Transportation Project Report Draft Design Report / Draft Environmental Impact Statement January 2019 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project Project Identification Number (PIN): X735.82 Queens County

Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Transportation Project Report Draft Design Report / Draft Environmental Impact Statement January 2019

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project

Project Identification Number (PIN): X735.82 Queens County

Page 2: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L
Page 3: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L
Page 4: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L
Page 5: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS

This Draft Design Report/Draft Environmental Impact Statement describes the social, economic, and environmental effects that may result from the implementation of the Van Wyck Expressway (VWE) Capacity and Access Improvements to John F. Kennedy (JFK) Airport Project (the Project). Where adverse impacts are identified, measures to mitigate those effects are described. The purpose of the Project is to provide increased capacity on the VWE between the Kew Gardens Interchange (KGI) and JFK Airport to improve vehicular access to and from JFK Airport. In addition, the Project will address operational, geometric, and structural deficiencies on the VWE between the KGI and JFK Airport. The alternatives considered include the No Build Alternative and the Build Alternative (the Preferred Alternative). The No Build Alternative serves as a baseline condition against with the potential benefits and impacts of the Build Alternative are evaluated. The Build Alternative would increase capacity between KGI and JFK airport by adding a fourth lane in each direction between Hoover Avenue and Federal Circle.

This document is available for public review and comment. Comments will be received until the end of the comment period, after which time the FHWA and NYSDOT will issue a Joint Record of Decision in accordance with 23 CFR 771 and 17 NYCRR Part 15. The environmental determination will be issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L. 112-141, 125 Stat. 405, Section 1319(b), unless the FHWA determines statutory criteria or practicability considerations preclude issuance of the combined document pursuant to Section 1319.

Requests for further information or submission of comments regarding the Project may be sent to [email protected] or the individuals listed below.

Glorimar Reyes, P.E. Project Manager New York State Department of Transportation Region 11 47-40 21st Street Long Island City, NY 11101 718-482-7223

Hans Anker, P.E. Senior Area Engineer Federal Highway Administration Leo O'Brien Federal Building Room 719, 11A Clinton Avenue Albany, NY 12207 518-431-8896

Page 6: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L
Page 7: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS

i

Contents

Executive Summary ................................................................................................ ES-1 S.1 PROJECT LOCATION ........................................................................................................... ES-2 S.2 PROJECT PURPOSE, OBJECTIVES AND NEED ............................................................... ES-5

S.2.1 Project Purpose and Objectives ................................................................................ ES-5 S.2.2 Project Need .............................................................................................................. ES-5

S.3 PROJECT ALTERNATIVES .................................................................................................. ES-5 S.3.1 Build Alternative ......................................................................................................... ES-5 S.3.2 No Build Alternative ................................................................................................. ES-10 S.3.3 Preferred Alternative ................................................................................................ ES-10

S.4 SOCIAL, ECONOMIC AND ENVIRONMENTAL EFFECTS................................................ ES-10 S.4.1 Permits and Approvals ............................................................................................. ES-13

S.5 PROJECT COSTS AND SCHEDULE .................................................................................. ES-14 S.6 PUBLIC INVOLVEMENT ..................................................................................................... ES-14

S.6.1 Public Scoping Meeting ........................................................................................... ES-14 S.6.2 DDR/DEIS Public Comment Period and Public Hearings ....................................... ES-14 S.6.3 Project Website ........................................................................................................ ES-15 S.6.4 Mailing List ............................................................................................................... ES-15 S.6.5 Environmental Justice .............................................................................................. ES-15 S.6.6 Limited-English Proficiency ...................................................................................... ES-15 S.6.7 Americans with Disabilities Act (ADA) ..................................................................... ES-15

S.7 CONTACT INFORMATION .................................................................................................. ES-16

Introduction ........................................................................................ 1-1 1.1 PROJECT CLASSIFICATION ................................................................................................... 1-1 1.2 PROJECT LOCATION .............................................................................................................. 1-2 1.3 PROJECT PURPOSE, OBJECTIVES, AND NEED ................................................................. 1-6

1.3.1 Project Purpose and Objectives ................................................................................... 1-6 1.3.2 Project Need ................................................................................................................. 1-6

1.4 DDR/DEIS CONTENTS ............................................................................................................. 1-9 1.5 PROJECT SCHEDULE ............................................................................................................. 1-9 1.6 CONTACT INFORMATION ....................................................................................................... 1-9

Project Context ................................................................................... 2-1 2.1 PROJECT HISTORY ................................................................................................................. 2-1 2.2 TRANSPORTATION PLANS AND LAND USE ........................................................................ 2-1

2.2.1 Local Plans for the Project Area ................................................................................... 2-2 2.2.2 Transportation Corridor ................................................................................................. 2-3

2.3 TRANSPORTATION CONDITIONS, DEFICIENCIES AND ENGINEERING CONSIDERATIONS .................................................................................................................. 2-4 2.3.1 Operations (Traffic and Safety) and Maintenance ........................................................ 2-4 2.3.2 Multimodal ................................................................................................................... 2-43 2.3.3 Infrastructure ............................................................................................................... 2-46 2.3.4 Potential Enhancement Opportunities ...................................................................... 2-107

Project Alternatives ........................................................................... 3-1 3.1 CONCEPTS DISMISSED FROM FURTHER CONSIDERATION ............................................. 3-1 3.2 LOGICAL TERMINI AND INDEPENDENT UTILITY ................................................................ 3-1 3.3 DESCRIPTION OF PROJECT ALTERNATIVES ..................................................................... 3-2

3.3.1 No Build Alternative ...................................................................................................... 3-2 3.3.2 Build Alternative ............................................................................................................ 3-2 3.3.3 Design Criteria for the Build Alternative ...................................................................... 3-16

3.4 ENGINEERING CONSIDERATIONS ...................................................................................... 3-23 3.4.1 Operations (Traffic and Safety) and Maintenance ...................................................... 3-23 3.4.2 Multimodal ................................................................................................................... 3-56

Page 8: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

ii

3.4.3 Infrastructure ............................................................................................................... 3-59 3.4.4 Landscape and Environmental Enhancements ........................................................ 3-126 3.4.5 Miscellaneous ........................................................................................................... 3-127

Social, Economic, and Environmental Considerations .................. 4-1 4.1 AGENCY COORDINATION ...................................................................................................... 4-1

4.1.1 Cooperating Agencies .................................................................................................. 4-1 4.1.2 Participating Agencies .................................................................................................. 4-2

