Land off Thieves Lane
Hertford
For Croudace Homes
Transport Assessment
March 2013
Document History
JOB NUMBER: 334/2013
DOCUMENT REF: Transport Assessment
REVISIONS: Draft 2 For Submission
Revision Comments By Checked Authorised Date
Draft 1 For team comment PE SA PE 12/03/2013
Draft 2 For submission PE SA PE 26/03/2013
Contents
1 Introduction 1
2 Pre-application Consultation, HCC Highways 2
3 Policy Review 4
Introduction 4
National Planning Policy Framework 4
East Herts Local Plan (EHLP) 5
Hertford and Ware Urban Transport Plan 7
Summary 10
4 The Existing Site Function and Base Line Conditions 11
Introduction 11
Site Location 11
Existing Site Transport Conditions 11
Local Travel Characteristics 11
Road Traffic Accidents 12
Summary 12
5 Local Facilities and Public Transport 13
Rail 13
Buses 13
Summary 14
6 Proposed Site Layout and Function 15
Proposed Car and Cycle Parking 15
Refuse and Servicing Arrangements 15
Summary 15
7 Traffic Modelling Rationale and Results 16
Local Cordon Survey 16
Census (Work Place Destination) 16
Traffic Surveys 16
Assignment Model 17
Trip Rates 17
TRICS 17
Future Year Assessment 17
ARCADY Model A414/Thieves Lane Roundabout 17
ARCADY Model Thieves Lane/Welwyn Road Roundabout 19
Summary 20
8 Summary and Conclusion 21
Conclusion 22
Appendices 23
Appendix: A Site Location Plan A-1
Appendix: B HCC Meeting Note and Correspondence B-2
Appendix: C Local Facilities Plan C-3
Appendix: D Five year accident data D-4
Appendix: E Bus Routes E-5
Appendix: F Potential Access Options F-6
Appendix: G Census (work place destination) G-7
Appendix: H Traffic Survey Data H-8
Appendix: I Assignment Model I-9
Appendix: J TRICS data J-10
Appendix: K Arcady results K-11
Page 1
1 Introduction
1.1 EAS Transport Planning has been commissioned by Croudace Homes to prepare a Transport
Assessment (TA) for a proposed future development off Thieves Lane in Hertford, East Herts District, on
Greenfield Land.
1.2 The site is bordered by Welwyn Road to the north, Thieves Lane to the east and farmland and woodland
to the west and south. The site is an urban extension and the east and northern boundaries are
established urban areas forming the Sele Farm ward. A location plan forms Appendix A.
1.3 For transport review purposes this TA is based on a proposed development of 280 houses with parking
allocation in accordance with the district policy. The site will comprise of a mix of 2 to 4 bedroom houses
although the final content is still to emerge.
1.4 Discussions have been held with Hertfordshire County Council (HCC) as highway authority following a
considerable amount of background surveying and modelling work of local junction capacity.
Hertfordshire have stated that they would not object to this development proposal. Appendix B contains
a meeting note in email form together with other discussion related emails. This document contains all
the discussions with HCC and the additional requirements of HCC following the discussions.
1.5 This TA has been prepared with regard to the DfT Guidance on Transport Assessments (March 2007).
1.6 The contents of this TA based on the agreed scope are:
• Section 2 – sets out the pre-application discussion with HCC
• Section 3 – sets out the policy context;
• Section 4 – describes the existing site function and sets out the baseline conditions;
• Section 5 – is a review of facilities near to the site and describes the available public transport.
• Section 6 – describes the site access, potential layout and function.
• Section 7 - describes the existing and expected transport impacts due to the development trips; and the detailed analysis of modelling undertaken at the nearby junctions as well as the surveys undertaken.
• Section 8 – summarises and concludes this report.
Page 2
2 Pre-application Consultation, HCC Highways
2.1 As described above EAS completed a range of surveys and modelling and discussed this at a meeting
with officers of HCC in January 2013. The full set of email records form Appendix B. The email note of
the meeting setting out the additional discussion is included below for ease of reading;
“Thanks you for your time last Tuesday when we met at County Hall to discuss the proposed residential
development off Thieves Lane in Hertford for circa 280 units with Croudace Homes
I understand that you will be happy to see a draft of a TA in due course in advance of any application so
that we can discuss any issues and work together on this project.
With respect to the work we have done so far your colleague will be reviewing the modeling but generally
you are content with the approach we have taken and the trip rate of circa 0.6 we have used rather than
the lower one observed at Turpins Close. You would like us to undertake a sensitivity test of assignment
based on the 2011 Census (work location) when this is available I( I believe soon) and compare this to
the findings of our site observations.
We will of course issue all the modeling as part of our TA including the PM ARCADY tests for the A414
junction and both AM and PM for the Welwyn Road junction.
We discussed the approach to access and agreed that this can all be solved in due course and that one
or two access points may be appropriate for the site but that it could operate with one access, in which
case an emergency access would be required. Access layouts should meet the MfS standards of
visibility and consider the position of existing junctions. You described HCC approach that they now
adopt the main routes only and any short cul- de-sacs generally are not adopted.
We discussed any traffic schemes or developments that we should consider as part of the assessment
but you confirmed that there were none in proximity which would impact upon our work.
We will of course include the relevant Local and National Policy within our document to ensure that we
comply on transport grounds and you suggested we review the Hertford and Ware Urban Transport Plan
as well.
You discussed the HCC relationship with Croudace which is good and that you would require a planning
obligation for transport so that benefits can be made strategically.
I believe you asked that we review accident patterns at the A414 roundabout just to the west of the rail-
bridge, we will be reviewing accident patterns as part of our TA and so will extend to this junction as well.
Page 3
This is all I can recall, so please add if there is anything else. Overall a positive meeting and I believe
you confirmed you would not have an objection on highway grounds as things currently stand.
I would be grateful if you would confirm this is a correct interpretation of our meeting as soon as possible
and please feel free to call with any questions/clarifications.”
2.2 HCC subsequently confirmed the above meeting note.
Page 4
3 Policy Review
Introduction
3.1 This section reviews the latest relevant policy documents both Nationally and Locally
National Planning Policy Framework
3.2 Paragraph 14 of the NPPF states:
“At the heart of the National Planning Policy Framework is a presumption in favour of sustainable
development, which should be seen as a golden thread running through both plan-making and decision-
taking.”
3.3 Paragraph 17 of the National Planning Policy Framework (NPPF) sets out 12 core planning principles
including core principle 11 which states that planning should:
“actively manage patterns of growth to make the fullest possible use of public transport, walking and
cycling, and focus significant development in locations which are or can be made sustainable.”
3.4 Section 4 of the NPPF on transport includes advice on Transport Assessments at paragraph 32:
“All developments that generate significant amounts of movement should be supported by a Transport
Statement or Transport Assessment. Plans and decisions should take account of whether:
● the opportunities for sustainable transport modes have been taken up depending on the nature and
location of the site, to reduce the need for major transport infrastructure;
● safe and suitable access to the site can be achieved for all people; and
● improvements can be undertaken within the transport network that cost effectively limit the significant
impacts of the development. Development should only be prevented or refused on transport grounds
where the residual cumulative impacts of development are severe”
3.5 Paragraphs 35 and 36 of the NPPF discusses locating development and use of Travel Plans
respectively:
“Plans should protect and exploit opportunities for the use of sustainable transport modes for the
movement of goods or people. Therefore, developments should be located and designed where practical
to
● accommodate the efficient delivery of goods and supplies;
Page 5
● give priority to pedestrian and cycle movements, and have access to high quality public transport
facilities;
● create safe and secure layouts which minimise conflicts between traffic and cyclists or pedestrians,
avoiding street clutter and where appropriate establishing home zones;
● incorporate facilities for charging plug-in and other ultra-low emission vehicles; and
● consider the needs of people with disabilities by all modes of transport.
A key tool to facilitate this will be a Travel Plan. All developments which generate significant amounts of
movement should be required to provide a Travel Plan.
3.6 Paragraph39 discusses parking policy:
If setting local parking standards for residential and non-residential development, local planning
authorities should take into account:
● the accessibility of the development;
● the type, mix and use of development;
● the availability of and opportunities for public transport;
● local car ownership levels; and
● an overall need to reduce the use of high-emission vehicles.”
East Herts Local Plan (EHLP)
3.7 The Secretary of state confirmed on 22nd March 2010 a range of saved policies from the 2007 EHLP.
Relevant policy extracts are set out below in italics, responses are in plain text;
TR1 Traffic Reduction in New Developments
Developments generating additional traffic will be required to incorporate measures, commensurate with
the scale of additional traffic generated, to ensure that alternative transport options to the private motor
vehicle are available to the users of the site. Such measures may include:
(a) the extension and improvement of pedestrian links;
(b) cycle paths and facilities;
(c) improvements to the passenger transport network which should include bus and/or rail facilities,
either directly to the site or in close proximity to it (i.e. within 400 metres maximum walk distance), and
Page 6
may involve an extension to existing infrastructure (e.g. additional cycle paths, bus shelters) and/or
enhancements to the existing bus network;
(d) the provision of moorings alongside navigable waterways (as appropriate); to be achieved via the
imposition of conditions and the use of planning obligations (or as subsequently revised) as appropriate
to the individual characteristics of the site.
3.8 The development proposes extensions to footways at the site boundary and refuges to access facilities.
Internally the layout design has yet to be agreed, but the site will be laid out to benefit alternative
transport modes as far as practicably possible.
TR3 Transport Assessments
Developments that are likely to generate significant movement and travel demand will require the
submission of a Transport Assessment to accompany the planning application, which should meet the
criteria contained in Hertfordshire County Council’s Roads in Hertfordshire – Design Guide, 2001 (or as
subsequently superseded, by the local highway authority)
3.9 Hence the production of this document.
TR7 Car Parking – Standards
Car parking provision for new development proposals will be assessed in accordance with the District
Council’s car parking standards (which should be taken as maximum standards), including coach, cycle
and powered two-wheeler provision, as set out at Appendix II. The actual provision made will be
determined on a site-specific basis having regard to the proposed use, location, and availability of, or
potential for access to, modes of transport other than the private car in accordance with the Council’s
SPD ‘Vehicle Parking Provision at New Development’.
3.10 Parking on site will be policy compliant.
TR12 Cycle Routes – New Developments
Where possible, the design of new developments will be required to include coherent, safe, convenient,
direct, comfortable, attractive routes and facilities for cyclists and pedestrians. Where practicable
opportunities exist or can be created, access routes into and through the site for cyclists and pedestrians
should be formed separate from roads, particularly if this would create an advantage over motorised
transport in the distance and time needed to travel to local facilities and services and/or improve the
wider cycle network. Where appropriate, developer contributions (or as subsequently revised) will be
expected to improve pedestrian and cycle routes associated with the use of the site.
3.11 Internally the layout design has yet to be agreed, but the site will be laid out to benefit alternative
transport modes as far as practicably possible.
Page 7
TR14 Cycling – Facilities Provision (Residential)
Applications for new residential developments should, where appropriate, demonstrate provision of
sufficient cycle storage facilities for occupants of new dwellings to enable cycle usage to become a
realistic option to the use of private motorized transport. Such facilities should include appropriate
secure, covered, waterproof storage facilities and be provided either within the curtilage of the dwelling
or, for example, in the case of flats, within a communal area, provided that such facilities are easily
observed and accessible.
3.12 Secure covered cycle storage will be incorporated into the development.
TR18 Home Zones
The implementation of Home Zones, involving appropriate speed limits and traffic calming measures to
ensure priority is given to the use of residential streets for the benefit of pedestrians, cyclists and local
residents, will be supported provided that they are of good quality design and consistent with and/or
enhance the character, landscape, and residential amenity of the area.
3.13 The development will be design to MfS standards which incorporates ‘Home Zone’ themes.
Hertford and Ware Urban Transport Plan
3.14 At the request of HCC the Hertford and Ware Transport Plan has been reviewed. Appropriate elements
are contained below. Extracts from the transport plan are in italics, responses are in plain text.
4.4.1 The County Council’s vision for Hertfordshire’s transport over the next twenty years is ‘to provide a
safe, efficient and affordable transport system that allows access for all to everyday facilities. Everyone
will have the opportunity and information to choose the most appropriate form of transport and time of
travel. By making best use of the existing network we will work towards a transport system that balances
economic prosperity with personal health and environmental well being.’
3.15 This is the basis of all transport policy which all development must consider.
4.4.2 The LTP has nine objectives set out under the government’s shared priorities of safety,
congestion, accessibility, air quality and quality of life. The objectives, listed under the shared priorities,
include:
Safety
– To improve safety for all by giving the highest priority to minimising the number of collisions and
injuries occurring as a result of the transport system.
3.16 All access points will be designed to meet appropriate standards, there are opportunities (described later)
Page 8
to improve crossing of roads for pedestrians.
Congestion
– To obtain the best use of the existing network through effective design, maintenance and
management.
– To manage the growth of transport and travel volumes across the county, and thereby secure
improvements in the predictability of travel time.
– To develop an efficient, safe, affordable and enhanced transport system which is attractive, reliable,
integrated and makes best use of resources.
3.17 As will be seen later existing travel patterns exist which combat congestion near to the site via peak
spreading. Any additional traffic from the site is shown to be imperceptible amongst the back ground
traffic.
Accessibility
– To develop a transport system that provides access to employment, shopping,education, leisure and
health facilities for all, including those without a car and those with impaired mobility.
– To ensure that the transport system contributes towards improving the efficiency of commerce and
industry and the provision of sustainable economic development in appropriate locations.
3.18 The location of the site has been shown to be accessible being located adjacent to many bus routes and
close to three schools, a local shopping area and within walking distance to Hertford North Station and
Town Centre.
Quality of Life
– To raise awareness and encourage use of more sustainable modes of transport through effective
promotion, publicity, information and education.
– To reduce the need for the movement of people and goods through integrated land use planning.
3.19 The location of the site would allow integration to existing infrastructure, services and education and
employment. All units would have secure cycle parking. A travel plan is not required as clarified in policy
TR4 of the EHLP.
Bus Strategy
4.4.8 The bus strategy’s objectives contribute to the overall LTP shared priorities of safety, congestion
management, accessibility and quality of life by:
Page 9
_ Providing an effective and efficient network of bus services as a travel mode which passengers will
choose to use;
_ Reviewing the network with others to ensure resources are used to best effect;
_ Improving bus punctuality through commercial partnerships and better management of the highway
network;
_ Developing accessibility to employment, shopping, education, leisure and health facilities by effective
design of the bus network, the use of less conventional approaches and securing maximum external
funding;
_ Continuing to improve vehicle quality and associated infrastructure at bus stops and interchanges to
increase access to the network by those with impaired mobility; and
_ Raising awareness and encouraging the use of bus services through improved information, marketing
and branding.
3.20 The location of the development site adjacent to many bus routes will increase the use of these routes
and therefore their viability.
Cycling Strategy
4.4.10 The Cycling Strategy documents mentions that Hertfordshire has the lowest levels of cycling to
work in the East of England region. The primary purpose of the cycling strategy is “to encourage more
people to cycle more often, and involve and support other stakeholders in doing the same.”
3.21 All units will have secure cycle parking.
Road Safety Plan
4.4.15 The Road Safety Plan is to deliver the LTP objective of improving safety for all by giving the
highest priority to minimising the number of collisions and injuries occurring as a result of the transport
network. It is to deliver Hertfordshire’s casualty reduction targets:
to reduce the number of people killed or seriously injured in road collisions to no more than 600 by
2010; to reduce the number of children killed or seriously injured in road collisions to no more than 56 by
2010; and no increase in slight casualties (5,509).
4.4.16 It should be noted that the safety targets (KSI and slight) have their own ranking system. Any
scheme the UTP may develop will only have safety as a secondary target and a UTP scheme cannot be
funded by a safety-related target.
Page 10
3.22 A review of personal injury road accidents close to the site has been undertaken, it is shown that the
level of accidents in the vicinity of the site is low.
A414
5.2.1 Key congestion hotspots in Hertford are cited as being mainly on the A414 on its route through the
town and at its connection with the A10. The Bluecoats and Mill Road junctions are often identified as
areas causing the most significant delays to traffic, both in the morning and evening peak periods.
Congestion also occurs frequently at the Castle Street junction with Parliament Square and at the
junction of Hale Road with Pegs Lane (County Hall and Wallfields roundabout). The proximity of the M25
to the study area also can lead to these problems being exacerbated when disruption occurs on the
motorway network.
3.23 This matter was considered at the outset. It was shown that the level of peak hour trip rates from the site
is low and traffic assigned away from the A414 (Hertford). Nevertheless this matter has been discussed
with HCC as the development could not solve A414 issues which would need a strategic solution.
Contributions will be sought from the developer towards other transport improvements to support
alternative travel options.
Summary
3.24 Numerous transport policies have been considered both nationally and locally. It is clear that the site will
be fully policy compliant.
Page 11
4 The Existing Site Function and Base Line Conditions
Introduction
4.1 This section describes the existing site function and the existing (baseline) travel characteristics of the
area local to the proposed development site.
Site Location
4.2 A plan of the proposed development site in relation to local centres and key facilities is shown in
Appendix C.
4.3 The site is located in the Sele Farm ward off Thieves Lane which forms a junction with the A414
approximately 300m south of the site and the Welwyn Road B1000 at the sites north east boundary. The
A414 is primary route through Hertfordshire linking to the Essex border and beyond to the east and
Hemel Hempstead to the west. More locally it also links the north south routes of the A10 and A1. The
A10 being approximately 3 miles east of the site and the A1 approximately 5 miles west of the site.
4.4 The A414 is therefore of significant strategic importance and this matter was of high consideration
throughout the study.
Existing Site Transport Conditions
4.5 Whilst the site is currently green field land, it is close to the A414. The A414 is a busy dual carriageway
for most of its length in the vicinity of the site although a bottle neck occurs to the east of the Thieves
Lane/A414 roundabout where it passes under a rail bridge and then continues into the Hertford central
area. As the A414 passes Hertford centre there are a number of roundabouts (some part time
signalized) and pedestrian crossing opportunities. As a result this section of the A414, within the
Hertford central area, is congested locally.
Local Travel Characteristics
4.6 To inform the modeling it was considered prudent to determine the peak hour trip rate for existing
residences off Thieves Lane and for this purpose EAS undertook a cordon count of Turpins Close
between 07.30 and 09.30 on a neutral weekday. At the same time EAS also completed a distribution
survey to determine vehicle assignment from Turpins Close. We expected that there would be peak
spreading from these developments in order to avoid the morning periods of congestion on the A414 and
also that the assignment would generally avoid the A414 into Hertford.
4.7 The results of the survey concurred with the expectations, the peak hour two way trip rate was 0.39 and
only 12% of traffic departing from the development in the peak period headed towards Hertford on the
Page 12
A414.
Road Traffic Accidents
4.8 Road Traffic Accident data has been obtained from HCC for the five year period ending November 2012.
4.9 No accidents have occurred with the limits of the site boundary. Two slight accidents have occurred to
the east on Thieves Lane and one slight accident has occurred to the north on Welwyn Road. Eight
slight accidents have occurred at the A414/Thieves Lane roundabout.
4.10 At the request of HCC we have also obtained data for the A414/Campfield Road Roundabout located
just to the west of the rail bridge. Two slight accidents have occurred at this roundabout.
4.11 No serious of fatal accidents have occurred in the study area. This is a very good accident record. The
accident data is included at Appendix D.
Summary
4.12 The site is located within a residential area but forming a greenfield extension to the Sele Farm ward.
4.13 The existing traffic conditions immediately surrounding the site are generally light. However the A414 is
located to the south of the site which is a busy dual carriageway for most of its length; a bottle neck
occurs to the east of the Thieves Lane/A414 roundabout junction causing congestion passing the
Hertford Town Centre area.
4.14 Survey results indicate that local residents avoid using the A414 towards Hertford in the peak periods.
This is typical of travel patterns in urban areas where there is peak spreading.
4.15 There have only been slight traffic accidents occurring in the most recent five year period in the study
area and these are low in number.
Page 13
5 Local Facilities and Public Transport
5.1 The plan attached at Appendix C, illustrates the local facilities with indicative pedestrian walk isochrones
and local public transport links. The site is very well located for accessing facilities by foot or cycle,
including retail, education, health, leisure, and employment.
5.2 Two primary schools and secondary school as well as local shops, a pub and bus stops, are all located
within a 400m walk of the site.
5.3 The local shops consist of;
• Co-op food store
• Fish and chips
• Pharmacy;
• Bakers
• Hairdressers
• Butchers
• Betting Shop
5.4 Hertford North Station is an approximate 900m walk from the site, which is located off North Road. At
this point North Road has marked cycle lanes and the Station has good levels of secure covered cycle
parking.
5.5 The whole of Hertford Town Centre with all amenities is within a 2km walk of the site. 2km is recognized
as a walkable distance.
Rail
5.6 As set out above Hertford North Station is located within 900m of the site but in addition Hertford East
Station is just outside of the Town Centre.
5.7 Hertford North has services to London Kings Cross and Moorgate as well as Stevenage in a northbound
direction. Services to London are generally every 20minutes with an hourly northbound service to
Stevenage.
5.8 Hertford East is at the end of the line for the Hertford Branch of the West Anglia Service; running south
to London Liverpool Street. Connections can be made at Broxbourne to travel northwards to Cambridge.
Two services per hour run from Hertford East Station.
Buses
5.9 The closest bus stops to the site are located on Thieves Lane at the site boundary. Two services pass
Page 14
the site boundary, the 388 and the H3. The 388 runs between Hertford and Welwyn bus station and the
H3 to Hertford North Station. Just to the north east of the site, within 100m of the boundary, a range of
additional services can be picked up. These run to various destinations including Harlow and Heathrow;
Hertford East and North Bus Stations, Broxbourne and Waltham Cross Train Stations.
5.10 The bus services local to the site are shown on the plan at Appendix E. It is clear that the site is very well
located to public transport services.
Summary
5.11 The site is located at the edge of an existing residential urban area and therefore benefits from the
existing urban facilities and infrastructure but will also add to the local economy and the viability of these
existing facilities.
5.12 The site is in walking distance of the Hertford North Rail Station, Hertford Town Centre and bus services
pass the site frontage. A range of everyday requirements including schools are also very local to the site.
The site is therefore in a very sustainable development location.
Page 15
6 Proposed Site Layout and Function
6.1 The development site will contain approximately 280 residential homes of between 2 and 4 bedrooms
although the final content is to be determined.
