    1

    1.MobilizationofABDConsultantsKnightFrankPvt LtdJVREPL,Gurgaon

    2.IssueofSmartParkingRFPforO&MonPPPbasis3.IssueofSmartEducationEOIforSchoolsinABDArea4.IssueofRCCUtilityDuct+Cabling RFPfor1.7kmPilotRoad5.AwardofGPSbasedVTMSProject

    forSolidWasteCollectionVehicles(pancity)6.FinalizationofWaterSupplyandSewerageDPR

    underAMRUT,fortheABDArea7.PreparationofRFPforSelectionofTransactionAdvisors

    forissueofMunicipalBonds

  • 22112016

    2

    Technical&AdministrativeSupportUnit:Eptisa Servicios DeIngeniera SL,Spain4FulltimeExperts: UrbanManagementExpert

    UrbanInfrastructureExpertICTSolutionsExpertProcurement&ContractExpert

    25SectorExperts+4FulltimeSupportStaff

    ICTConsultants: KPMGAdvisoryServicesPvt Ltd,NOIDAforICTMasterPlanandDPRs

    ABDConsultants: KnightFrankPvt LtdJVREPL,GurgaonforABDMasterPlanandDPRs

    HRAgency: PrimeOne WorkforcePvt Ltd,BhopalforrecruitmentofSPVStaff

    Architectural/Engineering ConsultantsforEARLYBIRDProjects

    FortressInfrastructureAdvisoryServices,MumbaiRIVERFRONTDEVELOPMENTPROJECT

    NitinShrimali &Associates,IndoreCONSERVATION/RESTORATIONOFRAJWADAANDCHHATRIBAGH

    SNSAssociates,IndoreVENDORMARKETATJINSIHAATMAIDAN

    VersatileEngineeringServicesPvt Ltd,IndoreUGCABLINGANDSTREETLIGHTINGALONGABDPILOTROADS

    ArjunHablani Architects,IndoreCONSERVATION/RESTORATIONOFGOPALMANDIR

  • 22112016

    3

    DEVELOPMENT OF ALL MAIN ROADS UNDER ABD AREAS AS SMART ROADS

    CONSTRUCTION OF CARRIAGE WAY NEARING COMPLETION

    UNDER GROUND CABLING TENDERS RECEIVED AND TECHNICAL EVALUATION COMPLETED

    RFP ISSUED FOR UG DUCT

    RFP ISSUED FOR CENTRAL DIVIDER AND STREET LIGHTING

    Mhow Naka

    Jinsi

    Bada Ganpati Tori Corner

  • 22112016

    4

    XLPE insulated armoured HV and LV cables are planned to be laid in trays within underground RCC duct. From this, connections will be provided to residential, commercial and other uses.

    Estimated cost of RCC Duct is Rs. 1.0 Crore per km per direction.

    Pilot Project is taken up along Biyabani Road. Expected date of completion is 30 April 2017.

  • 22112016

    5

    REDEVELOPMENT OF STREETS AND JUNCTIONS FOR WHICH DESIGNS HAVE ALREADY BEEN PREPARED

    ABD Consultants have been mobilized recently. Design of Streets and Junctions will be a priority task. Integration with Water Supply and Sewerage Improvement

    project essential, DPR has been finalized.

    PERFROMANCE-BASED CONTRACTS FOR MANAGEMENT OF SMART WATER SUPPLY SYSTEMS

  • 22112016

    6

    Under AMRUT, Rs. 1628 Crores have been allocated for whole City. M/s DRA (Nagpur) have been appointed as Consultants by IMC. DPR for Phase 1 works has been received on 30 Oct 2016. this has

    been reviewed by TASU, observations are compiled.

