OPERATIONS AND REFURBISHMENT OF THE EXISTING
MULTIPLEX TYRES AND SPARES FUEL RETAIL FACILITY,
OUTJO
UPDATED ENVIRONMENTAL MANAGEMENT PLAN
Assessed by: Assessed for:
Multiplex Tyres &
Spares
June 2019
Table of Contents
1 OBJECTIVES OF THE EMP ..................................................................................................................... 1
2 THE EMP ..................................................................................................................................................... 1
2.1 LAND USE, PLANNING, DESIGN, OPERATIONS – IDENTIFIED IMPACTS ............................................................. 1
2.2 LAND USE, PLANNING, DESIGN, OPERATIONS – MITIGATING MEASURES ........................................................ 2
3 THE IMPLEMENTATION OF THE EMP ............................................................................................... 2
3.1 PLANNING, CONSTRUCTION AND OPERATIONAL PHASES ................................................................................. 2
3.2 DECOMMISSIONING AND REHABILITATION..................................................................................................... 17
4 CONCLUSION ........................................................................................................................................... 17
5 REFERENCES ........................................................................................................................................... 17
List of Tables TABLE 1. PLANNING FOR CONSTRUCTION, OPERATIONS AND FUTURE DECOMMISSIONING OF
THE PROJECT ......................................................................................................................... 3
TABLE 2. THE CONSTRUCTION (REFURBISHMENT, CARE AND MAINTENANCE) PHASE ........................ 5
TABLE 3. THE OPERATIONAL PHASE .................................................................................................. 11
1 OBJECTIVES OF THE EMP Multiplex Tyres & Spares (Multiplex) requested Geo Pollution Technologies (Pty) Ltd to update their
existing EMP in order to renew their existing Environmental Clearance Certificate. The renewed
environmental clearance certificate is required for operations and construction (refurbishment, care
and maintenance) of their existing fuel retail facility in Outjo. Construction activities will be in line
with the proposed refurbishment included in the initial environmental assessment conducted in 2016
(Faul et al. 2016). The Environmental Management Plan (EMP) provides management options to
ensure impacts of construction and operations are minimised. An EMP is a tool used to take pro-active
action by addressing potential problems before they occur. This should limit the corrective measures
needed, although additional mitigation measures might be included if necessary. The EMP acts as a
stand-alone document, which can be used during the various phases (planning, construction,
operational and decommissioning) of any proposed activity or development. The construction phase
includes the demolition of old infrastructure and the construction activities for the installation of new
underground storage tanks, pumps and spill control infrastructure. All contractors and sub-contractors
taking part in the refurbishment and operations of this facility should be made aware of the contents of
the EMP, so as to plan the relevant activities accordingly in an environmentally sound manner.
The objectives of the EMP are:
� to include all components of construction activities (upgrades / refurbishment, maintenance, etc.)
and operations of the facility;
� to prescribe the best practicable control methods to lessen the environmental impacts associated
with the project;
� to monitor and audit the performance of operational personnel in applying such controls; and
� to ensure that appropriate environmental training is provided to responsible operational personnel.
Multiplex may choose to implement an environmental management system. At the heart of an EMS is
the concept of continual improvement of environmental performance with resulting increases in
operational efficiency, financial savings and reduction in environmental, health and safety risks. An
effective EMS would need to include the following elements:
� A stated environmental policy which sets the desired level of environmental performance;
� An environmental legal register;
� An institutional structure which sets out the responsibility, authority, lines of communication and
resources needed to implement the EMS;
� Identification of environmental, safety and health training needs;
� An environmental program(s) stipulating environmental objectives and targets to be met, and work
instructions and controls to be applied in order to achieve compliance with the environmental
policy; and
� Periodic (internal and external) audits and reviews of environmental performance and the
effectiveness of the EMS.
2 THE EMP The following general guidance for the EMP is based on the findings of the initial EIA and risk
assessment carried out by Geo Pollution Technologies (Faul et al. 2016).
2.1 Land Use, Planning, Design, Operations – Identified Impacts The following is the summary of the identified impacts:
� The current zoning designates the area as suitable for the continued operations of the fuel
retail facility;
� The immediate neighbours constitute mixed land use;
Page 1 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
� The risk of an accident/incident causing fires or explosions is possible. Human factors are still
being considered and the best engineering still goes in to maintaining a very safe facility. If a
fire or explosion was to occur and the necessary engineered structures were not in place there
would be a significant possible impact on the adjoining industrial properties.
2.2 Land Use, Planning, Design, Operations – Mitigating Measures The following is a summary of the proposed Management Plan, which will aid in mitigating /
preventing possible risk related to the operations and construction activities of the facility. The
measures provided has taken into consideration all the risk perceptions raised by all stakeholders
during the initial EIA:
� To prevent product loss through ruptures of pipelines or hose during the offloading operations,
all nozzles on road tankers and storage tanks are fitted with excess flow check valves. These
are designed to allow only specific flow rates and the moment it exceeds this, the process is
stopped. Small quantities lying in the hose that could leak would be captured by spill
containment structures.
� Firefighting equipment are present on site
� The risk of ecological threat and the contamination of soils or groundwater is prevented
through safe work practices, engineered safety devices and spill containment structures.
3 THE IMPLEMENTATION OF THE EMP
3.1 Planning, Construction and Operational Phases Tables 1 to 3 outline the management of the environmental elements that may be affected by the
different activities, grouped in each phase of development. These groups are as follows:
� Planning Phase
� Construction Phase (Care and Maintenance)
� Operational Phase
All monitoring results must be reported on as indicated.
Page 2 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Tab
le 1
.
Pla
nn
ing f
or
Con
stru
ctio
n, O
per
ati
on
s an
d F
utu
re D
ecom
mis
sion
ing o
f th
e P
roje
ct
Act
ivit
y
Ob
ject
ive
Act
ion
T
imin
g
Pro
of
of
Co
mp
lia
nce
R
esp
on
sib
le B
od
y
Co
mp
lia
nce
T
o
com
ply
w
ith
all
leg
al
req
uir
em
ents
fo
r o
per
atio
ns
and
const
ructi
on
acti
vit
ies
of
the
faci
lity
in N
am
ibia
.
Ensu
re
all
nec
essa
ry
per
mit
s fr
om
th
e
var
ious
min
istr
ies,
lo
cal
auth
ori
ties
and
an
y
oth
er b
od
ies
that
go
ver
ns
the
op
erat
ional
and
const
ructi
on a
ctiv
itie
s re
mai
n u
p t
o d
ate.
Fin
alis
e nego
tiat
ions
and
re
solv
e an
y
outs
tand
ing
issu
es,
if
an
y,
over
th
e
allo
cati
on o
f use
r ri
gh
ts a
nd
zo
nin
g o
f th
e
pro
per
ty o
n w
hic
h t
he
acti
vit
y t
akes
pla
ce.
Duri
ng
op
erat
ions
and
p
rio
r to
com
mence
ment
of
refu
rbis
hm
ent
All
co
ntr
acts
, p
erm
its,
cert
ific
ates
and
o
ther
le
gal
do
cum
ents
on f
ile.
Pro
po
nen
t
Ba
seli
ne
Det
erm
ine
bas
elin
e p
oll
uti
on
cond
itio
ns.
Co
llec
t so
il
and
w
ater
sa
mp
les
wher
e
req
uir
ed
and
anal
yse
fo
r ch
em
ical
s o
f
conce
rn.
Duri
ng
op
erat
ions
and
p
rio
r to
com
mence
ment
of
refu
rbis
hm
ent
Anal
ysi
s re
sult
s o
n f
ile
Ind
epen
den
t S
pec
iali
st
Co
nsu
ltant
Ap
po
intm
ents
T
o
appo
int
rep
uta
ble
contr
acto
rs
and
o
per
atio
nal
per
sonnel
an
d
esta
bli
sh
the
EM
P,
a le
gal
re
quir
em
ent
that
form
s p
art
of
the
contr
act
wit
h
the
contr
acto
r an
d e
mp
loyee
s.
Ap
po
int
a co
ntr
acto
r an
d
emp
loyee
s and
ente
r in
to a
n a
gre
em
ent
wh
ich i
ncl
ud
es t
he
EM
P.
Ensu
re
that
th
e co
nte
nts
o
f th
e E
MP
ar
e
und
erst
oo
d
by
the
con
trac
tor,
su
b-
contr
acto
rs,
em
plo
yee
s and
al
l p
erso
nnel
wh
o w
ill
be
pre
sent
on s
ite.
Duri
ng
op
erat
ions
and
p
rio
r to
com
mence
ment
of
refu
rbis
hm
ent
Co
ntr
acts
on f
ile
Pro
po
nen
t; C
ontr
acto
r
Ma
na
gem
ent
Est
abli
sh a
managem
ent
syst
em
to
imp
lem
ent
and
m
onit
or
Hea
lth,
Safe
ty
and
Envir
on
ment.
Mak
e p
rovis
ions
to
hav
e a
Hea
lth,
Saf
ety
and
E
nvir
on
men
tal
Co
ord
inat
or
to
imp
lem
ent
the
EM
P
and
o
ver
see
occ
up
atio
nal
hea
lth
and
sa
fety
as
w
ell
as
gen
eral
envir
on
menta
l re
late
d c
om
pli
ance
at
the
site
.
