12
VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Embed Size (px)

DESCRIPTION

Geoscience Australia 02 February 2006

Citation preview

Page 1: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

VLBI network design

Australian Government

Geoscience Australia

NGRS Workshop, 1-2 February, Canberra

Page 2: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Geoscience

Australia02 February 2006

Page 3: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Geoscience

Australia02 February 2006

Page 4: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Radiotelescopes in Australia

Geoscience Australia

02 February 2006

Page 5: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Radiotelescopes in Australia

Geoscience Australia

02 February 2006

Page 6: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

New network benefit

Geoscience Australia

02 February 2006

- ICRF (0.1 mas)

ITRF (1 mm)

network of small size fast moving dishes

IVS

Australian

more data

more sources

Australian geodetic datum

better reference sourcepositions

GPS

SLR

Page 7: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

New dish/network design benefit

Geoscience Australia

02 February 2006

Model sXp sYp sUT1 sNut1 sNut2 chi-sq Number (μas) (μas) (μsec) (μas) (μas) of scans____________________________________________________________________________ 6 stations 118 98 4.1 233 82 2.024 3290

6 st + Hartrao 101 61 4.2 168 60 1.646 3179

6 st + Hobart 81 69 3.4 156 61 1.657 3442

6 st + Yarra 58 59 2.7 133 47 1.693 3739

6 st + Y&Hob 58 54 2.7 133 45 1.646 4181

6 st + Y&Hart 43 47 2.5 116 43 1.553 3542

Page 8: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Geoscience

Australia02 February 2006

Hobart,26-meterantenna

Too far from all other radiotelescopes;Limited amount of good radiosources in the southern hemisphere;Slow slew rate (1 deg/sec) – little data;Old design

Page 9: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

New radiotelescope design

Geoscience Australia

02 February 2006

- Small size (< 20 meter);

- High slew rate (> 5 deg/sec);

- Near real-time VLBI;

- New equipment (broad band receiver 1-32 GHz);

- 5 deg elevation angle limit

Page 10: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Scheduling

Geoscience Australia

02 February 2006

- sharing time between astronomical VLBI and geodetic VLBI

- 50/50

- IVS makes schedule on annual basis

- ATNF makes schedule on semiannual basis - at least one Australian site each calendar day - own time assignment committee?

Page 11: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Geoscience

Australia02 February 2006

Heght differencesNy-Alesund

Year

1994 1996 1998 2000 2002 2004 2006m

eter

-0.15

-0.10

-0.05

0.00

0.05

0.10

0.15

TRF daily difference time series

Height componentKokee

Year

1992 1994 1996 1998 2000 2002 2004 2006

met

er

-0.15

-0.10

-0.05

0.00

0.05

0.10

0.15

Page 12: VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra

Geoscience

Australia02 February 2006

TRF daily difference time series

Height component,Hobart

Year

1988 1992 1996 2000 2004

met

er

-0.15

-0.10

-0.05

0.00

0.05

0.10

0.15

Height componentHartrao

Year

1984 1988 1992 1996 2000 2004

met

er

-0.15

-0.10

-0.05

0.00

0.05

0.10

0.15