1
C-Tecnics Ltd. 123 Ashgrove Road West, Aberdeen, AB16 5FA, Scotland Tel: +44 (0) 1224 666 322 Fax: +44 (0) 1224 692 222 [email protected] www.c-tecnics.com TWO DIVER SURFACE CONTROL PANEL • Portable & robust 2 diver system • Independent diver and diver supplies The C-Tecnics 2 Diver Surface Supply Control panel is built to comply with the UK’s robust Associaon of Diving Contractors’ Inshore diving standards and HSE guidelines. The working diver is on independent gas supplies from the standby diver – an important safety feature learned the hard way. Such gas contaminaon issues are overcome, as are HP regulator failures or pipework/valve failure, as each diver has his own regulator and supply. The engraved stainless steel facia is supported in a tough thermoplasc transport case. Stainless steel pipework is used and the compression style fings, valves relief valves and one way valves are of the highest quality. Weight 400gms (250gms in seawater) Depth Rating 1000m Mating Connectors RMG-2-MP Male 2-pin connectors (Alternatives available) • Stainless steel pipework and fings • Clear logic lines + operaon • Two HP gas inlets (8 JIC male) • Two supply isolaon valves • Two one-way valves • High-flow regulator • HP gauge • LP gauge • 6” Pneumo gauge, 0.25%, 0-70m/230ſt in ¼ m/1ſt increments • Purge needle valve with flow protector • Diver supply on/off ¼ turn valve Each diver’s supply has the following: The panel is manufactured under the company’s ISO 9000 Quality Assurance System. Tested in accordance with IMCA D018 and industry guidelines to 1.5 mes the maximum working pressure prior to dispatch. Tesng as per IMCA D023 to maximum working pressure at a minimum of every two years is always recommended. The unit is cleaned for breathing gas use against the Naonal Hyperbaric Centre in-house test procedures, to enable the panel to be used in with oxygen rich gases, such as nitrox required. Relief valves should be checked and re-cerfied in accordance with IMCA D018 which recommends every 2 ½ years as a minimum. Gauges should be re-cerfied every 6 months. There should be program of planned maintenance for this equipment incorporang with industry good pracce. • Diver outlet connecon (6 JIC) • Pneumo connecon (4 JIC)

TWO DIVER SURFACE CONTROL PANEL - iRov Underwater Services · 2018. 3. 20. · • Independent diver and diver supplies The C-Tecnics 2 Diver Surface Supply Control panel is built

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TWO DIVER SURFACE CONTROL PANEL - iRov Underwater Services · 2018. 3. 20. · • Independent diver and diver supplies The C-Tecnics 2 Diver Surface Supply Control panel is built

C-Tecnics Ltd.123 Ashgrove Road West, Aberdeen, AB16 5FA, Scotland

Tel: +44 (0) 1224 666 322 Fax: +44 (0) 1224 692 222 [email protected]

www.c-tecnics.com

TWO DIVER SURFACE CONTROL PANEL• Portable & robust 2 diver system• Independent diver and diver supplies

The C-Tecnics 2 Diver Surface Supply Control panel is built to comply with the UK’s robust Association of Diving Contractors’ Inshore diving standards and HSE guidelines. The working diver is on independent gas supplies from the standby diver – an important safety feature learned the hard way. Such gas contamination issues are overcome, as are HP regulator failures or pipework/valve failure, as each diver has his own regulator and supply. The engraved stainless steel facia is supported in a tough thermoplastic transport case. Stainless steel pipework is used and the compression style fittings, valves relief valves and one way valves are of the highest quality.

Weight400gms (250gms in seawater)

Depth Rating1000m

Mating ConnectorsRMG-2-MPMale 2-pin connectors(Alternatives available)

• Stainless steel pipework and fittings• Clear logic lines + operation

• Two HP gas inlets (8 JIC male)• Two supply isolation valves • Two one-way valves• High-flow regulator• HP gauge

• LP gauge• 6” Pneumo gauge, 0.25%, 0-70m/230ft in ¼ m/1ft increments• Purge needle valve with flow protector• Diver supply on/off ¼ turn valve

Each diver’s supply has the following:

The panel is manufactured under the company’s ISO 9000 Quality Assurance System. Tested in accordance with IMCA D018 and industry guidelines to 1.5 times the maximum working pressure prior to dispatch. Testing as per IMCA D023 to maximum working pressure at a minimum of every two years is always recommended. The unit is cleaned for breathing gas use against the National Hyperbaric Centre in-house test procedures, to enable the panel to be used in with oxygen rich gases, such as nitrox required. Relief valves should be checked and re-certified in accordance with IMCA D018 which recommends every 2 ½ years as a minimum. Gauges should be re-certified every 6 months. There should be program of planned maintenance for this equipment incorporating with industry good practice.

• Diver outlet connection (6 JIC)• Pneumo connection (4 JIC)