Transition Strategy and Management Plan (TSMP)(TSMP)
Trans t on to Enterpr se Infrastructure Solut ons (EIS)
Versio 3
March 8, 018
This d cument is hereby auth rized f r release by the General
Services Administrati n.
5/30/201
Signed by: CARLTON SHUFFLEBARGER
Carlt n Shufflebarger Deputy Direct r, Office f Telec mmunicati ns
Services Inf rmati n Techn l gy Categ ry General Services
Administrati n
Table f C ntents
2 Sc
pe.....................................................................................2
2.1 Definiti n f Transiti n
.......................................................................................
2 2.2 Expiring C
ntracts..............................................................................................
2
4 Transiti n Overview
.............................................................4 4.1
Resp nsibility
.....................................................................................................
4 4.2 Overview f Transiti n Strategy
.........................................................................
4 4.2.1 Inv lvement f the Agency’s highest levels and key functi
nal areas ......... 5 4.2.2 Agency Transiti n
Plan................................................................................
5 4.2.3 Early and effective supp rt fr m GSA t
Agencies...................................... 5 4.2.4 Phased,
rderly appr
ach............................................................................
5 4.2.5 Transparency and meaningful rep rting
...................................................... 5
4.3 Transiti n Sequence f Activities
.......................................................................
5 4.3.1 Pri r T Award Of EIS C
ntracts.................................................................
6 4.3.2 After EIS Awards
.........................................................................................
6 4.3.3 Critical Milest nes
.......................................................................................
7
5 Transiti n R les and Resp nsibilities
..............................10 5.1 Maj r Transiti n Stakeh
lders..........................................................................
10 5.2 Agency
Partners...............................................................................................
11 5.2.1 Agencies’ Maj r Resp nsibilities
............................................................... 11
5.2.2 Agencies’ Maj r R
les...............................................................................
12
5.3 Telec mmunicati ns Suppliers
........................................................................
13 5.3.1 Telec mmunicati ns Suppliers’ Maj r R
les............................................. 13 5.3.2 Telec
mmunicati ns Suppliers’ Maj r Resp nsibilities
............................. 14
5.4 GSA
.................................................................................................................
14 5.4.1 GSA Agency Assistance
Teams................................................................
15 5.4.2 GSA Supplier Assistance
Teams...............................................................
16 5.4.3 GSA Transiti n C rdinati n Center
(TCC)............................................... 17 5.4.4 Other
GSA Functi ns Inv lved In Transiti
n.............................................. 19
5.5 G vernment Oversight
.....................................................................................
19 5.5.1 Oversight’s Maj r R
les.............................................................................
19 5.5.2 Oversight’s Maj r Resp
nsibilities.............................................................
19
5.6 Stakeh lder
Register........................................................................................
19
6 Transiti n Assistance t Agencies
...................................20 6.1 Reducti n in GSA Fee
.....................................................................................
20 6.2 Invent ry Management
....................................................................................
20 6.3 GSA-Paid Transiti n Assistance
......................................................................
21
v.3, M rch 28, 2018 i
6.3.1 GSA-Assisted Transiti n (GSAAT)
............................................................ 21
6.3.2 Transiti n Ordering Assistance
(TOA).......................................................
22
7 Master Transiti n Schedule
...............................................24 8 Training
...............................................................................24
9 Pr gress Tracking and Rep rting
.....................................24 9.1 Dashb
ards......................................................................................................
25 9.2 Transiti n
Entities.............................................................................................
25 9.3 Tracking Critical Milest nes
.............................................................................
25 9.4 Other Transiti n Pr gress Measures
...............................................................
27
11 Transiti n Supp rt T ls
...................................................30 11.1 EIS
Transiti n Website
.................................................................................
30 11.2 TI in
E-MORRIS............................................................................................
30 11.3 Telec mmunicati ns Ordering and Pricing System (TOPS)
......................... 31 11.4 GSA C nexus
...............................................................................................
31 11.5 Self-Help Guides and T ls
..........................................................................
31 11.6 C ntact Us
....................................................................................................
32
12 Risk Management
...............................................................32
13 Less ns Learned
................................................................33
14 Change Hist ry
...................................................................33
v.3, M rch 28, 2018 ii
1 Intr ducti n GSA devel ped the EIS Transiti n Strategy and
Management Plan (TSMP) f r managing the transiti n fr m GSA’s
current netw rk services c ntracts t the Enterprise Infrastructure
S luti ns (EIS) pr gram. This d cument addresses the pr gram-level,
G vernment-wide appr ach that GSA f ll ws t manage a successful
transiti n t EIS. Success f r this pr gram includes c mpleti n f
transiti n pri r t the expirati n f the current c ntracts in May
2020. In additi n, this d cument adv cates the imp rtance f c
rdinati n, c llab rati n, and c perati n am ng transiti n stakeh
lders by clearly defining transiti n r les, addressing key issues
impacting transiti n, explaining the pr gram management functi ns
supp rting transiti n, and establishing transiti n pr cesses and pr
cedures. This c mprehensive appr ach pr vides the framew rk f r
managing a timely transiti n t EIS that results in reduced transiti
n expenses, pr mpt accrual f c st savings, minimized risk t
agencies’ missi ns, and expedited pp rtunities t impr ve perati
ns.
1.1 Offi e of Tele ommuni ations Servi es
GSA’s Federal Acquisiti n Service (FAS) Inf rmati n Techn l gy
Categ ry (ITC) pr vides Federal agencies access t aff rdable telec
mmunicati ns and netw rking services and s luti ns that meet agency
missi n requirements. Within ITC, GSA’s Office f Telec mmunicati ns
Services (OTS) pr vides telec mmunicati ns and netw rk services c
ntracts f r use by G vernment agencies such as the Netw rx c
ntracts and multiple Regi nal l cal service c ntracts (f rmerly
administered by GSA’s regi nal ffices). As these c ntracts near the
end f their peri ds f perf rmance, GSA is establishing the
replacement pr gram and c ntract vehicles t ensure that telec
mmunicati ns services c ntinue t supp rt agencies’ missi ns with ut
interrupti n.
Acc rdingly, GSA initiated a f ll w- n acquisiti n called EIS t
meet agency needs f r the next-generati n f telec mmunicati ns and
related inf rmati n techn l gy (IT) services. EIS pr vides c
ntinuity f r the services pr vided by current c ntracts as well as
a p rtf li f new and emerging services. These s luti ns meet r
exceed agency requirements, pr vide r bust security s luti ns, c nf
rm t G vernment p licies and standards, and ffer c mpetitive
pricing. EIS pr vides c ntinu us c mpetiti n t satisfy existing
netw rking perati ns, emerging requirements, techn l gy
refreshment, and access t inn vative s luti ns. In additi n t the
requirement t m ve services ff the expiring c ntracts, the c
mbinati n f m re services, greater c mpetiti n, a single s urce f r
wide-area and l cal services, and impr ved perf rmance pr vides
significant incentive t transiti n t EIS. GSA has created a c
mprehensive pr gram t assist agencies, in c njuncti n with
suppliers, with transiti ning services t the replacement EIS c
ntracts.
1.2 Lessons Learned from Previous Transitions
The transiti n f telec m services t Netw rx t k l nger than
expected, and OTS aims t substantially reduce the transiti n peri d
t EIS. The r bust Less ns Learned pr gram fr m the transiti n t
Netw rx, c mbined with its Risk Management pr gram
v.3, M rch 28, 2018 1
and the findings f several G vernment Acc untability Office (GAO)
audits, pr vides ITC with a wealth f less ns learned t transfer t
the transiti n t EIS. These include:
• C mplex acquisiti n pr cesses and weaknesses in agency transiti n
planning and executi n c ntributed t delays
• Agencies have limited res urces f r validating their invent ry f
active services that must be transiti ned
• Agencies’ selecti n f suppliers averaged m re than tw years t c
mplete, thereby delaying transiti n
• Agencies have insufficient c ntracting and pr ject management
expertise needed f r telec mmunicati ns c ntracts
• Small agencies d n’t have res urces t dedicate t transiti n
• Delays resulted in $329M f l st savings f r agencies and $18M
additi nal c st t GSA t administer tw pr grams (GAO-14-63).
GSA analyzed and pri ritized the less ns learned t inc rp rate int
the strategy f r NS2020 and transiti n t EIS. The less ns
themselves are h listically w ven int the plans and guidance GSA
has devel ped. The pri ritized less ns learned f r the strategy are
attached t this d cument in Appendix H, and the list f less ns
learned specifically fr m the transiti n fr m FTS2001 t Netw rx
appears in the Transiti n Handb k.
2 Sc pe
2.1 Definition of Transition
A transiti n is a m vement fr m expiring OTS c ntracts t the
replacement r success r c ntracts. Transiti ns can be: 1) adminis
ra ive, in which services m ve “like-f r-like” fr m an incumbent
supplier’s c ntract t the same supplier’s replacement c ntracts; 2)
physical, whereby service m ves fr m an expiring c ntract t a
different supplier’s replacement c ntract; r 3) ransforma ive, in
which the service is c nverted during the transiti n, such as t
replace a legacy service with a newer techn l gy, impr ved functi
nality, r expanded reach.
The EIS Transiti n is defined as the m vement f services fr m the
expiring Netw rx, WITS 3, and Regi nal l cal service c ntracts t
EIS. The transiti n peri d began with pr ject planning activities
in 2014 and c ntinues thr ugh the disc nnecti n f all services fr m
the c ntracts that expire in May 2020. As it is ften difficult t
separate new services fr m transiti ning services and t c rrelate
services rdered n EIS with th se they may be replacing, it may be
appr priate t include within the sc pe f transiti n new services
that are l gically related t services transiti ning.
2.2 Expiring Contra ts
There are appr ximately 85 c ntracts that c mprise the p rtf li f
Netw rx, WITS 3, and Regi nal l cal service c ntracts, and m st f
them will expire in 2020. The eight Netw rx c ntracts were c
nsidered f r extensi n fr m their initial expirati n f 2017. The
three Netw rx Universal c ntracts—held by AT&T, CenturyLink,
and Veriz n---
v.3, M rch 28, 2018 2
were extended t March 2020. Sprint elected n t t extend its Netw rx
Enterprise c ntract, and it expired in May 2017. The remaining f ur
Netw rx Enterprise c ntracts al ng with the tw WITS 3 c ntracts and
m st Regi nal l cal service c ntracts that w uld have expired pri r
t May 2020 were extended t that timeframe t all w f r transiti n t
EIS; alth ugh a few expire s ner. Any Regi nal l cal service c
ntracts that currently have pti n peri ds that all w f r perf
rmance bey nd May 2020 sh uld be c nsidered f r inclusi n in the
transiti n pr gram that is targeted f r c mpleti n in May 2020, but
GSA will retain the pti n f n t fully transiti ning services fr m
th se c ntracts until cl ser t the end f their peri d f perf
rmance. This all ws the transiti n pr gram t f cus n services that
are expiring, m derate the w rkl ad, and sequence transiti n
activities f r a m re rderly, efficient, and successful transiti
n.