6.2 The internal layout is also to be determined although it is possible that a link between Thieves Lane and
Welwyn Road will be formed. The site has generous frontage which can accommodate full visibility
splays. Appendix F contains a drawing which provides a potential option for access points and includes
pedestrian refuge options within Thieves Lane and Welwyn Road.
Proposed Car and Cycle Parking
6.3 Parking would be incorporated into the development in accordance with East Herts District Parking
Policy.
Refuse and Servicing Arrangements
6.4 Refuse facilities will be accessible to each unit. The layout would be designed to accommodate the
refuse collection requirements for East Herts District Council.
Summary
6.5 The internal layout has yet to be determined but it will be constructed to adoptable standards and with
the ethos of the ‘Manual for Streets’ which is adopted as a design guide for Hertfordshire.
6.6 There are many access options available, all will have appropriate visibility splays and access geometry.
Page 16
7 Traffic Modelling Rationale and Results
Local Cordon Survey
7.1 EAS undertook a cordon count of Turpins Close between 07.30 and 09.30 on a neutral weekday. At the
same time EAS also completed a survey to determine vehicle route choice (assignment). It was
expected that there would be peak spreading from the development in order to avoid the worst periods of
congestion on the A414 and also that the assignment would generally avoid the A414 into Hertford.
7.2 The results concur with the expectations, the peak hour two way trip rate was recorded as 0.39 and only
12% of traffic departing from the development in the peak period headed towards Hertford on the A414
(eastbound).
Census (Work Place Destination)
7.3 At the request of HCC we have undertaken a review of the 2011 census to determine ‘work place’
destination from the local area. The results of the data are included at Appendix G. What needs to be
kept in mind is that the census does not tell you;
• the time of the journey, i.e how the journey fits around the peak hour,
• that work place journeys only make up about 30% of all peak hour journeys,
• the route choice.
7.4 The work place locations are also broken down by mode of travel and from this it is likely that 55% would
need to travel east on the A414. The assignment taken to reach the A414 is not possible to determine,
but based on experience and observations it is highly likely that in the most congested periods most
people would choose to travel via Welwyn Road (east) and join the A414 at the North Road roundabout.
This route is generally less congested and has a dedicated left turn slip onto the A414 (east) avoiding
the bottleneck formed by the upstream rail bridge.
7.5 The lack of route choice (assignment) data in the census means that the overall journey to work data
adds no evidence to lend or remove support for the actual route choice observed in the Cordon Survey.
Traffic Surveys
7.6 Traffic surveys were obtained from HCC for the Thieves Lane/Welwyn Road Roundabout. These were
recorded in May 2011.
7.7 A full classified turning count and queue length survey was commissioned for the A414/Thieves Lane
Roundabout, this was competed on 4th
December 2012.
7.8 Both sets of traffic survey data are enclosed as Appendix H.
Page 17
Assignment Model
7.9 Assignment has been prepared based on the actual turning movements at this junction and the two way
movements of Thieves Lane and Welwyn Road rather than the observed assignment from the cordon
survey. The full assignment model was completed using EXCEL. The assignment model information is
contained in Appendix I.
Trip Rates
7.10 The observed two-way Trip Rate from Turpins Close was 0.39. Turpins Close contains of the order of 50
houses and so is a suitable proxy for the future development site. However, for the purposes of being
robust a 50% higher trip rate than the that observed was used i.e a two way trip rate of 0.6.
7.11 This was agreed as appropriate at the pre-application meeting with HCC. As such no further trip rates
have been calculated, but generally a trip rate of 0.6 for a home county site in a sustainable location is
robust.
TRICS
7.12 To validate the observed trip rates from Turpins Close and prove the robustness of using a 0.6 trip rate,
a TRICS assessment has been undertaken. The TRICS assessment included 43 sites ranging from 9 to
372 units throughout England. 19 of the sites were ‘sub-urban’ and 19 ‘edge of town’. 3 were ‘edge of
town centre’ and 2 were ‘neighbourhood centre’.
7.13 The results gave an AM two way peak hour vehicle trip rate of 0.566 and a PM two way peak hour
vehicle trip rate of 0.609. As a result the use of a two way trip rate of 0.6 following observations of 0.39,
is considered appropriate and robust.
7.14 Full TRICS trip rate information is contained at Appendix J.
Future Year Assessment
7.15 No future year assessment has been completed. HCC confirmed (in the meeting note) there were no
other development sites that needed to be considered within the assessment. Since the commencement
of the recession there has been stagnated traffic growth, therefore for the foreseeable future and for a
site where peak spreading is occurring due to congestion, allowing for a future year assessment is not
necessary.
ARCADY Model A414/Thieves Lane Roundabout
7.16 Arcady models for both the AM and PM peak hours for the A414/Hertingfordbury Road/Thieves Lane
roundabouts have been prepared.
Page 18
7.17 Full classified turning data for the A414 R/B was collected on a neutral weekday together with a queue
length survey of all arms. Prior to this the junction was visited on three occasions in the AM peak
specifically to observe the traffic.
7.18 The A414/Thieves Lane junction was observed to work very well and queues are minimal. EAS has
modelled the existing operation of the junction using ARCADY for both the AM and PM periods. The
results closely replicate the existing traffic conditions.
7.19 The likely development generated traffic was then added based on actual turning movements at this
junction rather than the observed assignment from the cordon survey and also using a 50% higher trip
rate than the that observed from the cordon survey for reasons of being robust.
7.20 Consideration was given as how to best model the A414 roundabout as it was clear that the flows into
the roundabout from Hertford are regularised by the signals upstream and the bottle neck caused by the
rail bridge just east of Campfield Road. Thus the flows onto the roundabout are remarkably similar in
each quarter of an hour period. EAS therefore built the model using the ‘Direct Input’ and actual HGV
options rather than the more simple OD TAB and default HGV options.
7.21 The results of the ‘existing’ and ‘with development’ ARCADY models for the AM period are as follows;
EXISTING AM ARCADY RESULTS OF THE A414/THIEVES LANE
Max RFC Max Queue
Arm A Hertingfordbury Road 0.243 0.3
Arm B A414 West 0.389 0.6
Arm C Thieves Lane 0.76 3
Arm D A414 West 0.951 12.6
AM ARCADY RESULTS A414/THIEVES LANE ‘WITH DEVELOPMENT’
Max RFC Max Queue
Arm A Hertingfordbury Road 0.255 0.4
Arm B A414 West 0.392 0.6
Arm C Thieves Lane 0.793 3.5
Arm D A414 West 0.966 13.7
Page 19
Table 7.1 Existing and ‘with development’ traffic flows AM PEAK; A414/Thieves Lane Roundabout
7.22 for the PM period are as follows;
EXISTING PM ARCADY RESULTS OF THE A414/THIEVES LANE
Max RFC Max Queue
Arm A Hertingfordbury Road 0.200 0.2
Arm B A414 West 0.635 1.7
Arm C Thieves Lane 0.253 0.3
Arm D A414 West 0.682 2.1
PM ARCADY RESULTS A414/THIEVES LANE ‘WITH DEVELOPMENT’
Max RFC Max Queue
Arm A Hertingfordbury Road 0.208 0.3
Arm B A414 West 0.649 1.8
Arm C Thieves Lane 0.269 0.4
Arm D A414 West 0.695 2.2
Table 7.2 Existing and ‘with development’ traffic flows PM PEAK; A414/Thieves Lane Roundabout
7.23 As can be seen there is a negligible increase in RFC and Queues ‘with development’ over the existing
situation in both the AM and PM peak periods.
ARCADY Model Thieves Lane/Welwyn Road Roundabout
7.24 The same exercise has been undertaken for the Welwyn Road junction. In this instance traffic flow data
was obtained from HCC. The count was undertaken in May 2011 and is therefore recent enough to be
valid.
7.25 The roundabout works well within capacity and continues to do so following the addition of the
development flows.
7.26 The results of this ARCADY assessment for both junctions are enclosed at Appendix K.
Page 20
Summary
7.27 Considerable attention has been given to prepare an accurate model of the junctions closest to the site
including the Thieves Lane/ Welwyn Road and Thieves Lane/A414 roundabout junctions. It is clear that
the models replicate very well the existing traffic conditions and the robust assessment prepared
confirms that the traffic generated by the development will be imperceptible.
Page 21
8 Summary and Conclusion
8.1 For transport review purposes this TA is based on a proposed development of 280 houses with parking
spaces that will be policy compliant. It is a greenfield site but adjacent to an established residential area
forming the Sele Farm ward.
8.2 Considerable pre-application discussion has taken place with Hertfordshire County Council as Highway
Authority and HCC have confirmed that they would have no objection to this application on Highways
Grounds.
8.3 The site is located at the edge of an existing residential urban area and therefore benefits from the
existing urban facilities and infrastructure but will also add to the local economy and the viability of these
existing facilities.
8.4 The site is in walking distance of the Hertford North Rail Station, Hertford Town Centre and bus services
pass the site frontage. A range of everyday requirements including schools are also very local to the site.
The site is therefore in a very sustainable development location.
8.5 The existing traffic conditions immediately surrounding the site are generally light, however the A414 is
located to the south of the site which is a busy dual carriageway for most of its length; a bottle neck
occurs to the east of the Thieves Lane/A414 roundabout junction causing congestion within the Hertford
Town Centre area
8.6 Survey results indicate that local residents avoid using the A414 towards Hertford in the peak periods
and the peak hour trip rates are low. This is typical of travel patterns in urban areas and is indicative of
peak spreading.
8.7 There have only been slight traffic accidents occurring in the most recent five year period in the study
area and these are considered low in number.
8.8 The internal layout has yet to be determined but it will be constructed to adoptable standards and with
the ethos of the ‘Manual for Streets’ which is adopted as a design guide for Hertfordshire.
8.9 There are many access options available, all will have appropriate visibility splays and access geometry.
8.10 Considerable attention has been given to prepare an accurate model of the junctions closest to the site
including the Thieves Lane/ Welwyn Road and Thieves Lane/A414 roundabout junctions. It is clear that
the models replicate very well the existing traffic conditions and the robust assessment prepared
confirms that the traffic generated by the development will be imperceptible.
Page 22
Conclusion
8.11 Transport Policy relevant in East Herts and nationally has been considered. Traffic generated by the
development will be imperceptible. The site is in a sustainable location and will add to the viability of
local services and infrastructure.
8.12 The site provides a highly policy compliant and sustainable residential development opportunity in
transport terms.
Page 23
Appendices
Appendix: A Site Location Plan
Appendix: B HCC Meeting Note and Correspondence
Appendix: C Local Facilities Plan
Appendix: D Five year accident data
Appendix: E Bus Routes
Appendix: F Potential Access Options
Appendix: G Census (work place destination)
Appendix: H Traffic Survey Data
Appendix: I Assignment Model
Appendix: J TRICS data
Appendix: K Arcady results
Page A-1
Appendix: A SITE LOCATION PLAN
Land at Thieves Lane, Hertford 3
The Site
1.0km
2.0km
*Town Centre
Page B-2
Appendix: B HCC MEETING NOTE AND
CORRESPONDENCE
1
Patrick Eggenton
From: Vetti Vettivelu [[email protected]]Sent: 18 February 2013 11:47To: Patrick Eggenton; Paul Chappell; Dan TanCc: Ben YallopSubject: RE: Proposed Development off Thieves Lane Hertford
Patrick
I am happy with what you have set out in the notes below. To be a complete TA please provide A414 Arcady for
both AM and PM peaks
Regards
Vetti
From: Patrick Eggenton [mailto:[email protected]]
Sent: 16 February 2013 09:31
To: Vetti Vettivelu; Paul Chappell; Dan Tan Cc: Ben Yallop
Subject: RE: Proposed Development off Thieves Lane Hertford
Hi Vetti and all,
I would be grateful if you could get back to me regarding the email/meeting note below.
I am aware that Croudace Homes would appreciate this which will give them confidence to move on and tackle
other planning issues.
Kind Regards
Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk
From: Patrick Eggenton
Sent: 11 February 2013 12:44
To: 'Vetti Vettivelu'; '[email protected]'; '[email protected]' Cc: 'Ben Yallop'
Subject: Proposed Development off Thieves Lane Hertford
Dear Vetti, Paul and Dan,
Thanks you for your time last Tuesday when we met at County Hall to discuss the proposed residential development
off Thieves Lane in Hertford for circa 280 units with Ben Yallop of Croudace Homes
2
I understand that you will be happy to see a draft of a TA in due course in advance of any application so that we can
discuss any issues and work together on this project.
With respect to the work we have done so far your colleague Dan will be reviewing the modeling but generally you
are content with the approach we have taken and the trip rate of circa 0.6 we have used rather than the lower one
observed at Turpins Close. You would like us to undertake a sensitivity test of assignment based on the 2011 Census
(work location) when this is available I( I believe soon) and compare this to the findings of our site observations.
We will of course issue all the modeling as part of our TA including the PM ARCADY tests for the A414 junction and
both AM and PM for the Welwyn Road junction.
We discussed the approach to access and agreed that this can all be solved in due course and that one or two access
points may be appropriate for the site but that it could operate with one access, in which case and emergency
access would be required. Access layouts should meet the MfS standards of visibility and consider the position of
existing junctions. You described HCC approach that they now adopt the main routes only and any short cul- de-sacs
generally are not adopted.
We discussed any traffic schemes or developments that we should consider as part of the assessment but you
confirmed that there were none in proximity which would impact upon our work.
We will of course include the relevant Local and National Policy within our document to ensure that we comply on
transport grounds and you suggested we review the Hertford and Ware Urban Transport Plan as well.
You discussed the HCC relationship with Croudace which is good and that you would require a planning obligation
for transport so that benefits can be made strategically.
I believe you asked that we review accident patterns at the A414 roundabout just to the west of the rail-bridge, we
will be reviewing accident patterns as part of our TA and so will extent to this junction as well.
This is all I can recall, so please add if there is anything else. Overall a positive meeting and I believe you confirmed
you would not have an objection on highway grounds as things currently stand.
I would be grateful if you would confirm this is a correct interpretation of our meeting as soon as possible and
please feel free to call with any questions/clarifications.
Kind Regards,
Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk
****Disclaimer****
The information in this message should be regarded as confidential and is intended for the addressee only unless explicitly stated. If you have received this message in error it must be deleted and the sender notified. The views expressed in this message are personal and not necessarily those of Hertfordshire County Council unless explicitly stated. Please be aware that emails sent to or received from Hertfordshire County Council may be intercepted and read by the council. Interception will only occur to ensure compliance with council policies or procedures or regulatory obligations, to prevent or deter crime, or for the purposes of essential maintenance or support of the email system.
1
Patrick Eggenton
From: Patrick EggentonSent: 19 December 2012 16:52To: '[email protected]'Subject: Proposed Development, Land at Thieves Lane HertfordAttachments: EXISTING A414 RB AM PEAK WITH DEV 121212.pdf; EXISTING A414 RB AM PEAK
121212.pdf; 1369 Hertfordshire.xlsm; Location and Facilities Plan pe Layout1 (1).pdf
Matthew,
As discussed just now, EAS has been appointed to prepare a Transport Assessment for a proposed development off
Thieves Lane at the west side of Hertford, (please see location plan attached). The development is likely to be
formed of 250 to 300 residential units and have two access points, one off Thieves Lane and one off Welwyn Road.
The detail of the access points has yet to be resolved but in principal there is space under the developers
control/Highway Land to implement priority junctions.
We have already undertaken some traffic assessment work to prove the viability of the development with mind to
the conditions of the A414 as it passes through Hertford. We decided it would be prudent to determine the peak
hour trip rate for existing residences off Thieves Lane and to this end we undertook a cordon count of Turpins Close
between 07.30 and 09.30 on a neutral weekday. At the same time we also completed a distribution survey to
determine vehicle assignment. We expected that there would be peak spreading from these developments in order
to avoid the worst periods of congestion on the A414 and also that the assignment would generally avoid the A414
into Hertford.
The results thoroughly concur with our expectations, the peak hour two way trip rate was 0.39 and only 12% of
traffic departing from the development in the peak period headed towards Hertford on the A414.
We have prepared a full Arcady for both the AM and PM peak hours for the A414/Hertingfordbury Road/Theives
Lane R/b and the Thieves Lane/Welwyn Road R/B.
Full classified turning data for the A414 R/B was recently collected on a neutral weekday together with a queue
length survey of all arms. Prior to this the junction was visited on three occasions in the AM peak specifically to
observe the traffic. In fact this junction works very well and queues are minimal. We have modeled the junction
using ARCADY and our ‘existing traffic’ ARCADY output (EXISTING A414 RB AM PEAK 121212.pdf) exactly replicates
the existing traffic conditions. We then added development traffic based on actual turning movements at this
junction rather than the observed assignment from the cordon survey and also using a 50% higher trip rate than the
that observed from the cordon survey for reasons of being robust. The results of the ‘existing’ and ‘with
development’ models are as follows;
EXISTING
MAX
RFC MAX Q
Arm A
Hertinfordbury
Road 0.243 0.3
Arm B A414 west 0.389 0.6
Arm C Thieves Lane 0.76 3
Arm D A414 west 0.951 12.6
EXISTING WITH DEVELOPMENT
MAX
RFC MAX Q
Arm A
Hertinfordbury
Road 0.255 0.4
Arm B A414 west 0.392 0.6
2
Arm C Thieves Lane 0.793 3.5
Arm D A414 west 0.966 13.7
As can be seen there is a negligible increase in RFC and Queues with the ‘with development’ over the existing
situation.
We have undertaken the same exercise for the Welwyn Road junction and this continues to operate well within
capacity and I have not attached the results here just to keep the size of this email down.
We spent some time considering how to model the A414 roundabout as it was clear that the flows into the
roundabout from Hertford are regularised by the signals upstream. Thus the flows onto the roundabout are
remarkably similar in each quarter of an hour period. We therefore built the model using the ‘Direct Input’ and
actual HGV options rather than the more simple OD TAB and default HGV option.
I have attached the results of the AM ARCADY Models and the classified traffic flow turning count data for your
perusal.
It is now my intention to comprehensively prepare the Transport Assessment document and so I would be grateful
for your views on the work we have so far completed and also an indication of any committed development in the
area which we should assess together with any committed highway improvement schemes.
If there are any specific matters that you would like to see addressed in the TA please let me know, I would like to
open up some regular dialogue with you as I am sure that new development in Hertford of this order will cause
some concern and I would not want it to come as a surprise for any parties involved.
Please confirm that you have received this email and please contact me should you have any questions, I look
forward to hearing from you shortly. Please note that we are based in Stanstead Abbotts so it would be very easy
for us to meet with you if that would help explain this further; it may equally be expedient for you to visit our offices
as we can the go through all the scheme data we have electronically.
I look forward to discussing this in more detail in the new year.
Kind Regards,
Patrick Eggenton EAS Unit 108 The Maltings Stanstead Abbotts Herts SG12 8HG t 01920 871777 m 07709 694819 www.eastp.co.uk
Page C-3
Appendix: C LOCAL FACILITIES PLAN
Page D-4
Appendix: D FIVE YEAR ACCIDENT DATA
224
17
36a
7472a
46
66
24
34
Allotment
2016
14
9
1
20
134
El
9
24
110
21
32
12
43
34
99
2826
68
24
48
72
37a
64
104
44
92
49
Hertford
1
35
4
Sta
85
35
22
Sub
1
1
3
19
7
53
36
22
82
17
143
90
123
108
57
56
137
Hall
5
10
24
32
6
Works
4
Blakemore Wood
46
El Sub Sta
58
103
20
44
5
202
111
Lodge
15
2
38
25
1828
1
8
84
32
31
14
37
13
1
96
Sta
5
11
21
65
1
Sta
20
97
53
62
1
7
Sub
44
108
11
57
23
1
80
64
71
Sta
75
84
Sele School
25
9
100
126
22
Depot
8
76
55
87
33
7
82
6491
51
85
16
Chesher's Plantation
72
47
108
50
20
112
74
8
116
The Old Barn
139
142
Hollybush Junior Mixed Infants School
11
77
24
113
30
12
15
16
125
64
76
101
9
6
70
36
PO
24
1
4
4252
9
Sub
2
19
110
29
Shelter
76
4249
66
1
5
21
Colmor
101
95
1
65
61
37
14
132
96
85
Lodge
41
67
86
52
14
2
51
98
73
168
12
29
10
180
Hertford St Andrew
7
46
19
97
30
98
26
37b
40
61
23
1
24
28
11
12
25
74
5
40
20
33
25
27
The Knoll
49
11
Sub
42
6
33
1
6
15
6
10
32
79
77
43
65
91
1
9
63
15
73Station
48
1
153
30
133
24
49
71
Sub Sta
2
Di s
ma
nt le
dR
ai lw
ay
92
1
88
12
Works
15
63
8
97
The
24
45
81
127
Mill Farm
61
46
Sub
ll
64
62
8
10
23
7
127to137
17
28
88
17
49
32
1
29
32
58
130
2
3
68
15
12
2
114
82
91
126a
40
69
34
124
78
126
5
128
8
2
212
11
33
122
42
5
25
109
27
190
16
1
Builder's Yard
93
114
3
45
111
92
16
109
34
28
36
2
33
85
15
2c
Rectory
134a
1to
16
21
10
72b
3840
9
22
29
13
22
29
27
26
25
2
134c
18
76
36
27
124
33
13
53
Sta
1
102
Allo
tmentG
15
C of E Primary School
6
41
142
24
158
6
86
35
34
42
145
25
22
64a
44
Shelter
37
43
40
13
24
65
49
34
Calton House
12
36to78
Golden Griffin
17
12
(PH)
60
1
12
81
2
1
42
Car Park
65
28
2
Tank
8878
131
End
200
Chandlers
Courtyard
82
11
2
136
Works
94
50
7
1
22
El
27
89
1
25
7888
20
45
111
18
25
29
8090
38
8
2
4454
3
16
44
18 116
109
95
108
70
70
9
147
124a
23
17
35
14a
Sub Sta
83
5
34
32
25
14
37
House
3
10
31
Gardens
116
Tank
18
111
1
21
119
21a
58
100
109
6
11
20
14
32
66
23
21
4
2
61
21
16
Dis
man
tled
Ra
ilwa
y
The Sele Arms
72
33
38
83
40
148
47
100a
124
72
El
98
81
21
66
3
11
5
21
99
69
32
25
100
13
73
130
62
75
1222
26
2
13
Tennis Court
24
6
14
El Sub Sta
16
29
108
70
13
136
6
142
100
107
115
54
102
16
1
El
15
2
45
29
87
21
32
100
7
119
20
10
8
1
12
78
9
73
3
El
22
35
27
80
25
49
57
31
10
36
87
17
59
37
2
10a
El
92
Calton
44
84
29
El
23
68
22
34
Gardens
Camps Hill
SM
(PH)
46
14
73
21
98
1
10
to1
3
7
48
1
66
Court
52
3to
6
45
48
109
The Dell
Sub
37
143
98a
El
80
48
145
Dis
mantl e
dR
ai lw
ay
Kingdom
28
26
7
5
2
41
13
to
Sandy Nook
34
3
63
96
54
11
5
114
Sta
1246
40
2
94
149
El Sub Sta
44
106
26
66
83
103
81
5a
92
2
Chelmsford Wood
101
26
50
79
110
90
7
70
16
23
Dismantled
18
Hall
30
46
100
8
32
5
28
31
14
10
North
Weir
3
32
73
91
151
40
5
1
14
137
23
9
50
39
62
26
31
2to
12
32
67
The
21
90
6
41
East
138
126
Epcombs
59
The
117
124
5
5238
34
26
Mece
na
41
1424
9
37
36
17
31
92
25
7282
Tank
2
1
15
28
12
40
122
96
Chelmsford
48
1
143
121
25
26to
37
141a
68
72
36b
25
140
10
1
39
15
Sub
Mill Hill
104
108
1a 114
11
23 20
19
21
101
Railway
21b
23
48
143
35
34
26
27
110
57
71
22
1
9
55
24
13
Sta
89
Allotment
31
Arrowhead
53
28
2
1
30
9
106
107
13
132
2
5
31
13
102
13
42
43
Sta
102a
142
139
38
96
9
17
Lady Hughes's Wood
1
5358
208
214
El
19
33
Sub
115to125
4
14
53
36
56
139
7484
74
El
4
22
4858
33
34
40
30
68
El Sub Sta
56
66
26
113
5060
86
26
El Sub Sta
2030
9
122
89
34
20
4
21
152
134
42
125
16
74
84
29
16
1
StJose
ph's
Catho
l ic
4
42
78
Prim
aryS
choo
l
18
132
12
96
126
23
59
39
120
71
1
13
22
Blakemore Wood
%U
%U
%U
%U
%U%U
%U
%U%U
%U
%U
%U
%U
%U
%U
%U
Slight%U
Serious%U
Fatal%U
Accidents by Maximum Severity
Postal Point CHN204Tel 01992 658339
Transport Planning Data TeamHertfordshire County CouncilCounty HallPegs LaneHertford SG13 8DN
G-DP520.28/001/17653
G-DP520
Hertfordshire County Council
Mar 2013
ACN
Not Held
1 of 1
File.
