19
1 ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 ITRF2008 Zuheir Altamimi IGN, France

tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

1ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008

Zuheir AltamimiIGN, France

Page 2: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

2ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Technique contributions• IVS: (1980.0 – 2009.0) : Full EOP set (91 sites)• IGS: (1997.0 – 2009.5) : PM, PMrate, LOD (492 sites)• ILRS: (1983.0 – 2009.0) : PM, LOD (89 sites)• IDS: (1993.0 – 2009.0) : PM, LOD (67 sites)

• New local ties since ITRF2005:– Tahiti : GPS SLR DORIS– Tsukuba: GPS VLBI– Herstmonceux: GPS SLR– Medicina & Noto : GPS VLBI– Greenbelt: VLBI SLR GPS DORIS– Maui/Haleakala– San Fernando : GPS SLR

Page 3: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

3ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 Network

579 sites (920 stations)

461 Sites North

118 Sites South

Page 4: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

4ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 Datum Specification

• Origin: SLR• Scale : Mean of SLR &VLBI • Orientation: Aligned to ITRF2005

using 179 stations located at 131 sites: 104 at northern hemisphere and 27 at southern hemisphere

Page 5: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

5ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008: GPS/IGS Site distribution

390

102

550 discontinuities

Page 6: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

6ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

IG1 internal precision (1997.0 - 2009.5)

Page 7: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

7ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

SLR-ILRSA Origin wrt ITRF2008

Page 8: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

8ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 Scale: mean of VLBI and SLR

± 1ppb (6.4 mm at the equator)

Page 9: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

9ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Scale FORMAL errors (1 σ) via ties to GPS

Scaleppb

Scale rateppb/yr

VLBI ± 0.10 ± 0.01

SLR ± 0.12 ± 0.01

DORIS ± 0.20 ± 0.03

Page 10: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

10ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 PM residuals

X-pole Y-poleGPS 10 10DORIS 239 353

X-pole Y-poleVLBI 142 120SLR 144 128

WRMS in µas

Page 11: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

11ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Transformation Param Fm ITRF2008 To ITRF2005

Txmm

Tymm

Tzmm

Scaleppb

-0.5± 0.2

-0.9± 0.2

-4.7± 0.2

0.94± 0.03

Tx ratemm/yr

Ty ratemm/yr

Tz ratemm/yr

Scale rateppb/yr

0.3± 0.2

0.0± 0.2

0.0± 0.2

0.00± 0.03

At epoch2005.0

Page 12: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

12ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 Horizontal Velocity Field

Page 13: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

13ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 Vertical Velocity Field

Page 14: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

14ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Accuracy of ITRF2008 Origin

• Defined by SLR only• Agreement with ITRF2005

– 4.7 mm in Z-translation at epoch 2005– 0.3 mm/yr drift in X-translation

• ==> “Accuracy”: 1 cm over the time-span of SLR observations

Page 15: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

15ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Accuracy of ITRF2008 Scale

• Defined by the average of VLBI and SLR• Difference btw the two technique solutions:

– 1.05 ppb at epoch 2005.0– 0.049 ppb/yr

• ==> “Accuracy”: 1.2 ppb (8 mm) over the common time-span of VLBI and SLR observations

Page 16: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

16ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

ITRF2008 precision gain

Page 17: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

17ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Uncertainties of the Transfer of SLR origin and SLR&VLBI mean scale to GPS frame

TXmm

TYmm

TZmm

Scalemm

0.6 0.5 0.6 0.6

Page 18: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

18ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

WGS84 - NGA Stations in ITRF2008NGA: National Geospatial-Intelligence Agency

Page 19: tttt - unoosa.org · ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010 3 ITRF2008 Network 579 sites (920 stations)

19ICG-5, WG D Meeting, Turin, Italy, Wednesday Oct. 20, 2010

Conclusions

• ITRF2008 is an improved solution, compared to ITRF2005

• Accuracy of ITRF2008 origin&scale: ~ 1 cm• Future Improvement: Technique-specific

systematic errors to be mitigated– GPS uncalibrated radome– VLBI antenna gravitational deformations– SLR range/timing biases– DORIS beacon reference point behavior ?