1 Capstone Project Final Report Small Lot Delivery System IE 4800/4880 Fall 2008/Winter 2009 Team Members: David Naujokas (Project Leader) (734) 216-0901 [email protected] Nashwan Fatteh (Team Member) (313) 492-0678 [email protected] Instructor: Dean Pichette [email protected] Alper Murat, Ph. D [email protected] Office: 313-577-3872 Cell: 313-443-4429

w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

1

Capstone Project Final Report Small Lot Delivery System

IE 4800/4880

Fall 2008/Winter 2009

Team Members: David Naujokas

(Project Leader) (734) 216-0901

[email protected] Nashwan Fatteh

(Team Member) (313) 492-0678

[email protected]

Instructor: Dean Pichette [email protected]

Alper Murat, Ph. D [email protected] Office: 313-577-3872 Cell: 313-443-4429

Page 2: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

2

Acknowledgments

We would like to give a special thank you to our Wayne State University Senior

Project advisors, Dr. Alper Murat and Dr. Dean Pichette for their help and support in this

project. Also Dr. Darin Ellis who helped the group in the ergonomics part of the project.

Executive Summary

Currently, Chrysler is using excel spreadsheets to do their efficiency and

ergonomic calculations. The problem that was given was to produce AMPS, Automatic

Manufacturing Planning System, screenshots that will allow Chrysler to do their

calculations within AMPS instead of the excel spreadsheets and manual methods that

they are using now. Before the screens could be produced, the efficiency spreadsheet had

to be analyzed to determine where the numbers were coming from and to make sure that

the way it was being done was correct. For the ergonomic assessment, the equations had

to be found and the appropriate data needed to be in the spreadsheet. The equations that

were used were the NIOSH 81 multi-lift equation and NIOSH 91 multi-task equation.

With the ergonomic advancements, the IE will not have to leave their desk

in order to do this assessment. Before the OR model (Operations Research), the

tugger driver would complain that their list gave them problems then the IE would

take that list and run the ergo assessment by picking the parts that were on the

list in AMPS and run the assessment. With the OR model, the ergonomic

assessment is in place while calculating the routes and hours for the day.

Page 3: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

3

Table of Contents

Acknowledgements .............................................................................................. 2

Executive Summary ............................................................................................. 2

Background.......................................................................................................... 4

Previous Problem................................................................................................. 4

Problem Statement ............................................................................................... 5

Project Objectives ................................................................................................ 7

Methods & Approach ........................................................................................... 8

Constraints for Model........................................................................................... 8

NISOH 91 Lifting Equation ................................................................................. 9

Objective Function............................................................................................. 12

Model Creation .................................................................................................. 12

Results and Expected Impact.............................................................................. 14

Page 4: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

4

Background AMPS is currently used as a user-friendly planning tool for direct-labor control

and man-power assignments. Indirect labor (material handling) assignments for bulk

materials are in the process of being integrated into AMPS. Small lot deliveries constitute

a significant portion of the line feeding operations in Chrysler assembly plants. Further,

its importance is expected to grow in accordance with inventory reduction efforts. Work

assignments (Tugger operators, routes, delivery schedules) for small lot deliveries are

currently performed via spreadsheets. Whenever there is a need for change in these

assignments (i.e., efficiency, ergonomic considerations), these spreadsheets need to be

manually updated.

Previous Problem

The challenge that Chrysler faced is that the indirect labor is not being

implemented in the Automated Manufacturing Planning System (AMPS). The Small Lot

Delivery System which is the indirect labor consist of Tugger routes is only being

recorded and updated on an excel spreadsheet. The spreadsheet is a good process to

monitor the routes, but employees manually updating the spreadsheet will cause data to

be incorrect. Every time the spreadsheet gets updated there is no standard process that the

employees follow. The problem with efficiency was it had to be validated by the group

and make sure that the way efficiency was being determined was taking into account all

the fixed variables. The ergonomic problems that Chrysler is having is the time that it

takes time for the employees to go and study the routes of each individual tugger driver.

