1

Traction Issues

Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should be brought in the meeting.

• Status of hotel load trials • All off POH locos should be fit for 40 day schedule. • Railways should ensure that the stocking of material during POH is as per

approved must change list issued by RDSO. • SWR to get in touch with KRCL for Verna EMD shed. • CMEs to take interest in educating their officers and staff on line haul cost. • Personal attention of CMEs is expected on the issue of DLSc. • REMLOT will add value and EFI and CRDI should be speeded up. • WR, BGKT and DLW should mention the status of air-conditioning of crew

cabs. • NR and SR should mention the sections identified for running of WDP1

DPS. • Electricals of DEMU should be on the similar lines that of EMUs – progress. • NCR has done good job in taking over the charge of diesel crews however,

in some railway technical control is being misinterpreted and control of crews is being handed over. It is easy to handover but difficult to take.

Performance Indices

1. Equipment Failure

• Railway-wise status is enclosed at Annexure T-1 • There is deterioration on NER, NWR, SR, SECR, WR and WCR.

These Railways should bring the action plan for improvement. • Railways worse than IR average : NCR, NER, NWR, NFR, WR,

WCR, ECR and NR.

2. Punctuality loss • Railway-wise status is enclosed at Annexure T-2 (i) & T-2 (ii). • ECR, NFR, WR and WCR should bring the action plan for

improvement as their performance has deteriorated. • Railways worse than IR average : NCR, NFR, NER, WCR, NWR and

ECR.

3. Shed attention • Railway-wise status is enclosed at Annexure T-3 • Average time taken for shed attention to FR locos by NCR, NR, NFR,

NWR, SECR and WCR is very high. These Railways should explain reasons for the excessive schedule time.

• Railways worse than IR average : NFR, WCR, NWR, NR and SECR.

Page 3: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

2

4. Progress of important RSP items viz. VCD, MBCS & DPS etc. • Present status is enclosed at Annexure T-4 (i) & T-4 (ii). • Railways should bring the action plan for achieving the target. • Railways should bring list of locations where DP system would be

useful especially for rake originating & terminating on their system

Fuel

5. Line Haul Cost • Railway-wise status is enclosed at Annexure T-5 (i) & T-5 (ii). • Line haul cost for diesel freight service on SER and SECR and for

coaching service on ECR, ECOR and SER is very high. These Railways should bring the action plan for improvement.

6. Explosive clearance of RCD

• Railway-wise status is enclosed at Annexure T-6 • Railways should bring the action plan for obtaining the clearance and

the likely dates. Running staff issues

7. Utilization of crews

• Railway-wise status of crew utilization is enclosed at Annexure T-7 • Railways should bring the action plan for achieving the utilization of

crews close to 104 hrs especially in freight service.

8. SPAD cases and Periodic rest • Railway-wise status of SPAD cases over last 5 years is enclosed at

Annexure T-8 (i) & T-8 (ii). • ER, ECR, NR, NCR & SCR should bring the initiative taken by them

to bring down the SPAD cases. • Ideally running staff should be allowed 4 periodical rests of 30 hrs/5

of 22 hrs. The rests provided to the running staff have come down abnormally. Railways should ensure that the running staff is given the prescribed Periodic rests.

9. Training of Loco Inspectors

• Railway-wise status is enclosed at Annexure T-9 (i) & T-9 (ii). • Progress over ER, NR and SWR is not satisfactory. Railways should

indicate the responsibility fixed for not adhering to Board’s target of Jan 2010. They should indicate under whose authority these LIs are being allowed to work on line.

10. Status of running rooms & crew lobby up-gradation:

Detailed status of up-gradation work done, work in progress and work planned should be brought. Action plan for obtaining the running room shield, the Railways should bring a presentation on the running room which

Page 4: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

3

is likely to be nominated, its marking as per the norms issued by the Board and action being taken to overcome the shortcomings. Two Railways will be asked to make a presentation on the same.

works for covering inadequacies/shed augmentation

11. Progress of sanctioned works & new works planned: Railways should bring the physical and financial progress of their

sanctioned works and details of new works being proposed for sanction. ZRs should bring milestones for setting up new Diesel shed such as SBI, SGUJ, Pandu, TSK & Sahibganj & DEMU sheds such as Raipur, Phulera & Miryani.

12. Action taken in response to the master plan issued by Railway Board

for procurement of Simulators and progress of procurement at COFMOW.

DEMUs

13. Ineffective percentage and action plan for its improvement

Railway-wise status is enclosed at Annexure T-10. Railways should bring the action plan for improvement. NR should bring the action plan and progress for modification on J&K

DEMUs for using in 12 coach formation and plans for transportation of coaches to J&K.

DEMU services should be used as a rake links originating and terminating at a DEMU car shed for optimum utilization of the rakes. This is not being done in ER, SER and NFR at present.

NR/RDSO/IROAF may apprise the progress made in CNG conversion of DEMUs.

14. Production of DEMUs at ICF and supply of RSP items

ICF should indicate the progress of supply of RSP items against Board’s bulk RSP. Railways should also indicate the progress of itemized RSP.

15. POH cycle time

Railway should bring the time taken in POH of DEMU coaches as per format given below

Total coaches undergone POH (April 10 to March 11)

Avg. time taken in transshipment Shed to shop and shop to shed

Avg. time taken by workshop for POH

Total time Transshipment time+ workshop time

Page 5: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

4

16. Equipment under trial and issues pending with RDSO, DLW & DMW will be discussed.

• Procurement of material from unapproved sources. (CMEs) • Progress of Hotel Load trails. (EDS(MP) RDSO) • CRS sanction for WDP4D locos. (CME/NR) • Status of CRS sanction for WDP4B locos at 110 kmph. (All CMEs) • Progress of 5000+HP loco at DLW & Multi Genset loco at DMW. (CME/DLE

& CME DMW) • Status of gas turbine locomotive.(Sr. ED/MP/RDSO) • CR & SR- conversion of YDM4 loco into WDS6 loco. (CME CR & SR)

17. Other items:

(A) Technologically complex (niche) items: Indian Railways procure several items from trade which are not only technologically complex but are also niche in their respective areas. They can be understood as a major sub-assembly, which is designed to the specific needs of the Railways. Railways may provide functional specifications for such items and the detailed design is left to the discretion of the manufacturer. Some examples (though pertaining to EMD locos) are the AC-AC traction control systems, distributed power system and traction motors. Various manufacturers have developed their own designs to meet the needs of the IR even though the internal designs vary widely from manufacture to manufacturer. The internal design features are generally proprietary though basic logic and algorithm is provided to the user. This is natural in the modern days of complex technology where in-house design capabilities, at RDSO or PUs, are not able to keep pace with the complexity of the rolling stock, nor with the technologically developments elsewhere in the world. Due to this reason, it is also virtually impossible to inspect these sub assemblies in the conventional sense. IR often has to depend on the manufacturer’s certificate itself or the WTC. The inspection, in practice stretches into a certification and verification exercise over a predetermined period of service by the sub assembly. In other words, if the supply has met the IR’s performance specifications AND has performed satisfactorily over a predefined period of time WITH a predetermined population in the field, we may safely conclude that the manufacturer/vendor has met our quality standards and should be suitably awarded a position in the vendor directory. The policy document prepared jointly by the Railway Board, DLW & RDSO for approval of vendors for such technologically complex items has already been e-mailed. Even though the policy deals with EMD locos sub-systems, it would serve as an illustration. The document would underline the need to proceed with caution in developing additional vendors for such niche items and in upgrading the existing ones. There is a need to expand this policy to include items of rolling stock in addition to those of the EMD locos.

Page 6: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

5

All CMEs are requested to bring suggestions on items to be included in the policy of niche items. This would include all rolling stock namely locomotives, coaches, wagons, cranes, DMUs, SPARTs etc. These will be discussed in the conference. (B) UTEX: UTEX is a system of service contract with assured quality levels at predetermined prices. This is not to be confused with Unit Exchange. In the system of service contract, the user (a workshop or a diesel shed, for example) enters into a running contract with a service provider who refurbishes sub-assemblies or major parts for the Railways. The system is based on statistical average for refurbishment rather than on measurements of the work content in individual pieces. The contractor is expected to carry out refurbishment of assemblies given to him at fixed contract prices regardless of the actual work content in each piece. A model on these lines exists in DMW which awards works contracts for rehabilitation/refurbishing of ABB turbochargers. The benefit to the Railways is that it gets sub-assembles repaired at fixed prices. It is noteworthy that the refurbished sub-assemblies come with warranty as new. It is upto the contractor to either refurbish the sub-assembly thoroughly or in some cases replace it with a new one. As far as Railways are concerned, the quality and reliability is identical in both cases. There is a precondition, however. Railways must hand over the sub-assembly to the contractor in working condition. The benefit to the contractor would be that he gets order for an assured quantity and often for a period of 2-3 years. He would, therefore, be motivated to invest in equipment and systems in his plant. The OEM of the sub-assembly is a natural candidate for such contracts though it may not be necessary in all cases. ACTION POINTS

i) CME/SWR and CME/DMW will make a presentation on the concept of UTEX. A draft manual/procedure for entering into UTEX should also be prepared and brought to the conference for deliberations. The draft may also be circulated in advance. The draft manual will contain inter-alia following details:

a. How to determine statistical averages? b. How to determine the average pricing for the contract? DMW, for

example, has placed a cap of 75% of new on the refurbishment contracts.

c. Procedure for entering into the contract – works contract, rate running contract, supply contract etc.

d. Procedure for inspection of outgoing and incoming material. e. Etc. etc

Page 7: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

6

ii) All CMEs will bring suggestions of sub-assemblies/major parts to be considered for UTEX. This would include all rolling stock namely; locomotives, coaches, wagons, cranes, DMUs, SPARTs etc. These will be discussed in the conference.

(C) Indigenization:

The presentation made by South Western Railway on the real cost of proliferation of vendors for loco assemblies/parts has already been emailed. Though this presentation deals with EMD loco only, similar situations may exist in case of ALCO locos, coaches and wagons. The issue is not limited only to indigenization of imported parts but also includes indiscriminate approval of vendors not qualified to match the standards of the existing ones. The consequences often result in far higher real expenditure than the savings which are envisaged in this exercise of enlarging the vendor list thereby attempting to create a more competitive situation. It has become necessary for the department to understand the need for high quality spares and assemblies which go into our rolling stock. These have a direct impact on safety as well as reliability. Moreover, very often, such enlargement of vendor lists does not bring about any real saving in real terms. Not disregarding the need to bring about transparency and fair competition in our purchase system, the primary objective of a department is to enable running of safe and reliable train service. There is, therefore, a need to build checks and balances in our vendor approval process at RDSO and PUs. It is planned to deliberate in the meeting on how to create such a system. Some of the action points are as follows: i) System of elimination of poorly performing vendors from the existing lists. ii) System of penalty, reprimands and/or DAR action against officers (of vendor approving authorities) whose approvals have led to poorer quality of supplies and/or higher real expenditure for the Railways, as brought out in the attached presentation. iii) System of penalty, reprimands and/or DAR action against officers in the field who have either procured from unapproved sources or have failed to prevent procurement from unapproved sources. This would include not only indenting officers but also those who are either commenting on technical suitability of offers or are members of tender committees. 18. ART & 140 Ton Crane

o AMC of Cranes – CME/ER to present the decisions taken in meeting held at Jamalpur recently and indicate implementation of decisions by zonal railways.

o Zonal railways to indicate crane wise the target dates for the maintenance

infrastructure as per yard stick to be in place.

o Failure of Cranes at Accident Site – Recently, few site failures have been highlighted. CMEs to confirm that:

Page 8: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

7

• All preventive maintenance schedules are being carried out as per laid down guideline,

• The operators / drivers / staff are adequately trained including refresher courses and experienced and sufficient no. is available for each crane for round the clock working.

• Safe load indicator is working on each crane. • Adequate stock of critical spares is available with each ZR.

CMEs to also indicate no. of full scale mock drills conducted and no. of

rolling stock handled during these drills by each crane in the last 1 year.

o We need to develop cold as well as hot cutting capability for SS in ARTs quickly in view of increasing proportion of SS stock. ER, WR & SCR have been nominated to conduct trials and develop specifications for different types of equipment. CMEs of these railways to present respective specifications finalised. All zonal railways to accordingly plan for immediate procurement of the equipment for those ARTs, which are likely to attend to accidents involving SS coaches.

Page 9: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

8

PU Items

1. Review of performance of Production Units

Performance of Production Units - Locomotives Production Units Actual

2009-10 Actual 2010-11

Target 2011-12

Target Upto

May. 2011

Actual Upto May. 2011

DLW ALCO 122 82 35 6 5 WDG4/WDP4 110 150 215 36 23 NRC/Export 26 35 25 4 8 Total 258 267 275 46 36 CLW WAG7/WAP4 160 160 130 20 19 WAG9/WAP5/WAP7 60 70 100 15 10

Total 220 230 230 35 29 Performance of Production Units - Components

Production Units Actual 2009-10

Actual 2010-11

Target 2011-12

Target Upto

May. 2011

Actual Upto May. 2011

DMW Loco Rebuilding 112 109 83 18 19 Power Pack (Total) 156 142 24 6 24 New Locos 25 RWF Wheels 187450 180810 200000 35153 35192 Axles (units) 65302 83339 89800 16397 16117 Wheelsets 55940 61281 68000 12696 11709

Page 10: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

9

Performance of Production Units -Coaches Production Units Actual

2009-10 Actual 2010-11

Target 2011-12

Target Upto

May. 2011

Actual Upto May. 2011

RCF MEMU 64 40 112 0 25 LHB 163 316 426 62 64 Hybrid stainless steel 214 140 0 0 Conventional 1127 1063 1046 205 158 NRC 17 16 Total 1568 1576 1600 267 247 ICF EMU 494 535 480 28 DEMU / J&K 64 93 144 1 SPART 3 0 9 METRO 16 64 8 MMTS AP 36 0 SS HYBRID/LHB 6 0 20 Conventional 842 771 743 158 NRC 24 52 50 Total 1433 1503 1510 194 195

2. Inter PU assistance The following matters pertaining to inter PU assistance will be deliberated:

• Assistance of RCF to RBL • Assistance of ICF to SER for Haldia.

