Contents

Information about TSN Group ………….…………………………………... 3 Contacts ……………………………………………………………………... 4 Industrial projects .………...…………………………………………… 5 – 21 Logistic terminals ………….…………………………………………. 22 – 29 Business centers ……………………………………………………. 30 – 44 Shopping malls ……………………………………………………….. 45 – 55 Hotels …………………………………………………………………. 56 – 65 Residential projects …………………………………………………. 66 – 77

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

3

group

Today TSN Group includes 7 companies; five of them are located in Saint

Petersburg:

1) “TSN” Ltd (established in 1995) – M&E contractor, also performs construction

and modernization of power plants, voltage ranging from (6) 10 kV up to 500

kV;

2) Electrical Center “TSN”, performing design and production of electrical boards;

3) “TSN Technologies and Materials” – company, supplying materials and

equipment;

4) “TSN Mechanical” – company, performing design and installation of

ventilation, air conditioning and sanitary systems;

5) “VATECH TSN”– company, performing design of all engineering systems;

6) “Electrical Installation Company TSN”, Moscow - successfully realizes

complete electrification of the industrial, residential and commercial projects

since 2000;

7) Sevenfort Engineering Company - M&E contractor in Lisbon, Portugal. TSN’ core business is MEP contracting for design and installation works for internal and intra-site engineering systems and networks. Being the professional and highly experienced Mechanical, Electrical & Plumbing designer and contractor TSN Group provides the integrated multi-service solution covering the full range of Engineering, Procurement / MEP contracting including conceptual and detailed design, installation, testing and commissioning (depending on the project scope and structure):

• power supply (10kV and 0.4kV); • internal power supply and electric lighting; • HVAC (heating, ventilation and air conditioning); • water supply and wastewater systems; • automatic fire extinguishing systems. • very low voltage systems, including fire and intrusion alarm, public address,

CCTV and telecommunication systems; • building management systems (BMS); • Process/technology equipment installations.

(Besides, TSN European Subsidiary –SevenFort would carry out the used equipment dismantling in EEC (for further installations on a project )

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

4

Contacts:

1) TSN Ltd.

61, Vyborgskaya emb., Saint Petersburg

Phone: +7 (812) 718-3585

2) Electrical Installation Company TSN

23, Profsoyuznaya str., Moscow

Phone: +7 (495) 411-6194

3) Electrical Center TSN

44, Polevaya Sabirovskaya str., Saint Petersburg

Phone: +7 (812) 430-4313

4) TSN Technologies and Materials

61, Vyborgskaya emb., Saint Petersburg

Phone: +7 (812) 448-9974

5) TSN Mechanical

8, Beloostrovskaya str., Saint Petersburg

Phone: +7 (812) 655-09-76

6) VATECH TSN

15, Novolitovskaya str.,

194100, Saint Petersburg, Russia

tel: +7 (812) 321-6501

fax: +7 (812) 321-6503

7) Sevenfort Engineering Company

Rua do poeta Bocage 2 -3ºB, 1600-233 Lisboa, Portugal tel. +351 21 75 73 990 fax. +351 21 75 73 992

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

5

Industrial projects, realized in contract with

TSN Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

6

Toyota factory Shushary, Leningrad region.

Total area: 60 000 sq.m.

Project realized: 2006-2007.

Performed works: design of mechanical systems: heating, ventilation and air

conditioning, compressed air, water supply and sewerage systems; and electrical

systems: power supply and electric lighting, fire-fighting and fire alarm systems,

automation of engineering systems.

Customer: RAMBOLL

Ford factory Vsevolozhsk, Leningrad region.

Project realized: 1999-2000, 2004, 2009.

Performed works: electrical works at construction and reconstruction of the

factory, electrical installations in workshops.

General contractors: YIT, Genix.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

7

General Motors factory Shushary, Leningrad region.

Total area: 94 Hectare

Project realized: 2007 - 2008.

Performed works: design of power supply system for technological equipment

(painting conveyor), installation of 6 substations in workshops (with 1250 kVA

transformers), 2500 А bus-bar system, and electrification of technological

processes.

