Upload
rianto-aritonang
View
217
Download
3
Embed Size (px)
DESCRIPTION
valves
Citation preview
Page 1 of 18Vessel Name : MV. JOCELINEDimension : 114.0m x 17.5m x 9.3m ( G! " 490# !ons$D%&a'ion : 10 Da(s )ine *ea'+e& *o&,in- Da(s .ll In Do/,Item DescriptionG General serviceG1 Shore Power SupplyProvide portable generator based on 440V/3 Phase /60Hz and up to 00 !"P#iesel $onsu%ption G &resh 'aterSupply (resh water in$lusive o( $onne$tion and dis$onne$tionG3 Provide rubbish bin in$luding disposal)G4 *o do$+ and undo$+ barge in$luding 1st do$+ in do$+)G, Subse-uent day do$+ hire )G6 #o$+ preparation)G. 'har(age)G/0iggers assistan$e (or do$+ing and undo$+ing and departure only )G1 *ugs hire (or do$+ing2 undo$+ing and departure only) G10G11Provided o( (ire lineper line per day) 3onne$tion dis$onne$tion in$luded) G1G13Pilotage (or arrival and departure to be arranged by 4wner5s lo$al agent at 4wner5s a$$ount)&ire patrol only (or day ti%e and when hot6wor+ a$tivity is onboard during nor%al wor+ing hours )!rrange%ent o( $ooling water per line per day) !llow (orlines7 !ir$on 8 re(igerator9) 3onne$tion dis$onne$tion in$luded) : S; 40 per line per day Page 2 of 18G14 Gas (ree inspe$tion by Shipyard personnel)G1,3ranage (or ship5s store/provision only2 per hour or part thereo()G16 Gang way at no $harge)G1. 0e%ove and re(it %anhole $overs )0enew gas+ets )0enew bro+en studs/nuts )G1/ 0e%ove and re(it botto% plugs)G11HH1a External Hull Blasting and PaintingBottom Area (1500 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%H1b Bottop Area (1000 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%H1$ !op "ide Area (#00 m2High pressure wash upto 3000 psi with (resh waterHard s$araping 2 assu%e .0< o( total areaHosing o( (resh water a(ter grid blasting and prior painting'ashdown oil strains with owner5$ $he%i$al2 %ini%u% $harge 00%Grit blastingS! )0 S! 1), S! 1)0 Provide (or$ed ventilation (an per tan+/lo$ation per day) 3onne$tion dis$onne$tion in$luded)Page 3 of 18Hull Painting*ou$h up$aot2 per $oat 7 %ini%u% $harge ,0< o( (ull $aot area9&ull 3oat Paint 2 !ssu%e 3 (ull $oat)General =otes (or Hull >lasting and Painting1) 4wner to supply all paint and thinner))"ini%u% $harge (or grit blasting 300%3) ?@$lude treat%ent o( botto% hull in way o( do$+ blo$+s)Ha!n$hor 7An$luded ite% no 390ange port and stbd an$hor and $oat with owner paintHP washing i( re-uired will $harge e@traHb!n$hor 3hain6 Bowering down an$hor $hain) *otal 1 sha$+le port and stbd6 3leaning and $hipping 7allow hosing down only96 "easure%ent an$hor $hain and re$ort to $lass and ownerH$3hain Bo$+er6 0e%oval and disposal o( %ud6 3leaning and painting $hain lo$+er port and stbdHH*o repaint dra(t2 pli%soll %ar+s2 barge na%e and P40 only)*o prote$t hull anodes during painting2 e@tra :S; 3 ea$h)A"teel $or%1aCltrasoni$ thi$+ness %easure%ent 7"ini%u% 00 spots9General re%ar+s (or steel renewal wor+Db9 Euoted pri$es in$ludes the (ollowing D3rop and renew 4wner5s supply Fin$ anodes 7allow 400@10@,0%%9 1. +g welded type hull anodes) ?@$lude a$$ess wor+s)*o $rop and renew de(e$tive steel using preblasted and pri%ed !>S Gr) ! ship plates and %ild steel se$tionals) 0egardless o( lo$ation and internals/pro(iles) Pri$e Per Gg)a9 !ll new steel2allow (or pre6blasted and pri%ed !>S gradeH!Iship plate or e-uivalent and %ild steel se$tionals) &or high tensile steel2 sur$harge 3,