4.2 SOCIAL CONDITIONS .............................................................................................................. 4-2 4.2.1 Land Use ....................................................................................................................... 4-2 4.2.2 Neighborhood and Community Cohesion ................................................................... 4-12 4.2.3 Environmental Justice ................................................................................................. 4-20 4.2.4 Social Groups Benefited or Harmed ........................................................................... 4-31 4.2.5 Schools and Places of Worship .................................................................................. 4-37

4.3 ECONOMIC CONDITIONS ..................................................................................................... 4-45 4.3.1 Regional and Local Economies .................................................................................. 4-45 4.3.2 Business Districts ....................................................................................................... 4-50

4.4 ENVIRONMENTAL CONDITIONS .......................................................................................... 4-53 4.4.1 Wetlands ..................................................................................................................... 4-53 4.4.2 Surface Waters and Waterways ................................................................................. 4-55 4.4.3 Wild, Scenic, and Recreational Rivers ....................................................................... 4-57 4.4.4 Navigable Waters ....................................................................................................... 4-57 4.4.5 Floodplains and Flood Conditions .............................................................................. 4-58 4.4.6 Coastal Resources ..................................................................................................... 4-60 4.4.7 Groundwater ............................................................................................................... 4-62 4.4.8 Stormwater Management ........................................................................................... 4-65 4.4.9 General Ecology and Wildlife Resources ................................................................... 4-73 4.4.10 Threatened and Endangered Species ........................................................................ 4-75 4.4.11 Critical Environmental Areas ...................................................................................... 4-78 4.4.12 Historic and Cultural Resources ................................................................................. 4-79 4.4.13 Parks and Recreational Resources ............................................................................ 4-90 4.4.14 Visual Resources ...................................................................................................... 4-104 4.4.15 Farmlands ................................................................................................................. 4-146 4.4.16 Air Quality ................................................................................................................. 4-146 4.4.17 Energy and Greenhouse Gases ............................................................................... 4-161 4.4.18 Noise ......................................................................................................................... 4-164 4.4.19 Asbestos and Lead ................................................................................................... 4-192 4.4.20 Hazardous Waste and Contaminated Materials ....................................................... 4-196

4.5 CONSTRUCTION EFFECTS ................................................................................................ 4-202 4.5.1 Traffic (including Pedestrians and Bicyclists) Effects ............................................... 4-202 4.5.2 Transit Effects ........................................................................................................... 4-204 4.5.3 Environmental Effects ............................................................................................... 4-206

4.6 INDIRECT AND SECONDARY EFFECTS ........................................................................... 4-209 4.7 CUMULATIVE EFFECTS ...................................................................................................... 4-210

4.7.1 Study Area and Methodology ................................................................................... 4-210 4.7.2 Past, Present, and Reasonably Foreseeable Future Projects ................................. 4-210 4.7.3 Short-Term and Long-Term Effects .......................................................................... 4-212 4.7.4 Potential Cumulative Effects ..................................................................................... 4-214

4.8 SHORT-TERM USES OF THE ENVIRONMENT AND MAINTENANCE AND ENHANCEMENT OF LONG-TERM PRODUCTIVITY .......................................................... 4-218

4.9 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES ..................... 4-219 4.10 ADVERSE ENVIRONMENTAL IMPACTS THAT CANNOT BE AVOIDED ......................... 4-220

Public Involvement ............................................................................ 5-1 5.1 PUBLIC MEETINGS .................................................................................................................. 5-2

5.1.1 Scoping Meeting ........................................................................................................... 5-2

Page 9: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

iii

5.1.2 Public Hearings ............................................................................................................. 5-5 5.2 COMMUNITY BOARD MEETINGS ........................................................................................... 5-5 5.3 PROJECT WEBSITE ................................................................................................................ 5-6 5.4 AVAILABILITY OF PROJECT REPORTS AND PUBLIC COMMENT

OPPORTUNITIES ..................................................................................................................... 5-6 5.5 MAILING LIST ........................................................................................................................... 5-7 5.6 PUBLIC INVOLVEMENT DURING CONSTRUCTION ............................................................. 5-7 5.7 CONTACT INFORMATION ....................................................................................................... 5-8

Page 10: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

iv

Appendices

APPENDIX A – Plan, Profiles and Sections APPENDIX B – Traffic Data APPENDIX C – Design Criteria and Nonstandard Features APPENDIX D – Utilities APPENDIX E – Capital Projects Complete Streets Checklist APPENDIX F – Smart Growth Checklist APPENDIX G – Agency Correspondence APPENDIX H – Groundwater Assessment Report APPENDIX I – Drainage Report APPENDIX J – Wetland Identification and Delineation Report APPENDIX K – Coastal Consistency Review APPENDIX L – Trees Survey APPENDIX M – Cultural Resources Supplemental Information APPENDIX N – Environmental Site Assessment, Phase I APPENDIX O – Asbestos and Lead Assessment Report APPENDIX P – Visual Impact Assessment Report APPENDIX Q – Air Quality Analysis APPENDIX R – Noise Analysis APPENDIX S – Preliminary Planting Plan APPENDIX T – Access Modification Report APPENDIX U – Consultant List of Preparers

Page 11: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

v

Tables Table S-1. Summary of Effects ..................................................................................................... ES-10 Table S-2. Project Schedule ......................................................................................................... ES-14 Table 1-1. Environmental Classification Summary ........................................................................... 1-1 Table 1-2. Existing Queue Length, Speed, Travel Time, and Delay Along the Van Wyck

Expressway between the Kew Gardens Interchange and JFK Airport during the Peak Periods, 2017 .......................................................................................................... 1-7

Table 1-3. Crash Data for the Van Wyck Expressway Between the Kew Gardens Interchange and JFK Airport, 2014–2016 ........................................................................ 1-8

