SMDB-1 ST-1 RIH FROM surface TO 2693 FT Total Stands DISP/FT THEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM DISP. TOTAL DISP. TOTAL 7.00 363.0 370.0 BBL BBL DC 217 0.0330 7.161 7.161 12.00 12.00 19.00 363.0 382.0 4.839 4.839 HWDP 653 0.0240 15.672 22.833 15.60 27.60 34.60 363.0 397.6 -0.072 4.767 5 DP 310 0.0240 7.440 30.273 -19.29 8.31 15.31 363.0 378.3 -26.730 -21.963 10 DP 310 0.0240 7.440 37.713 8.27 16.58 23.58 363.0 386.6 0.830 -21.133 15 DP 310 0.0240 7.440 45.153 6.89 23.47 30.47 363.0 393.5 -0.550 -21.683 17.75 368.0 385.8 20 DP 310 0.0240 7.440 52.593 -0.34 23.13 16.91 368.5 385.4 -7.780 -29.463 25 DP 310 0.0240 7.440 60.033 7.59 30.72 13.00 380.0 393.0 0.150 -29.313 28 DP 190 0.0240 4.560 64.593 4.31 35.03 17.31 380.0 397.3 -0.250 -29.563 STND Length

Trip Sheet Rih Smdb-1 St1

Embed Size (px)

DESCRIPTION

asd

Citation preview

Page 1: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM surface TO 2693 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 7.00 363.0 370.0 BBL BBL

DC 217 0.0330 7.161 7.161 12.00 12.00 19.00 363.0 382.0 4.839 4.839

HWDP 653 0.0240 15.672 22.833 15.60 27.60 34.60 363.0 397.6 -0.072 4.767

5 DP 310 0.0240 7.440 30.273 -19.29 8.31 15.31 363.0 378.3 -26.730 -21.963 F/U STRING

10 DP 310 0.0240 7.440 37.713 8.27 16.58 23.58 363.0 386.6 0.830 -21.133

15 DP 310 0.0240 7.440 45.153 6.89 23.47 30.47 363.0 393.5 -0.550 -21.683

17.75 368.0 385.8

20 DP 310 0.0240 7.440 52.593 -0.34 23.13 16.91 368.5 385.4 -7.780 -29.463 F/U STG AND MUD SHIFT TT

25 DP 310 0.0240 7.440 60.033 7.59 30.72 13.00 380.0 393.0 0.150 -29.313

28 DP 190 0.0240 4.560 64.593 4.31 35.03 17.31 380.0 397.3 -0.250 -29.563

STND Length

Page 2: Trip Sheet Rih Smdb-1 St1

30.6034.4036.10

Page 3: Trip Sheet Rih Smdb-1 St1

REMARKS

F/U STRING

F/U STG AND MUD SHIFT TT

Page 4: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM surface TO 3400 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 9.97 351.0 361.0 BBL BBL 2-Jul-15

DC 336 0.0330 11.088 11.088 16.21 16.21 26.18 351.0 377.2 5.122 5.122

HWDP 292 0.0240 7.008 18.096 9.80 26.01 35.98 351.0 387.0 2.792 7.914

5 DP 310 0.0240 7.440 25.536 -5.83 20.18 13.15 368.0 381.2 -13.270 -5.356 F/U STRING

10 DP 310 0.0240 7.440 32.976 7.15 27.33 20.30 368.0 388.3 -0.290 -5.646

15 DP 310 0.0240 7.440 40.416 8.44 35.77 28.74 368.0 396.7 1.000 -4.646

28.74 368.0 396.7 F/U STRING

20 DP 310 0.0240 7.440 47.856 12.75 48.52 37.49 372.0 409.5 5.310 0.664

25 DP 310 0.0240 7.440 55.296 -22.54 25.98 14.95 372.0 387.0 0.020 0.684 MUD SHIFT F/ TRIP TANK

30 DP 310 0.0240 7.440 62.736 8.15 34.13 23.10 372.0 395.1 0.710 1.394

35 DP 310 0.0240 7.440 70.176 8.90 43.03 32.00 372.0 404.0 1.460 2.854

40 DP 310 0.0240 7.440 77.616 8.70 51.73 40.70 372.0 412.7 1.260 4.114

44 DP 265 0.0240 6.360 83.976 3.66 55.39 44.36 372.0 416.4 -2.700 1.414

STND Length

Page 5: Trip Sheet Rih Smdb-1 St1

30.6034.4036.10

Page 6: Trip Sheet Rih Smdb-1 St1

REMARKS

2-Jul-15

F/U STRING

F/U STRING

MUD SHIFT F/ TRIP TANK

Page 7: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM 4260 TO 5383 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 21.45 365.0 386.5 BBL BBL 3-Jul-15