A c mplete list f the expiring c ntracts and ther pertinent inf
rmati n appears in Appendix A.
3 Transiti n Strategy Management Plan (TSMP) D cument
Overview
3.1 TSMP Obje tive
The bjective f the TSMP is t present GSA’s appr ach t successfully
perf rming its r le in managing the transiti n fr m expiring c
ntracts. It pr vides guidance t the GSA transiti n team as well as
inf rms agencies, c ntract rs, ther suppliers, and versight
rganizati ns such as Office f Management and Budget (OMB) and GAO.
It supplements the Transiti n Handb k, published t guide agencies
thr ugh all phases f the transiti n.
3.2 TSMP Do ument S ope
This d cument describes the strategy and plan f r GSA’s transiti n
pr gram at the G vernment-wide level f r the transiti n t
EIS.
The TSMP:
• Pr vides an verview f each f the characteristics f the transiti n
eff rt.
• Describes the r les and resp nsibilities f all stakeh
lders.
• Explains GSA’s appr ach t pr viding transiti n assistance and
training f r agencies.
• Discusses GSA’s appr ach t G vernment-wide transiti n management,
including schedule, tracking and rep rting, and c mmunicati
ns.
• Identifies the transiti n supp rt t ls that GSA uses and has made
available t agencies, in rder t facilitate each transiti n
activity.
• Describes risk management strategies t empl y during transiti
n.
• Describes the integrated rganizati n within GSA’s ITC, including
the Transiti n C rdinati n Center (TCC), with interfaces t agency
partners, suppliers f telec mmunicati ns services, and g vernment
versight rganizati ns.
The EIS Pr gram Office within GSA’s OTS is als devel ping,
implementing and executing pr cesses f r the launch and l ng term
supp rt f the EIS pr gram. This
v.3, M rch 28, 2018 3
d cument d es n t describe th se eff rts except as relevant t
transiti n.
4 Transiti n Overview
4.1 Responsibility
Acc rding t the OMB, “Agencies are individually resp nsible f r
transiti ning t the next generati n f Netw rx. H wever, GSA is
ultimately resp nsible f r a successful G vernment-wide transiti n
and sh uld take a str ng leadership r le in steering agencies in
the right directi n, harnessing less ns learned fr m the previ us
Netw rx transiti n.”1 T fulfill that resp nsibility GSA sets the
transiti n schedule and manages transiti n t meet that schedule.
Acc rdingly, GSA helps agencies thr ugh transiti n; h wever, f r
direct- rder agencies (agencies that place their wn rders directly
with the suppliers), it is their resp nsibility t execute transiti
n bef re the c ntracts expire.
F r a m re detailed discussi n f r les and resp nsibilities, see
Secti n 5, Transiti n R les and Resp nsibilities.
4.2 Overview of Transition Strategy
The GAO rep rt, “Full Ad pti n f S und Transiti n Planning
Practices by GSA and Selected Agencies C uld Impr ve Planning Eff
rts,” June 2006, identified best practices f r c nducting effective
transiti n planning. In particular, GAO identified five s und
transiti n planning practices:
1. Establish an accurate telec mmunicati ns invent ry and an invent
ry maintenance pr cess
2. Perf rm a strategic analysis f telec mmunicati ns requirements
and use this t shape the agency’s management appr ach and guide eff
rts when identifying res urces and devel ping a transiti n
plan
3. Establish a structured management appr ach that includes a
dedicated transiti n management team that uses clear lines f c
mmunicati ns in additi n t key management pr cesses, such as pr
ject management, c nfigurati n management, and change
management
4. Identify the funding and human capital res urces that the
transiti n eff rt requires 5. Devel p a transiti n plan that
includes transiti n bjectives, measures f
success, risk assessment, and a detailed timeline.
GSA has taken a strategic r le in defining transiti n planning,
executi n, management, and stakeh lders. GSA’s appr ach t planning
f r transiti n includes facilitating the establishment f the invent
ry t be transiti ned and leading the definiti n and res luti n f pr
gram-level fact rs and issues that affect transiti n activities.
While the agencies using services n the expiring c ntracts have the
primary resp nsibility f r executing transiti n successfully, GSA
supp rts the agencies by managing the c ntracts and pr viding a G
vernment-wide perspective n executi n, which includes tracking and
facilitating issue res luti n.
1 OMB p ssb ck document (Predecision l/Deliber tive), p. 12.
v.3, M rch 28, 2018 4
In c ncert with agency cust mers, suppliers, and versight rganizati
ns, GSA is implementing a transiti n strategy that capitalizes n
less ns learned fr m previ us transiti ns t effect a successful
transiti n t EIS. The key elements f this strategy are bel w.
4.2.1 I volveme t of the Age cy’s highest levels a d key fu ctio al
areas
The engagement f executive management is critical t secure and f
cus res urces acr ss the agency t plan and implement the transiti
n, track pr gress, and identify and resp nd t risks. GSA has asked
each agency t identify, by name, an executive as the Agency
Transiti n Sp ns r t serve as pr ject champi n f r the transiti n.
An ther fundamental requirement is early assignment f a Lead
Transiti n Manager (LTM) t devel p the agency’s transiti n pr ject
plan and lead the transiti n implementati n. The agency sh uld als
identify a Transiti n Ordering C ntracting Officer (TOCO) that
fully understands the agency’s transiti n requirements and
timelines, understands the Federal Acquisiti n Regulati n (FAR) and
agency’s acquisiti n p licies, and has a repert ire f w rkable appr
aches t meet the agency’s transiti n requirements.
4.2.2 Age cy Tra sitio Pla
Agencies with services n the expiring c ntracts must devel p an
Agency Transiti n Plan (ATP) and pr vide it t GSA. See the Transiti
n Handb k f r m re guidance and an utline. GSA tracks this as a
critical milest ne t be c mpleted by Oct ber 2016, with updates as
appr priate.
4.2.3 Early a d effective support from GSA to Age cies
Fr m the earliest agency engagements, GSA is pr viding tail red
supp rt t each agency appr priate t its transiti n appr ach,
especially f r the supplier selecti n, r “Fair Opp rtunity” (FO) pr
cess (see FAR Subpart 16.505). GSA w rked with the existing
suppliers t c nduct the initial validati n f invent ry and
maintains the invent ry thr ugh ut transiti n. GSA is pr viding
training and a user’s guide f r rdering n the EIS c ntracts.
4.2.4 Phased, orderly approach
GSA is c rdinating with agencies and suppliers t devel p a rec
mmended sequence f transiti n rders t achieve early pr gress, level
res urce demands, and minimize backl gs. GSA will w rk with all
stakeh lders t guide transiti n thr ugh this sequence.
4.2.5 Tra spare cy a d mea i gful reporti g
GSA is defining and tracking maj r milest nes and rep rting
agencies’ pr gress t OMB in a transparent manner. Measures f
transiti n pr gress are devel ped in c llab rati n with agencies
and suppliers and are representative f business v lume and the c
mplexity f services being transiti ned.
4.3 Transition Sequen e of A tivities
The transiti n peri d is b unded n the far end by the expirati n f
the current c ntracts and defined by interim milest nes that set
the sequence f transiti n-related activities.
v.3, M rch 28, 2018 5
While award f the EIS c ntracts is certainly a maj r milest ne,
there is significant planning and preparati n that can—and
must—happen independent f and pri r t that date by all three maj r
stakeh lders: GSA, agencies, and suppliers. After EIS awards are
made, activity is primarily f cused n agencies and suppliers
rdering and implementing services. The maj r transiti n-related
activities are bel w.
4.3.1 Prior To Award Of EIS Co tracts
• GSA c llab rates with agencies and suppliers t : o Devel p a
transiti n strategy and pr gram plan with critical milest nes o
Devel p and implement an appr ach t assisting agencies with
transiti n o C llect, validate, and pr vide agencies with the
invent ry f services t
transiti n (that is, the Transiti n Invent ry r “TI”) o Help
agencies prepare f r transiti n as detailed in
agency-specific
interagency agreements f r transiti n assistance o Devel p
curriculum f r training n Delegated Pr curement Auth rity
(DPA).
• Agencies: o Identify an executive sp ns r f r transiti n o Budget
f r transiti n expenses f r fiscal years (FY) 2016-2020 o Assemble
an integrated transiti n team f telec m, pr ject management,
acquisiti n, and financial experts o Plan f r human res urces, pr
cesses, and t ls o Bec me familiar with the EIS Request f r Pr p
sals (RFP), especially the
services, management and perati ns requirements, and pricing
structure o C nfirm TI o Devel p an Agency Transiti n Plan (ATP) by
Oct ber 2016 o Execute an interagency agreement (IAA) with GSA f r
transiti n
assistance o Initiate s licitati ns f r the FO pr cess t select EIS
suppliers, engaging
with suppliers f r market research, s urces s ught, and Requests f
r Inf rmati n (RFIs)
o C nsult the Transiti n Handb k f r a detailed discussi n f agency
activities.
• Suppliers: o Plan f r res urces needed t supp rt transiti n o C
llab rate with G vernment stakeh lders n transiti n planning o Pr
vide meaningful input t agencies t supp rt FO planning.
4.3.2 After EIS Awards
• EIS C ntract rs: o With GSA, successfully c mplete Business Supp
rt System (BSS) Testing
(BSST) and c mplete security testing o Resp nd t agencies’ FO s
licitati ns o C nduct utreach and training t agencies f r using the
EIS c ntract
v.3, M rch 28, 2018 6
o Coordi ate with age cies a d complete timely impleme tatio of
orders.
• Networx, WITS 3, a d GSA Regio al local service suppliers: o
Support age cies’ tra sitio to ew suppliers o Complete timely disco
ects a d termi atio of billi g.
• Age cies: o Atte d trai i g for a d receive Delegatio of
Procureme t Authority (DPA)
from GSA to age cy Orderi g Co tracti g Officers (OCOs) o Fi alize
FO solicitatio s a d select EIS supplier(s), awardi g fully-fu
ded
Task Orders (TOs) o Order services for tra sitio o EIS o Order
disco ects o Networx, WITS 3, a d GSA Regio al local service
co tracts.
