Page 1: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

Dakota County and City of Rosemount April 22, 2013

Page 2: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

Page 3: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

Page 4: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

State/Regional Significance

• TH 52 Mn/DOT Inter-Regional Corridor

• Principal Arterial / Principal Arterial Interchange

• Regional / Freeway Design

• $46,000,000 cost

• 52 Freeway Partnership Priority

Page 5: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

Page 6: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

• CSAH 42 Existing ADT = 12,000

• CSAH 42 Projected 2030 ADT = 27,000 – 42,000

• TH 52 Existing ADT = 34,500

• TH 52 Projected 2030 ADT = 50,000 – 58,000

• CSAH 42 classified as a non-freeway principal arterial roadway

Page 7: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

• Fatal crash in 2007

• Crash history 2008 to 2012– 22 reported crashes at ramp intersections

– 2 life-altering crashes

– 36% of crashes were injury crashes

–Crash Rate = 0.61 and 0.39 (Metro = 0.20)

–Severity Rate = 1.11 and 0.53 (Metro = 0.30)

Page 8: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Trunk Highway 52 and CSAH 42 Interchange

• Permitted UMore Mining – Truck Traffic

– 2013/2014 additional 200 heavy trucks on CSAH 42

– 2030 additional 450 heavy trucks on CSAH 42

Page 9: Trunk Highway 52 and CSAH 42 Interchange

Efficient, Effective, Responsive

Support SF 1171 Bonding Request

for $25,000,000

Questions?