Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Dassault Systèmes Confidential
V6 Solutions Strategy
Dassault Systèmes Confidential
Topics
DS Strategy: PLM 2.0
Business Process Scope
Coexistence with V5
The New ENOVIA Platform
Discussion
Dassault Systèmes Confidential
Basic definition
Alternate part
Design Alternatives
Substitute part
Multi-representation
Design iteration
Part version
Document iteration
Trade studies
Solution alternatives
Part locking
Part freezing
Part releasing
Zone
Volume
3
Assembly variant
Data access control
Part visibility
Part maturity
Configuration
Part evolution
VPM workspace
Design tree
Working product
Workbench
VPM reference
Release tree
……
DS Strategy : PLM 2.0, the PLM Online for All
“Online environment for virtual experience in 3D from anywhere”
Digital Mock-Up
Product Lifecycle
Management
CollaborativeInnovation
Realistic Simulation
3D Lifelike Experience
12
3
4
2D to 3D
1994 2000 20081981
PLM 1.0
3D
•All Users
•Users’ Interactions
•Generate IP
•Experience in 3D
•Online
Harnessing Collective Intelligence
PLM 2.0
Lifelike Experience
Imagine | Play Lifelike
Experience
Digital Manufacturing
& Production
Realistic
Simulation
Virtual Design
Systems
Shape
Mechanical
Equipments
Compliance
Multiphysics Digital Lab
Open Scientific Platform
Manufacturing Planning
Plant & Resources Eng.
Program & Control Eng.
Production Execution
Collaborative
Innovation
PLM 2.0 – ENOVIA V6 Footprint
过程数据管理
过程数据管理也称作WIP(work in progress)数据管理,指详细设计阶段结束前多个专业需要针对WIP数据的不同成熟度状态进行协同,以满足并行设计的需求。
另外还指研发中心内部需要管理的大量设计相关数据,这些数据一部分将最终发放到下游(制造、采购等),一部分仅在研发中心内部供设计参考和方案重用。如骨架参考模型,接口文件,可选设计方案等等,这些数据不是EBOM件,最终也不会被发放到制造,但对研发中心却是非常重要的设计支撑和中间数据。
零件 XXX
方案1(表达1)?
方案2(表达2)?
方案3(表达3)?
•针对一个给定零件, 设计员经常需要同时研究几个可选的设计方案.一般发生在设计阶段,设计员不确定哪一个是最优的设计
•尽管一些设计可选件随着设计进展逐渐被废弃,但有时设计员根据需要针对同一个零件发布2个或多个设计方案。
•针对这个零件, 设计员提交多个零件几何变型供下游人员来决策最佳的设计可选件 (如CAE人员,制造人员等,制造可行性).
•这些数据是辅助设计过程中的参考数据(非BOM件),并不会发放到下游制造部门。
时间
l材料 工艺系统 强度
……
设计参考数据
DMU分析数据
PDM
Why V6?
Enginering S.A.SManufacturing
流程
数据
需求管理
E-BOM
M-BOMMRP
ERP
Process +resourceProduct
“R”elease
“r”elease
CATIA+VPM DELMIA
WIP
E-HUB M-HUB
MRO
Creat dataConsume data
Dassault Systèmes Confidential
Experience
Experience
DesignSimulate
Produce
Collaborate
People
PLM 2.0 on V6 Platform
1. Global collaborativeinnovation
4. Online creation and collaboration
5. Ready to use PLM business processes
6. Lower cost of ownership
3. Single PLM platformfor IP management
2. Lifelike experience
Dassault Systèmes Confidential
V6 Multi-Tier Architecture Principle
Database Server: Metadata Repository
File Server(s) (FCS)
Representation and Content
Repository
HTTP
Clients
Applications Server(s) (MCS)
A
Workstation ClientsEx.: CATIA V6, DELMIA V6, SIMULIA V6, xCAD…
Web ClientsEx.: ENOVIA business process
applications
Light Visualization ClientsEx.: ENOVIA 3DLive
(*) Optional.
Data
Logic
Pre
senta
tion
S
D
FIndex Servers *
Indexing Repository
Dassault Systèmes Confidential
CATIA V6
3DLIVE.. V6
Multi-Client Topology
SIMULIA V6
DELMIA V6
HTTP
CATIA V5
xCAD
V6 Governance
Applications
D A
F
Dassault Systèmes Confidential
Topics
DS Strategy: PLM 2.0
Business Process Scope
Coexistence with V5
The New ENOVIA Platform
Discussion
Dassault Systèmes Confidential
V6 Product Categories
12
Governance
Global Sourcing
IP Lifecycle Management
Unified Live Collaboration
Lifelike Experience
Collaborative Innovation
Realistic Simulation
Virtual Design
Systems
Shape
Mechanical
Equipments
Compliance
Multiphysics Digital Lab
Open Scientific Platform
Manufacturing Planning
Plant & Resources Eng.
