1 UPDATE NOVEMBER 2014 WITH THE EXTERNAL FAÇADE OF THE BUILDING ALMOST COMPLETE AND THE SCAFFOLDING FINALLY GONE, THE MODERN, CONTEMPORARY STYLING OF EST ON FOSTER IS FINALLY FULLY EXPOSED. Work continued to progress well throughout October, with apartments in levels 1 and 2 completed. Firstly, the joinery and benchtops were installed in all apartments, then level 1 and level 2 apartments had their carpentry fit-off’s, followed by painting, tiling and finally the plumbing and electrical fit-off’s. Tiling of the common area stairwells was also completed. The balustrading on the balconies is partially installed, while the external rendering is finished and painting underway. Over the next 2 weeks, level 3 apartments will be completed, as well as the building externals, finishing with the landscaping works and the new footpath and driveway crossover. This will bring the building to Practical Completion, and given that we have already managed to obtain registered titles for the building, settlement will likely take place shortly thereafter, in mid-December this year. WELCOME TO THE FOURTH CONSTRUCTION UPDATE FOR EST ON FOSTER, NEWMARKET 4 / Building from Foster Street. Scaffolding had been dropped and the buildings modern façade has been exposed for the first time.

UPDATE 4 NOVEMBER 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e [email protected]

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UPDATE 4 NOVEMBER 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e info@mosaicproperty.com.au

1

UPDATE NOVEMBER 2014

WITH THE EXTERNAL FAÇADE OF THE BUILDING ALMOST COMPLETE AND THE SCAFFOLDING FINALLY GONE, THE MODERN, CONTEMPORARY STYLING OF EST ON FOSTER IS FINALLY FULLY EXPOSED.

Work continued to progress well throughout October, with apartments in levels 1 and 2 completed. Firstly, the joinery and benchtops were installed in all apartments, then level 1 and level 2 apartments had their carpentry fit-off ’s, followed by painting, tiling and finally the plumbing and electrical fit-off ’s. Tiling of the common area stairwells was also completed.

The balustrading on the balconies is partially installed, while the external rendering is finished and painting underway.

Over the next 2 weeks, level 3 apartments will be completed, as well as the building externals, finishing with the landscaping works and the new footpath and driveway crossover.

This will bring the building to Practical Completion, and given that we have already managed to obtain registered titles for the building, settlement will likely take place shortly thereafter, in mid-December this year.

WELCOME TO THE FOURTH CONSTRUCTION UPDATE FOR EST ON FOSTER, NEWMARKET

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

4

/ Building from Foster Street. Scaffolding had been dropped and the buildings modern façade has been exposed for the first time.

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

Page 2: UPDATE 4 NOVEMBER 2014 - Mosaic · Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e info@mosaicproperty.com.au

Developed by...

Mosaic Property Group Pty Ltd 84 Latrobe Tce, Paddington Q 4064, PO Box 526, Paddington Q 4064 p 07 3171 2270 f 07 3171 2217 e [email protected] w mosaicproperty.com.au

2

date 28/4/14 Mosaic Est. on Foster - logo_FINAL sharka designs

THE BUILDING IS NOW COMPLETE, HOWEVER OUR COMMITMENT TO YOU IS FAR FROM OVER…

The completion of a project is always an exciting time for everyone. You are very soon to be the proud owner of a beautiful, high quality apartment in a stunning building. For the Mosaic Team, we are handing over the ownership of a building we have loved since it was merely a set of concept plans and a vacant block of land.

But for us, the commitment to our clients certainly does not stop at settlement. We will continue to closely monitor and track the building and landscaping over the next 12 months, ensuring everything is settling as it should and if required, rectifying anything that may arise. We have a professional photographer taking photos and will soon send those to you, so you can show off your new apartment to your family and friends. If you are renting your apartment, then Mosaic Property Management will also be following your journey closely, ensuring you are achieving the best possible rental return and an outstanding ongoing service.

And of course, should have any questions at all about anything, no matter if it is now, or in 1, 2 or 5 years’ time, then we are here to assist. So please feel free to contact our office on 1300 336 989.

/ Level 1 kitchen / living area, looking out towards the exclusive use courtyard and terrace.

OTHER NEWS

/ Level 3 apartment living area. Plastering has been hung / set, and painting is about to commence.

/ Bathroom area. Tiling has been completed, along with the electrical and plumbing fit-offs. Final coat of paint now underway before the shower screen and accessories are installed.

/ The southern side of the building. Water meters and fire hydrant are visible in the left hand side of the frame, with raised landscaping beds visible to the right hand side. These landscaping beds will be heavily planted, to provide an aesthetically pleasing entry way into the building.