Page 11: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

10

FREIGHT ITEMS Routine Agenda Items 1. Performance Review of Equipment failure:

The comparative figures for 2008-09, 2009-10, 2010-11 and the current year (only one month) for Hot axles and Train Partings are as below:

Year (April to March) Hot Axle Train Partings 2008-09 599 793 2009-10 684 778 2010-11 779 717

2011-12 (Up to May 2011) 124 104 2010-11 (upto May 2010) 112 104

The train partings continue to occur in substantial numbers. Each train parting

is a potential accident. Thus, measures have to be taken to stem cases of train partings.

The hot axle cases over Indian Railways have increased by around 14% in

2010-11 as compared to 2009-10. During the CRSEs’ Conference held at Railway Board in April 2011, it was

decided to include analysis of rejections of CTRBs in Workshops by RDSO while analyzing bearing failures. Also, in order to explore the concept of codal life for freight bearings, a format has been circulated by RDSO for collection of information. During discussions, it was also discovered that Workshops outsourcing maintenance of bearings were found to have higher cases of bearing failures per unit of POH outturn as compared to the others.

Railways may discuss: • Action taken by Railways outsourcing maintenance of bearings for

improvement of quality • Action taken to remove deficiencies noticed during Quality Audit of bearing

overhaul in various Workshops • Submission of Bearing Failure reports/Workshop Rejection reports to RDSO in the proper format • Concept of codal life of freight bearings– NCR may make a presentation

Zonal Railways may bring their analysis of the hot axle issue, action taken by them so far and further action plan to improve performance in the area.

2. Controlling damages to wagons during handling

The average arising of Cat ‘C’ unloadables per month during the last five years is as follows:

Page 12: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

11

2010-11 2009-10 2008-09 2007-08 2006-07

809 930 773 585 424 Although the arising of Cat ‘C’ unloadables is showing a downtrend, it is still at very high level, accounting for almost 30% of the POH workload. An enduring mechanism is necessary to control such damages at both Railway Goods sheds and Private Sidings. Also system of charging damages needs to be streamlined. The performance of rehabilitation of wagons railway-wise vis-à-vis targets has been as follows during 2010-11:

Railway ECR ER NCR NR NWR SCR Target of upgraded

rehabilitation (BOXN to BOXNR)

600 250 600 400 400 200

Actuals 0 350 469 194 317 524 Target of MS Upgradation

0 0 0 0 0

Actuals 0 351 512 0 315 381

Railway SECR SER SR WCR WR Total Target of upgraded

rehabilitation (BOXN to BOXNR)

400 350 400 493 450 4543

Actuals 207 68 87 329 207 2752 Target of MS Upgradation

0 0 0 0 0 0

Actuals 659 127 0 0 613 2958 The performance of the Open Line against targets given to them vide Railway Board’s letter dated July 2, 2010 is an average of 14 wagons against a target of 30 per month for VSKP/ECoR. The remaining Railways (SWR, ECR and WCR) have not achieved any progress against the targets of BOXN rehabilitation given to them. Railways may discuss: • Rehabilitation performance Railway-wise • Action Plan to control wagon damages • Mechanism to recover losses from parties

3. Performance of CC and Premium rakes The number of CC, Premium and End-to-end examinations per day Railway-wise during the years 2010-11 and 2009-10 are as follows:

Page 13: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

12

CC Premium End-to-end Railway 2009-10 2010-11 2009-10 2010-11 2009-10 2010-11

CR 0.32 1.5 6.8 6 12 9 ECR 6.48 6.8 9.6 9.6 5.88 7.5 ECoR 3.27 3 3.8 3.5 13.5 11.5

ER 1.16 3.9 8.6 9 13.5 7 NCR 3.19 3.2 1.9 1 3.06 7.1 NER 0 0 2.66 2.1 2.72 0.73 NFR 0.52 0.1 6.67 10.9 4.41 4.2 NR 8.4 8.5 6 4.4 23.5 35.6

NWR 0.35 0.4 0.99 0.8 0.2 0.37 SCR 5.13 5.3 9.52 9.5 6.4 10.1 SER 4.16 4.3 13.45 17.61 16.9 24.9

SECR 4.6 4.8 4.5 6.4 18.5 6.4 SR 2.1 1.8 5.76 6.49 7.79 15.28

SWR 2.35 1.3 2.32 3.29 4.89 5.4 WCR 0.97 1.1 13.2 11.32 8.6 8.42 WR 2.3 2.9 13.5 12.5 2.7 4.9 IR 45.3 48.9 109.27 114.49 144.55 158.4

The above table reveals that over Indian Railways, while the total number of CC and premium examinations have gone up by 7.9% and 4.8% respectively, the end-to-end examinations have also increased by almost 9.6%. Each time an end-to-end rake is converted into premium rake, 5 examinations per month get reduced to just 2 examinations per month. Assuming an average of 12 hours are lost for each examination from placement to release, this translates into a loss of 1.5 days per rake per month or a loss of 18 days per rake per year. If all end-to-end examinations are replaced with premium, additional 39 rakes can be made available throughout the year through savings in time lost due to detention of rakes for examination. Further, it is found during random checks by NCO organization that the incoming CC and premium rakes are sometimes found to have brake power below 85%. This needs to be checked. An average of 771 trains were found running with invalid BPC during 2010-11. This also points towards unsafe running and needs to be controlled. Railways may discuss: • Strategy to minimise end-to-end examination on the Railways • Poor brake power in rakes arriving for PME • Trains running on invalid BPC

4. Special Drive to eliminate cases of Hand Brake Wheel working out:

The Aligarh mishap has opened our eyes to a very potent source of accidents on mechanical account. As per the CRS Report, the accident occurred because no riveting was done for securing the short spindle of hand brake wheel with the sleeve. Only welding of sleeve with short spindle had been

Page 14: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

13

done. The other side of the sleeve also indicated signs of welding with long spindle. The examination of the rivet hole indicated that no rivet was available in the hole for quite some time, as the hole was badly rusted. Post the mishap, it was instructed by Board that a special safety drive should be undertaken in order to attend to all cases of hand brake wheel problem. To prevent such cases in the future, the modification suggested by RDSO was also to be implemented. Railways may bring out the results of the drive in the following format:

Wagons in which problems were found Total wagons

examined Hand brake wheel found

missing

Spindle improperly

riveted

Other problems related to

hand brake

Wagons modified as per RDSO drawing

Railways may discuss the results of the drive.

5. BCNHL Door Problem

The BCNHL doors have been an area of concern since the inception of the wagon. Presently, RDSO is developing a modified sliding door design which will be first trial run on WR rakes. Railways may give the following information in regard to BCNHL doors:

Parameter Hinge door

design: Original design

Hinge door

design: Mod I (long cotter

s)

Hinge door design: Mod II

(changed design of

cotters and external

tower bolts)

Hinge door design:

BESCO’s design

(pressed door design of four hinges instead

of six )

Sliding door design:

Temaco’s design (with sliding roller

at the top)

Holding of BCNHL wagons

Cases of doors hitting fixed structures

RDSO to give a presentation on the modified door design. Railways may discuss the Action Plan for immediate and long-term solution of

the problem.

Page 15: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

14

6. Status of pending CRS permissions for load/speed enhancement

While the sanction of the Railway Board is available for running of BOXN and BCN wagons according to RDSO’s latest Speed Certificates, the Railways are yet to take sanction of the same. Thus, while BCNM1, BCNAM1, BCNAHSM1 have been certified for running at 75 Kmph in the loaded condition at CC+6+2, and for 65, 65 and 75 Kmph at CC+8+2, Railways are still running them at 60 Kmph. Similarly, BOXNM1 and BOXNHSM1 wagons have been cleared for 75 Kmph at CC+8+2 on the MGS-GZB section of Allahabad division on NCR. BOXNHL wagons have been certified for a speed of 75 Kmph in the loaded condition, but the Railways are yet to obtain CRS sanction for the same. Status of CRS Clearance (along with speeds) for the following wagons may be discussed:

Type of Wagon CC CC+6+2 CC+8+2 BOXNM1

BOXNHSM1 BOXNHL BCNAM1

BCNAHSM1 BCNM1

BCNHSM1 BCNHL BOST

BOSTHS Double-stack Containers

Railways may discuss their status and indicate the timeframe in which the requisite sanctions shall be obtained for various wagons.

7. Upgradation of maintenance facilities

It is found that proposals for Upgradation of maintenance facilities are inadequately prepared, as a result of which they get dropped at the last minute. The ground work for preparation of proposals for the Budget session should start immediately to ensure well-drafted and adequately justified proposals. The multi-disciplinary EDs’ Committee of Railway Board had recommended upgradation of infrastructure for maintenance of freight stock. The proposals for setting up of world-class freight examination facilities were sanctioned in the year 2008 at TKD, MGS and Gooty. However, there seems to be no progress on the implementation of these Projects. Lack of progress on these Projects is proving to be an obstacle in further planning of such facilities at other locations.

Page 16: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

15

Railways may discuss: • Status of various points mentioned in the EDs’ Committee and action plan

for their upgradation • Status of World Class facility Projects and targets for implementation • Further suggestions for capacity creation

8. Maintenance of New Design BOXNHL and BCNHL wagons

MGS, NKJ and Bhilai have been nominated for undertaking ROH of BOXNHL wagons. Rayanapadu Workshop, in addition to Jhansi and Raipur Workshops has been nominated for maintenance of Stainless Steel wagons. KJGY/NR and Shambhupura/WR are to base BCNHL wagons for examination and ROH. Railways may discuss maintenance preparedness including spares planning at the above-mentioned bases and suggest new bases for stainless steel wagons to be started in 2011-12/12-13.

9. Budget and Expenditure – Wagon Maintenance Wagon fleet is the main source of Railways’ revenue. It thus needs to be maintained well to face the challenges of increased loading, higher speeds, larger rakes and longer intervals between maintenance. Availability of funds for wagon maintenance needs to be monitored. Railways may discuss pre-August review status and bring out any specific shortfalls, PU-wise, to seek a mid-course correction at RE stage.

Year Final Budget Grant Actual Expenditure on Wagon Maintenance

2008-09 2009-10 2010-11

For the current year, Railways may discuss: • Specific PU-wise shortfall and additional requirement • Impact of fund shortage on material procurement and execution of Works

under revenue Special Agenda Items 1) Maintenance of Private Wagons

Page 17: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

16

1.1 Capacity and Preparedness

The stock of private wagons (wagons owned by other than Indian Railways) is increasing every year. With the introduction of new schemes like PFT, SFTO, AFTO etc., the size of the private wagon fleet is expected to increase at a fast rate. Present policy guidelines lay down that all private wagon maintenance is to be undertaken by the Railways. This situation brings the following aspects into prominence: a. Requirement of developing capacity for maintenance of a larger

number of wagons at locations suitable to the private parties b. Providing a certain acceptable service level to the private players and

minimizing stock detentions c. Maintaining transparency and uniformity while dealing with different

private players Railways may provide a list of private wagons ownership-wise active on their system and discuss the repercussions of the changing scenario and the preparedness required to deal with the same.

1.2 Creation of Wagon Maintenance Deposit Account (WMDA) and system for collection of maintenance charges WMDA are to be created at zonal level for streamlining the system of receipt, accountal and expenditure of funds received as maintenance charges. Mechanical Department is required to take the initiative to ensure that WMDA is created in their Railway and that receipts from the Centralised Deposit Account (CDA) maintained with Sr. DFM, DLI, NR are received regularly in the WMDA of their Railway in accordance with the % distribution advised by Railway Board. Railways may confirm opening of WDMA and bring out issues , if any, I implementation of the system.

1.3 Privatization of Wagon Maintenance

Railways may discuss the instances of private maintenance of freight stock in their Railway if any, feasibility of privatization of maintenance and the approach that needs to be adopted in the matter.

2) New Designs and Developments in Wagon Technology The following major strides have been made in wagon technology. RDSO may brief Railways through a presentation.

2.1 Development of indigenous couplers- Strategy for universalisation of design for all wagons may be discussed

Page 18: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

17

2.2 BOXNHAM wagons are high-speed high-capacity variants of BOXN stock. Progress of conversion of BOXN wagons to BOXNHAM wagons at JHNSW/KTTW Workshops may be discussed. Strategy for bulk conversion may be discussed.

2.3 Development of Autocar wagons: RDSO may give a presentation on the

new design. 2.4 Design of 25t and 32.5t axle load wagon at RDSO is a future-oriented

Project and aims to enable facing the challenges of DFC 2.5 Track-friendly bogies of 25 t axle load 3) Identification and segregation of Mechanical (Commercial)

functions on Railways Unlike other maintenance departments of Railways, Mechanical Department has remained very closely associated with operations and commercial functions of Railways. With increasing emphasis on customer satisfaction and increasing private investment in Railways, it is necessary to branch out Mechanical (Commercial) functions at Divisional and Headquarters level. The functions which would fall under Mechanical (Commercial), inter alia, could be as under: • Planning and providing maintenance to privately owned wagons • Mechanised loading and unloading system in Railway Goods Sheds

and monitoring and control of Mechanised loading, tippler at private siding

• Siding agreements, Private Wagon maintenance agreements, AMC for weighbridges, maintenance element in AFTO, SFTO, MWIS, LWIS, WLS etc.

• Weighbridge planning, installation and maintenance • Maintenance at Private Freight Terminals, Multi-modal Logistics part

of DFCCIL • ODC movements • Lashing and securing, regulation, non-ISO containers • Mechanised Parcel handling systems • Advertising on Rolling Stock

Railways may discuss the organizational impact and develop a strategy to introduce this change

4) Long Haul Operations

Instructions for long haul were issued in March 2011. Progress of long haul and any issues in the Board’s policy may be discussed. Long haul provides an opportunity to increase and improve profitability of Diesel operations. Also, it is a precursor to DFC operations. A strategy to prepare rolling stock for long haul may be discussed.