• GSA: o Mo itors a d reports tra sitio progress o Facilitates tra
sitio process a d issue resolutio with suppliers a d
age cies o Performs BSS testi g a d issues Authority to Operate
(ATO) o Provides age cy-specific assista ce as specified i tra
sitio IAAs o Performs outreach regardi g tra sitio a d the EIS
program with age cies
a d i dustry o Reviews age cy TO solicitatio s for scope complia ce
prior to release.
4.3.3 Cr t cal M lestones
The tra sitio timeli e ide tified i the figure below highlights the
critical tra sitio activities a d milesto es. Subseque t sectio s
provide more detailed descriptio s.
*NOTE EGA DING CONTINUITY OF SE VICE: Agencies should plan to
complete
their transition by March 2020. Some agencies will have challenges
completing by
that timeframe. The Networx contracts have a 365-day continuity of
service
period that allows for services to continue to operate at the last
year of contract
pricing which would allow services to continue to March 2021.
However, caution
v.3, M rch 28, 2018 7
is impo tant when conside ing the continuity of se vice pe iod. A
continuity of
se vice pe iod is exe cised on an al eady-expi ed cont act. Once
this pe iod ends,
the e is NO oppo tunity to extend the cont act o se vices.
4.3.3.1 Va idate Transition Inventory
Validati n and c nfirmati n f accurate Netw rx, WITS 3, and GSA
Regi nal l cal service invent ries sets the f undati n f r a
successful transiti n. Accurate invent ry ensures agencies and
stakeh lders have a c mprehensive understanding f the services that
must be disc nnected and pr vides inf rmati n f r planning f r
additi nal services required n EIS. An accurate and c mplete invent
ry:
• Assists agencies with transiti n planning by identifying the
services t be transiti ned and subsequently disc nnected fr m Netw
rx, WITS 3, and GSA Regi nal l cal service c ntracts
• Serves as the database f rec rd f r measuring transiti n pr gress
in a c nsistent manner acr ss all agencies, suppliers, and
services
• Serves as an input f r transiti n tracking • Must be c nfirmed by
Oct ber 2016; agencies signal c mpleti n f the
c nfirmati n by asserting such in the ATP.
4.3.3.2 De iver Agency Transition P ans
The ATP is an imp rtant t l f r c mmunicating the agency’s
requirements, expectati ns, and appr ach t ther transiti n stakeh
lders, including GSA, OMB, and suppliers. The Transiti n Handb k
describes the requirements and pr vides an utline f r the ATP. The
Agency Transiti n Sp ns r is t appr ve and deliver this plan t
GSA’s Assistant C mmissi ner f r ITC n later than Oct ber
2016.
4.3.3.3 Award EIS Contracts
While the TCC and agencies have been planning f r transiti n, the
GSA s urce selecti n team c nducted extensive utreach and c llab
rati n with agencies and suppliers t release the EIS RFP in Oct ber
2015 and evaluate pr p sals. After GSA selecti n f the EIS awardees
and N tices t Pr ceed, each supplier must begin dem nstrating it is
ready f r agency use f the EIS c ntract.
The EIS c ntracts require EIS awardees t pr vide Business Supp rt
Systems (BSS) f r management and perati ns functi ns. BSSs are
industries’ pr cesses, pr cedures, and supp rt infrastructure
primarily t facilitate rdering and inv icing f r services. GSA is
required t independently inspect and accept each EIS awardee’s BSS
acc rding t the test meth d l gy defined in Secti n E f the EIS c
ntracts. All EIS awardees are required t pr vide a detailed BSS
Verificati n Test Plan as part f its EIS pr p sal. The EIS awardee
has 12 m nths fr m the acceptance f the BSS Verificati n Test Plan
(see Secti n E.2.1 f the EIS c ntracts) t successfully c mplete BSS
testing. In additi n,
v.3, M rch 28, 2018 8
the EIS awardee must c mplete security testing in acc rdance with
Secti n G.5.6 f the EIS c ntracts and receive ATO.
The EIS supplier may NOT accept and pr cess TOs r service rders, pr
visi n r deliver services and bill f r services until after it
receives written n tificati n 1) fr m the EIS C ntracting Officer
(CO) that it has passed BSS testing and 2) fr m GSA that it has
successfully c mpleted security testing and received ATO. Agencies
may have their wn requirements f r BSS ATO; GSA will make available
d cumentati n ass ciated with its BSS Security Assessment,
including the ATO letter, t agencies up n request.
H wever, the FO pr cess may c ntinue during this peri d. While
suppliers are c nducting the BSS testing and security assessment,
they may resp nd t FO s licitati ns. Agencies can request that
suppliers state in their resp nses whether they have successfully c
mpleted the required BSS verificati n and security testing. F r m
re detail, see the Fair Opp rtunity and Ordering Guide.
4.3.3.4 Comp ete a Fair Opportunity (FO) Decisions for
Transitioning Services
EIS service requirements are driven by agency-specific missi n
needs and perati nal m dels. Plans f r EIS rdering sh uld be
determined by c nducting a c mplete analysis f an agency’s current
invent ry f telec mmunicati ns services and its future perati nal
needs. With th se requirements in mind, the agency sh uld bec me
familiar with the appr priate requirements in the EIS c ntracts.
This analysis determines h w the EIS service fferings can best meet
an agency’s needs. An agency can then gr up requirements int ne r m
re FO s licitati ns, using Statements f W rk (SOWs) as needed, and
select a supplier(s) thr ugh the pr cess in c mpliance with FAR
16.505 t meet the agency’s requirements.
T expedite the FO pr cess and ensure the resulting TOs can be
awarded t meet the FO decisi n milest ne, agencies are advised t
begin preparing their s licitati ns and securing funding in advance
f EIS award and expect t release th se s licitati ns as s n as p
ssible after award. GSA str ngly enc urages agencies t c nsider
using Requests f r Inf rmati n (RFIs) and draft RFPs well in
advance f EIS awards t impr ve the quality f their FO s licitati ns
and help the suppliers plan f r resp nding t th se s licitati ns as
s n as p ssible after EIS awards. GSA maintains an interactive
website (interact.gsa.g v) that is available f r agencies’ and
industry’s use f r sharing and c mmenting n RFIs and draft RFPs;
agencies can get help by c ntacting their GSA Agency Manager
(AM).
4.3.3.5 Transition Services off Expiring Contracts
Agencies and their selected suppliers implement services n EIS and
disc nnect services fr m the expiring c ntracts. GSA tracks and rep
rts transiti n pr gress f r all stakeh lders’ awareness. F r m re
detail, see Secti n 9, Pr gress Tracking and Rep rting.
v.3, M rch 28, 2018 9
5.1 Ma or Transition Stakeholders
The gover me t’s telecommu icatio s i frastructure is large a d
complex, a d it is directly li ked to the missio a d core busi ess
processes of all gover me t age cies. Tra sitio i g or upgradi g
this core age cy i frastructure is also complex a d it requires the
collaboratio of four major stakeholders to be successful: age cy
part ers, telecommu icatio s suppliers, GSA, a d gover me t
oversight groups.
The core role i tra sitio is the developme t a d impleme tatio of
age cy specific TOs that is a shared respo sibility of the specific
customer age cy a d EIS co tractors. These age cy-specific TOs
specify a d deliver the ext ge eratio of the gover me t’s telecommu
icatio s i frastructure.
Supporti g the TO developme t a d impleme tatio processes are the
GSA a d several key gover me t oversight groups. GSA defi es the
grou dwork for the tra sitio by developi g the EIS co tract a d
layi g out the tra sitio program structure a d processes. GSA also
has a key role i actively worki g with customer age cies a d EIS
suppliers to address specific age cy or supplier acquisitio or
impleme tatio issues. Fi ally GSA has a major role i measuri g a d
reporti g tra sitio progress to all key stakeholders to e sure this
large, complex a d distributed collaboratio is successfully movi g
the gover me t to its ext ge eratio of i frastructure. The
oversight groups i tur mo itor a d advise other tra sitio
stakeholders to help rapidly achieve a missio e ha ci g ext ge
eratio telecommu icatio s i frastructure for the gover me t.
However, all stakeholders share the same objective of maki g the
EIS tra sitio less costly, easier a d more efficie t, a d e suri g
the resulti g i frastructure is more effective a d be eficial to
the missio s of gover me t age cies across gover me t.
v.3, M rch 28, 2018 10
5.2 Agen y Partners
The primary resp nsibility f each agency is t manage and m nit r
all activities and functi ns relative t the agency-level transiti n
t EIS. EIS is a TO c ntract, and agencies are resp nsible f r
awarding TOs in a timely fashi n n EIS. GSA can supp rt agencies
thr ugh the TO award pr cess. H wever, since GSA d es n t have
direct auth rity within an agency, GSA’s r le will be supp rtive in
the award f these TOs. This means the agency will manage transiti n
activities t ensure replacement services and disc nnects are being
implemented timely and effectively, with minimal impact t the
agency’s perati n. Many G vernment rganizati ns are decentralized;
theref re, multiple entities within a Department r an independent
agency may perf rm the functi ns f an “agency.” The agency’s resp
nsibilities and functi ns may be delegated t an ther agency, t a
sub-agency r an agency c mp nent, r t a supp rt c ntract r auth
rized t act n behalf f the agency. Agencies are advised t apply s
und internal pr ject management best practices in rder t plan f r
the expected transiti n w rkl ad and establish a hierarchy f
transiti n teams at the sub-agency r c mp nent level if appr
priate.