Program & Control Eng.
Production Execution
Lifetime Support
Documentation
Maintenance
Live Operation
Digital Manufacturing& Production
Requirement
Engineer
Better Communication With The Extended Team
Data
Manager
Program
Manager
Contracts
ManagerConfiguration
Manager
Change
Board
Librarian
Requirement
Engineer
Systems
Architect
3D Layout
Architect
Systems
Designer
Systems
Integrator (OEM)
Safety
Engineer
Aviation
Regulation
Aerodynamics
Department
Work package
Team Leader
Stress Analyst
Standards
Manager
Composites
structure Designer
Structure Designer
Simulation
Engineer
Manufacturing
Technicians
Manufacturing
Planner
Simulation
Engineer
Time Analyst
Maintenance
Manager
Plant Manager
Shop
Manager
Quality
Manager
Worker
Support
Analyst
Spares
Analyst
Support
Planner
Worker
Maintenance
Planner
Shop
Manager
Help Desk
Aviation
Regulation
Maintenance
Analyst
Technical
writer
Technical
illustrator
Program
Schedule analyst
NEEDS
What you need people to do
How you want them to do it
How you will verify what they
have done
What they expect from you to
do what you ask
DECISIONS
Requirements change
Contract change
Schedule change
Design change
Process change
…
Reshape & Move The Iteration Peak
Typical change profile
Desired change profile
Number
of
changes
Relative Cost of Change
1 10 102 103 107104 105 106
Production
RFP ATPSRR
PDR CDR FAI / DeliverTRR
Concept Preliminary Design
RFP ATPSRR
PDR CDR FAI / DeliverTRR
Detail Design
Earlier Simulation
Better Collaboration
Dassault Systèmes Confidential
V6 Fundamentals
To accelerate innovation spiral, all data import, export & conversion should be eliminated• Share design without local data duplication
• Share product structure between design, simulation and manufacturing
ENOVIA V6 provides one single Architecture
To enable efficient cross-discipline collaboration, between all applications• Same Configuration Management across all
disciplines
• Program Management covering all activities of a projects
ENOVIA V6 relies on one single Data Model
Governance
Portfolio Configuration Management
ENOVIA Variant Configuration Central provides a
standard product structure to optimize the design process
for new product concepts
Requirements Management
ENOVIA Requirements Central captures the voice of
the customer and provides traceability to downstream
design data
Program Management
ENOVIA Program Central manage complex
programs across the extended enterprise
with real-time access to development IP
Decision Support Business Intel
ENOVIA 3DLive is used to search,
navigate, work, and collaborate in real-
time with intuitive 3D data
Compliancy
ENOVIA Materials Compliance
Central enables adherence to new
environmental compliance regulations
V6 Leverages Requirements Management
ENOVIA Requirement Central to capture customer or regulatory requests…
ENOVIA Requirements Central
captures the voice of the customer
and provides traceability to
downstream design data
… empowered by V6 Collaborative environmentRequirements directly accessible and usable for all users
Full traceability / requirement change impact analysis along all
product lifecycle
Global Sourcing
Supply Chain Network
ENOVIA Live Collaboration
manages the supply chain’s
contacts, locations, etc.