Page 19: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

18

Project Item:

Administrative control of FIAT bogie frame factory at Budge Budge, Kolkata.

A factory is being set up at Budge Budge (near Kolkata) for manufacture of FIAT bogie frames. These bogie frames will be supplied to RCF/Kapurthala, RCF/Rae Bareilly and also to zonal railways to cater for spares requirement.

A decision is required whether this factory should function under the administrative control of RCF/Kapurthala against whose sanctioned work the factory is being constructed or under Eastern Railway where the factory is located. Both alternatives would have certain advantages. Having combined control with areas of responsibilities defined can also be considered. A distribution which will enable effective management of the factory could be to assign the functions of manpower planning and staffing, maintenance of plants and assets, security and other day to day administrative functions to Eastern Railway, and project management for setting up the factory along with stores management including material planning and procurement when the factory is operational to RCF/Kapurthala.

Another parallel case is that of Dankuni factory which is located on ER but will cater exclusively to DLW. Since this factory has been sanctioned for ER, the work of construction as well as manpower planning & staffing are being done by ER. However, the functions of stores management may be assigned to DLW as the work will be undertaken against RSP sanctions for DLW.

Concerned CMEs may give their views during the discussion in CMEs

conference to facilitate a decision in the matter.

Page 20: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

19

Development Items

SN Action By 1.0

CENTRES OF EXCELLENCE (CoE)

1.1 Vide Item No.7 of the Minutes of 4th Workshop Management Group Meeting held on 27th & 28th August 2009, it was decided that Training of Staff and Supervisors needs to be taken as a thrust area. Following Centres of Excellence were to be developed:

DMW - Machine maintenance (Electronics & Hydraulics) RCF – LHB coach technologies, CDTS JMP - Hydraulics GOC, DLW, BPL, KGP - Welding.

Action taken/in hand may be advised.

E. Rly S.Rly S.E. Rly W.C. Rly DLW DMW RCF

1.2 Centres of Excellence for development and prototyping of various types of Mechatronics Systems at RCF/Kapurthala and DMW/Patiala have been announced in Hon’ble MR’s budget speech of 2011-12. A committee of officers from DMW,RCF, RDSO and IRIMEE has been asked to develop plans including estimates for setting up these centers by end of June 2011. RCF and DMW to process for sanction expeditiously.

DMW IRIMEE RDSO RCF

1.3 Wagon Prototyping Centre With a view to enhance long term competitiveness of IR in the freight sector, Centre of Excellence for wagon Prototyping at Kharagpur was proposed by Hon’ble MR in the budget Speech 2010-11. Detailed estimate of the project ”Kharagpur-Center of Excellence for Wagon Prototyping” under sanction in SER needs to expedited. The project is to be executed on a turnkey basis by SE Railway.

SER RDSO

2.0 ENVIRONMENT FRIENDLY TOILETS (EFT) Under writ Petition regarding Employment of Manual Scavengers and construction of dry latrines (prohibition) Act, a declaration in hon’ble High Court has been made by IR that Railways will install a total of 500 bio-toilets by March 2012. All actions pertaining to EFTs need to be monitored closely.

2.1 Setting up of a unit for Environment Friendly coach toilets at Motibagh Workshop of SECR at Nagpur A sanction of 14.2 crore has been included in the Pink Book-2011/12 at item no. 320 of SECR. A committee of following officers is nominated to develop detailed plans:

1. CDE/RCF/Kapurthala

RCF RDSO IRCAMTECH SECR

Page 21: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

20

2. ED/Carriage/RDSO/LKO 3. ED/IRCAMTECH/GWL 4. CRSE/SECR/Bilaspur

In first phase, manufacturing of prototype bio-tanks is likely to commence by 15th August’2011 with a target of manufacturing 60 tanks for this year. Sanction of detailed estimate needs to be expeditiously handled by SECR.

2.2 Vacuum Toilets Board has approved trial of Vacuum Retention Toilets on two Shatabdi Rakes. NR has given clearance for disposal of waste in the sewage system. 40 coaches (80 toilets) with ground and mobile evacuation facilities at NDLS Shatabdi Pit-line. A developmental tender for 80 toilets has been floated by Railway Board. Pre bid conference was held on 28th March 2011. RDSO to expedite the response on pre-bid queries.

NR ED/Carr. RDSO RCF

2.3 Zero Discharge Toilet System RDSO has placed an order for one rake (14 coaches -56 toilets) along with ground evacuation facilities at BBQ (Basin Bridge Jn.) depot of Southern Railway. SR and RDSO should monitor the progress closely.

RDSO SR

2.4 Toilets based on Joint Technology Development MoU with DRDO - 43 toilets (23 coaches) from RCF have been provided in two rakes of Gwalior – Varanasi Bundelkhand Express since 18.01.2011. Eight more coaches fitted with 14 Bio-toilets of design option-IV are likely to be turned out by RCF in July’2011. One rake is to be turned out by ICF by August 2011 and is planned to be operated in Chennai – Guwahati Express.

RCF NCR ICF NF

2.5 Further, Board (MM) has approved fitment of 300 more bio-toilets in five rakes, for which design has been finalized based on the feedback and experience gained in Bundelkhand Express. The rakes are allotted to WR, CR, NR, NER and NCR. Zonal Rlys should obtain information from RCF, RDSO and NCR for design, operation, test schemes, AMOC and other related issues. IRCAMTECH to coordinate.

WR CR NR NER NCR RCF RDSO IRCAMTECH

2.6

A Group has been formed with ED/IRCAMTECH as convener for finalising the specification for evacuation systems for different types of Toilets. This needs to be expedited.

IRCAMTECH NR RDSO RCF

3.0 IT APPLICATIONS FOR MECHANICAL DEPARTMENT

3.1 Action plan targets for various IT applications for Mech. Deptt. as decided in the 2nd Annual meeting held in Jan’2011 are given below:

Page 22: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

21

SN

Project Description Date Action by

Preparation and sanction of detailed estimate for roll out in three zones (CC Rakes)

June 2011

Trials for integration of train presence indicator and GPRS connectivity with pilot system

Sept. 2011

Floating of tender for rollout Sept.11

1 Wagon Identification Project

Finalisation of tender Dec.11

CRIS

System go live in BCT April 2011

2 Coaching Maintenance Module Go live in Delhi & LKO Depots July 2011

CRIS, WR NR

First M&P e-tender to be floated May 2011

CRIS , COFMOW

3 COFMOW

Pilot implementation/ Test Run of the new software

Dec.2011 CRIS, COFMOW

Testing of Customized ERP Modules

Feb. 2011

Preparation of input data from design office

Mar. 11

Networking activities Apr.11 System integration for ICF ERP modules commences

May 2011

Development of Central Application functionalities

July 2011

Transition and cutover to ERP environment in ICF

Aug. 2011

ICF CRIS

4 ICF-ERP

Go Live Sept. 11 5 RCF Design Change Management

System & Alternate Routings: Data Entry, Application Refinement and System Review and Report

June 2011

RCF

Testing & deployment of FMM Yard core functionalities

Mar.11

Launching of Central Application Apr.11 LMS Shed Core functionalities Apr.11

6 LMS & FMM Pilot Implementation Go Live in first Shed & first

Depot Aug. 11

CRIS NR

3.2

Post Contract Management at COFMOW: COFMOW’s periodic positions are available on line on COFMOW’s website. Zonal Railways and Production Units can download these positions. Zonal Railways/PUs may provide feedback to COFMOW for further improvements in the system. COFMOW in collaboration with CRIS has also commissioned a Post Contract Management Module. Following

COFMOW All Zonal Railways/ PUs

Page 23: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

22

information has to be updated against each supply order/contract by the consignees/railway headquarters: a) Date of Machine Received b) GA Drawing received c) GA Drawing approved d) Site handed over e) Foundation Started f) Foundation completed g) Verification Date h) Installation and Commissioning date i) PTC issue date j) Remarks All Railways and Production Units should use this system extensively and provide feedback to COFMOW for further improvements/modifications required in the system. Pilot run of the new software is also scheduled this year.

3.3 Loco Management System (LMS) A pilot project has been launched in three Diesel Sheds of Northern Railway. Northern Railway may report progress in terms of Hardware supply and Installation, Software development & customization and identification of core team at all levels with adequate training for taking over systems. CRIS & NR to ensure further progress as per action plan.

N.RLY CRIS

3.4

Freight Management Manager (FMM) Freight Maintenance Management (FMM) Pilot Project is approaching Go- Live phase. The Pilot Project FMM is to be implemented at Dadri (ALD-NCR), TKD (DLI- NR), Dhandari (FZR- NR). CRIS,NR & NCR to ensure progress as per action plan

NR NCR CRIS

3.5 Workshop Information System - II (WISE-II) CRIS has indicated that order for Workshop Information System - II (WISE-II) project covers thirty four workshops of Indian Railway out of which five workshops, namely LLH/ER, LPL/WR, R/SECR, LGD/SCR and CB/NR have been identified for Pilot phase and balance twenty nine workshop will be taken up in the rollout phase. Users’ requirement and proposed network inputs have been circulated to all Railways by CRIS. Detailed system requirement study is to be undertaken at five pilot locations and three more workshops namely BPL/WCR, KGP/SER and PER/SR.

CRIS ER WR SCR NR SECR WCR SER SR

3.6 Integrated Coaching Management System (ICMS) - Coach Maintenance Module (CMM) Coach Maintenance Module of ICMS has been made live at Bombay Central Coaching Depot. 13 Trains have been taken up, for which mechanical maintenance work orders are generated from the system, and

WR NR

Page 24: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

23

the details of repairs that are carried out are being recorded. CRIS & WR to ensure proper implementation. Further implementation at WR & NR is planned this year

CRIS

3.7 Enterprises Resource Planning at ICF CF-ERP project was launched in March 2010. ICF may report progress of the Hardware supply and Installation, Software development & customization and identification of core teams at all levels with adequate training for taking over systems. The target date of completion is September 2011. ICF to ensure proper implementation.

ICF CRIS

4.0 ON LINE MONITORING OF ROLLING STOCK

4.1

Wheel Impact Load Detectors (WILD) Phase-I Nine WILD Systems have been installed at (i) Mahalimarup/SER, (ii) Hospet/SWR, (iii) Bhilai/SECR, (iv) Arakkonam/SR, (v) Mughalsarai/ECR (2nos.), (vi) Guntakal/SCR, (vii) Asansol/ER and (viii) Vishakhapatnam/ECoR. The trend of critical alarms over the WILD Systems as compiled by RDSO is as under:-

% of trains which had critical alarm Arakk

onam Bhilai Hosp

et Mahalimarup

Asanasol

Guntakal

MGS-I MGS-II

Vizag

2007 2.39 3.94 1.42 1.21 2008 0.73 0.74 0.61 1.21 0.62 1.12 1.13 1.82 0.96 2009 0.49 0.31 0.33 1.04 0.94 0.75 1.37 1.78 0.2 2010 0.25 0.32 0.19 0.84 0.64 0.65 0.62 1.15 0.18 2011 0.14 0.26 0.34 0.73 0.51 0.23 0.33 0.65 0.34

Phase-II Six WILD Systems have been commissioned at (i)) Ajni (ii) Nagpur (iii) Bina (iv) Itarsi (v) New Katni and (ivi) Barwadi. Board’s JPO in the matter is to be implemented strictly. Provision has been made on the WILD Web site (www.irwild.net) to input details of Vehicle ID, Diagnosis and Action Taken for the rolling stock generating critical alarms, so that vehicle history can be maintained in the WILD database. Railways must ensure that information required is updated on the website time.

SER SWR SECR SR SCR ER ECR ECoR CR WCR ED/ Research RDSO

4.2

Acoustic Bearing Detector: At Bakkas, System validation in hand since Jan 2010 for RS-I (Bearing Running Surface Fault level-I) defects in wagons. To validate system capability, it is essential that coach and loco bearings are also monitored. RDSO has to develop standards for implementation in IR operating conditions. The committee of RDSO officers should finalise its report

ED/ Testing, RDSO Northern Railway

Page 25: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

24

expeditiously.

5.0

WEIGHBRIDGES

5.1 5.2

Twenty eight weighbridges are under various states of installation/ commissioning (ECR-7, SR-7, SER-2, ER-1, NCR-3, SCR-7, ECoR-1) and Seven are under procurement (WR-2, ER-2, SER-2, CR-1). Activities pertaining to Electronic in-motion weighbridges need to be closely monitored. For Maintenance of EIMWB’s through AMC with OEM’s guidelines on terms and conditions as laid down in Railway Board Tender were issued in 2001. In 2007, Railways were directed to finalise, rates/ terms & condition of AMC for maintenance of EIMWB’s with concurrence of their associate finance. Vide Railway Board’s letter No.2004/Dev.Cell/IDEI/3 dt.23.3.11, CMEs, All Indian Railways, were requested to furnish information about calibration of electronic in-motion weighbridges. The requisite information is not yet received from NCR and WCR.

All Zonal Railways NCR WCR

5.3 FOIS interface To achieve the objective of integrating weighbridge with FOIS through transfer of weighment data seamlessly, Amendment No. 5 to RDSO specification No. WD-29-MISC-05 has been issued vide DG (Wagon)’s letter No. MW/CS/PE/WB dated 18/19.02.2010. All new procurements of weighbridges should be made incorporating this amendment.

All Indian Railways ED/Wagon, RDSO

6.0 Crash Buffers:

6.1 Based on the recommendation of RSRC for improving crashworthiness of coaches, crash buffers have been provided in coaches. 1200 nos. have been fitted by RCF, which are allotted to almost Railways. All Railways should monitor performance of these crash buffers and furnish report to RDSO. RDSO has issued maintenance instructions for crash buffers vide letter No. MC/Crashworthiness dated 23/24.12.2010 to all railways. Railway-wise summary of fitment is given below:- Railway Number of Buffers Central 188 East Coast 16 East Central 32 Eastern 148 North Eastern 40 Northeast Frontier 208

CMEs, All Indian Railways ED/Carriage/RDSO CDE/RCF

Page 26: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

25

Northern 84 North Western 140 South Central 96 South Eastern 64 South East Central 32 South Western 16 West Central 40 Western 96 Total 1200

7.0 New Shell Structure Designs:

7.1 RCF to expedite the manufacture of prototype LHB crashworthy design shell. RDSO to remain prepared for carrying out full scale crash test.

