18
4/17/2019 1 Complete Streets Webinar Series Part 3: Complete Streets Planning and Policies What is and Why WalkWorks? Collaboration of the Pennsylvania Department of Health and the University of Pittsburgh Graduate School of Public Health Mission: To improve health status by addressing chronic disease risk factors to prevent and reduce obesity, diabetes, heart disease and more Increase physical activity in built environment through development of walking routes Influence policy by funding development of active transportation plans designed to increase opportunities for physical activity Method: Community‐based partners, municipalities, planning organizations 2 Today’s presenter Jeff Riegner Whitman, Requardt & Associates, LLP [email protected] 3

WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

1

Complete Streets Webinar Series

Part 3: Complete Streets Planning and Policies

What is and Why WalkWorks?

• Collaboration of the Pennsylvania Department of Health and the University of Pittsburgh Graduate School of Public Health

• Mission: To improve health status by addressing chronic disease risk factors to prevent and reduce obesity, diabetes, heart disease and more• Increase physical activity in built environment through 

development of walking routes• Influence policy by funding development of active 

transportation plans designed to increase opportunities for physical activity

• Method: Community‐based partners, municipalities, planning organizations

2

Today’s presenter

Jeff RiegnerWhitman, Requardt & Associates, [email protected]

3

Page 2: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

2

Most presentation content courtesy of the National Complete Streets Coalition

www.completestreets.org

Three‐part series on Complete Streets

• Part 1: Complete Streets basics and benefits (held on March 28, 2019)

• Part 2: Best practices in Complete Streets(held on April 11, 2019)

• Part 3: Complete Streets planning and policies(today’s webinar)

5

Planning and Policies

Page 3: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

3

Complete Streets policies

Ensure that the entire right‐of‐way is planned, designed, constructed, operated, and maintained to provide safe access for all users

7

Nearly 1,500 policies have been adopted nationwide.

8

0

200

400

600

800

1000

1200

1400

1600

pre‐2002

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

As of December 2018

Policies adopted at all levels

• State: 51(across 35 states, including Puerto Rico)

• Regional/MPO: 93

• County: 100

• Municipal: 1,239

• Total: 1,484 policies

9

As of December 2018

Page 4: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

4

Local and regional policies

10

As of December 2018

All sizes of jurisdictions

11As of December 2018

Policy types

12As of December 2018

Page 5: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

5

Policy development best practices

Include all stakeholders

• Members of the community

• Elected officials

• Other agencies13

Policy development best practices

Policy development helps to:

• Change transportation priorities

• Establish a new ideal for streets

• Communicate with the public14

Policy development best practices

Usually part of a broader movement

• Bicycle/pedestrian planning

• Smart growth

• Community visioning

• Safety initiatives

• Climate change initiatives

• Physical activity/health campaigns

15

Page 6: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

6

An ideal Complete Streets policy:

16

An ideal Complete Streets policy:

1. Sets a vision

2. Includes all users and all modes

3. Applies to all phases of all applicable projects

4. Specifies and limits exceptions, with management approval required

5. Emphasizes connectivity

6. Understood by all agencies to cover all roads

7. Uses best and latest design standards & is flexible

8. Complements the community’s context

9. Sets appropriate performance measures

10. Includes implementation steps

17

Vision

What do you want from your streets? What will consistently rally support from the community and its leaders?

18

Page 7: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

7

All users & modes

A clearly stated directive to include the needs of all people, regardless of how they travel, into the everyday transportation decision‐making process.

19

All projects & phases

Integrate Complete Streets into all projects:

• New construction

• Reconstruction

• Rehabilitation

• Repair

• Repaving

• Major maintenance

• Operations

20

Exceptions

Provides flexibility, but must not be exploited.

Three common exceptions:• User groups are prohibited

• Cost is excessively disproportionate to need and use

• Documented absence of current AND future need

Management approval required

21

Page 8: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

8

Network & connectivity

More than one or two “complete” streets

Connected, integrated system that provides for all users

Ensures gaps are filled

22

Other agencies

Many agencies have a stake in the funding, planning, and development of our streets.

Create partnerships

Communication between jurisdictions and agencies at all levels

23

Design guidance & flexibility

Use the best and latest design standards available

Allow for flexible approaches to design 

24

Page 9: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

9

Design guidance & flexibility

Design guidance & flexibility

Design guidance & flexibility

Page 10: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

10

Context sensitivity

Design relates well to type of neighborhood and buildings

Responds to multimodal transportation needs

28

Performance measures

Systematic collection and reporting of data

Ensures compliance with policy goals

Enables informed decision‐making

Short and long term measurements

29

Performance Measures: Reading, PA

30

The City shall measure the success of this policy using, but not being limited to, the following performance measures:

• Number of crashes and severity of injuries • Injuries and fatalities for all modes • Number of curb ramps • Number of countdown signals • Miles of accessible routes • On‐time arrivals for BARTA • Sidewalk condition ratings • Travel time in key corridors (point A to point B) • Emergency vehicle response times • Number of audible traffic signals • Number of students who walk or bike to school • Access to industrial property (trucks) 

