TEMPLATE D0010861 Page : 1 / 1
SPX Cooling Technologies SPX Ref. Nr : WB1-101-000467_QCP4840_ Client
VALVE(S) Quality Control Plan File Nr. : D0204482_ Issued by : CBR
- AIRCOOLED STEAM CONDENSER (ACC) Date 18/07/2014 Approved by : SNA
This inspection plan is intended to inform the vendor about the minimum extent of inspection foreseen for the order by SPX Contractor, Client and/or their representatives.
RD = Review Documentation (test report) RI = Random Inspection WP = Witness Point HP = Hold Point RTC = Review Test Certificate
Pos. Rev. Test description Test Execution Evaluation Inspection codesFrequency procedures / codes criteria / codes
or % Vendor SPX Client DATE PLACE
Code Sign. Code Sign. Code Sign. Code Sign. (month/year)
0 0 Check vendor/ - Review agreement Approved vendor - RD -
subvendor certification
2 DESIGN
2.1 0 Design standard All Vendor internal quality system Conform to requisition / valve list RD
ANSI ANSI
2.2 0 Drawings All Vendor internal quality system Valve list RD
2.3 0 Valve data 1 per type Vendor internal quality system Conform to requisition / valve list RD
3 MATERIAL
3.1 0 Raw material certificates 1 per batch Check certificates ( type ) DIN 50049 - 3.1. / EN 10204 - 3.1. RD
pressure parts or ASTM equivalent
3.2 0 Raw material certificates 1 per batch Check certificates ( type ) DIN 50049 - 2.2 / EN 10204 - 2.2 RD
non pressure parts or ASTM equivalent
4 WELDING DOCUMENTS
4.1 0 WPQ / WQ / WPQR All Vendor internal quality system Approval stamp on welding documents RD
(if applicable) ASME IX ASME IX
4.2 0 WPS / ( weldmap ) All According vendor standard WPS certified by WPQ RD
(if applicable)
5 VISUAL WELDING EXAMINATION
5.1 0 All welds 100% Vendor internal quality system Conform to WPS, applicable codes RD
According to WPS, applicable codes10 TESTING
10.1 0 (Hydrostatic) pressure test All According to code(s):ANSI Result conform to code(s):ANSI RD(1.5 * design pressure)
10.2 0 Seat leakage test All According to code(s): Conform to code(s):ANSI/API RDANSI/API
10.3 0 Functional test with actuator All Vendor internal quality system Conform to requisition / datasheet RD
11 VISUAL MATERIAL CHECK11.1 0 Quantity and type All Vendor internal quality system Conform to requisition / valve list RI
11.2 0 Dimensional check Sampling Vendor internal quality system Conform to ( vendor ) drawing / ANSI RI/RD
11.3 0 Auxiliaries Sampling Vendor internal quality system Conform to requisition / drawing RI/RD(fixation,material etc …)
11.4 0 Preservation Sampling Vendor internal quality system Conform to requisition RI/RD
11.5 0 Tagging Sampling Vendor internal quality system Conform to requisition RI
11.6 0 Packing & Marking All Vendor internal quality system Conform to requisition RITransport preparation
12 GENERAL12.1 0 Final inspection All According to ( vendor ) quality plan Conform to contractual documents RD
12.2 0 Review manuals 1 per type - Conform to requisition RD
Note : Vendor internal quality control plan is also applicable.