Table 1-4. Project Schedule .............................................................................................................. 1-9 Table 2-1. Van Wyck Expressway Classification Data ..................................................................... 2-4 Table 2-2. Existing: VWE Mainline Speeds (AM Peak Period Southbound) .................................... 2-6 Table 2-3. Existing: VWE Mainline Speeds (PM Peak Period Southbound) .................................... 2-6 Table 2-4. Existing: VWE Mainline Speeds (AM Peak Period Northbound) ..................................... 2-6 Table 2-5. Existing: VWE Mainline Speeds (PM Peak Period Northbound) ..................................... 2-6 Table 2-6. Existing: VWE Mainline Free-Flow Speed ....................................................................... 2-7 Table 2-7. Existing: VWE Service Road Free-Flow Speed (Southbound) ........................................ 2-8 Table 2-8. Existing: VWE Mainline Mode Share (AM Peak Hour) .................................................... 2-9 Table 2-9. Existing: VWE Mainline Mode Share (PM Peak Hour) .................................................... 2-9 Table 2-10. Basic Freeway Segment Level of Service Criteria ......................................................... 2-14 Table 2-11. Existing: VWE Mainline Level of Service (AM Southbound) .......................................... 2-14 Table 2-12. Existing: VWE Mainline Level of Service (PM Southbound) .......................................... 2-14 Table 2-13. Existing: VWE Mainline Level of Service (AM Northbound) .......................................... 2-15 Table 2-14. Existing: VWE Mainline Level of Service (PM Northbound) .......................................... 2-15 Table 2-15. Existing Average Queue, Average Speed, and Travel Time Along the VWE

between the KGI and JFK Federal Circle during the Peak Periods (2017) ................... 2-16 Table 2-16. Intersection Level of Service Criteria ............................................................................. 2-16 Table 2-17. Existing Service Road Level of Service and Delay (Southbound) ................................. 2-18 Table 2-18. Existing Service Road Level of Service and Delay (Northbound) ................................. 2-21 Table 2-19. 2025 No Build Alternative: VWE Mainline Level of Service (AM Southbound) ............. 2-24 Table 2-20. 2025 No Build Alternative: VWE Mainline Level of Service (PM Southbound) ............. 2-24 Table 2-21. 2025 No Build Alternative: VWE Mainline Level of Service (AM Northbound) .............. 2-24 Table 2-22. 2025 No Build Alternative: VWE Mainline Level of Service (PM Northbound) .............. 2-25 Table 2-23. Average Queue, Average Speed, and Travel Time Along VWE between the KGI

and JFK Federal Circle during the Peak Periods in 2025 .............................................. 2-26 Table 2-24. Average Queue, Average Speed, and Travel Time Along VWE between the KGI

and JFK Federal Circle during the Peak Periods in 2045 .............................................. 2-26 Table 2-25. 2025 No Build Alternative: Service Road Level of Service and Delay

(Southbound) ................................................................................................................. 2-28 Table 2-26. 2025 No Build Alternative: Service Road Level of Service and Delay

(Southbound) ................................................................................................................. 2-29 Table 2-27. 2025 No Build Alternative: Service Road Level of Service and Delay

(Northbound) .................................................................................................................. 2-31 Table 2-28. VWE Mainline: Crash Data Summary (2014–2016) ...................................................... 2-34

Page 12: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

vi

Table 2-29. VWE Mainline Southbound: Crash Summary by Crash Type and Time of Day (2014–2016) ................................................................................................................... 2-35

Table 2-30. VWE Mainline Northbound: Crash Summary by Crash Type and Time of Day (2014–2016) ................................................................................................................... 2-35

Table 2-31. VWE Mainline: Million Vehicle Miles Comparison (2014–2016) .................................... 2-35 Table 2-32. VWE Mainline Southbound: High Crash Locations (2014–2016) .................................. 2-36 Table 2-33. Northbound VWE High Crash Locations, 2014–2016 ................................................... 2-41 Table 2-34. 86th Avenue Pedestrian Bridge – Americans with Disabilities Act Compliance ............. 2-44 Table 2-35. Existing Nonstandard Features – Mainline (Lane and Shoulder Widths) ...................... 2-48 Table 2-36. Existing Nonstandard Features – Mainline (Horizontal/Vertical Stopping Sight

Distance) ........................................................................................................................ 2-50 Table 2-37. Existing Nonstandard Features – Mainline (Superelevation) ........................................ 2-51 Table 2-38. Existing Nonstandard Features – Ramps ...................................................................... 2-53 Table 2-39. Existing Nonstandard Features – Service Roads .......................................................... 2-60 Table 2-40. Existing Nonstandard Features – Service Roads (ADA Compliance) ........................... 2-61 Table 2-41. Existing Nonstandard Features – Collector-Distributor (Horizontal/Vertical

Stopping Sight Distance) ............................................................................................... 2-69 Table 2-42. Existing Nonconforming Features – Mainline ................................................................ 2-70 Table 2-43. Existing Nonconforming Features – Access Control ..................................................... 2-72 Table 2-44. Existing Nonconforming Features – Ramps .................................................................. 2-73 Table 2-45. Existing Nonconforming Features – Service Roads ...................................................... 2-73 Table 3-1. Concepts Dismissed from Further Consideration ............................................................ 3-1 Table 3-2. Probable Construction Costs for Build Alternative ......................................................... 3-16 Table 3-3. Critical Design Elements: VWE Mainline ....................................................................... 3-17 Table 3-4. Critical Design Elements: VWE Managed-Use Lane ..................................................... 3-18 Table 3-5. Critical Design Elements: VWE Service Roads ............................................................. 3-19 Table 3-6. Critical Design Elements for Van Wyck Collector-Distributor Road Northbound

(CDN) ............................................................................................................................. 3-20 Table 3-7. Critical Design Elements for Van Wyck Collector-Distributor Road Southbound

(MSS) ............................................................................................................................. 3-21 Table 3-8: Other Design Parameters .............................................................................................. 3-22 Table 3-9. VWE Mainline Forecast Annual Average Daily Traffic ................................................... 3-25 Table 3-10. Design Year (2025) AM and PM Peak-Hour Traffic Volumes – General-Use Lane

and Managed-Use Lane Combined ............................................................................... 3-25 Table 3-11. Design Year (2045) AM and PM Peak-Hour Traffic Volumes – General-Use Lane

and Managed-Use Lane Combined ............................................................................... 3-26 Table 3-12. 2025 and 2045 AM and PM Peak-Hour Traffic Volumes by Vehicle Type on the

Managed-Use Lane........................................................................................................ 3-26 Table 3-13. Average Queue, Average Speed, and Travel Time Along Van Wyck Expressway

between the Kew Gardens Interchange and JFK Federal Circle in 2025 during the AM and PM Peak Period – General-Use Lane and Managed-Use Lane ................ 3-33

Table 3-14. Average Queue, Average Speed, and Travel Time Along Van Wyck Expressway between the Kew Gardens Interchange and JFK Federal Circle in 2045 during the AM and PM Peak Period – General-Use Lane and Managed-Use Lane ................ 3-33

Table 3-15. Service Road Delay and Level of Service (AM Southbound) ........................................ 3-36 Table 3-16. Service Road Delay and Level of Service (PM Southbound) ........................................ 3-39 Table 3-17. Service Road Delay and Level of Service (AM Northbound) ......................................... 3-42