    In ABD Area: Water Supply System

    - Feeder Mains = 7.4 kms.- Distribution Network = 69 kms.- Construction OHT & GSR = 2 no.s (3 ML OHT, 6 ML GSR)

    Sewerage System-Collection System = 42 kms.-De-centralised STP = 10 MLD

    Water Reuse-Reuse network = 24 kms-Construction of OHT = 1 nos. (3 ML)

    Est.ProjectCost=Rs.175Crore(CAPEX)Rs.136Crore (OPEX)

    Project Components (Priority) Smart Meters & Management DMA-based distribution

    system for 24x7 supply & NRW Reduction

    SCADA & Automation 100% Sewage collection &

    Treatment Recycling & Reuse for effluent Long term Performance Based

    Contract for O & M to be awarded on PPP-basis

    Est. Project Cost = Rs. 175 Crore (CAPEX)Rs. 136 Crore (OPEX)

  • 22112016

    7

    INTEGRATED CONTROL & COMMAND CENTRE HAVING ALL THE MODULES

    DesignoftheSolution IOToperationalplatform

    IndoreCityNetwork

    FieldAreaNetwork

    SmartLight

    WiFiApplication

    VideoManagement&

    Analytics

    EnvironmentalApplication

    CCTVCamera WiFiAccessPoint StreetLight EnvironmentalSensor

    RFPforC4tobereadyby31/12/2016,tobeintegratedwithotherSMARTProjects

  • 22112016

    8

    EOI and POC process completed.

    RFP will be ready by 05-12-2016.

    EIGHT Companies presented POC:BSNLBhartiInfratelEricsson,UshaInternationalandEnergasiaIL&FSandCiscoHPLIndiaLtd.SmartTech andPhilipsIndiaLtd.TechMahindra,CiscoandNeev EnergyL&TandCisco

    Implementation on PPP-mode.

    About 800 Smart Poles and 70,000 LED street-lights planned in Indore.

    Smartpoleswillbeusedasawirelessinfrastructurebackboneforgettingatelecomandlocalconnectivity.UsingthiswithOFC,multipleapplicationscanbeachieved.

  • 22112016

    9

    StreetLightAutomation

    Connectedsmartlights ON/OFF/Dimmingandfaultdetection. Automaticschedules AllON/AlternateON/1in3ON/motionbasedON/OFF. Stopwastagetosaveenergy averageof25 30%overLEDusage.

    Key Features Internal and vehicle-to-vehicle

    communication systems as wellas collision avoidance andcrash detection systems.

    Central Control Station

    Passenger Information Management System

    Communication Sub System

    Travel Demand Management

    Incident and Emergency Management System

    Fleet Management System

    Best Practices/ Benchmarking

  • 22112016

    10

    ItisplannedtoimplementPOCinsomeschoolsbyreputedvendorsinSmartEducationsector.Someschoolsare: SUBHASHSCHOOL

    GOVTSCHOOLATMOGLINES

    SHARDAKANYASCHOOL

    CompanieslikeDELL,ILFS,EDUCOMPhaveshowninterestforPOC.

    Aworkshopwasorganizedon07Oct2016forSchoolPrincipalsandTeacherstodiscussSmartEducationapproach.

    EOIhasbeenissued,DateofSubmission30Nov2016.

    GPSbasedVehicleTrackingSolutionforMSW

    RFIDTagon

    Vehicle

    DataServer

    CompletetrackingofvehiclescollectingSolidWastebyInstallationofGPSSysteminmorethan700IMCvehicles.

    IntroductionofsurveillanceCCTVCamerasforaccuratemeasurementofsolidwasteonLandfillsiteandTrenchingGround.

    Contractorappointed,workcommenced.

  • 22112016

    11

    UseofGISTechnologyforImprovingPropertyTaxCollection

    GISSurveyAgencyADCC(Nagpur)isappointedforDetailedPropertysurveyofwholecityforcollectionofaccurateandcompletedatarelatedtoMunicipalPropertyTax.

    ConsultanthasprocuredsatelliteImageryforthewholeCity.

    PhysicalSurveyworkforABDAreaunderSmartCityMissionCompleted.By31Dec2016,workforABDAreatobecompleted.

    AftercompletesurveyworkofwholeCityincluding29villages,CollectionefficiencyofallCorporationtaxeswillbeincreased.