Volkswagen factory Kaluga

Total area: 220 000 sq.m.

Project realized: 2008

Performed works: design and installation of fire alarm system.

Customer: Volkswagen Rus.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

8

Hyundai factory

St. Petersburg

Project realized: 2009 - currently on-going

Performed works: part of scope.

General contractor: STEP

Nissan factory (finished products warehouse) St. Petersburg

Project realized: 2009

Performed works: part of scope.

General contractor: EtalonPromStroy

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

9

Stadco factory (Gestamp)

Leningrad region.

Total area: 15 500 sq.m.

Project realized: 2008

Performed works: design and installation of electrical, low-voltage and

mechanical systems (water supply and sewerage, ventilation of administration

building and technical block, compressed air system).

General contractor: STEP

Atria factory and logistic complex Gorelovo, Leningrad region.

Total area: 44 000 sq.m.

Project realized: 2007- 2008

Performed works: installation of electrical systems at construction of the I stage

(logistic complex, car wash, technical premises) and II stage (factory,

workshops).

General contractor: YIT

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

10

Ahlstrom factory

Tver region.

Total area: 14 500 sq.m.

Project realized: 2007- 2008

Performed works: installation of power supply and electric lighting systems,

phone and data network.

General contractor: SRV

Finndisp Ramenskoye, Moscow region.

Total area: 3200 sq.m.

Project is currently in work: 2007.

Performed works: installation of M&E systems: power supply and electric

lighting, ventilation, heating, water supply and sewerage systems.

Customer: QUATTRO GEMINI

"Alcan Packaging" Saint Petersburg, Krasnoye Selo

Total area: 9 500 sq.m.

Project realized: 2007.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

11

Performed works: design and installation of power supply and electric lighting,

installation of transformer substation.

Customer: ALCAN PACKAGING

Elcoteq factory Saint Petersburg

Total area: 15 000 кв.м.

Project realized: 2005г.

Performed works: installation of power supply and electric lighting systems,

installation of bus-bar system for feeding of technological processes.

Customer: LEMCON Rus

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

12

Rockwool factory Vyborg

Total area: 24 000 sq.m.

Project realized: 2005.

Performed works: supply and installation of three 10 kV transformer substations

and 0,4 distribution boards. Installation of technological equipment

Customer: ROCKWOOL

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

13

Wrigley chewing gum factory Saint Petersburg

Total area: 22 000 sq.m.

Project realized: 1998-99, 2005-2007

Performed works: design and installation of electrical systems, installation of

technological equipment at construction and expansion of the factory

Customer: WRIGLEY

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

14

JTI tobacco factory

Yeletz, Moscow region

Total area: 22 000 sq.m.

Project realized: 2004-2007

Performed works: three lines of reconstruction of transformer substations and 6

kV network, as well as 0,4 kV power supply system.

Customer: JTI

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

15

Amcor Flexible packaging factory

Velikiy Novgorod

Project realized: 2006.

Performed works: installation of M&E systems.

Customer: AMCOR

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

16

Amcor Rentsch packaging factory

Velikiy Novgorod Project realized: 2000.

Performed works: all electrical installation works, including installation of TS,

electric lighting and power supply system, control of ventilation.

Customer: AMCOR

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

17

SERDIX pharmaceutical plant

Moscow region

Total area: 6000 sq.m.

Project realized: 2006-2007.

Performed works: design and installation of electrical systems

Customer: SERVIER

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

18

House-building factory Sertolovo, Leningrad region

Total area: 26 hectares

Project realized: 1995.

Performed works: full scope of electrical installation works, including

electrification of technological processes

Customer: ABB Installaatiot OY

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

19

«Russian Standard» distillery

Saint Petersburg

Total area: 10 000 sq.m.

Project realized: 2006.

Performed works: installation and set-up of technological equipment. Work in

explosive areas.