Page 13: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

vii

Table 3-18. Service Road Delay and Level of Service (PM Northbound) ......................................... 3-45 Table 3-19. Allowable Lane Closure Times per NYCDOT Office of Construction Mitigation

and Coordination Stipulations ........................................................................................ 3-48 Table 3-20. VWE Service Road Parking Effects ............................................................................... 3-54 Table 3-21. Pedestrian Counts .......................................................................................................... 3-57 Table 3-22. Ramp Designations ........................................................................................................ 3-64 Table 3-23. VWE Mainline – Lane Widths Less than Standard (Northbound/Southbound) ............. 3-65 Table 3-24. VWE Mainline –Right Shoulder Widths Less Than Standard

(Northbound/Southbound) ............................................................................................. 3-65 Table 3-25. VWE Mainline – Left Shoulder Widths Less Than Standard

(Northbound/Southbound) ............................................................................................. 3-66 Table 3-26. VWE Mainline – Horizontal Curve Radius Less Than Standard (Northbound) ............. 3-67 Table 3-27. VWE Mainline – Superelevations Less Than Standard (Northbound and

Southbound) ................................................................................................................... 3-67 Table 3-28. VWE Mainline – Stopping Sight Distances (Horizontal/Vertical) Less Than

Standard (Northbound and Southbound) ....................................................................... 3-68 Table 3-29. VWE Managed-Use Lane – Shoulder Widths Less Than Standard (Northbound

and Southbound) ............................................................................................................ 3-70 Table 3-30. VWE Managed-Use Lane – Horizontal Curve Radius Less Than Standard

(Southbound) ................................................................................................................. 3-70 Table 3-31. VWE Managed-Use Lane – Stopping Sight Distance (Horizontal/Vertical) Less

Than Standard (Southbound) ........................................................................................ 3-71 Table 3-32. VWE Slip Ramps – Lane Width Less Than Standard .................................................... 3-72 Table 3-33. VWE Slip Ramps – Shoulder Width Less Than Standard ............................................. 3-73 Table 3-34. VWE Slip Ramps – Superelevations Less Than Standard (Northbound and

Southbound) ................................................................................................................... 3-74 Table 3-35. VWE Slip Ramps – Stopping Sight Distance (Horizontal and Vertical) Less Than

Standard ......................................................................................................................... 3-75 Table 3-36. VWE Loop Ramps – Lane Widths Less Than Standard ................................................ 3-76 Table 3-37. VWE Loop Ramps – Shoulder Widths Less Than Standard ......................................... 3-77 Table 3-38. VWE Loop Ramps – Horizontal Curve Radius Less Than Standard ............................. 3-77 Table 3-39. VWE Loop Ramps – Superelevations Less Than Standard (Northbound and

Southbound) ................................................................................................................... 3-78 Table 3-40. VWE Loop Ramps – Stopping Sight Distance (Horizontal) Less Than Standard ......... 3-78 Table 3-41. VWE Collector-Distributor Roads – Travel Lane Widths Less Than Standard .............. 3-79 Table 3-42. VWE Collector-Distributor Roads –Shoulder Widths Less Than Standard

(Southbound) ................................................................................................................. 3-79 Table 3-43. VWE Service Roads – Lane Width Less Than Standard (Northbound and

Southbound) ................................................................................................................... 3-80 Table 3-44. VWE Mainline/Managed-Use Lane – Auxiliary Lane Length Less than

Recommended Length (Northbound and Southbound,) ................................................ 3-81 Table 3-45. VWE Mainline/Managed-Use Lane – Nonconforming Compound Curves

(Northbound, 2025) ........................................................................................................ 3-81 Table 3-46. VWE Mainline/Managed-Use Lane – Median Widths Less than Recommended ......... 3-82 Table 3-47. VWE Mainline/Managed-Use Lane – Horizontal Clearance Less than

Recommended (Northbound and Southbound,) ............................................................ 3-82 Table 3-48. VWE Mainline/Managed-Use Lane – Nonconforming Broken Back Curves

(Northbound and Southbound,) ..................................................................................... 3-83

Page 14: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

viii

Table 3-49. VWE Mainline/Managed-Use Lane – Nonconforming Superelevation Transitions (Northbound) .................................................................................................................. 3-83

Table 3-50. VWE Mainline/Managed-Use Lane – Nonconforming Superelevation Transition Lengths .......................................................................................................................... 3-84

Table 3-51. VWE Mainline/Managed-Use Lane – Control of Access ............................................... 3-85 Table 3-52. VWE Mainline/Managed-Use Lane – Nonconforming Vertical Stopping Sight

Distance ......................................................................................................................... 3-86 Table 3-53. VWE Ramps – Nonconforming Broken Back Curves .................................................... 3-87 Table 3-54. VWE Ramps – Vertical Stopping Sight Distance: Slip Ramps ...................................... 3-88 Table 3-55. VWE Ramps – Nonconforming Superelevation Transitions .......................................... 3-88 Table 3-56. VWE Service Roads – Auxiliary Lane Length Less Than Recommended

(Northbound) .................................................................................................................. 3-89 Table 3-57. VWE Collector-Distributor Roads – Auxiliary Lane Length Less Than

Recommended (Southbound,) ....................................................................................... 3-89 Table 3-58. Staged Track Outage Summary: BIN 7066687, LIRR1: LIRR Atlantic Tracks 1–

4(*) ............................................................................................................................... 3-124 Table 4-1. Study Area Land Use Classification ................................................................................. 4-3 Table 4-2. Planned or Approved Development Projects Within the Study Area ............................... 4-9 Table 4-3. Population, 2014–2016 .................................................................................................. 4-18 Table 4-4. Population by Age, 2016 ................................................................................................ 4-18 Table 4-5. Median Household Income, 2014–2016 ........................................................................ 4-18 Table 4-6. Percentage of Families Whose Income is Below the Poverty Level, 2014–2016 ......... 4-19 Table 4-7. Housing by Occupancy and Tenure, 2016 .................................................................... 4-19 Table 4-8. Limited-English Proficiency Populations in the Study Area, 2016 ................................. 4-20 Table 4-9. Race, Ethnicity, and Income Characteristics for Populations in the Study Area,

Queens County and New York City 2016 ...................................................................... 4-23 Table 4-10. Percentage of Residents over 65 Years in Age in the Study Area, Queens

