Page 1: TREASURE ISLAND & YERBA BUENA ISLAND

MAY 8, 2015

TREASURE ISLAND & YERBA BUENA ISLANDMAJOR PHASE 1 APPLICATION

Page 2: TREASURE ISLAND & YERBA BUENA ISLAND

PREPARED FOR TREASURE ISLAND DEVELOPMENT AUTHORITY

ONE AVENUE OF PALMS, SUITE 241

SAN FRANCISCO, CA 94130

SUBMITTED BY

PREPARED BY

Page 3: TREASURE ISLAND & YERBA BUENA ISLAND

MAY 8, 2015

TREASURE ISLAND & YERBA BUENA ISLANDMAJOR PHASE 1 APPLICATION

Page 4: TREASURE ISLAND & YERBA BUENA ISLAND

TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION4

Page 5: TREASURE ISLAND & YERBA BUENA ISLAND

THE FOLLOWING WERE INSTRUMENTAL IN THE PREPARATION OF THIS DOCUMENT

ACKNOWLEDGMENT

A. DESIGN TEAM

Conger Moss Guillard Landscape Architecture – Landscape Architecture/Urban DesignBKF Engineers – Civil EngineeringAGS – Civil EngineeringENGEO, Inc. – Geotechnical EngineeringMoffatt & Nichol – Shoreline EngineeringAECOM – Landscape ArchitectureHood Design – Landscape ArchitectureThe Office of Cheryl Barton – Landscape ArchitectureAndrea Cochran Landscape Architecture – Landscape ArchitectureBCV Architects – ArchitectureDilworth Eliot Studios – ArchitectureHorton Lees Brogden Lighting Design - Lighting DesignBarrie D. Coate and Associates – Arborist and HorticulturistMJM Management – Public Space Operations, Maintenance and ProgrammingPage & Turnbull – Historic Resource ConsultingZimmer Gunsul Frasca Architects LLP – Urban Design

C. PROJECT MASTER DEVELOPER

Treasure Island Community Development LLC (TICD)

B. CITY, STATE, AND REGIONAL AGENCIES

Treasure Island Development Authority (TIDA)Treasure Island/Yerba Buena Island Citizen Advisory Board (CAB)San Francisco Department of Public Works (DPW)San Francisco Public Utilities Commission (SFPUC)San Francisco Planning DepartmentSan Francisco Fire Department (SFFD)San Francisco Mayor’s Office of Disability / Disability Council (MOD)San Francisco Municipal Transportation Agency (SFMTA)Treasure Island Mobility Management Agency (TIMMA)

