2010. Serbia DREPR Project – REGIONAL CONFERENCE 2010.

Tomo Drepr Regional Final

  • Upload
    tomodj

  • View
    252

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Tomo Drepr Regional  Final

SOLUTION ON THE CONTAMINATION PROBLEM SOLUTION ON THE CONTAMINATION PROBLEM IN THE VELIKI BAIN THE VELIKI BAČKI KANALČKI KANAL

Tomislav Djivuljskij, Engineering Department HeadTomislav Djivuljskij, Engineering Department Head Public Company “Directorate for Construction” VrbasPublic Company “Directorate for Construction” Vrbas

Serbia DREPR Project – REGIONAL CONFERENCE Serbia DREPR Project – REGIONAL CONFERENCE 2010. 2010.

Page 2: Tomo Drepr Regional  Final

VELIKI BAČKI KANALVELIKI BAČKI KANAL

Page 3: Tomo Drepr Regional  Final

КАРАКТЕРИСТИКЕ ВЕЛИКОГ БАЧКОГ КАНАЛАКАРАКТЕРИСТИКЕ ВЕЛИКОГ БАЧКОГ КАНАЛА

СПАЈА ДУНАВ И ТИСУ

•ДУЖИНА У СРЕДЊОЈ БАЧКОЈ ЈЕ 118 КМ•ПЕРИОДИ ЕКСПЛОАТАЦИЈЕ ВАЖНИ ЗА РЕЖИМ ВОДЕ:период високог водостаја у Дунаву близу Безданапериод одбране од поплавапериод без протокапериод производње шећера

Page 4: Tomo Drepr Regional  Final

SLAVNI REKORDISLAVNI REKORDI

GRAĐEN OD 1793 – 1802 g GRAĐEN OD 1793 – 1802 g NAJSKUPLJI PRIVREDNI OBJEKAT AUSTRO-UGARSKE CAREVINENAJSKUPLJI PRIVREDNI OBJEKAT AUSTRO-UGARSKE CAREVINE UTROŠENO 3,062.690 ForintiUTROŠENO 3,062.690 Forinti PROKOPAVAN JE RUČNO UZ ANGAŽOVANJE 3.000 RADNIKAPROKOPAVAN JE RUČNO UZ ANGAŽOVANJE 3.000 RADNIKA ISKOPANA JE KOLIČINA ZEMLJE RAVNA ISKOPU SUECKOG KANALAISKOPANA JE KOLIČINA ZEMLJE RAVNA ISKOPU SUECKOG KANALA KANAL JE NA DNU ŠIROK 17 m, A NA POVRŠINI 23 – 25 mKANAL JE NA DNU ŠIROK 17 m, A NA POVRŠINI 23 – 25 m IZGRAĐEN JE PUTEM KONCESIJE – GRADITELJI SU DOBILI IZGRAĐEN JE PUTEM KONCESIJE – GRADITELJI SU DOBILI

EKSKLUZIVNO PRAVO PREVOZA SOLI IZ RUMUNIJE NA BEČKI DVOREKSKLUZIVNO PRAVO PREVOZA SOLI IZ RUMUNIJE NA BEČKI DVOR KANAL JE VIŠENAMENSKI – SLUŽI ZA ODVODNJAVANJE, PLOVIDBU I KANAL JE VIŠENAMENSKI – SLUŽI ZA ODVODNJAVANJE, PLOVIDBU I

NAVODNJAVANJENAVODNJAVANJE VELIKI BAČKI KANAL JE OKOSNICA 1972.g DOVRŠENOG VELIKI BAČKI KANAL JE OKOSNICA 1972.g DOVRŠENOG

HIDROSISTEMA DUNAV – TISA – DUNAV, NAJVEĆEG U EVROPIHIDROSISTEMA DUNAV – TISA – DUNAV, NAJVEĆEG U EVROPI

Page 5: Tomo Drepr Regional  Final

ХС ДУНАВ- ТИСА- ДУНАВХС ДУНАВ- ТИСА- ДУНАВ

један од један од највећих у највећих у Eвропи и Eвропи и један од један од најзначајнијнајзначајнијих у их у светским светским размерама.размерама.