County, and New York City, 2016 .................................................................................. 4-32 Table 4-11. Persons with Disabilities Data, 2016 .............................................................................. 4-32 Table 4-12. Disability Status in the Study Area by Age Group, 2016 ............................................... 4-34 Table 4-13. Transit Access, 2016...................................................................................................... 4-36 Table 4-14. Schools in School District #28 and Study Area ............................................................. 4-39 Table 4-15. Schools in School District #27 and Study Area ............................................................. 4-41 Table 4-16. Places of Worship in the Study Area ............................................................................. 4-43 Table 4-17. Employment in Queens County (2007 to 2016) ............................................................. 4-46 Table 4-18. Employment Data for All Industries for Queens County ................................................ 4-46 Table 4-19. Household Income, 2016 ............................................................................................... 4-47 Table 4-20. Unemployment Rates .................................................................................................... 4-47 Table 4-21. Employment by Industry, 2016 ...................................................................................... 4-48 Table 4-22. Economic Profiles for Study Area Community Boards .................................................. 4-48 Table 4-23. Existing Open Space Inventory within Study Area ........................................................ 4-93 Table 4-24. National Ambient Air Quality Standards ....................................................................... 4-147 Table 4-25. Ambient Air Quality Monitored Data ............................................................................. 4-157 Table 4-26. Mesoscale Emission Burdens (tons/year) ................................................................... 4-159 Table 4-27. Mobile Source Air Toxic Emission Burdens (tons/year) ............................................... 4-159 Table 4-28. Predicted 24-hour PM10 Design Value Concentrations, 2025 ..................................... 4-160

Page 15: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

ix

Table 4-29. Predicted 24-hour PM2.5 Design Value Concentrations, 2025 ..................................... 4-160 Table 4-30. Predicted Annual PM2.5 Design Value Concentrations, 2025 ...................................... 4-160 Table 4-31. Direct Annual Energy Consumption ............................................................................. 4-162 Table 4-32. Direct Carbon Dioxide Equivalent (CO2e) Emissions .................................................. 4-163 Table 4-33. Indirect Construction GHG Emissions and Energy Use (Annual)* .............................. 4-163 Table 4-34. Total Direct and Indirect Greenhouse Gas Emissions and Energy Use ...................... 4-164 Table 4-35. Noise Abatement Criteria Hourly A-Weighted Noise Level in dB(A) ........................... 4-165 Table 4-36. Receptors with Noise Abatement Criteria Exceedances or Impacts ........................... 4-168 Table 4-37. Receptor Benefits for Recommended Noise Barriers .................................................. 4-180 Table 4-38. Receptors with Noise Abatement Criteria Exceedances or Impacts ........................... 4-180 Table 4-39. Various Construction Equipment Reference Noise Levels .......................................... 4-191 Table 4-40. Asbestos and Lead Sampling Summary ...................................................................... 4-195 Table 4-41. Short-Term and Long-Term Effects of the Build Alternative ........................................ 4-212 Table 5-1: Languages Spoken by 1 Percent or More of Study Area Population .............................. 5-1 Table 5-2: Commercial Flyer Distribution .......................................................................................... 5-4 Table 5-3: Community Board Meetings ............................................................................................. 5-6 Table 5-4: Repositories for the Draft Design Report/Draft Environmental Impact Statement .......... 5-7

Figures Figure S-1. Project Location ............................................................................................................ ES-3 Figure S-2. General Study Area....................................................................................................... ES-4 Figure S-3 Build Alternative Bridge and Ramp Locations – Northern Segment ............................. ES-7 Figure S-4 Build Alternative Bridge and Ramp Locations – Middle Segment ................................ ES-8 Figure S-5 Build Alternative Bridge and Ramp Locations – Southern Segment ............................ ES-9 Figure 1-1. Project Location ............................................................................................................... 1-3 Figure 1-2. General Study Area.......................................................................................................... 1-4 Figure 2-1. Existing: VWE Mainline Hourly Volumes between Atlantic Avenue/94th Avenue

and Jamaica Avenue........................................................................................................ 2-8 Figure 2-2. Multi-resolution Modeling Process Flow Map ................................................................ 2-12 Figure 2-3. VWE Mainline Crashes Southbound .............................................................................. 2-37 Figure 2-4. VWE Mainline Crashes Northbound .............................................................................. 2-39 Figure 2-5. Service Road Crash Types ............................................................................................ 2-42 Figure 3-1 Build Alternative Bridge and Ramp Locations – Northern Segment ................................ 3-7 Figure 3-2 Build Alternative Bridge and Ramp Locations – Middle Segment ................................... 3-8 Figure 3-3 Build Alternative Bridge and Ramp Locations – Southern Segment ............................... 3-9 Figure 3-4 Build Alternative Ramp Modifications – Hillside Avenue to LIRR .................................. 3-10 Figure 3-5 Build Alternative Ramp Modifications – LIRR to Liberty Avenue ................................... 3-11 Figure 3-6 Build Alternative Ramp Modifications – Liberty Avenue to 109th Avenue ...................... 3-12 Figure 3-7 Build Alternative Ramp Modifications – 109th Avenue to 116th Avenue ......................... 3-13 Figure 3-8 Build Alternative Ramp Modifications – Exit 1W ............................................................ 3-14 Figure 3-9. 2025 Build Alternative: VWE Mainline Speeds (AM Southbound) –

General-Use Lane Only ................................................................................................. 3-27

Page 16: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

x

Figure 3-10. 2025 Build Alternative: VWE Mainline Speeds (PM Southbound) – General-Use Lane Only ................................................................................................. 3-27

Figure 3-11. 2025 Build Alternative: VWE Mainline Speeds (AM Northbound) – General-Use Lane Only ................................................................................................. 3-27

Figure 3-12. 2025 Build Alternative: VWE Mainline Speeds (PM Northbound) – General-Use Lane Only ................................................................................................. 3-28

Figure 3-13. 2045 Build Alternative: VWE Mainline Speeds (AM Southbound) – General-Use Lane Only ................................................................................................. 3-28

Figure 3-14. 2045 Build Alternative: VWE Mainline Speeds (PM Southbound) – General-Use Lane Only ................................................................................................. 3-28

Figure 3-15. 2045 Build Alternative: VWE Mainline Speeds (AM Northbound) – General-Use Lane Only ................................................................................................. 3-29

Figure 3-16. 2045 Build Alternative: VWE Mainline Speeds (PM Northbound) – General-Use Lane Only ................................................................................................. 3-29

Figure 3-17. 2025 Build Alternative: VWE Mainline Level of Service (AM Southbound) – General-Use Lane Only ................................................................................................. 3-30

Figure 3-18. 2025 Build Alternative: VWE Mainline Level of Service (PM Southbound) – General-Use Lane Only ................................................................................................. 3-30

Figure 3-19. 2025 Build Alternative: VWE Mainline Level of Service (AM Northbound) – General-Use Lane Only ................................................................................................. 3-30

