Transportation Benefit DistrictsThe Ridgefield Interchange Project

Fall Conference of theAmerican Public Works Association

Washington State ChapterOctober 22, 2009

Justin L. Clary, P.E.City Manager

City of Ridgefield, Washington

Page 2: Transportation Benefit Districts

Ridgefield Location

2

Page 3: Transportation Benefit Districts

2008 Ridgefield Comprehensive Plan Map

3

Page 4: Transportation Benefit Districts

Recent Residential Growth

Pre-2004 – Relatively Stable Population Base 2004-Present

825 New Homes Constructed Population grew from 2,195 to 4,215; ranked No. 8 in State of

Washington for Percentage of Population Growth Rate (2000-2009)

Approximately 1,900 residential lots have gained, at a minimum, preliminary plat approval

4

2005 2007

Page 5: Transportation Benefit Districts

Recent Employment Growth

Employment-based growth has taken longer to realize than residential growth Approximately 500 jobs created since 2004

5

Page 6: Transportation Benefit Districts

Economic Development on the Horizon

Ridgefield’s Comprehensive Growth Plan projects 20,000 jobs will be created over the 20-Year planning horizon

There are a number of large-scale developments under planning and two under build-out

6

Page 7: Transportation Benefit Districts

Economic Development on the Horizon

7

Union Ridge Master Planned Business Park

Page 8: Transportation Benefit Districts

Economic Development on the Horizon

8

Southwest Washington Health System Medical Campus

Page 9: Transportation Benefit Districts

Economic Development on the Horizon

9

Port of Ridgefield’s Waterfront Master Plan

Page 10: Transportation Benefit Districts

Economic Development Attributes

10

Ridgefield Junction Employment Area Approximately 1,500 acres of land zoned for employment-

based development – the largest volume of developable land in the Greater Portland/Vancouver Metropolitan area

Direct access to an international trade corridor (Interstate-5) 25-minute drive to Portland International Airport Four deep-water ports within 30 miles (Vancouver, Portland,

Kalama and Longview) Two major railroad lines within 20 miles (BNSF and Union

Pacific)

Page 11: Transportation Benefit Districts

Transportation Challenge

11

I-5/SR 501 Interchange Built in 1964 to serve a rural community Sole access to Interstate 5 for Ridgefield Existing capacity rapidly eroding due to recent growth Development community has long identified the existing

interchange as a detriment to recruiting quality businesses

Page 12: Transportation Benefit Districts

A New Interchange

12

I-5/SR 501 Interchange Sized to serve 2030 traffic flows Design initiated in 2005 through WSDOT-City partnership

Page 13: Transportation Benefit Districts

Pre-Benefit District Funding Deficit

13

30% Design Completed in 2006 Projected an estimated total project cost of $38 million

Funding Secured through 2006 Federal SAFETEA-LU - $9 million State Transportation Partnership Account - $10 million State CTED Economic Development Grant - $2 million City Traffic Impact Fees - $2 million

Projected Funding Deficit = $15 million

Consistent message from legislators Has the City used all local options?

Page 14: Transportation Benefit Districts

Transportation Benefit District Feasibility Study

14

2007 Public-Private Partnership to conduct Feasibility Study Public – City of Ridgefield, Port of Ridgefield, CTED Grant Private – Individual Developer Donations

Stakeholder/Consultant Team FCS Group – Financial Analysis K&L Preston Gates Ellis LLP – Legal Analysis City, Port, developer and citizen representatives

Scope Conduct legal analysis of RCW 36.73 Evaluate Allowed Revenue Mechanisms Create Revenue Projections based on Land Use Designations Define District Boundaries Assist in TBD Implementation

Page 15: Transportation Benefit Districts

Feasibility Study Analysis

15

Legal Analysis Benefit District Creation Process Benefit District Board of Directors Bondable Revenue Streams

Funding Mechanisms Sales & Use Tax Vehicle Fee Fee or Charge (e.g., traffic impact fee) Vehicle Tolls Property Tax Local Improvement District Assessments

Land Use Projections Created model of buildable lands in the interchange influence area Developed revenue projections based on land use designations

- Used actual increases in assessed valuation of properties near other area interchanges that were replaced over the past decade- Created sales & use tax projections for commercially-zoned properties

Went through an iterative process with the community on revenue streams and district boundary delineation

Page 16: Transportation Benefit Districts

Feasibility Study Results

16

Challenges Encountered Public Approval Process: Registered Voter (TBD) vs. Property

Owner (LID) TBD Boundary Delineation – raised a question of

proportionality Bonding Constraints (TBD sunset of 10 years on sales tax

revenues does not allow for revenue bonding) Revenues increase only as development occurs Agriculture-designated lands were exempt from property

taxes Concern from property owners not intending to develop

Recommended TBD Parameters Revenue Stream – 0.2% Sales & Use Tax would create $1-2

million over the 10 year life of the TBD District Boundary – encompassed land zoned for

employment-based development (industrial, professional and commercial)

Page 17: Transportation Benefit Districts

Transportation Benefit District Boundary

17

Page 18: Transportation Benefit Districts

TBD Creation and Approval

18

District Creation In June 2008, Ridgefield City Council approved an ordinance

adopting the TBD and directed placement of the 0.2% sales & use tax on the November 2008 General Election ballot

Public Process & District Justification City conducted informational mailings and open houses Yes on Ridgefield TBD Committee formed by citizens Common Message – Everyone using the new interchange to

purchase goods that locate within the District will pay their “fair share” for using the interchange

Cost/Benefit Analysis – consumer would need to spend over $1,300 at the nearest commercial location before the 0.2% sales tax increase would be offset by the cost of fuel

November 2008 General Election Outcome TBD approved by 66%

Page 19: Transportation Benefit Districts

TBD “Side Effects”

19

Protection of Existing Project Funds 2008 Legislative session – existing State funds were nearly

reallocated to fully fund other transportation projects Governor’s draft 2009-2011 budget released in Fall 2008

again proposed reallocation of project funds City was able to effectively argue during the 2009

Legislative session that the Project has wide community support based on its approval of a sales tax increase despite a faltering economy

Positioned Interchange Project for ARRA Funds Project visibility created by voter approval of the TBD was

instrumental in the receipt of $10 million in ARRA funds

Page 20: Transportation Benefit Districts

Ridgefield Interchange Project Funding

20

Federal SAFETEA-LU (2005) American Recovery and Reinvestment Act (2009)

State Transportation Partnership Account (2005) CTED Economic Development Grant (2005) Pre-existing Funds (secured 2007, available 2011-2013)

Local Traffic Impact Fees (2005) Transportation Benefit District (2008)

Page 21: Transportation Benefit Districts

Questions?