14
Page 1 of 14 Vessel Name : MV. JOCELINE Dimension : 114.0m x 17.5m x 9.3m ( GRT - 4902 Tons) Duration : 10 Days Fine Weather Working Days All In Dock Item Description Marcopolo Shipyard Quota Singapore Do Qty Unit Unit Rate G General service G1 Shore Power Supply 10 days 160 Diesel consumption per liter 1.20 G2 Fresh Water 1 ton 10 G3 Provide rubbish bin including disposal. 10 days 40 G4 To dock and undock barge including 1st dock in dock 1 lot 1,750 G5 Subsequent day dock hire . 9 days 389 G6 Dock preparation. 1 lot 389 G7 Wharfage. 0 days 139 G8 3 moves 180 G9 2 moves 4,050 G10 G11 10 days 40 G12 10 days 40 G13 10 day 80 G14 Gas free inspection by Shipyard personnel. 10 day 60 G15 UR hour 60 G16 Gang way at no charge. G17 Remove and refit manhole covers . each 45 Renew gaskets . each 35 Renew broken studs/nuts . each 10 G18 Remove and refit bottom plugs. each 35 Provide portable generator based on 440V/3 Phase /60Hz and up to 200 AMP disconnection Riggers assistance for docking and undocking and departure only . only. Pilotage for arrival and departure to be arranged by Owner's local agent at Owner's account. Provided of fire line per line per day. Connection disconnection included. Fire patrol only for day time and when hot-work activity is onboard during normal working hours . Arrangement of cooling water per line per day. Allow for 2 lines( Aircon & refigerator). Connection disconnection included. @ S$ 40 per line per day Cranage for ship's store/provision only, per hour or part thereof.

Valves

Embed Size (px)

DESCRIPTION

valves

Citation preview

Page 1 of 18Vessel Name : MV. JOCELINEDimension : 114.0m x 17.5m x 9.3m ( G! " 490# !ons$D%&a'ion : 10 Da(s )ine *ea'+e& *o&,in- Da(s .ll In Do/,Item DescriptionG General serviceG1 Shore Power SupplyProvide portable generator based on 440V/3 Phase /60Hz and up to 00 !"P#iesel $onsu%ption G &resh 'aterSupply (resh water in$lusive o( $onne$tion and dis$onne$tionG3 Provide rubbish bin in$luding disposal)G4 *o do$+ and undo$+ barge in$luding 1st do$+ in do$+)G, Subse-uent day do$+ hire )G6 #o$+ preparation)G. 'har(age)G/0iggers assistan$e (or do$+ing and undo$+ing and departure only )G1 *ugs hire (or do$+ing2 undo$+ing and departure only) G10G11Provided o( (ire lineper line per day) 3onne$tion dis$onne$tion in$luded) G1G13Pilotage (or arrival and departure to be arranged by 4wner5s lo$al agent at 4wner5s a$$ount)&ire patrol only (or day ti%e and when hot6wor+ a$tivity is onboard during nor%al wor+ing hours )!rrange%ent o( $ooling water per line per day) !llow (orlines7 !ir$on 8 re(igerator9) 3onne$tion dis$onne$tion in$luded) : S; 40 per line per day Page 2 of 18G14 Gas (ree inspe$tion by Shipyard personnel)G1,3ranage (or ship5s store/provision only2 per hour or part thereo()G16 Gang way at no $harge)G1. 0e%ove and re(it %anhole $overs )0enew gas+ets )0enew bro+en studs/nuts )G1/ 0e%ove and re(it botto% plugs)G11HH1a External Hull Blasting and PaintingBottom Area (1500 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%H1b Bottop Area (1000 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%H1$ !op "ide Area (#00 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%Grit blastingS! )0 S! 1), S! 1)0 Provide (or$ed ventilation (an per tan+/lo$ation per day) 3onne$tion dis$onne$tion in$luded)Page 3 of 18Hull Painting*ou$h up$aot2 per $oat 7 %ini%u% $harge ,0< o( (ull $aot area9&ull 3oat Paint 2 !ssu%e 3 (ull $oat)General =otes (or Hull >lasting and Painting1) 4wner to supply all paint and thinner))"ini%u% $harge (or grit blasting 300%3) ?@$lude treat%ent o( botto% hull in way o( do$+ blo$+s)Ha!n$hor 7An$luded ite% no 390ange port and stbd an$hor and $oat with owner paintHP washing i( re-uired will $harge e@traHb!n$hor 3hain6 Bowering down an$hor $hain) *otal 1 sha$+le port and stbd6 3leaning and $hipping 7allow hosing down only96 "easure%ent an$hor $hain and re$ort to $lass and ownerH$3hain Bo$+er6 0e%oval and disposal o( %ud6 3leaning and painting $hain lo$+er port and stbdHH*o repaint dra(t2 pli%soll %ar+s2 barge na%e and P40 only)*o prote$t hull anodes during painting2 e@tra :S; 3 ea$h)A"teel $or%1aCltrasoni$ thi$+ness %easure%ent 7"ini%u% 00 spots9General re%ar+s (or steel renewal wor+Db9 Euoted pri$es in$ludes the (ollowing D3rop and renew 4wner5s supply Fin$ anodes 7allow 400@10@,0%%9 1. +g welded type hull anodes) ?@$lude a$$ess wor+s)*o $rop and renew de(e$tive steel using preblasted and pri%ed !>S Gr) ! ship plates and %ild steel se$tionals) 0egardless o( lo$ation and internals/pro(iles) Pri$e Per Gg)a9 !ll new steel2allow (or pre6blasted and pri%ed !>S gradeH!Iship plate or e-uivalent and %ild steel se$tionals) &or high tensile steel2 sur$harge 3,