Contract No.76/2010-EP
Document No.
V-30-1380-001REV
2
DATE: 0 3 OCT11 SHEET 1 of 4
Prepared BUI DINH NAM
Checked PHAM HONG NAM
DETAILED ELECTRICAL LOAD DATA Approved BUI XUAN MANH
DETAILED ELECTRICAL LOAD DATA
FOR CONSTRUCTION
Bio-fuel Ethanol Plant in Northern Region ProjectDist ribut ionPVC
PD
DP D (Sit e)Proc M
MICO
7/31/2019 V-30-1380-001
2/4
7/31/2019 V-30-1380-001
3/4
7/31/2019 V-30-1380-001
4/4
1) Rated kW : Motor Nameplate or Feeder Power/Current Rating.
2) Absorbed kW : Mechanical Power Input to Drive Shaft to Obtain Rated Output from Driven Equipment or Absorbed Electrical Power For Non-Motor Loads
3) Usage factor : Number of Hours in an Average Day That Equipment is Operated, Expressed as the Ratio (hours operated per day)/24
4) Load type: M = Motor, F = Feeder
2. Key for Starter Types 3. Key for Operation Type
1) DOL : Direct On Line Starter 1) C = Continuous Operation ( usage factor = 1)2) CON : Fused Contactor Feeder 2) I : Intermittent Operation ( usage factor = 0.2)
3) CB : Circuit Breaker 3) S/B: Standby Operation (usage factor = 0)
4) SS : Solid State Soft Start
5) VSD : Variable Speed Drive
6) SD : Star/Delta Starter
7) FUS : Fuse Switch Feeder
8) 2SP : Two Speed Starter
9) REV : Reversing DOL Starter
4. Calculations
1) Absorbed kW = Rated kW*Load factor
2) Input power kW=Absorbed kW / Efficiency Factor
3) Input power kVAR = Input power kW*TAN(ACOS(Power factor))