Prepared ApprovedChecked
Date
Initials
Client Org.
N.T.S.Scale.
Sheet No.
Project No.Project Title.
Drawing Title.
RevDrg No. Legend.
© Crown copyright and database rights 2013 Ordnance Survey 100019606
You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.(This restriction may not apply to HCC and its licensed contractors, agents & partners.)
A414 and B1000HertfordAccidents from 1 Dec 2007 to 30 Nov 2012
Data Services - Accident Data Supply
N
EW
S
N.T.S.
Selection Boundary
Full Confidential Accident Report 08-Mar-13Date Produced:
Set Name (if saved) : 17653 Set Total : 16
2012-4100A0770
Thu
Slight
B1000 Welwyn Road, Hertford Approx 30m West J/w Fordwich Rise
EHerts
Hertford
30mph
Notjunct
Notjunct
Nperpelx
Darklit
Fine
DryNone
None
Yes
B1000/1
Single
2
1
0
531238 212842
08/11/2012 19:29:00
Easting: Northing:
Casualty Details
Acc Ref:Both Vs Cars Trav West On Welwyn Rd. V2 Stopped For Red Ats & V1 Collided With Rear Of V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
2012-4100A0770
1
2
Driver
35
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
MisspeedV 1 A
Speeding ReckdrivV 1 B
137146
1
Car+3whl
None
Stopping
Carw
Notjunct
None
None
No
None
Front Notreq
NothtrunE
W
44
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Car+3whl
None
Stopping
Carw
Notjunct
None
None
No
None
Back Ntprov
NothtrunE
W
35
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 1 of 18Set Name (if saved) : 17653
2012-4100A0273
Tue
Slight
U606 Thieves Lane Hertfordapprox 20m North J/w Ladywood Road
EHerts
Hertford
40mph
T
Gwy/unct
Npernox
Daystlts
Rain
WetNone
None
Yes
U606/10
Single
2
2
0
530792 212560
24/04/2012 11:05:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Following V2 Bus Trav South On Thieves Lane. V2 Has Stopped And V1 Attempts To Overtake But Realises It Is On A Blind Bend And Pulls Back In Andcollides With R/o/s V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U1236/1
2012-4100A0273
1
1
Driver
40
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2012-4100A0273
2
1
Passenge
2
Female
Slight
Other
Notped
Notped
Yes
Rearseat
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
135673
1
Car+3whl
None
Otakesta
Carw
Approach
None
None
No
None
Front Notreq
NothtrunN
S
40
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Psv
None
Waitahea
Carw
Approach
None
None
No
None
Back Notreq
NothtrunN
S
45
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: WorkJ Purpose:
Page 2 of 18Set Name (if saved) : 17653
2011-4100A0543
Sat
Slight
B1000 Welwyn Road, Hertford J/w Bentley Road
EHerts
Hertford
40mph
T
Gwy/unct
Npernox
Daystlts
Fine
DryNone
None
Yes
B1000/3
Single
3
4
0
530401 213106
01/10/2011 16:23:00
Easting: Northing:
Casualty Details
Acc Ref:V3 Car Trav West On Welwyn Rd Stops For Veh Waiting To Turn Right Into Bentley Rd. V2 Car Stops Behind V3. V1 Collides Rear V2 Which Collides Rear V3
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U468/10
2011-4100A0543
1
1
Driver
58
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2011-4100A0543
2
2
Driver
60
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2011-4100A0543
3
3
Driver
62
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2011-4100A0543
4
3
Passenge
18
Female
Slight
Other
Notped
Notped
Yes
Rearseat
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
Flookdri Misspeed ReckdrivV 1 A
134261
1
Ahead
Carw
None
None
Front Negati
NothtrunE
58Acc Ref:
Veh Ref:
Maneouvre:
Location:
Skiding:
Object in Cway:
Impact Point: Driver Breath Test:
Hit and Run:From:
Driver Age:
Page 3 of 18Set Name (if saved) : 17653
Car+3whl
None
Approach
No
None W Female
Slight
Veh Type:
Towing;
Junction:
velcwy
Object off Cway To: Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Car+3whl
None
Waitahea
Carw
Approach
None
None
No
None
Back Negati
NothtrunE
W
60
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
3
Car+3whl
None
Waitahea
Carw
Approach
None
None
No
None
Back Notreq
NothtrunE
W
62
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 4 of 18Set Name (if saved) : 17653
2011-4100A0507
Thu
Slight
A414 Hertingfordbury Road Rbt J/w Willowmead & Campfield Road
EHerts
Hertford
40mph
R/bout
Gwy/unct
Npernox
Darkunkn
Fine
DryNone
None
No-otc
A414/60
Single
2
2
0
531654 212361
22/09/2011 19:55:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Trav West On Hertingfordbury Rd Stops At Rbt, V2 Lgv Approaches Fromrear And Hits R/o/s Corner V1 And F.t.s.
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U1101/1
2011-4100A0507
1
2
Driver
40
Male
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2011-4100A0507
2
2
Passenge
48
Female
Slight
Other
Notped
Notped
Yes
Frontsea
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
FlookdriV 1 A
134061
1
Gdltwght
None
Ahead
Carw
Approach
None
None
No
None
Front Notcon
Hit&runE
W Unknown
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Car+3whl
None
Waitahea
Carw
Approach
None
None
No
None
Back Notcon
NothtrunE
W
40
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 5 of 18Set Name (if saved) : 17653
2011-4100A0187
Sat
Slight
A119 North Road, Hertford Rbt J/w B1000 Welwyn Road
EHerts
Hertford
30mph
R/bout
Gwy/unct
Npercntr
Daystlts
Fine
DryNone
None
Yes
A119/16
R/bout
2
1
0
531611 212958
09/04/2011 09:40:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Entered Rbt To Turn Right From B1000 Welwyn Rd, But Failed To Give Way To Cyclist Riding V2 P/c Nw On A119 North Rd, Negotiating Rbt And V1 Struck R/n/s Of V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
B1000/1
2011-4100A0187
1
2
Driver
47
Male
Slight
Other
Notped
Notped
Notapp
No
No Cyclists
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
FlookdriV 1 A
133179
1
Car+3whl
None
Turnrigh
Carw
Er/about
None
None
No
None
Front Notreq
NothtrunSw
Se
48
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Bicycle
None
Ahead
Carw
Middle
None
None
No
None
Nearside Notap
NothtrunSe
Nw
47
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 6 of 18Set Name (if saved) : 17653
2010-4100A0297
Tue
Slight
Hertingfordbury Road, Hertford 15m Se Rbt J/w A414 Hertingfordbury Road.
EHerts
Hertford
60mph
R/bout
Gwy/unct
Npernox
Daystlts
Fine
DryNone
None
Yes
C152/30
Single
2
3
0
530665 212352
06/04/2010 16:05:00
Easting: Northing:
Casualty Details
Acc Ref:Both Vs Cars. V1 Having Negotiated Roundabout Exited Rbt To Trav Se On Hertingfordbury Road But For U/k Reason Crossed C/way To O/s Colliding Head On With V2 Trav Nw Approaching Rbt.
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
A414/56
2010-4100A0297
1
2
Driver
19
Male
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2010-4100A0297
2
2
Passenge
19
Male
Slight
Other
Notped
Notped
Yes
Frontsea
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2010-4100A0297
3
1
Passenge
22
Male
Slight
Other
Notped
Notped
Yes
Frontsea
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
LostcontV 1 A
130556
1
Car+3whl
None
Turnrigh
Carw
Lr/about
None
None
No
None
Front Notreq
NothtrunW
Se
26
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: WorkJ Purpose:
Page 7 of 18Set Name (if saved) : 17653
2
Car+3whl
None
Ahead
Carw
Approach
None
None
No
None
Front Notreq
NothtrunSe
Nw
19
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 8 of 18Set Name (if saved) : 17653
2010-4100A0214
Fri
Slight
A414 Eastbound C/way Towards Hertford Exact Location Not Reported Gridded 19m East Of Rbt J/w A414 Cole Green Bypass Hertingfordbury Road &Thieves Lane
EHerts
Hertford
70mph
R/bout
Gwy/unct
Npernox
Daystlts
Fine
DryNone
Pedestri
No-otc
A414/57
Dual
2
1
0
530698 212401
26/03/2010 08:00:00
Easting: Northing:
Casualty Details
Acc Ref:V2 Car & V1 M/c 50-125cc Both Trav East Into A414 Hertingfordbury Rd, From Rbt. V2 Stopped Suddenly To Allow Pedestrians To Cross Dual C/way (no X/ng) And V1 Skidded Into Rear Of V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
A414/56
2010-4100A0214
1
1
Driver
18
Male
Slight
Other
Notped
Notped
Notapp
No
No Motorcyclists
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
StoppingV 2 B
130192
1
Mc<=125
None
Starting
Carw
Lr/about
Skidded
None
No
None
Front Notcon
NothtrunW
E
18
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: RideschJ Purpose:
2
Othmotor
None
Stopping
Carw
Exit
None
None
No
None
Back Notcon
Hit&runW
E Unknown
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 9 of 18Set Name (if saved) : 17653
2009-4100A0682
Tue
Slight
A414 Hertingfordbury Road, Hertford 5m East Of Rbt J/w A414 Bypass, Hertingfordbury Road & Thieves Lane
EHerts
Hertford
70mph
R/bout
Gwy/unct
Npernox
Daystlts
Rain
WetNone
None
Yes
A414/57
Dual
2
1
0
530692 212384
03/11/2009 12:10:00
Easting: Northing:
Casualty Details
Acc Ref:Both Vs Cars Trav Westbound In Ln2 Of A414 Hertingfordbury Rd Approaching Rbt Where V2 Stopped And V1 Braked Hard And Skidded Into Rear Of V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
A414/56
2009-4100A0682
1
2
Driver
28
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
StoppingV 1 A
SlipweatV 1 B
129309
1
Gdmdwght
None
Stopping
Carw
Approach
Skidded
None
No
None
Front Negati
NothtrunE
W
33
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: WorkJ Purpose:
2
Car+3whl
None
Waitahea
Carw
Approach
None
None
No
None
Back Negati
NothtrunE
W
28
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 10 of 18Set Name (if saved) : 17653
2009-4100A0605
Sun
Slight
A414 Hertingfordbury Road, Hertford 9m East Of Rbt J/w A414 Cole Green Bypass, Thieves Lane & C152 Hertingfordbury Road
EHerts
Hertford
70mph
R/bout
Gwy/unct
Npernox
Daystlts
Fine
DryNone
None
No-otc
A414/57
Dual
2
2
0
530690 212380
27/09/2009 10:15:00
Easting: Northing:
Casualty Details
Acc Ref:Both V2 Car & V1 U/k Veh Trav Westbound On A414 Hertingfordbury Rd In Ln1, Approaching Thieves Ln Rbt Where V2 Stopped, Waiting To Enter Rbt And V1 Collided With Rear Of V2
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
A414/56
2009-4100A0605
1
2
Driver
31
Female
Slight
Other
Notped
Notped
Unknown
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2009-4100A0605
2
2
Passenge
31
Male
Slight
Other
Notped
Notped
Unknown
Frontsea
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
FlookdriV 1 A
128807
1
Othmotor
None
Ahead
Carw
Approach
None
None
No
None
Front Notcon
NothtrunE
W Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Car+3whl
None
Waitahea
Carw
Approach
None
None
No
None
Back Notcon
NothtrunE
W
31
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 11 of 18Set Name (if saved) : 17653
2009-4100A0587
Tue
Slight
A414 Hertingfordbury Road, Hertford Rbt J/w A414 Hatfield Road, Thieves Lane & Hertingfordbury Road
EHerts
Hertingf
70mph
R/bout
Gwy/unct
Npernox
Darklit
Rain
WetNone
None
Yes
A414/56
R/bout
1
1
0
530649 212360
15/09/2009 19:45:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Negotiating Right Turn From Thieves Ln On Rbt To Trav West On A414 Hertingfordbury Rd When Driver Lost Control And V1 Spun R/n/s Into Raised Kerb Coming To Rest Facing East InLn1 At Exit Onto A414 W/b
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
A414/54
2009-4100A0587
1
1
Driver
24
Female
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
LostcontV 1 A
128791
1
Car+3whl
None
Turnrigh
Carw
Middle
Skidded
Kerb
No
None
Offside Notreq
NothtrunNe
W
24
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 12 of 18Set Name (if saved) : 17653
2009-4100A0420
Mon
Slight
A414 Hertingfordbury Road, Hertford Rbt J/w Thieves Lane & C152 Hertingfordbury Road
EHerts
Hertingf
70mph
R/bout
Gwy/unct
Npernox
Daystlts
Fine
DryNone
None
No-otc
A414/56
R/bout
2
1
0
530639 212405
13/07/2009 17:30:00
Easting: Northing:
Casualty Details
Acc Ref:Cyclist Riding V2 P/c Negotiating Right Turn On A414 Rbt From C152 Hertingfordbury Rd Was Struck From O/s By Front Of V1 Car Also Negotiating Rbt
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U606/10
2009-4100A0420
1
2
Driver
50
Male
Slight
Other
Notped
Notped
Notapp
No
No Cyclists
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
Flookdri Misspeed PassclosV 1 B
128505
1
Car+3whl
None
Turnrigh
Carw
Middle
None
None
No
None
Front Notcon
NothtrunSe
E Female
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Bicycle
None
Turnrigh
Carw
Middle
None
None
No
None
Offside Notap
NothtrunSe
E
50
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 13 of 18Set Name (if saved) : 17653
2009-4100A0251
Fri
Slight
A414 Hertingfordbury Road, Hertford Rbt J/w C152 Hertingfordbury Road And Thieves Lane
EHerts
Hertingf
70mph
R/bout
Gwy/unct
Npernox
Daystlts
Fine
DryNone
None
No-otc
A414/56
R/bout
2
1
0
530655 212415
17/04/2009 12:13:00
Easting: Northing:
Casualty Details
Acc Ref:Both Vs Cars Trav In U/k Direction On A414 Hertingfordbury Rd Negotiating Rbt When V1 Collided With Rear Of V2, Then Reversed And Drove Off
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U606/10
2009-4100A0251
1
2
Driver
35
Male
Slight
Other
Notped
Notped
Unknown
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
Flookdri Misspeed Swerved LostcontV 1 B
127750
1
Car+3whl
None
Rightben
Carw
Er/about
None
None
No
None
Front Notcon
Hit&runSw
E
30
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
2
Car+3whl
None
Rightben
Carw
Er/about
None
None
No
None
Back Notcon
NothtrunSw
E
35
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: TofrowrkJ Purpose:
Page 14 of 18Set Name (if saved) : 17653
2008-4100A0831
Sat
Slight
A414 Hertingfordbury Road, Hertford Est 156m Nw Of J/w Valeside
EHerts
Hertford
70mph
Notjunct
Notjunct
Npernox
Darklit
Fine
WetNone
None
Yes
A414/57
Dual
1
1
0
531123 212337
06/12/2008 23:11:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Trav Se On A414 Hertingfordbury Rd With Driver Intoxicated. V1 Hit N/s Kerb, Driver Lost Control And V1 Left C/way N/s, Colliding With A Tree And Overturned
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
2008-4100A0831
1
1
Driver
43
Female
Slight
Other
Notped
Notped
Unknown
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
Lostcont AlcydrivV 1 A
126906
1
Car+3whl
None
Ahead
Carw
Notjunct
Overturn
Kerb
Nrebound
Tree
Front Positiv
NothtrunNw
Se
43
Female
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 15 of 18Set Name (if saved) : 17653
2008-4100A0701
Tue
Slight
A414 Hertingfordbury Road, Hertford Rbt J/w Thieves Lane & Hertingfordbury Road
EHerts
Hertingf
70mph
R/bout
Gwy/unct
Npernox
Darklit
Rain
WetNone
None
Yes
A414/56
R/bout
1
3
0
530675 212418
21/10/2008 03:00:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Trav Ne On A414 Failed To Negotiate Rbt Colliding With N/s Barrier
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
U606/10
2008-4100A0701
1
1
Driver
18
Male
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2008-4100A0701
2
1
Passenge
18
Male
Slight
Other
Notped
Notped
Yes
Frontsea
