Click here to load reader
Upload
sooner123456
View
216
Download
0
Embed Size (px)
Citation preview
8/9/2019 V-215B-101-A-018_REV_E
http://slidepdf.com/reader/full/v-215b-101-a-018reve 1/4
Total sheets
Vendor's NAME :
Owner Name :
Purchaser :
Plant Location: :
Project name :
P.O. NO. :
Equipment/Material name :
Item number :
DOCUMENT TITLE :
FA: For Approval
FI: For Information
FC: For Construction
AB: As-Built
ISSUE PURPOSE : (by Vendor)
RESULT CODE : A, B, R, N (by JVC)
NEXT STATUS : FA, FI, FC, AB (by JVC)
RESUBMISSION DATE : (by JVC)
NEXT SUBMISSION DATE : (by JVC)
RESPONSSIBLE DEPT./ PERSON (by JVC)
Review Date (by JVC)
A: Approved/Reviewed without Comment;
Dung Quat Refinery Additional Sulfur Recovery Unit
4
Han Yang Industry Co., Ltd.
Binh Son Refining & Petrochemical Co., Ltd.
JGC Vietnam Co., Ltd.
Quang Ngai, Vietnam
G-V079-P-215B-101-A
WASTE HEAT BOILER/1ST/2ND SULFUR CONDENSER,
FINAL SULFUR CONDENSER, THERMAL INCINERATOR
SG-2501,SG-2502,H-2504
REFRACTORY DRY OUT PROCEDURE
Rev Issue PurposeSubmission
DateEnter Issue Purpose
A FA 14-Oct-2014
C FC 07-Nov-2014
AB
D FC 13-Feb-2015
E AB 23-Feb-2015
Dung Quat Refinery Additional Sulfur Recovery Unit
A
JVC MECH / GANESH
8/9/2019 V-215B-101-A-018_REV_E
http://slidepdf.com/reader/full/v-215b-101-a-018reve 2/4
REFRACTORY DRY-OUT PROCEDURE AT SHOP
DQR Project / Dry-Out
Operating
253℃ HOLD
38℃/hr
40℃/hr
(Cooling Down)
HOLD
120℃
40℃/hr
(Natural Cooling)
Around 0℃)
Temp ℃)
Time hr)
* TEMPERATURE CONTROL METHOD
Cool Down Schedule
2 2 Hr
3.5 Hr Until 253℃ at speed of 38℃/Hr temperature rise
20
No TIME METHOD
1 3 Hr
Heat Up Schedule
5 5 Hr
Temperature will need to maintain 6Hr in 253℃ (HOLDING)
Until ambient temperature at speed of -40℃/Hr temperature down
3
From Around temperature(0℃) until 120℃ at speed of 40℃/Hr temperature rise
4 6 Hr
Temperature will need to maintain 2Hr in 120℃ (HOLDING)
SG-2501, SG-2502, H-2504 Pre-Dry out Schedule (At Shop)
3 8.5 14.5
53℃ Manhole Open
I N D R A
2 8 - F E B - 2
0 1 5
8/9/2019 V-215B-101-A-018_REV_E
http://slidepdf.com/reader/full/v-215b-101-a-018reve 3/4
Heat-up of Incinerator H-2504
Step
Raise to/
Hold,
Deg-C
Raise
with,
Deg-C/h
Time,
h
Sub total
time,
h
Remarks
NOTES
0 20 0 0 1. This curve is for first heat-up at site. For subsequent start-up, it is not necessary to follow this curve but the temperature
1 150 20 6.5 6.5 raise-up and cool-down can be continuous with the heat-up/ cool down rate NOT greater than 60 deg-C/ h.
2 150 Hold 7.5 14 2. Holding time is for leak check/ inspection around the equipment. Approximately four (4) hours.
3 350 30 6.7 20.7 3. When temperature is down to 60 deg-C, manhole can be open for inspection.
4 350 Hold 7.5 28.2 4. Vender have no objection about this curve JGC process team made
5 540 40 4.7 32.9
6 540 Hold 4 36.9
7 760 40 5.5 42.4
8 760 Hold 4 46.4 Note 2
9 60 40 17.4 59.8 Note 3
ATTACHMENT 1
20
150 150
350 350
540 540
760
60
0
100
200
300
400
500
600
700
800
0 5 10 15 20 25 30 35 40 45 50 55 60 65
T e m p e r a t u r e ,
d e g - C
Time, hours
First heat-up curve at site of Incinerator H-2504 (Note 1)
1
2
3
4
5
6
7
8
9
I N D R A
2 8 - F E B - 2
0 1 5
8/9/2019 V-215B-101-A-018_REV_E
http://slidepdf.com/reader/full/v-215b-101-a-018reve 4/4
Heat-up of Thermal Reactor H-2502
Step
Raise to/
Hold,
Deg-C
Raise
with,
Deg-C/h
Time,
h
Sub total
time,
h
Remarks
NOTES
0 20 0 0 1. This curve is for first heat-up at site. For subsequent start-up, it is not necessary to follow this curve but the temperature
1 230 40 5.3 5.3 raise-up and cool-down can be continuous with the heat-up/ cool down rate NOT greater than 60 deg-C/ h.
2 230 Hold 4 9.3 2. Holding time is for leak check/ inspection around the equipment. Approximately four (4) hours.
3 540 40 7.8 17.1 3. Vendor recommends to hold at the working temperature of 1200 deg-C. But holding at 1350 deg-C is also acceptable.
4 540 Hold 4 21.1 4. When temperature is down to 60 deg-C, manhole can be open for inspection.
5 1200 40 16.5 37.6 5. Vender have no objection about this curve JGC process team made.
6 1200 Hold 4 41.6 Note 2, 3
7 60 40 28.5 66.1 Note 4
ATTACHMENT 2
20
230 230
540 540
1200
60
0
200
400
600
800
1000
1200
1400
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
T e m p e r a t u r e ,
d e g
‐ C
Time, hours
First heat‐up curve at site of Thermal Reactor H‐2502 (Note 1)
1
2
3
4
5
6
7
I N D R A
2 8 - F E B - 2
0 1 5