5PREFACE

Page 6: TREASURE ISLAND & YERBA BUENA ISLAND

TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION6

Page 7: TREASURE ISLAND & YERBA BUENA ISLAND

CONTENTS0.0 EXECUTIVE SUMMARY

2.0 LAND USE AND DEVELOPMENT PROGRAM

2.1 Overall Existing Land Use

2.2 Overall Trust Lands

2.3 Overall and Major Phase 1 Proposed Land use

2.4 Major Phase 1 Development Blocks

2.5 Major Phase 1 Building Heights and Massing

2.6 Major Phase 1 Project Housing

2.7 Major Phase 1 Potential Commercial

34

36

38

40

42

48

52

33

1.0 INTRODUCTION

1.1 Regulatory Context and Authority

1.2 Project Overview

1.3 Sustainability and Environment

1.4 Phasing and Schedule of Performance

1.5 Major Phase 1 Associated Public Benefits

1.6 Major Phase 1 Overview

1.7 Sub-Phases within Major Phase 1

1.8 Consistency with Entitlement Documents

16

18

20

25

26

28

29

31

15

3.0 TRANSPORTATION AND STREETSCAPES

3.1 Transportation Summary

3.2 Transportation Networks

3.2.1 Pedestrian Network

3.2.2 Bicycle Network

3.2.3 Vehicular Network

3.2.4 Transit Network

3.3 Intermodal Hub

3.4 Street Design

3.5 Parking and Loading

57

59

60

61

62

63

64

66

84

55

6.0 GEOTECHNICAL AND SHORELINE IMPROVEMENTS

6.1 Geotechnical Documents

6.2 Treasure Island and Causeway Geotechnical Improvements

6.3 Yerba Buena Geotechnical Improvements

6.4 Sea Level Rise Strategy and Shoreline Improvements

233

234

238

240

231

5.0 UTILITIES

5.1 Stormwater Treatment

5.2 Storm Drain

5.3 Sanitary Sewer

5.4 Low Pressure Water

5.5 Recycled Water

5.6 Joint Trench

221

222

224

226

227

228

219

4.0 PARKS AND OPEN SPACE

4.1 Overall Parks and Open Space

4.2 Major Phase 1 Parks and Open Space

4.2.1 Waterfront Plaza

4.2.2 Ferry Terminal

4.2.3 Ferry Shelter

4.2.4 Building 1 Plaza

4.2.5 Marina Plaza

4.2.6 Building 2 Plaza

4.2.7 Building 3 Parking and Open Space

4.2.8 Clipper Cove Promenade

4.2.9 Cultural Park

4.2.10 Cityside Waterfront Park

4.2.11 Eastside Commons

4.2.12 Urban Agricultural Park

4.2.13 Eastside Park

4.2.14 YBI Hilltop Park

4.2.15 YBI Beach Park

92

95

99

113

115

123

133

143

149

155

169

179

190

203

205

207

217

9113 7.0 LAND TRANSFER AND IMPLEMENTATION

7.1 Existing Property Ownership

7.2 Land Transfer and Mapping Processes

7.3 Public and Private Property Ownership

249

250

251

247

8.0 APPENDICES

8.1 Appendix A: MMRP

8.2 Appendix B: Schedule of Performance

8.3 Appendix C: Major Phase 1 Housing Data Tables

8.4 Appendix D: Summary Pro Forma

8.5 Appendix E: Geotechnical Reports

8.6 Appendix F: Qualifications of Residential Auction Lot Bidders

8.7 Appendix G: Ferry Shelter and Pier Wind Mitigation

254

261

262

266

267

269

270

253

7PREFACE

Page 8: TREASURE ISLAND & YERBA BUENA ISLAND

1.0 INTRODUCTION

1.1 Vicinity Plan

1.2 Overall Illustrative Plan

1.3 Major Phase 1 Public Benefits

1.4 Major Phases Site Plan

1.5 Major Phase 1 Sub-Phase Boundary Change

1.6 Major Phase 1 Sub-Phase Site Plan

14

19

27

28

29

29

4.0 PARKS AND OPEN SPACE

97

98

100

101

102

103

104

105

106

107

107

108

109

110

111

112

114

116

117

117

119

120

120

121

121

121

122

124

125

126

127

128

129

129

130

131

132

134

2.0 LAND USE AND DEVELOPMENT PROGRAM

2.1 Existing Land Use

2.2 Trust Lands

2.3 Overall Proposed Land Use

2.4 Major Phase 1 Proposed Land Use

2.5 Treasure Island Development Blocks

2.6 Yerba Buena Island Development Blocks

2.7 Treasure Island Conceptual Building Height and Massing

2.8 Treasure Island Building Heights

2.9 Yerba Buena Island Conceptual Building Height and Massing

2.10 Yerba Buena Island Building Heights

2.11 Major Phase 1 Authority Lots

2.12 Major Phase 1 Auction Lots and JV Lots

2.13 Major Phase 1 Potential Commercial

35

37

38

39

40

41

43

44

45

46

50

51

52

3.0 TRANSPORTATION AND STREETSCAPES

3.1 Pedestrian Network Site Plan

3.2 Bicycle Network Site Plan

3.3 Vehicular Network Site Plan