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
2008-4100A0701
3
1
Passenge
18
Male
Slight
Other
Notped
Notped
Yes
Rearseat
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
ToofastV 1 A
Slipweat ReckdrivV 1 B
126115
1
Car+3whl
None
Ahead
Carw
Er/about
Skidded
None
Nearside
Sidcrash
Front Negati
NothtrunSw
E
18
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 16 of 18Set Name (if saved) : 17653
2008-4100A0315
Sat
Slight
A414 Hertingfordbury Road, Hertford 29m Sw Of Rbt J/w Willowmead & Campfield Road
EHerts
Hertford
40mph
Notjunct
Notjunct
Nperpelx
Daystlts
Fine
DryNone
None
Yes
A414/58
Dual
1
1
1
531595 212337
26/04/2008 10:12:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Trav Sw On A414 Hertingfordbury Rd From Rbt Collided With Pedestriancrossing C/way From N/s Kerb, Using Pelican X/ng
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
2008-4100A0315
1
1
Pedestri
78
Female
Slight
Other
Xnrside
Pedcross
Notapp
Ped
Ped Pedestrians
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
NoPed Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
IllpedesC 1 B
FlookdriV 1 B
124882
1
Car+3whl
None
Ahead
Carw
Notjunct
None
None
No
None
Front Negati
NothtrunNe
Sw
49
Male
None
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 17 of 18Set Name (if saved) : 17653
2008-4100A0197
Sat
Slight
Thieves Lane, Hertford 20m Sw Of Ladywood Road
EHerts
Hertford
40mph
Notjunct
Notjunct
Npernox
Darkunli
Fine
WetNone
None
Yes
U606/10
Single
1
1
0
530778 212520
29/03/2008 19:40:00
Easting: Northing:
Casualty Details
Acc Ref:V1 Car Trav Sw On Thieves Ln Into Downhill R/h Bend When, For U/k Reason, Driver Lost Control And V1 Veered O/s, Driver Overcorrected And V1 Left C/wayinto N/s Fence
Accident Details:
Date:
Day of Week:
Acc Severity:
District:
Parish:
Speed Limit:
Jun Detail:
Jun Control:
Weather:
Light:
Road Surface:
Ped Xing:
Spec Conditions:
C/way Hazard:
1st / 2nd Rd:
On Site:
C/way Type:
Num Vehicles:
Num Cas:
Num Peds:
Acc Ref:
Vehicle Details
2008-4100A0197
1
1
Driver
24
Male
Slight
Other
Notped
Notped
Yes
No
No Car Users
Acc Ref:
Veh Ref:
Cas Ref:
Cas Class:
Cas Age:
Cas Gender:
Car Passenger:
PSV Passenger:
School Pupil:
Cas Severity:
Road User Class:
Seat Belt:
Ped Movement:
Ped Location:
Ped Work on Rd:
Participant Confidence
Contributory Factors
Factor 1 2 3 4 5 6
Slipweat LostcontV 1 A
124390
1
Car+3whl
None
Rightben
Carw
Notjunct
None
None
Nearside
Otherobj
Nearside Notreq
NothtrunNe
Sw
24
Male
Slight
Acc Ref:
Veh Ref:
Veh Type:
Towing;
Maneouvre:
Location:
Junction:
Skiding:
Object in Cway:
velcwy
Object off Cway
Impact Point: Driver Breath Test:
Hit and Run:From:
To:
Driver Age:
Driver Gender:
Driver Severity:NotfrvForeign Veh: OtherJ Purpose:
Page 18 of 18Set Name (if saved) : 17653
Page E-5
Appendix: E BUS ROUTES
Page F-6
Appendix: F POTENTIAL ACCESS OPTIONS
Page G-7
Appendix: G CENSUS (WORK PLACE
DESTINATION)
Welwyn Road West A414 West A414 East Total
Lambeth Ward All people Works at Home Underground Train Bus Taxi Car Driver Car Passenger M/C Bicycle On Foot Other Hertford/North A414 East
Barnet 43 0 0 0 3 0 37 3 0 0 0 0 37
Broxbourne 146 0 0 13 6 0 118 6 3 0 0 0 118
Camden 28 0 0 24 0 0 4 0 0 0 0 0 4
City of London 67 0 0 61 0 0 3 0 3 0 0 0 3
Dacorum 18 0 0 0 0 0 18 0 0 0 0 0 18
East Hertfordshire Bishop's Stortford All Saints 3 0 0 0 0 0 3 0 0 0 0 0 3
Bishop's Stortford Central 6 0 0 0 0 0 3 0 0 0 3 0 3
Bishop's Stortford Meads 4 0 0 0 0 0 4 0 0 0 0 0 4
Bishop's Stortford South 3 0 0 0 0 0 3 0 0 0 0 0 3
Braughing 3 0 0 0 0 0 3 0 0 0 0 0 3
Buntingford 10 0 0 0 0 0 10 0 0 0 0 0 10
Great Amwell 9 0 0 3 0 0 6 0 0 0 0 0 3
Hertford Bengeo 88 0 0 0 4 0 39 11 0 5 29 0 39
Hertford Castle 502 0 0 3 76 3 234 49 4 24 109 0 234
Hertford Heath 31 0 0 0 0 0 19 0 6 3 3 0 19
Hertford Kingsmead 106 0 0 0 6 0 65 9 3 8 12 3 65
Hertford Rural North 8 0 0 0 0 0 8 0 0 0 0 0 8
Hertford Rural South 17 0 0 0 0 0 14 0 0 0 3 0 14
Hertford Sele 420 195 3 11 3 0 129 14 3 11 51 0 129
Hunsdon 6 0 0 0 0 0 3 0 0 0 3 0
Much Hadham 4 0 0 0 0 0 4 0 0 0 0 0 4
Mundens and Cottered 3 0 0 0 0 0 3 0 0 0 0 0 3
Puckeridge 3 0 0 0 0 0 3 0 0 0 0 0 3
Sawbridgeworth 8 0 0 0 0 0 5 0 0 0 3 0 5
Stanstead Abbots 12 0 0 0 0 0 12 0 0 0 0 0 12
Thundridge & Standon 24 0 0 0 0 0 21 3 0 0 0 0 21
Walkern 6 0 0 0 0 0 6 0 0 0 0 0 6
Ware Chadwell 53 0 0 0 4 0 39 4 0 3 0 3 39
Ware Christchurch 41 0 0 3 3 0 29 3 0 0 3 0 29
Ware St Mary's 50 0 0 0 0 0 43 0 3 4 0 0 43
Ware Trinity 3 0 0 0 0 0 3 0 0 0 0 0 3
Watton-at-Stone 11 0 0 0 0 0 8 0 0 0 3 0 8
Enfield 81 0 0 18 0 3 51 9 0 0 0 0 51
Epping Forest 28 0 0 0 0 0 22 3 0 0 3 0 22
Hackney 16 0 0 10 0 0 6 0 0 0 0 0 6
Haringey 12 0 0 3 0 0 9 0 0 0 0 0 9
Harlow 55 0 0 3 0 0 49 3 0 0 0 0 49
Hertsmere 26 0 0 0 0 0 26 0 0 0 0 0 26
Islington 26 0 0 17 0 0 9 0 0 0 0 0 9
Luton 13 0 0 0 0 0 13 0 0 0 0 0 13
Milton Keynes 18 0 0 0 0 0 18 0 0 0 0 0 18
North Hertfordshire Arbury 3 0 0 0 0 0 3 0 0 0 0 0 3
Baldock Town 6 0 0 3 0 0 3 0 0 0 0 0 3
Hitchin Bearton 3 0 0 0 0 0 3 0 0 0 0 0 3
Knebworth 3 0 0 0 0 0 3 0 0 0 0 0 3
Letchworth East 3 0 0 0 0 0 3 0 0 0 0 0 3
Letchworth South West 3 0 0 0 0 0 3 0 0 0 0 0 3
Royston Palace 3 0 0 0 0 0 3 0 0 0 0 0 3
Weston and Sandon 3 0 0 0 0 0 3 0 0 0 0 0 3
St Albans 33 0 0 0 0 0 30 3 0 0 0 0 30
Stevenage 60 0 0 10 0 0 47 3 0 0 0 0 47
Tower Hamlets 10 0 0 7 0 0 3 0 0 0 0 0 3
Uttlesford 19 0 3 0 0 0 16 0 0 0 0 0 16
Watford 17 0 0 0 0 0 17 0 0 0 0 0 17
Welwyn Hatfield 290 0 0 0 6 0 238 25 6 15 0 0 238
Westminster 65 0 6 46 0 0 13 0 0 0 0 0 13
Other 153 0 0 27 0 0 114 0 3 6 3 0
Grand Total 2685 195 12 262 111 6 1604 148 34 79 228 6 309 263 823 89 0 1484
21% 18% 55% 6% 0% 100%
Welwyn Road East
Page H-8
Appendix: H TRAFFIC SURVEY DATA
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012
Junction: Thieves Lane / A414 / Hertingfordbury Road
Approach: Thieves Lane
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0730 - 0745 0 0 9 2 0 0 0 11 0 0 3 1 0 0 0 4 0 0 79 5 0 0 0 84
0745 - 0800 0 0 20 3 0 0 0 23 0 0 4 1 0 0 0 5 0 1 98 10 1 0 0 110
Hourly Total 0 0 29 5 0 0 0 34 0 0 7 2 0 0 0 9 0 1 177 15 1 0 0 194
0800 - 0815 0 0 26 2 0 0 0 28 0 0 2 2 0 0 0 4 0 0 77 7 1 0 0 85
0815 - 0830 0 0 25 2 0 0 0 27 0 0 15 0 0 0 0 15 0 0 92 6 0 0 0 98
0830 - 0845 0 0 31 2 0 1 1 35 0 0 36 2 0 0 0 38 0 0 120 11 0 0 0 131
0845 - 0900 0 0 18 4 0 0 0 22 0 0 19 1 0 0 0 20 0 2 83 9 0 0 0 94
Hourly Total 0 0 100 10 0 1 1 112 0 0 72 5 0 0 0 77 0 2 372 33 1 0 0 408
0900 - 0915 0 0 22 2 1 0 0 25 0 0 5 1 0 0 0 6 0 1 79 6 0 0 0 86
0915 - 0930 0 0 20 8 2 0 0 30 1 0 2 0 0 0 0 3 0 0 43 3 0 0 0 46
Hourly Total 0 0 42 10 3 0 0 55 1 0 7 1 0 0 0 9 0 1 122 9 0 0 0 132
Session Total 0 0 171 25 3 1 1 201 1 0 86 8 0 0 0 95 0 4 671 57 2 0 0 734
1630 - 1645 0 0 14 2 0 0 0 16 0 0 2 0 0 0 1 3 0 0 39 3 0 0 0 42
1645 - 1700 0 0 12 1 0 0 0 13 0 0 4 1 0 0 0 5 0 0 28 3 0 0 0 31
Hourly Total 0 0 26 3 0 0 0 29 0 0 6 1 0 0 1 8 0 0 67 6 0 0 0 73
1700 - 1715 0 0 7 2 0 0 0 9 0 0 5 0 0 0 0 5 0 0 28 5 0 0 2 35
1715 - 1730 0 0 18 0 0 0 0 18 0 0 4 2 0 0 0 6 0 0 33 5 0 0 0 38
1730 - 1745 0 0 19 3 0 0 0 22 0 0 4 1 0 0 0 5 0 0 34 1 0 0 0 35
1745 - 1800 0 0 20 1 0 0 0 21 0 0 2 1 0 0 0 3 0 0 33 1 0 0 0 34
Hourly Total 0 0 64 6 0 0 0 70 0 0 15 4 0 0 0 19 0 0 128 12 0 0 2 142
1800 - 1815 0 0 18 0 0 0 0 18 0 0 4 1 0 0 0 5 0 0 30 2 0 0 0 32
1815 - 1830 0 0 13 1 0 0 1 15 0 0 3 0 0 0 0 3 0 0 30 1 0 0 0 31
Hourly Total 0 0 31 1 0 0 1 33 0 0 7 1 0 0 0 8 0 0 60 3 0 0 0 63
Session Total 0 0 121 10 0 0 1 132 0 0 28 6 0 0 1 35 0 0 255 21 0 0 2 278
Left to A414 (East) Ahead to Hertingfordbury Road Right to A414 (West)
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012
Junction: Thieves Lane / A414 / Hertingfordbury Road
Approach: A414 (East)
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0730 - 0745 0 0 4 2 0 0 0 6 0 1 311 43 8 5 1 369 0 0 13 1 0 0 0 14
0745 - 0800 0 0 5 2 0 0 0 7 0 1 304 49 4 2 2 362 0 1 14 7 0 0 0 22
Hourly Total 0 0 9 4 0 0 0 13 0 2 615 92 12 7 3 731 0 1 27 8 0 0 0 36
0800 - 0815 0 0 10 3 0 0 0 13 0 2 319 39 1 6 0 367 0 0 21 4 0 0 1 26
0815 - 0830 3 0 20 2 0 0 0 25 0 3 268 35 4 2 0 312 0 0 31 5 1 1 0 38
0830 - 0845 0 0 15 3 0 0 0 18 0 0 272 27 2 6 1 308 0 0 41 3 0 0 0 44
0845 - 0900 0 0 12 0 0 0 0 12 0 1 293 25 6 5 1 331 0 0 40 4 0 0 0 44
Hourly Total 3 0 57 8 0 0 0 68 0 6 1152 126 13 19 2 1318 0 0 133 16 1 1 1 152
0900 - 0915 0 0 6 1 0 0 0 7 1 0 267 35 8 6 1 318 0 0 15 3 1 0 1 20
0915 - 0930 0 0 6 2 0 0 0 8 0 1 212 33 6 11 1 264 0 0 20 6 1 0 0 27
Hourly Total 0 0 12 3 0 0 0 15 1 1 479 68 14 17 2 582 0 0 35 9 2 0 1 47
Session Total 3 0 78 15 0 0 0 96 1 9 2246 286 39 43 7 2631 0 1 195 33 3 1 2 235
1630 - 1645 0 0 12 3 0 0 0 15 0 0 214 29 1 2 0 246 0 0 34 6 0 1 0 41
1645 - 1700 0 0 10 1 0 0 0 11 0 0 177 26 1 1 3 208 0 0 40 8 0 0 0 48
Hourly Total 0 0 22 4 0 0 0 26 0 0 391 55 2 3 3 454 0 0 74 14 0 1 0 89
1700 - 1715 0 0 8 0 0 0 0 8 0 0 172 20 3 2 0 197 0 1 49 6 0 0 0 56
1715 - 1730 0 0 12 0 0 0 0 12 0 0 146 14 0 2 0 162 0 0 67 3 0 0 0 70
1730 - 1745 0 0 10 1 0 0 0 11 0 0 163 6 1 0 0 170 0 0 46 8 0 0 0 54
1745 - 1800 0 0 12 4 0 0 0 16 0 0 170 17 2 2 1 192 0 0 59 7 1 1 1 69
Hourly Total 0 0 42 5 0 0 0 47 0 0 651 57 6 6 1 721 0 1 221 24 1 1 1 249
1800 - 1815 0 0 7 0 0 0 0 7 0 1 181 16 2 2 0 202 0 2 66 5 0 0 0 73
1815 - 1830 0 0 12 2 0 0 0 14 0 0 208 18 4 3 1 234 0 0 59 7 0 0 0 66
Hourly Total 0 0 19 2 0 0 0 21 0 1 389 34 6 5 1 436 0 2 125 12 0 0 0 139
Session Total 0 0 83 11 0 0 0 94 0 1 1431 146 14 14 5 1611 0 3 420 50 1 2 1 477
Left to Hertingfordbury Road Ahead to A414 (West) Right to Thieves Lane
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012
Junction: Thieves Lane / A414 / Hertingfordbury Road
Approach: Hertingfordbury Road
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0730 - 0745 0 0 1 1 0 0 0 2 0 0 1 0 0 0 0 1 0 0 14 4 0 0 0 18
0745 - 0800 0 0 1 0 0 0 0 1 0 0 1 1 0 0 0 2 0 0 11 2 2 0 0 15
Hourly Total 0 0 2 1 0 0 0 3 0 0 2 1 0 0 0 3 0 0 25 6 2 0 0 33
0800 - 0815 0 0 6 0 0 0 0 6 0 0 6 1 0 0 2 9 0 0 20 1 0 0 0 21
0815 - 0830 0 0 2 0 0 0 0 2 0 0 6 0 0 0 0 6 0 0 18 1 1 0 0 20
0830 - 0845 0 0 5 0 0 0 0 5 0 0 8 1 0 0 0 9 0 0 26 1 0 0 0 27
0845 - 0900 0 0 7 0 0 0 0 7 0 0 8 1 0 0 0 9 0 0 30 2 0 0 0 32
Hourly Total 0 0 20 0 0 0 0 20 0 0 28 3 0 0 2 33 0 0 94 5 1 0 0 100
0900 - 0915 0 0 2 0 0 0 0 2 0 0 6 1 0 0 0 7 0 0 39 2 1 0 0 42
0915 - 0930 0 0 4 0 0 0 0 4 0 0 4 0 0 0 0 4 0 0 21 2 0 0 0 23
Hourly Total 0 0 6 0 0 0 0 6 0 0 10 1 0 0 0 11 0 0 60 4 1 0 0 65
Session Total 0 0 28 1 0 0 0 29 0 0 40 5 0 0 2 47 0 0 179 15 4 0 0 198
1630 - 1645 0 0 4 1 0 0 0 5 0 0 2 1 0 0 0 3 0 0 14 2 0 0 0 16
1645 - 1700 0 0 3 0 0 0 0 3 0 0 6 1 0 0 0 7 0 0 23 5 0 0 0 28
Hourly Total 0 0 7 1 0 0 0 8 0 0 8 2 0 0 0 10 0 0 37 7 0 0 0 44
1700 - 1715 0 0 5 0 0 0 0 5 0 0 7 1 0 0 0 8 0 0 22 1 0 0 0 23
1715 - 1730 0 0 4 0 0 0 0 4 0 0 10 0 0 0 0 10 0 0 17 3 0 0 0 20
1730 - 1745 0 0 2 0 0 0 0 2 0 0 6 3 0 0 0 9 0 0 17 3 0 0 0 20
1745 - 1800 0 0 3 0 0 0 0 3 0 0 13 2 0 0 0 15 0 0 21 4 0 0 0 25
Hourly Total 0 0 14 0 0 0 0 14 0 0 36 6 0 0 0 42 0 0 77 11 0 0 0 88
1800 - 1815 0 0 3 0 0 0 0 3 0 0 8 0 0 0 0 8 0 0 18 1 0 0 0 19
1815 - 1830 0 0 1 0 0 0 0 1 0 0 7 1 0 0 0 8 0 0 16 1 0 0 0 17
Hourly Total 0 0 4 0 0 0 0 4 0 0 15 1 0 0 0 16 0 0 34 2 0 0 0 36
Session Total 0 0 25 1 0 0 0 26 0 0 59 9 0 0 0 68 0 0 148 20 0 0 0 168
Left to A414 (West) Ahead to Thieves Lane Right to A414 (East)
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012
Junction: Thieves Lane / A414 / Hertingfordbury Road
Approach: A414 (West)
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0730 - 0745 0 0 13 5 0 0 0 18 0 2 189 35 3 6 0 235 0 0 1 1 0 0 0 2
0745 - 0800 0 0 27 1 1 0 0 29 0 2 200 24 4 2 0 232 0 0 3 0 0 0 0 3
Hourly Total 0 0 40 6 1 0 0 47 0 4 389 59 7 8 0 467 0 0 4 1 0 0 0 5
0800 - 0815 0 0 24 3 0 0 1 28 0 2 180 19 3 2 2 208 0 0 10 1 0 0 0 11
0815 - 0830 0 0 20 0 0 0 0 20 0 2 180 21 4 3 1 211 0 0 9 0 0 0 0 9
0830 - 0845 0 0 17 2 0 0 0 19 0 2 149 14 6 4 1 176 0 0 18 0 0 0 0 18
0845 - 0900 0 0 12 2 1 0 0 15 0 1 155 19 2 3 1 181 0 0 7 1 0 0 0 8
Hourly Total 0 0 73 7 1 0 1 82 0 7 664 73 15 12 5 776 0 0 44 2 0 0 0 46
0900 - 0915 0 0 12 2 1 0 0 15 0 3 135 11 5 1 2 157 0 0 4 1 0 0 0 5
0915 - 0930 0 0 15 2 0 0 0 17 0 0 150 21 4 0 0 175 0 0 3 0 0 0 0 3
Hourly Total 0 0 27 4 1 0 0 32 0 3 285 32 9 1 2 332 0 0 7 1 0 0 0 8
Session Total 0 0 140 17 3 0 1 161 0 14 1338 164 31 21 7 1575 0 0 55 4 0 0 0 59
1630 - 1645 0 0 44 8 1 0 0 53 0 4 199 40 3 3 0 249 0 0 2 1 0 0 0 3
1645 - 1700 0 0 56 19 0 0 0 75 0 3 200 33 1 3 0 240 0 0 13 1 0 0 0 14
Hourly Total 0 0 100 27 1 0 0 128 0 7 399 73 4 6 0 489 0 0 15 2 0 0 0 17
1700 - 1715 0 1 69 10 0 0 0 80 0 1 191 31 0 1 2 226 0 0 4 0 0 0 0 4
1715 - 1730 0 0 85 9 1 0 0 95 0 0 197 37 1 1 0 236 0 0 7 1 0 0 0 8
1730 - 1745 1 1 93 8 0 0 0 103 0 1 197 37 1 0 0 236 0 0 13 0 1 0 0 14
1745 - 1800 0 0 85 6 0 0 0 91 0 1 203 20 2 4 0 230 0 0 6 2 0 0 0 8
Hourly Total 1 2 332 33 1 0 0 369 0 3 788 125 4 6 2 928 0 0 30 3 1 0 0 34
1800 - 1815 0 0 87 8 0 0 1 96 0 0 212 21 2 0 0 235 0 0 7 0 0 0 0 7
1815 - 1830 0 1 69 4 0 0 0 74 0 2 226 11 1 1 0 241 0 0 8 0 0 0 0 8
Hourly Total 0 1 156 12 0 0 1 170 0 2 438 32 3 1 0 476 0 0 15 0 0 0 0 15
Session Total 1 3 588 72 2 0 1 667 0 12 1625 230 11 13 2 1893 0 0 60 5 1 0 0 66
Left to Thieves Lane Ahead to A414 (East) Right to Hertingfordbury Road
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 201213 Thieves LnA414 EHertingfordbury RdA414 WN/A 7 2 ## TRUE TRUE TRUE FALSE
Junction: Thieves Lane / A414 / Hertingfordbury Road
Vehicle Class:
Start Time:
End Time:
734 95 201
161 NORTH
1575 235
59 2631
96
29 47 198
Note: The above diagram represents the Junction surveyed, although may not be the exact
layout of the actual location.
Important This spreadsheet & Interactive Vehicle Flow Diagram was produced based on specific
Note: parameters. Consequently, alteration to the spreadsheet format or it's properties
may result in malfunction.
Hert
ing
ford
bu
r
y R
oad
A414 (East)A414 (West)
Th
ieves L
an
e
ALL CLASSES
1) 0730
1) 0930
Peak Hour
Hertfordshire - Manual Traffic Survey, Tuesday 4th December 2012
Junction: Thieves Lane / A414 / Hertingfordbury Road
Approach: A414 (West)
TIME Lane 1 Lane 2 Lane 1 Lane 2 Lane 1 Lane 2 Lane 1 Lane 2
0730 - 0745 2 1 2 2 1 0 3 2
0745 - 0800 2 2 3 2 2 0 3 3
0800 - 0815 1 2 4 2 1 0 4 2
0815 - 0830 1 2 6 4 2 3 3 2
0830 - 0845 2 0 7 6 3 2 5 2
0845 - 0900 0 0 6 5 1 2 4 1
0900 - 0915 1 0 4 4 1 2 3 2
0915 - 0930 1 0 4 3 1 1 3 3
1630 - 1645 4 0 6 3 1 0 6 4
1645 - 1700 0 0 7 2 3 2 6 3
1700 - 1715 2 0 5 3 3 3 3 2
1715 - 1730 2 0 4 2 3 2 4 3
1730 - 1745 3 0 7 4 3 2 5 4
1745 - 1800 1 0 5 3 3 1 7 3
1800 - 1815 0 0 5 2 2 2 6 3
1815 - 1830 0 0 4 2 2 1 5 4
Thieves Lane A414 (East) Hertingfordbury Road A414 (West)
TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400
Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.
Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59
Weather & comments Fine
STRAIGHT ON RIGHT
TO Welwyn Road eastbound INTO Thieves Lane
FROM Welwyn Road FROM Welwyn Road
HCV HCV HCV
HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR
CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C
07:00 0 0 22 0 3 1 0 26 0 0 9 0 1 0 0 10 07:00 36
07:15 0 0 26 0 4 0 0 30 0 0 7 0 2 0 0 9 07:15 39
07:30 0 0 56 0 12 0 0 68 0 0 14 2 6 0 0 22 07:30 90
07:45 0 0 84 2 11 0 0 97 0 1 22 0 3 0 0 26 07:45 123
08:00 0 2 90 1 8 2 0 103 0 0 36 0 1 0 1 38 08:00 141
08:15 0 0 48 2 6 1 1 58 0 0 24 1 1 0 0 26 08:15 84
08:30 0 2 41 2 7 1 1 54 0 0 30 0 2 0 0 32 08:30 86
08:45 0 0 48 0 6 0 0 54 0 0 16 0 4 0 0 20 08:45 74
09:00 0 0 29 0 4 0 0 33 0 0 12 0 2 0 0 14 09:00 47
09:15 0 0 24 0 3 0 0 27 0 0 17 0 0 0 0 17 09:15 44
09:30 0 0 32 5 1 0 0 38 0 0 9 0 0 0 0 9 09:30 47
09:45 0 0 18 1 5 0 0 24 0 0 10 0 0 0 0 10 09:45 34
Totals 0 4 518 13 70 5 2 612 0 1 206 3 22 0 1 Totals 845
STRAIGHT ON RIGHT
TO Welwyn Road eastbound INTO Thieves Lane
FROM Welwyn Road FROM Welwyn Road
12:00 0 0 37 0 3 2 2 44 0 0 5 1 0 0 1 7 12:00 51
12:15 0 0 25 0 4 0 1 30 0 0 8 0 0 0 0 8 12:15 38
12:30 0 0 19 0 1 1 0 21 0 0 9 0 2 0 0 11 12:30 32
T
O
T
A
L
INTO
FROM
Hertfordshire
Highways
T
O
T
A
L
INTO
FROM
12:30 0 0 19 0 1 1 0 21 0 0 9 0 2 0 0 11 12:30 32
12:45 0 3 35 1 5 0 0 44 0 0 11 0 0 0 1 12 12:45 56
13:00 0 0 24 0 4 0 0 28 0 0 8 0 1 0 0 9 13:00 37
13:15 0 0 32 2 2 0 0 36 0 0 10 0 3 1 0 14 13:15 50
13:30 0 0 28 1 2 0 0 31 0 1 6 0 0 0 0 7 13:30 38
13:45 0 0 17 0 3 0 1 21 0 0 8 0 0 0 0 8 13:45 29
Totals 0 3 217 4 24 3 4 255 0 1 65 1 6 1 2 76 Totals 331
STRAIGHT ON RIGHT
TO Welwyn Road eastbound INTO Thieves Lane
FROM Welwyn Road FROM Welwyn Road
16:00 0 0 49 0 8 0 2 59 0 0 14 0 1 1 1 17 16:00 76
16:15 0 2 60 1 10 1 0 74 0 0 11 0 0 1 0 12 16:15 86
16:30 0 1 44 1 6 0 0 52 0 0 9 0 1 0 0 10 16:30 62
16:45 0 0 46 1 5 0 0 52 0 0 12 0 1 0 0 13 16:45 65
17:00 0 0 134 1 8 1 0 144 0 0 21 0 1 0 0 22 17:00 166
17:15 0 0 127 1 6 0 0 134 0 0 16 0 0 0 0 16 17:15 150
17:30 0 0 79 0 3 0 0 82 0 0 14 0 1 0 0 15 17:30 97
17:45 2 0 115 1 3 1 0 120 0 1 37 1 2 0 0 41 17:45 161
18:00 1 0 83 1 8 0 0 92 0 1 19 0 2 0 0 22 18:00 114
18:15 1 2 42 1 4 0 0 49 0 0 7 0 0 0 0 7 18:15 56
18:30 0 0 50 0 3 0 0 53 1 0 21 0 0 0 0 21 18:30 74
18:45 0 2 47 0 0 0 0 49 0 0 11 0 0 0 0 11 18:45 60
Totals 4 7 876 8 64 3 2 960 1 2 192 1 9 2 1 207 Totals 1167
INTO
FROM
T
O
T
A
L
FORM SF-224a SPECIAL ISSUE 3 Page 1 of 4
TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400
Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.
Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59
Weather & comments Fine Period changeover at 12:15 was delayed to 12:20.
LEFT RIGHT
Welwyn Road westbound TO INTO Welwyn Road eastbound
Thieves Lane FROM FROM Thieves Lane
HCV HCV HCV
HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR
CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C
07:00 0 0 10 0 5 0 0 15 0 0 8 0 3 1 2 14 07:00 29
07:15 0 0 19 0 3 0 0 22 0 0 14 0 7 0 2 23 07:15 45
07:30 0 1 21 0 2 0 0 24 0 0 37 0 5 0 1 43 07:30 67
07:45 1 3 30 0 6 1 0 40 0 0 28 1 9 1 0 39 07:45 79
08:00 0 1 49 1 3 0 0 54 0 0 35 6 8 2 0 51 08:00 105
08:15 0 0 55 0 3 0 0 58 0 0 34 0 0 1 2 37 08:15 95
08:30 0 0 71 0 1 2 0 74 1 0 46 1 0 0 0 47 08:30 121
08:45 0 0 60 0 5 0 0 65 0 0 41 1 2 1 1 46 08:45 111
09:00 0 0 38 0 0 0 0 38 0 0 25 0 5 1 0 31 09:00 69
09:15 0 0 18 0 3 0 0 21 0 0 22 0 3 1 0 26 09:15 47
09:30 0 0 24 0 6 1 0 31 0 0 15 0 0 2 1 18 09:30 49
09:45 0 0 19 0 0 0 1 20 0 0 23 0 1 0 0 24 09:45 44
Totals 1 5 414 1 37 4 1 462 1 0 328 9 43 10 9 Totals 861
LEFT RIGHT
Welwyn Road westbound TO INTO Welwyn Road eastbound
Thieves Lane FROM FROM Thieves Lane
12:00 0 0 11 0 3 0 0 14 0 0 36 0 4 0 1 41 12:00 55
12:15 0 0 9 0 2 0 0 11 0 1 13 0 4 0 0 18 12:15 29
12:30 1 0 15 0 2 0 0 17 1 0 42 0 5 0 0 47 12:30 64
Hertfordshire
Highways
T
O
T
A
L
INTO
FROM
T
O
T
A
L
INTO
FROM
12:30 1 0 15 0 2 0 0 17 1 0 42 0 5 0 0 47 12:30 64
12:45 1 0 20 0 2 0 0 22 0 0 43 0 1 0 0 44 12:45 66
13:00 0 0 12 0 2 0 0 14 0 0 21 0 7 0 1 29 13:00 43
13:15 0 0 15 0 2 0 0 17 0 0 31 1 1 1 0 34 13:15 51
13:30 0 0 10 0 2 1 0 13 0 0 15 0 2 1 0 18 13:30 31
13:45 0 0 17 0 4 2 0 23 0 0 28 1 5 0 0 34 13:45 57
Totals 2 0 109 0 19 3 0 131 1 1 229 2 29 2 2 265 Totals 396
LEFT RIGHT
Welwyn Road westbound TO INTO Welwyn Road eastbound
Thieves Lane FROM FROM Thieves Lane
16:00 0 2 18 1 2 0 0 23 0 0 49 0 12 0 0 61 16:00 84
16:15 0 1 28 0 6 0 0 35 0 0 52 0 12 0 0 64 16:15 99
16:30 0 0 25 0 1 0 0 26 0 0 60 0 11 0 0 71 16:30 97
16:45 0 0 27 0 4 0 0 31 0 1 90 0 10 2 0 103 16:45 134
17:00 0 0 36 0 9 0 0 45 0 1 94 0 22 1 0 118 17:00 163
17:15 0 0 22 0 1 0 0 23 0 0 83 2 8 0 0 93 17:15 116
17:30 0 0 36 0 5 0 0 41 0 0 106 1 8 2 0 117 17:30 158
17:45 1 0 32 0 2 1 0 35 0 2 82 0 7 0 0 91 17:45 126
18:00 0 1 25 0 3 0 0 29 0 0 87 0 10 3 0 100 18:00 129
18:15 0 1 32 0 1 0 0 34 0 0 62 0 6 0 0 68 18:15 102
18:30 0 0 25 0 2 0 0 27 0 0 63 0 3 0 0 66 18:30 93
18:45 0 0 19 0 2 0 0 21 0 0 43 0 2 0 0 45 18:45 66
Totals 1 5 325 1 38 1 0 370 0 4 871 3 111 8 0 997 Totals 1367
T
O
T
A
L
INTO
FROM
FORM SF-224a SPECIAL ISSUE 3 Page 2 of 4
TRAFFIC SURVEY - JUNCTION (CLASSIFIED) 1100 to 1400
Road No B1000 Location Welwyn Road j/w Thieves Lane, Hertford.
Day & Date Tuesday 24th May 2011 Job No. 11-052 Grid Ref. 59
Weather & comments Fine
LEFT STRAIGHT ON
Thieves Lane TO Welwyn Road westbound INTO
Welwyn Road FROM Welwyn Road FROM
HCV HCV HCV
HOUR P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL P/C M/C CARS PSV LCV <3 TON >3 TON TOTAL HOUR
CHEVRON excl P/C CHEVRON excl P/C CHEVRON excl P/C
07:00 0 0 31 0 7 0 0 38 1 1 35 1 5 1 0 43 07:00 81
07:15 0 0 43 1 13 0 1 58 2 1 45 1 9 0 0 56 07:15 114
07:30 0 2 77 0 5 1 1 86 0 2 76 3 10 0 0 91 07:30 177
07:45 0 2 80 0 9 4 1 96 0 0 111 0 11 0 0 122 07:45 218
08:00 0 2 85 1 3 0 1 92 1 0 89 1 10 1 0 101 08:00 193
08:15 0 1 100 0 11 1 0 113 1 1 94 0 11 2 0 108 08:15 221
08:30 0 0 87 2 10 2 0 101 0 0 73 0 4 0 1 78 08:30 179
08:45 0 0 79 0 5 0 0 84 0 0 49 4 3 0 0 56 08:45 140
09:00 0 0 72 2 8 2 1 85 0 1 46 1 4 2 0 54 09:00 139
09:15 0 1 42 0 4 4 0 51 0 0 37 0 4 1 0 42 09:15 93
09:30 0 1 39 2 4 0 0 46 0 1 33 1 3 0 0 38 09:30 84
09:45 0 0 39 0 3 2 0 44 0 0 41 0 4 1 0 46 09:45 90
Totals 0 9 774 8 82 16 5 894 5 7 729 12 78 8 1 835 Totals 1729
LEFT STRAIGHT ON
Thieves Lane TO Welwyn Road westbound INTO
Welwyn Road FROM Welwyn Road FROM
12:00 1 0 33 0 3 0 0 36 0 0 31 0 8 0 0 39 12:00 75
12:15 1 0 29 1 1 1 0 32 1 0 23 0 7 1 0 31 12:15 63
12:30 2 0 25 1 5 1 0 32 0 0 33 1 4 1 0 39 12:30 71
Hertfordshire
Highways
T
O
T
A
L
INTO
FROM
T
O
T
A
L
INTO
FROM
12:30 2 0 25 1 5 1 0 32 0 0 33 1 4 1 0 39 12:30 71
12:45 0 0 30 0 7 0 1 38 0 0 22 1 2 1 0 26 12:45 64
13:00 0 0 29 0 5 0 0 34 0 0 18 0 6 0 1 25 13:00 59
13:15 0 0 21 0 5 1 0 27 0 1 27 0 4 0 1 33 13:15 60
13:30 0 0 19 1 4 1 0 25 0 1 33 1 6 0 0 41 13:30 66
13:45 0 0 28 0 1 0 1 30 0 0 18 0 6 0 0 24 13:45 54
Totals 4 0 214 3 31 4 2 254 1 2 205 3 43 3 2 258 Totals 512
LEFT STRAIGHT ON
Thieves Lane TO Welwyn Road westbound INTO
Welwyn Road FROM Welwyn Road FROM
16:00 0 0 25 1 4 1 0 31 0 0 39 0 6 0 0 45 16:00 76
16:15 0 0 37 3 7 0 1 48 0 0 27 1 6 0 0 34 16:15 82
16:30 0 0 33 0 2 1 0 36 0 1 38 1 6 1 0 47 16:30 83
16:45 0 0 31 0 3 0 0 34 0 0 47 0 9 0 0 56 16:45 90
17:00 0 1 34 2 5 1 0 43 0 2 40 0 3 0 0 45 17:00 88
17:15 0 0 34 0 2 0 0 36 0 0 44 0 6 0 0 50 17:15 86
17:30 0 0 41 0 4 0 0 45 0 0 42 0 5 0 0 47 17:30 92
17:45 0 1 37 0 2 0 0 40 0 2 38 0 1 0 0 41 17:45 81
18:00 0 1 44 1 2 1 0 49 0 0 34 1 6 0 0 41 18:00 90
18:15 0 0 34 1 0 0 0 35 0 0 31 0 4 0 0 35 18:15 70
18:30 1 0 37 0 4 0 0 41 0 1 28 0 3 0 0 32 18:30 73
18:45 0 0 17 1 4 0 0 22 0 0 27 0 1 0 0 28 18:45 50
Totals 1 3 404 9 39 4 1 460 0 6 435 3 56 1 0 501 Totals 961
T
O
T
A
L
INTO
FROM
FORM SF-224a SPECIAL ISSUE 3 Page 3 of 4
Page I-9
Appendix: I ASSIGNMENT MODEL
Welwyn Road Roundabout
3% 103
141 3% 38
Welwyn Road W Welwyn Road E
155 101 2%
92 2%
54 51
2% 16%
2%
130 1
Turpin
Close
63 1 4
2
132
63
6%
Thieves Lane
1% 0% 0%
85 4 28
4% 28
3% 208
0% 11
A414 West A414 East
26 4%
367 2%
13 0%
6 9 21
0% 22% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T1
BASELINE SURVEYS AM PEAK 08:00-08:15
DEVELOPMENT SITE
Welwyn Road Roundabout
7% 58
84 4% 26
Welwyn Road W Welwyn Road E
166 108 2%
113 2%
58 37
0% 8%
2%
139 0.8
Turpin
Close
64 1 4
2
141
64
3%
Thieves Lane
0% 0% 0%
98 15 27
0% 20
4% 211
0% 9
A414 West A414 East
38 5%
312 2%
25 0%
2 6 20
0% 0% 5%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T2
BASELINE SURVEYS AM PEAK 08:15-08:30
DEVELOPMENT SITE
Welwyn Road Roundabout
7% 54
86 0% 32
Welwyn Road W Welwyn Road E
152 78 1%
101 1%
74 47
3% 2%
1%
133 1
Turpin
Close
72 1 4
2
135
72
0%
Thieves Lane
0% 0% 6%
131 38 35
0% 19
6% 176
0% 18
A414 West A414 East
44 0%
308 3%
18 0%
5 9 27
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T3
BASELINE SURVEYS AM PEAK 08:30-08:45
DEVELOPMENT SITE
Welwyn Road Roundabout
0% 54
74 0% 20
Welwyn Road W Welwyn Road E
121 56 7%
84 7%
65 46
0% 7%
6%
104 1
Turpin
Close
68 1 4
2
106
68
1%
Thieves Lane
0% 0% 0%
94 20 22
7% 15
3% 181
0% 8
A414 West A414 East
44 0%
331 4%
12 0%
7 9 32
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T4
BASELINE SURVEYS AM PEAK 08:45-09:00
DEVELOPMENT SITE
Welwyn Road Roundabout
4% 269
385 2% 116
Welwyn Road W Welwyn Road E
594 343 3%
390 3%
251 181
1% 8%
3%
506 3
Turpin
Close
267 2 16
9
515
267
2%
Thieves Lane
0% 0% 2%
408 77 112
2% 82
4% 776
0% 46
A414 West A414 East
152 2%
1318 3%
68 0%
20 33 100
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T5
BASELINE SURVEYS AM PEAK 08:00-09:00
DEVELOPMENT SITE
Welwyn Road Roundabout
70% 21
3 30% 23% 13
Welwyn Road W 25% 3 Welwyn Road E
14 7
6 30 9 75% 12 77%
16% 85%
16 42
25% 75%
Dwellings 80
Trips
In Out 24
AM 12 36
PM 36 12
58
Trip Rate
In Out
AM 0.15 0.45 50%
PM 0.45 0.15 62% 56 15 9
38% 34
Dwellings 200
Trips 15 2
In Out 50%
AM 30 90
PM 90 30
Thieves Lane
68% 13% 19%
30 6 8
31% 5
A414 West A414 East
10 57%
2
12%
Hertingfordbury Rd
FIGURE T6
PROPOSED DEVELOPMENT TRAFFIC AM PEAK
DEVELOPMENT SITE
Welwyn Road Roundabout
70% 5
1 30% 23% 3
Welwyn Road W 25% 1 Welwyn Road E
3 2
1 8 2 75% 3 77%
16% 85%
4 10
25% 75%
Dwellings 80
Trips
In Out 6
AM 3 9
PM 9 3
14
Trip Rate
In Out
AM 0.04 0.11 50%
PM 0.11 0.04 62% 14 4 2
38% 9
Dwellings 200
Trips 4 1
In Out 50%
AM 8 23
PM 23 8
Thieves Lane
68% 13% 19%
7 1 2
31% 1
A414 West A414 East
2 57%
1
12%
Hertingfordbury Rd
FIGURE T7
PROPOSED DEVELOPMENT TRAFFIC AM PEAK - 15 MINUTE INTERVAL
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 108
142 3% 41
Welwyn Road W 1 Welwyn Road E
158 103 2%
1 8 2 95 2%
58 61
2% 16%
2%
136 1
Turpin
Close
77 1 4
2
135
64
6%
Thieves Lane
1% 0% 0%
92 5 30
4% 29
3% 208
0% 11
A414 West A414 East
28 4%
367 2%
13 0%
6 10 21
0% 22% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T8
BASELINE + DEVELOPMENT AM PEAK 08:00-08:15
DEVELOPMENT SITE
Welwyn Road Roundabout
7% 63
85 4% 29
Welwyn Road W 1 Welwyn Road E
169 110 2%
1 8 2 116 2%
62 47
0% 8%
2%
145
Turpin
Close
78 1 4
2
14 4 144
9
4 65
3%
Thieves Lane
0% 0% 0%
105 16 29
0% 21
4% 211
0% 9
A414 West A414 East
40 5%
312 2%
25 0%
2 7 20
0% 0% 5%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T9
BASELINE + DEVELOPMENT AM PEAK 08:15-08:30
DEVELOPMENT SITE
Welwyn Road Roundabout
7% 59
87 0% 35
Welwyn Road W 1 Welwyn Road E
155 80 1%
1 8 2 104 1%
78 57
3% 2%
1%
139 1
Turpin
Close
86 1 4
2
14 4 138
9
4 73
0%
Thieves Lane
0% 0% 6%
138 39 37
0% 20
6% 176
0% 18
A414 West A414 East
46 0%
308 3%
18 0%
5 10 27
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T10
BASELINE + DEVELOPMENT AM PEAK 08:30-08:45
DEVELOPMENT SITE
Welwyn Road Roundabout
0% 59
75 0% 23
Welwyn Road W 1 0 Welwyn Road E
124 58 7%
1 8 2 87 7%
69 56
0% 7%
0
110
Turpin
Close
82 1 4
2
1
14 4 109
9
4 69
2%
Thieves Lane
0% 0% 0%
101 21 24
7% 16
3% 181
0% 8
A414 West A414 East
46 0%
331 4%
12 0%
7 10 32
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T11
BASELINE + DEVELOPMENT AM PEAK 08:45-09:00
DEVELOPMENT SITE
Welwyn Road Roundabout
4% 290
388 2% 129
Welwyn Road W 3 Welwyn Road E
608 350 3%
6 30 9 402 3%
267 223
1% 8%
3%
530 3
Turpin
Close
325 2 16
9
56 15 524
34
15 269
3%
Thieves Lane
0% 0% 2%
438 83 120
2% 87
4% 776
0% 46
A414 West A414 East
162 2%
1318 3%
68 0%
20 35 100
0% 6% 1%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T12
BASELINE + DEVELOPMENT AM PEAK 08:00-09:00
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 144
166 0% 22
Welwyn Road W Welwyn Road E
90 45 0%
43 0%
45 118
0% 1%
0%
65 5
Turpin
Close
144 2 1
1
66
144
1%
Thieves Lane
6% 0% 0%
35 5 9
0% 80
3% 226
0% 4
A414 West A414 East
56 4%
197 2%
8 0%
5 8 23
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T13
BASELINE SURVEYS PM PEAK 17:00-17:15
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 134
150 0% 16
Welwyn Road W Welwyn Road E
73 50 0%
36 0%
23 93
0% 2%
0%
52 5
Turpin
Close
175 2 1
1
53
175
2%
Thieves Lane
0% 0% 0%
38 6 18
1% 95
2% 236
0% 8
A414 West A414 East
70 4%
162 2%
12 0%
4 10 20
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T14
BASELINE SURVEYS PM PEAK 17:15-17:30
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 82
97 0% 15
Welwyn Road W Welwyn Road E
88 47 0%
45 0%
41 117
0% 3%
0%
60 5
Turpin
Close
166 2 1
1
61
166
1%
Thieves Lane
0% 0% 0%
35 5 22
0% 103
1% 236
7% 14
A414 West A414 East
54 4%
170 2%
11 0%
2 9 20
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T15
BASELINE SURVEYS PM PEAK 17:30-17:45
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 120
161 2% 41
Welwyn Road W Welwyn Road E
76 41 0%
40 0%
35 91
3% 0%
1%
81 5
Turpin
Close
175 2 1
1
82
175
2%
Thieves Lane
0% 0% 0%
34 3 21
0% 91
3% 230
0% 8
A414 West A414 East
69 4%
192 2%
16 0%
3 15 25
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T16
BASELINE SURVEYS PM PEAK 17:45-18:00
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 480
574 1% 94
Welwyn Road W Welwyn Road E
327 183 0%
164 0%
144 419
1% 1%
0%
258 19
Turpin
Close
660 9 3
2
260
660
2%
Thieves Lane
1% 0% 0%
142 19 70
0% 369
2% 928
3% 34
A414 West A414 East
249 4%
721 2%
47 0%
14 42 88
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T17
BASELINE SURVEYS PM PEAK 17:00-18:00
DEVELOPMENT SITE
Welwyn Road Roundabout
84% 8
21 16% 37% 22
Welwyn Road W 16% 6 Welwyn Road E
4 19
3 9 30 85% 35 63%
25% 75%
15 11
25% 75%
Dwellings 80
Trips
In Out 57
AM 12 36
PM 36 12
26
Trip Rate
In Out
AM 0.15 0.45 62%
PM 0.45 0.15 50% 15 56 1
50% 15
Dwellings 200
Trips 34 11
In Out 38%
AM 30 90
PM 90 30
Thieves Lane
62% 8% 30%
10 1 5
56% 25
A414 West A414 East
17 38%
3
6%
Hertingfordbury Rd
FIGURE T18
PROPOSED DEVELOPMENT TRAFFIC PM PEAK
DEVELOPMENT SITE
Welwyn Road Roundabout
84% 2
5 16% 37% 6
Welwyn Road W 16% 1 Welwyn Road E
1 5
1 2 8 85% 9 63%
25% 75%
4 3
25% 75%
Dwellings 80
Trips
In Out 14
AM 12 36
PM 36 12
7
Trip Rate
In Out
AM 0.15 0.45 62%
PM 0.45 0.15 50% 4 14
50% 4
Dwellings 200
Trips 9 3
In Out 38%
AM 30 90
PM 90 30
Thieves Lane
62% 8% 30%
3 0 1
56% 6
A414 West A414 East
4 38%
1
6%
Hertingfordbury Rd
FIGURE T19
PROPOSED DEVELOPMENT TRAFFIC PM PEAK 15MIN INTERVALS
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 146
171 0% 28
Welwyn Road W 1 Welwyn Road E
91 50 0%
1 2 8 52 0%
49 121
0% 1%
0%
79 5
Turpin
Close
151 2 1
1
4 14 66
4
9 147
1%
Thieves Lane
6% 0% 0%
38 5 10
0% 86
3% 226
0% 4
A414 West A414 East
60 4%
197 2%
8 0%
5 9 23
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T20
BASELINE + DEVELOPMENT PM PEAK 17:00-17:15
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 136
155 0% 22
Welwyn Road W 1 Welwyn Road E
74 55 0%
1 2 8 45 0%
27 96
0% 2%
0%
66 5
Turpin
Close
182 2 1
1
4 14 53
4
9 178
2%
Thieves Lane
0% 0% 0%
41 6 19
1% 101
2% 236
0% 8
A414 West A414 East
74 4%
162 2%
12 0%
4 11 20
