4
Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA Hanshin Electronics JAPAN TOKYO KEIKI JAPAN SHIN-EI ELECTRONIC CO.,LTD SINGAPORE JASON ASIA SINGAPORE SK SYSTEM ENGINEERS PTE LTD PHILIPPINES TECHSYS Corporation CHINA JASON ASIA CHINA COSCO GCNC CHINA HOSTMOST Engineering CHINA Seven Seas Electronic Co.,Ltd INDIA NAVICOM Technology INDIA ULTRA MARINE TAIWAN RESON Electronics TAIWAN EAGLES ELECTRONICS HONGKONG HOSTMOST Engineering MALAYSIA Jason, Johindah Malim Sdn Bhd. INDONESIA JASON ASIA THAILAND A&MARINE THAI THAILAND Jason Electronics (Thailand) Co. Ltd. OCEANIA AUSTRALIA NOVAMARINE MIDDLE EAST U.A.E. ELCOME INT. U.A.E. MARITRONICS BAHRAIN ELCOME INT. EUROPE CYPRUS RAYTECH FRANCE AVON Communications S.A GERMANY HOPPE GREECE MARVEL L.T.D GREECE D.C.S.I. International GREECE Automation Marine Syetem Ltd. GREECE ITS CERTRAL AMERICA VENEZUELA RADIO MARINA DE VENEZUELA PANAMA PASRAS S.A. SOUTH AMERICA ARGENTINA Everthron Marine Systems SRL BRAZIL AVANTIA TECNOLOGIA BRAZIL Orion Shiprepairs Ltda BRAZIL METALOCK Brazil Ltda AFRICA SOUTH AFRICA SMD TELECOMM. ASIA KOREA SAMSUNG HEAVY INDUSTRIES SINGAPORE CYCLECT PHILIPHINE WOOJU INC. INDIA PENTA ELECTOMEC PVT. LTDD OCEANIA AUSTRALIA NOVAMARINE MIDDLE EAST U.A.E. MARITRONICS EUROPE GREECE NOVA ELECTRONICS S.A. GREECE Automation Marine Syetem Ltd. ITALY A . Santamaria S.p.A BELGIUM Electro Partners N.V. U.K. MJR Controls Ltd SPAIN AAGE HEMPEL AMERICA USA SEABOARD CONTROLS SOUTH AMERICA BRAZIL AVANTIA TECNOLOGIA BRAZIL METALOCK Brazil Ltda SINGAPORE SK SYSTEM ENGINEERS PTE LTD PHILIPPINES TECHSYS Corporation CHINA JASON ASIA CHINA COSCO GCNC CHINA HOSTMOST Engineering CHINA Seven Seas Electronic Co.,Ltd INDIA NAVICOM Technology INDIA ULTRA MARINE TAIWAN RESON Electronics TAIWAN EAGLES ELECTRONICS HONGKONG HOSTMOST Engineering MALAYSIA Jason, Johindah Malim Sdn Bhd. INDONESIA JASON ASIA OCEANIA AUSTRALIA NOVAMARINE MIDDLE EAST U.A.E. ELCOME INT. U.A.E. MARITRONICS EUROPE CCYPRUS RAYTECH FRANCE AVON Communications S.A GERMANY HOPPE GREECE MARVEL L.T.D GREECE D.C.S.I. International GREECE Automation Marine Syetem Ltd. GREECE ITS UKRAINER D.C.S.I. UKRAINE ITALY MASTER CONTROL ITALY C.G. TELEMAR NETHERLAND RADIO HOLLAND NETHERLAND I&C Services B.V. U.K. MJR Controls Ltd SPAIN AAGE HEMPEL AMERICA USA Mackay Communications, Inc. USA SPERRY MARINE CANADA MARITECH NAVAL CANADA OASIS MARINE UKRAINER D.C.S.I. UKRAINE ITALY MASTER CONTROL ITALY TELEMAR NETHERLAND RADIO HOLLAND NETHERLAND I&C Services B.V. BELGIUM SPERRY MARINE U.K. MJR Controls Ltd RUSSIA MT Electronics LLC SPAIN AAGE HEMPEL Gibraltar Sandvik Marine Electronics EGYPT PAN ARAB PORTUGAL Assistemar, Lda AMERICA USA Mackay Communications, Inc. USA SPERRY MARINE CANADA MARITECH NAVAL CANADA OASIS MARINE CERTRAL AMERICA VENEZUELA RADIO MARINA DE VENEZUELA PANAMA PASRAS S.A. SOUTH AMERICA ARGENTINA Everthron Marine Systems SRL CHILE NAVAL RADIO BRAZIL AVANTIA TECNOLOGIA BRAZIL Orion Shiprepairs Ltda BRAZIL METALOCK Brazil Ltda AFRICA SOUTH AFRICA SMD TELECOMM. ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA DEX SINGAPORE JASON ASIA Navigation System Automation System Power System Growing into the world's best company Headoffice Service Station Sales Department TEL Suwon +82-(0)31-229-1238 Busan +82-(0)51-863-0912 Shanghai +86-(0)21-2231-4370 FAX Suwon +82-(0)31-229-1109 Busan +82-(0)51-861-1552 Shanghai +86-(0)21-6278-9112 E-Mail [email protected] Copyright © 2013. All rights reserved Technical information in this catalogue can be changed without notice. Service Department TEL +82-(0)31-229-1478 / 1218 FAX +82-(0)31-229-1029 E-Mail [email protected] Web www.digitalvessel.com/as Power & Control Systems Division Suwon Office 1339, Hyohaeng-ro(Banwol-dong), Hwaseong City, Gyeonggi-do, Korea(445-330) Busan Office (Yeonsan-dong) RM 501, KPMS BLD 1073, Jungang-daero Road, Yeoneje-gu, Busan 611-830, Korea Shanghai Office Rm2711, Shanghai International Trade Center No.2201, YanAn Road, Shanghai, China 200336 http://www.shi.samsung.co.kr http://www.shipcs.com REGASIFICATION SYSTEM Marine & Offshore Solution l Regasification System

