Validation Change Control Maintaining The Validate State-09-2015.pptx

Embed Size (px)

Citation preview

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    1/56

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    2/56

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    3/56

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    4/56

    All rights reserved. Do not copy without permission. 0

    DA Guidance #o Industry

    /anuary 11 #hree Stages o( Process !alidation

    Process Design Stage *process is de(ined 'ased

    on development and scale2up- Process Per(ormance 8uali(ication *PP8- Stage

    *Design is con(irmed as 'eing capa'le o(reproduci'le production-

    Continued !eri(ication and improvement*Continuously gaining assurance the processremains in a validated state o( control-

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    5/56

    All rights reserved. Do not copy without permission.

    Im!ortance of Change Control

    %ot to prevent change.

    #o control and document change.

    3e)uired 'y the regulations. Identi(y GBP and validation implications.

    Ascertain process remains in a state o(

    control. Bust 'e implemented using a procedure.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    17/56

    All rights reserved. Do not copy without permission. 16

    Controlling Change

    Eow to maintain a validated?)uali(ied state a(terchange *implementing change control- &valuate (or impact on GBP compliance.

    &valuate (or impact on validation. nowledgea'le assessment o( re)uirements to maintain

    compliance and validation *commensurate with ris@level-.

    Develop plan to implement re)uirements.

    Implement re)uirements and maintain a compliant andvalidated system.

    Bonitor to ensure change gave intended result and didnot introduce une:pected issues

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    18/56

    All rights reserved. Do not copy without permission. 15

    #he AS#B &

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    19/56

    All rights reserved. Do not copy without permission. 14

    Process !alidation General

    Principles and Practices Guidance to industry issued 'y the DA in

    /anuary 11. $utlines the li(e cycle approach to validation. Inline with the principles advanced in ICE 85,

    ICE 84, ICE 81 and in AS#B &

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    20/56

    All rights reserved. Do not copy without permission.

    DA Guidance to Industry

    /anuary 11 #hree Stages o( Process !alidation

    Process Design Stage *process is de(ined 'ased on

    development and scale2up- Process 8uali(ication Stage *Design is con(irmed

    as 'eing capa'le o( reproduci'le production-

    Continued !eri(ication and improvement

    *Continuously gaining assurance the processremains in a state o( control-

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    21/56

    All rights reserved. Do not copy without permission. 1

    #he "i(e Cycle Approach to Process

    !alidationPlanning

    Design *ICE 85-

    Implementation

    8uali(icationContinuous

    !eri(ication

    Improvement

    ICE 84

    ICE 84, CAPA, PA#

    Change Control

    PA#

    ICE 81

    #he 8uality System

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    22/56

    All rights reserved. Do not copy without permission.

    Stage 1 Process Design

    Fnderstanding the science

    Fnderstanding the ris@ uilding 8uality into the process

    &sta'lishing Control Strategy

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    23/56

    All rights reserved. Do not copy without permission. ;

    Stage Implementation and Process

    8uali(ication

    8uali(ication o( utilities and e)uipment Process Per(ormance 8uali(ication *PP8-

    protocol

    Protocol e:ecution and report

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    24/56

    All rights reserved. Do not copy without permission. 0

    Stage ; Continued Process

    !eri(ication*ensure process remains in a validated state o( control-

    Bonitoringappropriate parameters to ensure

    process in a state o( control.

    Fse CAPA, PA# and change control as well asdata collected in monitoring to maintain the

    validated state and continually improve the

    process. Proper maintenanceo( the (acility, utilities, and

    process e)uipment

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    25/56

    25

    Stage ; o( Guidance Stipulates

    Process must remain in a state o( control *or in the8uali(ied?validated State-

    #his is accomplished 'y veri(ying that it is, through a systemto detect unplanned departures *monitoring-.

    I( trends are o'served, then you must ta@e action to correct.&very time you ta@e action to correct *e.g. PA#, CAPA- youmaintain the validated state and you are improving theoperation.

    Fse Statistics to identi(y trends and review such using SB&.

