ULOGA OPERATORA PRIJENOSNIH SUSTAVA U PROVEDBI INTEGRACIJE
TRŽIŠTA ELEKTRIČNE ENERGIJE EUROPSKE UNIJE I ENERGETSKE ZAJEDNICE
Mr.sc. Damjan Međimorec, član Upravnog odbora ENTSO-E(HEP-Operator prijenosnog sustava d.o.o.,direktor Sektora za razvoj i institucijsku suradnju)
D. MEĐIMOREC | 2/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Sadržaj
• Europska mreža operatora prijenosnih sustava za električnu energiju (ENTSO-E)
• ENTSO-E uloga prema “Trećem energetskom paketu Europske unije”
• Pravila za mreže (Network codes) kao provedbeni propisi “Trećeg energetskog paketa Europske unije”
• Integracija tržišta električne energije
• Uloga ENTSO-E za tržište električne energije• Pravila za mrežu o dodjeli kapaciteta i upravljanju zagušenjima
(CACM)
D. MEĐIMOREC | 3/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Ishodišta ENTSO-E
Udruženja europskih operatora prijenosnih sustava 2008.g.:
D. MEĐIMOREC | 4/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Nastanak ENTSO-E
Prag, 26. lipanj 2008. Brussels, 19. prosinac 2008. 1. srpnja2009.
ENTSO-E
UCTE
NORDEL
BALTSO
UKTSOA
ATSOI
ETSO
Potpisivanje Deklaracije o namjeri
Osnivanje ENTSO-E ENTSO-E u potpunosti
preuzeo sve aktivnosti
• Prethodne aktivnosti preuzete i kroz pravno obvezujuće sporazume (CTA’s – posebice od UCTE i ETSO)• Nastavak aktivnosti bez prekida • Daljnji razvoj na dosadašnjim temeljima
D. MEĐIMOREC | 5/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
ENTSO-E obuhvaća :• 525 milijuna građana• 828 GW instalirane proizvodnje• 305000 km prijenosnih vodova• 3400 TWh godišnje potrošnje• 400 TWh godišnje
prekogranične razmjene
• 41 član (OPS) iz 34 države
- 8 “regionalnih tržišta”
- 5 sinkronih područja
ENTSO-E – osnovni podaci
D. MEĐIMOREC | 6/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Dvojaka uloga ENTSO-E
• Udruženje operatora prijenosnih sustava
– Jedinstvena platforma suradnja europskih OPS-ova na paneuropskoj i regionalnoj razini
– Promocija interesa OPS-ova
• Subjekt “trećeg energetskog paketa” EU
– Definirano ime (i kratica): Europska mreža operatora prijenosnih sustava za električnu energiju(ENTSO-E)
– Važna aktivna uloga u europskom procesu pripreme i donošenja pravila, planova i dr.
ENTSO-E osnovan i počeo s radom (kao udruženje) i prije stupanja na snagu “trećeg paketa” anticipirajući njegovu primjenu temeljem unaprijed objavljenih i usuglašenih relevantnih odredbi njegovih relevantnih propisa
D. MEĐIMOREC | 7/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
ENTSO-E misija i vizija
Misija– Sigurnost (pogona): unapređivanje suradnje OPS-ova– Dostatnost (razvoja): TYNDP– Tržište (platforma): spajanje tržišta prema ciljnom modelu– Održivost (integracije prvenstveno OIE):
istraživanje i razvoj, te nove tehnologije
Vizija
Postati i ostati središnja točka za sve europske (tehničke, tržišne i političke) teme u svezi OPS-ova, kao i sučelje sa korisnicima prijenosne mreže, institucijama EU, regulatorima i nacionalnim vladama.Svojim uratcima doprinositi sigurnosti opskrbe, paneuropskom tržištu bez granica, sigurnoj integraciji novih izvora električne energije (posebice obnovljivih) i pouzdanoj mreži okrenutoj ka budućnosti i usklađenoj s ciljevima energetske politike.