Total System for Digital Vessel...Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Total System for Digital Vessel...Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA

Power & Control Systems Division

Total System for Digital Vessel

ASIAKOREA SAMSUNG HEAVY INDUSTRIESKOREA DONGBO ELECTRICKOREA KUMHO TECHKOREA Hanshin ElectronicsJAPAN TOKYO KEIKIJAPAN SHIN-EI ELECTRONIC CO.,LTDSINGAPORE JASON ASIASINGAPORE SK SYSTEM ENGINEERS PTE LTDPHILIPPINES TECHSYS CorporationCHINA JASON ASIACHINA COSCO GCNCCHINA HOSTMOST EngineeringCHINA Seven Seas Electronic Co.,Ltd INDIA NAVICOM TechnologyINDIA ULTRA MARINETAIWAN RESON Electronics TAIWAN EAGLES ELECTRONICSHONGKONG HOSTMOST EngineeringMALAYSIA Jason, Johindah Malim Sdn Bhd.INDONESIA JASON ASIATHAILAND A&MARINE THAITHAILAND Jason Electronics (Thailand) Co. Ltd.OCEANIA AUSTRALIA NOVAMARINEMIDDLE EASTU.A.E. ELCOME INT.U.A.E. MARITRONICSBAHRAIN ELCOME INT.EUROPECYPRUS RAYTECHFRANCE AVON Communications S.AGERMANY HOPPEGREECE MARVEL L.T.DGREECE D.C.S.I. InternationalGREECE Automation Marine Syetem Ltd.GREECE ITS

CERTRAL AMERICAVENEZUELA RADIO MARINA DE VENEZUELA PANAMA PASRAS S.A.SOUTH AMERICAARGENTINA Everthron Marine Systems SRLBRAZIL AVANTIA TECNOLOGIABRAZIL Orion Shiprepairs Ltda BRAZIL METALOCK Brazil Ltda AFRICASOUTH AFRICA SMD TELECOMM.

ASIAKOREA SAMSUNG HEAVY INDUSTRIESSINGAPORE CYCLECTPHILIPHINE WOOJU INC.INDIA PENTA ELECTOMEC PVT. LTDDOCEANIAAUSTRALIA NOVAMARINEMIDDLE EASTU.A.E. MARITRONICSEUROPEGREECE NOVA ELECTRONICS S.A.GREECE Automation Marine Syetem Ltd.ITALY A . Santamaria S.p.ABELGIUM Electro Partners N.V.U.K. MJR Controls LtdSPAIN AAGE HEMPELAMERICAUSA SEABOARD CONTROLSSOUTH AMERICABRAZIL AVANTIA TECNOLOGIABRAZIL METALOCK Brazil Ltda