    8uality unit to review the in(ormation.

    Fse data collected to identi(y ways to improve process.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    26/56

    26

    Stage ; o( Guidance Stipulates

    8uality unit to meet with manu(acturing periodicallyto evaluate data.

    Bonitor 'eyond process parameter *e.g complaints,

    $$S, deviations, etc.-. Fse data collected to identi(y ways to improve

    process.

    Baintenance o( the (acility, utility and e)uipment is

    o( critical importance (or maintaining the validatedstate.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    27/56

    Bonitoring

    %eed to @now the right Critical 8uality

    Attri'utes *C8As- o( product

    %eed to @now the Critical ProcessingParameters *CPPs- which a((ect C8As

    Bonitor the CPPs and C8As

    Insure you ta@e actions when you see adeviation or o'serve a trend.

    All rights reserved. Do not copy without permission. 6

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    28/56

    All rights reserved. Do not copy without permission. 5

    Data (rom varia'le 'eing monitored should con(orm to a

    random pattern around the target value, and should 'e within the

    action limits to indicate that the system?process?condition is

    under control.

    J

    J

    J

    J

    JJ

    JJ

    Action "evel

    Alert "evel

    Alert "evel

    Action "evel

    Time

    2unction

    eing

    Monitored

    J

    J JJ

    JJ

    J

    JJJ

    JJ

    ailure

    #arget !alue

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    29/56

    All rights reserved. Do not copy without permission. 4

    Monitoring ensures trends to+ards failure are identified

    in time

    J

    J

    J

    J

    JJ

    JJ

    Action "evel

    Alert "evel

    Alert "evel

    Action "evel

    2unction

    eing

    Monitored

    J

    J JJ

    JJ

    J

    JJJ

    JJ

    JJ

    #rend 'egins

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    30/56

    All rights reserved. Do not copy without permission. ;

    Correct the negati"e trend 4y mani!ulating the !ro!er

    CPP

    J

    J

    J

    J

    JJ

    JJ

    Action "evel

    Alert "evel

    Alert "evel

    Action "evel

    2unction

    eing

    Monitored

    J

    J JJ

    JJ

    J

    JJJ

    JJ

    JJ

    egin Banipulating

    CPP

    J JJ J

    JJ

    JJ

    JJ

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    31/56

    ;1

    P0T C0 */ IT

    Process Analyer

    Processing step

    Product 8ualityK ( *input property, intermediate property, processing conditions, )uantityand )uality o( processing input, etc.-

    Computer Bodel

    3esult o( analysis

    or reading

    Critical

    Sample?3eading

    Product o( accepta'le

    )uality

    Processing step

    Control signal

    Banipulate process intodesired state

    InputProcessing step

    inal stepProduct )uality reading

    Process analyer

    3esult o( analysis

    or reading

    In!ut*material, heat,

    agitation, etc.-

    All rights reserved. Do not copy without permission.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    32/56

    %egative event

    CAPA

    All rights reserved. Do not copy without permission. ;

    $5am!le Monitoring data

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    33/56

    CAPA

    CAPAK Corrective Action Preventive

    Action

    A process which uses many o( the e:isting)uality system components to ensure

    process remains in a state o( control.

    Action is ta@en to correct a deviation or noncon(ormance *)uality event-, 'ased on level

    o( ris@.

    All rights reserved. Do not copy without permission. ;;

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    34/56

    CAPA

    As issues are corrected or prevented (romhappening again you return the process into a

    state o( control and improve the process

    In cases o( intolera'le ris@ action is ta@en toprevent the reoccurrence o( the )uality event.

    Bany o( these actions re)uire changes, which

    should 'e implemented a(ter invo@ing the

    change control system to insure system

    remains in a validated state o( control.

    All rights reserved. Do not copy without permission. ;0

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    35/56

    CAPA

    Fse ris@ assessment and your @nowledge o( theprocess to determine the degree o( corrective

    and preventive action to 'e ta@en.

    #he level o( e((ort, its (ormality and the levelo( documentation should 'e commensurate

    with the level o( ris@ and 'e 'ased on science.

