Volvo Apqp

Embed Size (px)

Citation preview

  • 8/20/2019 Volvo Apqp

    1/30

     AdvancedProductQuality

    Planning

    Volvo 3P

     APQP

     APQP

    Information for suppliers

  • 8/20/2019 Volvo Apqp

    2/30

     APQP information for suppliers

    2

    Volvo 3P   APQP

     APQP

    Contents

    1 - What is APQP and its benefits ?

    2 - When to start and how to share APQP planning and status with Volvo ?

    3 - Where to find APQP information / templates ?

    4 - What are the Volvo APQP specifics ?

    5 - Conclusion: what to keep in mind

  • 8/20/2019 Volvo Apqp

    3/30

    1 - What is APQP and its benefits?

  • 8/20/2019 Volvo Apqp

    4/30

     APQP information for suppliers

    4

    Volvo 3P   APQP APQP

     APQP Definition and Objective accordingto AIAG

    • Definition

    ”APQP is a guideline designed to produce a product quality plan

    which will support the development of a product or service that

    will satisfy the customer”

    • Objective

    ”To facilitate communication with everyone involved to assure

    that all required steps are completed on time”.

  • 8/20/2019 Volvo Apqp

    5/30

     APQP information for suppliers

    5

    Volvo 3P   APQP APQP

     Advanced Product Quality Planning

    is supplier’s planningin compliance with AIAG reference manual

    It is a VOLVO

    requirement (incl.

    RTS, PAA, PHR) as

    specified in SQAM

    Pre-requisite: supplier is trained to APQP

    according to AIAG reference and its own

    development process is in compliance with it

  • 8/20/2019 Volvo Apqp

    6/30

     APQP information for suppliers

    6

    Volvo 3P   APQP APQP

    What does APQP mean for Volvo?

    • Supplier APQP team is responsible for performing the APQP and report toVolvo team during the APQP review meetings, using the APQP reviewcheck-list

    •  A very detailed supplier timing chart synchronised with Volvo project milestones

    •  A very detailed APQP check-list review aiming to identify and manage risks

    •  A management by project phases (not by activity as it was done in the past)

    •  A regular Volvo-supplier APQP follow-up meeting with formal reviews prior toVOLVO releases

    •  Additional 3 Volvo specific best practices (RTS, PAA, PHR)

     A robust way of working cross-functionally between Volvo and supplier aiming todeliver a project at contracted QDCF

  • 8/20/2019 Volvo Apqp

    7/30

     APQP information for suppliers

    7

    Volvo 3P   APQP APQP

     APQP is supplier's planning that integrates VOLVO

    inputs, constraints and deliverables and is synchronizedwith VOLVO project milestones

    Examples of Volvo inputs:

    • Technical requirements

    • Time plan: part release dates, PPAP date, SP date…

    • Prototype requirements

    • Verification and validations performed by Volvo

    ….

     APQP simplifiedprocess flow

  • 8/20/2019 Volvo Apqp

    8/30

     APQP information for suppliers

    8

    Volvo 3P   APQP APQP

    Volvo Objective for APQP

    Have suppliers develop a relevant

    plan for new part launch

    Plan for 

    activities

    Volvo - supplier interactions

    Deliver to the plan

    Successful activities on time !