SINGAPORE SK SYSTEM ENGINEERS PTE LTDPHILIPPINES TECHSYS CorporationCHINA JASON ASIACHINA COSCO GCNCCHINA HOSTMOST EngineeringCHINA Seven Seas Electronic Co.,Ltd INDIA NAVICOM TechnologyINDIA ULTRA MARINETAIWAN RESON Electronics TAIWAN EAGLES ELECTRONICSHONGKONG HOSTMOST EngineeringMALAYSIA Jason, Johindah Malim Sdn Bhd.INDONESIA JASON ASIAOCEANIA AUSTRALIA NOVAMARINEMIDDLE EASTU.A.E. ELCOME INT.U.A.E. MARITRONICSEUROPECCYPRUS RAYTECHFRANCE AVON Communications S.AGERMANY HOPPEGREECE MARVEL L.T.DGREECE D.C.S.I. InternationalGREECE Automation Marine Syetem Ltd.GREECE ITS UKRAINER D.C.S.I. UKRAINEITALY MASTER CONTROLITALY C.G. TELEMARNETHERLAND RADIO HOLLANDNETHERLAND I&C Services B.V.U.K. MJR Controls LtdSPAIN AAGE HEMPELAMERICAUSA Mackay Communications, Inc. USA SPERRY MARINECANADA MARITECH NAVALCANADA OASIS MARINE

UKRAINER D.C.S.I. UKRAINEITALY MASTER CONTROLITALY TELEMARNETHERLAND RADIO HOLLANDNETHERLAND I&C Services B.V.BELGIUM SPERRY MARINEU.K. MJR Controls LtdRUSSIA MT Electronics LLCSPAIN AAGE HEMPELGibraltar Sandvik Marine ElectronicsEGYPT PAN ARABPORTUGAL Assistemar, LdaAMERICA USA Mackay Communications, Inc. USA SPERRY MARINECANADA MARITECH NAVALCANADA OASIS MARINECERTRAL AMERICAVENEZUELA RADIO MARINA DE VENEZUELA PANAMA PASRAS S.A.SOUTH AMERICA ARGENTINA Everthron Marine Systems SRLCHILE NAVAL RADIOBRAZIL AVANTIA TECNOLOGIABRAZIL Orion Shiprepairs Ltda BRAZIL METALOCK Brazil Ltda AFRICASOUTH AFRICA SMD TELECOMM.

ASIAKOREA SAMSUNG HEAVY INDUSTRIESKOREA DONGBO ELECTRICKOREA KUMHO TECHKOREA DEXSINGAPORE JASON ASIA

Navigation System

Automation System

Power System

Growing into the world's best company

HeadofficeService Station

Sales DepartmentTEL Suwon +82-(0)31-229-1238 Busan +82-(0)51-863-0912 Shanghai +86-(0)21-2231-4370FAX Suwon +82-(0)31-229-1109 Busan +82-(0)51-861-1552 Shanghai +86-(0)21-6278-9112E-Mail [email protected]

Copyright © 2013. All rights reserved Technical information in this catalogue can be changed without notice.

Service DepartmentTEL +82-(0)31-229-1478 / 1218 FAX +82-(0)31-229-1029 E-Mail [email protected] www.digitalvessel.com/as

Power & Control Systems DivisionSuwon Office 1339, Hyohaeng-ro(Banwol-dong), Hwaseong City, Gyeonggi-do, Korea(445-330) Busan Office (Yeonsan-dong) RM 501, KPMS BLD 1073, Jungang-daero Road, Yeoneje-gu, Busan 611-830, KoreaShanghai Office Rm2711, Shanghai International Trade Center No.2201, YanAn Road, Shanghai, China 200336 http://www.shi.samsung.co.kr http://www.shipcs.com

REGASIFICATION SYSTEM

Marine &

Offshore S

olution l Regasification S

ystem

Page 2: Total System for Digital Vessel...Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

High Pressure Pump• Boosting of LNG Pressure (100 bar)

• Cryogenic(-162˚C) Design• Submerged Centrifugal type REGASIFICATION SYSTEM

Why SHI S-REGAS Module?

The regasification system, which is installed in onshore LNG terminal or upper part of the offshore LNG FSRU, is a system that directly gasify liquefied natural gas and supply so that power plants or consumers can use it.

The main equipment for the regasification system includes recondenser, high pressure LNG booster pump, vaporizer and sea water system.

LNG, which is fed up to recondensor from cargo tank by feed pump inside the cargo tank, is pressurized to about 100bar by the high pressure booster pump, and sent to onshore after being gasified to natural gas through heat exchange with sea water in the vaporizer.