5 DP 315 0.0243 7.655 7.655 7.85 7.85 29.30 365.0 394.3 0.196 0.196

10 DP 315 0.0243 7.655 15.309 8.61 16.46 37.91 365.0 402.9 0.955 1.151

15 DP 315 0.0243 7.655 22.964 6.07 22.53 44.98 364.0 409.0 -1.584 -0.433

STND Length

Page 8: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM 5215 TO 6334 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 22.46 356.0 378.5 BBL BBL 6-Jul-15

5 DP 315 0.0243 7.655 7.655 4.44 4.44 5.90 365.0 370.9 -3.215 -3.215

10 DP 315 0.0243 7.655 15.309 11.20 15.64 15.10 367.0 382.1 3.546 0.331

15 DP 315 0.0243 7.655 22.964 6.90 22.54 21.00 368.0 389.0 -0.755 -0.423

STND Length

Page 9: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM surface TO 6809 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 13.20 356.0 369.2 BBL BBL 7-Jul-15

DC 213 0.0330 7.029 7.029 6.02 6.02 19.22 356.0 375.2 -1.009 -1.009

HWDP 413.63 0.0240 9.927 16.956 10.02 16.04 29.24 356.0 385.2 0.093 -0.916

5 DP 310 0.0240 7.440 24.396 7.11 23.15 36.35 356.0 392.4 -0.330 -1.246

10 DP 310 0.0240 7.440 31.836 -5.41 17.74 23.94 363.0 386.9 9.150 7.904 MUD SHIFT

15 DP 310 0.0240 7.440 39.276 -7.14 10.60 11.80 368.0 379.8 -2.580 5.324

20 DP 310 0.0240 7.440 46.716 9.09 19.69 19.89 369.0 388.9 1.650 6.974

25 DP 310 0.0240 7.440 54.156 6.77 26.46 26.66 369.0 395.7 -0.670 6.304

30 DP 310 0.0240 7.440 61.596 -17.29 9.17 9.37 369.0 378.4 -0.730 5.574 MUD SHIFT

35 DP 310 0.0240 7.440 69.036 11.89 21.06 18.26 372.0 390.3 4.450 10.024

40 DP 310 0.0240 7.440 76.476 5.14 26.20 23.40 372.0 395.4 -2.300 7.724

45 DP 310 0.0240 7.440 83.916 7.73 33.93 31.13 372.0 403.1 0.290 8.014

50 DP 310 0.0240 7.440 91.356 -28.83 5.10 15.30 359.0 374.3 -3.270 4.744 MUD SHIFT / F/U STRING

55 DP 310 0.0240 7.440 98.796 16.58 21.68 15.88 375.0 390.9 2.140 6.884

60 DP 310 0.0240 7.440 106.236 7.19 28.87 23.07 375.0 398.1 -0.250 6.634

65 DP 310 0.0240 7.440 113.676 8.43 37.30 31.50 375.0 406.5 0.990 7.624

STND Length

Page 10: Trip Sheet Rih Smdb-1 St1

70 DP 310 0.0240 7.440 121.116 8.04 45.34 39.54 375.0 414.5 0.600 8.224

75 DP 310 0.0240 7.440 128.556 -9.08 36.26 22.46 383.0 405.5 3.480 11.704 MUD SHIFT

80 DP 310 0.0240 7.440 135.996 -15.66 20.60 6.80 383.0 389.8 -1.100 10.604

85 DP 310 0.0240 7.440 143.436 -4.80 15.80 16.00 357.0 373.0 -12.240 -1.636

90 DP 310 0.0240 7.440 150.876 8.30 24.10 24.30 357.0 381.3 0.860 -0.776

95 DP 310 0.0240 7.440 158.316 8.78 32.88 31.08 359.0 390.1 1.340 0.564

Page 11: Trip Sheet Rih Smdb-1 St1

REMARKS

7-Jul-15

MUD SHIFT

MUD SHIFT

MUD SHIFT / F/U STRING

Page 12: Trip Sheet Rih Smdb-1 St1

MUD SHIFT

Page 13: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM 6070TO 6809 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 10.83 336.0 346.8 BBL BBL 7-Jul-15