Hav
e th
e fo
llo
win
g
em
ergen
cy
pla
ns,
equip
ment
and
p
erso
nnel
in
p
lace
to
d
eal
wit
h a
ll e
mer
genci
es:
Ris
k
Managem
ent
/ M
itig
atio
n
/
Envir
on
menta
l M
anagem
ent
Pla
n/
Em
ergency
Res
po
nse
P
lan
and
H
SE
Duri
ng
op
erat
ions
and
p
rio
r to
com
mence
ment
of
refu
rbis
hm
ent
Do
cum
enta
tio
n o
n f
ile
Per
sonal
P
rote
ctio
n
Eq
uip
ment
(PP
E)
on s
ite
Sig
nage
rela
ted
to
rest
rict
ed
area
s, d
anger
ou
s ar
eas,
and
PP
E r
equir
ements
on s
ite
Em
ergency
resp
on
se
mat
eria
l o
n s
ite
Pro
po
nen
t; C
ontr
acto
r
Page 3 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Act
ivit
y
Ob
ject
ive
Act
ion
T
imin
g
Pro
of
of
Co
mp
lia
nce
R
esp
on
sib
le B
od
y
Man
uals
Ad
equat
e
pro
tect
ion
and
in
dem
nit
y
insu
rance
co
ver
fo
r in
cid
ents
;
Co
mp
ly w
ith t
he
pro
vis
ions
of
all
rele
van
t
safe
ty s
tand
ard
s;
Pro
ced
ure
s,
equip
men
t and
m
ater
ials
req
uir
ed f
or
emer
gen
cie
s.
Res
tora
tio
n
Fu
nd
/In
sura
nce
To
es
tab
lish
a
fund
/insu
ran
ce
for
futu
re
env
iro
nm
enta
l
rest
ora
tio
n
or
po
lluti
on
rem
edia
tio
n i
f ev
er r
equir
ed.
To
esta
bli
sh
a fu
nd
fo
r fu
ture
ec
olo
gic
al
rest
ora
tio
n o
f th
e p
roje
ct s
ite
sho
uld
pro
ject
acti
vit
ies
ceas
e and
th
e si
te
is
dec
om
mis
sio
ned
an
d
env
iro
nm
enta
l
rest
ora
tio
n
or
po
lluti
on
rem
edia
tio
n
is
req
uir
ed.
Duri
ng
op
erat
ions
and
p
rio
r to
com
mence
ment
of
refu
rbis
hm
ent
Fin
anci
al
stat
em
ents
o
f
rest
ora
tio
n f
und
/insu
rance
Pro
po
nen
t;
Ind
epen
den
t S
pec
iali
st
Co
nsu
ltant
Rep
ort
ing
T
o e
stab
lish
a r
epo
rtin
g s
yst
em
to r
epo
rt o
n m
onit
ori
ng a
spec
ts
of
con
stru
ctio
n,
op
erat
ion
and
dec
om
mis
sio
nin
g a
s o
utl
ined
in
the
EM
P.
Est
abli
sh
a re
po
rtin
g
syst
em
to
re
po
rt
on
asp
ects
o
f co
nst
ructi
on,
op
erat
ion
and
dec
om
mis
sio
nin
g a
s o
utl
ined
in t
he
EM
P.
Sub
mit
bi-
ann
ual
rep
ort
s to
the
Min
istr
y o
f
Envir
on
ment
and
T
ouri
sm.
Rep
ort
ing
is
req
uir
ed
for
Envir
on
menta
l C
lear
ance
Cer
tifi
cate
ren
ew
al a
pp
lica
tio
ns.
Duri
ng
op
erat
ions
and
ref
urb
ish
men
t as
wel
l as
p
oss
ible
futu
re
dec
om
mis
sio
nin
g
of
the
dev
elo
pm
ent
Mo
nit
ori
ng R
epo
rts
Pro
po
nen
t; C
ontr
acto
r
En
vir
on
men
tal
Cle
ara
nce
Ren
ewa
l
To
re
new
th
e E
nv
iro
nm
enta
l
Cle
aran
ce
Cer
tifi
cate
every
thre
e yea
rs.
Ap
po
int
a sp
ecia
list
en
vir
on
menta
l
consu
ltan
t to
up
dat
e th
e E
IA a
nd
EM
P a
nd
app
ly
for
renew
al
of
the
Envir
on
menta
l
Cle
aran
ce C
erti
fica
te.
Pri
or
to
exp
iry
of
Envir
on
menta
l
Cle
aran
ce C
erti
fica
te
Ren
ew
ed
Env
iro
nm
enta
l
Cle
aran
ce C
erti
fica
te
Pro
po
nen
t;
Ind
epen
den
t S
pec
iali
st
Co
nsu
ltant
Page 4 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Tab
le 2
.
Th
e C
on
stru
ctio
n (
refu
rbis
hm
ent,
care
an
d m
ain
ten
an
ce)
Ph
ase
C
rite
ria
N
atu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
En
ha
nce
d
skil
ls
an
d
tech
no
log
y
tra
nsf
er
to
Ou
tjo
a
nd
su
bse
qu
ent
pro
mo
tio
n
of
eco
no
mic
dev
elo
pm
ent
Peo
ple
nee
d
skil
ls
to
per
form
thei
r jo
bs.
The
tech
no
log
y t
o d
o
som
ethin
g
is
oft
en
no
t fo
und
loca
lly.
Dev
elo
pm
ent
of
peo
ple
and
te
chno
log
y
are
key
to
eco
no
mic
dev
elo
pm
ent.
Co
ntr
acto
rs
must
b
e so
urc
ed
loca
lly
and
lo
cal
busi
nes
ses
sup
po
rted
as
far
as i
s p
ract
ical
ly p
oss
ible
.
Pro
of
of
appoin
tmen
t of
loca
l
contr
acto
rs o
n f
ile.
Pro
po
nen
t
Incr
ease
d
spre
ad
o
f H
IV/
AID
S;
Incr
ease
d i
nfl
ux
to
Ou
tjo
;
Incr
ease
d
info
rm
al
sett
lem
ent
an
d
ass
oci
ate
d
pro
ble
ms;
Red
uce
d
pro
per
ty v
alu
es
New
and
ex
isti
ng
dev
elo
pm
ents
attr
act
peo
ple
w
ho
se
ek
wo
rk.
This
in
tu
rn
can
incr
ease
th
e
exte
nt
of
info
rmal
se
ttle
men
ts
and
its
ass
oci
ated
pro
ble
ms.
The
incr
ease
d
truckin
g
and
dis
trib
uti
on
of
go
od
s fr
om
Outj
o
could
co
ntr
ibute
to
the
spre
ad
of
HIV
/ A
IDS
.
It i
s p
oss
ible
that
thes
e ca
n a
ffec
t
pro
per
ty
pri
ces
in
the
area
dep
end
ing o
n t
he
pro
xim
ity t
o a
resi
den
tial
sit
e.
Ap
po
inti
ng
rep
uta
ble
co
ntr
acto
rs
wh
o
imp
lem
en
t
educa
tio
nal
pro
gra
m o
n H
IV/A
IDS
fo
r all
the
staff
, in
par
ticu
lar
the
tru
ck d
riv
ers,
is
imp
erat
ive.
Rest
ricte
d
em
plo
ym
en
t fo
r lo
cal
p
eo
ple
o
nly
sh
ou
ld
be
pra
cti
ced
. D
ev
iati
on
s fr
om
th
is
pra
ctic
e sh
ould
b
e
just
ifie
d
app
rop
riate
ly.
Tra
inin
g
of
loca
l p
eop
le
sho
uld
be
con
sid
ered
fro
m t
he
star
t. T
hes
e m
eas
ure
s
wil
l re
duce
the
infl
ux o
f new
com
ers
to t
he
tow
n a
nd
ther
eby r
edu
ce g
row
th i
n t
he i
nfo
rmal
sett
lem
en
t an
d
main
tain
pro
per
ty p
rices.
Pro
of
of
appoin
tmen
t of
loca
l
contr
acto
rs o
n f
ile.
Pro
po
nen
t
Em
plo
ym
ent
Co
nst
ruct
ion
acti
vit
ies
oft
en
req
uir
es
the
em
plo
ym
ent
of
conta
cto
rs a
s w
ell
as
em
plo
ym
ent
and
tr
ainin
g
of
staff
fo
r th
e
faci
lity
.
Em
plo
ym
ent
and
co
ntr
acto
rs s
ho
uld
fir
st b
e so
urc
ed
loca
lly,
then r
egio
nall
y a
nd
th
en n
atio
nal
ly.
Devia
tio
ns
fro
m t
his
sho
uld
be
just
ifie
d.
Pro
of
of
appoin
tmen
t of
loca
l
contr
acto
rs o
n f
ile.
Co
ntr
acto
r; P
rop
onen
t
Tra
ffic
T
he
site
is
lo
cate
d
in
Hag
e
Gei
ngo
b
Str
eet
in
Ou
tjo.