Vodeća snaga i glas u realizaciji ciljeva europske (elektro)energetske politike
D. MEĐIMOREC | 8/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Skupština
Upravni odbor Tajništvo
Pravno-regulatorna grupa Ekspertna grupa za podatke
Ekspertna grupa za nadzor usklađenosti
Europski standardiplaniranja razvoja
Modeliranje mrežei podaci
10 god. Planrazvoja mreže
Dostatnost sustava i Modeliranje tržišta
Sjeverno more Baltičko more Kontinentalnasrednja i južna
Kontinentalnajugozapadna
Radne grupe
Regionalne grupe
Upravljanjeimovinom2050 / Supermreža
Kontinentalnajugoistočna
Kontinentalnasrednja i istočna
Electronic HighwayZaštita kritične infrastruktureEuropski pogonski standardi
Velika BritanijaBaltikSkandinavijaKontinentalnaEuropa
Funkcionalnimodel
Operativnerezerve
Klasificiranjeincidenata
Koordiniraneusluge
ENTSO-E Eurelectricupravljanje frekvencijom
/
Irska - Sj. Irska
Dobrovoljne regionalne grupe
Timovi prema potrebi
Sjeverna Europa
Radne grupe
Regionalne grupe
Razmjenapodataka
Tržišne informacijei razvidnostPomoćne uslugeIntegracija tržišta
JugozapadnaEuropa
JugoistočnaEuropa
SjeverozapadnaEuropaBaltik
Obnovljiviizvori energije
Radne grupe
Regionalne grupe
Planistraživanja i razvoja
Praćenje i azmjena znanjar
Radne grupe
Odbor sustava
za razvoj
Odbor sustava
za vođenje
Izolirani sustavi
Odbor za tržište
Odbor Istraživanje i razvoj
za
ENTSO-E – organizacijski ustroj
D. MEĐIMOREC | 9/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
ENTSO-E osnovne odgovornosti
• Prema člancima Uredbe (EZ) 714/2009 :
Čl. 4: ENTSO – obveza rada na dovršetku jedinstvenog unutarnjeg tržišta
Čl. 6: Priprema Pravila za mreže (Network codes) – u skladu s okvirnim smjernicama ACER (Agencije za suradnju
energetskih regulatora) i intenzivnu javnu raspravu,s konačnim obvezujućim učinkom
Čl. 7: Obuhvat Pravila za mreže– prekogranične teme i one u svezi integracije tržišta,
bez zadiranja u pravo država članica da propisuju svoja domicilna pravila
Čl. 8: ENTSO aktivnosti – Pravila za mreže, Desetgodišnji planovi razvoja (TYNDP),sezonske prognoze dostatnosti, izvješća o dostatnosti proizvodnje
D. MEĐIMOREC | 10/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Pravila za mrePravila za mrežže e ((NetworkNetwork codescodes))
kao provedbeni propisi u funkciji integracije tržišta električne energije
D. MEĐIMOREC | 11/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Why did the Commission introduce the idea of IEM (Internal energy market) ?
Let us for a moment imagine how our energy landscape would look like without an internal energy market. We would have 27 markets in Europe, with widely diverging market rules and network operationrules. Gas and electricity would not flow freely across borders.Energy companies would not be able to take full advantage of economies of scale. The level of competition would be much lower, with less choice for customers. Security of energy supply would be a significant concern in many Member States, in particular in those depending on a single supplier without being adequately interconnected with other Member States. And meeting our climatechange objectives with 27 markets would be much more expensive and much less efficient. Without an internal energy market Europe would be vulnerable. We would all pay the price.”
Commissioner Günther H. Oettinger
D. MEĐIMOREC | 12/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
The scale of the challenge –additional 52300 km lines (TYNDP 2012)
The IEM will not be a reality without the necessary infrastructure investmentThe IEM will not be a reality without the necessary infrastructure investment
D. MEĐIMOREC | 13/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
About €100 billion in the coming 10 years
• €100 billion investment on grids…
• ≈ 1.5-2 €/MWh in Europe over the 10-year period,
• ≈ 2% of the bulk power prices,
• ≈ less than 1% of the total end-users’electricity bill
• €100 billion investment on grids…
• ≈ 1.5-2 €/MWh in Europe over the 10-year period,
• ≈ 2% of the bulk power prices,
• ≈ less than 1% of the total end-users’electricity bill
billion € billion €Austria 1.1 Ireland 3.9Belgium 1.9 Latvia 0.4Bosnia‐Herzegovina 0.0 Lithuania 0.7Bulgaria 0.2 Luxembourg 0.3Croatia 0.2 Montenegro 0.4Czech Republic 1.7 Netherlands 3.3Cyprus 0.0 Norway 6.5Denmark 1.4 Poland 2.9Estonia 0.3 Portugal 1.5Finland 0.8 Romania 0.7France 8.8 Serbia 0.2FYROM 0.1 Slovakia 0.3Germany 30.1 Slovenia 0.3Greece 0.3 Spain 4.8Hungary 0.1 Sweden 2.0Iceland 0.0 Switzerland 1.7Italy 7.1 United Kingdom 19.0
Total ENTSOE perimeter 104
D. MEĐIMOREC | 14/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
What is a network code?
D. MEĐIMOREC | 15/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
How are network codes developed?