Figure 3-20. 2025 Build Alternative: VWE Mainline Level of Service (PM Northbound) – General-Use Lane Only ................................................................................................. 3-30

Figure 3-21. 2045 Build Alternative: VWE Mainline Level of Service (AM Southbound) – General-Use Lane Only ................................................................................................. 3-31

Figure 3-22. 2045 Build Alternative: VWE Mainline Level of Service (PM Southbound) – General-Use Lane Only ................................................................................................. 3-31

Figure 3-23. 2045 Build Alternative: VWE Mainline Level of Service (AM Northbound) – General-Use Lane Only ................................................................................................. 3-32

Figure 3-24. 2045 Build Alternative: VWE Mainline Level of Service (PM Northbound) – General-Use Lane Only ................................................................................................. 3-32

Figure 3-25. VWE Mainline: Average Travel Time Comparison – General-Use Lane and Managed-Use Lane........................................................................................................ 3-34

Figure 3-26. VWE Service Road: Average Travel Time Comparison ................................................ 3-34 Figure 3-27 Build Alternative Parking Changes ................................................................................ 3-55 Figure 4-1. Land Use .......................................................................................................................... 4-4 Figure 4-2. Zoning .............................................................................................................................. 4-6 Figure 4-3. Planned or Approved Development Projects Within the Study Area ............................. 4-10 Figure 4-4. Census Tracts within the Study Area ............................................................................. 4-13 Figure 4-5. Community Board Districts and Neighborhoods within the Study Area ......................... 4-17 Figure 4-6. Minority Communities within the Study Area ................................................................. 4-24 Figure 4-7. Low-Income Communities within the Study Area .......................................................... 4-25 Figure 4-8. Environmental Justice Communities within the Study Area........................................... 4-26 Figure 4-9. Persons with Disabilities ................................................................................................ 4-33 Figure 4-10. Transit Service and Transit Access in Study Area ......................................................... 4-35 Figure 4-11. Schools in Study Area .................................................................................................... 4-40 Figure 4-12. Places of Worship in Study Area ................................................................................... 4-42 Figure 4-13. Business Improvement Districts in Study Area .............................................................. 4-52 Figure 4-14. Floodplains ..................................................................................................................... 4-59

Page 17: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

xi

Figure 4-15. Coastal Zone Boundary ................................................................................................. 4-61 Figure 4-16. Existing Drainage Areas ................................................................................................ 4-67 Figure 4-17. Proposed Stormwater Infiltration Basins ........................................................................ 4-70 Figure 4-18. Proposed Drainage Areas .............................................................................................. 4-71 Figure 4-19. Area of Potential Effects within the Study Area ............................................................. 4-81 Figure 4-20. Parks and Open Spaces ................................................................................................ 4-94 Figure 4-21. Tree Removal Near Unnamed Park ............................................................................... 4-99 Figure 4-22. Tree Removal Near Norelli-Hargreaves Playground ................................................... 4-100 Figure 4-23. Tree Removal Near Dr. Charles R. Drew Memorial Park ............................................ 4-101 Figure 4-24. Tree Removal Near Foch Sitting Area ......................................................................... 4-102 Figure 4-25. Tree Removal Near Playground One Forty ................................................................. 4-103 Figure 4-26. Area of Visual Effect..................................................................................................... 4-106 Figure 4-27. Landscape Unit Map .................................................................................................... 4-108 Figure 4-28. Viewpoints – Northern Segment – Grand Central Parkway to Atlantic Avenue .......... 4-113 Figure 4-29. Viewpoints – Middle Segment ...................................................................................... 4-114 Figure 4-30. Viewpoints – Southern Segment .................................................................................. 4-115 Figure 4-31. Visual Resources: Viewpoint 1 – Existing Conditions (No Build Alternative) .............. 4-117 Figure 4-32. Visual Resources: Viewpoint 1 – Visual Simulation of Build Alternative without

Noise Barrier ................................................................................................................ 4-117 Figure 4-33. Visual Resources: Viewpoint 1 – Visual Simulation of Build Alternative with Solid

Noise Barrier ................................................................................................................ 4-118 Figure 4-34. Visual Resources: Viewpoint 1 – Visual Simulation of Build Alternative with

Transparent Noise Barrier ............................................................................................ 4-118 Figure 4-35. Visual Resources: Viewpoint 2 – Existing Conditions (No Build Alternative) .............. 4-120 Figure 4-36. Visual Resources: Viewpoint 2 – Visual Simulation of Build Alternative ..................... 4-120 Figure 4-37. Visual Resources: Viewpoint 3 – Existing Conditions (No Build Alternative) .............. 4-122 Figure 4-38. Visual Resources: Viewpoint 3 – Visual Simulation of Build Alternative ..................... 4-122 Figure 4-39. Visual Resources: Viewpoint 4 – Existing Conditions (No Build Alternative) .............. 4-124 Figure 4-40. Visual Resources: Viewpoint 4 – Visual Simulation of Build Alternative ..................... 4-124 Figure 4-41. Visual Resources: Viewpoint 5 – Existing Conditions (No Build Alternative) .............. 4-126 Figure 4-42. Visual Resources: Viewpoint 5 – Visual Simulation of Build Alternative without

Noise Barrier ................................................................................................................ 4-126 Figure 4-43. Visual Resources: Viewpoint 5 – Visual Simulation of Build Alternative with Solid

Noise Barrier ................................................................................................................ 4-127 Figure 4-44. Visual Resources: Viewpoint 5 – Visual Simulation of Build Alternative with

Transparent Noise Barrier ............................................................................................ 4-127 Figure 4-45. Visual Resources: Viewpoint 6 – Existing Conditions (No Build Alternative) .............. 4-129 Figure 4-46. Visual Resources: Viewpoint 6 – Visual Simulation of Build Alternative without

Noise Barrier ................................................................................................................ 4-129 Figure 4-47. Visual Resources: Viewpoint 6 – Visual Simulation of Build Alternative with Solid

Noise Barrier ................................................................................................................ 4-130 Figure 4-48. Visual Resources: Viewpoint 6 – Visual Simulation of Build Alternative with

Transparent Noise Barrier ............................................................................................ 4-130 Figure 4-49. Visual Resources: Viewpoint 7 – Existing Conditions (No Build Alternative) .............. 4-132 Figure 4-50. Visual Resources: Viewpoint 7 – Visual Simulation of Build Alternative ..................... 4-132 Figure 4-51. Visual Resources: Viewpoint 8 – Existing Conditions (No Build Alternative) .............. 4-134