Co
nst
ruct
ion a
ctiv
itie
s m
ay h
ave
som
e im
pac
t o
n t
he m
ovem
ent
of
traf
fic
to
the
site
w
hen
const
ruct
ion
mat
eria
l an
d
equip
ment
must
be
tran
spo
rted
to
When
sig
nif
ican
t im
pac
ts o
n t
raff
ic i
s exp
ecte
d (
e.g.
duri
ng d
eliv
ery o
f new
sto
rage
tan
ks
and
mat
eria
ls),
the
contr
acto
r m
ust
li
aise
w
ith
the
rele
van
t tr
aff
ic
dep
artm
ent
to
ensu
re
that
traf
fic
flo
w
alo
ng
the
affe
cte
d r
oute
is
min
imal
ly d
isru
pte
d.
The
pla
cem
ent
of
sign
s to
warn
and
dir
ect
traf
fic
wil
l
mit
igat
e tr
aff
ic i
mp
acts
.
Rece
ive
a w
eek
ly p
lan
nin
g s
heet
from
C
on
trac
tor
to
kno
w
when
traf
fic
auth
ori
ties
and
the g
en
eral
pub
lic
nee
d
to
be
info
rmed
o
f
po
ssib
le o
bst
ructi
on
s
An
y t
raff
ic r
elat
ed i
nci
dents
and
com
pla
ints
re
ceiv
ed
sho
uld
b
e
Co
ntr
acto
r; P
ropo
nen
t
Page 5 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
the
site
.
reco
rded
in a
rep
ort
to
get
her
wit
h
step
s ta
ken
to
m
itig
ate
the
imp
acts
.
Fir
e a
nd
Ex
plo
sio
n
Ha
zard
Co
nst
ruct
ion
acti
vit
ies
nea
r
exis
tin
g
sto
rage
tan
ks
and
fu
el
lines
, as
wel
l as
th
e re
mo
val
ther
eof,
w
hic
h
may
con
tain
resi
dual
fu
el
may
po
se
risk
s o
f
fire
and
exp
losi
on.
All
eq
uip
ment
and
to
ols
must
co
mp
ly w
ith s
tand
ard
s
wh
ich
allo
w
cert
ain
to
ols
an
d
equ
ipm
ent
nea
r
flam
mab
le s
ourc
es.
Saf
ety d
ista
nce
s m
ust
be
adher
ed
to a
s w
ell
as s
afe
wo
rk p
roce
dure
s. S
afe
ty t
alk
s and
job
haza
rd a
nal
ysi
s to
be d
one b
efo
re w
ork
sta
rts.
Fir
efig
hti
ng m
easu
res
as p
er t
he
Mat
eria
l S
afety
Dat
a
Shee
ts o
f th
e p
rod
uct
sho
uld
be
adher
ed t
o.
In a
dd
itio
n t
o t
his
, al
l p
erso
nnel
have
to b
e se
nsi
tise
d
abo
ut
resp
onsi
ble
fi
re p
rote
cti
on m
easu
res
and
go
od
ho
use
kee
pin
g
such
as
the
rem
oval
o
f fl
am
mab
le
mat
eria
ls
incl
ud
ing
rub
bis
h,
dry
veget
atio
n,
and
hyd
roca
rbo
n-s
oaked
so
il
fro
m
the
vic
init
y
of
the
const
ruct
ion.
Regula
r in
spec
tio
ns
sho
uld
be
carr
ied
out
to c
hec
k f
or
thes
e m
ater
ials
at
the
site
.
All
fu
el
sto
rage
and
hand
ling
faci
liti
es
in
Nam
ibia
mu
st c
om
ply
wit
h s
tric
t sa
fety
dis
tance
s as
pre
scri
bed
by S
outh
Afr
ican
Nat
ional
Sta
nd
ard
s (S
AN
S).
SA
NS
is a
do
pte
d b
y t
he
Min
istr
y o
f M
ines
and
Ener
gy a
s th
e
nat
ional
sta
nd
ard
. If
the
sett
ing-o
ut
of
the
site
and
the
safe
ty d
ista
nce
s to
the
nea
rest
ad
jace
nt
pro
per
ty w
ere
adher
ed t
o,
then
an
y d
evel
op
men
t ca
n b
e sa
fely
buil
t
on
the
neig
hb
ouri
ng
p
roper
ty.
It
is
spec
ific
ally
app
rop
riat
e to
co
mp
ly
wit
h
thes
e st
and
ard
s,
as
Mult
iple
x h
as n
o c
ontr
ol
on t
he
futu
re p
lace
ment
of
faci
liti
es a
rou
nd
the
facil
ity.
It m
ust
be
assu
red
that
suff
icie
nt
fire
fig
hti
ng r
eso
urc
es
are
avai
lab
le.
A h
oli
stic
fir
e p
rote
ctio
n a
nd
pre
ven
tio
n
pla
n
is
nee
ded
. T
his
ho
list
ic
pla
n
must
in
clud
e an
em
ergency
resp
onse
p
lan
an
d
fire
fig
hti
ng
pla
n.
Reg
ula
r su
rveys
of
the
fire
-fig
hti
ng
equip
ment
and
wat
er s
up
ply
sho
uld
be
carr
ied o
ut.
Exp
erie
nce
has
sho
wn t
hat
th
e b
est
chan
ce t
o r
apid
ly
Sup
erv
isio
n o
f w
ork
is
req
uir
ed
and
re
po
rts
of
safe
and
u
nsa
fe
pra
cti
ce
to
be
bro
ug
ht
to
the
atte
nti
on
of
the
HS
E.
An
y in
cid
en
ts re
po
rted
m
ust
b
e
reco
rded
to
get
her
w
ith
step
s
taken
to
mit
igat
e th
e im
pac
ts.
All
info
rmat
ion
and
rep
ort
ing t
o
be
incl
ud
ed i
n a
rep
ort
.
Co
ntr
acto
r; P
rop
on
en
t
Page 6 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
put
out
a m
ajo
r fi
re is
in
th
e fi
rst
5
min
ute
s. It
is
imp
ort
ant
to
reco
gnis
e th
at
a re
spo
nsi
ve
fire
pre
ven
tio
n p
lan d
oes
no
t so
lely
incl
ud
e th
e avai
lab
ilit
y
of
fire
fi
gh
tin
g eq
uip
men
t,
but
mo
re im
po
rtan
tly,
it
invo
lves
p
rem
edit
ated
m
easu
res
and
ac
tiv
itie
s to
tim
eou
sly p
revent,
curb
and
avo
id c
ond
itio
ns
that
may
resu
lt
in
fire
s.
An
inte
gra
ted
fi
re
pre
ven
tio
n
pla
n
sho
uld
be
dra
fted
bef
ore
co
nst
ruct
ion c
om
mence
.
Hea
lth
, S
afe
ty
an
d S
ecu
rit
y
Duri
ng
const
ruct
ion
acti
vit
ies,
const
ruct
ion p
erso
nnel
wil
l ac
cess
the
site
. E
xca
vat
ion,
eart
hm
ovin
g
and
tr
ansp
ort
eq
uip
men
t m
ay b
e
req
uir
ed.
This
in
crea
ses
the
po
ssib
ilit
y o
f in
juri
es.
A ri
sk to
site
sec
uri
ty a
nd
per
sonnel
hea
lth
and
sa
fety
ex
ists
d
uri
ng
this
per
iod
.
Th
e r
esp
on
sib
le c
on
tracto
r m
ust
en
sure
th
at
all
sta
ff
mem
bers
are
b
riefe
d
abo
ut
the
po
ten
tial
risk
s o
f
inju
ries
on
sit
e.
Th
e C
on
tracto
r sh
ou
ld b
e o
bli
ged
to
ad
here
to
th
e
foll
ow
ing
:
�
All
Healt
h a
nd
Safe
ty s
tan
dard
s sp
ecif
ied
in
th
e
Lab
ou
r A
ct;
�
Sele
cte
d p
ers
on
nel
sho
uld
be
train
ed
in
fir
st a
id
an
d
a
firs
t aid
k
it
mu
st
be
av
ail
ab
le
on
si
te.
Ad
eq
uate
em
erg
en
cy
fa
cil
itie
s an
d
the
co
nta
ct
deta
ils
of
all
em
erg
en
cy s
erv
ices
mu
st b
e r
ead
ily
av
ail
ab
le;
�
Pro
vid
e
all
em
plo
yees
wit
h
req
uir
ed
an
d
ad
eq
uate
per
son
al
pro
tecti
ve e
qu
ipm
en
t (P
PE
).
�
In
co
nsu
ltati
on
w
ith
th
e
Ou
tjo
T
raff
ic
Dep
art
men
t p
rep
are
an
d
sub
mit
a
traff
ic
man
ag
em
en
t p
rog
ram
me
for
secti
on
s o
f th
e
road
s to
be c
lose
d o
r tr
aff
ic d
ivert
ed
if
necess
ary
du
rin
g t
he d
eli
very
of
eq
uip
men
t;
�
Eq
uip
men
t th
at
are
lo
ck
ed
aw
ay o
n s
ite m
ust
be
pla
ced
in
a w
ay t
hat
do
es
no
t en
co
ura
ge c
rim
inal
acti
vit
ies;
�
Ind
uct
ion
tra
inin
g f
or
con
tact
ors
or
staf
f o
per
atin
g
on t
he
site
is
req
uir
ed;
and
�
Sec
uri
ty p
erso
nnel
to
pre
ven
t u
nau
tho
rise
d e
ntr
y
of
the
con
stru
ctio
n s
ite.