Customer: YIT

"ASSI-DOMAN" (KAPPA since 2001)

Vsevolozhsk, Leningrad region

Project realized: 1997.

Performed works: full scope of electrical works, including: installation of

transformer substation and diesel-generator set, burglar and fire alarm, video

monitoring system, phone network and dispatching, electric lighting, smoke

extinguishing system, automation of engineering systems of the building.

Customer: "ES-Projektit OY"

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

20

BREWERIES

Since 2000 up to 2004 "TSN" participated in construction, expansion and modernization of

several breweries in Saint Petersburg, Klin, Yaroslavl, Tula, Samara, Habarovsk, Voronezh

and has fulfilled works on installation of power supply, electric lighting, safety and

communications systems. Construction of the 2nd line and modernization of the existing

production of Sun Interbrew brewery was realized in Klin in 2001. At the same period

modernization of “Baltica” brewery was realized in Tula. At the 3d line of construction of

“Vena” brewery in Saint Petersburg TSN fulfilled a full scope of electrical installation works

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

21

in 2002. In the same 2002 TSN performed works at construction of new administrative and

storage premises of “Yarpivo” brewery in Yarostavl. In 2003 TSN supplied distribution

boards, produced by “Electrical Center TSN” for the new plants of “Baltica” in Samara and

Habarovsk. And at the same year electrical installation works were fulfilled at brewery in

Voronezh.

Tobacco factory BAT Rothmans

Olgino, Leningrad region

Project realized: 2001-2002.

Performed works: installation of power supply, safety and communication

systems, supply of distribution boards, produced by Electrical Center TSN.

Customer: BAT

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

22

Logistic terminal projects, realized in contract with TSN Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

23

“A” class logistic complex Shushary, Leningrad region.

Total area: 160 000 sq.m.

Project is currently under construction

Performed works: installation of power supply system

Customer: RAVEN Avalon Logistics

General Contractor: Vilia

Logistic complex in Krekshino.

Moscow region.

Total area: 300 000 sq.m.

Project is currently under construction

Performed works: full scope of electrical installation works

Customer: Roseurodevelopment

General contractor: TRASKO

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

24

Cargo terminal "FM-Logistic" Moscow region, international airport Московская область, международный

аэропорт "Шереметьево-2"

Total area: 38 000 sq.m.

Project realized: 2004.

Performed works: full scope of works on installation of electrical and low

voltage systems

General contractor: Lemcon Rus

Contractor: "ES-Projektit OY"

.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

25

Logistic center «FM Logistic»

Chekhov. Moscow region

Total area:

Project realized: 2003.

Performed works: installation of electrical systems

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

26

Logistic park "Diamond" Khimky, Moscow region.

Total area: 80 000 sq.m.

Project realized: 2002.

Performed works: design and installation of electrical systems

Customer:

NLC

General

Contractor:

TRASKO

INVEST

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

27

Cargo terminal Pulkovo

Saint Petersburg, Pulkovskoye shosse

Total area: 14 000 sq.m.

Project realized: 2002.

Performed works: Installation of electric lighting and power supply systems at

check-points 1, 2 and inside terminal building. Supply of materials and

equipment. Electrical Center TSN produced more than 100 distributional boards

and MDB for the project.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

28

Oil terminal "Neste" Leningrad region, Bronka.

Total area: about 9 hectares

Project realized: 1998.

Performed works:

All electrical installation works, including electrification of technological

processes.

2000-2007 – expansion of the terminal, service maintenance.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

29

BOHMANS storage facilities Khimky, Moscow region

Total area: 4500 sq.m.

Project realized: 2002

Performed works:

Design and installation of power supply, electric lighting systems, burglar and

fire alarm, access control, phone and data network.

Customer: " Skanska East Europe OY"

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

30

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

31

Business center projects realized in contract

with TSN Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

32

Business center “Two Captains”. Moscow. "А" class business center.

Total area – 100 000 sq.m. Project realized: currently in realization

Performed works: installation of power supply and electric lighting, safety and

communications systems, water supply and sewerage, water and gas fire

fighting, BMS

General contractor: Strabag

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

33

Business center “Citydel”. Moscow.