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T21
BASE + DEVELOPMENT PM PEAK 17:15-17:30
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 84
102 0% 21
Welwyn Road W 1 Welwyn Road E
89 52 0%
1 2 8 54 0%
45 120
0% 3%
0%
74 5
Turpin
Close
173 2 1
1
4 14 61
4
9 169
1%
Thieves Lane
0% 0% 0%
38 5 23
0% 109
1% 236
7% 14
A414 West A414 East
58 4%
170 2%
11 0%
2 10 20
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T22
BASE + DEVELOPMENT PM PEAK 17:30-17:45
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 122
166 2% 47
Welwyn Road W 1 Welwyn Road E
77 46 0%
1 2 8 49 0%
39 94
3% 0%
1%
95 5
Turpin
Close
182 2 1
1
4 14 82
4
178
2%
Thieves Lane
0% 0% 0%
37 3 22
0% 97
3% 230
0% 8
A414 West A414 East
73 4%
192 2%
16 0%
3 16 25
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T23
BASE + DEVELOPMENT PM PEAK 17:45-18:00
DEVELOPMENT SITE
Welwyn Road Roundabout
3% 488
595 1% 116
Welwyn Road W 6 Welwyn Road E
331 202 0%
3 9 30 199 0%
159 430
1% 1%
0%
315 19
Turpin
Close
686 9 3
2
15 56 261
15
34 671
1%
Thieves Lane
1% 0% 0%
152 20 75 0
0% 394
2% 928
3% 34
A414 West A414 East
266 4%
721 2%
47 0%
14 45 88
0% 0% 0%
Hertingfordbury Rd
Key:
100 Total no. of vehicles
10% Percentage HGVs (inc PSVs)
FIGURE T24
BASE + DEVELOPMENT PM PEAK 17:00-18:00
DEVELOPMENT SITE
Page J-10
Appendix: J TRICS DATA
LIST OF SITES relevant to selection parameters
1 BD-03-A-01SEMI DETACHED, LUTONBEDFORDSHIRE
NEW BEDFORD ROAD
LUTON
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 131
Survey date:THURSDAY 08/07/2004 Survey Type:MANUAL
2 BD-03-A-02SEMI DETACHED, LUTONBEDFORDSHIRE
RIDDY LANE
LUTON
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 82
Survey date:TUESDAY 06/07/2004 Survey Type:MANUAL
3 CA-03-A-02MIXED HOUSES, PETERBOROUGHCAMBRIDGESHIRE
THORPE ROAD
PETERBOROUGH
Edge of Town Centre
Residential Zone
Total Number of dwellings: 363
Survey date:THURSDAY 13/05/2004 Survey Type:MANUAL
4 CA-03-A-04DETACHED, PETERBOROUGHCAMBRIDGESHIRE
THORPE PARK ROAD
PETERBOROUGH
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 9
Survey date:TUESDAY 18/10/2011 Survey Type:MANUAL
5 CB-03-A-03SEMI DETACHED, WORKINGTONCUMBRIA
HAWKSHEAD AVENUE
WORKINGTON
Edge of Town
Residential Zone
Total Number of dwellings: 40
Survey date:THURSDAY 20/11/2008 Survey Type:MANUAL
6 CB-03-A-04SEMI DETACHED, WORKINGTONCUMBRIA
MOORCLOSE ROAD
SALTERBACK
WORKINGTON
Edge of Town
No Sub Category
Total Number of dwellings: 82
Survey date:FRIDAY 24/04/2009 Survey Type:MANUAL
7 CH-03-A-05DETACHED, CREWECHESHIRE
SYDNEY ROAD
SYDNEY
CREWE
Edge of Town
Residential Zone
Total Number of dwellings: 17
Survey date:TUESDAY 14/10/2008 Survey Type:MANUAL
8 CH-03-A-06SEMI-DET./BUNGALOWS,CREWECHESHIRE
CREWE ROAD
CREWE
Suburban Area (PPS6 Out of Centre)
No Sub Category
Total Number of dwellings: 129
Survey date:TUESDAY 14/10/2008 Survey Type:MANUAL
9 CH-03-A-08DETACHED, CHESTERCHESHIRE
WHITCHURCH ROAD
BOUGHTON HEATH
CHESTER
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 11
Survey date:TUESDAY 22/05/2012 Survey Type:MANUAL
10 CW-03-A-01TERRACED, PENZANCECORNWALL
ALVERTON ROAD
PENZANCE
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 13
Survey date:THURSDAY 30/06/2005 Survey Type:MANUAL
11 CW-03-A-02SEMI D./DETATCHED, TRUROCORNWALL
BOSVEAN GARDENS
TRURO
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 73
Survey date:TUESDAY 18/09/2007 Survey Type:MANUAL
12 DS-03-A-01SEMI D./TERRACED, DRONFIELDDERBYSHIRE
THE AVENUE
HOLMESDALE
DRONFIELD
Neighbourhood Centre (PPS6 Local Centre)
Residential Zone
Total Number of dwellings: 20
Survey date:THURSDAY 22/06/2006 Survey Type:MANUAL
13 ES-03-A-02 PRIVATE HOUSING,PEACEHAVENEAST SUSSEX
SOUTH COAST ROAD
PEACEHAVEN
Edge of Town
Residential Zone
Total Number of dwellings: 37
Survey date:FRIDAY 18/11/2011 Survey Type:MANUAL
14 EX-03-A-01 SEMI-DET., STANFORD-LE-HOPEESSEX
MILTON ROAD
CORRINGHAM
STANFORD-LE-HOPE
Edge of Town
Residential Zone
Total Number of dwellings: 237
Survey date:TUESDAY 13/05/2008 Survey Type:MANUAL
15 GM-03-A-10DETACHED/SEMI, MANCHESTERGREATER MANCHESTER
BUTT HILL DRIVE
PRESTWICH
MANCHESTER
Edge of Town
Residential Zone
Total Number of dwellings: 29
Survey date:WEDNESDAY 12/10/2011 Survey Type:MANUAL
16 GS-03-A-01SEMI D./TERRACED, GLOUCESTERGLOUCESTERSHIRE
KINGSHOLM ROAD
KINGSHOLM
GLOUCESTER
Edge of Town Centre
No Sub Category
Total Number of dwellings: 73
Survey date:TUESDAY 25/05/2004 Survey Type:MANUAL
17 LC-03-A-22 BUNGALOWS, BLACKPOOLLANCASHIRE
CLIFTON DRIVE NORTH
BLACKPOOL
Edge of Town
Residential Zone
Total Number of dwellings: 98
Survey date:TUESDAY 18/10/2005 Survey Type:MANUAL
18 LC-03-A-29 DETACHED/SEMI D., BLACKBURNLANCASHIRE
REVIDGE ROAD
FOUR LANE ENDS
BLACKBURN
Edge of Town
Residential Zone
Total Number of dwellings: 185
Survey date:THURSDAY 10/06/2004 Survey Type:MANUAL
19 LE-03-A-01 DETACHED, MELTON MOWBRAYLEICESTERSHIRE
REDWOOD AVENUE
MELTON MOWBRAY
Edge of Town
Residential Zone
Total Number of dwellings: 11
Survey date:TUESDAY 03/05/2005 Survey Type:MANUAL
20 LN-03-A-01MIXED HOUSES, LINCOLNLINCOLNSHIRE
BRANT ROAD
BRACEBRIDGE
LINCOLN
Edge of Town
Residential Zone
Total Number of dwellings: 150
Survey date:TUESDAY 15/05/2007 Survey Type:MANUAL
21 LN-03-A-02MIXED HOUSES, LINCOLNLINCOLNSHIRE
HYKEHAM ROAD
LINCOLN
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 186
Survey date:MONDAY 14/05/2007 Survey Type:MANUAL
22 LN-03-A-03SEMI DETACHED, LINCOLNLINCOLNSHIRE
ROOKERY LANE
BOULTHAM
LINCOLN
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 22
Survey date:TUESDAY 18/09/2012 Survey Type:MANUAL
23 MS-03-A-01TERRACED, RUNCORNMERSEYSIDE
PALACE FIELDS AVENUE
RUNCORN
Neighbourhood Centre (PPS6 Local Centre)
Residential Zone
Total Number of dwellings: 372
Survey date:THURSDAY 06/10/2005 Survey Type:MANUAL
24 NT-03-A-03SEMI DETACHED,KIRKBY-IN-ASHFDNOTTINGHAMSHIRE
B6018 SUTTON ROAD
KIRKBY-IN-ASHFIELD
Edge of Town
Residential Zone
Total Number of dwellings: 166
Survey date:WEDNESDAY 28/06/2006 Survey Type:MANUAL
25 NY-03-A-01MIXED HOUSES,NORTHALLERTONNORTH YORKSHIRE
GRAMMAR SCHOOL LANE
NORTHALLERTON
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 52
Survey date:TUESDAY 25/09/2007 Survey Type:MANUAL
26 NY-03-A-03PRIVATE HOUSING, BOROUGHBRIDGENORTH YORKSHIRE
NEW ROW
BOROUGHBRIDGE
Edge of Town Centre
Residential Zone
Total Number of dwellings: 14
Survey date:MONDAY 15/09/2008 Survey Type:MANUAL
27 NY-03-A-05HOUSES AND FLATS, RIPONNORTH YORKSHIRE
BOROUGHBRIDGE ROAD
RIPON
Edge of Town
No Sub Category
Total Number of dwellings: 71
Survey date:MONDAY 22/09/2008 Survey Type:MANUAL
28 NY-03-A-06BUNGALOWS/SEMI DET., BBDGENORTH YORKSHIRE
HORSEFAIR
BOROUGHBRIDGE
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 115
Survey date:FRIDAY 14/10/2011 Survey Type:MANUAL
29 SF-03-A-01 SEMI DETACHED, IPSWICHSUFFOLK
A1156 FELIXSTOWE ROAD
RACECOURSE
IPSWICH
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 77
Survey date:WEDNESDAY 23/05/2007 Survey Type:MANUAL
30 SF-03-A-02 SEMI DET./TERRACED, IPSWICHSUFFOLK
STOKE PARK DRIVE
MAIDENHALL
IPSWICH
Edge of Town
Residential Zone
Total Number of dwellings: 230
Survey date:THURSDAY 24/05/2007 Survey Type:MANUAL
31 SF-03-A-03 MIXED HOUSES, BURY ST EDMDSSUFFOLK
BARTON HILL
FORNHAM ST MARTIN
BURY ST EDMUNDS
Edge of Town
Out of Town
Total Number of dwellings: 101
Survey date:MONDAY 15/05/2006 Survey Type:MANUAL
32 SH-03-A-03DETATCHED, SHREWSBURYSHROPSHIRE
SOMERBY DRIVE
BICTON HEATH
SHREWSBURY
Edge of Town
No Sub Category
Total Number of dwellings: 10
Survey date:FRIDAY 26/06/2009 Survey Type:MANUAL
33 SH-03-A-04TERRACED, SHREWSBURYSHROPSHIRE
ST MICHAEL'S STREET
SHREWSBURY
Suburban Area (PPS6 Out of Centre)
No Sub Category
Total Number of dwellings: 108
Survey date:THURSDAY 11/06/2009 Survey Type:MANUAL
34 ST-03-A-05 TERRACED/DETACHED, STOKESTAFFORDSHIRE
WATERMEET GROVE
ETRURIA
STOKE-ON-TRENT
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 14
Survey date:WEDNESDAY 26/11/2008 Survey Type:MANUAL
35 TV-03-A-01MIXED HOUSES/FLATS, HARTLEPLTEES VALLEY
POWLETT ROAD
HARTLEPOOL
Suburban Area (PPS6 Out of Centre)
No Sub Category
Total Number of dwellings: 225
Survey date:THURSDAY 14/04/2005 Survey Type:MANUAL
36 WL-03-A-01SEMI D./TERRACED W. BASSETTWILTSHIRE
MAPLE DRIVE
WOOTTON BASSETT
Edge of Town
Residential Zone
Total Number of dwellings: 99
Survey date:MONDAY 02/10/2006 Survey Type:MANUAL
37 WM-03-A-01TERRACED, COVENTRYWEST MIDLANDS
FOLESHILL ROAD
FOLESHILL
COVENTRY
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 79
Survey date:FRIDAY 03/02/2006 Survey Type:MANUAL
38 WM-03-A-02DETACHED/SEMI D., STRBRIDGEWEST MIDLANDS
HEATH STREET
STOURBRIDGE
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 12
Survey date:WEDNESDAY 26/04/2006 Survey Type:MANUAL
39 WM-03-A-03MIXED HOUSING, COVENTRYWEST MIDLANDS
BASELEY WAY
ROWLEYS GREEN
COVENTRY
Edge of Town
Residential Zone
Total Number of dwellings: 84
Survey date:MONDAY 24/09/2007 Survey Type:MANUAL
40 WO-03-A-01DETACHED, BROMSGROVEWORCESTERSHIRE
MARLBOROUGH AVENUE
ASTON FIELDS
BROMSGROVE
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 10
Survey date:THURSDAY 23/06/2005 Survey Type:MANUAL
41 WO-03-A-02SEMI DETACHED, REDDITCHWORCESTERSHIRE
MEADOWHILL ROAD
REDDITCH
Edge of Town
No Sub Category
Total Number of dwellings: 48
Survey date:TUESDAY 02/05/2006 Survey Type:MANUAL
42 WO-03-A-03DETACHED, KIDDERMINSTERWORCESTERSHIRE
BLAKEBROOK
BLAKEBROOK
KIDDERMINSTER
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 138
Survey date:FRIDAY 05/05/2006 Survey Type:MANUAL
43 WO-03-A-06DET./TERRACED, BROMSGROVEWORCESTERSHIRE
ST GODWALDS ROAD
ASTON FIELDS
BROMSGROVE
Edge of Town
No Sub Category
Total Number of dwellings: 232
Survey date:THURSDAY 30/06/2005 Survey Type:MANUAL
TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNED
Calculation Factor: 1 DWELLS
Count Type: VEHICLES
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00-01:00
01:00-02:00
02:00-03:00
03:00-04:00
04:00-05:00
05:00-06:00
06:00-07:00
07:00-08:00 43 99 0.073 43 99 0.265 43 99 0.338
08:00-09:00 43 99 0.16 43 99 0.406 43 99 0.566
09:00-10:00 43 99 0.178 43 99 0.213 43 99 0.391
10:00-11:00 43 99 0.152 43 99 0.19 43 99 0.342
11:00-12:00 43 99 0.19 43 99 0.179 43 99 0.369
12:00-13:00 43 99 0.202 43 99 0.183 43 99 0.385
13:00-14:00 43 99 0.183 43 99 0.177 43 99 0.36
14:00-15:00 43 99 0.193 43 99 0.196 43 99 0.389
15:00-16:00 43 99 0.282 43 99 0.217 43 99 0.499
16:00-17:00 43 99 0.322 43 99 0.196 43 99 0.518
17:00-18:00 43 99 0.381 43 99 0.228 43 99 0.609
18:00-19:00 43 99 0.272 43 99 0.221 43 99 0.493
19:00-20:00
20:00-21:00
21:00-22:00
22:00-23:00
23:00-24:00
Daily Trip Rates: 2.588 2.671 5.259
Page K-11
Appendix: K ARCADY RESULTS
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vai"(drive-on-the-left ) at 17:13:24 on Wednesday, 12 December 2012
FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:
INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST
GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle
TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown
SCALING FACTORS
----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(08.00)AND ENDS(09.00)
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES
LENGTH OF TIME SEGMENT - (15) MINUTES
DEMAND FLOW PROFILES ARE INPUT DIRECTLY.
DEMAND SET TITLE: EXISTING 2012 DEMAND SET TITLE: EXISTING 2012
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.167 I 0.250 I 0.583 I I I I 0.0 I 6.0 I 9.0 I 21.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.045 I 0.000 I 0.113 I 0.842 I I I I 11.0 I 0.0 I 28.0 I 208.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.034 I 0.726 I 0.000 I 0.239 I I I I 4.0 I 85.0 I 0.0 I 28.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.032 I 0.904 I 0.064 I 0.000 I I I I 13.0 I 367.0 I 26.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.071 I 0.214 I 0.714 I I I I 0.0 I 2.0 I 6.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.038 I 0.000 I 0.083 I 0.879 I I I I 9.0 I 0.0 I 20.0 I 211.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.107 I 0.700 I 0.000 I 0.193 I I I I 15.0 I 98.0 I 0.0 I 27.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.067 I 0.832 I 0.101 I 0.000 I I I I 25.0 I 312.0 I 38.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.122 I 0.220 I 0.659 I I I I 0.0 I 5.0 I 9.0 I 27.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.085 I 0.000 I 0.089 I 0.826 I I I I 18.0 I 0.0 I 19.0 I 176.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.186 I 0.642 I 0.000 I 0.172 I I I I 38.0 I 131.0 I 0.0 I 35.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.049 I 0.832 I 0.119 I 0.000 I I I I 18.0 I 308.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.146 I 0.188 I 0.667 I I I I 0.0 I 7.0 I 9.0 I 32.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.039 I 0.000 I 0.074 I 0.887 I I I I 8.0 I 0.0 I 15.0 I 181.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.147 I 0.691 I 0.000 I 0.162 I I I I 20.0 I 94.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.031 I 0.855 I 0.114 I 0.000 I I I I 12.0 I 331.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.00-08.15 I I ARM A 2.40 11.50 0.209 - - - 0.0 0.3 3.8 - 0.110 I I ARM B 16.47 37.54 0.439 - - - 0.0 0.8 11.4 - 0.047 I I ARM C 7.80 17.23 0.453 - - - 0.0 0.8 11.7 - 0.105 I I ARM D 27.07 29.37 0.922 - - - 0.0 9.1 108.2 - 0.300 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.15-08.30 I I ARM A 1.87 12.29 0.152 - - - 0.3 0.2 2.8 - 0.096 I I ARM B 16.00 37.12 0.431 - - - 0.8 0.8 11.5 - 0.047 I I ARM C 9.33 17.22 0.542 - - - 0.8 1.2 16.8 - 0.126 I I ARM D 25.00 28.50 0.877 - - - 9.1 7.8 123.8 - 0.302 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.30-08.45 I I ARM A 2.73 11.21 0.243 - - - 0.2 0.3 4.6 - 0.118 I I ARM B 14.20 36.49 0.389 - - - 0.8 0.6 9.7 - 0.045 I I ARM C 13.60 17.91 0.760 - - - 1.2 3.0 40.5 - 0.221 I I ARM D 24.67 25.94 0.951 - - - 7.8 12.6 160.8 - 0.524 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.45-09.00 I I ARM A 3.20 11.45 0.280 - - - 0.3 0.4 5.6 - 0.121 I I ARM B 13.60 36.15 0.376 - - - 0.6 0.6 9.2 - 0.044 I I ARM C 9.07 17.90 0.507 - - - 3.0 1.0 16.7 - 0.117 I I ARM D 25.80 28.40 0.908 - - - 12.6 11.3 176.3 - 0.419 I I I ------------------------------------------------------------------------------------------------------------------
QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.3 08.30 0.2 08.45 0.3 09.00 0.4
QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 0.8 * 08.45 0.6 * 09.00 0.6 *
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 6 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 1.2 * 08.45 3.0 *** 09.00 1.0 *
QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 9.1 ********* 08.30 7.8 ******** 08.45 12.6 ************* 09.00 11.3 ***********
QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 153.0 I 153.0 I 16.8 I 0.11 I 16.8 I 0.11 I I B I 904.1 I 904.1 I 41.8 I 0.05 I 41.8 I 0.05 I I C I 597.0 I 597.0 I 85.7 I 0.14 I 85.7 I 0.14 I I D I 1538.1 I 1538.1 I 569.1 I 0.37 I 571.3 I 0.37 I ---------------------------------------------------------------------------- I ALL I 3192.1 I 3192.1 I 713.4 I 0.22 I 715.6 I 0.22 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================
Printed at 17:16:42 on 12/12/2012]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vai"(drive-on-the-left ) at 17:32:04 on Wednesday, 12 December 2012
FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:
INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST
GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle
TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown
SCALING FACTORS
----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(08.00)AND ENDS(09.00)
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES
LENGTH OF TIME SEGMENT - (15) MINUTES
DEMAND FLOW PROFILES ARE INPUT DIRECTLY.