Ref
er to
th
e S
AN
S d
ocu
ment,
M
ater
ial
Safe
ty D
ata
A r
egis
ter
of
all
inci
den
ts m
ust
be
mai
nta
ined
. T
his
sh
ould
in
clude
mea
sure
s ta
ken
to e
nsu
re t
hat
such
inci
den
ts d
o n
ot
repea
t it
self
.
Fir
st a
id a
nd f
iref
ighti
ng t
rain
ing
cert
ific
ates
on f
ile.
All
in
form
ati
on a
nd
rep
ort
ing t
o
be
incl
ud
ed i
n a
rep
ort
.
Co
ntr
acto
r; P
rop
on
en
t
Page 7 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
Shee
ts (
MS
DS
) an
d m
anagem
ent
syst
em
man
ual
s.
Un
der
gro
un
d
Uti
liti
es
If
any
exca
vat
ions
are
req
uir
ed
for
const
ruct
ion
acti
vit
ies,
und
ergro
und
uti
liti
es
like
tele
com
munic
atio
ns,
wat
er s
up
ply
and
se
wer
s ar
e at
ri
sk
of
bei
ng
dam
aged
.
Thes
e im
pac
ts
may
re
sult
in
sect
ions
of
Outj
o
bei
ng
left
wit
ho
ut
amen
itie
s.
Ap
po
inti
ng
q
uali
fied
an
d
rep
uta
ble
co
ntr
acto
rs
is
ess
en
tial.
P
rop
er tr
ain
ing
o
f co
nst
ructi
on
p
ers
on
nel
wo
uld
red
uce t
he p
oss
ibil
ity o
f th
e i
mp
act
occu
rrin
g.
Th
e
con
tracto
r m
ust
d
ete
rmin
e
ex
actl
y
wh
ere
am
en
itie
s an
d
pip
eli
nes
are
si
tuate
d
befo
re
co
nst
ructi
on
co
mm
en
ces
(uti
lity
cle
ara
nce
e.g
.
gro
un
d p
en
etr
ati
ng
rad
ar s
urv
eys)
. L
iais
on
wit
h t
he
To
wn
Co
un
cil
an
d s
up
pli
ers
of
serv
ices
is e
ssen
tial.
Em
erg
en
cy
pro
ced
ure
s an
d
co
nta
ct
deta
ils
of
em
erg
en
cy
resp
on
se
team
s fo
r d
eali
ng
w
ith
th
e
po
ssib
le
con
seq
uen
ces
of
this
im
pact
mu
st
be
in
pla
ce b
efo
re c
on
stru
cti
on
co
mm
en
ce.
Map
s an
d l
oca
tion i
nfo
rmat
ion o
f
exis
ting u
nder
gro
und a
men
itie
s o
n
file
.
A r
egis
ter
of
all
inci
den
ts m
ust
be
mai
nta
ined
. T
his
sh
ould
in
clude
mea
sure
s ta
ken
to e
nsu
re t
hat
such
inci
den
ts d
o n
ot
repea
t it
self
.
All
in
form
ati
on a
nd
rep
ort
ing t
o
be
incl
ud
ed i
n a
rep
ort
.
Co
ntr
acto
r; P
rop
on
en
t
No
ise
N
ois
e p
oll
uti
on
may
exis
t if
hea
vy
vehic
les
is
req
uir
ed
for
const
ruct
ion
acti
vit
ies.
A
ud
ible
war
nin
g no
ises
fro
m eq
uip
men
t.
Co
mp
acti
on,
cem
ent
mix
ing,
dri
llin
g
and
ex
cavat
ing
may
b
e
req
uir
ed,
this
w
ill
furt
her
contr
ibute
to
no
ise
po
llu
tio
n.
Fo
llo
w W
orl
d H
ealt
h O
rganiz
atio
n (
WH
O)
guid
elin
es
on m
axim
um
no
ise
level
s (G
uid
elin
es
for
Co
mm
un
ity
No
ise,
19
99
) to
pre
ven
t hea
rin
g i
mp
airm
ent.
Co
nst
ruct
ion
wo
rker
s to
b
e is
sued
w
ith
hea
rin
g
pro
tect
ion w
her
e nee
ded
.
A
com
pla
ints
re
gis
ter
must
be
mai
nta
ined
in
w
hic
h
any
com
pla
ints
fr
om
th
e co
mm
unit
y
must
be
logged
. C
om
pla
ints
must
be
inves
tigat
ed a
nd, if
appro
pri
ate,
acte
d u
po
n.
All
in
form
atio
n and
re
po
rtin
g to
be
incl
ud
ed i
n a
rep
ort
.
Co
ntr
acto
r; P
rop
on
en
t
Wast
e
Pro
du
cti
on
Th
e
abil
ity
of
pro
du
cts
an
d
bu
ild
ing
ru
bb
le t
o a
ct
as
a w
ast
e
wh
ich
m
ust
b
e
cle
an
ed
u
p
or
rem
ov
ed
off
-sit
e.
Co
nst
ruct
ion
acti
vit
ies
at
the
faci
lity
may p
rod
uce
was
te i
n t
he
form
of
do
mest
ic w
aste
, b
uil
din
g
rub
ble
o
r an
y
oth
er
was
te
as
a
resu
lt o
f sp
illa
ge
or
leakag
e f
rom
clea
nin
g a
nd
pai
nti
ng m
ater
ials
.
An
y
soil
/
wast
e co
nta
min
ated
hyd
roca
rbo
ns
that
m
ay
be
enco
unte
red
d
uri
ng
th
e
Was
te r
educt
ion m
easu
res
sho
uld
be
imp
lem
ente
d a
nd
all
was
te t
hat
can b
e re
-use
d /
rec
ycl
ed m
ust
be
kep
t
sep
arat
e.
Ensu
re
adeq
uat
e d
isp
osa
l st
ora
ge
faci
liti
es
are
avai
lab
le t
hat
ensu
res
was
te c
anno
t b
e b
low
n a
way b
y
win
d a
nd
pre
vent
scav
en
gin
g (
hu
man a
nd
no
n-h
um
an)
of
wast
e st
ora
ge.
Was
te
sho
uld
b
e d
isp
ose
d
of
regula
rly
and
at
app
rop
riat
ely
clas
sifi
ed
dis
po
sal
faci
liti
es,
th
is
incl
ud
es
haz
ard
ous
mat
eria
l (e
mp
ty
chem
ical
conta
iner
s, and
o
ther
co
nta
min
ated
m
ate
rial
su
ch as
conta
min
ated
ru
gs,
pap
er w
ater
and
so
il).
Reg
ula
r vis
ual
insp
ecti
on.
A
regis
ter
of
haz
ardo
us
was
te
pro
duce
d
and
dis
posa
l m
ethods
sho
uld
be
mai
nta
ined
.
All
in
form
atio
n an
d re
port
ing to
be
incl
uded
in a
rep
ort
.
Co
ntr
acto
r; P
rop
on
en
t
Page 8 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
const
ruct
ion
phas
e sh
ould
b
e
trea
ted
as
haz
ard
ous
was
te.
Haz
ard
ous
wast
e m
ay n
ot
be
mix
ed w
ith o
ther
was
te
stre
am
s an
d s
ho
uld
be
dis
po
sed
of
as h
azar
do
us
was
te
at a
n a
pp
rop
riat
ely c
lass
ifie
d f
acil
ity.
See
th
e m
ater
ial
safe
ty
dat
a sh
eets
av
aila
ble
fr
om
sup
pli
ers
for
dis
po
sal
of
con
tam
inat
ed p
rod
uct
s and
em
pty
co
nta
iner
s.
The
spil
l ca
tch
ment
trap
s an
d
oil
w
ater
se
par
ato
r
sho
uld
b
e cl
eaned
re
gula
rly
an
d
wast
e d
isp
ose
d
of
app
rop
riat
ely.
Surf
acta
nts
(so
ap)
may n
ot
be
allo
wed
to e
nte
r th
e o
il w
ater
sep
arat
or
Lia
ise
wit
h t
he
mu
nic
ipal
ity r
egar
din
g w
aste
dis
po
sal
and
han
dli
ng o
f haz
ard
ous
wast
e.
Sp
ille
d
hyd
roca
rbo
ns
may
no
t b
e w
ash
ed
off
th
e
fore
court
are
a usi
ng s
urf
acta
nts
lik
e so
ap.
Surf
acta
nts
wil
l ca
use
th
e o
il/w
ater
se
par
ato
r to
m
alfu
ncti
on
lead
ing t
o h
yd
roca
rbo
ns
ente
ring t
he
sew
ers.
Gro
un
dw
ate
r,
Su
rface
W
ate
r
an
d
Soil
Co
nta
min
ati
on
Po
rous
surf
ace
sub
stra
te
can
allo
w
un
wante
d
haz
ard
ous
and
eco
logic
ally
d
etri
menta
l
sub
stance
s to
se
ep
do
wn
to
the
wat
er ta
ble
ei
ther
at
the
site
o
f
spil
l o
r af
ter
bei
ng w
ashed
aw
ay
by s
urf
ace
flo
w.