3.4 Transit Network Site Plan

3.5 Intermodal Transit Hub

3.6 Major Phase 1 Street Families

3.7 Palm Drive Section

3.8 Palm Drive Illustrative Plan

3.9 Clipper Cove Ave Section

60

61

62

63

65

67

68

68

69

3.10 Clipper Cove Ave Illustrative Plan

3.11 California Ave Section

3.12 California Ave Illustrative Plan

3.13 Treasure Island Village Streets - Avenue D Section

3.14 Treasure Island Village Streets - Avenue D Illustrative Plan

3.15 Treasure Island Village Streets - Avenue C Section

3.16 Treasure Island Village Streets - Avenue C Illustrative Plan

3.17 Treasure Island Village Streets - Avenue G Section

3.18 Treasure Island Village Streets - Avenue G Illustrative Plan

3.19 Retail Main Street Section

3.20 Retail Main Street Illustrative Plan

3.21 Avenue C South Section

3.22 Avenue C South Illustrative Plan

3.23 Shared Public Way Section

3.24 Shared Public Way Illustrative Plan

3.25 Prototypical Eastside Neighborhood Garden Street Section

3.26 Prototypical Eastside Neighborhood Garden Street Illustrative Plan

3.27 Cityside Ave Section

3.28 Cityside Ave Illustrative Plan

3.29 Prototypical Windrow Street Section

3.30 Prototypical Windrow Street Illustrative Plan

3.31 Treasure Island Causeway Section

3.32 Treasure Island Causeway Illustrative Plan

3.33 Treasure Island Road Section

3.34 Macalla Road Section

3.35 Yerba Buena Road Section

3.36 Major Phase 1 On-Street Parking

3.37 Major Phase 1 Off-Street Parking

3.38 Major Phase 1 Loading Zones

3.39 Major Phase 1 Accessible Parking Areas

69

70

70

71

71

72

72

73

73

74

74

75

75

76

76

77

77

78

78

79

79

80

80

81

82

83

85

87

88

89

LIST OF FIGURES4.5 Major Phase 1 Existing Conditions

4.6 Waterfront Plaza Bird’s Eye View

4.7 Waterfront Plaza Illustrative Plan

4.8 Waterfront Plaza Promenade View

4.9 Waterfront Plaza Cityside Esplanade View

4.10 Waterfront Plaza Seating Cubes View

4.11 Waterfront Plaza Pedestrian Circulation

4.12 Waterfront Plaza Bicycle Circulation

4.12.1 Waterfront Plaza Bus & Shuttle Shelter East Elevation

4.12.2 Waterfront Plaza Bus & Shuttle Shelter Plan

4.13 Waterfront Plaza Materials Diagram

4.14 Waterfront Plaza Furnishings Diagram

4.15 Waterfront Plaza Lighting Diagram

4.16 Waterfront Plaza Planting Diagram

4.17 Waterfront Plaza Tree Planting Diagram

4.18 Ferry Terminal Bird’s Eye View

4.19 Ferry Terminal Gangplank Bird’s Eye View

4.20 Ferry Terminal Ferry Shelter Illustrative Floor Plan

4.21 Ferry Terminal Ferry Shelter West Elevation

4.22 Ferry Terminal Ferry Shelter South Elevation

4.23 Ferry Terminal Ferry Shelter Section

4.24 Ferry Terminal Site Section

4.25 Ferry Terminal Detailed Section

4.26 Ferry Terminal View from Float

4.27 Ferry Terminal Arrival View

4.28 Ferry Terminal View from Crosswalk

4.29 Building 1 Plaza View

4.30 Building 1 Plaza Illustrative Plan

4.31 Building 1 Plaza Circulation Diagram

4.32 Building 1 Plaza Materials

4.33 Building 1 Plaza Furnishings and Lighting

4.34 Building 1 Plaza Planting

4.35 Building 1 Plaza North-South Section

4.36 Building 1 Plaza East-West Section

4.37 Building 1 Plaza Bird’s Eye View

4.38 Building 1 Plaza View from Upper Plaza

4.39 Marina Plaza South Bird’s Eye View

4.40 Marina Plaza Illustrative Plan

93

94

96

96

4.1 Open Space and Park Typologies

4.2 Major Phase 1 Proposed Parks and Open Space

4.3 San Francisco Wind Directionality and Frequency by Season

4.4 San Francisco Sun Directionality

TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION8

Page 9: TREASURE ISLAND & YERBA BUENA ISLAND

6.0 GEOTECHNICAL AND SHORELINE IMPROVEMENTS

6.1 Treasure Island Geological North-South Cross Section

6.2 Major Phase 1 Treasure Island Conceptual Geotechnical Mitigation

6.3 Yerba Buena Island Geologic Map

6.4 Sea Level Rise Strategy Site Plan Diagram

6.5 Sea Level Rise Sections A1, A2, B1 and B2

6.6 Sea Level Rise Section C

234

237

238

243

244

245