5.2.1 Age cies’ Major Respo sibilities
The functi ns t be perf rmed by the agency f r transiti n include
the f ll wing:
• Establish an integrated transiti n management team with executive
Agency Transiti n Sp ns r, LTM, and TOCO that uses clear lines f c
mmunicati ns and key management pr cesses
• Devel p and maintain lines f c mmunicati n with GSA OTS and the
TCC • C nfirm TI t ensure it is accurate and current
• Understand EIS Services, management and perati ns requirements,
and pricing structure
• Evaluate current technical s luti ns and devel p transiti n
planning f r target technical s luti ns, including upgrades, transf
rmati ns, retirement, r ther changes
• Devel p and maintain an ATP that includes transiti n bjectives,
acquisiti n strategy, measures f success, risk assessment, and a
detailed timeline; pr vide ATP t GSA and update as appr
priate
• Identify the funding and human capital res urces that the
transiti n eff rt requires
• C mmunicate transiti n g als, telec mmunicati ns requirements,
and existing invent ry t the suppliers during market research and
thr ugh ut the rdering pr cess, especially in FO s licitati
ns
• Execute an Interagency Agreement IAA with GSA f r transiti n
assistance, as applicable
• Order services f r transiti n n EIS
• Order disc nnects n Netw rx and WITS 3
• M nit r the supplier’s transiti n perf rmance, accept r reject
services in acc rdance with the EIS c ntract, and c rdinate c
rrective acti ns with the supplier and GSA if required
• M nit r and facilitate c rdinati n between the supplier and L cal
G vernment C ntacts (LGCs) and ther agency vend rs and
suppliers.
v.3, M rch 28, 2018 11
5.2.2 Age cies’ Major Roles
The f ll wing are key f r an agency’s Integrated Transiti n
Team:
• LTM and supp rting TMs
• TOCO and ther OCOs f r the agency ( r pers nnel with auth rity t
bligate the agency’s funds).
Depending n an agency’s transiti n requirements, there may be a
need t identify additi nal staff f r implementati n f transiti n
activities. These res urces may c me fr m within an agency r fr m
supp rt c ntract rs and can include financial analysts and billing
pers nnel, l cal site c ntacts, inf rmati n assurance r IT security
experts, r netw rk engineers. If agencies determine additi nal
agency-specific supp rt is required t manage transiti n activities,
GSA’s AMs can advise agencies n c ntract vehicles that can pr vide
staffing supp rt f r the transiti n eff rt; agencies can als c
nsult the Acquisiti n Gateway at https://hallways.cap.gsa.g
v.
5.2.2.1 Lead Transition Manager (LTM)
Each agency’s Chief Inf rmati n Officer, r ther auth rity as appr
priate, app ints a LTM. GSA c rdinates with the LTMs t manage
transiti n assistance, disseminate inf rmati n, c nduct w rksh ps,
deliver training, and ther c mmunicati n f decisi ns, plans, and
helpful res urces. The LTM devel ps the ATP; acts as the central p
int f c ntact t GSA’s TCC; executes, tracks, and rep rts transiti n
activities; and escalates issues t GSA as appr priate. The LTM must
have str ng pr ject management, c mmunicati ns, and interpers nal
skills and be a rec gnized leader within the agency.
5.2.2.2 Supporting Transition Managers (TMs)
Supp rting TMs lead the planning, management, and implementati n f
the agency’s transiti n thr ugh the maj r activities bel w.
• Engage agency staff t define requirements
• Pr vide pr ject management f the agency’s transiti n t EIS,
including meeting milest ne deadlines and managing pr ject
risks
• Plan and prepare agency-specific transiti n strategies f r the
ATP al ng with m re detailed plans as needed
• Ensure accuracy f the agency’s TI
• Ensure transiti n rders are placed and implemented in a timely
fashi n; pri ritize rders f r services that have lengthy r c mplex
installati ns
• Escalate issues t Cust mer Engagement and Agency Transiti n Sp ns
r, the EIS suppliers, r GSA as appr priate
• Interface with the L cal G vernment C ntacts (LGCs) r end-user
cust mers
• Distribute transiti n inf rmati n t the agency.
5.2.2.3 Transition Ordering Contracting Officer (TOCO)
The TOCO is the agency’s acquisiti n lead f r facilitating the
OCOs’ use f the EIS c ntracts; this is a new r le identified f r
the transiti n t EIS resulting fr m less ns
v.3, M rch 28, 2018 12
5.2.2.4 Ordering Contracting Officers (OCOs)
The agency’s Ordering C ntracting Officers (OCOs), r ther fficials
wh have auth rity t bligate the agency’s funds, are critical t the
success f transiti n and, theref re, must be part f the agency’s
transiti n team fr m the utset.
OCOs are resp nsible f r f ll wing the rdering pr cedures,
including the FO selecti n f suppliers, in c mpliance with the FAR,
the terms and c nditi ns f the EIS c ntracts, and any agency p
licies t place TOs n the EIS c ntracts. Ordering telec mmunicati ns
services inv lves understanding c mp nents that are n t c mm nly
included in ther IT s luti ns and can require the agency t describe
c mplex netw rk requirements and evaluate disparate pr p sals r qu
tati ns f r their s luti ns. The agency sh uld assign OCOs with
experience in telec mmunicati ns acquisiti ns and must ensure the
OCOs participate in training that GSA and the EIS suppliers ffer.
GSA has a pr gram t assist agencies with rdering, and agencies can
get help by c ntacting their GSA AM.
F r agencies t place TOs n the EIS c ntracts and t ensure rdering c
mplies with pr curement statutes and p licies, agencies’ OCOs must
attend training and receive a DPA fr m GSA. The OCO f r each TO may
designate a C ntracting Officer’s Representative(s) (CORs) auth
rized t place service rders specified in the TO. The COR is a
federal empl yee with Federal Acquisiti n Certificati n–C ntracting
Officer’s Representative (FAC-COR) certificati n and has c mpleted
supplier-pr vided training related t placement f service rders. If
the agency d es n t use the FAC-COR certificati n pr cess, the OCO
may app int an individual wh is resp nsible f r these duties. The
COR is delegated limited TO c ntract administrati n auth rity thr
ugh a COR app intment letter by the OCO with a DPA; f r m re inf
rmati n see the EIS Management and Operati ns (MOPS) Handb k n
gsa.g v/eis.
5.3 Tele ommuni ations Suppliers
The suppliers pr viding services n b th the expiring c ntracts as
well as the EIS c ntracts have a significant, critical r le in the
successful implementati n f transiti n. Other suppliers with
specialized expertise als pr vide a valuable service, with their
unique perspective and inn vative thinking. It is imp rtant that
suppliers be inv lved fr m the beginning stages f planning t ensure
their expertise and insight shape the pr gram.
5.3.1 Telecommu icatio s Suppliers’ Major Roles
The r le f the suppliers includes the f ll wing:
• C llab rate with transiti n stakeh lders t define a phased appr
ach t manage
v.3, M rch 28, 2018 13
an rderly transiti n that c mpletes by May 2020
• Participate in planning with GSA and pr vide advice n strategies
t minimize the transiti n time
• C nduct transiti n planning and implementati n c nsistent with
GSA’s TSMP t the extent p ssible
• Pr p se and deliver services as specified acc rding t their c
ntracts
• Dedicate pers nnel as needed t interact with dedicated G vernment
pers nnel
• Train r rient GSA’s transiti n pers nnel t use any self-help t ls
r systems the supplier makes available t agencies f r transiti n
and implementati n.
5.3.2 Telecommu icatio s Suppliers’ Major Respo sibilities
The EIS c ntract rs specifically will:
• Manage transiti n activities as described in their respective Pr
gram Management Plans
• Identify a lead p int f c ntact f r transiti n
• Ascertain thr ugh their rder pr cessing practices which services
n an rder are replacing active services n an ther c ntractual
vehicle and give th se rders the appr priate attenti n t supp rt
transiti n g als. GSA enc urages agencies t enhance r transf rm
services as well as rder new services in c njuncti n with transiti
ning services. Theref re, GSA d es n t require suppliers t identify
rders specifically as “transiti n.”
The suppliers f r expiring c ntracts specifically will:
• Pr vide data n active services t build and maintain the transiti
n invent ry • Pr vide the TCC with transiti n status rep rts t
facilitate transiti n tracking and
rep rting
• Identify a lead p int f c ntact f r transiti n
• Pr vide interc nnecti ns (“gateways”) as needed with success r pr
vider t minimize service disrupti ns t agencies during transiti
n
• Disc nnect services acc rding t the rdering and perf rmance
requirements f their respective c ntracts f r th se services
• Perf rm Primary Interexchange Carrier/L cal Primary Interexchange
Carrier (PIC/LPIC) changes in supp rt f transiti n t EIS.
5.4 GSA
GSA has maj r pri r and p st c ntract award r les and resp
nsibilities. Bef re EIS award, there are three maj r r les f r GSA.
First, GSA is t devel p and award the EIS c ntracts. Sec nd, GSA is
t devel p verall p licies and a supp rt infrastructure t ensure
that agencies are able t execute their transiti n in a timely
manner. Third, GSA is t supp rt the devel pment and executi n f
agency transiti n plans. A key c mp nent f the EIS transiti n
strategy is that the devel pment and award f the c ntract is
ccurring simultane usly with the devel pment f a transiti n supp rt
infrastructure and pr viding agencies supp rt t devel p acquisiti n
plans and s licitati ns pri r t the award f EIS. P st award the f
cus is n agency assistance, supplier assistance, and transiti n rep
rting and c ntract administrati n. Within the
v.3, M rch 28, 2018 14
Federal acquisiti n framew rk, the bjective f all GSA teams is
making the EIS transiti n timely and c st effective f r
agencies.
GSA’s r le in transiti n planning, executi n, and management
includes the f ll wing:
• Publish a TSMP f r all stakeh lders t share a c mm n
understanding f the g als f transiti n and GSA’s appr ach t
managing transiti n acr ss the G vernment
• Maintain and track the master transiti n schedule
• Perf rm validati n and maintenance f TI
• M nit r suppliers’ perf rmance acc rding t their respective c
ntracts and initiate c rrective acti n if required
• Pr vide tail red supp rt t each agency appr priate t its transiti
n appr ach
• Assist agencies with transiti n planning, agency-specific
transiti n pr jects, and using the EIS c ntracts thr ugh c
nsultative services, self-help t ls, and training
• Supp rt the transiti ns f GSA’s regi nal full service and small
direct- rder agencies, including transiti n planning, rdering
services n EIS, and c rdinati n f disc nnects fr m expiring c
ntracts
• Define maj r milest nes and rep rt transiti n pr gress t all
stakeh lders, initiating c rrective acti n where required
• M nit r and facilitate c rdinati n, c mmunicati n, and c perati n
am ng the suppliers, agencies, and ther GSA rganizati ns.
5.4.1 GSA Age cy Assista ce Teams
5.4.1.1 Major Ro es of Agency Assistance Teams
The OTS’s Cust mer Engagement Divisi n is resp nsible f r ensuring
that appr priate and effective supp rt is pr vided t each agency
during their transiti n t EIS. Within the Cust mer Engagement
Divisi n, each agency is assigned an AM, and that AM has verall
resp nsibility f r the management f GSA supp rt t that agency. Any
ther OTS rganizati n pr viding supp rt t an agency will w rk with
versight fr m the AM.