Lea
kag
es
fro
m e
xis
tin
g t
anks
and
pip
elin
es
and
co
nst
ructi
on
veh
icle
s, a
ccid
enta
l sp
ills
of
fuel
,
pai
nts
and
oth
er c
hem
ical
s m
igh
t
occ
ur.
Gro
und
wat
er m
ight
spre
ad
po
lluta
nts
to
nei
ghb
ou
ring
rece
pto
rs
and
m
ay
crea
te
an
imp
act
on
und
ergro
und
infr
astr
uct
ure
.
All
p
reca
uti
on
s ar
e to
b
e ta
ken
to
p
reven
t
conta
min
atio
n
of
the
soil
as
this
co
uld
ente
r th
e
eco
syst
em
.
Ap
po
inti
ng
quali
fied
an
d
rep
uta
ble
co
ntr
acto
rs
is
esse
nti
al.
Pro
per
tr
ainin
g
of
const
ruct
ion
per
son
nel
wo
uld
red
uce
the
po
ssib
ilit
y o
f th
e im
pac
t o
ccurr
ing.
An
y s
pil
l o
f fu
el
of
20
0l
or
mo
re m
ust
be
rep
ort
ed t
o
the
Min
istr
y o
f M
ines
and
Energ
y a
nd
rem
edia
tio
n
acti
on t
aken.
Po
llute
d s
oil
and
buil
din
g r
ub
ble
must
be
tran
spo
rted
aw
ay
fro
m
the
site
to
an
app
roved
, ap
pro
pri
atel
y
clas
sifi
ed
wast
e d
isp
osa
l si
te.
Po
llute
d
soil
ca
n
be
rem
edia
ted
.
Co
nfi
rm
MS
DS
in
form
atio
n
for
any
fuel
s,
oil
s,
lub
rica
nts
or
chem
ical
s th
at m
ust
be
dis
card
ed.
A
soil
p
oll
uti
on
bas
elin
e st
ud
y
mu
st
be
carr
ied
o
ut
befo
re
const
ruct
ion
on
the
site
s
com
mence
. If
po
lluti
on i
s p
rese
nt
a cl
ean-u
p a
nd
rem
edia
tio
n p
lan
mu
st b
e est
abli
shed
. T
he
bas
eli
ne
wil
l al
low
ass
ess
ment
and
com
par
iso
n
of
the
cond
itio
n
of
soil
su
bst
rate
d
uri
ng o
per
atio
nal
and
af
ter
dec
om
mis
sio
nin
g
phas
es.
Rep
ort
fo
rm
for
all
spil
ls
or
leak
s d
uri
ng
c
on
str
uc
tio
n is
to
be
com
ple
ted
b
y
Co
ntr
acto
r
and
su
bm
itte
d
to
the
HS
E
dep
art
men
t.
All
info
rmat
ion
and
rep
ort
ing t
o
be
incl
ud
ed i
n a
rep
ort
.
Co
ntr
acto
r;
Pro
po
nen
t;
Ind
ep
en
den
t S
pecia
list
Co
nsu
ltan
t
Page 9 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
iga
tio
n
Mo
nit
ori
ng
R
esp
on
sib
le B
od
y
Cu
mu
lati
ve
Imp
act
Po
ssib
le
cum
ula
tive
imp
acts
asso
ciat
ed
wit
h
the
op
erat
ional
phas
e in
clud
e in
crea
sed
tra
ffic
in
the
area
. T
his
w
ill
have
a
cum
ula
tive
imp
act
on t
raff
ic f
low
on s
urr
ou
nd
ing s
tree
ts
Ad
dre
ssin
g e
ach o
f th
e in
div
idual
im
pac
ts a
s d
iscu
ssed
and
re
com
mend
ed
in
the
EM
P
wo
uld
re
duce
th
e
cum
ula
tive
imp
act.
Rev
iew
ing
bia
nn
ual
re
po
rts
for
any
new
o
r re
-
occ
urr
ing
im
pac
ts
or
pro
ble
ms
wo
uld
ai
d
in
iden
tify
ing c
um
ula
tive
imp
acts
and
hel
p i
n p
lan
nin
g i
f
the
exis
tin
g m
itig
atio
ns
are
insu
ffic
ient
Bi-
annual
rep
ort
s b
ased
o
n
all
imp
acts
w
ill
giv
e an
overa
ll
asse
ssm
ent
of
the im
pac
t o
f th
e
const
ruct
ion p
hase
.
Page 10 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Tab
le 3
. T
he
Op
erati
on
al
Ph
ase
C
rite
ria
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
Sk
ills
,
Tec
hn
olo
gy
a
nd
Dev
elo
pm
ent
Duri
ng
th
e o
per
ati
on
al
phase
tra
inin
g i
s
pro
vid
ed
to
a p
ort
ion o
f th
e w
ork
forc
e
to
be
able
to
m
ain
tain
an
d
op
erat
e
vari
ou
s fe
atu
res
of
a f
uel
reta
il f
acil
ity
acco
rdin
g
to
the
req
uir
ed
stan
dar
ds.
Skil
ls
are
tr
an
sfer
red
to
an
u
nsk
ille
d
wo
rkfo
rce
for
gen
eral
task
s.
The
tech
no
log
y
req
uir
ed
for
the
develo
pm
en
t o
f th
e fa
cili
ty i
s o
ften n
ew
to
the
local
in
du
stry
, ai
din
g
in
op
erati
on
al e
ffic
iency.
Develo
pm
ent
of
peo
ple
an
d
tech
no
log
y
are
key
to
eco
no
mic
dev
elo
pm
en
t.
Skil
ls d
evel
op
ment
and
im
pro
vem
ent
pro
gra
ms
to b
e m
ade
avai
lab
le a
s id
enti
fied
duri
ng p
erfo
rmance
ass
essm
ents
.
Em
plo
yee
s to
b
e in
form
ed
abo
ut
par
amet
ers
and
req
uir
em
ents
fo
r re
fere
nce
s up
on e
mp
loym
ent.
The
pro
po
nen
t m
ust
em
plo
y
Nam
ibia
ns
wh
ere
po
ssib
le.
Dev
iati
ons
fro
m
this
p
ract
ise
sho
uld
b
e ju
stif
ied
app
rop
riat
ely.
Rec
ord
sh
ould
be
kep
t of
trai
nin
g p
rovid
ed.
Ensu
re
that
al
l tr
ainin
g
is
cert
ifie
d
or
man
ager
ial
refe
rence
pro
vid
ed
(pro
of
pro
vid
ed
to
the
emplo
yee
s)
incl
usi
ve
of
trai
nin
g
atte
ndan
ce,
com
ple
tion
and
imple
men
tati
on.
.
Pro
po
nen
t
Dem
og
rap
hic
Pro
file
a
nd
Co
mm
un
ity
Hea
lth
New
and
ex
isti
ng d
evel
op
ments
at
trac
t
peo
ple
who
see
k w
ork
. T
his
in t
urn
can
incr
ease
th
e exte
nt
of
info
rmal
sett
lem
ents
and
its
ass
oci
ated
pro
ble
ms.
It
is
po
ssib
le
that
th
ese
can
aff
ect
pro
per
ty p
rice
s in
the
area
dep
end
ing o
n
the
pro
xim
ity t
o a
res
iden
tial
sit
e.
The
truck
ing a
nd
dis
trib
uti
on
of
fuel
to
Outj
o c
ould
co
ntr
ibute
to
the s
pre
ad o
f
HIV
/ A
IDS
.
Res
tric
ted
em
plo
ym
ent
for
Outj
o r
esid
ents
only
sho
uld
be
pra
ctic
ed.
Dev
iati
ons
fro
m t
his
pra
ctic
e sh
ould
be
just
ifie
d
app
rop
riat
ely.
Tra
inin
g o
f lo
cal
peo
ple
sho
uld
be
consi
der
ed
fro
m th
e st
art.
T
hes
e m
easu
res
wil
l re
duce
th
e in
flu
x o
f
new
com
ers
to t
he
tow
n a
nd
ther
eby r
educe
gro
wth
in t
he
info
rmal
set
tlem
ent
and
mai
nta
in p
rop
erty
pri
ces
.
Fac
ilit
y in
spec
tion sh
eet
for
all
area
s w
hic
h m
ay p
rese
nt
envir
onm
enta
l hea
lth
risk
s,
kep
t on f
ile.
Rep
ort
bas
ed o
n e
duca
tional
pro
gra
mm
es
and
trai
nin
g
conduct
ed.
Rep
ort
an
d
revie
w
of
emplo
yee
dem
ogra
phic
s.
.
Pro
po
nen
t
Em
plo
ym
ent
An i
ncr
ease
of
skil
led
and
pro
fess
ional
lab
our
has
an
d
wil
l co
nti
nue
to
take
pla
ce
due
to
the
op
erat
ions
of
the
faci
lity
.
The
pro
po
nen
t m
ust
em
plo
y
loca
l N
am
ibia
ns
wh
ere
po
ssib
le.
If t
he
skil
ls e
xis
t lo
call
y,
em
plo
yee
s m
ust
fir
st b
e so
urc
ed
fro
m t
he
tow
n,
then
the
regio
n a
nd
then
nat
ional
ly.
Dev
iati
ons
fro
m t
his
pra
ctic
e m
ust
be
just
ifie
d
Su
mm
ary
rep
ort
b
ased
on
emplo
yee
rec
ord
s.