DEMAND SET TITLE: EXISTING 2012
DEMAND SET TITLE: WITH DEV AM DEMAND SET TITLE: EXISTING 2012
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.167 I 0.250 I 0.583 I I I I 0.0 I 6.0 I 9.0 I 21.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.045 I 0.000 I 0.113 I 0.842 I I I I 11.0 I 0.0 I 28.0 I 208.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.034 I 0.726 I 0.000 I 0.239 I I I I 4.0 I 85.0 I 0.0 I 28.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.032 I 0.904 I 0.064 I 0.000 I I I I 13.0 I 367.0 I 26.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.071 I 0.214 I 0.714 I I I I 0.0 I 2.0 I 6.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.038 I 0.000 I 0.083 I 0.879 I I I I 9.0 I 0.0 I 20.0 I 211.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.107 I 0.700 I 0.000 I 0.193 I I I I 15.0 I 98.0 I 0.0 I 27.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.067 I 0.832 I 0.101 I 0.000 I I I I 25.0 I 312.0 I 38.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.122 I 0.220 I 0.659 I I I I 0.0 I 5.0 I 9.0 I 27.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.085 I 0.000 I 0.089 I 0.826 I I I I 18.0 I 0.0 I 19.0 I 176.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.186 I 0.642 I 0.000 I 0.172 I I I I 38.0 I 131.0 I 0.0 I 35.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.049 I 0.832 I 0.119 I 0.000 I I I I 18.0 I 308.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.146 I 0.188 I 0.667 I I I I 0.0 I 7.0 I 9.0 I 32.0 I I I I ( 0.0)I ( 0.0)I ( 6.0)I ( 1.0)I I I I I I I I I I ARM B I 0.039 I 0.000 I 0.074 I 0.887 I I I I 8.0 I 0.0 I 15.0 I 181.0 I I I I ( 0.0)I ( 0.0)I ( 2.4)I ( 4.1)I I I I I I I I I I ARM C I 0.147 I 0.691 I 0.000 I 0.162 I I I I 20.0 I 94.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.2)I ( 0.0)I ( 1.8)I I I I I I I I I I ARM D I 0.031 I 0.855 I 0.114 I 0.000 I I I I 12.0 I 331.0 I 44.0 I 0.0 I I I I ( 0.0)I ( 2.6)I ( 2.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- DEMAND SET TITLE: WITH DEV AM
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 5 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 08.00 - 08.15 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.15 - 08.30 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.30 - 08.45 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 08.45 - 09.00 I I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.100 I 0.700 I 0.000 I 0.200 I I I I 1.0 I 7.0 I 0.0 I 2.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.000 I 0.000 I 1.000 I 0.000 I I I I 0.0 I 0.0 I 2.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.00-08.15 I I ARM A 2.46 11.24 0.219 - - - 0.0 0.3 4.0 - 0.113 I I ARM B 16.53 37.42 0.442 - - - 0.0 0.8 11.5 - 0.048 I I ARM C 8.40 17.24 0.487 - - - 0.0 0.9 13.4 - 0.112 I I ARM D 27.20 29.08 0.935 - - - 0.0 10.3 119.2 - 0.330 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.15-08.30 I I ARM A 1.93 11.98 0.161 - - - 0.3 0.2 3.0 - 0.100 I I ARM B 16.06 37.00 0.434 - - - 0.8 0.8 11.6 - 0.048 I I ARM C 9.93 17.22 0.577 - - - 0.9 1.3 19.2 - 0.136 I I ARM D 25.13 28.22 0.890 - - - 10.3 9.0 142.3 - 0.345 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.30-08.45 I I ARM A 2.79 10.96 0.255 - - - 0.2 0.3 4.9 - 0.122 I I ARM B 14.26 36.38 0.392 - - - 0.8 0.6 9.8 - 0.045 I I ARM C 14.20 17.91 0.793 - - - 1.3 3.5 47.4 - 0.250 I I ARM D 24.80 25.67 0.966 - - - 9.0 15.0 187.8 - 0.612 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 08.45-09.00 I I ARM A 3.26 11.13 0.293 - - - 0.3 0.4 6.0 - 0.127 I I ARM B 13.66 36.03 0.379 - - - 0.6 0.6 9.3 - 0.045 I I ARM C 9.67 17.90 0.540 - - - 3.5 1.2 19.3 - 0.126 I I ARM D 25.93 28.10 0.923 - - - 15.0 13.7 213.7 - 0.513 I I I ------------------------------------------------------------------------------------------------------------------
QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.3 08.30 0.2 08.45 0.3 09.00 0.4
QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.8 * 08.30 0.8 * 08.45 0.6 * 09.00 0.6 *
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV.vao - Page 7 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 0.9 * 08.30 1.3 * 08.45 3.5 **** 09.00 1.2 *
QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 08.15 10.3 ********** 08.30 9.0 ********* 08.45 15.0 *************** 09.00 13.7 **************
QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 156.6 I 156.6 I 17.9 I 0.11 I 17.9 I 0.11 I I B I 907.7 I 907.7 I 42.3 I 0.05 I 42.3 I 0.05 I I C I 633.0 I 633.0 I 99.3 I 0.16 I 99.4 I 0.16 I I D I 1545.9 I 1545.9 I 663.1 I 0.43 I 666.4 I 0.43 I ---------------------------------------------------------------------------- I ALL I 3243.1 I 3243.1 I 822.6 I 0.25 I 826.0 I 0.25 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================
Printed at 17:38:59 on 12/12/2012]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 1 -------------------------------------------------------------------------------- ___________________ A R C A D Y 6 ___________________ ASSESSMENT OF ROUNDABOUT CAPACITY AND DELAY Analysis Program: Release 7.0 (FEBRUARY 2010) (c) Copyright TRL Limited, 2010 Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO ______________________________________________________ For sales and distribution information, program advice and maintenance, contact: TRL Limited Tel: +44 (0) 1344 770758 Crowthorne House Fax: +44 (0) 1344 770356 Nine Mile Ride Email: [email protected] Wokingham, Berks. Web: www.trlsoftware.co.uk RG40 3GA,UK --------------------------------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF THEIR RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION --------------------------------------------------------------------------------- Run with file:- "z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\ A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai"(drive-on-the-left ) at 10:39:48 on Thursday, 13 December 2012
FILE PROPERTIES *************** RUN TITLE: A414 Thieves Lane RBT Existing Flows 2012 LOCATION: A414 WITH THIEVES LANE DATE: 10/12/12 CLIENT: CROUDACE ENUMERATOR: EAS [EAS-PC] JOB NUMBER: 334 STATUS: DESCRIPTION:
INPUT DATA ********** ARM A - HERTINGFORDBURY ROAD ARM B - A414 WEST ARM C - THIEVES LANE ARM D - A414 EAST
GEOMETRIC DATA -------------- ----------------------------------------------------------------------------------------------------------------------- T5 I ARM I V (M) I E (M) I L (M) I R (M) I D (M) I PHI (DEG) I SLOPE I INTERCEPT (PCU/MIN) I ----------------------------------------------------------------------------------------------------------------------- I ARM A I 3.20 I 7.70 I 18.30 I 62.00 I 61.00 I 23.0 I 0.589 I 30.536 I I ARM B I 7.30 I 8.60 I 5.00 I 45.00 I 61.00 I 30.0 I 0.695 I 41.547 I I ARM C I 3.60 I 7.36 I 12.80 I 15.50 I 61.00 I 50.0 I 0.502 I 25.630 I I ARM D I 6.71 I 6.71 I 0.00 I 36.50 I 61.00 I 34.0 I 0.614 I 34.164 I ----------------------------------------------------------------------------------------------------------------------- V = approach half-width L = effective flare length D = inscribed circle diameter E = entry width R = entry radius PHI = entry angle
TRAFFIC DEMAND DATA ------------------- Only sets included in the current run are shown
SCALING FACTORS
----------------------- T13 IARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I ----------------------- TIME PERIOD BEGINS(17.00)AND ENDS(18.00)
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 3 -------------------------------------------------------------------------------- LENGTH OF TIME PERIOD -( 60) MINUTES
LENGTH OF TIME SEGMENT - (15) MINUTES
DEMAND FLOW PROFILES ARE INPUT DIRECTLY.
DEMAND SET TITLE: 2012 EXISTING PM DEMAND SET TITLE: 2012 EXISTING PM
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 4 -------------------------------------------------------------------------------- -------------------------------------------------------------------- T33 I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/T I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 17.00 - 17.15 I I I I I I I I ARM A I 0.000 I 0.139 I 0.222 I 0.639 I I I I 0.0 I 5.0 I 8.0 I 23.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.013 I 0.000 I 0.258 I 0.729 I I I I 4.0 I 0.0 I 80.0 I 226.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.102 I 0.714 I 0.000 I 0.184 I I I I 5.0 I 35.0 I 0.0 I 9.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.031 I 0.755 I 0.215 I 0.000 I I I I 8.0 I 197.0 I 56.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.15 - 17.30 I I I I I I I I ARM A I 0.000 I 0.118 I 0.294 I 0.588 I I I I 0.0 I 4.0 I 10.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.024 I 0.000 I 0.280 I 0.696 I I I I 8.0 I 0.0 I 95.0 I 236.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.097 I 0.613 I 0.000 I 0.290 I I I I 6.0 I 38.0 I 0.0 I 18.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.049 I 0.664 I 0.287 I 0.000 I I I I 12.0 I 162.0 I 70.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.30 - 17.45 I I I I I I I I ARM A I 0.000 I 0.065 I 0.290 I 0.645 I I I I 0.0 I 2.0 I 9.0 I 20.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.040 I 0.000 I 0.292 I 0.669 I I I I 14.0 I 0.0 I 103.0 I 236.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.081 I 0.565 I 0.000 I 0.355 I I I I 5.0 I 35.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.047 I 0.723 I 0.230 I 0.000 I I I I 11.0 I 170.0 I 54.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- I 17.45 - 18.00 I I I I I I I I ARM A I 0.000 I 0.070 I 0.349 I 0.581 I I I I 0.0 I 3.0 I 15.0 I 25.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.024 I 0.277 I 0.699 I 0.000 I I I I 8.0 I 91.0 I 230.0 I 0.0 I I I I ( 3.0)I ( 0.0)I ( 0.0)I ( 2.0)I I I I I I I I I I ARM C I 0.052 I 0.586 I 0.362 I 0.000 I I I I 3.0 I 34.0 I 21.0 I 0.0 I I I I ( 0.0)I ( 1.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.058 I 0.693 I 0.249 I 0.000 I I I I 16.0 I 192.0 I 69.0 I 0.0 I I I I ( 0.0)I ( 2.0)I ( 4.0)I ( 0.0)I I I I I I I I --------------------------------------------------------------------
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT --------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ T70 I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.00-17.15 I I ARM A 2.40 19.03 0.126 - - - 0.0 0.1 2.1 - 0.060 I I ARM B 20.66 36.88 0.560 - - - 0.0 1.3 18.3 - 0.061 I I ARM C 3.26 16.93 0.193 - - - 0.0 0.2 3.5 - 0.073 I I ARM D 17.40 31.61 0.550 - - - 0.0 1.2 17.5 - 0.070 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.15-17.30 I I ARM A 2.26 19.68 0.115 - - - 0.1 0.1 2.0 - 0.057 I I ARM B 22.60 36.26 0.623 - - - 1.3 1.6 23.9 - 0.073 I I ARM C 4.13 16.54 0.250 - - - 0.2 0.3 4.9 - 0.080 I I ARM D 16.27 31.24 0.521 - - - 1.2 1.1 16.7 - 0.067 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.30-17.45 I I ARM A 2.06 20.13 0.102 - - - 0.1 0.1 1.7 - 0.055 I I ARM B 23.53 37.06 0.635 - - - 1.6 1.7 25.5 - 0.074 I I ARM C 4.13 16.34 0.253 - - - 0.3 0.3 5.0 - 0.082 I I ARM D 15.67 31.19 0.502 - - - 1.1 1.0 15.5 - 0.064 I I I ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I - - I 17.45-18.00 I I ARM A 2.87 14.34 0.200 - - - 0.1 0.2 3.6 - 0.087 I I ARM B 21.93 35.39 0.620 - - - 1.7 1.6 25.0 - 0.074 I I ARM C 3.87 21.32 0.181 - - - 0.3 0.2 3.4 - 0.057 I I ARM D 18.47 27.09 0.682 - - - 1.0 2.1 29.8 - 0.114 I I I ------------------------------------------------------------------------------------------------------------------
QUEUE AT ARM A -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.2
QUEUE AT ARM B -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 1.3 * 17.30 1.6 ** 17.45 1.7 ** 18.00 1.6 **
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG z:\.. \ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vao - Page 6 -------------------------------------------------------------------------------- QUEUE AT ARM C -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 0.2 17.30 0.3 17.45 0.3 18.00 0.2
QUEUE AT ARM D -------------- TIME SEGMENT NO. OF ENDING VEHICLES IN QUEUE 17.15 1.2 * 17.30 1.1 * 17.45 1.0 * 18.00 2.1 **
QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- ---------------------------------------------------------------------------- T75 I ARM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I------------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I ---------------------------------------------------------------------------- I A I 143.9 I 143.9 I 9.5 I 0.07 I 9.5 I 0.07 I I B I 1330.8 I 1330.8 I 92.6 I 0.07 I 92.7 I 0.07 I I C I 230.8 I 230.8 I 16.8 I 0.07 I 16.8 I 0.07 I I D I 1017.1 I 1017.1 I 79.5 I 0.08 I 79.6 I 0.08 I ---------------------------------------------------------------------------- I ALL I 2722.6 I 2722.6 I 198.3 I 0.07 I 198.4 I 0.07 I ---------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD. * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD. * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. END OF JOB ============================================= end of file ===============================================
Printed at 10:45:35 on 13/12/2012]
ARCADY 6GUI Version: 6.2 AG
Analysis Program: Release 7.0 (FEBRUARY 2010)
(c) Copyright TRL Limited, 2004
Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO
For sales and distribution information, program advice and maintenance, contact:
TRL Limited
Crowthorne House
Nine Mile Ride
Wokingham, Berks.
RG40 3GA, UK
Tel: +44 (0)1344 770758
Fax:+44 (0)1344 770864
Email: software@ trl.co.uk
Web:www.trlsoftware.co.uk
The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution
Run Information
Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vaiAt: 15:27:29 on Tuesday, March 12, 2013Mode: Drive On The LeftUnits: Metric
Arm Labelling
Arm Full Arm Names
Arm A HERTINGFORDBURY ROAD
Arm B A414 WEST
Arm C THIEVES LANE
Arm D A414 EAST
Flow Scaling Factor
Arm Flow Scaling Factor(%)
Arm A 100
Arm B 100
Arm C 100
Arm D 100
File Properties
Run Title A414 Thieves Lane RBT Existing Flows 2012
Location A414 WITH THIEVES LANE
Date 10/12/2012
Client CROUDACE
Enumerator EAS [EAS-PC]
Job Number 334
Status
Description
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 1 of 9
Errors and Warnings
[No errors or warnings]
Geometric Data
Data Item Arm A Arm B Arm C Arm D
Approach Road Half-Width (m) 3.20 7.30 3.60 6.71
Entry Width (m) 7.70 8.60 7.36 6.71
Flare Length (m) 18.30 5.00 12.80 0.00
Entry Radius (m) 62.00 45.00 15.50 36.50
Inscribed Circle Diameter (m) 61.00 61.00 61.00 61.00
Entry Angle (degrees) 23.00 30.00 50.00 34.00
Slope 0.589 0.695 0.502 0.614
Intercept (PCU/Min) 30.536 41.547 25.630 34.164
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 2 of 9
Junction Diagram: (View Extent = 80m)
10 Metres
Flare
HERTINGFORDBURY ROAD 18.3 m
A41
4 W
ES
T 5
m
THIEVES LANE 12.8 m
A
41
4 E
AS
T 0
m
Angles Between Arms (Degrees): Arm A(90) Arm B(90) Arm C(90) Arm D(90)
Demand Data
Demand Profiles are Synthesised using DIRECT DataPeriod of interest (for Queue and Delay calculations): 17:00 to 18:00Length of Time Period: 60 minLength of Time Segment: 15 min
Direct Data for Demand Set: 2012 EXISTING PM
Time Period ArmDemand Data
(Veh/Min)
Segment : 1 -17:00 to 17:15
A 2.40
B 20.66
C 3.26
D 17.40
Segment : 2 -17:15 to 17:30
A 2.26
B 22.60
C 4.13
D 16.27
Segment : 3 -17:30 to 17:45
A 2.06
B 23.53
C 4.13
D 15.67
Segment : 4 -17:45 to 18:00
A 2.87
B 21.93
C 3.87
D 18.47
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 3 of 9
Direct Data for Demand Set: PM DEVELOPMENT FLOWS
Time Period ArmDemand Data
(Veh/Min)
Segment : 1 -17:00 to 17:15
A 0.06
B 0.40
C 0.27
D 0.27
Segment : 2 -17:15 to 17:30
A 0.06
B 0.40
C 0.27
D 0.27
Segment : 3 -17:30 to 17:45
A 0.06
B 0.40
C 0.27
D 0.27
Segment : 4 -17:45 to 18:00
A 0.06
B 0.40
C 0.27
D 0.27
Turning Proportions for Demand Set: 2012 EXISTING PM
Turning proportions vary over time and entry and calculated from turning count data (shaded)
Time Period From/To Arm A Arm B Arm C Arm D
Segment : 1 -17:00 to 17:15
Arm A0.000 0.139 0.222 0.639
0.0 5.0 8.0 23.0
Arm B0.013 0.000 0.258 0.729
4.0 0.0 80.0 226.0
Arm C0.102 0.714 0.000 0.184
5.0 35.0 0.0 9.0
Arm D0.031 0.755 0.215 0.000
8.0 197.0 56.0 0.0
Segment : 2 -17:15 to 17:30
Arm A0.000 0.118 0.294 0.588
0.0 4.0 10.0 20.0
Arm B0.024 0.000 0.280 0.696
8.0 0.0 95.0 236.0
Arm C0.097 0.613 0.000 0.290
6.0 38.0 0.0 18.0
Arm D0.049 0.664 0.287 0.000
12.0 162.0 70.0 0.0
Segment : 3 -17:30 to 17:45
Arm A0.000 0.065 0.290 0.645
0.0 2.0 9.0 20.0
Arm B0.040 0.000 0.292 0.669
14.0 0.0 103.0 236.0
Arm C0.081 0.565 0.000 0.355
5.0 35.0 0.0 22.0
Arm D0.047 0.723 0.230 0.000
11.0 170.0 54.0 0.0
Segment : 4 -17:45 to 18:00
Arm A0.000 0.070 0.349 0.581
0.0 3.0 15.0 25.0
Arm B0.024 0.277 0.699 0.000
8.0 91.0 230.0 0.0
Arm C0.052 0.586 0.362 0.000
3.0 34.0 21.0 0.0
Arm D0.058 0.693 0.249 0.000
16.0 192.0 69.0 0.0
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 4 of 9
Turning Proportions for Demand Set: PM DEVELOPMENT FLOWS
Turning proportions vary over time and entry and calculated from turning count data (shaded)
Time Period From/To Arm A Arm B Arm C Arm D
Segment : 1 -17:00 to 17:15
Arm A0.000 0.000 1.000 0.000
0.0 0.0 0.0 0.0
Arm B0.000 0.000 1.000 0.000
0.0 0.0 6.0 0.0
Arm C0.000 0.750 0.000 0.250
0.0 3.0 0.0 1.0
Arm D0.000 0.000 1.000 0.000
0.0 0.0 4.0 0.0
Segment : 2 -17:15 to 17:30
Arm A0.000 0.000 1.000 0.000
0.0 0.0 0.0 0.0
Arm B0.000 0.000 1.000 0.000
0.0 0.0 6.0 0.0
Arm C0.000 0.750 0.000 0.250
0.0 3.0 0.0 1.0
Arm D0.000 0.000 1.000 0.000
0.0 0.0 4.0 0.0
Segment : 3 -17:30 to 17:45
Arm A0.000 0.000 1.000 0.000
0.0 0.0 0.0 0.0
Arm B0.000 0.000 1.000 0.000
0.0 0.0 6.0 0.0
Arm C0.000 0.750 0.000 0.250
0.0 3.0 0.0 1.0
Arm D0.000 0.000 1.000 0.000
0.0 0.0 4.0 0.0
Segment : 4 -17:45 to 18:00
Arm A0.000 0.000 1.000 0.000
0.0 0.0 0.0 0.0
Arm B0.000 0.000 1.000 0.000
0.0 0.0 6.0 0.0
Arm C0.000 0.750 0.000 0.250
0.0 3.0 0.0 1.0
Arm D0.000 0.000 1.000 0.000
0.0 0.0 4.0 0.0
Heavy Vehicle Percentages for Demand Set: 2012 EXISTING PM
Vary over entry
Time Period From/To Arm A Arm B Arm C Arm D
17:00 to 17:15
Arm A 0.0 0.0 0.0 0.0
Arm B 3.0 0.0 0.0 2.0
Arm C 0.0 1.0 0.0 0.0
Arm D 0.0 2.0 4.0 0.0
Heavy Vehicle Percentages for Demand Set: PM DEVELOPMENT FLOWS
Vary over entry
Time Period From/To Arm A Arm B Arm C Arm D
17:00 to 17:15
Arm A 0.0 0.0 0.0 0.0
Arm B 0.0 0.0 0.0 0.0
Arm C 0.0 0.0 0.0 0.0
Arm D 0.0 0.0 0.0 0.0
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 5 of 9
Queue Diagrams: (View Extent = 80m)
Queue Length Colour
Mean Queue
5 th % ile
90 th % ile
95 th % ile
Start Time: 17:00---> End Time: 18:00
Queue Interval 1: 17:15
10 Metres
Flare
HERTINGFORDBURY ROAD 18.3 m
A41
4 W
ES
T 5
m
THIEVES LANE 12.8 m
A
41
4 E
AS
T 0
m
Queue Interval 2: 17:30
10 Metres
Flare
HERTINGFORDBURY ROAD 18.3 m
A41
4 W
ES
T 5
m
THIEVES LANE 12.8 m
A
41
4 E
AS
T 0
m
Queue Interval 3: 17:45
10 Metres
Flare
HERTINGFORDBURY ROAD 18.3 m
A41
4 W
ES
T 5
m
THIEVES LANE 12.8 m
A
41
4 E
AS
T 0
m
Queue Interval 4: 18:00
10 Metres
Flare
HERTINGFORDBURY ROAD 18.3 m
A41
4 W
ES
T 5
m
THIEVES LANE 12.8 m
A
41
4 E
AS
T 0
m
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 6 of 9
Demand Data Graphs
Direct Entry/Exit Flows for Demand Set: 2012 EXISTING PM
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh/M
in)
Arm A Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh/M
in)
Arm B Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh/M
in)
Arm C Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh/M
in)
Arm D Entry Flows
17:00 17:15 17:30 17:45 18:00
Direct Entry/Exit Flows for Demand Set: PM DEVELOPMENT FLOWS
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh
/Min
)
Arm A Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh
/Min
)
Arm B Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh
/Min
)
Arm C Entry Flows
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Ra
te o
f F
low
(V
eh
/Min
)
Arm D Entry Flows
17:00 17:15 17:30 17:45 18:00
Capacity (against Time) Graphs, for each 15min Interval (17:00 - 18:00)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
14
15
16
17
18
19
20
14
15
16
17
18
19
20
Time
Ca
pa
ci ty (
Veh
/Min
)
Capacity Vs Time (Arm A)
17:00 17:15 17:30 17:45 18:0035.0
35.2
35.4
35.6
35.8
36.0
36.2
36.4
36.6
36.8
37.0
35.0
35.2
35.4
35.6
35.8
36.0
36.2
36.4
36.6
36.8
37.0
Time
Ca
pa
city (
Veh
/Min
)
Capacity Vs Time (Arm B)
17:00 17:15 17:30 17:45 18:0016
17
18
19
20
21
22
16
17
18
19
20
21
22
Time
Ca
pa
city (
Veh
/Min
)
Capacity Vs Time (Arm C)
17:00 17:15 17:30 17:45 18:0026
27
28
29
30
31
32
26
27
28
29
30
31
32
Time
Ca
pa
city (
Veh
/Mi n
)
Capacity Vs Time (Arm D)
17:00 17:15 17:30 17:45 18:00
RFC (against Time) Graphs, for each 15min Interval (17:00 - 18:00)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm A)
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm B)
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm C)
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm D)
17:00 17:15 17:30 17:45 18:00
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 7 of 9
Start Queue (against Time) Graphs, for each 15min Interval (17:00 - 18:00)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ueu
e (
Ve
hs)
Start Queue Vs Time (Arm A)
17:00 17:15 17:30 17:45 18:000.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
Sta
rt Q
ueu
e (
Ve
hs)
Start Queue Vs Time (Arm B)
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ueu
e (
Ve
hs)
Start Queue Vs Time (Arm C)
17:00 17:15 17:30 17:45 18:000.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
Sta
rt Q
ueu
e (
Ve
hs)
Start Queue Vs Time (Arm D)
17:00 17:15 17:30 17:45 18:00
End Queue (against Time) Graphs, for each 15min Interval (17:00 - 18:00)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
End
Que
ue
(V
eh
s)
End Queue Vs Time (Arm A)
17:00 17:15 17:30 17:45 18:000.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
End
Que
ue
(V
eh
s)
End Queue Vs Time (Arm B)
17:00 17:15 17:30 17:45 18:000.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
End
Que
ue
(V
eh
s)
End Queue Vs Time (Arm C)
17:00 17:15 17:30 17:45 18:000.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
0.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
Time
End
Que
ue
(V
eh
s)
End Queue Vs Time (Arm D)
17:00 17:15 17:30 17:45 18:00
Geometric Delay Graph
No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.