The AM is resp nsible f r identifying the supp rt needed fr m GSA
during the transiti n planning, acquisiti n planning, and transiti
n executi n p rti ns f the transiti n. Once the supp rt requirement
is identified, it is the resp nsibility f the Cust mer Engagement
Divisi n t pr vide that supp rt. OTS leadership will ensure that
supp rt is pr vided t each agency fr m ther departments within OTS.
These ther departments are resp nsible f r pr viding supp rt t
agencies, thr ugh Cust mer Engagement Divisi n’s AM, as described
bel w.
The EIS pr gram ffice and the TCC are resp nsible f r ensuring that
training n the pr cedures t use the EIS acquisiti n is available t
agencies. The Cust mer Engagement Divisi n is resp nsible f r
ensuring the training is pr vided t each agency.
The OTS Cust mer Engagement Divisi n is resp nsible f r pr viding
technical and
v.3, M rch 28, 2018 15
price assistance t agencies during the acquisiti n phase f the
transiti n. This may be supp rted as needed thr ugh the Office f
Transiti n and Service Delivery Divisi n, the Transiti n C rdinati
n Center, and supp rt c ntract rs embedded at each agency.
The Office f Transiti n and Service Delivery is resp nsible f r
defining and publishing p licies related t transiti n, devel ping
supp rt d cumentati n f r transiti n, awarding and managing c
ntracts that supp rt the transiti n, and rep rting n transiti n pr
gress t stakeh lders utside f each agency. P st award f agency TOs,
the Office f Transiti n and Service Delivery has primary resp
nsibility f r supp rting agencies in the implementati n f their
TOs, including activati n f services n EIS and disc ntinuing
services n the expiring c ntract.
Just as the Cust mer Engagement Divisi n is resp nsible f r
marshalling supp rt f ther GSA rganizati ns t agencies, the OTS
Supplier Engagement Divisi n is resp nsible f r managing GSA’s
relati nship with suppliers t supp rt timely and efficient agency
transiti ns.
5.4.1.2 Major Agency Assistance Responsibi ities
Transiti n is divided int three phases: Transiti n Planning,
Acquisiti n Executi n, and Transiti n Executi n (see Appendix
G).
First, agencies must plan their transiti n. GSA supp rts each
agency in the devel pment f a transiti n plan. T d this, GSA
advises each agency n the invent ry, supplier mix, and service mix
and als n the use f the EIS acquisiti n. GSA is resp nsible f r
ensuring agencies are familiar with the sc pe f the c ntract, the
services available thr ugh the c ntract, and their resp nsibilities
t award a TO.
Sec nd, agencies must devel p and then c mpete s licitati ns that
result in the award f TOs. GSA is resp nsible f r supp rting each
agency thr ugh ut this pr cess. This means pr viding supp rt t
plan, write, and execute s licitati ns. GSA will ffer and pr vide
direct embedded assistance f r this acquisiti n supp rt. Further,
GSA will pr vide guidance n requirements and pricing f r each s
licitati n.
Third, p st award f TOs, GSA is resp nsible f r supp rting agencies
as they execute their transiti n. GSA will be an adv cate f r
agencies in dealing with suppliers t ensure a timely transiti n,
and, GSA will advise agencies n their c mpleti n status f transiti
n.
5.4.2 GSA Supplier Assista ce Teams
5.4.2.1 Major Ro es of Supp ier Assistance Teams
Supplier Engagement is resp nsible f r pr gram management f OTS’ c
ntracts in the areas f suppliers’ perf rmance, rdering and billing
pr cess, c ntract deliverables, suppliers’ BSS, evaluati n f pr p
sed c ntract m dificati ns, and ther t pics that, while n t
specifically related t transiti n, certainly impact the success f
transiti n.
v.3, M rch 28, 2018 16
Acquisiti n Operati ns pr vides the pr curement and c ntract
administrati n f Telec mmunicati ns Services acquisiti n vehicles.
The EIS CO(s) has verall resp nsibility and auth rity t administer
the c ntract, with supp rt fr m C ntracting Specialists in this
rganizati n. Acquisiti n Operati ns is als pr viding supp rt f r
agencies’ OCOs and thers inv lved in the acquisiti n activities ass
ciated with using EIS, such as issuing DPAs and advising n the FO
and rdering pr cess.
5.4.2.2 Major Supp ier Assistance Responsibi ities
Supplier Assistance includes:
• Evaluating supplier perf rmance against c ntract
requirements
• Pr viding technical and management supp rt f c ntract m dificati
n requests including letter f rec mmendati n submissi ns t the c
ntracting fficer f r final determinati n and issuance
• Pr viding Master Agreement versight and perf rmance rep rting f
results, c mpliance, and sc pe determinati n
• C llab rati n with suppliers n g -t -market activities supp rted
by the g vernment including messaging and awareness functi ns
• Pr viding c ntract guidance, pr cess advice, issue res luti n,
and assistance with system interface issues.
5.4.3 GSA Tra sitio Coordi atio Ce ter (TCC)
GSA’s TCC has the lead f r managing GSA’s transiti n pr gram. The
TCC is headed by the Direct r f Telec mmunicati ns Services
Transiti n and rep rts t the Direct r f the Transiti n and Service
Delivery Divisi n.
5.4.3.1 TCC’s Major Ro es
• Tracking and Rep rting perf rms invent ry validati n and
maintenance, devel ps
and implements transiti n tracking and rep rting and participates
in
devel pment, administrati n, and maintenance f systems the TCC
uses. This
includes the system f r tracking transiti n pr gress and the EIS
Transiti n web
site.
• Agency Assistance supp rts the AMs t help agencies with transiti
n planning,
agency-specific transiti n pr jects, and using the EIS c
ntracts.
• GSA-Assisted Transiti n manages supp rt f r the transiti ns f
GSA’s regi nal
full service and small direct- rder agencies t EIS.
• Pr ject Management devel ps, maintains, and tracks the transiti n
schedule,
perf rms pr ject management f the TCC’s’ activities, devel ps
Standard
Operating Pr cedures (SOPs), manages c mmunicati ns, c nducts
internal
training, pr vides Tier 2 and Tier 3 Help Desk supp rt, and w rks
with GSA’s
cust mer service rganizati ns, as required, t assist agency cust
mers.
v.3, M rch 28, 2018 17
5.4.3.2 TCC’s Major Responsibi ities
ROLE RESPONSIBILITY DESCRIPTION
Administrati n f Transiti n Assistance Appr ach
Help Cust mer Engagement manage what assistance is being given t
which agencies and the quality f assistance; c llect use cases,
schedule training
Agency Assistance
Transiti n Ordering Assistance
Pr vide Cust mer Engagement with expertise t help agencies write
statements f w rk and requests f r pr p sal, research prices, make
fair pp rtunity selecti n f EIS suppliers, and rder services n
EIS
Pr ject Management
C mmunicati n and Training
Supp rt industry and g vernment advis ry gr ups; train agencies' c
ntracting and pr ject management staff t use EIS c ntracts; d
cument TSMP and achieve agreement n appr ach t transiti n
assistance; c llect and share use cases and best practices acr ss
agencies and suppliers
Pr ject Management
Help Desk Supp rt Supplement ITC help desk f r transiti n peri d t
resp nd t pr blems and inquiries regarding transiti n; includes
training Tier 1, pr viding Tier 2&3 technical supp rt, tracking
and rep rting, and perf rmance analysis
Pr ject Management
TCC Pr ject Management and C ntr l
Pr ject management, change c ntr l, risk management, c mmunicati ns
management, internal SOPs, pr ject rep rting, cust mer utreach, cut
ver supp rt and m nit ring, track c ntract m dificati ns f r
transiti n
Pr ject Management
Transiti n Requirements f r EIS Acquisiti n
C mp se transiti n secti n f EIS RFP and supp rt s urce selecti
n
GSA- Assisted Transiti n
GSA Assisted Transiti ns
Help full service cust mers and small agencies award and track EIS
rders and disc nnect services n expiring c ntracts
Tracking and Rep rting
Define System Requirements f r EIS Invent ry
Devel p requirements f r GSA's invent ry system and ensure c
nsistency with EIS RFP requirements; supp rt evaluati n and
acceptance testing f GSA's invent ry system
Tracking and Rep rting
Validate and Maintain TI
C llect, rec ncile, c rrect, validate, and maintain TI thr ugh ut
transiti n; validate suppliers' rep rts weekly, and assist agencies
with invent ry
Tracking and Rep rting
Track Transiti n Pr gress
Devel p requirements and appr ach f r tracking pr gress; devel p
and implement pr gress rep rts
v.3, M rch 28, 2018 18
5.4.4 Other GSA Fu ctio s I volved I Tra sitio
5.4.4.1 Service De ivery and Order Writing Center
These tw rganizati ns w rk t gether t prepare, pr cess, implement,
and track rders f r the Regi nal l cal service c ntracts.
5.4.4.2 So utions Deve opment
S luti ns Devel pment pr vides s luti ns architecture, assistance
with S licitati n/Statement f W rk (SOW) devel pment, and pricing
assistance t agencies. This gr up als manages Netw rk H sting
Center (NHC) perati ns, including Netw rx and EIS Pricers, and
versees devel pment and intr ducti n f GSA C nexus, GSA’s rdering,
billing and invent ry supp rt system f r EIS.
5.5 Government Oversight
G vernment versight gr ups include Office f Management and Budget
(OMB) and rganizati ns within the US C ngress, such as GAO and C
ngressi nal C mmittees. These gr ups perf rm critical m nit ring,
supp rt, and interventi n t ensure agencies and GSA give appr
priate f cus and pri rity t transiti n and apply res urces—b th
schedule and financial--effectively.
5.5.1 Oversight’s Major Roles
This gr up includes Office f Federal Pr curement P licy (OFPP) and
Res urce Management Office (RMO) within OMB as well as GAO, the H
use f Representative’s C mmittee n Oversight and G vernment Ref rm,
the H use f Representatives Subc mmittee n G vernment Operati ns,
the H use f Representatives Subc mmittee n Inf rmati n Techn l gy,
and the Senate’s C mmittee n H meland Security and G vernmental
Affairs. They emphasize f cus n schedule and ther pri rities, make
rec mmendati ns f r adjustment t schedule/pr cess, and supp rt
budget requests.
5.5.2 Oversight’s Major Respo sibilities
• OMB: Address b ttlenecks and delays, appr ve agency budgets, and
distribute appr priati ns
• US C ngress: C nduct audits and hearings, enact helpful legislati
n.