Page 11: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

11

Performance Measures: Reading, PA

31

(Continued)

• Commercial vacancies in downtown improvement district (DID)• Number of mode users: walk, bike, transit • Bike route connections to off‐road trails (equity across all districts of the City) • % of city that is within two miles of a ‘low stress’ bike route • Number of employees downtown • Number of bike share users • Progress towards STAR Community standards: (a) drive alone max 25% and bike/walk min "of 5%; (b) 50% of household spending less than 15% of household income on "transportation; and (c) bike/pedestrian fatalities – progress toward Vision Zero • Citizen and business surveys of satisfaction with streets and sidewalks • Number of bicycle friendly businesses recognized by the League of AmericanBicyclists • Number of bike parking spaces

Performance Measures: Reading, PA

32

(Continued)

The Complete Streets Task Force will present an annual report to the Mayor and City Council showing progress made in implementing this policy. The annual report on the annual increase or decrease for each performance measure contained in this executive order compared to the previous year(s) shall be posted on‐line for each of the above measures.

Lesson learned: Starting with a manageable number of easy‐to‐track performance measures leads to a greater 

chance of success.

Project evaluation example: Edgewater Drive, Orlando, FL

33

Page 12: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

12

Background

• Repaving project schedule by FDOT

• FDOT open to reconfiguration if City takes over jurisdiction

• Changes must be accepted by neighborhood and before/after study must be conducted

• Public determined nine “measures of effectiveness”

34

Before:

35

After:

36

Page 13: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

13

Measures of effectiveness

Measure

1 Avoid increased traffic on neighborhood streets

2 Reduce speeding on Edgewater Drive

3 Increase number of people bicycling

4 Increased number of people walking

5 Reduce crashes

6 Increase use of on-street parking

7 Increase pedestrian satisfaction among residents

8 Increase pedestrian satisfaction among merchants

9 Increase parking satisfaction among residents

37

Measures of effectiveness

Measure Accomplished?

1 Avoid increased traffic on neighborhood streets YES

2 Reduce speeding on Edgewater Drive YES

3 Increase number of people bicycling YES

4 Increased number of people walking YES

5 Reduce crashes YES

6 Increase use of on-street parking YES

7 Increase pedestrian satisfaction among residents YES

8 Increase pedestrian satisfaction among merchants NO

9 Increase parking satisfaction among residents YES

38

Crash rate

39

12.6

8.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

Cra

sh R

ate

(per

MV

M)

Before After

1 crash every  2.5 days

(146 per  yr)

34% Reduction

1 crash every   4.2 days

(87 per  yr)

Page 14: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

14

Injury rate

40

3.6

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Inju

ry R

ate

(per

MV

M)

Before After

68% Reduction

1 injury every 9 days

(41 per  yr)

1 injury every   30 days

(12 per  yr)

Speeding

41

15.7%

7.5%9.8% 8.9%

29.5%

19.6%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

Perc

en

t o

f V

eh

icle

s T

ravelin

g o

ver

36 M

PH

Before AfterBefore BeforeAfter

North End Middle South End

After

Automobile traffic volumes

42

20,50018,100

0

5,000

10,000

15,000

20,000

25,000

Veh

icle

s p

er D

ay

Before After

Generally remained in

18k-20k range

Page 15: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

15

On‐street parking use

43

29%

41%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

Par

kin

g U

tiliz

atio

n P

erce

nta

ge

Before After

People walking

44

2,136

2,632

0

500

1000

1500

2000

2500

3000

Nu

mb

er o

f P

edes

tria

ns

Before After

23% Increase

People bicycling

45

375

486

0

100

200

300

400

500

600

Nu

mb

er o

f B

icyc

les

Before After

30% Increase

Page 16: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

16

Average peak period travel time

46

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

AM Before AM After PM Before PM After

Northbound

Southbound

Property values 

• 4,600 residential properties in neighborhood

• Consistent with countywide growth of 8‐10%

• 110 commercial properties in neighborhood

• Consistent with countywide growth of 1‐2%

47

Resource forselectingperformancemeasures

48

Page 17: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

17

Next steps

Clear direction beyond policy adoption

Maintain momentum

Assign oversight to new or existing committee

Regular public reporting to engage community, show accountability, and celebrate accomplishments

49

Include activities to:

• Plan for implementation

• Change procedures and processes

• Review and update design guidance

• Offer training and educational opportunities

• Measure performance

50

ExerciseWhat are the next steps you can 

take to introduce Complete Streets in your community?

Please type your response into the question box. You may include the name of your community if you like.

Page 18: WalkWorks CS 3 planning and policies · 4/17/2019  · Most presentation content courtesy of the National Complete Streets Coalition Three‐part series on Complete Streets •Part

4/17/2019

18

52

53

Thank you!