"А" class business center.

Total area: 96 000 sq. m.

Office premises: 60 000 sq.m. Project realized: 2006-2007г.

Performed works: installation of power supply and electric lighting systems,

shell&core scope.

Customer: TEMA

General contractor: Bouygues

Contractor: INEO Vostok

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

34

Business center "Krugozor". Moscow.

"А" class business center.

Total area of the 1st line: 30 000 sq. m.,

Total area of the 2nd line: 14 000 sq.m. Project realized: 2006-2007.

Performed works: design and installation of electrical systems and safety and

communications systems.

Customer: Horus Capital

General contractor: STEP

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

35

Business center "Krylatskie Hills". Buildings B, C. Moscow.

"А" class business center.

Building B: 20 000 sq. m.,

Building C: 20 000 sq.m. Project realized: 2006.

Performed works: design and installation of electrical systems and safety and

communications systems.

Customer: CMI

General contractor: CODEST

Contractor: RC Impianti.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

36

Business center "Gorky Park Tower ". Moscow.

"А" class business center.

Total area: 30 000 sq. m.

Project realized: 2006.

Performed works: installation of power supply and electric lighting systems,

shell&core scope.

Customer: STIMUL GROUP

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

37

Business center "Balchug Plaza". Moscow.

"А" class business center.

Total area: 31 000 sq.m. Project realized: 2005.

Performed works: full scope of works on electrification of the project, supply of

DBs, installation of fire alarm and notification system, including supply of

necessary equipment. Maintenance of fire alarm and notification systems.

Customer: CMI

General contractor: CODEST

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

38

Business center Ducat Place III. Moscow.

"А" class business center.

Total area: 60 000 sq.m.

Office premises: 32 800 sq.m. Project realized: 2005 – 2006.

Performed works: installation of power supply and electric lighting systems, 10

kV transformer substation, installation of safety and communications systems.

General contractor: CODEST

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

39

Business complex «Novinskiy Passage» Moscow.

"А" class business center.

Total area: 78 000 sq. m.

Project realized: 2003-2004.

Performed works: installation of power supply and electric lighting systems.

General contractor: SKANSKA

Contractor: VATECH ELIN EBG (SIEMENS ELIN)

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

40

Business center "Smolensky Passage", Moscow

"А" class business center.

Total area: 70 000 sq. m.

Project realized: 1997-1998.

Performed works: installation of power supply and electric lighting systems.

General contractor: SKANSKA

Contractor: ABB Installatiot OY

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

41

Business center "Veda House", Saint Petersburg. "А" class business center.

Total area: 22 000 sq. m.,

Project realized: 2004-2007.

Performed works: installation of

power supply and electric lighting

systems.

Customer: Veda-system

Business center «Jensen Group». Saint Petersburg.

Project realized: 2000 .

Performed works: design and

installation of power supply and

electric lighting systems

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

42

Business center Phoenix. Saint Petersburg.

Total area: 4500 sq.m.

Project realized: 2004

Performed works: installation of power supply and electric lighting systems

Customer: STEP.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

43

Business center «Neptune». Third line of construction. Saint Petersburg.

Area of the 3d line: 15000 sq.m.

Project realized: 1999

Performed works: full scope of electrical installation works.

Customer: Rubin.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

44

"Swedish House" ("Andersson House"), including Swedish consulate

Total area: 4000 sq.m.

Project realized: 1999

Performed works: full scope of electrical installation works.

General contractor: SKANSKA

Contractor: ABB Installaatiot OY

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

45

Representative office of Chukotskiy autonomous region in Saint Petersburg.

Total area: 10 000 sq.m.

Project realized: 2002-2005

Performed works: design and installation of power supply and electric lighting

systems.

Customer: Chukotskiy autonomous region.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

46

Shopping malls, realized in contract with TSN

Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

47

“Atlantic City” shopping mall Savushkina str., St. Petersburg

Total area – 46 000 sq.m.