They have to follow the driver and get the appropriate measurements in order to perform

Page 5: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

5

the assessment. The specific problem to this is that tugger driver has a different route

every day, so Chrysler is only getting the day’s ergonomic assessment, and not the

overall assessment of that route. So the problem is that Chrysler would like to implement

these spreadsheets into their AMPS program.

Problem Statement

The challenge that Chrysler is currently facing is Routes are determined solely on

hourly usage rather then a complete shift. The IE’s would rather have a list for the

tuggers on a daily basis then an hourly basis. This option will save time and money.

Ergonomics is done after routes and efficiency is calculated. This is a problem because

the tugger would complain of heavy lifting or too many parts. The IE would then have to

collect data and measurements to check for any ergonomic concerns. All the data for the

Tugger routes are in excel spreadsheet. This group wants to design an OR model that

will help save the company time and money. The OR model will not only plan routes but

will also include ergonomic feasibility checks.

Page 6: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

6

Figure 1. Tugger Driver Process

Tugger Picks up Pick List

Tugger Picks up

Parts in CMA

(First Lift)

Tugger Drives to Drop Location

Is there still parts on tugger

Tugger Drives to

empty box location

drop point

Tugger Drops off

empty boxes and

Sorts them by size

Tugger drops off part at location

Tugger picks up

empty container and places it on

tugger.

Tugger route is complete

Page 7: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

7

Project Objectives Chrysler has asked WSU for help in fulfilling their need to put in place an OR

model to plan routes. The OR model will also include ergonomic checks within the

model. The project objectives were to analyze, understand and design an excel

spreadsheet based work assignment for the Small Lot Delivery System which includes a

segment of an assembly line.

Page 8: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

8

Methods & Approach In the beginning stages of the project, the problem Chrysler is having with

efficiency and ergonomics needed to be defined. The steps used for this project were:

first, go through the Tote Simulation spreadsheet that was provided by Chrysler to clearly

understand what is involved in creating spreadsheet; second, to find any mistakes that

were made; third, determine what the necessary constraints are for a model; and fourth, to

determine how to incorporate the NIOSH 91 equation into the model. The data was

collected by the previous group that completed their capstone in 2007/2008. Due to the

time it was very unfortunate that this group didn’t have the chance to take a tour to the

plant to getter a better understanding of how the tugger replenishes the lines.

Constraints for Model

There are three main constraints for this model. First, the inventory levels must

be kept at a level sufficient to prevent any line stoppages from lack of parts. This

requires a minimum constraint for each station greater than zero. Second, the inventory

levels cannot exceed the actual capacity at each station. This provides a maximum

inventory constraint for each station. Since actual maximum inventory values were

unknown to the team, they were estimated based on part consumption rates.

The second main constraint is that delivery amounts can only be integer values.

Inventory only arrives in full containers and therefore, the tugger operators cannot move

partial part containers to the assembly line.

Page 9: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

9

The third main constraint is that relating to the ergonomics. The ergonomic

equation used for this project is the NIOSH 91 lifting equation. The implementation of

this equation is explained in the next section.

NIOSH 91 Lifting Equation

The NIOSH 91 lifting equation is as follows:

RWL = LC x HM x VM x DM x AM x FM x CM

RWL = Recommended Weight Limit

LC = 51 lbs

HM = Horizontal Multiplier - HM = 10/H, where H is the distance from the hands to the

midpoint between the ankles. It can be estimated using the following two equations:

When V is greater than or equal to 10, H = 8 + W/2 where W is the width of the

container.

When V is less than 10, H = 10 + W/2

If H is less than 10, the multiplier equals 1.0.

VM = Vertical Multiplier – VM = 1 – ( 0.003 | V-30| ), where V is the vertical distance

between the hands and the floor.

DM = Distance Multiplier – DM = 0.82 + ( 1.8/D ), where D is the vertical travel distance

of the object. If D is less than 10 inches, DM equals 1.0.