Page 6: Tomo Drepr Regional  Final

NESLAVNI REKORDINESLAVNI REKORDI

VELIKI BAČKI KANALVELIKI BAČKI KANALNAJZAGAĐENIJI VODOTOK U NAJZAGAĐENIJI VODOTOK U

EVROPIEVROPI

Page 7: Tomo Drepr Regional  Final

DANUBE POLLUTION REDUCTION DANUBE POLLUTION REDUCTION PROGRAMMEPROGRAMME

NATIONAL REVIEWS 1998NATIONAL REVIEWS 1998

Federal Republic of YugoslaviaFederal Republic of Yugoslavia

UNDP/GEF AssistanceUNDP/GEF Assistance

Page 8: Tomo Drepr Regional  Final

AGRICULTURAL HOT SPOTSAGRICULTURAL HOT SPOTS

Page 9: Tomo Drepr Regional  Final
Page 10: Tomo Drepr Regional  Final

INDUSTRIAL HOT SPOTSINDUSTRIAL HOT SPOTS

Page 11: Tomo Drepr Regional  Final
Page 12: Tomo Drepr Regional  Final

MUNICIPAL HOT SPOTSMUNICIPAL HOT SPOTS

Page 13: Tomo Drepr Regional  Final
Page 14: Tomo Drepr Regional  Final

NIVA REPORT 2004 - 2006NIVA REPORT 2004 - 2006

Page 15: Tomo Drepr Regional  Final

DEKONTA REPORT 2005 - 2006 DEKONTA REPORT 2005 - 2006

Page 16: Tomo Drepr Regional  Final

REVITALIZACIJA REVITALIZACIJA VELIKOG BAČKOG VELIKOG BAČKOG KANALAKANALA

Page 17: Tomo Drepr Regional  Final

KOMPONENTE PROJEKTAKOMPONENTE PROJEKTA

SAKUPLJANJE OTPADNIH VODA ( Magistralni SAKUPLJANJE OTPADNIH VODA ( Magistralni kolektorkolektor; ; KasnalizacijaKasnalizacija: Vrbas , Kula , : Vrbas , Kula , Crvenka i 5 sela opCrvenka i 5 sela opštine Vrbasštine Vrbas

CENTRALNO POSTROJENJE ZA PREČIŠĆAVANJE CENTRALNO POSTROJENJE ZA PREČIŠĆAVANJE OTPADNIH VODA – CPPOV VRBASA i KULE OTPADNIH VODA – CPPOV VRBASA i KULE KAPACITETA 120.000 ESKAPACITETA 120.000 ES

IZMULJEMJE I REMEDIJACIJA VELIKOG BAČKOG IZMULJEMJE I REMEDIJACIJA VELIKOG BAČKOG KANALA – od prevodnice KANALA – od prevodnice “VRBAS” do “VRBAS” do “TRIANGLA” “TRIANGLA” u dužini od 6 km u dužini od 6 km

Page 18: Tomo Drepr Regional  Final
Page 19: Tomo Drepr Regional  Final

PROJEKTI U FAZI REALIZACIJEPROJEKTI U FAZI REALIZACIJE

1.1. Sistem za evakuaciju i prečišćavanje Sistem za evakuaciju i prečišćavanje otpadnih voda naselja u Opštini Vrbas otpadnih voda naselja u Opštini Vrbas 2007 – 20 2007 – 201111

2.2. Magistralni kolektor V Faza 2010-2011 Magistralni kolektor V Faza 2010-2011

3.3. CPPOV Vrbasa i Kule 2011 - 2012CPPOV Vrbasa i Kule 2011 - 2012

Page 20: Tomo Drepr Regional  Final

KANALIZACIONA MREZA U NASELJIMA OPŠTINE VRBASKANALIZACIONA MREZA U NASELJIMA OPŠTINE VRBAS

Page 21: Tomo Drepr Regional  Final

Izgradnja IV i V faze magistralnog kolektoraIzgradnja IV i V faze magistralnog kolektora

