US Department of Energy (DOE)

of theQuality Assurance Program

of the XXX Program

at the ZZZ Site

Bob BlythDOE-NE

July xx, 200x

DOE-NE Audit

Page 2: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Activities related to the XXX QA program at the ZZZ

Scope

Objective

Determine the level of compliance of the ZZZ XXX program with ASME NQA-1-2000

Verify closure of FY 2004 XXX QA audit findings

Page 3: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

xxx QA Program Objective

• Ensure xxx Program Produces Products that are useable to program customers

- Ultimately NRC Licensable

Page 4: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Team• Auditor 1 – DOE Site 1- Identification and Control of Items -

complete- Control of Special Processes – No Activity- Inspection Test and Operating Status– No

Activity- Control of Nonconforming items- Document Control- QA Records- Software

Page 5: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Team – cont’d

• Auditor 2 – DOE Site 2

– Design Control

- Procurement Document Control

- Instructions Procedures and Drawings

Page 6: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Team – cont’d

• Auditor 3 – DOE Site 3– Control of Purchased Items and

Services– Inspection– Test Control – No Activity– Control of Measuring & Test

Equipment – No Activity– Handling Storage and Shipping– Audits

Page 7: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Team – cont’d

• Bob Blyth – DOE NE, ATL

– Organization

– QA Program

– Corrective Action

Page 8: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Protocols

• Draft Form 2s

– Developed by Auditor

– Emailed to Program POC

• Factual accuracy

• Discussion

Page 9: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Protocols (Cont’d)

Page 10: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Protocols (Cont’d)• Findings– Issued at exit out meeting– Proposed corrective actions approved by

finding originator– Tracked to closure by XXX QA Program– Significant defined “as a serious threat to

human health or safety”• Report issued 30 days after closeout– Review by XXX program for factual

accuracy prior to issue

Page 11: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Audit Meetings

• Audit Team meetings - 3:30

– Monday & Wednesday – Room 350

– Tuesday - Room 151

• Management Information Meetings - 4:30

– Monday & Wednesday – Room 350

– Tuesday - Room 151

• Audit Exit Meeting

– Thursday - 2:00, Room 350

Page 12: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Exit Meeting

• Summary of Each Element

– Review of Issues

- Notable Practices

- Concerns

- Findings

Page 13: US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit

US Department of Energy (DOE)

Questions

• ?