AM = Asymmetry Multiplier – AM = 1 – ( 0.0032 A ) The asymmetry angle, A, is

measured from the mid-sagittal line of the worker. For the purpose of this project, the

AM is assumed to equal 1.0 since all of the lifts are either from a general storage location

or directly off of the tugger meaning that the container is directly in front of the worker

when it is being lifted.

Page 10: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

10

FM = Frequency Multiplier – F is the frequency of lifts in lifts/min. It can very from 0.2

lifts/ min up to 15 or greater. There is no equation for this multiplier and must be pulled

from a table. This table is shown in figure 2.

CM = Coupling Multiplier – CM is a classification modifier with three options, Good,

Fair, and Poor. It is also based off of a table shown in figure 3. For this project, CM is

assumed to be 1.0 since all of the containers have good handles and the components are

unlikely to shift during the lift.

Figure 2. Frequency Multiplier Table

Page 11: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

11

Figure 3. Frequency Multiplier Table

Page 12: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

12

Objective Function

It was determined that there can be several objective functions for this model. It

can be a. to minimize the total work of the tugger operator, b. to minimize inventory

levels of parts on the line, or c. to minimize the cost both underutilizing the tugger

operator and the cost of inventory levels. The equations for calculating total work were

directly based on the efficiency calculations for the previous year’s project.

Model Creation

The left side of the model is based directly upon the previous year’s project.

Figure 4 captures a screenshot of this section.

Figure 5. Left and Middle Sections of Model

Since the only variables for the NIOSH equation that are different for each part

number are HM, VM, and L, these are the only multipliers displayed on the model. FM

is also listed but is based on the hourly frequencies. In order to simplify the model, HM

Page 13: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

13

and VM are chosen to be the smallest multiplier for which containers are chosen for each

hour. In other words, the model chooses the smallest multiplier for which parts are

actually being moved on the route. L is also chosen in the same way except that the

largest one is chosen. This inherently adds a factor of safety for each route because the

RWL will always be smaller than what it would be if a multi-lift equation was used. In

order for the model to be expanded to include the full number of parts that are used in

SHAP, the multi-lift equation could not be used due to its much higher complexity.

The middle section of the model is where the solution and the RWL are displayed.

The solution is broken into hour routes where the numbers represent the number of

containers to be delivered to each station for that hour’s route. Just below the solution

are the NIOSH equation calculations. It shows the HM, VM, and FM used for each

hour’s equation. It then calculates a RWL for that route and checks it against the

maximum L for that hour.

The following screenshot shows the inventory calculations for each part.

Figure 6. Right Side Section of Model

The Max All Inventory column is the maximum allowable inventory for each part

number. For the purpose of this project they are estimated based on the hourly

Page 14: w09 Capstone Project - Wayne State Universitywebpages.eng.wayne.edu/IME_abet2012/capstone projects... · 2009. 5. 14. · 1 Capstone Project Final Report Small Lot Delivery System

14

consumption of parts. The next column, Max Invent, is the actual maximum inventory

level for each part. The Initial Supply column is where initial inventory levels before

hour 1 are entered.

Results and Expected Impact The model created for this project successfully finds solutions that meet the

constraints established. However, the objective function of minimizing inventory failed to

produce any results. This may be a limitation with the solver function in excel. On the

other hand, however, setting the objective function to minimize the cost of both

underutilization and cost of inventory successfully solved the model. This is almost the

same as minimizing inventory except has the added benefit of maximizing the work of

the tugger operator.

It should also be noted that the model cannot find solutions when the initial

inventory values are equal to zero. What this means is that there must be some inventory

at the stations in order for this model to be applicable to the plant floor. The reason that it

cannot find a solution is because the tugger operator would have to deliver parts to every

single station if the initial inventory was zero and this would greatly violate ergonomic

feasibilities.

The impact of this project should be that Chrysler will be able to create routes for

their tugger operators that will both be the most efficient as possible as well as keeping

those routes ergonomically feasible without ever having to do an ergonomic assessment

at the floor level. This will both save lots of time for both the industrial engineers and the

tugger operators. They may also be able to further reduce costs due to lowering overall

inventory levels.