Project is realized: 2008

Performed works: electrical

installation (full scope,

shell&core).

City Mall «Belgorodskiy»

Belgorod

Total area: 63 000 sq.m.

Project is realized: currently under construction.

Performed works: installation of mechanical systems: HVAC, water supply and

sewerage.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

48

MEGA shopping malls (6)

Moscow, Saint Petersburg, Novosibirsk, Nizhniy Novgorod

Total area of each: 150 000 – 240 000 sq.m. Projects realized: 2002-2007.

Performed works: design and/or installation of electrical, low-voltage systems

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

49

“Sennaya” shopping mall

Saint Petersburg, Sennaya sq.

Total area: 60 000 sq.m. Project realized: 2003.

Performed works: installation of power supply and electric lighting systems,

shell&core scope.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

50

AUCHAN hypermarkets(12)

Moscow, Saint Petersburg, Yekaterinburg Total area: 14 000 sq.m. each Projects realized: 2002-2007.

Performed works: full scope of electrical installation works.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

51

Mosmart hypermarket

Moscow Total area: 26 000 sq.m. Project realized: 2003.

Performed works: installation of interior lighting

Customer: Bouygues Batiment

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

52

METRO Cash&Carry hypermarkets (15)

Total area: 13 000 sq.m. each Projects realized: 2003-2007.

Performed works: installation of power supply and electric lighting systems

Customer: Klampfer

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

53

IKEA (3)

Saint Petersburg

Total area: 30 000 sq.m. each Projects realized: 2003-2007.

Performed works: installation of power supply, electric lighting and safety and

communications systems.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

54

Atrium shopping mall

Moscow Total area: 100 000 sq.m. Project realized: 2001.

Performed works: installation of 10 kV distribution boards, transformers, power

supply and electric lighting systems, burglar alarm, access control, BMS.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

55

Zanevskiy Kaskad

Saint Petersburg Total area: 34 000 sq.m. Project realized: 2006.

Performed works: design and installation of power supply and electric lighting

systems in public areas and tenants, including cinemas

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

56

Piter-Raduga Saint Petersburg

Total area: 100 000 sq.m. Project realized: 2007.

Performed works: installation of power supply and electric lighting systems,

shell&core scope, supply of distribution boards and necessary equipment.

Piter shopping mall Saint Petersburg

Total area: 47 000 sq.m.

Project realized: 2006.

Performed works: full scope of

electrical installation works.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

57

Hotels realized in contract with TSN Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

58

Crown Plaza Hotel 4* Saint Petersburg, Pulkovo-III area

Rooms: 300 Project realized: on-going now

Performed works: design and installation of power supply and electric lighting

systems.

General contractor: TOR

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

59

“Lion Palace” deluxe Saint Petersburg, Voznesenskiy ave.

Total area: 26 600 sq.m. Project realized: on-going now

Performed works: design and installation of power supply and electric lighting

systems, ventilation and air conditioning systems, heating, BMS.

General contractor: Tristar Investmet Holdings

Hotel operator: Four Seasons

Phoenix Hotel Saint Petersburg

Total area: 13 000 sq.m., 268 rooms Project realized: on-going now

Performed works: installation of power supply and electric lighting systems

General contractor: Kompakt

Hotel operator: Park Inn

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

60

Neptune Hotel (Best Western) 4* Saint Petersburg.

Rooms: 150 rooms

Project realized: 2001

Performed works: installation of power supply and electric lighting systems.

Customer: Rubin.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

61

Sokos Hotel Vasilevsky - 4* Saint Petersburg

Total area: 15 800 sq.m., 255 rooms Project realized: 2007-2008

Performed works: design and installation of power supply and electric lighting

systems, snow melting and de-icing systems.

