36
U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible Features Ryan Hedrick PN Regional Diving Officer

U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

  • Upload
    vandien

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

Page 1: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible Features Ryan Hedrick

PN Regional Diving Officer

Page 2: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

– Reclamation maintains more than 500 dams through the Safety of Dams Program which is based on a 6-year inspection interval

– A vital part of this maintenance operation is the underwater work performed by Reclamation’s dive team

Hoover Dam, NV

Grand Coulee Dam, WAYellowtail Dam, MT

Page 3: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Underwater Inspection Program

CARTER

ANDREWS

MORRIS

FULLER

MEYER

SPICHER

JERRY ?

Original Team - MP Region 1967 – Currently PN and MP

Page 4: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Clients

PN Region– Area and Field Offices in conjunction with local irrigation

districts

GP, MP, UC– Area and Field Offices in conjunction with local irrigation

districts

Other Agencies (Interagency Agreements)– Bureau of Indian Affairs– National Park Service– Forest Service– National Aeronautical and Space Administration

Page 5: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Regulations

Reclamation’s divers are “professional” divers

Diving Regulations– Diving Safe Practices Manual– Reclamation Safety and Health

Standards, Requirements for Reclamation Diving Operations [section 29.2]

– OSHA Commercial Diving Regulations [29 CRF 1910, Subpart T]

Page 6: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Tasks

Reclamation facilities inspection

– dam stilling basins– intake structures– stoplog slots– siphons

Irrigation pump inspection

Construction inspection

Fishscreen inspection

Stoplog/bulkhead inspection

Trashrack inspection

Underwater geological survey

Bridge inspection

Zebra & Quagga Mussel survey Silver Jack Dam, CO

Page 7: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Identify damage or problems before it becomes an emergency or ends up in a catastrophic failure

Prevent or reduce unscheduled facility downtime

Enhance the safety and operation of the facility

Routine inspections allow managers to better plan, schedule and budget for repairs

Protect the public, employees, and waterway environments

Page 8: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Spillway Stilling Basin – Damage

Page 9: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Outlet Works Intake Structure - Plan

Page 10: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Outlet Works Intake Structure - Plan

Page 11: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Outlet works cleanup

Page 12: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Final cleanup

Page 13: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Methods of Conduit Inspections

Page 14: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Surface Supplied Air (SSA)

Page 15: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Surface Supplied Air (SSA)

Hands OnAudioVisualSafe

Page 16: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

SSA Limitations

Depth <100 ft.Penetration <300 ft.TimeVisibility

Page 17: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Limitations to Conduit inspections on SSA

Depth

Access

Commercial Divers

Time

Money

Page 18: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

VideoRay

– PRO 4 Remote Operated Vehicle (ROV)

Page 19: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

VideoRay

– PRO 4 Remote Operated Vehicle (ROV)

Page 20: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Trashrack and Outlet Works

Page 21: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Trashrack and Outlet Works

Page 22: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Trashrack and Outlet Works

Page 23: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

2 ft. Diameter conduit with good visibility

Page 24: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

2 ft. Diameter conduit with good visibility

Page 25: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Structure with poor visibility

Page 26: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Structure with poor visibility

Page 27: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Structure with poor visibility

Page 28: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Structure with poor visibility

Page 29: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

LimitationsDepthVisibilityAccessSnagging

Page 30: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

TopsideInspections

Page 31: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Inspection of 27” conduit interior

Used forced air and two open manholes

Difficult to see rust nodules due to silt in conduit

Inspection of Conduit interiorAgate Dam

Page 32: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Inspection of Inlet Tower Ochoco Dam

For Inspections requiring rope access requires climb team from PN Region Office in Boise

Initial training is 40 hours, annual refresher required

Page 33: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Inspection of outlet works Howard Prairie Dam

Inspection of 30” pipe interior performed by ROV Fin in the pipe prevented acceptable retrieval method for person in conduit

FIN

Page 34: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Conduit Inspection Emigrant Dam

Conduit and regulating gate inspection requiring rope access

Page 35: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Questions?

Page 36: U.S. Bureau of Reclamation Underwater Investigation of ...€¦ · U.S. Bureau of Reclamation Underwater Investigation of Conduits and Inaccessible ... 6-year inspection interval

Ryan [email protected]