Pro
po
nen
t
Sec
ure
F
uel
Su
pp
ly
The
op
erat
ion o
f th
e f
acil
ity w
ill
aid
in
secu
ring f
uel
sup
ply
to
lo
cals
, tr
avel
lers
and
the
tran
spo
rt i
nd
ust
ry.
Reg
ula
r ta
nk d
ips
and
fuel
vo
lum
e re
conci
liat
ion t
o e
nsu
re
fuel
is o
rder
ed b
efo
re i
t is
dep
lete
d.
Pla
n i
n a
dvance
fo
r p
eak t
ouri
st s
easo
ns
and
ho
lid
ays
when
Fuel
vo
lum
e re
conci
liat
ion
s
on f
ile.
Pro
po
nen
t
Page 11 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
the
dem
and
fo
r fu
el i
ncr
ease
.
Tra
ffic
T
he
site
is
lo
cate
d
in
Hag
e G
eingo
b
Str
eet
in O
utj
o in
a
busi
nes
s la
nd
u
se
area
. T
raff
ic
to
the
fuel
re
tail
fa
cili
ty
wil
l var
y
wit
h
fluct
uat
ion
s in
fu
el
dem
and
and
p
oss
ibly
fo
llo
win
g
anno
unce
ments
of
fuel
pri
ce i
ncr
ease
s.
Veh
icle
s fu
elle
d
are
exp
ecte
d
to
be
smal
l to
m
ediu
m
size
d ca
rs an
d so
me
larg
er t
ruck
s.
Duri
ng p
erio
ds
of
incr
ease
d f
uel
dem
and
such a
s p
rio
r to
fuel
pri
ce
incr
ease
s an
d
in
pea
k
touri
st
seas
on
eno
ug
h
atte
nd
ants
m
ust
b
e o
n
duty
to
p
reven
t ca
rs
wai
ting
for
refu
elli
ng a
nd
po
tenti
all
y c
ausi
ng t
raff
ic i
mp
acts
.
An
y
com
pla
ints
re
ceiv
ed
regar
din
g
traf
fic
issu
es
sho
uld
be
reco
rded
to
get
her
wit
h a
ctio
n t
aken
to
pre
vent
imp
acts
fr
om
re
pea
tin
g
itse
lf.
A
rep
ort
sh
ould
b
e
com
pil
ed
of
all
inci
den
ts
rep
ort
ed,
com
pla
ints
rece
ived
, an
d a
ctio
n t
aken.
Pro
po
nen
t
Fir
e a
nd
Ex
plo
sion
Ha
zard
Pro
duct
s kep
t o
n s
ite
are
flam
mab
le a
nd
ther
efo
re a
fir
e ri
sk e
xis
ts.
The
foll
ow
ing c
ontr
ols
are
typ
ical
mea
sure
s fo
r m
itig
atin
g
the
thre
at o
f sp
illa
ge
of
haz
ard
ous
chem
ical
s and
po
ssib
le
fire
outb
reak
:-
�
A
ho
list
ic
fire
p
rote
ctio
n
and
p
reven
tio
n
pla
n
is
nee
ded
. T
his
p
lan
mu
st
incl
ud
e an
em
ergen
cy
resp
onse
p
lan,
fire
fig
hti
ng
pla
n
and
sp
ill
reco
ver
y
pla
n.
�
Sp
ecia
l no
te
mu
st
be
tak
en
of
the
reg
ula
tio
ns
stip
ula
ted
in
se
ctio
ns
47
an
d
48
o
f th
e P
etro
leu
m
Pro
duct
s an
d E
ner
gy A
ct,
19
90
(A
ct N
o.
13
of
199
0).
�
Mai
nta
in f
irefi
ghti
ng e
quip
men
t, g
oo
d h
ou
sekee
pin
g
and
p
erso
nnel
tr
ainin
g (f
irefi
ghti
ng,
fire
p
reven
tio
n
and
res
po
nsi
ble
ho
use
kee
pin
g p
ract
ices
).
Fir
e F
igh
tin
g a
nd
Fir
e P
reve
nti
on
:
�
Ensu
re a
ll c
hem
ical
s ar
e st
ore
d a
cco
rdin
g t
o M
SD
S
and
SA
NS
inst
ruct
ions.
�
Mai
nta
in
reg
ula
r si
te,
mec
han
ical
and
el
ectr
ical
insp
ecti
ons
and
mai
nte
nance
.
�
Cle
an a
ll s
pil
ls /
lea
ks.
�
Sp
ecia
l no
te
mu
st
be
tak
en
of
the
reg
ula
tio
ns
stip
ula
ted
in
se
ctio
ns
47
an
d
48
o
f th
e P
etro
leu
m
Pro
duct
s an
d E
ner
gy A
ct,
19
90
(A
ct N
o.
13
of
199
0).
�
Fo
llo
w
SA
NS
st
and
ard
s fo
r o
per
atio
n
and
A
regis
ter
of
all
inci
den
ts
mu
st
be
mai
nta
ined
o
n
a
dai
ly
bas
is.
This
sh
ould
incl
ud
e m
easu
res
taken
to
ensu
re
that
su
ch
inci
den
ts
do
no
t re
pea
t th
em
selv
es.
A r
epo
rt s
ho
uld
be
com
pil
ed
of
all
inci
dents
re
po
rted
.
The
repo
rt
sho
uld
co
nta
in
dat
es w
hen fi
re d
rill
s w
ere
cond
uct
ed
and
w
hen
fi
re
equip
ment
was
te
sted
an
d
trai
nin
g g
iven
Pro
po
nen
t
Page 12 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
mai
nte
nance
of
the
faci
lity
.
�
All
dis
pen
sers
mu
st b
e eq
uip
ped
wit
h d
evic
es t
hat
cut
fuel
sup
ply
duri
ng f
ires
.
�
The
pro
po
nen
t sh
ould
li
aise
w
ith
the
loca
l F
ire
Bri
gad
e to
ensu
re t
hat
all
fir
e re
quir
em
ents
are
met
.
This
inclu
des
, b
ut
is n
ot
lim
ited
to
SA
NS
10
40
0 T
:
20
11
.
Hea
lth
, S
afe
ty
an
d S
ecu
rity
Duri
ng o
per
atio
nal
tim
es a
ll p
roce
dure
s
for
off
load
ing,
sto
rage
and
dis
pen
sing o
f
fuel
pre
sents
ri
sks
to
em
plo
yee
s and
clie
nts
. T
hes
e ri
sks
are
ass
ess
ed i
n t
erm
s
of
the
pre
dic
ted
im
pac
t if
re
alis
ed.
Typ
ical
exam
ple
s ar
e:-
�
Bre
athin
g i
n e
xce
ssiv
e fu
mes
�
Sli
pp
ing o
n w
et s
urf
aces
�
Pro
duct
co
nta
ct
wit
h
eyes
and
skin
�
Sta
ff
no
t w
eari
ng
pro
tect
ive
clo
thin
g
�
Car
cino
genic
eff
ects
o
f so
me
pet
role
um
pro
duct
s
All
Healt
h a
nd
Safe
ty s
tan
dard
s sp
ecif
ied
in
th
e L
ab
ou
r
Act
sho
uld
be c
om
pli
ed
wit
h.
Imp
lem
en
t an
d m
ain
tain
an
in
teg
rate
d h
ealt
h an
d sa
fety
man
ag
em
en
t sy
stem
, to
act
as a
mo
nit
ori
ng
an
d m
itig
ati
ng
too
l, w
hic
h i
nclu
des:
-
�
Op
erat
ional
and
pro
ced
ura
l m
anual
s
�
Hea
lth a
nd
saf
ety t
rain
ing
�
Ho
use
kee
pin
g r
ule
s
�
Co
lour
cod
ing a
reas
, p
ipes
, eq
uip
ment
and
sub
stance
s
�
Sig
nage
for
per
sonal
p
rote
ctiv
e eq
uip
ment
(e.g
.
pro
tect
ive
clo
thin
g l
ike
safe
ty b
oo
ts a
nd
har
d h
ats)
�
Saf
e w
ork
pro
ced
ure
s an
d p
erm
its
to w
ork
�
Cle
ara
nce c
erti
fica
tes
for
con
fined
sp
aces
�
Em
ergency r
esp
on
se p
lan
s
�
Mat
eria
l S
afet
y D
ata
Shee
ts (
MS
DS
)
�
Fir
st a
id t
reat
ment
and
tra
inin
g
�
Med
ical
pro
ced
ure
s an
d e
mer
gen
cy s
ervic
es
�
Dai
ly s
afe
ty m
om
ents
and
/or
dri
lls
Imp
lem
en
tati
on
of
main
ten
an
ce r
eg
iste
r fo
r all
eq
uip
men
t
an
d f
uel/
hazard
ou
s su
bst
an
ce s
tora
ge a
reas.
Th
e
MS
DS
g
ive
healt
h
rela
ted
m
ed
ical
resp
on
ses
for
pers
on
nel
ass
isti
ng
sta
ff w
ho
are
ex
po
sed
to
th
e f
uels
.
An
y
inci
den
ts
must
b
e
reco
rded
w
ith
acti
on
taken
to
pre
ven
t fu
ture
occ
urr
ence
s.