Page 18: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

xii

Figure 4-52. Visual Resources: Viewpoint 8 – Visual Simulation of Build Alternative ..................... 4-134 Figure 4-53. Visual Resources: Viewpoint 9 – Existing Conditions (No Build Alternative) .............. 4-136 Figure 4-54. Visual Resources: Viewpoint 9 – Visual Simulation of Build Alternative ..................... 4-136 Figure 4-55. Visual Resources: Viewpoint 10 – Existing Conditions (No Build Alternative) ............ 4-138 Figure 4-56. Visual Resources: Viewpoint 10 – Visual Simulation of Build Alternative without

Noise Barrier ................................................................................................................ 4-138 Figure 4-57. Visual Resources: Viewpoint 10 – Visual Simulation of Build Alternative with

Solid Noise Barrier ....................................................................................................... 4-139 Figure 4-58. Visual Resources: Viewpoint 10 – Visual Simulation of Build Alternative with

Transparent Noise Barrier ............................................................................................ 4-139 Figure 4-59. Visual Resources: Viewpoint 11 – Existing Conditions (No Build Alternative) ............ 4-141 Figure 4-60. Visual Resources: Viewpoint 11 – Visual Simulation of Build Alternative ................... 4-141 Figure 4-61. Visual Resources: Viewpoint 12 – Existing Conditions (No Build Alternative) ............ 4-143 Figure 4-62. Visual Resources: Viewpoint 12 – Visual Simulation of Build Alternative ................... 4-143 Figure 4-63. Regional Build Alternative vs. No Build Alternative with ±5% Change in Annual

Average Daily Traffic (2045) ........................................................................................ 4-150 Figure 4-64. MSAT and Mesoscale Analyses Study Area ............................................................... 4-151 Figure 4-65. MSAT and Mesoscale Analysis Roadway Network ..................................................... 4-152 Figure 4-66. Project Corridor Build Alternative vs. No Build Alternative with ±5% Change in

Annual Average Daily Traffic (2045) ............................................................................ 4-153 Figure 4-67. Particulate Matter Model Receptor Grid (AERMOD) ................................................... 4-155 Figure 4-68 Activity Categories and Long-Term Noise Measurement Sites ................................... 4-166 Figure 4-69 Noise Analysis: Traffic Noise Study Area Segments ................................................... 4-169 Figure 4-70 Existing Noise Levels from JFK Airport to Rockaway Boulevard (Segment 1) ............ 4-170 Figure 4-71 Existing Noise Levels from Rockaway Boulevard to 109th Street (Segment 2) ........... 4-171 Figure 4-72 Existing Noise Levels from 109th Street to Jamaica Avenue (Segment 3) ................. 4-172 Figure 4-73 Existing Noise Levels from Jamaica Avenue to Union Turnpike (Segment 4) ............ 4-173 Figure 4-74 Build Alternative Noise Levels from JFK Airport to Rockaway Boulevard

(Segment 1) ................................................................................................................. 4-174 Figure 4-75 Build Alternative Noise Levels from Rockaway Boulevard to 109th Street

(Segment 2) ................................................................................................................. 4-175 Figure 4-76 Build Alternative Noise Levels from 109th Street to Jamaica Avenue (Segment 3) .... 4-176 Figure 4-77 Build Alternative Noise Levels from Jamaica Avenue to Union Turnpike

(Segment 4) ................................................................................................................. 4-177 Figure 4-78 Proposed Noise Barriers between JFK Airport and Rockaway Boulevard

(Segment 1) ................................................................................................................. 4-181 Figure 4-79 Proposed Noise Barriers between Rockaway Boulevard and Foch Boulevard

(Segment 2) ................................................................................................................. 4-182 Figure 4-80 Proposed Noise Barriers between Foch Boulevard and Linden Boulevard

(Segment 2) ................................................................................................................. 4-183 Figure 4-81 Proposed Noise Barriers between Linden Boulevard and 109th Street

(Segment 2) ................................................................................................................. 4-184 Figure 4-82 Proposed Noise Barriers between 109th Street and Liberty Avenue (Segment 3) ...... 4-185 Figure 4-83 Proposed Noise Barriers between Liberty Avenue and Jamaica Avenue

(Segment 3) ................................................................................................................. 4-186 Figure 4-84 Proposed Noise Barriers between Jamaica Avenue and Queens Boulevard

(Segment 4) ................................................................................................................. 4-187

Page 19: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

xiii

Figure 4-85 Proposed Noise Barriers between Queens Boulevard and Union Turnpike (Segment 4) ................................................................................................................. 4-188

Figure 4-86. Segment Locations (Hazardous Waste and Contaminated Materials) ........................ 4-201 Figure 5-1. Meetings and Flyer Distribution for the Project ................................................................ 5-3

Page 20: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

xiv

LIST OF PREPARERS Group Director Responsible for Production of the Design Approval Document: Harold Fink, PE, Deputy Chief Engineer, NYSDOT Region 11 Description of Work Performed: Directed the preparation of the Design Approval Document in accordance with established standards, policies, regulations, and procedures, except as otherwise explained in this document.

PLACE P.E. STAMP This report was prepared by the following NYSDOT staff: Glorimar Reyes, PE, Project Manager, NYSDOT Region 11 Description of Work Performed: Directly supervised the preparation of the Draft Design Report Chapters 1 through 3 in accordance with established standards, policies, regulations and procedures, except as otherwise explained in this document.

PLACE P.E. STAMP Note: It is a violation of law for any person, unless they are acting under the direction of a licensed professional engineer, architect, landscape architect, or land surveyor, to alter an item in any way. If an item bearing the stamp of a licensed professional is altered, the altering engineer, architect, landscape architect, or land surveyor shall stamp the document and include the notation “altered by” followed by their signature, the date of such alteration, and a specific description of the alteration.

