Upload
lorie
View
31
Download
0
Tags:
Embed Size (px)
DESCRIPTION
April 24, 2012. Transit Needs. Presentation outline. What is a Needs Plan? Existing and Future Ridership Levels Transit Market/Needs Assessment Public Outreach Results Needs Plan Services. What is a Needs Plan?. Reflects the Desire of the Community - PowerPoint PPT Presentation
Citation preview
Transit Needs
April 24, 2012
PRESENTATION OUTLINE• What is a Needs Plan?• Existing and Future Ridership Levels• Transit Market/Needs Assessment• Public Outreach Results• Needs Plan Services
WHAT IS A NEEDS PLAN?
• Reflects the Desire of the Community• Identifies Future Public Transportation Needs
– Existing Service Improvements– Service Expansion
2006 2007 2008 2009 2010 20110.0
0.5
1.0
1.5
2.0
2.5
PCTS & WHATLAMTD
1.7 M
2.1 M2.2 M
1.9 M 1.9 M2.0 M
Historical Ridership Growth
2013 - 2022 Ridership Growth
0% - 10%10% - 20%>20%
With No Service Changes…
TRANSIT MARKET ASSESSMENT• Traditional Transit Market• Discretionary Transit Market• 2025 Travel Flow• Trip Generators and Attractors• Transit Centers and Corridors
Traditional Transit Market
High
Very High
Discretionary Transit Market
Population Density
Employment Density
Transit Supportive
2025 Travel Flow
13,000 – 16,000> 16,000
10,000 – 13,000
Daily Person Trips
Transit Centers and Corridors
Corridor
Core
Center
Trip Generators and Attractors
Trip Generators and Attractors
• 31 Listening Sessions held 2/6 – 4/19
• Outreach to over 1,000 residents
Public Outreach Results
Have you ever ridden a public transportation bus in Polk County?
Have you ever used a public transportation bus in another location?
Public Outreach Results
52.95%50.08%
66.40%
33.60%
Respondents Listed Modes of Travel
Public Outreach Results
Drive Own Vehicle
Relies on Others
Bike Walk Bus Other0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
76.23%
17.49%
7.85% 9.64%
18.61%13.45%
Service Improvements Cited as Added Incentive to Use Public Transportation
Public Outreach Results
More Destinati
ons
Servi
ce Fr
equency
Expan
ded Hours
Nicer V
ehicles
Weekend Se
rvice
Other0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%45.39%
38.73% 39.49%
6.35%
34.04%
25.11%
NEEDS PLAN SERVICES• Improvements to Existing Services• Service Expansions
NEEDS PLAN SERVICES• Transit Services Hierarchy
– Bus Rapid Transit– Express Service– Traditional Fixed-Route Service (< 60 min)– Traditional Fixed-Route Service (> 60 min)– Fixed-Route Service with Route Deviations– Flex Service– Demand-Response/Paratransit Service
Urban
Rural
NEEDS PLAN SERVICES
Demand Response/Paratransit Service
IMPROVEMENTS TO EXISTING SERVICES
– Increase Service Span– Increase Service Frequency– Add Saturday and/or Sunday Services
Frequency, Service Span, and Sunday Service Improvements
Frequency and Service Span Improvements
SERVICE EXPANSIONS– New Urban Services– New Rural Services
NEEDS PLAN HIGHLIGHTS• Strengthen existing service network• Improve county-wide connectivity• Implement premium bus services
– Express bus connections to:• Polytechnic and other college campuses• Posner Center• Sunrail• Others
– Bus rapid transit (BRT)• Multiple/flexible service options for rural areas
NEXT STEPS• Finalize Needs Plan• Develop Costs• Prioritize Needs Plan Services• Develop Revenue Options and Financial Plan