Delay (against Time) Graphs, for each 15min Interval (17:00 - 18:00)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
0.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
Time
De
lay (
Veh
.Min
)
Delay Vs Time (Arm A)
17:00 17:15 17:30 17:45 18:0019
20
21
22
23
24
25
26
27
28
19
20
21
22
23
24
25
26
27
28
Time
De
lay (
Veh
.Min
)
Delay Vs Time (Arm B)
17:00 17:15 17:30 17:45 18:002.0
2.4
2.8
3.2
3.6
4.0
4.4
4.8
5.2
5.6
6.0
2.0
2.4
2.8
3.2
3.6
4.0
4.4
4.8
5.2
5.6
6.0
Time
De
lay (
Veh
.Min
)
Delay Vs Time (Arm C)
17:00 17:15 17:30 17:45 18:0015
20
25
30
35
15
20
25
30
35
Time
De
lay (
Veh
.Min
)
Delay Vs Time (Arm D)
17:00 17:15 17:30 17:45 18:00
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 8 of 9
Queues and Delay:
Segment ArmDemand
(Veh / Min)
Capacity(Veh /Min)
Demand /Capacity
(RFC)
Ped Flow(Ped / Min)
StartQueue (Veh)
EndQueue (Veh)
Delay(Veh.Min /
TimeSegment)
GeometricDelay
(Veh.Min /Time
Segment)
ArrivalDelay(Min /Veh)
Segment : 1 -17:00 to 17:15
A 2.46 18.75 0.131 - 0.0 0.2 2.2 - 0.061
B 21.06 36.67 0.574 - 0.0 1.3 19.4 - 0.063
C 3.53 16.94 0.208 - 0.0 0.3 3.8 - 0.074
D 17.67 31.50 0.561 - 0.0 1.3 18.3 - 0.071
Segment : 2 -17:15 to 17:30
A 2.32 19.40 0.120 - 0.2 0.1 2.1 - 0.059
B 23.00 36.05 0.638 - 1.3 1.7 25.4 - 0.076
C 4.40 16.55 0.266 - 0.3 0.4 5.3 - 0.082
D 16.54 31.14 0.531 - 1.3 1.1 17.4 - 0.069
Segment : 3 -17:30 to 17:45
A 2.12 19.85 0.107 - 0.1 0.1 1.8 - 0.056
B 23.93 36.85 0.649 - 1.7 1.8 27.1 - 0.077
C 4.40 16.34 0.269 - 0.4 0.4 5.5 - 0.084
D 15.94 31.08 0.513 - 1.1 1.1 16.1 - 0.066
Segment : 4 -17:45 to 18:00
A 2.93 14.06 0.208 - 0.1 0.3 3.8 - 0.090
B 22.33 35.17 0.635 - 1.8 1.8 26.7 - 0.078
C 4.14 21.33 0.194 - 0.4 0.2 3.7 - 0.058
D 18.74 26.98 0.695 - 1.1 2.2 31.4 - 0.119
Queuing Delay Information Over Whole Period
ArmTotal Demand Queueing Delay Inclusive Queueing Delay
(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)
A 147.4 147.4 9.9 0.07 9.9 0.07
B 1354.8 1354.8 98.5 0.07 98.6 0.07
C 247.1 247.1 18.3 0.07 18.3 0.07
D 1033.3 1033.3 83.3 0.08 83.4 0.08
ALL 2782.6 2782.6 210.0 0.08 210.1 0.08
Delay is that occuring only within the time period.
Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.
These will only be significantly different if there is a large queue remaining at the end of the time period.
Accident Data
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
Accident Results
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
12 March 2013 334 A414 Thieves Lane RBT Existing Flows 2012 Direct Input & HGV PM.vai
Page 9 of 9
ARCADY 6GUI Version: 6.2 AG
Analysis Program: Release 7.0 (FEBRUARY 2010)
(c) Copyright TRL Limited, 2004
Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO
For sales and distribution information, program advice and maintenance, contact:
TRL Limited
Crowthorne House
Nine Mile Ride
Wokingham, Berks.
RG40 3GA, UK
Tel: +44 (0)1344 770758
Fax:+44 (0)1344 770864
Email: software@ trl.co.uk
Web:www.trlsoftware.co.uk
The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution
Run Information
Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\existing flows thieves lane welwyn rd rb.vaiAt: 15:07:01 on Wednesday, November 28, 2012Mode: Drive On The LeftUnits: Metric
Arm Labelling
Arm Full Arm Names
Arm A Thieves Lane
Arm B Welwyn Road West
Arm C Welwyn Road East
Flow Scaling Factor
Arm Flow Scaling Factor
(%)
Arm A 100
Arm B 100
Arm C 100
File Properties
Run Title existing layout
Location Thieves Lane/Welwyn Road RB
Date 28/11/2012
Client Croudace
Enumerator
Job Number 334
Status Draft 1
Description
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 1 of 7
Errors and Warnings
[No errors or warnings]
Geometric Data
Data Item Arm A Arm B Arm C
Approach Road Half-Width (m) 3.80 3.95 3.95
Entry Width (m) 7.40 6.80 5.70
Flare Length (m) 16.10 25.00 19.00
Entry Radius (m) 33.70 106.50 38.70
Inscribed Circle Diameter (m) 29.50 27.70 30.90
Entry Angle (degrees) 12.00 27.50 17.00
Slope 0.732 0.720 0.682
Intercept (PCU/Min) 32.240 31.969 28.614
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 2 of 7
Junction Diagram: (View Extent = 40m)
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Angles Between Arms (Degrees): Arm A(120) Arm B(120) Arm C(120)
Demand Data
Demand Profiles are Synthesised using ODTAB DataPeriod of interest (for Queue and Delay calculations): 07:45 to 09:15Length of Time Period: 90 minLength of Time Segment: 15 min
Total Traffic Demand (Vehicles/Hour) for Demand Set: existing layout
From/To Arm A Arm B Arm C
Arm A 0.0 251.0 181.0
Arm B 116.0 0.0 269.0
Arm C 390.0 343.0 0.0
Entry Flow Data for Demand Set: existing layout
Arms
Number of Minutes From Start When Rate of flow (Veh/Min)
Flow Starts To
Rise
Top of Peak is
Reached
Flow Stops
FallingBefore Peak At Top of Peak After Peak
Arm A 15.00 45.00 75.00 5.40 8.10 5.40
Arm B 15.00 45.00 75.00 4.81 7.22 4.81
Arm C 15.00 45.00 75.00 9.16 13.74 9.16
Turning Proportions
ODTAB Demand Data type is used, no turning proportions available.
Heavy Vehicle Percentages for Demand Set: existing layout
Default vehicle percentages
Time Period From/To Arm A Arm B Arm C
07:45 to 09:15
Arm A 10.0 10.0 10.0
Arm B 10.0 10.0 10.0
Arm C 10.0 10.0 10.0
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 3 of 7
Queue Diagrams: (View Extent = 40m)
Queue Length Colour
Mean Queue
5 th % ile
90 th % ile
95 th % ile
Start Time: 07:45---> End Time: 09:15
Queue Interval 1: 08:00
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m Queue Interval 2: 08:15
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 3: 08:30
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 4: 08:45
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 4 of 7
Queue Interval 5: 09:00
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 6: 09:15
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Demand Data Graphs
No graph available
Capacity (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
24.0
24.4
24.8
25.2
25.6
26.0
26.4
26.8
27.2
27.6
28.0
24.0
24.4
24.8
25.2
25.6
26.0
26.4
26.8
27.2
27.6
28.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm A)
07:45 08:15 08:45 09:1526.0
26.2
26.4
26.6
26.8
27.0
27.2
27.4
27.6
27.8
28.0
26.0
26.2
26.4
26.6
26.8
27.0
27.2
27.4
27.6
27.8
28.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm B)
07:45 08:15 08:45 09:1524.0
24.2
24.4
24.6
24.8
25.0
25.2
25.4
25.6
25.8
26.0
24.0
24.2
24.4
24.6
24.8
25.0
25.2
25.4
25.6
25.8
26.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm C)
07:45 08:15 08:45 09:15
RFC (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm C)
07:45 08:15 08:45 09:15
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 5 of 7
Start Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm C)
07:45 08:15 08:45 09:15
End Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm C)
07:45 08:15 08:45 09:15
Geometric Delay Graph
No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.
Delay (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm A)
07:45 08:15 08:45 09:153.0
3.5
4.0
4.5
5.0
5.5
6.0
3.0
3.5
4.0
4.5
5.0
5.5
6.0
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm B)
07:45 08:15 08:45 09:158
10
12
14
16
18
20
8
10
12
14
16
18
20
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm C)
07:45 08:15 08:45 09:15
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 6 of 7
Queues and Delay:
Segment ArmDemand
(Veh / Min)
Capacity
(Veh /
Min)
Demand /
Capacity
(RFC)
Ped Flow
(Ped / Min)
Start
Queue
(Veh)
End
Queue
(Veh)
Delay
(Veh.Min /
Time
Segment)
Geometric
Delay
(Veh.Min /
Time
Segment)
Arrival
Delay
(Min /
Veh)
Segment : 1 -
07:45 to 08:00
A 5.42 26.17 0.207 - 0.0 0.3 3.8 - 0.048
B 4.83 27.43 0.176 - 0.0 0.2 3.1 - 0.044
C 9.20 25.02 0.368 - 0.0 0.6 8.4 - 0.063
Segment : 2 -
08:00 to 08:15
A 6.47 25.55 0.253 - 0.3 0.3 5.0 - 0.052
B 5.77 27.11 0.213 - 0.2 0.3 4.0 - 0.047
C 10.98 24.83 0.442 - 0.6 0.8 11.5 - 0.072
Segment : 3 -
08:15 to 08:30
A 7.93 24.71 0.321 - 0.3 0.5 6.9 - 0.060
B 7.06 26.67 0.265 - 0.3 0.4 5.3 - 0.051
C 13.45 24.56 0.548 - 0.8 1.2 17.4 - 0.090
Segment : 4 -
08:30 to 08:45
A 7.93 24.70 0.321 - 0.5 0.5 7.1 - 0.060
B 7.06 26.67 0.265 - 0.4 0.4 5.4 - 0.051
C 13.45 24.56 0.548 - 1.2 1.2 18.0 - 0.090
Segment : 5 -
08:45 to 09:00
A 6.47 25.54 0.253 - 0.5 0.3 5.2 - 0.052
B 5.77 27.11 0.213 - 0.4 0.3 4.1 - 0.047
C 10.98 24.83 0.442 - 1.2 0.8 12.3 - 0.072
Segment : 6 -
09:00 to 09:15
A 5.42 26.15 0.207 - 0.3 0.3 4.0 - 0.048
B 4.83 27.43 0.176 - 0.3 0.2 3.3 - 0.044
C 9.20 25.02 0.368 - 0.8 0.6 9.0 - 0.063
Queuing Delay Information Over Whole Period
ArmTotal Demand Queueing Delay Inclusive Queueing Delay
(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)
A 594.6 396.4 32.0 0.05 32.0 0.05
B 529.9 353.3 25.2 0.05 25.2 0.05
C 1008.9 672.6 76.6 0.08 76.6 0.08
ALL 2133.5 1422.3 133.8 0.06 133.8 0.06
Delay is that occuring only within the time period.
Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.
These will only be significantly different if there is a large queue remaining at the end of the time period.
Accident Data
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
Accident Results
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
28 November 2012 334 existing flows thieves lane welwyn rd rb.vai
Page 7 of 7
ARCADY 6GUI Version: 6.2 AG
Analysis Program: Release 7.0 (FEBRUARY 2010)
(c) Copyright TRL Limited, 2004
Adapted from ARCADY/3 which is Crown Copyright by permission of the controller of HMSO
For sales and distribution information, program advice and maintenance, contact:
TRL Limited
Crowthorne House
Nine Mile Ride
Wokingham, Berks.
RG40 3GA, UK
Tel: +44 (0)1344 770758
Fax:+44 (0)1344 770864
Email: software@ trl.co.uk
Web:www.trlsoftware.co.uk
The user of this computer program for the solution of an engineering problem is in no way relieved of their responsibility for the correctness of the solution
Run Information
Run with file:- z:\EAS\Current Projects\Hertford Thieves Lane\Analysis\ARCADY\existing flows thieves lane welwyn rd with dev
rb.vaiAt: 15:59:27 on Wednesday, November 28, 2012Mode: Drive On The LeftUnits: Metric
Arm Labelling
Arm Full Arm Names
Arm A Thieves Lane
Arm B Welwyn Road West
Arm C Welwyn Road East
Flow Scaling Factor
Arm Flow Scaling Factor
(%)
Arm A 100
Arm B 100
Arm C 100
File Properties
Run Title existing layout
Location Thieves Lane/Welwyn Road RB
Date 28/11/2012
Client Croudace
Enumerator
Job Number 334
Status Draft 1
Description
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 1 of 7
Errors and Warnings
[No errors or warnings]
Geometric Data
Data Item Arm A Arm B Arm C
Approach Road Half-Width (m) 3.80 3.95 3.95
Entry Width (m) 7.40 6.80 5.70
Flare Length (m) 16.10 25.00 19.00
Entry Radius (m) 33.70 106.50 38.70
Inscribed Circle Diameter (m) 29.50 27.70 30.90
Entry Angle (degrees) 12.00 27.50 17.00
Slope 0.732 0.720 0.682
Intercept (PCU/Min) 32.240 31.969 28.614
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 2 of 7
Junction Diagram: (View Extent = 40m)
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Angles Between Arms (Degrees): Arm A(120) Arm B(120) Arm C(120)
Demand Data
Demand Profiles are Synthesised using ODTAB DataPeriod of interest (for Queue and Delay calculations): 07:45 to 09:15Length of Time Period: 90 minLength of Time Segment: 15 min
Total Traffic Demand (Vehicles/Hour) for Demand Set: forecast flows
From/To Arm A Arm B Arm C
Arm A 0.0 276.0 222.0
Arm B 137.0 0.0 290.0
Arm C 406.0 351.0 0.0
Entry Flow Data for Demand Set: forecast flows
Arms
Number of Minutes From Start When Rate of flow (Veh/Min)
Flow Starts To
Rise
Top of Peak is
Reached
Flow Stops
FallingBefore Peak At Top of Peak After Peak
Arm A 15.00 45.00 75.00 6.22 9.34 6.22
Arm B 15.00 45.00 75.00 5.34 8.01 5.34
Arm C 15.00 45.00 75.00 9.46 14.19 9.46
Turning Proportions
ODTAB Demand Data type is used, no turning proportions available.
Heavy Vehicle Percentages for Demand Set: forecast flows
Default vehicle percentages
Time Period From/To Arm A Arm B Arm C
07:45 to 09:15
Arm A 10.0 10.0 10.0
Arm B 10.0 10.0 10.0
Arm C 10.0 10.0 10.0
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 3 of 7
Queue Diagrams: (View Extent = 40m)
Queue Length Colour
Mean Queue
5 th % ile
90 th % ile
95 th % ile
Start Time: 07:45---> End Time: 09:15
Queue Interval 1: 08:00
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m Queue Interval 2: 08:15
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 3: 08:30
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 4: 08:45
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 4 of 7
Queue Interval 5: 09:00
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Queue Interval 6: 09:15
5 Metres
Flare
Thieves Lane
16.1 m
Welwyn Road W
est
25 m
W
elw
yn R
oa
d E
ast
19
m
Demand Data Graphs
No graph available
Capacity (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
24.0
24.4
24.8
25.2
25.6
26.0
26.4
26.8
27.2
27.6
28.0
24.0
24.4
24.8
25.2
25.6
26.0
26.4
26.8
27.2
27.6
28.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm A)
07:45 08:15 08:45 09:1526.0
26.2
26.4
26.6
26.8
27.0
27.2
27.4
27.6
27.8
28.0
26.0
26.2
26.4
26.6
26.8
27.0
27.2
27.4
27.6
27.8
28.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm B)
07:45 08:15 08:45 09:1524.0
24.1
24.2
24.3
24.4
24.5
24.6
24.7
24.8
24.9
25.0
24.0
24.1
24.2
24.3
24.4
24.5
24.6
24.7
24.8
24.9
25.0
Time
Cap
acity (
Ve
h/M
in)
Capacity Vs Time (Arm C)
07:45 08:15 08:45 09:15
RFC (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
RF
C
RFC Vs Time (Arm C)
07:45 08:15 08:45 09:15
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 5 of 7
Start Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
Sta
rt Q
ue
ue
(V
eh
s)
Start Queue Vs Time (Arm C)
07:45 08:15 08:45 09:15
End Queue (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm A)
07:45 08:15 08:45 09:150.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm B)
07:45 08:15 08:45 09:150.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Time
En
d Q
ueu
e (
Ve
hs)
End Queue Vs Time (Arm C)
07:45 08:15 08:45 09:15
Geometric Delay Graph
No Data. Please select 'Geometric Delay' in 'Principal Options' and try again.
Delay (against Time) Graphs, for each 15min Interval (07:45 - 09:15)
(QUEUEING DELAY INFORMATION OVER WHOLE PERIOD)
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm A)
07:45 08:15 08:45 09:153.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm B)
07:45 08:15 08:45 09:155
10
15
20
5
10
15
20
Time
De
lay (
Ve
h.M
in)
Delay Vs Time (Arm C)
07:45 08:15 08:45 09:15
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai
Page 6 of 7
Queues and Delay:
Segment ArmDemand
(Veh / Min)
Capacity
(Veh /
Min)
Demand /
Capacity
(RFC)
Ped Flow
(Ped / Min)
Start
Queue
(Veh)
End
Queue
(Veh)
Delay
(Veh.Min /
Time
Segment)
Geometric
Delay
(Veh.Min /
Time
Segment)
Arrival
Delay
(Min /
Veh)
Segment : 1 -
07:45 to 08:00
A 6.25 26.10 0.239 - 0.0 0.3 4.6 - 0.050
B 5.36 27.06 0.198 - 0.0 0.2 3.6 - 0.046
C 9.50 24.84 0.382 - 0.0 0.6 9.0 - 0.065
Segment : 2 -
08:00 to 08:15
A 7.46 25.47 0.293 - 0.3 0.4 6.1 - 0.055
B 6.40 26.67 0.240 - 0.2 0.3 4.7 - 0.049
C 11.34 24.61 0.461 - 0.6 0.8 12.4 - 0.075
Segment : 3 -
08:15 to 08:30
A 9.14 24.61 0.371 - 0.4 0.6 8.6 - 0.064
B 7.84 26.13 0.300 - 0.3 0.4 6.3 - 0.055
C 13.89 24.30 0.572 - 0.8 1.3 19.1 - 0.096
Segment : 4 -
08:30 to 08:45
A 9.14 24.59 0.372 - 0.6 0.6 8.8 - 0.065
B 7.84 26.13 0.300 - 0.4 0.4 6.4 - 0.055
C 13.89 24.30 0.572 - 1.3 1.3 19.8 - 0.096
Segment : 5 -
08:45 to 09:00
A 7.46 25.45 0.293 - 0.6 0.4 6.4 - 0.056
B 6.40 26.66 0.240 - 0.4 0.3 4.8 - 0.049
C 11.34 24.61 0.461 - 1.3 0.9 13.3 - 0.076
Segment : 6 -
09:00 to 09:15
A 6.25 26.08 0.240 - 0.4 0.3 4.8 - 0.050
B 5.36 27.06 0.198 - 0.3 0.2 3.8 - 0.046
C 9.50 24.84 0.382 - 0.9 0.6 9.5 - 0.065
Queuing Delay Information Over Whole Period
ArmTotal Demand Queueing Delay Inclusive Queueing Delay
(Veh) (Veh/Hr) (Min) (Min/Veh) (Min) (Min/Veh)
A 685.5 457.0 39.3 0.06 39.3 0.06
B 587.7 391.8 29.6 0.05 29.6 0.05
C 1042.0 694.6 83.1 0.08 83.1 0.08
ALL 2315.1 1543.4 152.0 0.07 152.0 0.07
Delay is that occuring only within the time period.
Inclusive delay includes delay suffered by vehicles that are still queueing after the end of the time period.
These will only be significantly different if there is a large queue remaining at the end of the time period.
Accident Data
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
Accident Results
No Data, please select the 'Accident Analysis' option in 'Principal Options' and try again.
28 November 2012 334 existing flows thieves lane welwyn rd with dev rb.vai