7.0 LAND TRANSFER AND IMPLEMENTATION

7.1 Existing Property Ownership

7.2 Major Phase 1 Proposed Private Property Parcels249

251

5.0 UTILITIES

5.1 Major Phase 1 Stormwater Treatment

5.2 Major Phase 1 Storm Drain

5.3 Major Phase 1 Sanitary Sewer

5.4 Major Phase 1 Low Pressure Water

5.5 Major Phase 1 Recycled Water

5.6 Major Phase 1 Joint Trench

221

223

225

226

227

229

4.41 Marina Plaza Circulation Diagram

4.42 Marina Plaza Materials

4.43 Marina Plaza Furnishings and Lighting

4.44 Marina Plaza Planting

4.45 Marina Plaza North-South Section

4.46 Marina Plaza East-West Section

4.47 Marina Plaza Main Plaza View

4.48 Marina Plaza North Bird’s Eye View

4.49 Building 2 Plaza West Elevation

4.50 Building 2 Plaza Illustrative Plan

4.51 Building 2 Plaza Bird’s Eye View

4.52 Building 2 Plaza Materials and Planting Diagram

4.53 Building 2 Plaza Furnishings and Lighting Diagram

4.54 Building 3 Plaza View from Side Grove

4.55 Building 3 Plaza Illustrative Plan

4.56 Building 3 Plaza Bird’s Eye View

4.57 Building 3 Plaza Materials and Planting Diagram

4.58 Building 3 Plaza Furnishings and Lighting Diagram

4.59 Clipper Cove Promenade Bird’s Eye View

4.60 Clipper Cove Promenade Illustrative Plan

4.61 Clipper Cove Promenade Pedestrian Circulation Diagram

4.62 Clipper Cove Promenade Bicycle Circulation Diagram

4.63 Clipper Cove Promenade Vehicular Circulation Diagram

4.64 Clipper Cove Promenade Materials Diagram

4.65 Clipper Cove Promenade Furnishings Diagram

4.66 Clipper Cove Promenade Lighting Diagram

4.67 Clipper Cove Promenade Planting Diagram

4.68 Clipper Cove Promenade Avenue B1 West Section

4.69 Clipper Cove Promenade Avenue M1 Block Section

4.70 Clipper Cove Promenade View from Avenue C

4.71 Clipper Cove Promenade View at Overlook

4.72 Clipper Cove Promenade View at End of Avenue C

4.73 Clipper Cove Promenade View of End Deck

4.74 Cultural Park View of City through Allée

4.75 Cultural Park Illustrative Plan

4.76 Cultural Park Circulation Diagram

4.77 Cultural Park Materials Diagram

4.78 Cultural Park Furnishings and Lighting Diagram

135

136

137

138

139

139

140

141

142

144

145

146

147

148

150

151

152

153

154

156

158

158

158

159

161

162

163

164

165

166

166

167

167

168

170

171

172

173

4.79 Cultural Park Planting Diagram

4.80 Cultural Park Entry Walk Section A

4.81 Cultural Park North-South Section B

4.82 Cultural Park East-West Section C

4.83 Cultural Park Bird’s Eye View from West

4.84 Cultural Park Chapel Entry View

4.85 Cityside Waterfront Park The Bowl View

4.86 Cityside Waterfront Park Illustrative Plan

4.87 Cityside Waterfront Park Circulation Diagram

4.88 Cityside Waterfront Park Hotel and Plaza Illustrative Plan

4.89 Cityside Waterfront Park The Bowl Illustrative Plan

4.90 Cityside Waterfront Park The Bowl Section

4.91 Cityside Waterfront Park Materials Diagram

4.92 Cityside Waterfront Park Planting Diagram

4.93 Cityside Waterfront Park Furnishings Diagram

4.94 Cityside Waterfront Park Lighting Diagram

4.95 Eastside Commons Swing Space View

4.96 Eastside Commons Illustrative Plan

4.97 Eastside Commons Entry Plaza and Gardens Illustrative Plan

4.98 Eastside Commons Swing Space Illustrative Plan

4.99 Eastside Commons Dog Run Illustrative Plan

4.100 Eastside Commons Circulation Diagram

4.101 Eastside Commons Materials Diagram

4.102 Eastside Commons Planting Diagram

4.103 Eastside Commons Furnishings Diagram

4.104 Eastside Commons Lighting Diagram

4.105 Urban Agricultural Park Illustrative Plan

4.106 Eastside Park Illustrative Plan

4.107 YBI Hilltop Park Cypress Grove / North Summit View

4.108 YBI Hilltop Park Illustrative Plan

4.109 YBI Hilltop Park Circulation Diagram

4.110 YBI Hilltop Park Materials and Furnishings

4.111 YBI Hilltop Park Planting Diagram

4.112 YBI Hilltop Park Tidelands Trust View Cone Section A

4.113 YBI Hilltop Park Tidelands Trust View Cone Section B

4.114 YBI Hilltop Park Section C