RDSO RCF

7.2 Instructions were issued vide letter No.2010/Dev.Cell/IGRI/1 dated 08.01.2010 for designs of Monocoque wagons. Sanction for these prototype exists in Rolling Stock Programme. RDSO and RCF to take further necessary action.

ED/WAGON, RDSO CDE/RCF

8.0 Training 8.1 A Committee consisting of ED/IRCAMTECH and Professor /IRIMEE on

Training needs of Mech. Department had submitted its report on training needs of Mechanical Department. Based on this report, training is being organized in the following areas for which conveners are indicated below : Area Convener 1. Contract Management ED/CAMTECH 2. CDTS & Environment Friendly toilets CDE/RCF 3. Secondary suspension ED/Carriage, RDSO 4. MBCS, MCBG in ALCO locos Sr.ED/MP, RDSO 5. BMBS ED/Wagon/RDSO 6. GM Locos CDE/DLW 7. Welding technologies including SS welding CWM/BPL 8. Maintenance of CNC machines CME/DMW 9. Mechatronics including Weighbridges and Dir/IRIMEE rolling stock sub-system 10. Maintenance of 140T cranes CWM/JMP 11. Disaster management & ART and other site Principal, equipment operations STC/Bangalore Railways should provide necessary inputs to the conveners and utilize the training programmes by nominating suitable trainees.

All Zonal Railways & Pus

Page 27: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

26

Plan Head – 41 (WORKSHOP ITEMS)

1. Feedback on CRB’s DO to General Managers:

CRB, vide his DO No.2009/M(W)/814/35 Safety Pt. dated .03.11, while emphasizing the importance of workshops in maintaining requisite safety standards in rolling stocks and giving exhaustive attention to the passenger amenities portion, has impressed upon General Managers to give adequate attention on upkeep of workshop infrastructure, timely availability of materials and training of manpower. In this regard, General Managers have been advised to conduct annual inspections of the major workshops on their Railways on the pattern of annual open line inspections. They have also been advised to review and ensure adequate delegation of powers to the workshop in-charges to cater to the timely availability of material, specialized training needs and other infrastructural requirements including those necessitated by the factories act. The feedback in this regard may kindly be given by the Railways on both Annual inspection by GMs and review of delegation of powers to CWMs.

2. Feedback on action Plan decided during CMEs’ Meeting:

To discuss the quality of POH of coaches, a meeting was convened in Railway Board on 8.3.11 in which a number of related issues were deliberated. The minutes of the said meeting were issued vide Board’s letter No. No.2009/M(W)/814/35/Safety/Pt. dated 25.03.11. Railways to confirm the progress on the course of action decided in the meeting. Railways may also confirm that the feedback on 04 items namely curtains, rexines, PVC and laminates has been given to RDSO. RDSO to apprise the action taken on these items subsequently.

3. Annual Performance Appraisal of officers working in workshops: Board, vide its letter No.2009/SCC/3/1 dated 2nd February 2009, had advised the procedure for writing the ACRs (now APAR) of officers working in workshops. Railways are requested to confirm that instructions of the Board in this regard are being followed without any deviation.

4. Workshop Portal:

The workshop portal in a more detailed format has been hosted at the Railnet URL: http://10.1.5.78:8081/MCDO/. In addition to POH outturn, the progress of RSP works, POH unit cost, POH cycle time, incentive payments, staff strength, coach sick marking and local passing have also been added to the site. It is seen that a number of workshops/headquarters are not feeding the data regularly in the portal. It can be appreciated that a meaningful analysis is possible only when complete data is fed into the

Page 28: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

27

portal. Railways must ensure feeding the data regularly for proper utilization of the portal. The workshops can view each other’s performance in all the fields. It may be confirmed by the CMEs in their PCDO each month that the latest data has been updated as advised by AM(PU) in his DO No.2009/M(W)/814/35/Safety dated 27.06.11.

5. Assembly of wheel sets: Due to shortfall in capacity of wheel set assembly at RWF, six workshops (PER(C), JMP, ASR, UBLS, PL and PR) have been advised by Board to undertake assembly of wheel sets for self- consumption or dispatch to designated consignees. The total no. of wheel set assemblies planned in workshops during 2011-12 is 5200. The targets for the workshops were finalised after discussion with individual Railways. The progress on the said work may be apprised by the concerned zonal Railways.

6. Shortfall in manufacture of ICF assembled bogies:

Due to switch over to 18-month POH periodicity of coaches, there is an increasing requirement of ICF bogies for unit exchange. The four Railways ER, NR, SR and SWR have been regularly allotted the RSP work for manufacture of ICF assembled bogies. In some of the Railways, there has been a lag of more than one year in completing the allotted work under RSP. As per the data taken from workshop portal, the progress of all the four Railways has been below the target for the year 2010-11 as can be seen from the table below:

Railway Target Actual ER 180 156 NR 50 0 SR 250 126

SWR 100 62 Railways may bring an action plan and advise the time lines by which the target would be achieved.

7. Setting up/expansion of facilities for maintenance of LHB coaches in workshops: The following programme for setting up/enhancing POH capacities of LHB coaches was decided in the last CME’s Conference. Augmentation of capacity in existing workshops: 1. Jagadhri – From present levels of 15 to 35 per month 2. Lilluah – From 10 to 30 per month 3. Lower Parel – From 15 to 30 per month

Page 29: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

28

Creation of capacity in other workshops: 1. Mysore – 10 coaches per month 2. Peramur(Carr.) – 25 coaches per month 3. Lallaguda – 20 coaches per month

Later on ECoR was also asked to develop facilities for LHB at MCSW workshop. The Railways may confirm that the Works Programme proposals for inclusion in the Budget 2012-13 are being sent by 31.10.2011.

8. Quality Issues: An analysis of the cases of coaches getting sick marked within 100 days of POH in 2010-11 over the IR shows the following major reasons: (i) water tank/system leakage (13%) (ii) Bolster/axle box spring defective (11.3%) (iii) brake cylinder defective/B.P/F.P (8.5%) (iv) wheel defects (5.6%) and (v) D.V defects (5.4%).

The cases of en route coach detachments on account of roller bearing failures have also increased in the recent past. The subject was discussed in detail during CME’s meeting held at Railway Board on 8.3.11. A detailed feedback on the action taken by the Railways in compliance of the items discussed and circulated vide the minutes of the meeting is desired.

9. Issues pertaining to LHB Coaches: The following issues need to be addressed by RDSO: a. High Consumption of LHB Wheel Discs: It has been reported by Railways that the average life of LHB wheel discs is less than 3 years while the POH periodicity of LHB coaches itself is 3 years. The reasons for same need to be critically looked into by RDSO and suitable remedial measures suggested for implementation. b. High incidences of roller bearing failures:

During 2010-11, there have been a number of cases of en route coach detachment of LHB coaches on account of roller bearing failures. There have been 05 en route roller bearing failures in LHB coaches (in a population of 817 coaches) as compared to conventional coaches where there are 33 cases ( in population of 45183 coaches) i.e severity in LHB coaches is much more. RDSO to study and issue comprehensive instructions on maintenance of LHB bearings.

Page 30: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

29

c. Incidences of jerk in LHB coaches:

The phenomenon of jerk in LHB coaches during run has still not been addressed adequately .Though some refinements have been identified by RDSO , a conclusive solution of the problem still needs to be found. RDSO has to develop a proper system for obtaining regular feedback for addressing the problems being faced in the field on priority. RDSO needs to institutionalize a system of feedback and apprise the action taken on each of these items in their MCDOs.

10. POH of 140T Cranes:

Recently, a few cases of 140T crane failure at accident site have been highlighted. References are also received from Zonal Railways regarding maintenance and other issues related to 140T cranes. For resolving the issues, a review meeting should be regularly held by RDSO with Eastern Railway, Central Railway and some user Railways only. The items which need to be discussed are: i. Methodology of procurement and distribution of spares for

MLR/POH/regular maintenance of cranes. ii. Must change item during POH. iii. AMC of cranes and its sub-assemblies. iv. Action plan to liquidate overdues, if any. v. Codal life and scope of extension beyond 26 years. vi. Infrastructure at depot level – T&P, initial stocking, lubricants etc.

11. Feedback on 18-month POH:

Board, vide its earlier letter, had already enhanced the POH interval from 12 to 18 months for Mail/Express coaches. Since now an experience of about 2 years has already been gained on the revised periodicity, Railways may critically analyze and furnish information on the following after evaluating the same on their system: i. %age of coaches switched over to 18-month POH periodicity.

ii. %age of coaches where IOH is handled in the depots by arranging

overhauled bogies from the workshops and their average cycle time.

iii. %age of coaches which are booked to the workshop even for IOH instead of taking unit exchange overhauled bogies and the average cycle time for IOH of coaches in such cases.

iv. Average reduction ineffective %age of coaching stock achieved as compared to the period prior to implementation of 18-month POH periodicity.

Page 31: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

30

v. Facilities needed in the depots to carry out the IOH with coaches

being sent to shops @ 18 months intervals.

12. PH – 4100, M&P

I. Installation & Commissioning of machines – The progress of machine commissioning is very tardy. On an average almost 100 machines, each costing more that Rs. 25 lakh, are pending installation / commissioning for more than 6 months. This translates into blockage of huge funds in addition to reduction in production capacity. Individual officers must be made responsible for this work by allotting machines to them.

II. Performance based Sanction & Allotment of funds under PH-41 – The fresh

sanction of M&P as well as allotment of funds will be made strictly based on performance of the zonal railway / PU in expenditure and commissioning of machines.

III. Mandatory Comprehensive AMC for High Value / Sophisticated M&P –

Based on the feedback received from zonal railways and PUs, Railway Board is considering a proposal from COFMOW for inclusion of mandatory CAMC for six groups of machine as part of the procurement process itself. All railways except DLW have already given their consent for the same. Once approval is given by Board on the same, railways would be required to give a commitment along with machine indents that adequate provision of funds from revenue budget will be made for payment of CAMC charges.

13. PROPOSED REVISED YARDSTICKS / NORMS FOR CREATION OF

REVENUE CHARGED GAZETTED POSTS IN MECHANICAL ENGINEERING DEPARTMENT

The following tables give the existing provisions and proposed yardsticks / norms for each area. CME may please provide feedback on each area prior to the conference to DME(P)-II (Fax 011 2338 9696, email [email protected]).

EXISTING

Page 32: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

31

PROPOSED

EXISTING

PROPOSED

EXISTING

PROPOSED

Page 33: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

32

EXISTING

PROPOSED

EXISTING

PROPOSED

Page 34: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

33

EXISTING

PROPOSED

EXISTING

Page 35: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

34

PROPOSED

EXISTING

PROPOSED

Page 36: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

35

Planhead-42 1. Utilization of funds Railway-wise utilization of funds during 2010-11, Budget Grant 2011-12 and

utilization of funds upto May, 2011 are given in Annexure-I. It is heartening that CR, ECR, SCR, SECR, SWR, DLW, ICF & RCF have

exceeded 20% of their outlays. Notable poor performers are ECoR, ER, NCR, NER, NFR, NR, NWR, SER, SR, WCR, WR, CLW & RWF.

2. Detailed estimates pending

Railway-wise summary of detailed estimates pending is at Annexure-II. The complete list of works with pending detailed estimates is placed at Annexure-III.

Page 37: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

36

Annexure-I Fund Utilization under Planhead-42

(Rs. in crores)

Railway Actual 2010-11 Approx)

Budget grant 2011-12

Utilization upto May’11

(Approx).

% Utilisation

CR 37.64 43.36 8.86 20.43% ECoR 11.25 19.34 0.84 4.34% ECR 32.79 30.03 9.64 32.10%

ECR/WP 266.13 363.21 53.93 14.85% ER 104.14 92.19 14.63 15.87%

NCR 26.38 75.06 3.58 4.77% NER 27.91 20.80 3.10 14.90% NFR 20.71 34.74 4.17 12.00% NR 18.25 45.89 3.72 8.11% RBL 150.42 320.00 2.90 0.91% NWR 13.11 17.36 1.69 9.74% SCR 30.00 41.51 13.90 33.49%

SECR 18.25 22.82 5.14 22.52% SER 40.54 73.32 6.35 8.66% SR 31.14 38.67 6.16 15.93%

SWR 34.09 29.84 10.76 36.06% WCR 24.15 30.58 5.32 17.40% WR 74.32 56.85 6.50 11.43%

Sum IR 961.22 1355.57 161.19 11.89% CLW 34.15 16.49 0.87 5.28% DLW 25.18 10.05 8.33 82.89% DMW 2.79 4.28 0.07 1.64% ICF 24.79 12.54 3.97 31.66% RCF 28.54 38.27 9.91 25.89% RWF 6.55 8.54 0 0.00% Metro

(Kolkata) 2.58 4.26 0 0.00%

Sum PU 124.58 94.43 23.15 24.52% Grand Total

1085.80 1450.00 184.34 12.71%

Page 38: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

37

Annexure-II Summary of Pending detailed estimates

Railway 2006-07 2007-08 2008-09 2009-10 2010-11 Total

CR 3 3

ECoR 2 1 1 4

ECR 1 1 1 4 7

WP/ECR 2 2 4

ER 2 4 9 15

NCR 2 2

NER 1 2 3

NFR 1 3 4

NR 3 4 8 5 4 24

NWR 1 1 2

SCR 1 1 8 10

SECR 1 1 1 3

SER 7 7 14

SR 1 2 1 1 5

SWR 2 1 3

WCR 2 2

WR 1 5 6

CLW 3 3

DLW 1 1

DMW 2 2

ICF 0

RCF 1 1

RWF 2 2

Metro(Kolkata)

1 1

Total 6 10 16 30 59 121

Page 39: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

38

Annexure-III

List of pending detailed estimate works

(Rs. in thousands) Rly Year of

approval Pink Book No

Location Description Cost Expn upto 3/11

Outlay 11-12

Balance

CR 2010-11 332 Wadi Bunder Four maintenance sidings & extension of intermediate overhauling shed.