Revitalizacija Velikog Bačkog Kanala

Page 22: Tomo Drepr Regional  Final

CPPOV Vrbas - KulaCPPOV Vrbas - Kula

Kapacitet Kapacitet 120.000 ES120.000 ES Organsko optereOrgansko opterećenje ćenje 7.500 kg BPK5/dan7.500 kg BPK5/dan Hidrauličko opterećenje Hidrauličko opterećenje 23.730 m3/dan 23.730 m3/dan Propisan kvalitet vode nakon tretmana:Propisan kvalitet vode nakon tretmana: BPK5 max 20 mg/lBPK5 max 20 mg/l SM max 30 mg/lSM max 30 mg/l Ntot maxNtot max 10 mg/l 10 mg/l Ptot maxPtot max 1 mg/l 1 mg/l

Revitalizacija Velikog Bačkog Kanala

Page 23: Tomo Drepr Regional  Final

SNOWBALLSNOWBALL

SNOWBALL STARTED SNOWBALL STARTED ROLLING GETTING ROLLING GETTING BIGGER AND TAKES BIGGER AND TAKES EVERYTHING INSIDEEVERYTHING INSIDE

Page 24: Tomo Drepr Regional  Final

ČIŠĆENJE MULJA I REVITALIZACIJA ČIŠĆENJE MULJA I REVITALIZACIJA VELIKOG BAČKOG KANALAVELIKOG BAČKOG KANALA

2010 g2010 g

Page 25: Tomo Drepr Regional  Final

Project Project Site - Grand Canal, Site - Grand Canal, VrbasVrbas

Page 26: Tomo Drepr Regional  Final

Sludge sediment excavation and pre-Sludge sediment excavation and pre-treatmenttreatment

1) Excavation (floating dredger / suck-pump dredger))

2) Dewatering (passive approach)

3) Sampling and selection of an appropriate technology- collect at least 3 samples from each 10 000 tones

- define contamination character

The samples should be analysed for priority pollutants:- Petroleum hydrocarbons (C10-C40)- PCBs- Heavy metals- Content of coliform bacteria (ecotoxicity)

Page 27: Tomo Drepr Regional  Final

1) Treatment of sediments contaminated only 1) Treatment of sediments contaminated only microbiallymicrobially

- chemical hygienisation is a method which is economically more advantageous, and therefore commendable for sludge sediment treatment (compare to composting / thermal hygienisation)

- mixing with 3 wt% of quicklime is proposed

Page 28: Tomo Drepr Regional  Final

2) Treatment of sediments contaminated by petroleum 2) Treatment of sediments contaminated by petroleum hydocarbonshydocarbons

- treatment of the most contaminated parts (TPHs between 2,000 ppm – 5,000 ppm) can be completed in two years (seasons)

- treatment of less contaminated parts (TPHs concentration below 2,000 ppm) can completed in one year season

Contaminated material

Decontaminated material

bacterial mixture lyofilizate

reinoculation on slant agar

cultivation on specific media

inoculum for bioreactor

cultivation in bioreactor

addition of minerals, aeration, heating

final bioculture

Material in remediation process

minerals+ additives cultivation,

moistening+ inert

material

Periodic operation during biotechnology process

Page 29: Tomo Drepr Regional  Final

3) Treatment of sediments contaminated by heavy 3) Treatment of sediments contaminated by heavy metalsmetals

we propose to to install a mobile S/S unit in the vicinity of dewatering basins (minimization the influence on environment)

The stabilisation product will be disposed onto the interdepony (approximately 2 weeks) and afterwards transported at non-hazardous waste landfill

2 mixing units will run simultaneously, with a total treatment capacity of approx. 200 tons of sediment per day (treatment completed in two years)

Page 30: Tomo Drepr Regional  Final

CILJCILJ: : VELIKI BAČKI KANAL 201VELIKI BAČKI KANAL 2015.5.

Page 31: Tomo Drepr Regional  Final

НАМЕНЕ И УПРАВЉАЊЕ КАНАЛОМНАМЕНЕ И УПРАВЉАЊЕ КАНАЛОМ

•ОДВОДЊАВАЊЕ

•НАВОДЊАВАЊЕ

•СНАДБЕВАЊЕ ВОДОМ

•РЕЦИПИЈЕНТ ЗА ОТПАДНЕ ВОДЕ

•РЕЧНИ САОБРАЋАЈ

•УЗГОЈ РИБЕ

•ТУРИЗАМ И РЕКРЕАЦИЈА