    Bany o( the actions ta@en correct or prevent a

    processing pro'lem re)uire changes to the

    operation2Fse Change Control to manage

    them.

    All rights reserved. Do not copy without permission. ;

    Change Control System

    Change

    Identi(iedGBP

    IssuesL

    &mergencyL

    Initiate

    Change

    Control

    Implement as

    Baintenance

    $'tain

    Approvals

    Implement

    Change

    Document

    Change

    Implement

    Compliance

    3e)uirements

    %$%$

    =&S =&S

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    37/56

    All rights reserved. Do not copy without permission. ;6

    Change Control Procedure

    Initiate change *simple (orm with

    Husti(ication, technical in(ormation and drawings-.

    3eview and approval *)uality unit, usergroup, engineering, validation pro(essional,

    regulatory a((airs, sa(ety and environmental-. Identi(y GBP implications

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    38/56

    All rights reserved. Do not copy without permission. ;5

    Change Control Procedure

    6cont.7

    De(ine what is needed to ma@e the

    change permanent.

    Identi(y revalidation re)uirements, i(

    any, and implement.

    Change permanent.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    39/56

    All rights reserved. Do not copy without permission. ;4

    Initiating Change

    A short and concise (orm

    Should have space (or comments and

    approvals Should have all in(ormation needed to

    render Hudgment

    Should have space to de(ine re)uirements(or implementing change

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    40/56

    All rights reserved. Do not copy without permission. 0

    Change 3e)uest orm

    Page 1

    $riginatorMs In(ormation

    Date

    Short #itle

    3eason (or 3e)uesting Change

    Description o( 3e)uested Change

    nown or Suspected GBP Implications Add support documentation and?or drawings

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    41/56

    All rights reserved. Do not copy without permission. 01

    Change 3e)uest ormPage

    3eview, 3e)uirements, and Approval

    #echnical review and comments 'y engineering,

    technical services, operation, regulatory, sa(ety,

    environmental, and 8A2recommend approval?disapproval 3eview and approval 'y Change Control Committee

    *needed i( disagreements occur a'ove-

    De(ine re)uirements to 'e satis(ied (or change

    implementationN validation, document or drawing

    modi(ication, procedure modi(ication, etc.

    Ch C t l d

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    42/56

    All rights reserved. Do not copy without permission. 0

    Change Control procedure

    $nd

    $nd

    Change re-uired

    'enerate

    Change (e-uest

    'MP

    Im!lications&

    o

    o

    8es

    (e-ualification&

    (e"alidation&

    8es

    Implement Change

    Baintenance

    Im!lement Change

    Insure 'MP

    (e-uirements *one

    Issue 'MP

    (e!ort

    /4tain 0!!ro"al

    Change is

    Permanent

    (e-ualify

    (e"alidate

    Issue (e!orts

    /4tain

    0!!ro"als

    Change is

    Permanent

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    43/56

    All rights reserved. Do not copy without permission. 0;

    &mergency Changes

    Implement Change

    ill out paper wor@ and circulate (or comments

    and approval *within 05 hours- Implement GBP re)uired actions immediately

    3elease is contingent on additional testing and

    implementation o( GBP re)uirements.

    eep a close eye on the lots released once

    distri'uted and (acilitate (ast customer (eed'ac@.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    44/56

    All rights reserved. Do not copy without permission. 00

    Post Change Bonitoring and its

    Importance

    $nce change is implemented and 'ecomespermanent you must continue to monitor thechanged part to ensure a- change achieved its o'Hective and '- that no unintended issues arise.

    Do a lot o( monitoring in the 'eginning toesta'lish 'ac@ground in(ormation, then scale 'ac@to a statistically appropriate level.

    "oo@ at variation (or the 'atch and also (or 'atchto 'atch variations.

    Always 'e )uantitative and use statistical methodswhen ever possi'le.

  • 7/24/2019 Validation Change Control Maintaining The Validate State-09-2015.pptx

    45/56

    All rights reserved. Do not copy without permission. 0