5 DP 315 0.0240 7.560 7.560 12.66 12.66 19.49 340.0 359.5 5.100 5.100

10 DP 315 0.0240 7.560 15.120 8.34 21.00 27.83 340.0 367.8 0.780 5.880

5 DP 310 0.0240 7.440 22.560 -367.83 -346.83 0.0 -375.270 -369.390

10 DP 310 0.0240 7.440 30.000 0.00 -346.83 0.0 14.560 -354.830 MUD SHIFT

15 DP 310 0.0240 7.440 37.440 0.00 -346.83 0.0 4.560 -350.270

20 DP 310 0.0240 7.440 44.880 0.00 -346.83 0.0 -7.440 -357.710

25 DP 310 0.0240 7.440 52.320 0.00 -346.83 0.0 -7.440 -365.150

30 DP 310 0.0240 7.440 59.760 0.00 -346.83 0.0 16.560 -348.590 MUD SHIFT

35 DP 310 0.0240 7.440 67.200 0.00 -346.83 0.0 -7.440 -356.030

40 DP 310 0.0240 7.440 74.640 0.00 -346.83 0.0 -7.440 -363.470

45 DP 310 0.0240 7.440 82.080 0.00 -346.83 0.0 -7.440 -370.910

50 DP 310 0.0240 7.440 89.520 0.00 -346.83 0.0 25.560 -345.350 MUD SHIFT / F/U STRING

55 DP 310 0.0240 7.440 96.960 0.00 -346.83 0.0 -14.440 -359.790

60 DP 310 0.0240 7.440 104.400 0.00 -346.83 0.0 -7.440 -367.230

65 DP 310 0.0240 7.440 111.840 0.00 -346.83 0.0 -7.440 -374.670

STND Length

Page 14: Trip Sheet Rih Smdb-1 St1

70 DP 310 0.0240 7.440 119.280 0.00 -346.83 0.0 -7.440 -382.110

75 DP 310 0.0240 7.440 126.720 0.00 -346.83 0.0 12.560 -369.550 MUD SHIFT

80 DP 310 0.0240 7.440 134.160 0.00 -346.83 0.0 14.560 -354.990

85 DP 310 0.0240 7.440 141.600 12.00 -334.83 0.0 4.560 -350.430

90 DP 310 0.0240 7.440 149.040 0.00 -334.83 0.0 -7.440 -357.870

95 DP 310 0.0240 7.440 156.480 0.00 -334.83 0.0 -7.440 -365.310

Page 15: Trip Sheet Rih Smdb-1 St1

REMARKS

7-Jul-15

MUD SHIFT

MUD SHIFT

MUD SHIFT / F/U STRING

Page 16: Trip Sheet Rih Smdb-1 St1

MUD SHIFT

Page 17: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM surace TO 6809 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 21.00 298.0 319.0 BBL BBL 8-Jul-15