5.6 Stakeholder Register
Each stakeh lder listed in the Stakeh lder Register has been
assigned t ne f five maj r gr ups based n their r le in the
transiti n pr cess. Each is classified as Internal r External, and
Supp rter r Neutral r Resist r.
1. Oversi ht – pr vide high-level guidance and directi n; act as
high-level escalati n
p int; rep rt newsw rthy items t the public;
2. A ency Partners – the agency cust mers f c ntracts administered
by GSA;
v.3, M rch 28, 2018 19
3. Transition Pro ram Mana ement – GSA pers nnel and c nsulting c
ntract rs wh
manage the G vernment-wide transiti n pr gram;
4. Office of Telecommunications Services and Supportin Functions –
pers nnel
and gr ups within GSA wh manage the EIS pr gram, administer c
ntracts, pr vide
legal guidance and advice, and assist agency cust mers t facilitate
a successful
transiti n; and
5. Telecommunications Suppliers - Netw rx, WITS 3, Regi nal l cal
service, and EIS
suppliers; this gr up f stakeh lders pr vides telec m and IT
services acc rding t
the c ntracts.
See Appendix D f r a c mplete Stakeh lder Register f r the transiti
n pr gram.
6 Transiti n Assistance t Agencies A key element f GSA’s G vernment
wide management f transiti n is assisting agencies. In the transiti
n t Netw rx, GSA administered a Transiti n Credit Reimbursement
(TCR) pr cess; f r the EIS transiti n, alternative appr aches are
replacing transiti n reimbursements. The f ll wing are intended t
expedite agency transiti ns:
• Reducti n in GSA fee n new c ntracts
• GSA-c nducted invent ry validati n and management
• GSA-paid transiti n assistance, in vari us f rms tail red t each
agency.
6.1 Redu tion in GSA Fee
F r EIS, the GSA fee will be set at 4.75% (see the AM f r details).
This represents a 32% reducti n fr m the fee n Netw rx and all ws
agencies t begin immediately realizing l wer c sts f r their
services n EIS.
6.2 Inventory Management
C mplete and accurate invent ry has been identified as a critical
success fact r f r effective transiti ns. Building n less ns
learned fr m previ us transiti ns, GSA w rked with the current
suppliers and agencies t c nduct the validati n f the TI t relieve
the agencies f the burden f this lab r-intensive and time-c nsuming
task. Validati n c nsisted f a c mprehensive c mparis n f billing
and invent ry data GSA has c llected ver the c urse f the Netw rx,
WITS 3, and GSA Regi nal l cal service c ntracts with that f the
suppliers n th se vehicles. GSA c mpleted TI validati n in January
2016, which resulted in a highly c nsistent data set f 8.5 milli n
rec rds validated t ver 85% accuracy. GSA pr vided the TI t the
agencies t c nfirm by Oct ber 2016 that TI is sufficiently c mplete
and accurate f r transiti n planning and tracking. The TI is
accessible t auth rized agency users thr ugh the GSA EMORRIS
applicati n. GSA c ntinues w rk with suppliers and agencies t
validate and update the TI n a m nthly basis as new rec rds are
identified, services disc nnected, and discrepancies are rec
nciled. GSA will c ntinue thr ugh ut the transiti n peri d t
maintain the TI, enhance the agencies’ access t it, and impr ve
data accuracy.
T further supp rt agencies as they devel p their SOWs and t pr vide
data f r
v.3, M rch 28, 2018 20
transiti n service rders, the TCC has created a m re detailed
invent ry called the All Agency Invent ry (AAI). AAI extends
current TI data t a m re detailed level, t include individual C
ntract Line Items (CLINs), features, equipment, bandwidth, and ther
data n t currently included in TI. The data, c mprising nearly 32
milli n rec rds, is primarily based n c ntract r invent ry,
billing, and rders f r Netw rx, WITS 3, and Regi nal l cal service
c ntracts. Output f this data is available up n a request t the TCC
thr ugh the AM. The TCC ffers agency level detail rec rds and ver
30 different rep rts summarizing the data in a myriad f ways f r
agency use and disseminati n. The n rmalizati n and c nsistency f
data used f r rdering facilitates faster rdering fr m the FO pr
cess t pr visi ning, and implementati n t billing verificati
n.
6.3 GSA-Paid Transition Assistan e
GSA has budgeted $90M t pr vide GSA-paid assistance t agencies that
rder services directly fr m the suppliers (direct- rder); agencies
will reimburse GSA f r these services thr ugh the GSA fee n EIS.
GSA all cates supp rt t direct rder agencies in three tiers, as
determined by their relative annual business v lume, averaged ver
Fiscal Year (FY)12-15, n the Netw rx c ntracts. “Large” agencies
are th se f r which average annual business v lume exceeded $10M;
“medium” agencies are th se f r which average annual business v
lume was between $1M and $10M. Due t the c mplexity and v lume f
services the large agencies have t transiti n, GSA has all cated
appr ximately $85M f the budgeted am unt t the large agencies and
the remaining $5M t the medium agencies acc rding t the appr ach
described bel w. Agencies with less than $1M in annual business v
lume are c nsidered “small” and receive supp rt thr ugh the
GSA-Assisted Transiti n pr gram als described bel w.
6.3.1 GSA-Assisted Tra sitio (GSAAT)
As part f the strategy t pr vide early and effective supp rt t
agencies and t devel p a phased and rderly appr ach t transiti n,
GSA is f cused n pr viding tw cust mer gr ups—cust mers using Regi
nal l cal service c ntracts and small, direct- rder cust mers—with
specialized assistance. The g al is t simplify the FO pr cess and
minimize the number f FO s licitati ns t make the c ntract r
selecti n pr cess m re efficient and effective. This specialized
assistance c mprises the GSA-Assisted Transiti n (GSAAT) pr
ject.
6.3.1.1 Direct-Order Agencies
Small, direct- rder agencies tend t have very straight-f rward
transiti ns and limited staff t c nduct the transiti n; theref re,
at the request and auth rity fr m the Agency, Small agencies and
Native American tribes have the pti n t A) request GSAAT supp rt; r
B) manage their wn transiti n.
When agencies and Native American tribes elect GSAAT, GSA will
facilitate the agency’s transiti n f all services fr m GSA’s
expiring netw rk services c ntracts t EIS. This includes pricing
services, s licitati n assistance, preparing EIS Task Orders (TOs)
and service rders, and submitting disc nnect rders f r Netw rx,
WITS 3, and RLSs. An auth rized rdering fficial f r the agency r
Native American tribe will award the TO, bligating the agency’s
funds, and GSA will track the implementati n f the TO.
v.3, M rch 28, 2018 21
The agency r Native American tribe will retain the resp nsibility
and auth rity t administer the TO and pay f r services thr ugh ut
the peri d f perf rmance f the TO. GSA-Assisted transiti n is
available at varying levels f supp rt:
Level 1. Price-Only Level 2. S licitati n/Statement f W rk (SOW)
Assistance Level 3. S licitati n Assistance with GSA c ntracting
supp rt
GSA’s c st f r pr viding this service will be rec vered thr ugh the
fee agencies pay n the services they rder fr m GSA c ntracts r, f r
Level 3 supp rt, fr m GSA’s Transiti n Fund. All three levels f
GSAAT supp rt are available t the agencies at n additi nal c st t
the agency. S licitati n Assistance with GSA c ntracting supp rt,
Level 3, will require an Interagency Agreement (IAA) Part A t d
cument the arrangement between b th parties including r les and
resp nsibilities and terms and c nditi ns.
6.3.1.2 Regiona Loca Service Contracts
GSA’s eleven ge graphic regi ns pr vide l cal telec mmunicati n
services thr ugh a variety f c ntracts and service delivery
vehicles in supp rt f Federal agencies thr ugh ut the 50 states,
U.S. territ ries, and verseas. F r all regi nal c ntracts except
Regi n 11’s WITS 3 c ntracts, the regi ns perate a “full service” m
del that includes managing service transiti ns, rdering services n
behalf f agencies, tr ublesh ting service disrupti ns, and res
lving issues with the suppliers as the cust mer f rec rd n behalf f
the agency cust mers.
All agencies currently using services pr vided by the GSA Regi nal
l cal service c ntracts f rmerly administered in GSA Regi ns 1-10
are participating in GSA’s Full Service pr gram. Agencies
participating in the Full Service pr gram need t rder their
replacement services directly fr m the EIS c ntract rs.
GSA is c mmitted t supp rting agencies thr ugh ut this Full Service
transiti n with the assistance t agencies' pr curement teams as
they make their FO decisi ns. Agencies receive GSA assistance thr
ugh TOA supp rt, the SOW/S licitati n Assist T l, and EIS Pricer.
GSA has shared with agencies the w rk GSA has previ usly d ne t
prepare f r transiti ning l cal services pr vided thr ugh the Full
Service pr gram.
6.3.2 Tra sitio Orderi g Assista ce (TOA)
In devel ping an effective pr gram t expedite and assist the
agencies thr ugh transiti n, GSA c nsidered the f ll wing
criteria:
1. It must address the less ns learned fr m previ us transiti ns,
principally that FO decisi ns t k an average f 2.5 years and that
the TCR pr gram was lab r- intensive and ineffective at m tivating
a timely transiti n.
2. It must all cate assistance using an equitable meth d. 3. It
must c mply with fiscal law and the purp ses f the Acquisiti n
Services Fund
fr m which it is paid. 4. It sh uld ffer several levels f supp rt
tail red t each agency.
v.3, M rch 28, 2018 22
5. It must n t fav r a class f suppliers (such as incumbents) in FO
decisi ns, and must all w transf rmati n where prudent.
The resulting TOA pr gram pr vides transiti n assistance t the
agencies’ rdering c ntracting fficers (OCOs) and pr ject managers f
r purp ses f c nducting FO decisi ns and placing EIS TOs. The
transiti n assistance takes the f rm f third-party c ntract r supp
rt. The TCC retains verall pr ject management, funding, and perf
rmance-m nit ring resp nsibilities f r this task. The agency must
assign a pr ject manager t m nit r the c ntract r’s supp rt and pr
vide feedback t the GSA COR. TOA c ntract rs have c ntinual c ntact
with OTS’s pr gram and c ntracting pers nnel t devel p inn vative s
luti ns, share best practices, and c llect less ns learned and c
mmunicate th se acr ss the agencies.