Page 21: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

xv

Acronyms/Abbreviations AADT .................................................................................................................... annual average daily traffic AASHTO ............................................................................. American Association of State Highway Officials ACHP ............................................................................................ Advisory Council on Historic Preservation ACM ................................................................................................................ asbestos containing materials ACS .................................................................................................................. American Community Survey ADA ................................................................................................................ Americans with Disabilities Act AHERA ...................................................................................... Asbestos Hazard Emergency Response Act APE ............................................................................................................................. area of potential effect AREMA .............................................. American Railway Engineering and Maintenance of Way Association ASTM ......................................................................................... American Society for Testing and Materials AVE .................................................................................................................................. area of visual effect BID ................................................................................................................. business improvement districts BLS .................................................................................................................. Bureau of Labor and Statistics BPM ................................................................................................................................. Best Practice Model CAA ............................................................................................................................................ Clean Air Act CEA ................................................................................................................... Critical Environmental Areas CEQ ............................................................................................................ Council on Environmental Quality CERCLA ................................... Comprehensive Environmental Response, Compensation, and Liability Act CFR ................................................................................................................... Code of Federal Regulations CMP ................................................................................................................ coastal management program CRIS ................................................................................................... Cultural Resource Information System CSO ........................................................................................................................ combined sewer overflow CSS .......................................................................................................................... combined sewer system CUNY .................................................................................................................. City University of New York CWA ...................................................................................................................................... Clean Water Act DBH ......................................................................................................................... diameter at breast height DEIS ..................................................................................................... draft environmental impact statement DHV ............................................................................................................................... design hourly volume E&SCP ...................................................................................................... erosion and sediment control plan ECL ............................................................................................................ Environmental Conservation Law EIS ................................................................................................................ environmental impact statement EJ .................................................................................................................................. environmental justice ESA .............................................................................................................. Environmental Site Assessment ETC ................................................................................................................... estimated time of completion FAA ............................................................................................................... Federal Aviation Administration FDNY ................................................................................................................ Fire Department of New York FEIS ..................................................................................................... final environmental impact statement FEMA ........................................................................................... Federal Emergency Management Agency FHV ........................................................................................................................................ for-hire vehicles FHWA ........................................................................................................... Federal Highway Administration GHG ...................................................................................................................................... greenhouse gas GIS ............................................................................................................... Geographic Information System GUL ...................................................................................................................................... general-use lane HCM ...................................................................................................................... Highway Capacity Manual HOT .................................................................................................................................. high-occupancy toll HOV ........................................................................................................................... high-occupancy vehicle

Page 22: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS PIN X735.82 CONTENTS

xvi

HSI .................................................................................................................... Highway Safety Investigation IPaC ................................................................................................. Information, Planning and Conservation ITS .............................................................................................................. intelligent transportation systems JFK Airport ............................................................................................................... John F. Kennedy Airport KGI ........................................................................................................................ Kew Gardens Interchange LBP ....................................................................................................................................... lead-based paint LEP ....................................................................................................................... Limited English Proficiency LIRR .............................................................................................................................Long Island Rail Road LOS ......................................................................................................................................... level of service LTCP ....................................................................................................................... Long Term Control Plans LWCF ..................................................................................................... Land and Water Conservation Fund LWRP ................................................................................................ local waterfront revitalization programs MEV ........................................................................................................................... million entering vehicles MOA ................................................................................................................... Memorandum of Agreement MODA ........................................................................................................... Mayor’s Office of Data Analytics MPT ....................................................................................................... maintenance and protection of traffic MSAT ........................................................................................................................ mobile source air toxics MTA ...................................................................................................... Metropolitan Transportation Authority MUL ................................................................................................................................. managed-use lanes MVM ................................................................................................................................ million vehicle miles NAAQS ............................................................................................. National Ambient Air Quality Standards NAC ......................................................................................................................... Noise Abatement Criteria NEPA ......................................................................................................... National Environmental Policy Act NHPA ........................................................................................................ National Historic Preservation Act NHS ........................................................................................................................ National Highway System NPDES ............................................................................... National Pollutant Discharge Elimination System NPL .............................................................................................................................. National Priorities List NPS .............................................................................................................................. National Park Service NRHP ..................................................................................................... National Register of Historic Places NYCDCP .................................................................................... New York City Department of City Planning NYCDEP ................................................................. New York City Department of Environmental Protection NYCDOT .................................................................................. New York City Department of Transportation NYCHA ........................................................................................................ New York City Housing Authority NYCT ............................................................................................................................ New York City Transit NYMTC .................................................................................. New York Metropolitan Transportation Council NYNHP .................................................................................................. New York Natural Heritage Program NYPD ........................................................................................................ New York City Police Department NYSCMP .............................................................................. New York State Coastal Management Program NYSDEC ......................................................... New York State Department of Environmental Conservation NYSDOL ............................................................................................... New York State Department of Labor NYSDOS ............................................................................................... New York State Department of State NYSDOT ................................................................................ New York State Department of Transportation OPRHP ....................................................................... Office of Parks, Recreation and Historic Preservation OSHA ................................................................................... Occupational Safety and Health Administration P.S. ............................................................................................................................................. public school PANYNJ .................................................................................... Port Authority of New York and New Jersey PCB ........................................................................................................................ polychlorinated biphenyls PCC ........................................................................................................................ Portland cement concrete QCEW .................................................................................... Quarterly Census of Employment and Wages

Page 23: Transportation Project Report - NYSDOT Home€¦ · issued as a single Final Design Report/Final Environmental Impact Statement and Record of Decision document pursuant to Pub. L

PIN X735.82 Van Wyck Expressway Capacity and Access Improvements to JFK Airport Project DDR/DEIS CONTENTS

xvii

RCNM ..................................................................................................... Roadway Construction Noise Model RCP .......................................................................................................................... reinforced concrete pipe RCRA ........................................................................................... Resource Conservation and Recovery Act REC .................................................................................................... Recognized Environmental Conditions ROD .................................................................................................................................. Record of Decision SEQRA ............................................................................................ State Environmental Quality Review Act SHPO ......................................................................................................... State Historic Preservation Office SIP ......................................................................................................................... State Implementation Plan SMDM ........................................................................................... Stormwater Management Design Manual SMP .......................................................................................................... stormwater management practices SPDES ................................................................................... State Pollutant Discharge Elimination System SWPPP ............................................................................................... Stormwater Pollution Prevention Plan TEM ...................................................................................................... The NYSDOT Environmental Manual TIP ....................................................................................................... Transportation Improvement Program TMP ........................................................................................................... Transportation Management Plan TNM .................................................................................................................................. Traffic Noise Model TSCA ................................................................................................................ Toxic Substances Control Act ULURP ................................................................................................ Uniform Land Use Review Procedure UPARR ................................................................................................ Urban Park and Recreation Recovery USACE ............................................................................................................ U.S. Army Corps of Engineers USDOT ..................................................................................................... U.S. Department of Transportation USEPA ............................................................................................... U.S. Environmental Protection Agency USFWS ........................................................................................................... U.S. Fish and Wildlife Service VIA ......................................................................................................................... Visual Impact Assessment VMS ........................................................................................................................... variable message signs VMT .............................................................................................................................. vehicle-miles traveled VOC ..................................................................................................................... volatile organic compounds VWE ........................................................................................................................... Van Wyck Expressway WRP .......................................................................................................... Waterfront Revitalization Program WZTC ........................................................................................................................ work zone traffic control