Collaborative Sourcing
ENOVIA Sourcing Central
manages negotiations and quotes
for procured products and services
Supplier Performance Monitoring
ENOVIA Supplier Central manages
outsourced design and manufacturing
partners to become an integral part of
the design collaboration process
ENOVIA Quotation Central leverages
supplier expertise and ensures accurate
and timely responses to new sourcing
opportunities
Consistent Product Data Across All Departments
Data Sharing or
Synchronization
Derivation
ERP/MRP/MES/MRO
Enterprise Solutions
Modeling Solutions
As-Conceived As-Designed As-Planned Manufacture
As-Planned Maintenance
Process
Plans
Logical
Structure
Functional
Structure
As-Required
PBOM
Resource
Structure
Process
Structure
Product
Structure
EBOM Drawings,
Specs
Drawings,
Specs
Reqmt
Structure
Specs
As-Manufactured
MBOM Work
orders
CBOM
As-Built/
As-Maintained
UBOM Quality
Records
Waivers
Work
Instructions
EBOM
(Tools)
Dassault Systèmes Confidential
Systems/MCAD/ECAD/Software
Program ManagementSolution Principle
Suppliers
Real time monitoring of program activities with cross-functional process integration
3D Desktop
Designers Contracts
managerSub-contracts
manager
Schedule
analysts Program
managerWP
integrator
Contracts /Sub-contracts
management
Product and Configuration management
Resource management
Program Planning and controls
Schedule
analysts Data manager
Program “Home”
Windows desktop Web browser
Link contract data
requirement to scheduleLink schedule/contract to
product deliverables Link schedule/contract to
allocated resources
Topics
DS Strategy: PLM 2.0
Business Process Scope
Coexistence with V5
The New ENOVIA Platform
Discussion
Time
Migration / Carry OverScope of V6 usage
Coexistence
Authoring in V4/V5
(Files and/or on
ENOVIA DB
Authoring in V6
ENOVIA V6
Introduce V6 authoring for dedicated project or processes
Keep V4/V5 communities and collaboration between V4/V5 and V6
Manage step by step transition following the communities migration on V6
Carry over the data necessary for your program
Incremental or one shot import
Design & engineering are performed in V6
Take full benefit of V6 ROI
V6 Transition: Two Complementary Approaches
Logical Architecture for V6 / CATIA V5
MCS
DB
FCS
Client-MCS
http/s protocol
3DLIVE
Navigator
Client-FCS
http/s protocol
Governance
CATIA V5/
Designer
Central
IDOL
Client-IDOL
http/s protocol
Client-DB
Proprietary protocol
CATIA V4/V5 with…V6
Transition
File Based
ENOVIA VPM V4
ENOVIA VPM V5
ENOVIA Smarteam
ENOVIA MatrixOne
xPDM
V6 Transition: Supported Customer Scenarios
DELMIA E5/V5 with…V6
Transition
File Based
ENOVIA MANUFACTURING HUB
Topics
DS Strategy: PLM 2.0
Business Process Scope
Coexistence with V5
The New ENOVIA Platform
Discussion
DB ServerDB ServerDB Server
ENOVIAV6 Flexibility
MCS + FCS
+DB+NDX
Demo
MCS + FCS
+DB Client
+NDX
Sandbox /Training ProofofConcept
MCS
+DB ClientFCS Server
ProductionPrototype
IDOL Server MCS
+DB Client
FCS Server
3D Index
ServerConferencing
Server
From demo environment to full-scale production prototype
DB
ENOVIA V6 Flexibility
DBServer
MCS FCS Server
MCS
MCS
MCS Load Balanced Cluster on LAN
FCS Server
Load-balancer
Load-balancer
Note that load balancer can
either be in software or
hardware and configured based on load or
IP address as appropriate
3D Index
ServerConferencing
ServerIDOL Server
Load-balancer
3D Index
Server
V6 Architecture: Optimized for Extended Enterprise & Supplier Collaboration - Examples
DF
ENOVIA 3DLive Collaboration
Remote Access (with FCS)
PLM Exchanges via V6
CATIA V5 Partner delivering in a V6 Project
3DXML Publishing
Livecollaboration
Asynchronous collaboration
D F
F
A
A: ENOVIA Application Server (MCS)
D: Database Server
F: ENOVIA File Server (FCS)
F
A
Network security
Firewall management: Single port access to V6 Server
NAT and name translation
HTTPS is supported from client to reverse proxy
Firewall Firewall
OEM NetworkRemote Site Network
Firewall
DMZ
Reverse
ProxyExisting
Proxy
HTTP / SSL / IPSEC
Phase 2Phase 2
Phase 2Phase 2
Phase 2Phase 2
Phase 2Phase 2
http /https
third party
third partythird party
Public Network
http /httpshttp /https
http /https
http /https
http
Multi Site Public network infrastructure
Collaboration Server
FCS
MCS
RDBMS
User on Public Internet
Remote Site
Data
Ap
plic
ation L
aye
r
Secure Infrastructure – Remote Sites - ExampleRemote sites over WAN or MPLS accessing ENOVIA V6 with local FCS
Inte
rne
tD
MZ
WAN
Remote UsersFiber Switch
Storage Bay /
SAN
MCS
FCSDB NDX CNF
Orange = 1Gbit
Green= 2 Gbit FC or iSCSI
FCS
Proxy Server
(Optional)
Note: Remote users may also connect via a web
portal (like WebSphere Portal Server) and via other
secure access methods.
As only http-based access is required by ENOVIA V6,
the actual implementation will be customer-
dependant
Data
Cente
r
Thank you