A r
epo
rt s
ho
uld
be
com
pil
ed
of
all
inci
den
ts r
epo
rted
. T
he
repo
rt
sho
uld
co
nta
in
dat
es
when
tr
ainin
g
wer
e
cond
uct
ed an
d w
hen
sa
fety
equip
men
t an
d
stru
cture
s
wer
e in
spec
ted
an
d
mai
nta
ined
.
Pro
po
nen
t
Nois
e N
ois
e p
oll
uti
on w
ill
exis
t d
ue
to v
ehic
les
acce
ssin
g
the
site
to
o
fflo
ad
fuel
o
r
refu
el.
Fo
llo
w
Wo
rld
H
ealt
h
Org
an
izat
ion
(WH
O)
guid
elin
e o
n
max
imu
m n
ois
e le
vels
(G
uid
elin
es f
or
Co
mm
un
ity N
ois
e,
19
99)
to p
reven
t hea
rin
g i
mp
air
men
t.
All
mac
hin
ery m
ust
be
reg
ula
rly s
ervic
ed t
o e
nsu
re m
inim
al
no
ise
pro
duct
ion.
WH
O G
uid
elin
es.
Mai
nta
in
a co
mp
lain
ts
regis
ter.
Rep
ort
o
n
com
pla
ints
an
d
acti
ons
taken
to
ad
dre
ss
Pro
po
nen
t; C
ontr
acto
rs
Page 13 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
Kee
p v
olu
me
of
pub
lic
add
ress
syst
em
s o
n a
lev
el w
her
e
nei
ghb
ours
are
no
t im
pac
ted
.
Man
age
no
ise
cause
d b
y c
lients
– l
oud
mu
sic
etc.
com
pla
ints
an
d
pre
ven
t
futu
re o
ccurr
ence
s.
Air
Qu
ali
ty
Fuel
vap
ours
ar
e re
leas
ed
into
th
e ai
r
duri
ng re
fuel
lin
g o
f b
ulk
st
ora
ge
tank
s
as
wel
l as
at
fi
llin
g
po
ints
. P
rolo
nged
exp
osu
re m
ay h
ave
carc
ino
genic
eff
ects
.
Dust
m
ay
be
gener
ated
sh
ould
an
y
const
ruct
ion t
ake
pla
ce
Per
sonnel
iss
ued
w
ith a
pp
rop
riat
e m
ask
s w
her
e ex
cess
ive
vap
ours
are
pre
sent.
Em
plo
yee
s sh
ou
ld
be
coac
hed
o
n
the
dan
ger
s o
f fu
el
vap
ours
.
Ven
t p
ipes
m
ust
b
e p
roper
ly
pla
ced
as
p
er
SA
NS
req
uir
em
ents
.
An
y
com
pla
ints
re
ceiv
ed
regar
din
g
exce
ssiv
e fu
el
vap
ours
sho
uld
be
reco
rded
wit
h n
ote
s o
n a
ctio
n t
aken.
All
in
form
atio
n
and
rep
ort
ing t
o b
e in
clud
ed i
n a
rep
ort
Pro
po
nen
t; C
ontr
acto
rs
Wa
ste
Pro
du
ctio
n
Wast
e
is
pro
du
ced
d
uri
ng
n
orm
al
op
erati
on
s.
Th
ese
can
b
e
soil
s th
at
beco
me
co
nta
min
ate
d
wit
h
fuel,
do
mest
ic w
ast
e f
rom
bin
s, o
ffic
es
an
d
ab
luti
on
fa
cil
itie
s.
Co
nta
min
ati
on
o
f
fuel
thro
ug
h
accid
en
tal
mix
ing
o
f
pro
du
cts
resu
lts
in h
azard
ou
s w
ast
e.
An
y
co
nta
min
ate
d
mate
rial
(so
ils,
bu
ild
ing
ru
bb
le
an
d
em
pty
ch
em
ical
co
nta
iners
) sh
ou
ld
be
treate
d
as
hazard
ou
s w
ast
e.
Wast
e r
ed
ucti
on
measu
res
sho
uld
be i
mp
lem
en
ted
an
d a
ll
wast
e t
hat
can
be r
e-u
sed
/ r
ecycle
d m
ust
be k
ep
t se
para
te.
En
sure
ad
eq
uate
d
isp
osa
l st
ora
ge fa
cil
itie
s are
av
ail
ab
le
that
ensu
res
wast
e can
no
t b
e b
low
n aw
ay
b
y w
ind
an
d
pre
ven
t sc
av
en
gin
g
(hu
man
an
d
no
n-h
um
an
) o
f w
ast
e
sto
rag
e.
Was
te s
ho
uld
be
dis
po
sed
of
regula
rly a
nd
at
app
ropri
atel
y
clas
sifi
ed d
ispo
sal
faci
liti
es,
this
incl
ud
es h
azar
do
us
mat
eria
l
(em
pty
chem
ical
co
nta
iner
s, c
onta
min
ated
rugs,
pap
er w
ater
and s
oil
).
Haz
ardo
us
was
te m
ay n
ot
be
mix
ed w
ith o
ther
was
te s
trea
ms
and
sh
ould
be
dis
po
sed
o
f as
haz
ardo
us
was
te
at
an
appro
pri
atel
y c
lass
ifie
d f
acil
ity.
See
the
mat
eria
l sa
fety
dat
a sh
eets
avai
lable
fro
m s
up
pli
ers
for
dis
po
sal
of
conta
min
ated
pro
duct
s an
d e
mp
ty c
onta
iner
s.
Th
e s
pil
l ca
tch
men
t tr
ap
s an
d o
il w
ate
r se
para
tor
sho
uld
be
cle
an
ed
re
gu
larl
y
an
d
wast
e
dis
po
sed
o
f ap
pro
pri
ate
ly.
Su
rfacta
nts
(s
oap
) m
ay
n
ot
be
all
ow
ed
to
en
ter
the
oil
wate
r se
para
tor
Lia
ise
wit
h t
he m
un
icip
ali
ty r
egar
din
g w
ast
e d
isp
osa
l and
han
dli
ng o
f haz
ardous
wast
e.
Sp
ille
d h
yd
roca
rbo
ns
may n
ot
be
was
hed
off
the
fore
court
A
reg
iste
r o
f h
azar
do
us
wast
e d
isp
osa
l sh
ould
b
e
kep
t.
Th
is
sho
uld
in
clu
de
typ
e
of
wast
e,
vo
lum
e
as
well
as
dis
po
sal
meth
od
/fac
ilit
y.
An
y
com
pla
ints
re
cei
ved
regar
din
g
wast
e sh
ou
ld
be
reco
rded
w
ith
no
tes
on
acti
on t
ak
en.
The
oil
w
ate
r se
par
ato
r
mu
st b
e re
gula
rly i
nsp
ecte
d
and
all
h
yd
rocar
bo
ns
rem
oved
o
nce
d
ete
cted
.
Outf
low
wate
r m
ust
co
mp
ly
wit
h
eff
luent
quali
ty
stand
ard
s.
All
in
form
ati
on
and
rep
ort
ing t
o b
e in
clu
ded
in
a re
po
rt.
Pro
po
nen
t
Page 14 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
area
usi
ng s
urf
acta
nts
lik
e so
ap.
Surf
acta
nts
wil
l ca
use
the
oil
/wat
er s
epar
ato
r to
mal
fun
ctio
n l
ead
ing t
o h
yd
roca
rbo
ns
ente
rin
g t
he
sew
ers.
Gro
un
dw
ate
r,
Su
rfa
ce
Wa
ter
an
d
So
il
Con
tam
ina
tio
n
Po
rou
s su
rface
su
bst
rate
ca
n
allo
w
un
wan
ted
haza
rdo
us
and
ec
olo
gic
ally
det
rim
enta
l su
bst
ance
s to
see
p d
ow
n t
o
the
wat
er t
able
.
Surf
ace
runo
ff f
rom
the
site
is
exp
ecte
d
in
a w
este
rly
dir
ecti
on.
Runo
ff
of
poll
uta
nts
fro
m t
he
tanks
is n
ot
exp
ecte
d
to r
each
any n
earb
y s
urf
ace
wat
er d
ue
to
spil
l co
ntr
ol
and
the
des
ign
of
the
faci
lity
. It
is
unli
kel
y th
at a
rele
ase
of
fuel
w
ould
ca
use
an
im
pac
t o
n
any
nea
rby s
urf
ace
wat
er.
Gro
und
wat
er is
uti
lize
d in
th
e ar
ea fo
r
hu
man
co
nsu
mp
tio
n
and
sh
ould
b
e
pro
tect
ed a
t al
l co
sts.
Pro
per
co
nta
inm
ent
mec
han
ism
s
inst
alle
d s
ho
uld
co
nta
in a
ny r
elea
se t
hat
mig
ht
tak
e p
lace
fro
m s
pil
lages
duri
ng
op
erati
on
of
the f
aci
lity
.
The
foll
ow
ing m
easu
res
mu
st b
e em
plo
yed
/ m
ainta
ined
to
pre
ven
t sp
illa
ge i
nto
surf
ace w
ate
r d
rain
age c
han
nel
s an
d
gro
und
wat
er s
ourc
es:-
�
Sp
ill
contr
ol
stru
cture
s an
d p
roce
dure
s m
ust
be
in p
lace
acco
rdin
g t
o S
AN
S s
tand
ard
s o
r b
ette
r.