233100 500 1907 230693

CR 2010-11 333 Bhusawal Electric Loco Workshop - Augmentation of wheel set manufacturing capacity.

35000 500 1907 32593

CR 2010-11 334 Badnera Setting up of wagon repair (periodical overhauling) workshop.

2475700 1000 108021 2366679

ECoR 2008-09 372 Cuttack Development of freight train examination and sick line facilities for premium rakes.

41519 6860 12714 21945

ECoR 2008-09 373 Mancheswar Augmentation of periodical overhauling capacity for outturn of 150 coaches per month.

264706 35407 9128 220171

ECoR 2009-10 374 Visakhapatnam Electric loco shed - Augmentation of homing capacity of electric locos to 175.

126100 500 6085 119515

ECoR 2010-11 375 Macheswar Integrated washing pit lines(2 Nos).

152363 500 12714 139149

ECR 2006-07 483 Sonpur Setting up of wagon periodic overhauling workshop.

892019 141368

15213 735438

ECR 2006-07 484 Marhoura Setting up of diesel locomotive manufacturing unit.

27190000 902800

530426 25756774

ECR 2007-08 491 Dalmianagar Setting up of freight bogie and coupler manufacturing plant for high capacity higher axle load wagons (Phase-I).

970000 560000

6085 403915

ECR 2007-08 492 Mughalsarai Smart yard facilities at down departure yard.

330000 500 3178 326322

ECR 2007-08 495 Madhepura Setting up of greenfield electric loco manufacturing factory.

19605700 1712617

530426 17362657

ECR 2008-09 500 Khagaria Setting up of concrete sleeper plant.

82400 1000 6085 75315

ECR 2009-10 502 Rajendranagar Coaching complex - Extension of sick line.

30621 500 3178 26943

ECR 2010-11 503 Mughalsarai Repair of unloadable wagons.

140000 500 9128 130372

Page 40: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

39

ECR 2010-11 504 Patratu Covered shed and heavy duty flooring for repair of unloadable wagons.

48355 200 3178 44977

ECR 2010-11 505 Narayanpur Anant

Wagon routine overhauling depot.

96915 500 3043 93372

ECR 2010-11 506 Barauni New loco shed to home 100 electric locos.

496000 500 3043 492457

ER 2008-09 554 Narkeldanga Car Shed - Additional pit on line No.4 & shed on line No.3 & 4 for 12-coach rakes formation.

60000 500 6357 53143

ER 2008-09 557 Malda Upgradation of freight train examination yard & sick line facilities to A-category.

157715 500 6357 150858

ER 2009-10 565 Kanchrapara Workshop - Augmentation of capacity for periodical overhauling of 40 motor & 80 trailer coaches per month.

596540 0 6085 590455

ER 2009-10 566 Naopara Construction of repair workshop for undertaking mid-life rehabilitation of coaches (300 coaches per annum).

1470000 0 61 1469939

ER 2009-10 568 Jellingham Setting up of wagon component factory for manufacture of high capacity bogies, couplers & draft gear.

1000000 0 6085 993915

ER 2009-10 569 Howrah Remodelling of diesel shed. 28251 500 13682 14069ER 2010-11 570 Howrah &

Bandel Additional maintenance facilities at car sheds for running of 12-coach electrical multiple unit trains (Phase-II).

108018 500 6085 101433

ER 2010-11 571 Barasat Car Shed - Extension of inspection pits & shed (line No.3 & 4) for maintenance of 12-coach electrical multiple unit rakes.

28243 500 3178 24565

ER 2010-11 572 Sonarpur Car Shed - Extension of shed over pit line No.3, 4, 5 & 6, independent shunting neck, additional cat-walk, stabling line etc. for 12 coach trains.

60000 500 4564 54936

ER 2010-11 573 Andal (Up Sick Line) - Extension of heavy duty covered shed with EOT crane gantry.

47430 500 3178 43752

ER 2010-11 574 Jamalpur (Diesel Shed) - Basic infrastructure for maintenance of diesel electrical multiple units.

40000 500 9535 29965

ER 2010-11 575 Beliaghata (Diesel Shed) - Upgradation of maintenance facilities for WDS6/WDM2 locos.

40000 500 3178 36322

ER 2010-11 576 Tikiapara Remodelling of coaching yard (Phase-II).

443800 100 12714 430986

Page 41: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

40

ER 2010-11 577 Sealdah Development of coaching maintenance infrastructure.

660000 0 12714 647286

ER 2010-11 578 Kanchrapara New rail coach manufacturing unit.

8601600 200000

12170 8389430

NCR 2010-11 494 Baad Upgradation of facilities for premium end to end train examination at tank wagon depot.

36000 500 6357 29143

NCR 2010-11 495 Kanpur Augmentation of holding capacity from 150 to 175 electric locos.

96500 500 6357 89643

NER 2009-10 208 Lucknow Extension of sick line covered shed in new broad guage coaching complex.

35765 100 3178 32487

NER 2010-11 209 Manduadih Washing pit (1 No.). 47730 500 2543 44687NER 2010-11 210 Gonda Routine overhauling depot. 339093 500 12714 325879NFR 2009-10 187 Kishanganj Development of coaching

maintenance facilities. 66500 5000 9535 51965

NFR 2010-11 197 New Jalpaiguri Setting up of rail axle manufacturing factory.

2841200 100 200000 2641100

NFR 2010-11 198 Guwahati Setting up of wagon manufacturing factory at Amingaon.

1885000 100 200000 1684900

NFR 2010-11 199 New Coochbehar

Setting up of electronic signal production unit.

783800 100 20304 763396

NR 2006-07 641 Jagadhri Workshop - Provision of paint booth.

67732 1065 304 66363

NR 2006-07 644 Northern Railway

Infrastructure facilities for implementation of revised policy circular-IV for coaching stock (8 stations).

97400 15000 636 81764

NR 2006-07 645 Raebareli Setting up of new rail coach factory.

16850000 3044400

3200000 10605600

NR 2007-08 647 Ghaziabad (Electrical Multiple Unit Car shed) - Extension of heavy repair shop.

44151 40470 2340 1341

NR 2007-08 649 Firozpur, Pathankot & Jalandhar

Depots - Facilities for maintenance of revised policy circular-IV trains.

44600 500 636 43464

NR 2007-08 652 Hazrat Nizamuddin

Extensive repair and complete renovation of old washing lines at coach care centre (5 Nos.).

300000 22510 39071 238419

NR 2007-08 653 Northern Railway

Trials with Freight Miser TM system for electric & diesel locomotives.

40000 200 64 39736

NR 2008-09 654 Lucknow Setting up of main line electrical multiple unit car shed (10 rakes).

188812 73587 6357 108868

NR 2008-09 655 Khanalampura Setting up of new electric loco shed for homing 100 locos.

608034 134998

6085 466951

NR 2008-09 656 Charbagh Workshop - Optimisation of capacity of shops, improvement in infrastructure, decongestion, crane ganties etc.

170863 52860 19155 98848

Page 42: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

41

NR 2008-09 657 Lucknow Washing lines (600 m each), stabling lines & spurs (2 Nos each) for mini sick line at good shed area.

61969 59257 1724 988

NR 2008-09 658 Tughlakabad (Wagon Care Centre) - Augmentation of routine overhauling capacity of BLC wagons.

45016 42764 1432 820

NR 2008-09 659 Alambagh (Diesel shed) - Augmentation of holding capacity from 100 to 175 locos & development of facilities for maintenance of GM locos.

85866 54550 9535 21781

NR 2008-09 660 Ludhiana & Amritsar

Development of mandatory facilities for terminal examination.

35000 500 318 34182

NR 2008-09 661 Lucknow Replacement, extension & designing of old coaching shed at sick line for operating 20 ton EOT cranes in coaching shed.

25000 2000 3178 19822

NR 2009-10 662 Lucknow Modernisation of Alambagh workshop (Phase-I).

774244 3000 122 771122

NR 2009-10 663 Anand Vihar 3 additional washing lines. 269202 35000 61784 172418NR 2009-10 664 Amritsar Workshop - Additional shed

with EOT cranes for manufacturing stainless steel BOXN HL wagons & air suspension bogies.

67829 27074 12170 28585

NR 2009-10 665 Jagadhari Workshop - Facilities for increasing monthly air conditioned coach periodical overhauling out-turn from 18 to 30 coaches.

63903 10000 12170 41733

NR 2009-10 666 Ghaziabad Extension of electric loco shed from 120 to 150 locos.

173640 500 6357 166783

NR 2010-11 667 Ludhiana (Diesel shed ) - Upgradation of facilities for increased holding of diesel locos from 140 to 170.

77762 500 6357 70905

NR 2010-11 668 Charbagh Facilities for intermediate overhualing of 60 coaches per month in loco shop.

124273 5000 12714 106559

NR 2010-11 669 Ghaziabad (Electric loco shed) - Augmentation of holding capacity from 150 air-conditioned locos to 175.

80000 500 6085 73415

NR 2010-11 670 Ludhiana (Electric Loco Shed) - Augmentation of holding capacity from 150 AC locos to 175.

80000 500 6085 73415

NWR 2007-08 251 Barmer Integrated coach care complex.

32000 501 12714 18785

NWR 2009-10 255 Bhagat ki Kothi Augmentation of capacity of diesel shed for accommodating 50 EMD locos.

64700 20100 12170 32430

Page 43: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

42

SCR 2007-08 459 Gooty Detachment free examination facilities for CC rake maintenance.

155000 5001 6085 143914

SCR 2009-10 474 Hyderabad (Coaching depot) - Catwalk between line No.9 & 10 and No.11 & 12.

43200 3001 14036 26163

SCR 2010-11 476 Guntur Additional CAMTECH design pit line (560 m).

57091 500 6357 50234

SCR 2010-11 477 Lallaguda Shops - Shed for intermediate overhauling of bogies.

97409 500 6385 90524

SCR 2010-11 478 Maula Ali (Diesel loco shed ) - Facilities for homing 6 diesel electrical multiple unit rakes.

50600 500 6357 43743

SCR 2010-11 479 Guntur Intermediate overhauling shed at coaching depot.

55000 500 7946 46554

SCR 2010-11 480 Tirupati Conversion of washing line to pit line at coaching depot.

39436 500 9535 29401

SCR 2010-11 482 Tirupati Conversion of stabling line into pit line.

34629 500 6357 27772

SCR 2010-11 483 Gooty (Diesel Loco Shed) - New shed for WDG4 loco maintenance.

87200 500 15892 70808

SCR 2010-11 484 Gooty (Diesel shed) - Augmentation of homing capacity to 150 locos.

122200 100 6357 115743

SECR

2008-09 309 Raigarh New electric loco shed with holding capacity of 100 locos.

368600 5300 7170 356130

SECR

2009-10 312 Korba Upgradation of freight maintenance facilities.

44562 8200 6357 30005

SECR

2010-11 315 Raipur Diesel shed - Expansion of capacity to home WDG4 locos.

232473 700 15213 216560

SER 2009-10 387 Adityapur New routine overhauling shed for air brake stock.

113374 4000 6357 103017

SER 2009-10 388 Bokaro Steel City

Extension of routine overhauling depot for maintenance of block rake with covered shed.

127800 3000 6357 118443

SER 2009-10 390 Bokaro Steel City

Upgradation of premium rake examination facilities at empty yard.

53602 6000 7628 39974

SER 2009-10 391 Bhojudih Augmentation of sick line facilities at carriage and wagon examination point.

79026 3000 6357 69669

SER 2009-10 392 Bondamunda (Electric loco shed) - Extension at Chakradharpur end by 28.5 m to increase loco holding to 175.

102120 13500 6085 82535

SER 2009-10 395 Tatanagar Extension of wheel shop at centralised traction repair centre.

59515 6000 6085 47430

SER 2009-10 396 Bokaro Augmentation of old sick line with EOT crane facility.

104836 6000 6357 92479

Page 44: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

43

SER 2010-11 380 Haldia Setting up of diesel multiple unit manufcturing factory.

2490300 100 404256 2085944

SER 2010-11 385 Hatia (Coaching Depot) - Integratged washing cum pit lines (26-coach length) (585 m) (2 Nos).

135126 500 9535 125091

SER 2010-11 398 Tatanagar (Electric loco shed) - Extension of heavy & light lifting bay and creation of masintenance facilities for homing of WAG-9 locos.

70000 500 6085 63415

SER 2010-11 399 Tikiapara Extension of inspection/stabling pits, covered shed with lighting arrangement and modification of car shed for maintenance of 12-car rakes.

40357 500 6357 33500

SER 2010-11 400 Kharagpur Workshop - Setting up of centre of excellence for wagon prototyping.

1001700 100 31784 969816

SER 2010-11 401 Anara (Adra) - Setting up of mid-life rehabilitation workshop for coaches.

1847000 100 91277 1755623

SER 2010-11 402 Haldia Setting up of wagon manufacturing factory.

1358200 100 200000 1158100

SR 2006-07 511 Allepey Setting up of plant for manufacture of fabricated rolling stock components of coaching stock.

850000 2 1 849997

SR 2008-09 521 Tondiarpet, Irumpanam, Jolarpet

Conversion of ROH depot from vacuum to air brake stock - maintenance facilities for repair of unloadable wagons.

349700 5225 10171 334304

SR 2008-09 523 Southern Railway

Other end facilities for platform turn-around trains (50 platforms).

127500 13237 10171 104092

SR 2009-10 525 Perambur Modernisation of carriage and wagon workshop.

437782 15021 29633 393128

SR 2010-11 527 Erode (Diesel Shed) - Augmentation of homing capacity from 100 to 150 locos.