Development of FWGL
Development of NC
D. MEĐIMOREC | 16/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Potential Benefits
D. MEĐIMOREC | 17/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
D. MEĐIMOREC | 18/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Broader Links & Dependencies
D. MEĐIMOREC | 19/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
FWGL on Electricity
GridConnection
Requirements for Generators
DemandConnection NC
Grid Connection Network Codes
HVDC NC
D. MEĐIMOREC | 20/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
ENTSO‐E
ERGEG/ACER
2011201010/2009 2012
„Pilot“ Phase „Formal“ Phase
Drafting of „Pilot Code“
drafting of Framework Guideline
Consultation ERGEGconsultation
ACER
Final Network Code
Pilot FWGL
Pilot Code
Drafting of Network Code
Public Consultationinformal & written consultation
FinalFWGL
+/- 12 informal bilateral meetings
Early draft publications
Two workshops in Brussels
ACER FWGL
consultation
Written consultation
(1500 comments) 6 formal meetings
2 RG workshops
Large public workshop
Formal consultation
(6052 comments)
Requirements for Generators – Process to date
D. MEĐIMOREC | 21/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
EU-wide Network CodeRequirements for Generators (RfG)
National grid codes
National grid codes
Crucial in coping with changing power systems
D. MEĐIMOREC | 22/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
RfG Status
D. MEĐIMOREC | 23/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
RfG main messages
D. MEĐIMOREC | 24/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Demand Connection Code – Scope
D. MEĐIMOREC | 25/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Status & Next Steps
D. MEĐIMOREC | 26/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Demand Connection Code for demand users complements the Requirements for
Generators code and network operator’s responsibilities
Key significant users are transmission connected demand facilities, all distribution
networks and controllable demand
Basic connection capabilities for Demand Side Response support the vision of smart
grid roadmaps
Demand Side Response requirements:
» offer functional capabilities to be further specified by standardization;
» enable market based DSR (similar to mandatory capabilities for generators); and
» prescribe the processes on how appliances could be mandatorily fitted.
DCC - Conclusions
D. MEĐIMOREC | 27/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
FWGL on System
Operation
OperationalSecurity NCOperationalSecurity NC
Load-FrequencyControl and
Reserves
Load-FrequencyControl and
Reserves
OperationalPlanning and Scheduling
OperationalPlanning and Scheduling
Operational Training
Emergencyand
Restoration
System operation network codes
D. MEĐIMOREC | 28/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
System States
Operational TestingMonitoring andInvestigation
Operational Trainingand
CertificationFr
eque
ncy
Con
trol
Mgm
t.
Dyn
amic
Sta
bilit
y M
gmt.
Data Exchange
Requirements
General Provisions: Subject matter, Definitions, Scope, Regulatory aspects, Confidentiality, Relation with National Law
Compliance Derogations Final provisionsLiability
Operational Security - Scope
D. MEĐIMOREC | 29/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Operational Security – Key themes from consultation
1220 comments received, currently being processed with the aim of improving the code.
Recurring themes are:
- Clarify the role of regulators;- Impose greater requirements for harmonisation;- Ensure the rules are clear and enforceable; - Ensure TSOs face the same strength of requirements as other parties;- Manage the links to other codes carefully & explain interactions.
Stakeholder workshop planned for 20 December (and in early 2013).
Code to be delivered by 1 March 2013.
D. MEĐIMOREC | 30/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
General Provisions: Subject matter, Definitions, Scope, Regulatory aspects, Confidentiality, Relation with National Law
Building Scenarios
and
Elaborating Common Grid
models
Performing coordinated
security analysis and
setting up
remedial actions
Tim
efra
mes
Planning process
framework
REGIONAL COORDINATION
Ancillary services and adequacy
monitoring
Schedule verification
Schedule notification
Pan-European seasonal
coordinated adequacy
assessment
Security Analysis Adequacy SchedulingOutage planning
PROCESSESY+
YD
-1M
D-2
WID
Common TSO Environment for operational planning data
Operational Planning & Scheduling – Scope
D. MEĐIMOREC | 31/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Frequency Containment Frequency Restoration Replacement
Control Structure
Minimum Product Requirements
XB Exchange/Sharing
Frequency Quality
Data / Info Exchange
Load Frequency Control & Reserves – Scope
D. MEĐIMOREC | 32/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Network Code Overview
NC timeline
D. MEĐIMOREC | 33/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
How are stakeholders involved?
D. MEĐIMOREC | 34/35OKRUGLI STOLOKRUGLI STOL Zagreb, 29. 11. 2012.Zagreb, 29. 11. 2012.
Areas for further focus