Thr ugh the TOA task rder, the TCC pr vides c ntract r supp rt t
agencies fr m a menu f Subtasks. The Subtasks pr vide varying
levels f assisting agency cust mers thr ugh the FO pr cess and
rdering services fr m the EIS c ntract, by analyzing and defining
cust mer requirements, c nducting market research, assisting with s
licitati n d cumentati n, making rec mmendati ns f r service
selecti n, determining the c st f the services, and guiding cust
mers n placing rders f r th se services. TOA c ntract rs supp rt—n
t replace--the agency’s transiti n team and the OCOs making the FO
decisi ns. Agencies must have telec m staff and agency experts n
the team t define requirements and ensure the FO decisi n meets th
se requirements.
Based n the number and c mplexity f FO decisi ns each agency needs
t make f r transiti n, the TOA task rder’s COR identifies the appr
priate Subtask per FO decisi n. These c mprise the pr p sed
Transiti n Assistance Package (TAP) f r each agency, which GSA then
reviews with the agency and revises as needed t supp rt the
agency’s transiti n plans. Each Subtask defines a level f supp rt
fr m a c mbinati n f c ntract specialists, telec mmunicati ns
engineers, and analysts, with a cadre f subject matter experts t pr
vide additi nal “surge” assistance as needed. GSA will make c
ntract r supp rt available up t a t tal level f eff rt c mmensurate
with the funding am unt all cated t that agency.
GSA all cates funding f r c ntract r supp rt t large agencies based
n their percentage c ntributi n t the Netw rx business v lume
applied t the $85M budget, as appr ved and available each fiscal
year. GSA reserves this am unt f r each agency but pr vides actual
supp rt based n the agency’s need. The level f eff rt f r supp rt
is determined initially fr m the TAP. If the level f eff rt appr
aches the t tal all cated funding, GSA will determine the appr
priate c urse f acti n t c ntr l expenses while supp rting the
agency t the extent p ssible. If an agency will n t use its full
all cati n f funding, GSA reserves it f r ther agencies that may
need additi nal supp rt.
GSA all cates c nsultant supp rt t the medium-sized agencies f r ne
FO decisi n per agency. Whether the level f eff rt is f r a c mplex
r simple FO decisi n is based n discussi ns with each agency.
Furtherm re, GSA w rks with the agencies t p l requirements where p
ssible and reduce the verall number f FO s licitati ns,
thereby
v.3, M rch 28, 2018 23
streamlining and expediting the pr cess t reduce c sts while all
wing agencies t award and administer their wn TOs.
7 Master Transiti n Schedule GSA established a transiti n schedule
with appr priate milest nes t address the vari us activities that
ccur during transiti n planning and transiti n executi n. A summary
view f this schedule appears in Appendix G. Agencies sh uld use the
transiti n schedule t c rdinate agency transiti n activities ar und
maj r transiti n milest nes. The master transiti n schedule will be
maintained and updated thr ugh ut the transiti n peri d.
GSA c ntinues w rking with agencies and suppliers t identify additi
nal c nsiderati ns t effectively sequence transiti n activities,
guidelines n h w suppliers resp nd t FO s licitati ns, and h w t
impr ve the FO pr cess. In Oct ber 2017, GSA c llected a f recast f
FO s licitati ns fr m the large and medium agencies. GSA shared the
schedule f r these s licitati ns with the EIS c ntract rs t help
them plan f r resp nding t the s licitati ns. GSA will c ntinue t
receive updates fr m agencies and share them with c ntract
rs.
8 Training GSA is making several training pp rtunities available f
r its wn transiti n team as well as f r agencies. First, the TCC
has devel ped and maintains a library f SOPs and ensures TCC staff
is kept current n these SOPs. The GSA TCC Training Plan f r EIS c
nsists f c urses designed t assist agencies with the transiti n t
EIS. Training m dules are available thr ugh Instruct r-Led Training
(ILT) and electr nic learning (ELearning) m dules. T find ut what
training is available and h w t access it, see www.gsa.g
v/eistransiti n.
Training m dules include the f ll wing t pics:
EIS Fundamentals Transiti n Invent ry EIS Pricing Structure pr
vided in c ncert with Telec mmunicati ns 101 EIS Pricer S licitati
n/SOW Assist T l Fair Opp rtunity and Ordering Delegated Pr
curement Auth rity (DPA) EIS Management and Operati ns Billing and
Disputes Intr ducti n t GSA C nexus.
The training pr grams are ffered t agencies t ensure staff is
sufficiently kn wledgeable f transiti n res urces and
activities.
9 Pr gress Tracking and Rep rting GSA’s transiti n tracking meth d
l gy all ws the G vernment t track pr gress f
v.3, M rch 28, 2018 24
transiti n. The TCC’s Transiti n Pr gress Tracking Meth d l gy
(TPTM) d cuments the pr cess, t ls, metrics, and rep rting
requirements f r the transiti n t EIS. The TPTM all ws GSA t
evaluate status by EIS supplier, agency, l cati n, service, and
ther fact rs. The g al in implementing this meth d l gy is t gain a
c mprehensive view f all transiti n activities, t identify b
ttlenecks, backl gs, and ther issues pr actively, and t facilitate
their res luti n. The TCC uses inf rmati n fr m the GSA Help Desk,
Less ns Learned, and ther s urces as appr priate t supp rt its
assessment f transiti n pr gress, pr blems, and trends.
The TCC tracks and rep rts pr gress measures in the f ll wing categ
ries:
• Critical Milest nes
• Transiti n Executi n
9.1 Dashboards
The TCC rep rts transiti n pr gress using Transiti n Pr gress Dashb
ards within the E-MORRIS TI m dule and n the EIS Transiti n
website. Pr gress rep rting at the agency level is as defined by
the “transiti n entity.”
9.2 Transition Entities
Transiti n entity is the level at which an agency requests GSA t
rep rt transiti n pr gress. While the TCC uses the term “transiti n
entity,” the term “agency” is used in transiti n pr gress rep rts
that the TCC disseminates t stakeh lders utside f the TCC. F r rep
rting purp ses the TCC uses the same categ ries as f r GSA-paid
transiti n assistance—that is, large, medium, and small-- f these
transiti n entities based n business v lume. The list f transiti n
entities is available n the EIS Transiti n website.
9.3 Tra king Criti al Milestones
There are several critical milest nes under discussi n with
agencies and c ntract rs t m nit r, track, and rep rt perf rmance.
The TCC prepares a Sc recard rep rt f preparedness and executi n pr
gress f agencies within designated categ ries (large, medium,
small). This rep rt sh ws pr gress details and summaries f agencies
n preparedness and executi n tracking metrics. The table bel w
displays a mapping f transiti n activities within each transiti n
phase and the ass ciated target milest ne date. The figure f ll
wing the table illustrates a sample Sc recard f r large
agencies.
v.3, M rch 28, 2018 25
Transition Phase Transition Activity Tar et Milestone
Portfolio Stat
Measure?
Acquisiti n Planning Identify and c mmunicate Integrated Transiti n
Team: Agency Transiti n Sp ns r, Transiti n Ordering C ntracting
Officer, Lead Transiti n Manager
Jun 2016 N
Acquisiti n Planning Sign Interagency Agreement Within 2 m nths
after award f TOA task rder
N
Acquisiti n Planning TI Activity Oct 2016 N
Acquisiti n Planning Agency Transiti n Plan Submitted Oct 2016
Yes
Acquisiti n Planning Release Fair Opp rtunity (FO) S licitati
ns
Oct 2017 Yes
Acquisiti n Decisi n Award Task Orders Oct 2018 Yes
Transiti n Executi n Transiti n 50% c mplete Jun 2019 Yes
Transiti n Executi n Transiti n 100% c mplete Mar/May 2020
Yes
Transiti n Executi n Transiti n pr gress against stated timelines
defined within each ATP
As defined within each ATP
N
9.4 Other Transition Progress Measures
I additio to the critical milesto es, GSA tracks a d reports o
other measures that provide useful i formatio about tra sitio
progress performa ce. The TCC provides a variety of reports that
will depict the progress agai st the prepared ess metrics. Reports
are available i the dashboards a d i the mo thly Tra sitio Progress
Tracki g Report (TPTR). These additio al measures are described i
the TPTM docume t, available upo request.
10 Communication GSA recog ized that early commu icatio is critical
to e couragi g age cies to begi tra sitio pla i g a d to establish
effective collaboratio with suppliers a d the age cies. Co ti ual,
ope commu icatio a d coordi atio across GSA a d tra sitio
stakeholders plays a critical role i the success of tra sitio
executio .
10.1 Contacting GSA
GSA’s IT Customer Service Ce ter (ITCSC) is available to age cy
customers a d suppliers to help resolve issues a d questio s
regardi g tra sitio . The ITCSC a d TCC use a Customer Relatio ship
Ma ageme t (CRM) system to mai tai a d track all co tacts a d
direct i teractio s with GSA's i ter al a d exter al customers. The
ITCSC does ot replace the EIS, Networx, WITS 3, or GSA Regio al
local service suppliers’ customer service or trouble ma ageme t
services. It is primarily a mea s for co tacti g
v.3, M rch 28, 2018 27
the TCC and the GSA OTSteam.
10.2 Coordination within GSA
Transiti n-related d cumentati n GSA creates is generally c
rdinated thr ugh OTS and Acquisiti n Operati ns, and with the
Office f General C unsel and Office f the Chief Financial Officer
as appr priate. OTS administers a change c ntr l pr gram f r versi
n c ntr l f designated d cumentati n, and the TCC’s integrated
change c ntr l pr cess includes an interface t the OTS pr cess. C
mmunicati ns designed f r agencies are devel ped in c llab rati n
with Cust mer Engagement; th se f r suppliers with Supplier
Engagement.
10.3 Management Es alation within OTS
F r transiti n issues n t res lved satisfact rily r requiring
higher-level management attenti n, the chart bel w c ntains
management chain and c ntact inf rmati n f r escalati n.
Amando avino
10.4 Conferen es and Collaborative Forums
The American C uncil f r Techn l gy-Industry Advis ry C uncil
(ACT-IAC) is a 501(c)3 n n-pr fit educati nal rganizati n
established t impr ve g vernment thr ugh the effective and inn
vative applicati n f techn l gy. ACT-IAC pr vides an bjective,
trusted and ethical f rum where g vernment and industry executives
can c mmunicate, c llab rate and learn. GSA is an active
participant in ACT-IAC’s Netw rks and Telec mmunicati ns C mmunity
f Interest (N&T COI) and engages industry and agency partners n
transiti n primarily thr ugh the N&T COI’s Transiti n Subc
mmittee. The subc mmittee meets regularly t identify strengths r
weaknesses, devel p c llab rative s luti ns, and pr vide d cumented
rec mmendati ns f r impr ving the
v.3, M rch 28, 2018 28
success f the transiti n pr gram.