    OTHER MAJOR PROJECTS

  • 22112016

    12

    Indoreisaheritagerichandculturallyvibrantcity.

    Conservation / adaptive reuse of erstwhile royal structures isimportant to restore the citys historic significance.

    Heritage conservation can provide impetus to tourism sector. Structures being taken up for conservation / restoration under

    Smart City Project are: Rajwada, Chhatri Bagh, Gopal Mandir andKrishnapura Chhatris.

    DPR under preparation, Target Date 10 Dec 2016.

    Shifting of ghumtis in near proximity

    Reconstruction of portion which recently fell in 2016.

    Faade development

  • 22112016

    13

    DPR ready. RFP to be floated.

    Restoration of Historic Wall, Gate and Bastions, Faade Development of Chhatris

    Development of Garden and monument lighting

    Provision of Parking and Public Conveniences

    Design of Signage + Interpretation

    Work on Gopal Mandir has commenced recently by Architect Arjun Hablani. DPR will be ready by 31 Dec 2016.

    ImportanceofParkingProjectduetoproposalforpedestrianization ofpartsofABDArea.

    SurveyoflandsforNewParkingProjectisunderprogress.Identificationofgovernmentowned,underutilizedlandistheemphasis.In1st PhaseofProjectPlanningParkingbuildingsareproposedat1. VeerSavarkar Market2. nearSubhash ChaukWaterTank3. NearMukeripura Masjid4. Yashwant Ganj nearMalganj Chauraha onIMCLand,5. OpenlandnearKhajuri BazaarandbehindMadhyaPradeshBookStall

    EOIforPOCisprepared.StrategyistoimplementSMARTPARKINGonPPPmodeanddesignrevenuesharingarrangement.

    ISCDLmayhavetoprovideVGF/CAPEXforbuildingtheparkingstructure.

    RFPforSmartParkingatTHREEEXISTINGPARKINGSTRUCTURESissued.

  • 22112016

    14

    KARBALA

    LENGTH3.9Km RAMBAGH

    RIVERFRONTDEVELOPMENTPROJECT

    Key Project for Urban Renewal.

    Survey of 3.9 km stretch completed.

    Phase 1 DPR to be ready by 15-12-2016.

    Project Execution to be coordinated with DEWATS.

    Project Execution to be coordinated with HFA / PMAY.

    RIVERFRONTDEVELOPMENTPROJECTI. RiverfrontDevelopmentofSubhash MargBridgetoJawahar MargBridge,Rehabilitation

    ofFruitMarket/Sabji Mandi Vendors,DevelopmentofGardenandUndergroundParking,DevelopmentofHarsiddhi GardenatC.P.Shekhar Nagar DPRby20Dec2016

    II. RiverfrontDevelopmentofJawahar MargtoGangor Ghat DPRby10Dec2016III. RiverfrontDevelopmentofGangor Ghat toKarbalaBridge

  • 22112016

    15

    RIVERFRONTDEVELOPMENTPROJECTGARDEN and COMMERCIAL AREA DEVELOPMENT

    RIVERFRONTDEVELOPMENTPROJECT

    HARSHIDHI CITY PARK ( C.P. SHEKHAR NAGAR )

  • 22112016

    16

    Itwaria and MalharganjHaat Bazaar will alsobe shifted to Jinsi HaatMaidan.

    DPR under preparation,to be ready by 30 Nov2016.

    INDORE SMART CITY,-ch-Mh- {ks=

    xaxoky cl LVsaM

    egw ukdk

    ,-ch-Mh- {ks=

    xaxoky cl LVsaM

    egw ukdk

    RedevelopmentofM.O.G.LinesArea(PPPMode)

    Currentlyidentifiedland,in4pocketsisspreadover52acres.

    ThesecompriseexistingResidentialuse(629units),Commercialuse(35units)andPublic/Semipublicuse(39units).

    Allthesewillneedtobecompensated.

    ProjectFeasibilityReportunderpreparation,TargetDate31Dec2016.

  • 22112016

    17

    Total Land Area forRed