205200 0 6742 198458

SWR 2009-10 275 Hubli Division Other end examination facilities ( 7 stations).

34105 1 6039 28065

SWR 2009-10 277 Vasco da Gama

Additional pit line (Road No.7).

49300 1 636 48663

SWR 2010-11 278 Hubli Diesel Shed - Expansion of homing capacity from 150 to 200 EMD locos.

187000 1 6039 180960

WCR 2010-11 396 Bhopal Additional infrastructure for bogie intermediate overhauling.

88000 5000 12714 70286

WCR 2010-11 397 Jabalpur 1 20-coach pit line & stabling line at old loco shed.

65200 15000 12714 37486

WR 2010-11 410 Sabarmati Setting up of mega (base) diesel electric multiple unit

260000 550 45892 213558

Page 45: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

44

depot.

WR 2010-11 412 Valsad Augmentation of homing capacity from 100 to 125 locos.

80000 500 6357 73143

WR 2010-11 413 Dahod Augmentation of mid term rehabilitation capacity from 54 to 108 electric locos per annum.

280000 500 6357 273143

CLW 2009-10 11 Dankuni Setting up of electric loco assembly and ancillary unit of Chittaranjan Locomotive Works.

1230000 376976

132511 720513

CLW 2010-11 12 Chittaranjan Replacement of overhead crane line (4000 m) & re-roofing of floor shop.

33023 500 4501 28022

CLW 2010-11 13 Chittaranjan Re-flooring of steel foundry shop floor.

43196 500 5851 36845

CLW 2010-11 14 Chittaranjan Replacement of alluminium sheet & wall up at steel foundry.

30000 500 4501 24999

CLW 2010-11 15 Chittaranjan Modernisation and augmentation of production capacity from 200 to 275 electric locos per annum.

1300000 500 12170 1287330

CLW 2010-11 16 Chittaranjan Centre of excellence for design, development & evaluation of advanced technology systems for electrical rolling stock.

420000 0 6085 413915

DLW 2007-08 6 Varanasi Provision of reliable power supply.

400000 199999

18255 181746

DMW 2010-11 3 Patiala Extension of TMS workshop area.

28500 500 5781 22219

DMW 2010-11 4 Patiala Extension of loco stripping shop with two rooms in workshop area.

45900 1000 10953 33947

RCF 2010-11 13 Kapurthala Extension of finishing shop towards shower testing area.

36000 3500 16126 16374

RWF 2009-10 4 Bangalore Augmentation of infrastructure facilities for movement of steel scrap & wheel tyre axle items (parking lots B&C).

36500 0 18255 18245

RWF 2009-10 5 Bangalore Extension of new scrap pre-conditioning bay (132 x 30m) and old scrap pre-conditioning bay (66 x 30m).

85100 0 13996 71104

Metro 2009-10 29 Noapara Rake rehabilitation facility. 696100 70500 36511 589089

Page 46: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

45

COACHING ITEMs

1. Performance review of Railways:

Enroute coach detachments on ownership basis - Annexure-1 Punctuality losses on C&W account - Annexure-2

2. Recent policy directives and guidelines 3. Coaching niche item – technologically complex 4. Evaluation of 18 month POH periodicity of ICF design mail/ express

coaches - Annexure-3 5. Cleanliness of passenger coaches:

Reasons for not showing visible improvement Weaknesses in the contract management system

Suggestion for improvement in the coach housekeeping standard 6. Setting up of Mechanized laundries - Annexure-4

The following issues may be discussed: Performance standard of existing laundries On-going contracts requiring revision/ attention to weak areas – suggestion for

further improvement BOOT model without land lease

7. Performance review of coach furnishing/ bogie components

LED based display system

Cushioning materials for seats and berths UIC vestibules, expected life, warranty etc. PVC flooring, upholstery for seats & berths and brake gear bushes to the latest

specifications 8. Performance of hybrid Stainless Steel coaches–repairs to the bolster: 9. Manufacture and operation of Double Decker coaches: 10. Proliferation of LHB coaches – issues involved

High instances of premature bearing failures Cracks/breakages in wheel discs and wheel shelling: Center Buffer Couplers: Maintenance infrastructure, procurement of spares, training of staff

11. CRS Sanction for new design of Rolling stock: 12. Manpower Planning - Annexure-5

Page 47: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

46

1. Performance review of Railways:

(a) Enroute coach detachments on ownership basis Status - Annexure – 1

There have been 19 cases of detachments in just 2 months during the year which shows increasing trend. NR, SER, SR, ECoR & ECR may take note of this and take corrective measures.

(b) Punctuality losses on C&W account

Status – Annexure-2 Average per month punctuality loss of 128 direct cases has shown increase of 140 per month during the current year.

2. Recent policy directives and guidelines

i) Model guidelines for pest and rodent control in coaches and in depot premises were issued by the Board vide letter No.2000/M(C)/141/7 Vol. IV dated 21.12.2010.

ii) Model guidelines for setting up of mechanized laundries in BOOT scheme issued vide letter No. 2009/M(C)/165/6 dated 14.01.2011.

iii) For the sake of uniformity/standardization in the process, equipment and layout of mechanized laundry, Committee’s recommendation issued by CWE/ER vide letter No. MPD/16/2009-10/HWH dated 11.05.2011 may be adopted by the Railways.

iv) Revised model guidelines indicating scope of work and special conditions for mechanized cleaning and CTS have been circulated by ECoR and WR.

v) Inspection protocol for all cleaning/ C&W contracts issued by the Board vide letter No. 95/MC/141/1 Vol.II dated 21.05.2010 to be strictly enforced.

3. Coaching nich item – technologically complex Railways may suggest details of nich items requiring stringent quality norms, vendor developments and declared eligibility criteria etc. to obtain best service performance.

4. Evaluation of 18 month POH periodicity of ICF design mail/ express

coaches (Annexure-3): Policy directives have been issued vide Board’s letter No. 2007/MC/141/1

dated 06.07.2011 for implementation of 18 month POH periodicity of mail/ express coaches. While the scheme has been implemented in most of the

Page 48: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

47

Railways, some Railways have raised logistics problems due to high inventory and transportation of bogies. Railways may critically analyze and evaluate the implementation of enhanced POH periodicity on their system and suggest changes, if any, required. RDSO may coordinate and give a presentation on current status.

5. Cleanliness of passenger coaches:

The comprehensive policy directives have been issued for implementation of mechanized cleaning, clean train station, on-board house-keeping and pest and rodent control measures. While some Railways have shown improvement in the cleaning quality, there is not much change in the overall coach house-keeping standard of coaching trains. The general perception is that the cleaning standard still requires lot of improvement as the quality continues to be far below from the satisfactory. Railways may discuss:

Reasons for not showing visible improvement Weaknesses in the contract management system Suggestion for improvement in the coach housekeeping

standard

6. Setting up of Mechanized laundries

Policy directives have been issued vide Board’s letter No. 2009/M(C)/165/6 dated 14.01.2011for setting up of mechanized laundries in the identified depots. 8 new laundries have been set up (CR-1, ER-2, SCR-2, WR-1, NFR-2). The work is in progress in 5 more laundries (ECR-1, SER-1, SECR-1, SR-1, ECR-1). Progress of the NCR-2, NER-3, NWR-1, SR-2, SWR-3, NR-3, WCR-2, SCR-1, ECoR-3, CR-1, SER-1 Railways is not satisfactory: Status on the Railways - Annexure – 4 The following issues may be discussed:

1. BOOT model without land lease 2. Performance standard of existing laundries 3. On-going contracts requiring revision/ attention to weak areas –

suggestion for further improvement

7. Performance review of coach furnishing/ bogie components: Zonal Railways to provide feedback on performance of upgraded materials

as per prescribed format.

Page 49: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

48

RDSO shall make an outline presentation on the performance, review of technical specification and status of vendor development.

(a) Cushioning materials for seats and berths

(b) UIC vestibules, expected life, warranty etc.

(c) PVC flooring, upholstery for seats & berths and brake gear bushes to the latest specifications

(d) LED based display system

8. Performance of hybrid Stainless Steel coaches–repairs to the bolster:

The cracks reported in the body bolster of stainless steel hybrid coaches have serious safety implications. Railways are required to comply the rectification procedure as circulated by RDSO/RCF.

Railways may confirm the strict compliance of the repair procedure and

advise the status in the following format:

Total Holding

No. of coaches in which cracks/defects observed (Coach No. and type to be mentioned)

Status Attended/ Not attended

Remarks

9. Manufacture and operation of Double Decker coaches:

In a quantum leap towards development of high-capacity coaches with interiors and aesthetics to world class standards, a higher height (4366mm) EOG Air conditioned double decker coach to LHB-FIAT design was developed by RDSO & RCF. This coach design has a body width of 3135mm. 128 seats coach design has been cleared for operations at a maximum permissible speed of 160 kmph. One complete rake of such EOG AC Double-Decker Chair Cars was turned out by RCF in 2010-11. Following preparatory field exercises, action is underway for obtaining CRS Sanction for induction of this rake in regular service between Howrah and Dhanbad. Based on the experience gained through manufacture of the first rake and route proving runs etc., the design parameters have been refined (particularly the body width has been reduced to 3050mm). It is planned to manufacture two such rakes during 2011-12 for induction in train services between Mumbai-Ahmedabad and Delhi-Jaipur.

Page 50: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

49

RCF may earnestly work upon to manufacture the prototype coach to the revised design parameters to enable RDSO to conduct the necessary oscillation trials for issuance of a final speed certificate. • RCF may advise current status and the target date for turning out

of the first rake for induction in services from RCF. • WR, NWR & NR must also undertake preparatory exercises and

confirm route clearance, particularly from the stand point of infringements that might be caused to the fixed structures i.e. platform shelters/cover over platforms owing to the higher height of the double decker coach shell and the distance between the center line of the track and the platform coping as governed by the schedule of dimensions, because of the well portion of the lower deck being lower than the station platform level.

• These Railways must also be in preparedness for processing of

timely CRS sanction once the final speed certificates is issued by RDSO.

10. Proliferation of LHB coaches – issues involved:

(i) High instances of premature bearing failures:

Enroute coach detachments on LHB coaches on roller bearing failure account per unit coach holding are much higher as compared to conventional ICF design coaches, despite the overhaul/ refurbishment of these bearings being fully entrusted to the OEMs. RDSO need to comprehensively address this issue and take up the issue with OEMs.

(ii) Cracks/breakages in wheel discs and wheel shelling:

Recent months have also witnessed quite a few instances of circumferential cracks/breakages in the web portion of LHB wheel discs. The wheel shelling phenomena is also continuing requiring frequent tyre turning. The comprehensive review of LHB wheel design needs to be undertaken by RDSO in wake of safety implications and current status advised.

iii) Center Buffer Couplers:

Jerks emanating from CBCs have been an area of concern all along. Remedial measures such as reduction in draft gear preload of coach CBC and use of ‘H’ type tight lock loco CBC with lower draft gear preload has shown some improvement. However there has been a marked improvement with the trials with balanced type draft gear in the coach CBC. A detailed technical evaluation report is to be drawn up by

Page 51: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

50

RDSO in consultation with concerned Railways where such trials have been conducted. The specifications for coach CBC needs to be accordingly firmed up. RDSO may give presentation on current status indicating time frame for finalization of the specification and vendor approval.

iv) Maintenance infrastructure, procurement of spares, training of

staff • Zonal Railways should confirm their preparedness for

induction of LHB rakes on their system. 11. CRS Sanction for new design of Rolling stock:

Following new type of stock is envisaged to be manufactured for induction in regular service during 2011-12:

(i) LHB – FIAT design EOG non-AC sleeper Class & General Class

coaches (LWSCN and LS) for running in mail/ express trains etc. (ii) LHB-FIAT design EOG non-AC chair cars in ‘day’ Duronto trains etc. (iii) LHB-FIAT design EOG AC double decker chair cars.

Besides above, LHB-FIAT EOG AC rakes are also planned for induction in new Duronto services and replacement of existing Rajdhani/Shatabdi services with ICF design coaches. Allotments for the above noted stock have been advised to the respected owning Railways from time to time.

Concerned Railways (Originating/Passing-through/Terminating) must timely plan and seek CRS sanction besides organizing necessary infrastructure for maintenance and operations with such stock. RDSO must ensure timely issuance of the final speed certificates for the above noted stock, if not already done so. The owning Railways may coordinate the process for respective trains.

12. Manpower Planning:

Railways have been advised to carry out comprehensive review of manpower planning, based on current workload and the extant pattern of maintenance and running of trains taking the benchmarking norms for manpower issued in terms of Board’s letter No. 2000/MC/143/5 dated 24.12.2001 as a base reference and initiate action for creation of posts/ staff recruitment in line with Board’s directives issued vide letter No. E(G)/2003/EC-2/3 dated 31.10.2003, wherever shortfall is noticed arising out of it. Railways have reported that as per 31.03.2011, there is a net shortfall of about 29,665 nos. against total requirement of 97,876 (shortfall of 30%). Railway-wise position is given in Annexure-5. Action plan for Railways for creation of posts and filling up of vacancies may be advised.

