10
US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Embed Size (px)

Citation preview

Page 1: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

US 89 LandslideFebruary 20, 2013

Arizona Department of TransportationCategory: 7a) Issues/Crisis Management Communication

Page 2: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Day One: Situation

Click photo to begin slideshow(slides will advance automatically)

In the early morning of Feb. 20, a landslide ripped through the mountain slope along US 89 in northern Arizona, destroying a 500-foot stretch of roadway and essentially eliminating the only direct route between two adjoining communities and cutting off direct travel to popular tourist destinations.

Initial Communication Challenges Six hours from Phoenix, very limited media access Coincided with large snow storm Limited cell phone access, difficult to get

immediate information Slide located on the Navajo Nation: language

barriers, environmental and cultural sensitivitiesImmediate Communication Efforts Relied heavily on social media to reach

traditional media Three ADOT Communications staff members and

Deputy State Engineer flown to site Began immediate coordination with state, tribal

and local officials and neighboring states.

Page 3: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Day One: Social and Traditional Media Initial travel advisory and photo shared over 3,500 times,

retweeted 140 times Updates, photos and aerial video top 10,000 shares in one day 1,700 new Facebook Likes in first 24 hours

Rush hour snow report (unrelated to landslide). This and other snow reports shared 564 times, retweeted 200+ times

Page 4: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Day Two: Communications Response Communications incident command established First video posted to YouTube; shared in news

release, on ADOT Blog, Facebook, Twitter Responded to 12 media outlets Fliers and posters created, sent to printer Dedicated website created and posted Email update subscription list established

Click photo to play video on YouTube

Page 5: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Stakeholder Engagement

Established an office in City of Page city hall that is staffed twice a week to provide a convenient resource for the local community

ADOT representative continues to spend one day a week in the Navajo Nation's Bodaway Gap Community to be available to answer.

Coordination meetings routinely held with the Page City Council, Coconino County Board of Supervisors, Navajo Division of Transportation, Navajo Nation agencies

The actual landslide occurred on a stretch of highway on the Navajo Nation, and -- in an area with little redundancy of travel routes -- effectively cut off travel between two neighboring communities. Substantial and sustained efforts were taken to communicate with local communities.

Personal visits are made regularly to surrounding communities, tourist attractions and businesses spread over several miles on either side of the landslide.

and tribal chapters. Coordination and outreach activities also extend into Utah.

Page 6: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Tourism and Travel

Maximized partnerships with Arizona Highways magazine, Arizona Department of Tourism and AAA Arizona to spread the word that these major tourist destinations remained accessible.

Long-term closure notification and detour information provided to Google Maps, Garmin, Telenav and Nokia.

Lake Powell • Grand Canyon • Marble Canyon • Horseshoe Bend • Utah National Parks The detour around the US 89 closure extends the trip to Lake Powell by approximately 45 miles. However, the route to the Grand Canyon and the popular Marble Canyon, which are accessed by US 89A, were not impacted. Succinctly communicating that all businesses were accessible, but that some required additional travel time, was a challenge.

Click photo to play video on YouTube

Page 7: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Maximizing the ADOT Blog ADOT Blog series “Transportation Defined”

utilized to more fully explain many of the complicated terms and processes associated with the geological assessment and the project process.

From day of event to May 31, 18 US 89-related blog posts have received over 36,000 pageviews.

Regularly receive blog comments asking for route information specific to upcoming travel. All comments responded to (usually including a link back to azdot.gov/US89).

All blog posts posted to Facebook and Twitter and included in news releases.

Read all US 89 blog posts

Page 8: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

Sustained social mediaADOT has sustained social engagement since the event, creating videos and blogs to provide updates and responding to travel-related inquiries.

Page 9: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

The importance of videoVideo has continued to play an integral role in the communicating information about the closure and the efforts to restore the travel route.

ADOT’s in-house production team among first on scene

Initial video viewed on YouTube almost 50,000 times.

To date, 10 US 89 informational videos and PSAs produced and posted to YouTube, disseminated to municipal stations statewide, embed codes provided to media for posting to websites.

B-Roll and sound bites provided to media (through secure ftp server) on near-weekly basis.

Page 10: US 89 Landslide February 20, 2013 Arizona Department of Transportation Category: 7a) Issues/Crisis Management Communication

By the Numbers

7,051564

$370,40018

30,00083

85,903

Facebook shares of US 89 photos in one day (2/20)

Estimated earned media value of US 89 reports

Media interviews conducted (2/21-5/31)

Facebook shares of snow in Scottsdale photo (2/20)

Navajo Nation chapter meetings attended

YouTube views of US 89 videos (2/21-5/31)

Fliers distributed to area businesses, tribal chapter houses