  • 8/20/2019 Volvo Apqp

    9/30

     APQP information for suppliers

    9

    Volvo 3P   APQP APQP

    Benefits of APQP• Secures supplier project management is in place

    • Ensures early planning takes place

    • Establishes pro-active communication on both

    Volvo and supplier side

    • Identifies required changes early in the process in

    order to mitigate risks and to reduce need for late

    design and process changes

    • Provides quality product on time and at lower cost

    • Improves PPAP approved on time

    • Reduces PPM levels at SOP

    • Reduces field failures

    Stronger & earlier supplier’s involvement in Projects

    0

    100

    Supplier involvement

    Room for Manoeuvre

    IG VG CSG DG FDCG IG PPG EG

    DeploymentConcept

    Study

    Detailed

    Dvlpt

    Final

    Dvlpt

    Industriali-

    zationPre-study

    CG FG LG RG

    QDCF

    CSG

    DG FDCG IG PPG EG

    DeploymentConcept

    StudyDetailed

    DvlptFinalDvlpt

      IndustrializationPre-study

    CG FG LG RG

    Industrial launchCosts

    Time

    IG VG

     Advanced Qual ity in Projects

  • 8/20/2019 Volvo Apqp

    10/30

    2 - When to start and how to share APQPplanning and status with Volvo ?

  • 8/20/2019 Volvo Apqp

    11/30

     APQP information for suppliers

    11

    Volvo 3P   APQP APQP

    Suppliers should provide the first APQP planning

    with their answer to the Request for Quotation

    10.4 Advanced Product Quality

    Planning

    (…)

    The supplier is requested to build its

    Plan of Product Realization according to

    the AIAG APQP Manual.

    (…)

    The supplier is requested to submit with

    its proposal … a preliminary APQP

    plan …

    Request For Quotation

  • 8/20/2019 Volvo Apqp

    12/30

     APQP information for suppliers

    12

    Volvo 3P   APQP APQP

    How to match with Volvo GDP? Development supplier 

    SQE coordinatescompletion of

    VOLVO APQP

    activities with the

    Project Team

    Supplier performs APQP activities under 

    its responsibility

    Supplier

    Product

    Design

    Supplier

    Process

    Design

    Supplier

    Process

    Development

    SupplierProduct &

    Process

    Validation

     APQP

    KICK-OFF

    review

     APQP

    PRODUCT DESIGN

    review

     APQP

    PROCESS DEVELOPMENT

    review

     APQP

    LAUNCH

    review

     APQP

    INDUSTRIALIZATION

    review

    Concept Study Detailed development Final development Industrialization

    DG FDCG IG PPG RG

     A

    Release

    B

    Release

    C

    Release

    P

    Release

    Supplier

    selected

    PPAP

     Approved

    Volvo

    PPAP

    amendment

    VOLVO Project team performs

     APQP activities under its

    responsibility and consult Supplier

     APQP deliverables

    Volvo

    PPAP

    order 

  • 8/20/2019 Volvo Apqp

    13/30

     APQP information for suppliers

    13

    Volvo 3P   APQP APQP

    How to match with Volvo GDP ? Production supplier 

    SQE coordinatescompletion of

    VOLVO APQP

    activities with the

    Project Team

    Supplier performs APQP activities under 

    its responsibility

    Supplier

    Process

    Design

    Supplier

    Process

    Development

    SupplierProduct &

    Process

    Validation

    Supplier

    selected

     APQP

    KICK-OFF

    review

     APQP

    PROCESS DEVELOPMENT

    review

     APQP

    LAUNCH

    review

     APQP

    INDUSTRIALIZATION

    review

    Concept Study Detailed development Final development Industrialization

    DG FDCG IG PPG RG

     A

    Release

    B

    Release

    C

    Release

    P

    Release

    PPAP

     Approved

    Volvo

    PPAP

    amendment

    VOLVO Project team performs

     APQP activities under its

    responsibility and consult Supplier

     APQP deliverables

    Volvo

    PPAP

    order 

  • 8/20/2019 Volvo Apqp

    14/30

     APQP information for suppliers

    14

    Volvo 3P   APQP APQP

     APQP planning: bad example

    Updated:

    2012

    Jan Feb Mar Apr May J un Jul Aug Sep Oct Nov Dec Jan Febr Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Febr Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