GSA Interact is an pen, c llab rative, nline c mmunity f r c
nnecting, c mmunicating, learning and engaging acr ss GSA t pics.
Interact’s g al is t help increase g vernment’s effectiveness thr
ugh better c mmunicati n and c llab rati n. Interact’s Featured Gr
up f r EIS (interact.gsa.g v/eis) pr vides an pp rtunity f r inf
rmal, real-time discussi ns and c llab rati n between GSA and cust
mer agencies and p tential EIS suppliers. The EIS pr gram and TCC
use Interact t release inf rmati n t the stakeh lder c mmunity
widely and with ut bias. It als pr vides a f rum f r subscribers t
submit c mments and questi ns that can be readily shared with all
members. GSA enc urages agencies t use Interact t facilitate market
research f r the devel pment f their FO s licitati ns f r
EIS.
GSA’s EIS and transiti n team participate in a variety f c
nferences, media webinars and interviews, and ther events as an
ther avenue t reach stakeh lders.
10.5 Exe utive Oversight
Beginning in April 2015, Assistant C mmissi ner f r ITC and the
Direct r f Office f Telec mmunicati ns Services met with ver 16
large agencies t engage their Chief Inf rmati n Officers (CIOs) and
Chief Acquisiti n Officers (CAOs) in awareness f the need t begin
planning f r transiti n t EIS. These meetings set the f undati n f
r establishing a l ng-term partnership f r executive attenti n t
transiti n. GSA meets with CIO C uncils within the departments as
requested t help c nvey the imp rtance f transiti n thr ugh ut the
departments, understand agency-specific c ncerns, and c llab rate n
s luti ns.
The Assistant C mmissi ner f r ITC peri dically updates the
Department level CIO C uncil n transiti n pr gress. The OMB Sc
recard is intended t be the f rmat f r rep rting status in a snapsh
t.
10.6 Agen y Transition Stakeholders
GSA has implemented an appr ach t c mmunicating with agency
transiti n teams that all ws f r rapid disseminati n f inf rmati n
as well as discussi ns tail red t the specific needs f each
agency.
At times, a push f inf rmati n is appr priate t c mmunicate inf
rmati n quickly and widely. GSA generally uses the EIS Transiti n
website, Interact, ITC bl gs, and email blasts f r these c
mmunicati ns. GSA maintains a listing f CIOs, Agency Transiti n Sp
ns rs, LTMs and TOCOs f r each agency, as well as pr files in the
CRM t l that all w GSA t easily email the appr priate recipients.
When a resp nse is expected, the c mmunicati n includes an email
address f r ne f the mailb xes the TCC m nit rs t ensure pr mpt
receipt and tracking f inc ming email.
In many cases, h wever, it’s necessary t meet with agencies
individually t address requirements particular t their missi ns,
perating envir nments, and p licies. The GSA AMs are the primary
facilitat rs f these discussi ns.
v.3, M rch 28, 2018 29
F r t pics m re appr priate t a c llab rative f rum, in February
2016, GSA established the Infrastructure Advis ry Gr up (IAG). The
IAG serves as an advis ry c uncil t the FAS C mmissi ner with
regard t the inf rmati n techn l gy and netw rk services pr grams
that supp rt the Federal g vernment. As appr priate, the IAG
discusses transiti n-related t pics, issues, and status.
11 Transiti n Supp rt T ls This secti n identifies the systems,
self-help guides r t ls, and applicati ns GSA administers, uses, r
makes available t transiti n stakeh lders t execute transiti n.
This gr up f systems, t ls, and applicati ns are herein referred t
as “t ls.”
11.1 EIS Transition Website
GSA uses its public website as a centralized l cati n f r accessing
transiti n inf rmati n and t ls. The transiti n website, gsa.g
v/eistransiti n, is the h me page f r linking t these t ls and
requesting access t them as well as finding additi nal inf rmati n
and res urces helpful t agencies and suppliers inv lved in transiti
n. The transiti n website shares transiti n status with all stakeh
lders. The inf rmati n n the EIS transiti n website is specific t
transiti n activities; updates n the EIS program are available n
gsa.g v/eis.
Examples f inf rmati n included n r linked t fr m the EIS Transiti
n website are:
• Descripti n f the TCC and services available
• Timeline and milest nes
• Tips f r preparing f r transiti n • Transiti n Invent ry and All
Agency Invent ry in E-MORRIS
• Training and vide learning
• Transiti n Pr gress
• FAQs • GSA c ntacts
• Hyperlinks t related web sites f r Netw rx, WITS 3, GSA Regi nal
l cal service c ntracts, EIS, TOPS, and E-MORRIS
• Guides, white papers, and handb ks related t transiti n as well
as the EIS c ntracts
• News articles and s cial media c mmunicati ns.
11.2 TI in E-MORRIS
E-MORRIS is a secure web-based system that pr vides G vernment
agency users with three primary applicati ns: (1) the Netw rx
Invent ry M dule (NIM); (2) billing rep rts/data f r services
rdered under the Netw rx c ntracts, and (3) a m dule f r TI and
AAI.
GSA is using the E-MORRIS applicati n t pr vide secure, auth rized
access t agency TI data. GSA-validated transiti n rec rds are pr
vided at the “service instance” level f r Netw rx, WITS 3 and Regi
nal l cal service c ntracts. A service instance rec rd (SIR)
v.3, M rch 28, 2018 30
represents a summarized r llup f a base service C ntract Line Item
Number (CLIN); it d es n t itemize supp rting elements f a service
such as equipment and features. C nsequently, service instance
level data is NOT sufficient in detail t prepare transiti n rders.
GSA uses the service instance data t track the pr gress f transiti
n. Agencies can use the data t assist with transiti n planning and
tracking.
Access t E-MORRIS is determined by the agency’s Netw rx Designated
Agency Representative’s (DAR) Administrat r, and restricted by
Agency Hierarchy C de (AHC). In rder t ensure that nly auth rized
users have access, E-MORRIS administrat rs d n t create an acc unt
f r an agency user until GSA has c nfirmed receipt f a c py f the
DAR Administrat r letter.
F r m re inf rmati n and access see the Transiti n Invent ry User
Guide and ther TI links n the EIS Transiti n website.
11.3 Tele ommuni ations Ordering and Pri ing System (TOPS)
TOPS pr vides GSA the ability t rder regi nal teleph ne pr ducts
and services n the current c ntracts. It handles the entire
lifecycle f an rder—fr m rec rding the agencies’ riginal rders,
tracking rders, paying suppliers, billing cust mers, and generating
acc unting entries. TOPS pr vides b th regi nal invent ry and
billing data t track transiti n. TOPS c ntinues t be used while
services remain n Regi nal l cal services c ntracts.
11.4 GSA Conexus
GSA C nexus pr vides ne secure site with a single sign- n f r GSA
and GSA’s cust mers t d the f ll wing f r the EIS C ntract:
• IAA Management Part A and B
• Task Order Capture fr m Suppliers
• Billing Accuracy and Dispute Rep rts t Agencies t file with
Suppliers • Service Level Agreement (SLA) Rep rts t Agencies t file
with Suppliers
• Invent ry Management and M nthly invent ry supplier rec nciliati
n
• Business Analytics and Rep rting.
11.5 Self-Help Guides and Tools
The f ll wing guides, handb ks, and t ls are available (as
indicated) t assist agencies, suppliers, and ther stakeh
lders.
• Transiti n Handb k (gsa.g v/eistransiti n) • TI and AAI Users
Guides (gsa.g v/eistransiti n)
• Fair Opp rtunity and Ordering Guide (gsa.g v/eistransiti n)
• EIS Management and Operati ns Handb k (gsa.g v/eis) • S licitati
n/Statement f W rk Assist T l (up n request thr ugh AM)
• EIS Training (instruct r led and eLearning) n a multitude f t
pics (gsa.g v/eis)
• DPA Training (gsa.g v/eis)
11.6 Conta t Us
Stakeh lders can reach the ITCSC by calling 855-482-4348 r email at
[email protected] v.
12 Risk Management The TCC has implemented a Risk Management pr
gram t effectively deal with uncertainties, ass ciated risks and pp
rtunities f a pr ject. The Pr ject Management B dy f Kn wledge
(PMBOK) Guide defines risk as “an uncertain event r c nditi n that,
if it ccurs, has a p sitive r negative effect n a pr ject's
bjectives.” Risk has a cause and, if it ccurs, a c nsequence. Pr
ject risk includes b th negative risk (threats t the pr ject's
bjectives) and p sitive risk ( pp rtunities t impr ve n th se
bjectives). A risk has tw c mp nents: pr bability and impact.
Maj r fact rs c ntributing t risks t the transiti n pr gram include
the f ll wing:
• Heavy resp nsibility f suppliers, agencies, and GSA
• Transiti n t Netw rx t k six years, and EIS transiti n is d uble
the v lume in half the time
• EIS transiti n is m re c mplex • EIS transiti n includes 85 Netw
rx and l cal c ntracts
• Transf rmati n f telec m business may be an pp rtunity r a
distracti n, r b th
• Enf rcement f TOs
• Timeline f 1 year planning and <3 year transiti n • Agencies’
ability t all cate res urces
• Presidential transiti n
• EIS award timeline.
T mitigate the risks fr m th se fact rs, GSA included the f ll wing
elements f the transiti n strategy:
• Cust mer Engagement Inv lvement: Executive sp ns r, lead transiti
n manager, and acquisiti n liais n
• Agency Transiti n Plans
• Invent ry validati n—c mpleted Jan 2016 • OMB Assistance
o C rdinating with OMB’s Office f the CIO t enc urage agencies t
plan early
o P rtf li Stat measures o EIS transiti n n President’s Management
C uncil agenda o Designate EIS as Best In Class o Appr ve agencies’
budget requests f r FY18-20
• Federal CIO C uncil attenti n t transiti n sc recard.
The TCC manages risk thr ugh a r bust pr gram that includes
quarterly assessments,
v.3, M rch 28, 2018 32
identificati n f resp nse plans, and implementati n f acti n items.
F r m re inf rmati n, see Appendix E.
13 Less ns Learned Capturing less ns learned is an integral part f
every p