Page 52: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

51

Annexure - 1

CAUSEWISE BREAK-UP OF ENROUTE COACH DETACHMENTS (OWNERSHIP BASIS)

210-11 2011-12(Upto May) RLY A B C D E F Total A B C D E F Total

CR 4 0 0 1 0 1 6 0 0 0 1 0 0 1 ER 4 0 0 2 0 0 6 0 0 0 0 0 0 0

ECR 3 0 1 0 1 0 5 1 1 0 0 0 0 2 ECoR 3 1 1 2 0 0 7 1 0 0 0 0 1 2

NR 6 0 1 1 1 1 10 2 0 1 0 0 2 5 NCR 0 1 0 0 0 0 1 1 0 0 0 0 0 1 NER 2 0 0 0 0 0 2 0 0 0 0 0 0 0 NFR 1 1 0 1 0 0 3 0 0 0 0 0 0 0 NWR 0 0 1 1 0 0 2 0 1 0 0 0 0 1 SR 8 0 1 0 2 1 12 2 0 0 0 0 0 2

SCR 3 1 1 0 0 0 5 0 0 0 0 0 0 0 SER 2 0 2 0 1 0 5 4 0 0 0 0 0 4

SECR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SWR 0 0 0 0 0 0 0 1 0 0 0 0 0 1 WR 2 0 0 0 2 0 4 0 0 0 0 0 0 0

WCR 1 0 0 1 0 0 2 0 0 0 0 0 0 0 IR 39 4 8 9 7 3 70 12 2 1 1 0 3 19

A-Roller Bearing Failure

B-Bogie & Suspension Gear Defects

C-Wheel Flats/Air Brake System defects

D-Draw & Buffing Gear defects

E-Failure of Major Structural members of Coach Body(Head Stock, Sole Bar failure)

F- Other Misc. Defects

Page 53: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

52

PUNCTUALITY LOSS CASES Annexure-2

2010-11 2011-12(Upto May) Rly No. of Cases Total Average/month Total Average/month

CR Direct 57 4.8 12 6 Indirect 60 5.0 15 7.5 Total 117 9.8 27 13.5

ER Direct 105 8.8 11 5.5 Indirect 101 8.4 24 12 Total 206 17.2 35 17.5

ECR Direct 127 10.6 27 13.5 Indirect 210 17.5 36 18 Total 337 28.1 63 31.5

ECoR Direct 67 5.6 16 8 Indirect 65 5.4 5 2.5 Total 132 11.0 21 10.5

NR Direct 414 34.5 78 39 Indirect 174 14.5 36 18 Total 588 49.0 114 57

NCR Direct 315 26.3 40 20 Indirect 621 51.8 96 48 Total 936 78.0 136 68

NER Direct 43 3.6 12 6 Indirect 26 2.2 4 2 Total 69 5.8 16 8

NFR Direct 48 4.0 11 5.5 Indirect 24 2.0 6 3 Total 72 6.0 17 8.5

NWR Direct 8 0.7 1 0.5 Indirect 14 1.2 1 0.5 Total 22 1.8 2 1

SR Direct 74 6.2 13 6.5 Indirect 91 7.6 11 5.5 Total 165 13.8 24 12

SCR Direct 33 2.8 4 2 Indirect 61 5.1 6 3 Total 94 7.8 10 5

SER Direct 92 7.7 11 5.5 Indirect 125 10.4 7 3.5 Total 217 18.1 18 9

SECR Direct 22 1.8 2 1 Indirect 61 5.1 9 4.5 Total 83 6.9 11 5.5

SWR Direct 23 1.9 1 0.5 Indirect 26 2.2 3 1.5 Total 49 4.1 4 2

WR Direct 50 4.2 8 4 Indirect 123 10.3 20 10 Total 173 14.4 28 14

WCR Direct 64 5.3 33 16.5 Indirect 109 9.1 35 17.5 Total 173 14.4 68 34

Page 54: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

53

Total Direct 1542 128.5 280 140 Indirect 1891 157.6 314 157 Total 3433 286.1 594 297

Page 55: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

54

Annexure 3

The following details may also be furnished for discussion and for suggesting improvement:

(i) Total holding of subject coaches.

(ii) Average ineffective of coaching stock as compared to the period prior to implementation of 18 months POH periodicity.

(iii) Unscheduled Primary/secondary detachments per 100 coach holding as compared to the period prior to implementation of 18 months POH periodicity.

(iv) Average cycle time for IOH (from the time the coaches marked sick for IOH to the time it is put back in service)

(v) No. of coaches where IOH is handled in the depots by arranging overhauled bogies from the workshops and average cost of transportation of bogie between depot to the Workshop and back.

(vi) No. of coaches where IOH is handled in the depots but only the workshops supplied wheel sets are changed.

(vii) No. of coaches which are booked to the workshops even for IOH.

(viii) The extent of repairs of the bogie frame required during IOH.

Page 56: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

55

Annexure 4

Status of Mechanized laundry (As on 01June11)

Commissioned 10

CR/1(WB), NR/2(LKO &BSB), ER/2(TKPR & NCC), SCR/2(SC & HYB), WR/1(IND), NFR/1(KYQ-1Ton), NFR/1(KYQ -3 Ton)

Contract Placed/Work under process 5

ECR/1(SJP), SER/1(TATA), SECR/1(DUG), SR/1(MAS), ECR/1(DNR)

Tender opened/ due 7 CR/1(WB-6Ton),SER/1(HTE), WR/2 (MCT, ADI), NWR/2 (JU ,BKN), SECR/1(BSP),

Proposal under finance vetting/ under preparation 24

NCR/2(GWL, ALD ), NER/3(MUV,GKP ,LJN), NWR/1(JP), SR/2 (ERS,TVC), SWR/3 (UBL,SBC ,YPR), NR/3(CDG ,JAT,DLI ) WCR/2 (JBP,BPL),SCR/1 (TPTY), NFR/2 (NJP,DBRT), ECoR/3 (VSKP,BBSPUI), CR/NGP, SER/SRC

Reconsideration demanded by Railways 3 NER/MAU, NR/AME,WCR/KTT

Page 57: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

56

Annexure-5

MANPOWER FOR COACH MAINTENANCE ACTIVITIES                                         AS IN MARCH‐2011 STATUS OF PROPOSALS FOR SANCTION OF ADDITIONAL 

POST RLYs 

TOTAL REQUIRMENT OF STAFF AS PER YARD STICK 

EQUIVALENT MANPOWER 

TO WORKLOAD OUTSOURCED 

NET

 REQ

UIRMEN

AVAILABLE  SANCTION 

ON ROLL 

 NET ADDITION

AL  REQUIRMENT OF STAFF 

VACANCIES BASED ON CURRENT SANCTION 

MORE   SANCTIONS REQUIRED 

INITIATEDNOT 

AGREED UNDER PROCESS

   1  2  3=1‐2  4  5  6=3‐5  7=4‐5  8=6‐7  9  10  11 

CR  6899  391  6508  5371  4376  2132  995  1137  293  248  45 

ECoR  2660  513  2147  1519  1312  835  207  628  251  0  251 

ECR  8860  1686  7174  6013  4936  2238  1077  1161  298  0  7 

ER  7074  901  6173  5657  5222  951  435  516  516  0  516 

NCR  4197  442  3755  2857  2372  1383  485  898  359  0  359 

NER  5729  487  5242  3370  2906  2336  464  1872  1458  0  1458 

NFR  3250  22  3228  2372  2372  856  0  856  0  0  0 

NR  18836  2291  16545  11277  9473  7072  1804  5268  3586  1222  2364 

NWR  4133  483  3650  2746  2510  1140  236  904  166  0  166 

SCR  6767  936  5831  4255  3787  2044  468  1576  1102  421  681 

SECR  1660  181  1479  1235  1054  425  181  244  0  0  0 

SER  4565  0  4565  3502  2942  1623  560  1063  306  0  306 

SR  8415  1034  7381  5619  4992  2389  627  1762  1751  388  1363 

SWR  3431  1138  2293  2328  1781  512  547  ‐35  37  0  37 

WCR  3121  283  2838  1862  1634  1204  228  976  1149  0  171 

WR  8279  789  7490  5779  4965  2525  814  1711  0  0  0 

IR  97876  11577  86299  65762  56634  29665  9128  20537  11272  2279  7724 

Page 58: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure T-1

Rly Year CR ER EC ECOR NR NC NE NF NW SR SC SE SECR SW WR WC TOT (Rly-IR)

Avg.Dsl Loco Holding

Eq fail/ 100locos/ month

%age improvement

09-10 66 0 3 0 2 3 0 0 6 2 34 0 1 20 11 10 158 200.4 6.610-11 66 1 5 0 3 1 1 0 4 4 31 0 0 19 11 24 170 216.5 6.509-10 0 87 43 0 10 2 7 70 2 0 0 0 1 0 1 7 230 266.1 7.210-11 0 76 41 0 11 4 11 70 6 0 1 0 0 1 3 3 227 279.6 6.809-10 1 2 127 0 20 6 27 7 6 0 0 0 0 0 4 24 224 192.3 9.710-11 1 5 103 0 37 7 21 14 10 0 0 2 0 0 3 26 229 211.0 9.009-10 0 4 1 71 0 0 0 4 0 0 4 3 14 0 0 0 101 191.3 4.410-11 1 0 0 53 0 0 0 1 0 1 1 1 9 0 0 0 67 190.1 2.909-10 1 6 75 0 121 30 74 33 116 0 0 0 0 0 41 28 525 504.8 8.710-11 1 18 101 0 118 20 69 26 125 0 2 0 1 0 38 18 537 518.9 8.609-10 1 1 25 0 31 63 41 14 20 1 1 0 2 0 12 45 257 111.0 19.310-11 0 2 26 0 27 85 23 10 23 0 0 0 0 0 11 35 242 116.0 17.409-10 2 4 45 0 36 12 125 30 10 0 0 0 1 0 4 7 276 163.7 14.110-11 0 12 61 0 60 14 140 28 26 0 0 1 0 0 11 13 366 180.3 16.909-10 1 39 67 0 43 7 28 183 13 0 0 0 0 0 4 9 394 209.8 15.610-11 0 77 62 0 32 2 27 140 24 0 0 1 0 0 11 2 378 224.1 14.109-10 0 2 20 0 54 14 4 6 117 1 0 0 0 1 37 18 274 196.3 11.610-11 0 1 7 0 65 12 4 7 177 0 0 0 0 2 44 7 326 187.5 14.509-10 14 0 0 0 0 0 0 1 2 96 9 0 0 9 6 1 138 267.3 4.310-11 18 1 0 0 1 1 0 0 0 129 8 0 0 7 3 0 168 274.3 5.109-10 50 0 1 0 0 0 0 0 1 6 60 0 0 12 3 3 136 443.7 2.610-11 51 0 2 0 0 1 0 0 0 5 46 0 0 16 8 6 135 453.3 2.509-10 0 11 9 54 3 1 2 4 0 0 0 3 3 0 0 3 93 252.9 3.110-11 0 12 15 46 3 2 2 1 1 0 0 2 4 0 0 0 88 246.8 3.009-10 1 0 0 17 0 0 1 0 0 0 1 1 6 0 0 0 27 76.1 3.010-11 1 0 0 26 0 0 0 0 0 0 1 1 4 0 0 0 33 84.7 3.209-10 17 0 0 0 0 0 0 0 2 6 28 0 1 41 1 2 98 292.1 2.810-11 29 0 0 0 0 1 0 1 0 12 23 0 0 40 0 0 106 302.8 2.909-10 2 0 19 0 26 8 4 8 59 0 1 0 0 0 108 18 253 244.4 8.610-11 0 1 14 0 36 10 4 12 116 3 1 0 0 0 119 12 328 272.6 10.009-10 12 6 43 0 33 44 22 15 42 0 2 0 0 1 13 88 321 343.3 7.810-11 4 7 65 0 39 46 41 39 61 1 5 0 2 2 24 82 418 351.1 9.909-10 168 162 478 142 379 190 335 375 396 112 140 7 29 84 245 263 3505 3955.5 7.4

10-11 172 213 502 125 432 206 343 349 573 155 119 8 20 87 286 228 3818 4109.6 7.7

WC -27.3

TOT (IR-Rly)

-4.8

SE 3.0

SECR -9.8

SW -4.3

WR -16.2

NF 10.2

NW -24.6

SR -18.6

SC 2.8

ECOR 33.2

NR 0.9

NC 9.9

NE -20.4

EQUIPMENT FAILURES OF DIESEL LOCOMOTIVES

Apr-Mar' 2011

CR 0.4

ER 6.1

EC 6.8

Page 59: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-2 (i)

Direct Total Direct Total Direct Total Direct Total Direct TotalCR 132 202 71 15.5 23.7 118 215 82 12.0 21.8 22.6 7.8ER 203 420 119 14.2 29.4 197 376 128 12.8 24.5 9.8 16.8EC 219 407 79 23.1 42.9 185 460 86 17.9 44.6 22.4 -3.8ECOR 51 89 28 15.2 26.5 42 74 32 10.9 19.3 27.9 27.2NR 655 1164 304 18.0 31.9 609 1111 305 16.6 30.4 7.3 4.9NC 288 592 48 50.0 102.8 312 619 52 50.0 99.2 0.0 3.5NE 256 443 88 24.2 42.0 239 466 95 21.0 40.9 13.5 2.6NF 349 661 101 28.8 54.5 366 755 113 27.0 55.7 6.3 -2.1NW 193 404 93 17.3 36.2 224 322 99 18.9 27.1 -9.0 25.1SR 212 414 133 13.3 25.9 190 343 143 11.1 20.0 16.6 22.9SC 181 304 131 11.5 19.3 142 256 141 8.4 15.1 27.1 21.8SE 73 138 45 13.5 25.6 65 122 53 10.2 19.2 24.4 24.9SECR 15 25 15 8.3 13.9 16 28 17 7.8 13.7 5.9 1.2SW 181 330 95 15.9 28.9 150 253 102 12.3 20.7 22.8 28.6WR 123 227 81 12.7 23.4 116 299 88 11.0 28.3 13.2 -21.2WC 286 529 118 20.2 37.4 317 682 129 20.5 44.1 -1.4 -17.9KR 6 12 0 0.0 0.0 2 4 0 0.0 0.0 0.0 0.0

PUNCTUALITY LOSS CASES ON DIESEL LOCO ACCOUNT (BG)

Rly.April-Mar'2009-2010 April-Mar'2010-2011

%age Improvement

/100ML /monthNo. of PL cases Avg. Mail Link

PL cases/100 Link /month No. of PL cases Avg.