    Projekt milestones

    V3P APQP

    Product Milesones

    Process Checkpoints

    Verification PPAP

    P-drawing

    MRD Blanks 10w28

    MRD 10w36

    Production 10w38

    PSW 10w42

     Allocatition request

    Hub equipm Mfg

    Personell BC

    Logistic system Updating communication system

    Material Handling

    2011

    Ref.V3P APQP

    Plan Issue 1 date 10/8-09

    2009

    Project Plan

    2010

    03/11/09

    P#3

    10w2409w38

    P#2

    11w48

    P#4

    SoP

    11w35

    Packa in

    10w47

    PS

    10w43

    SPR

    10w34

    1 ST

    10w25

    IR

    09w38

    PDR

    09w26

    KO

    09w26

    P#0

    Manufacturing & InstallOrders

    09w40

    10w34

    Legend:

    KO = APQP Kick-off 

    PDR = Product Design Review

    PDR = Process Design ReviewIR = Industrialization Review

    1 ST = 1:st part from Serial

    SPR = Significant Production Run

    LR = Launch Review

    Training

    LR

    11w27

    RFQDesi n

    P

    Significant prod. Run

    10w42

  • 8/20/2019 Volvo Apqp

    15/30

  • 8/20/2019 Volvo Apqp

    16/30

     APQP information for suppliers

    16

    Volvo 3P   APQP APQP

     APQP review: the way to share APQP withVolvo

    OBJECTIVES

    •Detects any deviation,

    assesses the risks and

    assigns actions

    •Gives visibility of the

    progress to Volvo andsupplier teams

    •Escalate the roadblocks

    to project management /

    line organization for

    decision or action

    DEFINITION

     A formal meeting where Volvo

    reviews supplier's APQP plan.

    Volvo and supplier check that

    the project at component level

    is on track with respect to

    deadlines and results.

     ATTENDEES

    Expected attendees :

    •SQE

    •Development (SIPD

    leader, design engineer…)

    •Buyer 

    … Manufacturing, Logistic,

    Geometry, Laboratory…

    •Supplier team (project

    leader, engineering, quality,sales, manufacturing,

    methods…)

  • 8/20/2019 Volvo Apqp

    17/30

     APQP information for suppliers

    17

    Volvo 3P   APQP APQP

     APQP reviews - Who Does What

    SQE

    Design

    engineer 

    Buyer 

    Organizes the APQP reviews for

    Key Components

    Makes sure that all PROCESSdesign, verifications & validations

    activities are integrated/completed :

    timing and results

    Ensures that the overall supplier

     APQP plan is complete and

    matches project milestones

    Participates in APQP reviews for Key Components

    Ensures that all PRODUCT design , verifications & validations activities are integrated/completed: timing and results

    Participates in APQP reviews for

    key components

    Ensures APQP activities underhis responsibility are

    integrated/completed:

    timing and results

    Supplier

    project team

    updates its

     APQP plan and

    evaluate the

    project status:

    Timing &Results

  • 8/20/2019 Volvo Apqp

    18/30

     APQP information for suppliers

    18

    Volvo 3P   APQP APQP

     APQP review reporting file

    •  APQP review reporting file is owned by the supplier 

    and totally shared with Volvo

    • Contains

     – contact directory

     – co-signed time-plan – 1 check-list of questions per review

     – 1 cover page for the summary. Project status and risks

  • 8/20/2019 Volvo Apqp

    19/30

     APQP information for suppliers

    19

    Volvo 3P   APQP APQP

     APQP review reporting file instruction

  • 8/20/2019 Volvo Apqp

    20/30

  • 8/20/2019 Volvo Apqp

    21/30

  • 8/20/2019 Volvo Apqp

    22/30

    3 – Where to find APQP informationand Volvo templates / guidelines

  • 8/20/2019 Volvo Apqp

    23/30

     APQP information for suppliers

    23

    Volvo 3P   APQP APQP

    Information, guidelines and templates•  APQP manual from AIAG

    http://www.aiag.org

    •  APQP in Volvo supplier portal

     –  APQP guideline for suppliers

     –  APQP review file – Generic APQP time plan

     –  APQP responsibility matrix

    • Supplier Quality Assurance Manual

  • 8/20/2019 Volvo Apqp

    24/30

    4 - What are Volvo APQP specifics

    (best practices)

  • 8/20/2019 Volvo Apqp

    25/30

     APQP information for suppliers

    25

    Volvo 3P   APQP APQP

    RTS - Review of Technical Specification

    OBJECTIVES

    •Make sure the supplier

    understands early

    enough all the technical

    specifications of the

    components to be supplied

    to Volvo

    •Supplier agrees on the

    feasibility of these

    specifications.