Investor: “Hotel Plus” Ltd.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

62

Park Inn Pulkovskaya Hotel 4* Saint Petersburg

Rooms: 840 Project realized: 2007

Performed works: installation of power supply and electric lighting systems at

reconstruction of the hotel lobby premises.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

63

Olympic Park Hotel Saint Petersburg

Total area: 16 000 sq.m., 342 rooms Project realized: 2007

Performed works: design of electrical, low-voltage and mechanical systems

(stage P and tender documentation)

Customer: JGB Development

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

64

Severnaya Korona Hotel Saint Petersburg

Total area: 40 000 sq.m. Project realized: 2006-2008

Performed works: design of electrical and low-voltage systems (stage P)

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

65

Hayatt Hotel Ekaterinburg

Project realized: 2005

Performed works: installation of electrical and low-voltage systems (part of

scope)

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

66

Sheraton Palace Hotel Moscow

Rooms: 212 Project realized: 2008

Performed works: design and installation of power supply and electric lighting

systems, ventilation and cooling systems at modernization of the hotel

General contractor: Strabag AG

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

67

Residential projects, realized in contract with

TSN Group

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

68

Papula residential complex Vyborg, Leningrad region

Project realized: 2007 – 2009

Performed works: installation of indoor electrical systems: power supply and

electric lighting; low voltage: fire fighting, video monitoring, TV, phone and

data,

door interlocutor; mechanical: ventilation, heating, water supply and sewerage;

BMS system.

General contractor: SRV

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

69

Paradniy Kvartal Reconstruction and new development of Block 1210, Central district, St.

Petersburg

Total area: 270 000 m2

Project realized: 2007 – 2008

Performed works: design of HVAC, water supply, sewerage and extinguishing

systems - design of electrical lighting, 0.4kV power systems and low voltage

systems (full scope).

Developer: JV Peter the Great.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

70

De luxe residential complex Olympic village Krestovskiy Island, St. Petersburg

Total area: 68 400 m2

Project realized: 2006 – 2008

Performed works: design and installation of electrical lighting and 0.4kV

power systems

Developer: Evrovent

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

71

De luxe residential building 42 Shpalernaya str., St. Petersburg

Project realized: 2001

Performed works: installation of electrical systems: lighting and 0.4kV power

systems, low voltage: video monitoring, door interlocutor, phone and data, TV,

fire fighting system.

Developer: JV Peter the Great.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

72

“Monolith Plaza” Kosygina str., Moscow

Project realized: 2003-2004

Total area: 26 500 m2

Performed works: installation of electrical systems: power supply and electric

lighting, low voltage: phone and data network, I-net, radio, TV, video

monitoring, door interlocutor system, fire-fighting, fire notification.

General contractor: Strabag AG.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

73

Residential building with underground parking

7 Molochniy lane, Moscow

Project realized: 2007

Performed works: design and installation of low-voltage systems: door

interlocutor, access control, TV, fire fighting and notification, automation and

BMS.

General contractor: Gelar.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

74

“Venskiy Dom” Neapolimovskiy lane, Moscow

Project realized: 2002-2003

Performed works: installation of electrical systems: power supply and electric

lighting, including installation of distribution panels, produced by TSN.

General contractor: Strabag AG.

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

75

De luxe residential Complex “Blizhnaya Dacha” 11 Starovolynskaya str., Moscow

Total area: 90 000 m2

Project realized: 2006-2007

Performed works: installation and set up of electrical equipment, interior lighting

system, earth connection system, performing all necessary tests, supplying all

materials

General contractor: Strabag AG

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

76

De luxe residential complex "Stolnik" 5 Mal.Levshinsky lane, Moscow

Project realized: 2002-2003

Performed works: design and installation of electrical systems: transformer

substation, power supply, electric lighting.

General contractor: Codest

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

77

Residential complex Klochkov lane, St. Petersburg

Project realized: 2002

Performed works: installation of power supply and electric lighting, including

installation of distribution panels, produced by TSN.

General contractor: Profit

Группа компаний ТСН web: www.tsn-group.com TSN Group mail: [email protected]

78

Residential building Vishnevskogo str., St. Petersburg

Project realized: 1997-1998

Performed works: installation of power supply and electric lighting systems.

General contractor: Profit