14
TowerWise.c a Energy savings Energy savings in Multi-suite in Multi-suite residential residential buildings: buildings: Case Studies Case Studies TEEAC Meeting TEEAC Meeting November 3 November 3 rd rd , , 2011 2011

TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Embed Size (px)

Citation preview

Page 1: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

TowerWise.caEnergy savings in Energy savings in Multi-suite Multi-suite residential buildings:residential buildings:Case StudiesCase Studies

TEEAC Meeting TEEAC Meeting November 3November 3rdrd , 2011 , 2011

Page 2: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

OutlineOutline

New ConstructionNew ConstructionAppleby WoodsAppleby Woods

Combined Heat and PowerCombined Heat and PowerBloor StreetBloor Street

Page 3: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

Design Objectives:Design Objectives:

Reduce operating costs Reduce operating costs through good building through good building design design

ConservationConservation

Renewable Energy SourcesRenewable Energy Sources

101 condominium suites101 condominium suites

Page 4: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

Building EnvelopeBuilding Envelope

Insulated concrete formsInsulated concrete forms

Low window-to-wall ratioLow window-to-wall ratio

Page 5: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

PV GenerationPV Generation

Grid-tied, roof-mounted Grid-tied, roof-mounted PV systemPV system

Stand-alone LED parking Stand-alone LED parking lot lighting unitslot lighting units

Page 6: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

Ground Source Heat Ground Source Heat Pump SystemPump System

54 boreholes in the 54 boreholes in the parking lotparking lot

Hydronic loopHydronic loop

Suite-based water-to-air Suite-based water-to-air heat pump and fanheat pump and fan

Page 7: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

Other featuresOther features

Dual flush toiletsDual flush toilets

Energy Star appliancesEnergy Star appliances

Low-e argon-filled Low-e argon-filled windowswindows

Motion-sensor parking Motion-sensor parking garage lighting in stallsgarage lighting in stalls

Page 8: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Appleby WoodsAppleby Woods

Page 9: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Bloor StreetBloor Street

Pre-Retrofit Situation:Pre-Retrofit Situation:

326 rental suites326 rental suites

Built in 1980Built in 1980

Needed to replace Needed to replace emergency power systememergency power system

Pilot CHP systemPilot CHP system

Page 10: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Bloor StreetBloor Street

Design and InstallationDesign and Installation

335kW electrical output335kW electrical output

1.4MMBTU thermal output1.4MMBTU thermal output

Housed in a 40ft container Housed in a 40ft container located on the rooflocated on the roof

Commissioned in July 2009Commissioned in July 2009

Page 11: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Bloor StreetBloor Street

Energy PerformanceEnergy Performance

Page 12: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Bloor StreetBloor Street

CHP System supplies about 40% of annual electrical CHP System supplies about 40% of annual electrical demand while producing waste heatdemand while producing waste heat

Page 13: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

Lessons LearnedLessons Learned

New ConstructionNew Construction

Low energy features for Low energy features for lessless

Combined Heat and Combined Heat and PowerPower

Detailed planning processDetailed planning process

http://www.stlucieco.gov/planning/planning.htm

Page 14: TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies TEEAC Meeting November 3 rd, 2011

For More InformationFor More Information