Mail Link

PL cases/100 Link /month

Page 60: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

IR 3423 6361 1549 18.4 34.2 3290 6385 1665 16.5 32.0 10.6 6.6

Page 61: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-2 (ii)

2008-09 2009-10 2010-11 2008-09 2009-10 2010-11 2008-09 2009-10 2010-11

CR 109 132 137 145 202 215 77 128 117

ER 92 170 160 249 420 376 72 158 206

ECR 244 353 323 264 407 460 174 370 337

ECoR 11 54 83 40 89 74 45 117 132

NR 289 416 367 472 1164 1111 96 604 588

NCR 81 171 158 206 592 619 493 1178 936

NER 0 0 0 280 443 466 34 63 69

NFR 0 0 0 303 661 755 30 61 72

NWR 0 0 0 207 404 322 17 29 22

SR 119 183 139 194 414 343 78 276 165

SCR 101 196 146 156 304 256 54 173 94

SER 78 140 130 71 138 122 72 215 217

SECR 36 59 43 21 25 28 41 98 83

SWR 74 0 0 164 330 253 36 79 49

WR 114 117 98 139 227 299 80 122 173

WCR 329 201 182 329 529 682 100 208 173

TOTAL 1677 2192 1966 3240 6349 6381 1499 3879 3433

Punctuality Position Electric & Diesel

Rly ELECT. DIESEL C&W

Page 62: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-3

T/Loco T/Time Avg/Time

CR 77 2987.45 30.50

ER 251 8398.25 33.25

EC 493 15547.45 31.30

ECO 120 3368.40 20.05

NR 892 38465.45 43.10

NC 151 5277.05 35.00

NE 166 5136.30 31.00

NF 246 10676.10 43.25

NW 600 25635.30 42.45

SR 35 737.30 21.05

SC 17 580.10 34.10

SE 37 1209.50 32.40

SEC 27 1088.45 40.20

SW 47 1217.50 25.55

WR 436 15065.55 34.35

WC 297 12765.10 43.00

Total 3892 148162.55 38.05

FR Diesel Loco Attention - Apr'10 To March'11

RlyApr'10-Mar'11

Page 63: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure T-4(i)

Rly Fitted till May'11 Yet to be fittedCR 175 16ER 173 106ECR 132 81ECo 119 64NR 219 303NC 88 36NE 59 128NF 168 83NW 92 93SR 132 147SC 340 90SE 212 30SEC 84 5SW 274 37WR 285 0WC 125 210IR 2677 1429

VCD

Page 64: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure T-4 (ii)

ITEMPB No./ Year 947/ 09-10 1092/ 10-11 1103/ 10-11 1039/ 11-12Qty 200 800 50 300

CR 25 45 10ER 30 35ECR 40ECo 15 30 10NR 35 10NC 10 10NE 30NF 10 20NW 25 30 20SR 30 35SC 15 32 20SE 15 30 10SEC 10SW 8 20WR 50 20WC 25 30DLW 0 0 20 160IR 200 460 50 260

MBCS DPS

Page 65: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should
Page 66: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should
Page 67: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Items/ Rly CR CR New letter ER NFR SR SCR SER SWR WRFuel Cost Cost high on ER as

compared to SER.Cost increased

Booking of expenditure

No booking on stg & dept. Started now, Fuel for inf locos now against stg,2% of pass fuel against stg, will increase to 5%

On CR Fuel oil is bifurcated on running & shunting account on the basis of statement no. 17, statement of train & engine EKMs. In the year 2009-10 the expenditure under head H 212-215 in goods is bifurcated in the ratio of 83.7% & 16.3% resp.

Repair cost not divided as per manual. Being corrected.Shunting being shown against pass. Being corrected.

Proper booking of fuel in shunting locos is being ensured

GTKMs The length of trains was corrected & correct GTKMs calculated. The payload for covered wagons has now been increased.

Mistake found out, being corrected. Figures being taken from CTR only & not from Trip cards.

Wrong booking. Trainwise figures asked.

Explained concerned staff about importance of correct booking. Meeting with FA & CAO & stat officers

Daily accountal of GTKMs planned

SFC Diesel sheds have been instructed to carefully maintain & analyze locowise SFC reords.

Fuel issued to "Golden Chariot" locos not debited to Commercial.

Accounts office Ajmer is adopting incorrect procedures

Operating expenses (Running staff)

Checked, Found OK

Expenses for running staff, shed & yard staff wrongly booked. Pointed out to accounts.

21 % increase in fuel cost shown, actual increase only 5%. 11.5 croes shown against Dsl Hyd locos.Pointed out to Finance.

Repair & maint cost increased due to 6th CPC. Salary of electric loco pilots being charged in dsl in 2 divisions. Corrected now.

Correct booking of salaries of running staff. Resulted in transfer of 18 crores from Dsl to Electric traction

SBC div entire running staff cost being booked to Dsl. DEMU service cost beinmg booked to Dsl. Running room cost being booked to Dsl.in SBC.

Summary of Line Haul Cost (LHC)

Page 68: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Items/ Rly CR CR New letter ER NFR SR SCR SER SWR WRIRFA IRFA Credit booked

to Dsl tracion is less towards engine hire charges from other Rlys. Pointed out to Accounts.

Finance branch is charging less IRFA debit towards engine hire charges from other Rlys. .Less realization of IRFA debits on fuel charges from KRCL. Outstanding 48 crores. Being sorted out.

IRFA to Rolling stock not proper

Gross & Tare wt.

Payload increased and Goods GTKMs increased by 17.3% & pass GTKMs by 10.29%

Tare wt per PCV taken as 49 tonne as against 60 T on NR & 65 T on NWR, Being revised to 58 T

Coach wt & pass carrying wt fixed 20 yrs back. Action taken to revise

Adopted a standard figure of 50 tonnes per coach & not as per SER presentation. Needs calrification

DRF Allocation of DRF as per % share od Dsl & elect but all booked against Dsl due to high %, interest charges also booked to Dsl only. Pointed out to Accounts.

Remarks No separate head for booking of lube oil of stg

LHC will improve, figures corrected

Unpublished Figures for 2009-10 will be scrutinized to ensure that there is no error

Unified prog developed in MS access for all divisions.

CMPE(Dsl) being sent to Ajmer to study

From MCDO

Reply recd as per new letter points a to j,

only theoritical letter not

measurable.

Page 69: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-5 (ii)

WCRCost increased

All divisions, depots advised. For correct bookings in proper heads, FA & CAO requested for correct accountal

All divisions, depots $ STT sections advised & so figures imporevd

All divisions, depots $ STT section advised for correct acctal & booking in proper head & so figures imporevdDivision wise booking demand 8F examined Distribution of expenditure among Dsl & elect checked & corrected

Page 70: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

WCR

LHC will improve

Page 71: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-6

Rly Available Awaited TotalCR 6 12 18ER 0 9 9 Reply Not RecdECR 3 8 11ECOR 10 0 10NR 1 22 23 Drawings resubmittedNCR 11 0 11NER 8 1 9NFR 3 10 13NWR 0 14 14 Drawings resubmittedSR 15 4 19SCR 0 21 21 No progress, Help asked for from IOCSER 8 4 12SECR 11 1 12SWR 8 4 12WR 25 1 26WCR 6 1 7IR 115 112 227

RCD Explosive Clearance

Page 72: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-7

Total CasesForth Nightly Hours>104hrs

(%)

90 hrs to 104 hrs (%)

80 hrs to 90 hrs (%)

60 hrs to 80 hrs (%) < 60 hrs (%) Worst Lobbies

CR 333 38 34 22 6 0 DD, PB

ER 793 23 55 15 6 1 BWN, JMP

ECR 692 22 34 18 14 12 BJU, MFP, CPU

ECo 317 58 19 11 6 6 TIG, RGDA

NR 1262 36 36 19 7 2 SRE, RAC

NC 181 18 60 14 5 4 GWL

NE 411 15 46 18 9 12 GKP, GD

NF 631 26 16 14 20 24 LMG, APDJ

NW 670 25 37 18 15 6 JU, FL

SR 169 5 28 27 21 18 MDU

SC 659 68 30 2 0 0

SE 464 40 33 13 10 3 BKSC, KGP

SEC 241 44 19 19 10 9 RSD, DRJ

SW 660 23 27 9 3 37 UBL, HPT

WR 554 37 33 17 9 3 GIM

WC 293 47 42 11 0 0

I R 8330 33 34 15 9 9

RLY

No. of LPs(Goods)

Utilization of Diesel Loco Pilots Goods (1st forthnight of APR'11)

Page 73: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure T-8 (i)

2006-07 2007-08 2008-09 2009-10 2010-11 TOTCR 0 0 0 1 1 2ER 2 3 2 3 1 11EC 3 1 2 7 1 14ECoR 0 0 0 0 0 0NR 5 7 8 18 2 40NC 3 1 3 3 2 12NE 1 1 0 2 3 7NF 0 1 0 0 1 2NW 0 1 0 0 1 2SR 0 0 3 2 0 5SC 2 0 0 2 3 7SE 0 0 2 0 0 2SECR 0 0 0 0 0 0SW 0 0 1 0 0 1WR 0 1 0 1 2 4WC 0 0 0 0 0 0IR 16 16 21 39 17 109

Signal Passing at Danger (SPAD) By Diesel Crew

Page 74: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-8 (ii)

RLY Avg. Dec'10 Avg.Apr'11 Worst Lobbies

CR 4.04 3.73

ER 3.77 3.91 RPH. BGA

ECR 3.32 3.18 BRWD, SGRL

ECo 3.34 3.14 RGDA

NR 3.67 3.75 BE,SSB

NC 3.02 2.58 CNB, BNDA

NE 4.43 4.51 BC, LJN

NF 3.03 2.96 LMG, TSK

NW 3.32 3.31 MTD

SR 3.67 3.78

SC 3.92 2.30 KCG, DHNE

SE 3.49 3.44 BKSC, KGP

SEC 3.70 4.21 RSD, TMR

SW 2.63 3.09 UBL, ASK

WR 2.86 2.73 GDA, MHW

WC 3.24 3.38 JBP, STA

I.R. 3.70 3.60

Periodic Rest to Dsl Running staff

Page 75: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

RlyTotal No. of Loco Inspectors

Total No. of Loco Inspectors undergone initial/referasher trg.

Balance Reason for not attending

CR 73 68 5

ER 62 25 37There is no infrastructure available in Eastern Railway for conducting initial training forLI's,

ECR 67 64 3 Absentee

ECoR 35 34 1 Out of station on duty at NDLS

NR Due to foggy weather.

NCR 28 22 6 Due to foggy weather.

NER 84 75 114 LI's wkg as Sr CC, 01 in safety, 01 in Dsl shed & 01 in STC/GKP

NFR 161 130 31 Newly Promoted

NWR 166 148 18 11 LI's Newly Promoted

SR 23 23 NIL

SCR(Ele) 54 54 NIL

SCR(DSL) 70 68 2One LI submitted VR and one Ex- India leave during the training course.

SER39 38 1

Newly Promoted

SECR22 21 1

Personal problems

SWR 36 24 12

Last year, STC/SBC were fully occupied due with the successive batches of initial traing courses for the large induction of newly recruited ALPs in this Railway.

WR(DSL) 61 49 12

WR(Ele.) 60 52 8 Newly Promoted

WCR 112 84 28 LI's deputed for monitoring and counseling of loco running staff.

Training of Loco Inspectors

Page 76: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-9 (i)

Action plan for balance

Will be sent for trg. In the forthcoming course.

They will be sent for Initial trg.course at STC/KGP shortly.

Course will be organise soon for these 03

Will cover in the next batch

Li's trg. has been started continue w.e.f 24.03.11.It is expected that complete by end of Feb 2012 i e @ 20 LI's per month.Will be sent for trg in first available course as per trg. Programme 2011-2012 of DTC, JHS.

02 LI's will send in next class.

They will be sent for Initial trg.course shortly.Covered in trg.programme for 2011-2012

Joined Railway recently and wiil be sent for trg.shortly.

Will be sent for trg.during April 2011.

Will be sent for trg.in next slot.

Loco Inspectors training courses are being organised at STC/SBC during first week of June-2011.

Will be sent for trg.in current year.

Will be sent for trg.in next slot.

Will be sent for trg.in next slot.

Page 77: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-9 (ii)

Rly Total Holding of locos

Provision of separate seat made so far

Balance if any Action plan for the balance fleet

CR 190 20 170 Seat are under procurement.ER 123 10 113

ECR 224 1 223 Procurement under processECoR 180 NIL 180 Work under process

NR Position not providedNCR 115 53 62 Action plan for WP under progress.

NER 187 25 16225 WDM3A locos are being covered in first phase.

NFR NIL The work will taken up in current year & shall be completed by Aug'2011

NWR 191 9 182 Tendering is under process.SR Position not provided

SCR 400 150 250 Work under process

SER 237 126 111

NS requisition for procurement of 106 nos. locos is under process for shed & 18 nos. for Shop.Restlocos will be completed within Sept. 2011.

SECR 64 53 11 Seat are under procurement through stores.

SWR Position not providedWR 286 NIL 286 Design yet to be finalized.

WCR Position not providedTOTAL

Provision of seat for Inspecting official in Loco Cab

Page 78: Traction Issues - Indian Railway · Traction Issues Action on decisions taken in previous meetings. Action taken/progress on the following decisions taken in previous meetings should

Annexure-T-10

Jan'11-Jun'11

700 1400 700 1400 700 1400 OverallER 7.0 15.0 0.5 1.1 6.6 7.2 7.0NR 27.0 44.0 6.5 6.0 24.2 13.6 17.7NE 0.0 2.0 0.0 0.0 0.0 0.0NC 0.0 4.5 0.0 0.8 16.9 16.9NF 0.0 6.3 0.0 0.2 2.4 2.4SR 12.0 9.0 2.4 1.3 20.2 15.0 17.9SC 26.0 10.0 2.8 0.4 10.9 4.1 9.0SE 0.0 8.0 0.0 0.7 8.7 8.7SEC 3.0 7.0 0.6 1.6 20.8 22.3 21.9SW 0.0 8.0 0.0 1.3 16.3 16.3WR 12.0 3.7 1.6 0.6 13.5 16.7 14.2IR 113.1 151.9 18.9 18.4 16.7 12.1 14.1

DMU Ineffective

RlyHolding Under Ineff. Ineff. (%age)