�
All
fuel
ling s
ho
uld
be
cond
uct
ed o
n s
urf
aces
pro
vid
ed
for
this
p
urp
ose
. E
.g.
Co
ncr
ete
slab
s w
ith
reg
ula
rly
mai
nta
ined
sea
ls b
etw
een s
lab
s.
�
The
pro
ced
ure
s fo
llo
wed
to
p
reven
t en
vir
on
men
tal
dam
age
duri
ng
serv
ice
and
m
ainte
nance
, an
d
com
pli
ance
wit
h t
hes
e p
roce
dure
s, i
nclu
din
g t
he
corr
ect
use
of
sum
ps
and
reg
ula
r re
po
rtin
g o
f sp
illa
ges
mu
st b
e
aud
ited
and
co
rrec
tio
ns
mad
e w
her
e nec
essa
ry.
�
Pro
per
tra
inin
g o
f o
per
ato
rs m
ust
be
cond
uct
ed o
n a
regula
r b
asis
.
�
An
y s
pil
lage
of
mo
re t
han
20
0 l
must
be
rep
ort
ed t
o t
he
Min
istr
y
of
Min
es
and
E
ner
gy
and
re
med
iati
on
inst
itu
ted
.
�
Sp
ill
clea
n-u
p m
ean
s m
ust
be
avai
lab
le o
n s
ite a
s p
er
the
rele
vant
MS
DS
.
Insp
ecti
on h
ole
s at
the
end
s
of
the
tan
ks
mu
st
as
a
min
imu
m
be
insp
ecte
d
ever
y 1
4 d
ays
and
eval
uat
ed
if l
iqu
id i
s p
rese
nt.
If
larg
e sp
ills
o
ccurr
ed
or
leak
s ar
e ex
pec
ted
in
reti
cula
tio
n
or
tank
s,
a
po
lluti
on
surv
ey
mu
st
be
cond
uct
ed t
o d
eter
min
e th
e
exte
nt
of
po
lluti
on.
A r
epo
rt s
ho
uld
be
com
pil
ed
of
all
spil
ls
or
leakag
es
rep
ort
ed.
The
rep
ort
sho
uld
conta
in
the
foll
ow
ing
info
rmat
ion
:
�
dat
e an
d
dura
tio
n
of
spil
l
�
pro
duct
sp
ille
d
�
vo
lum
e o
f sp
ill
�
rem
edia
l ac
tio
n t
aken
�
com
par
iso
n
of
pre
-
exp
osu
re
bas
elin
e d
ata
wit
h
po
st
rem
edia
tio
n
dat
a (e
.g.
soil
hyd
roca
rbo
n
conce
ntr
atio
ns)
�
cop
y o
f d
ocu
men
tati
on
in
wh
ich
spil
l w
as
rep
ort
ed t
o M
inis
try o
f
Min
es a
nd
Ener
gy
Pro
po
nen
t;
Ind
ep
en
den
t
Sp
ecia
list
Co
nsu
ltan
t
Eco
logic
al
Th
e eff
ect
of
op
era
tio
nal
act
ivit
ies
on
R
ep
ort
an
y
ex
trao
rdin
ary
si
gh
tin
gs
to
the
Min
istr
y
of
A r
eco
rd s
ho
uld
be k
ept
of
Pro
po
nen
t
Page 15 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
Cri
teri
a
Natu
re
Mit
igati
on
M
on
itori
ng
R
esp
on
sib
le B
od
y
Imp
act
th
e
eco
syst
em
fu
ncti
on
ing
an
d
bio
div
ers
ity.
En
vir
on
men
t an
d T
ou
rism
.
Mit
igati
on
m
easu
res
rela
ted
to
w
ast
e
han
dli
ng
an
d
the
pre
ven
tio
n
of
gro
un
dw
ate
r,
surf
ace
wate
r an
d
soil
co
nta
min
ati
on
sh
ou
ld
lim
it
eco
syst
em
an
d
bio
div
ers
ity
imp
acts
.
Av
oid
scav
en
gin
g o
f w
ast
e b
y f
au
na.
Th
e
est
abli
shm
en
t o
f h
ab
itats
an
d
nest
ing
si
tes
at
the
facil
ity s
ho
uld
be a
vo
ided
wh
ere
po
ssib
le.
any
extr
aord
inar
y
fau
na
sig
hti
ngs
or
enco
unte
rs
on
site
.
All
dat
a to
be
com
pil
ed i
n a
report
.
Vis
ua
l Im
pa
ct
Th
is
is
an
im
pact
that
aff
ects
th
e
aest
heti
c a
pp
eara
nce.
Reg
ula
r w
aste
d
isp
osa
l,
go
od
ho
use
kee
pin
g
and
ro
uti
ne
mai
nte
nance
on i
nfr
astr
uct
ure
wil
l en
sure
that
the
lon
gevit
y
of
stru
cture
s ar
e m
axim
ised
an
d
a lo
w
vis
ual
im
pac
t is
mai
nta
ined
.
A
mai
nte
nance
re
cord
sho
uld
be
kep
t.
A r
epo
rt s
ho
uld
be
com
pil
ed
of
all
com
pla
ints
re
ceiv
ed
and
act
ions
taken
Pro
po
nen
t
Cu
mu
lati
ve
Imp
act
Po
ssib
le c
um
ula
tiv
e i
mp
acts
ass
ocia
ted
wit
h
the
op
era
tio
nal
ph
ase
in
clu
de
incre
ase
in
tr
aff
ic fr
eq
uen
tin
g th
e si
te
an
d a
lon
g t
he s
ecti
on
s o
f ro
ad
s n
ear
the
facil
ity.
An
in
cre
ase
in
em
issi
on
s fr
om
these
v
eh
icle
s w
ill
decre
asi
ng
th
e
air
qu
ali
ty
aro
un
d
the
facil
ity.
Wear
an
d
tear
on
th
e r
oad
s an
d i
ncre
ase
d r
isk
s o
f
road
tr
aff
ic in
cid
en
ces
co
uld
in
cre
ase
.
Ad
dit
ion
al
traff
ic a
nd
op
era
tio
nal
no
ise
wo
uld
fu
rth
er
incre
ase
no
ise i
mp
acts
in
the a
rea.
Ad
dre
ssin
g e
ach o
f th
e in
div
idual
im
pac
ts a
s d
iscuss
ed a
nd
reco
mm
end
ed
in
the
EM
P
wo
uld
re
duce
th
e
cum
ula
tiv
e
imp
act.
Rev
iew
ing
bia
nn
ual
re
po
rts
for
any
new
o
r re
-occ
urr
ing
imp
acts
o
r p
rob
lem
s w
ould
ai
d in
id
enti
fyin
g cu
mu
lati
ve
imp
acts
and
hel
p i
n p
lan
nin
g i
f th
e e
xis
tin
g m
itig
atio
ns
are
insu
ffic
ient.
.
Su
mm
ary
rep
ort
b
ased
on
all
oth
er
imp
acts
m
ust
b
e
crea
ted
to
giv
e an
o
ver
all
asse
ssm
ent
of
the
imp
act
of
the
Op
erat
ional
Phas
e.
Pro
po
nen
t
Page 16 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019
3.2 Decommissioning and Rehabilitation Decommissioning is not foreseen during the validity of the environmental clearance certificate.
Decommissioning was however assessed as construction activities include modification and
decommissioning. Should decommissioning occur at any stage, rehabilitation of the area may be
required. Decommissioning will entail the complete removal of all infrastructure including
buildings and underground infrastructure. Any pollution present on the site must be remediated.
The impacts associated with this phase include noise and waste production as structures are
dismantled. Noise must be kept within WHO standards and waste should be contained and
disposed of at an appropriately classified and approved waste facility and not dumped in the
surrounding areas. Future land use after decommissioning should be assessed prior to
decommissioning and rehabilitation initiated if the land would not be used for future purposes.
The Environmental Management Plan for the facility will have to be reviewed at the time of
decommissioning to cater for changes made to the site and implement guidelines and mitigation
measures.
4 CONCLUSION The above Environmental Management Plan, if properly implemented will ensure adverse impacts on
the environment is continually mitigated and prevented. Where impacts occur, immediate action must
be taken to reduce the escalation of effects associated with these impacts. To ensure the relevance of
this document to the specific stage of project, it needs to be reviewed throughout all phases.
The Environmental Management Plan should continue to be used as an on-site reference document
during all phases of the existing facility. Parties responsible for transgressing of the environmental
management plan should be held responsible for any rehabilitation that may need to be undertaken.
The proponent could use an in-house Health, Safety, Security and Environment Management System
in conjunction with the environmental management plan. All operational personnel must be taught the
contents of these updated documents.
Monitoring reports must be submitted to the Ministry of Environment and Tourism to allow for future
renewal applications for environmental clearance certificates.
5 REFERENCES Faul A, Botha P, Brews L. 2016. Environmental Impact Assessment for the Refurbishment and
Operations of the Multiplex Tyres & Spares Fuel Retail Facility in Outjo.
Page 17 of 17
Geo Pollution Technologies (Pty) LtdMultiplex Tyres and Spares - Updated EMP - July 2019