DC 213 0.0370 7.881 7.881 7.80 7.80 27.80 299.0 326.8 -0.081 -0.081

HWDP 413 0.0242 9.995 17.876 1.42 9.22 9.22 319.0 328.2 -8.575 -2.656 MUD TRANSFER @ 1800 HRS

5 DP 315 0.0242 7.623 25.499 1.28 10.50 19.50 310.0 329.5 -6.343 -8.999 F/U STRING 1825 HRS

10 DP 315 0.0242 7.623 33.122 12.20 22.70 27.70 314.0 341.7 26.577 17.578

15 DP 315 0.0242 7.623 40.745 10.60 33.30 36.30 316.0 352.3 14.977 32.555

20 DP 315 0.0242 7.623 48.368 -42.81 -9.51 27.49 282.0 309.5 -50.433 -17.878 F/U STRING 1920 HRS

25 DP 315 0.0242 7.623 55.991 27.13 17.62 5.62 331.0 336.6 19.507 1.629

30 DP 315 0.0242 7.623 63.614 24.38 42.00 16.00 345.0 361.0 16.757 18.386

35 DP 315 0.0242 7.623 71.237 9.85 51.85 23.85 347.0 370.9 2.227 20.613

40 DP 315 0.0242 7.623 78.860 -19.13 32.72 37.72 314.0 351.7 -26.753 -6.140 F/U STRING 2030 HRS

45 DP 315 0.0242 7.623 86.483 7.56 40.28 41.28 318.0 359.3 -0.063 -6.203

50 DP 315 0.0242 7.623 94.106 4.82 45.10 45.10 319.0 364.1 30.197 23.994

STND Length

Page 18: Trip Sheet Rih Smdb-1 St1

REMARKS

8-Jul-15

MUD TRANSFER @ 1800 HRS

F/U STRING 1825 HRS

F/U STRING 1920 HRS

F/U STRING 2030 HRS

Page 19: Trip Sheet Rih Smdb-1 St1

SMDB-1 ST-1RIH FROM surace TO 6809 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 21.72 285.0 306.7 BBL BBL 8-Jul-15

7'' CSG 114 0.0226 2.575 2.575 6.28 6.28 28.00 285.0 313.0 3.705 3.705

7'' CSG 75 0.0226 1.694 4.270 3.10 9.38 31.10 285.0 316.1 1.406 11.110

7'' CSG 315 0.0226 7.116 11.385 -11.60 -2.22 19.50 285.0 304.5 -18.716 -7.605

7'' CSG 315 0.0226 7.116 18.501 8.20 5.98 27.70 285.0 312.7 23.084 15.479

7'' CSG 315 0.0226 7.116 25.617 8.60 14.58 36.30 285.0 321.3 13.484 28.963

7'' CSG 315 0.0226 7.116 32.733 -8.81 5.77 27.49 285.0 312.5 -15.926 13.037

7'' CSG 315 0.0226 7.116 39.849 -21.87 -16.10 5.62 285.0 290.6 -28.986 -15.949

7'' CSG 315 0.0226 7.116 46.965 10.38 -5.72 16.00 285.0 301.0 3.264 -12.685

7'' CSG 315 0.0226 7.116 54.080 7.85 2.13 23.85 285.0 308.9 0.734 -11.950

7'' CSG 315 0.0226 7.116 61.196 13.87 16.00 37.72 285.0 322.7 6.754 -5.196

7'' CSG 315 0.0226 7.116 68.312 36.56 52.56 41.28 318.0 359.3 29.444 24.248

7'' CSG 315 0.0226 7.116 75.428 4.82 57.38 45.10 319.0 364.1 30.704 54.952

STND Length

Page 20: Trip Sheet Rih Smdb-1 St1

REMARKS

8-Jul-15

Page 21: Trip Sheet Rih Smdb-1 St1

Rajani-4RIH FROM surace TO 10933 FT

Total Stands DISP/FTTHEORITICAL ACTUAL TRIP PVT PVT+TRIP LOSS CUM REMARKS

DISP. TOTAL DISP. TOTAL 0.0 BBL BBL 11-Aug-15

DC 213 0.0370 7.881 7.881 0.00 0.00 0.0 -7.881 -7.881

HWDP 413 0.0242 9.995 17.876 0.00 0.00 0.0 -9.995 -17.876

5 DP 470 0.0242 11.374 29.250 0.00 0.00 0.0 -11.374 -29.250

10 DP 470 0.0242 11.374 40.624 0.00 0.00 0.0 -11.374 -40.624

15 DP 470 0.0242 11.374 51.998 0.00 0.00 0.0 -11.374 -51.998

20 DP 470 0.0242 11.374 63.372 0.00 0.00 0.0 -11.374 -63.372 F/U STRING 1920 HRS

25 DP 470 0.0242 11.374 74.746 0.00 0.00 0.0 -11.374 -74.746

30 DP 470 0.0242 11.374 86.120 0.00 0.00 0.0 -11.374 -86.120

35 DP 470 0.0242 11.374 97.494 0.00 0.00 0.0 -11.374 -97.494

40 DP 470 0.0242 11.374 108.868 0.00 0.00 0.0 -11.374 -108.868 F/U STRING 2030 HRS

45 DP 470 0.0242 11.374 120.242 0.00 0.00 0.0 -11.374 -120.242

50 DP 470 0.0242 11.374 131.616 0.00 0.00 0.0 -11.374 -131.616

STND Length

Page 22: Trip Sheet Rih Smdb-1 St1

REMARKS

11-Aug-15

F/U STRING 1920 HRS

F/U STRING 2030 HRS