    DEFINITION

     A documented review of

    technical specifications.

    “Technical specifications”,

    includes all the documentation

    needed to specify and verify a

    product (part version report orPVR, drawings, digital models,

    technical requirements or TR,

    standards, etc).

     ATTENDEES

    Expected attendees :

    •Design engineer 

    •SQE

    •Buyer 

    •Supplier team

  • 8/20/2019 Volvo Apqp

    26/30

     APQP information for suppliers

    26

    Volvo 3P   APQP APQP

    PAA - Product Application Agreement

    OBJECTIVES

    •The PAA ensures the

    supplier agrees (by written

    approval) that the product

    he has designed will be

    compatible with

    environment constraintswhen installed and used in

    all of the application

    environments defined by

    Volvo.

    DEFINITION

    The Product Application

     Agreement (PAA) is a signed

    agreement between Volvo and

    a supplier.

     ATTENDEES

    Expected attendees :

    •Design engineer 

    •Supplier team

    •Buyer 

    Temperature

    Vibration

    Humidity

    Electromagneticcompatibility

    Proximity of

    other parts

     And more...

  • 8/20/2019 Volvo Apqp

    27/30

     APQP information for suppliers

    27

    Volvo 3P   APQP APQP

    PHR - Part Handling Review

    OBJECTIVES

    •The PHR ensures the

    supplier agrees (by written

    approval) on the

    INDUSTRIAL

    ENVIRONMENT &

    PROCESS with which thepart he delivers is

    assembled on

    Trucks/Powertrain units.

    DEFINITION

    The Part Handling Review

    (PHR) is a signed agreement

    between Volvo and a supplier.

    Physical visits to all VOLVO

    plant areas shall be conducted

    for PHR

     ATTENDEES

    Expected attendees :

    •Volvo Manufacturing team

    •Supplier team

    •SQE

    •Buyer 

    Parts

    Delivery

    (Inbound

    logistic)

    Truck /

    Powertrain unit

    delivery area

    Storage

     Assembly processTests

    Tooling

     And more...Handling Cleanliness

    Rework

  • 8/20/2019 Volvo Apqp

    28/30

    5 – Conclusion: what to keep in mind

  • 8/20/2019 Volvo Apqp

    29/30

     APQP information for suppliers

    29

    Volvo 3P   APQP APQP

     APQP – What to keep in mind ?•  APQP is owned by supplier and reported to Volvo,

    using the APQP review file

    •  APQP plan takes into account the VOLVO constraints• Supplier provides his first APQP plan with the answer to the Request

    for Quotation

    • It is reviewed at least at each APQP review meeting

    •  APQP should contain enough details to be understandable

    • Critical path and risk areas should be identified

    • The plan must drive actions

    • There will be problem: they must be fixed or escalated

  • 8/20/2019 Volvo Apqp

    30/30

     APQP information for suppliers

    30

    Volvo 3P   APQP APQP

    Glossary•  APQP: Advanced Product Quality Planning

    • DFMEA: Design – Failure Mode and Effect Analysis

    • DVP&R: Design Validation Plan and Report

    • GDP: Global Development Process

    • GPS: Global Purchasing System

    • MSA: Measurement System Analysis

    • PAA: Product Application Agreement

    • PFMEA: Process – Failure Mode and Effect Analysis• PHR: Part Handling review

    • PPAP: Production Part Approval Process

    • QDCF: Quality Delivery Cost Features

    • RFQ: Request For Quotation

    • RTS Review of Technical Specification

    • SQE: Supplier Quality Engineer