The regasification system is a system the core technologies of which are the design and analytics required for extremely low temperature down to -160˚C and high pressure up to 100bar and stable control technology.

We have secured price competitiveness through localization of parts and our own technology on the basis of the reliability of the process engineering with various achievement experience, and we have secured good clients in the world and attained high customer satisfaction by supplying EPC turnkey-type packages which can be quickly counteracted if any problem occurs.

In the long term, SHI Power & Control Systems Division will carry on topside turnkey projects based on process engineering by establishing the system where the process facilities included in the offshore topside can be manufactured and supplied as a module type.

Recondenser• Pressure Stabilization

• Feeding of continuous LNG • Recondensing Boil off Gas

Vaporizer (Heat Exchanger)• Vaporizing of LNG to Natural Gas by Sea water

• Cryogenic / High Pressure / Anti-corrosion Material• Shell & Tube Type

Sea Water System• Heating Medium

• Sea Water Lift Pump• Automatic Flushing Filter

REGASIFICATION SYSTEM2 3

Sea Water (Hot)

Sea Water (Cold)

Page 3: Total System for Digital Vessel...Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

• Regasification system installed on LNG FSRU/RV which supplies NG to consumer instead of onshore LNG terminal

INTRO PROCESS

EQUIPMENT

Increasing LNG Demand Process Configuration

Outline HP Vaporizer

Main Features Recondenser

• Annual demands of LNG * Source : Ernst & Young assessment from multiple sources

• Shell & Tube type Vaporizer• Optimum design for requirement

• Experiences in LNG FSRU• Self-developed regasification process• Localization of equipment; cryogenic high

pressure pump and vaporizer• Unification for engineering, procurement and

installation• Cost-reduction (CAPEX, OPEX)

• Recondensing BOG from Cargo tank• Buffer tank for HP pump

4 5 REGASIFICATION SYSTEM

Page 4: Total System for Digital Vessel...Power & Control Systems Division Total System for Digital Vessel ASIA KOREA SAMSUNG HEAVY INDUSTRIES KOREA DONGBO ELECTRIC KOREA KUMHO TECH KOREA

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

Mobility

Time ReliabilityAvailibility

CostCost• Simple installation process

• Rapid response for problem with self-developed modeling

• Shorten construction period through each facility’s modularization

• Experience with Golar FSRU makes it possible to offer reliable information

• Improved business process with unified equipment contact

• Cost down through minimization of local working

Actual

280

Projected

Mill

ion

tonn

es p

er y

ear

600

500

400

300

200

100

JKT

OthAsia

US

Europe

Other

0 2000

2005

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2025

2030

500

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

6.5 bara

4.5 barg

100 barg,5 degCHP PUMP

LNG FEEDPUMP

Cargo Tank

110 barg

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

105 barg

1.03 bara,-110 degC

-160 degC

Bellows Expansion Joint

Sea water Outlet

Sea water Inlet Sea water Inlet

Over 100 barg, 8 degC7 degCNG Outlet

105 barg, -153 degC

14 degC 14 degC

LNG Inlet

4.5 barg

BOG Inlet

LNG Inletfor recondensing

LNG Inlet

LNG Outlet

110 barg

4.5 barg

Vent

Fill / Drain

LNG Inlet

LNG Outlet

BOG Inlet

Inter cooler Inter cooler After cooler

1st 2nd 3rd

1.03 bara,-110 degC

BOG Outlet6.5 bara,40 degC

BOG COMPRESSOR

RECONDENSEROVER BOARD

SEA WATER LIFT PUMP

HP PUMP

LNG FEEDPUMP

Cargo Tank

LNGVAPORIZER

METERING /VENT SYSTEM

NG TO SHORE

BOG

NG

LNG

Sea water

Module 1

Module 2 Module 3

Module 4

EQUIPMENT PACKAGEHP Pump Module Package Configuration

BOG Compressor Regasification Modules

• Submergible multi-stage centrifugal pump • Control logic materialization according to safety condition

• Low pressure compressor shall be designed to transfer excessive boil-off gas to the recondenser during the regasification operation

Module 1Recondenser Module

Module 3Metering Module

Module 2Regasification Module

Module 4Seawater Module

6 7

VENTSTACK

BOG COMPRESSOR

H.P BOOSTER PUMP

S.W LIFT PUMP

S.W FILTER

LNG VAPORIZER

RECONDENSER

K.O DRUM

K.O DRUM

REGASIFICATION SYSTEM