14
Upgrade Technical Proposal Status J. Butler August 5, 2010 1

Upgrade Technical Proposal Status

  • Upload
    aletta

  • View
    47

  • Download
    0

Embed Size (px)

DESCRIPTION

Upgrade Technical Proposal Status . J. Butler August 5 , 2010. O utline. Latest of the schedule Review Steps Status of chapter and appendices Internal Chapter review Ex Officio Members Requested chapter readers Schedule goals. The 10 year technical Plan. The 20 year physics plan. - PowerPoint PPT Presentation

Citation preview

Page 1: Upgrade Technical Proposal  Status

1

Upgrade Technical Proposal Status

J. ButlerAugust 5, 2010

Page 2: Upgrade Technical Proposal  Status

2

Outline

• Latest of the schedule• Review– Steps– Status of chapter and appendices– Internal Chapter review• Ex Officio Members• Requested chapter readers

– Schedule goals

Page 3: Upgrade Technical Proposal  Status

3

The 10 year technical Plan

Page 4: Upgrade Technical Proposal  Status

The 20 year physics plan

4

2 year cycle: 6-8 month shutdown once every 2 years

Page 5: Upgrade Technical Proposal  Status

Preliminary Luminosity Predictions

5

So here we go

Very preliminary with

large

error b

ars

Page 6: Upgrade Technical Proposal  Status

Preliminary Luminosity Predictions

6

So here we go

Page 7: Upgrade Technical Proposal  Status

7

Preliminary Long Term Predictions

Page 8: Upgrade Technical Proposal  Status

8

Preliminary Long Term Predictions

Page 9: Upgrade Technical Proposal  Status

9

STEPS OF REVIEW

• Initial draft – status on next slide• Review in subsystem communities and

acceptance• Reading for overall consistency of document• Designated Readers from CMS for some or all

of the document• Broad release in CMS• Acceptance by CMS

Page 10: Upgrade Technical Proposal  Status

10

Status of Chapters and Appendices• Subsystem chapters – all submitted and much back-and-forth with subsystem authors.

– Muon - ready for internal review in community POSTED– Hcal HB/HE - almost ready for internal review– Hcal forward – almost ready for internal review POST TODAY OR TOMORRW– Pixels – almost ready for internal review POST TOMORROW OR SATURDAY– Trigger/DAQ – ready for internal review of community TRIGGER POSTED, DAQ HAS SOME MISSING FIGURES

(SHOULD RESOLVE TODAY)– BRM/lumi – in final stages. Is being presented to full community and Technical Coordination as they go– Infrastructure – initial draft available, STATUS?

• Appendices– High Performance Spectrometer (a version on FP420) – almost ready for internal review WILL READ AND POST

TOMORROW– MPGD – (Micro Pattern Gas Detector (a GEM) eta coverage of 1.6-2.1 for muon redundant coverage. Alternative to

RPCs)– Phase 2 – very little work done– ECAL – new section, just added– IFP ????

• Other chapters– Introduction – material exists. Needs input from July 26 schedule which we now have – will work on this weekend

with a draft by Monday for initial circulation in this group– Physics case – much work to be done (more below)– Cost and Schedule and Organization – basic input exists - priority for next week and following week

Page 11: Upgrade Technical Proposal  Status

11

Internal Chapter Reviewers

• Ex Officio – Spokesperson and deputies– Affected Project Managers, Run Coordinators,

Technical Coordinators – Physics Coordinators and Deputy– ?

Page 12: Upgrade Technical Proposal  Status

12

Internal Chapter Reviewers• Additional Reviewers (non confirmed, more nominees requested, discuss today!)

– HCAL• Jim Virdee• Harvey Newman• Michel Della Negra• Brad Cox• Kirsten Borras

– Muons• Peter Sharp• Jim Virdee• Thomas Mueller• Dan Green• Daniela Bortoletto• ?

– Pixels• Peter Sharp• Jeff Spalding• Ranier Wallney• Gail Hansen• Frank Hartmann• Joe Incandela• Gigi Rolandi• Kevin Burkett

Page 13: Upgrade Technical Proposal  Status

13

Internal Chapter Reviewers• Additional Reviewers (non confirmed, more nominees requested)

– Trigger/DAQ• Vivian Odell• Harry Cheung• Geoff Hall• Marvin Johnson (?)• ?

– BRM• Nicola Bacchetta• Roland Horisberger• Gino Bolla• Peter Sharp• Karl Gill• Pushpa Bhat

Page 14: Upgrade Technical Proposal  Status

14

Schedule for Document

• From Guido (this morning): – I am assuming that we will be ready to distribute a

draft0 around August 16-18, followed by a draft 1 after a couple of weeks.

• September 6: Final Draft