4.115 YBI Hilltop Park Pathway towards South Hilltop View

4.116 YBI Hilltop Park South Hilltop Picnic / Gathering Area View

174

175

175

175

176

177

178

180

181

182

184

185

186

187

188

189

191

192

193

194

195

196

197

198

199

200

202

204

206

208

209

210

211

213

213

213

214

214

4.117 YBI Hilltop Park Pathway towards North Hilltop View

4.118 YBI Hilltop Park Pathway / Goat Path View

4.119 YBI Beach Park Illustrative Plan

215

215

216

9PREFACE

Page 10: TREASURE ISLAND & YERBA BUENA ISLAND

4.0 PARKS AND OPEN SPACE

2.0 LAND USE AND DEVELOPMENT PROGRAM

2.1 Major Phase Aggregate Development in Relation to Total Allowable Building Program

2.2 Major Phase 1 Development Blocks with Dimensions

2.3 Example Schedule of Excess Land Appreciation Structure

2.4 Proposed Schedule for Excess Land Appreciation Structure

2.5 Major Phase and Sub-Phase Summary of Housing Data

2.6 Authority Housing Lots, Auction Lots and JV Lots

38

41

49

49

49

49

3.0 TRANSPORTATION AND STREETSCAPES

3.1 Major Phase 1 Anticipated On-Street Parking Allocation

3.2 Major Phase 1 Anticipated Off-Street Parking Allocation

85

86

LIST OF TABLES

6.0 GEOTECHNICAL AND SHORELINE IMPROVEMENTS

6.1 Recommended Perimeter Crest Elevations 240

4.1 Major Phase 1 Parks and Open Space Acreage 94

TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION10

Page 11: TREASURE ISLAND & YERBA BUENA ISLAND

A

AC acres

AC Alameda-Contra Costa (Transit)

ADA Americans with Disabilities Act

B

BFE Base Flood Elevation

BMP Best Management Practices

BLDG Building

C

CAB Citizen Advisory Board

CEQA California Environmental Quality Act

CIP cast-in-place

D

D4D Design for Development

DA Development Agreement

DBI Department of Building Inspection

DDA Disposition and Development Agreement

DRDAP Design Review and Document Approval Procedure

E

(E) Existing

EIR Environmental Impact Report

F

FPS feet per second

GLOSSARY OF ABBREVIATIONS AND ACRONYMS

G

GGIE Golden Gate International Exposition

GSF gross square fee

I

IP Infrastructure Plan

IPCC Intergovernmental Panel on Climate Change

J

JV Joint Venture

L

LED light-emitting diode

LEEDND Leadership in Energy & Environmental Design

Neighborhood Development

LPW low pressure water

M

MHW Mean High Water

MLLW Mean Lower Low Water

MMRP Mitigation and Monitoring and Reporting Program

MP Major Phase

N

NAVD North American Vertical Datum of 1988

NAVD88 North American Vertical Datum of 1988

NRC National Research Council

NSTI Naval Station Treasure Island

O

O+M Operations and Maintenance

P

PG&E Pacific Gas and Electric

PV photovoltaic

POSP Parks and Open Space Plan

R

ROW Right of Way

RW recycled water

S

SBE Small Business Enterprise

SFCTA San Francisco County Transportation Authority

SFFD San Francisco Fire Department

SFPUC San Francisco Public Utilities Commission

SFMTA San Francisco Municipal Transportation Agency

SGMP Soil and Groundwater Management Plan

SLC (California) State Lands Commission

SLR Sea Level Rise

SOQHD Senior Officer Quarters Headquarters District

SP spaces (parking)

SS sanitary sewer

SWPPP Stormwater Pollution Prevention Plan

T

TI Treasure Island

TICD Treasure Island Community Development

TIDA Treasure Island Development Authority

TIHDI Treasure Island Homeless Development Initiative

TIMMA Treasure Island Mobility Management Agency

TITIP Treasure Island Transportation Implementation Plan

TSM Tentative Subdivision Map

TTM Tentative Transfer Map

U

US United States

W

WRU Wave Run-Up

Y

YBI Yerba Buena Island

YMCA Young Men’s Christian Association

11PREFACE

Page 12: TREASURE ISLAND & YERBA BUENA ISLAND

4A4C

4B4D

4E

3B

3C

3A

2B

2A

2C

1A

1B1C

1D

1E

1F

1YA

1YB

Major Phase 1 Boundary

1000’ 2000’

N

MAJOR PHASES

Major Phase 2

Major Phase 4 Major Phase 3

Major Phase 1

MAJOR PHASE SITE PLAN

TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION12