47
Washington State S. T. I. P. 2021 to 2024 (Project Funds to Nearest Dollar) MPO/RTPO: CDTC Y Inside N Outside September 28, 2021 County: Agency: WSDOT - NC Total Project Total Est. STIP Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No. 02 202804G 202804G 03 2.210 EIS Yes 001.46 003.67 58,494,729 21-09 SR 28/East Wenatchee Corridor Improvements Widens SR 28 between 9th Street and 23rd Street and improves mobility and safety. Funding Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total RW 2021 0 CWA 21,749,998 0 21,749,998 Project Totals 0 21,749,998 0 21,749,998 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th RW 4,250,002 7,500,000 9,999,996 0 0 CN 0 0 0 0 31,000,000 Totals 4,250,002 7,500,000 9,999,996 0 31,000,000 Page 2

Washington State S. T. I. P. 2021 to 2024 (Project Funds

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

02 202804G 202804G 03 2.210 EIS Yes 001.46 003.67 58,494,729 21-09

SR 28/East Wenatchee Corridor Improvements

Widens SR 28 between 9th Street and 23rd Street and improves mobility and safety.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

RW 2021 0 CWA 21,749,998 0 21,749,998

Project Totals 0 21,749,998 0 21,749,998

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 4,250,002 7,500,000 9,999,996 0 0

CN 0 0 0 0 31,000,000

Totals 4,250,002 7,500,000 9,999,996 0 31,000,000

Page 2

Page 2: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

02 228531B 228531B 03 1.600 CE Yes 2.77 4.37 18,005,300 21-09

SR 285/North Wenatchee Area - Intersection Improvements

The project will relieve congestion and provide safety enhancements through intersection improvements, access revisions, pedestrian and transit improvements, ITS solutions and environmental work.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

RW 2021 0 CWA 3,820,000 0 3,820,000

CN 2023 0 CWA 11,345,300 0 11,345,300

Project Totals 0 15,165,300 0 15,165,300

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 1,000,000 1,820,000 1,000,000 0 0

CN 0 0 1,000,000 9,000,000 1,345,300

Totals 1,000,000 1,820,000 2,000,000 9,000,000 1,345,300

Page 3

Page 3: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

00 0097(187) 297100I 297100I 21 0.080 CE Yes 11.41 11.49 686,945 21-09

SR 971 Navarre Coulee Site 7 - Rock Slope Scaling

This project will scale the slope to increase highway safety and increase slope stability.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 STP 622,786 0 12,709 635,495

Project Totals 622,786 0 12,709 635,495

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 12,709 622,786 0 0 0

Totals 12,709 622,786 0 0 0

Page 4

Page 4: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

05 0097(187) 297100J 297100J 21 0.110 CE No 11.23 11.34 554,482 21-09

SR 971 Navarre Coulee Site 8 - Rock Slope Scaling

This project will scale the slope to increase highway safety and increase slope stability.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 STP 510,405 0 10,416 520,821

Project Totals 510,405 0 10,416 520,821

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 10,416 510,405 0 0 0

Totals 10,416 510,405 0 0 0

Page 5

Page 5: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Func Cls

03

Project Number PIN

200204R

STIP ID

200204R

Imp Type

21

Total Project Length

0.060

Environmental Type

CE

RW Required

No

Begin Termini

142.69

End Termini

142.75

Total Est. Cost of Project

306,179

STIP Amend. No.

21-09

US 2/2 Mi E of Orondo - Rock Slope Scaling B

This project will enhance safety at this location by scaling the existing rock slope.

Funding

Phase PE

Start Date 2021

Federal Fund Code NHPP

Federal Funds

40,934 State Fund Code State Funds

0 Local Funds

4,048 Total

44,982

CN 2022 NHPP 255,973 0 5,224 261,197

Project Totals 296,907 0 9,272 306,179

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 20,982 24,000 0 0 0

CN

Totals

0

20,982

261,197

285,197

0

0

0

0

0

0

Page 6

Page 6: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Func Cls

03

Project Number PIN

200204S

STIP ID

200204S

Imp Type

21

Total Project Length

0.060

Environmental Type

CE

RW Required

No

Begin Termini

143.00

End Termini

143.06

Total Est. Cost of Project

304,579

STIP Amend. No.

21-09

US 2/2 Mi E of Orondo - Rock Slope Scaling C

This project will enhance safety at this location by scaling the existing rock slope.

Funding

Phase PE

Start Date 2021

Federal Fund Code NHPP

Federal Funds

40,456 State Fund Code State Funds

0 Local Funds

4,001 Total

44,457

CN 2022 NHPP 254,920 0 5,202 260,122

Project Totals 295,376 0 9,203 304,579

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 20,000 24,457 0 0 0

CN

Totals

0

20,000

260,122

284,579

0

0

0

0

0

0

Page 7

Page 7: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 200208U 200208U 21 0.400 CE No 118.97 119.37 5,012,000 21-09

US 2/97 Easy Street - Roundabout

This project will construct a roundabout at the US2/97 Easy Street intersection.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 0 CWA 4,341,075 0 4,341,075

Project Totals 0 4,341,075 0 4,341,075

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 41,075 4,300,000 0 0 0

Totals 41,075 4,300,000 0 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for WSDOT - NC 1,725,474 41,256,373 41,600 43,023,447

Page 8

Page 8: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: LCV MPO Y Inside N Outside September 28, 2021

County: Asotin

Agency: Asotin Co.

Func Project Cls Number PIN

05 A022(022)

Grande Ronde Road BST

STIP ID

0241

Imp Type

04

Total Project Length

0.760

Environmental Type

CE

RW Required

No

Begin Termini

MP 10.15

End Termini

MP 10.91

Total Est. Cost of Project

190,000

STIP Amend. No.

21-09

Grade and prep existing gravel road for Bituminous Surface Treatment

Funding

Phase CN

Start Date 2021

Federal Fund Code STP(R)

Federal Funds

119,000 State Fund Code State Funds

0 Local Funds

18,000 Total

137,000

CN 2021 HIP(R) 41,790 0 6,522 48,312

Project Totals 160,790 0 24,522 185,312

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN

Totals

185,312

185,312

0

0

0

0

0

0

0

0

Agency Totals for Asotin Co.

Federal Funds

160,790 State Funds

0 Local Funds

24,522 Total

185,312

Page 9

Page 9: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: LCV MPO Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - SC

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

06 512902J 512902J02 21 1.510 CE No 41.28 42.55 2,458,875 21-09

SR 129/Highland Ave to US 12 and SR 129 Spur - ADA Compliance

Upgrade curb ramps and pedestrian signals to meet ADA Compliance. Pedestrian curb ramps and signals at various intersections on SR 129 in the city of Clarkston do not fully meet ADA standards. This project will upgrade the ramps and pedestrian signals to meet current standards and improve accessibility for pedestrians.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 STP 367,560 0 15,315 382,875

CN 2022 STP 2,034,480 0 41,520 2,076,000

Project Totals 2,402,040 0 56,835 2,458,875

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 115,265 267,610 2,049,383 26,617 0

Totals 115,265 267,610 2,049,383 26,617 0

Federal Funds State Funds Local Funds Total

Agency Totals for WSDOT - SC 2,402,040 0 56,835 2,458,875

Page 10

Page 10: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: Peninsula RTPO Y Inside N Outside September 28, 2021

County: Mason

Agency: Shelton

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

06 5460 44 CE No Various Various 890,292 21-09

SRTS Crosswalk Improvements-State Funding

At Franklin St and 7th St, Railroad Ave and 9th St and Franklin and 7th Street install Rectangular Rapid Flashing beacons and ADA curb ramp replacement or upgrades. The project includes curb extensions, median refuge island, audible pedestrian signals, sidewalk and speed feedback sign.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 SRTS 88,857 13,869 102,726

CN 2022 0 SRTS 681,245 106,321 787,566

Project Totals 0 770,102 120,190 890,292

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 102,726 0 0 0 0

CN 0 787,566 0 0 0

Totals 102,726 787,566 0 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Shelton 0 770,102 120,190 890,292

Page 11

Page 11: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Kitsap

Agency: Bremerton

Total Project

Func Project Imp Length Environmental RW Begin Cls Number PIN STIP ID Type Type Required Termini

04 BRE-28 21 0.000 CE Yes N/A

Systemic Pedestrian Treatments - Rectangular Rapid Flashing Beacons

Install rectangular rapid flashing beacons, signage, curb ramps, and other improvements at 8 locations citywide.

End Termini

N/A

Total Est. Cost of Project

864,500

STIP Amend. No.

21-09

Funding

Phase PE

Start Date 2021

Federal Fund Code HSIP

Federal Funds

72,000 State Fund Code State Funds

0 Local Funds

8,000 Total

80,000

RW 2022 HSIP 72,000 0 8,000 80,000

CN 2022 HSIP 704,500 0 0 704,500

Project Totals 848,500 0 16,000 864,500

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL

Totals

80,000

80,000

784,500

784,500

0

0

0

0

0

0

Agency Totals for Bremerton

Federal Funds

848,500 State Funds

0 Local Funds

16,000 Total

864,500

Page 12

Page 12: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: King

Agency: Federal Way

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 FW-48 06 0.240 CE No 9th Ave S Pacific Hwy S (SR 99) 1,116,000 21-09

S 348th St Preservation Project

Replacement of existing curb ramps and pedestrian push buttons to meet current ADA standards; full width planning bituminous pavement; HMA pavement repair; 2 1/2' thick HMA overlay; removal and replacement of existing dual-faced sloped mountable curb; replacement of traffic signal detection loops; channelization; and utility adjustments.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 NHPP 75,000 0 15,000 90,000

CN 2023 NHPP 855,000 0 171,000 1,026,000

Project Totals 930,000 0 186,000 1,116,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 90,000 0 1,026,000 0 0

Totals 90,000 0 1,026,000 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Federal Way 930,000 0 186,000 1,116,000

Page 13

Page 13: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Pierce

Agency: Pierce Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 PCO-187 05 0.910 CE No 66th Ave. E 81st Ave. E 2,100,000 21-09

160th St. E. (66th Ave. E. to 81st Ave. E.)

Grind and overlay the existing pavement, pavement repair, and upgrade deficient curb ramp and pedestrian push buttons. Guardrail needs will be assessed during preliminary engineering and included within existing right of way where viable.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 NHPP 225,000 0 25,000 250,000

CN 2023 NHPP 1,665,000 0 185,000 1,850,000

Project Totals 1,890,000 0 210,000 2,100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 250,000 1,850,000 0 0

Totals 0 250,000 1,850,000 0 0

Page 14

Page 14: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Pierce

Agency: Pierce Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

04 PCO-185 28 0.360 CE Yes Golden Given Rd E 16th Ave E 1,356,000 21-09

Safe Routes to School - 104th St E

Construct new sidewalk and paved shoulder on south side of 104th St E; install RRFB and lighting at 16th Ave E intersection; improve existing ADA curb ramps and crosswalk.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 SRTS 259,000 0 5,000 264,000

RW 2023 SRTS 107,000 0 5,000 112,000

CN 2024 SRTS 970,000 0 10,000 980,000

Project Totals 1,336,000 0 20,000 1,356,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 264,000 0 112,000 980,000 0

Totals 264,000 0 112,000 980,000 0

Page 15

Page 15: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Pierce

Agency: Pierce Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 PCO-186 05 1.080 CE No 116th St S / Steele St S 96th St S 2,854,000 21-09

Steele Street South

This preservation project will provide for the preservation of Steele St S by grinding and overlaying the existing asphalt pavement roadway. The project will also improve non-complaint ADA curb ramps and pedestrian push buttons to the maximum extent feasible. Existing vehicle detection systems at traffic signals using induction loops may be converted to video detection if loops are impacted.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 NHPP 288,000 0 31,000 319,000

CN 2023 NHPP 2,282,000 0 253,000 2,535,000

Project Totals 2,570,000 0 284,000 2,854,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 319,000 2,535,000 0 0

Totals 0 319,000 2,535,000 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Pierce Co. 5,796,000 0 514,000 6,310,000

Page 16

Page 16: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: King

Agency: Seattle

Func Cls

03

Project Number PIN STIP ID

SEA-200

Imp Type

23

Total Project Length

2.400

Environmental Type

CE

RW Required

Yes

Begin Termini

1st Ave

End Termini

Martin Luther King Jr Way

Total Est. Cost of Project

134,728,800

STIP Amend. No.

21-09

Madison Corridor Bus Rapid Transit

Construct a high-capacity transit project from the Downtown and First Hill-Capitol Hill regional urban centers to Madison Valley, including dedicated transit lanes, level-boarding stations, left-door boarding, off-board fare payment, and real-time arrival Information. Project scope includes transit signal priority, deployment of 9-diesel hybrid vehicles (NEPA updated and approved by FTA), and pedestrian/bicycle infrastructure improvements including protected bike lanes as well as sidewalk repairs and upgrades. In addition to the termini on Madison from 1st Avenue to Martin Luther King Jr. Way, the project route also runs from 1st Avenue at Madison to 1st Avenue at Spring Street, Spring Street from 1st Avenue to 9th Avenue, and Spring Street at 9th Avenue to Madison at 9th Avenue. Construction will be phased. The Title change is to remain consistent with FTA Small Starts Grant Title.

Funding

Phase CN

Start Date 2021

Federal Fund Code 5309(NS)

Federal Funds

59,900,000 State Fund Code State Funds

0 Local Funds

0 Total

59,900,000

CN 2021 FTA Discretionary 10,897,354 0 0 10,897,354

CN 2022 0 OTHER 2,545,000 0 2,545,000

Project Totals 70,797,354 2,545,000 0 73,342,354

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 70,797,354 2,545,000 0 0 0

Totals 70,797,354 2,545,000 0 0 0

Page 17

Page 17: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: King

Agency: Seattle

Func Cls

Project Number PIN STIP ID

Imp Type

Total Project Length Environmental

Type RW Required

Begin Termini

End Termini

Total Est. Cost of Project

STIP Amend. No.

03 SEA-240 23 13.500 CE Yes Westlake Ave N at 9th Ave N N 105th St at Aurora Ave N 24,400,000 (SR 21-09

Northgate to Downtown Transit Improvements

The City of Seattle will construct transit spot improvements and multimodal corridor improvements along King County Metro Route 40 to improve connections to major destinations in North and Central Seattle including Northgate, Greenwood, Crown Hill, Ballard ,Fremont, South Lake Union, and Downtown Seattle. Key features of the enhanced Route 40 corridor include: bus priority lanes, pavement improvements, traffic signal optimization, bus stop rebalancing, additional bus stops, and bicycle and pedestrian upgrades.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021

PE 2022

RW 2021

CN 2023

Expenditure Schedule

Phase

ALL

Totals

CMAQ

5307

Project Totals

1st

3,600,000

3,600,000

0

1,000,000

0

3,000,000

4,000,000

2nd

1,200,000

1,200,000

OTHER

OTHER

OTHER

1,500,000

0

1,500,000

3,000,000

6,000,000

3rd

19,600,000

19,600,000

300,000

200,000

300,000

13,600,000

14,400,000

4th

0

0

1,800,000

1,200,000

1,800,000

19,600,000

24,400,000

5th & 6th

0

0

Agency Totals for Seattle

Federal Funds

74,797,354 State Funds

8,545,000 Local Funds

14,400,000 Total

97,742,354

Page 18

Page 18: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Snohomish

Agency: Snohomish Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 SNOCO-155 06 3.120 CE No Seattle Hill Road SR 9 5,000,000 21-09

132nd/134th/Cathcart Way Overlay

Apply HMA overlay meeting current standards to the existing surface. Plane and repair as necessary. Re-stripe and repave existing bike lanes as necessary. Upgrade all non-compliant ramps to current standards.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 NHPP 472,000 0 0 472,000

CN 2023 NHPP 4,528,000 0 0 4,528,000

Project Totals 5,000,000 0 0 5,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 472,000 4,528,000 0 0

Totals 0 472,000 4,528,000 0 0

Page 19

Page 19: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Snohomish

Agency: Snohomish Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 SNOCO-156 06 1.120 CE No Spruce Way Ash Way 3,301,000 21-09

164th Street SW Overlay

Asphalt overlay, pavement repair, and curb ramp upgrades.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 NHFP 33,000 0 47,000 80,000

PE 2021 NHPP 232,000 0 0 232,000

CN 2023 NHFP 294,000 0 448,000 742,000

CN 2023 NHPP 2,247,000 0 0 2,247,000

Project Totals 2,806,000 0 495,000 3,301,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 312,000 0 2,989,000 0 0

Totals 312,000 0 2,989,000 0 0

Page 20

Page 20: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Snohomish

Agency: Snohomish Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

05 SNOCO-158 06 0.000 CE No N/A N/A 1,937,452 21-09

Red Bridge #537 Preventative Maintenance

Paint bridge and perform minor repairs as necessary.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 STP(BR) 341,869 0 46,152 388,021

CN 2024 STP(BR) 1,549,431 0 0 1,549,431

Project Totals 1,891,300 0 46,152 1,937,452

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 388,021 0 0 1,549,431 0

Totals 388,021 0 0 1,549,431 0

Page 21

Page 21: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County: Snohomish

Agency: Snohomish Co.

Func Project Cls Number PIN STIP ID

04 SNOCO-157

Snohomish River Bridge #1 Scour Mitigation

Seismic and scour structural improvements.

Imp Type

06

Total Project Length

0.000

Environmental Type

DCE

RW Required

No

Begin Termini

N/A

End Termini

N/A

Total Est. Cost of Project

3,039,631

STIP Amend. No.

21-09

Funding

Phase PE

Start Date 2021

Federal Fund Code STP(BR)

Federal Funds

578,012 State Fund Code State Funds

0 Local Funds

78,031 Total

656,043

CN 2024 STP(BR) 2,383,588 0 0 2,383,588

Project Totals 2,961,600 0 78,031 3,039,631

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL

Totals

656,043

656,043

0

0

0

0

2,383,588

2,383,588

0

0

Agency Totals for Snohomish Co.

Federal Funds

12,658,900 State Funds

0 Local Funds

619,183 Total

13,278,083

Page 22

Page 22: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: Sound Transit

Func Cls

Project Number PIN STIP ID

Imp Type

Total Project Length Environmental

Type RW Required

Begin Termini

End Termini

Total Est. Cost of Project

STIP Amend. No.

00 RTA-82 23 0.000 EIS Yes South 200th Street and 28th Av

South 316th Street and 23rd Av

2,451,535,00 0 21-09

Federal Way Link Extension

Engineering (including NEPA), design and construction to extend light rail approximately 7.8 miles from Angle Lake Station (SeaTac) to the Federal Way Transit Center. The alignment is adjacent to I-5 and includes 3 stations: one near Highline College in Kent / Des Moines, one station at South 272nd, and one station at the Federal Way Transit Center. Parking will be built at each of the three stations. This project is anticipated to be financed with an FTA Full Funding Grant Agreement and federal TIFIA Master Credit Agreement loan. The FFGA award is $790M with a total baseline cost estimate of $3.16B. When the TIFIA loan is executed, a total of $629,472,431 in TIFIA loan disbursements will be available 2019-2024. This is a multi-year project and the programming reflects the funds available within the span of the regional TIP.

Page 23

Page 23: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: Sound Transit

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 0 726,000 726,000

PE 2022 0 0 1,484,000 1,484,000

PE 2023 0 0 40,000 40,000

PE 2024 0 0 30,000 30,000

RW 2021 0 0 38,262,000 38,262,000

RW 2022 0 0 5,369,000 5,369,000

RW 2023 0 0 3,700,000 3,700,000

RW 2024 0 0 3,700,000 3,700,000

CN 2021 5309(NS) 97,710,967 0 369,832,000 467,542,967

CN 2021 FTA Discretionary 158,583,550 0 0 158,583,550

CN 2022 5309(NS) 100,000,000 0 472,958,000 572,958,000

CN 2023 5309(NS) 100,000,000 0 246,895,000 346,895,000

CN 2024 5309(NS) 100,000,000 0 56,679,000 156,679,000

Project Totals 556,294,517 0 1,199,675,000 1,755,969,517

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 665,114,517 579,811,000 350,635,000 160,409,000 0

Totals 665,114,517 579,811,000 350,635,000 160,409,000 0

Page 24

Page 24: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: Sound Transit

Func Cls

Project Number PIN STIP ID

Imp Type

Total Project Length Environmental

Type RW Required

Begin Termini

End Termini

Total Est. Cost of Project

STIP Amend. No.

00 RTA-78 23 8.000 EIS Yes Lynnwood Transit Center area

Northgate Transit Center 2,771,623,99 7 21-09

Lynnwood Link Extension

Extend Sound Transit's Link Light Rail project from Lynnwood to Northgate. This project is anticipated to be financed with a federal TIFIA Master Credit Agreement loan. When the loan is executed, a total of $657,863,164 in TIFIA loan disbursements will be available 2018- 2023. This is a multi-year project and the programming reflects the funds available within the span of the regional TIP.

Page 25

Page 25: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: Sound Transit

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 0 10,633,000 10,633,000

PE 2022 0 0 9,386,000 9,386,000

PE 2023 0 0 8,900,000 8,900,000

PE 2024 0 0 6,914,000 6,914,000

RW 2021 0 0 6,805,000 6,805,000

RW 2022 0 0 5,000,000 5,000,000

RW 2023 0 0 4,386,000 4,386,000

RW 2024 0 0 4,000,000 4,000,000

CN 2021 5309(NS) 97,710,967 0 575,712,000 673,422,967

CN 2021 FTA Discretionary 94,047,724 0 0 94,047,724

CN 2022 5309(NS) 100,000,000 0 502,969,000 602,969,000

CN 2023 5309(NS) 100,000,000 0 358,982,000 458,982,000

CN 2024 5309(NS) 100,000,000 0 163,805,000 263,805,000

Project Totals 491,758,691 0 1,657,492,000 2,149,250,691

Page 26

Page 26: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: Sound Transit

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 784,908,691 617,355,000 472,268,000 274,719,000 0

Totals 784,908,691 617,355,000 472,268,000 274,719,000 0

Federal Funds State Funds Local Funds Total

Agency Totals for Sound Transit 1,048,053,208 0 2,857,167,000 3,905,220,208

Page 27

Page 27: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NW

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

01 140504G WDNW-2065 21 0.500 CE Yes MP 7.50 MP 8.00 10,000,000 21-09

I-405/Ripley Lane Stream Connection Project

The project will establish flow capacity and restore stream connection between I-405 and Lake Washington to address WSDOTs obligation to reconnect Streams 7.7A and 7.8 across the I-405 Corridor.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 CWA 833,113 0 833,113

PE 2022 0 CWA 185,934 0 185,934

RW 2021 0 CWA 4,491,126 0 4,491,126

RW 2022 0 CWA 410,541 0 410,541

CN 2022 0 CWA 1,600,000 0 1,600,000

CN 2024 0 CWA 1,400,000 0 1,400,000

Project Totals 0 8,920,714 0 8,920,714

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 5,324,239 2,196,475 0 1,400,000 0

Totals 5,324,239 2,196,475 0 1,400,000 0

Page 28

Page 28: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NW

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

01 100520P WDNW-2066 24 2.130 CE No 162.97 165.1 537,648 21-09

I-5/Jackson St & S Forest St Vicinity - Fiber Repair

The conduits and fiber optic cables have been damaged by vandalism. The conduits and fiber optic lines will be replaced. The new fiber optic lines will keep the I-5 Express Lanes signs and gates functioning.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 0 123,952 123,952

CN 2022 NHPP 405,422 0 8,274 413,696

Project Totals 405,422 0 132,226 537,648

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 123,952 413,696 0 0 0

Totals 123,952 413,696 0 0 0

Page 29

Page 29: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NW

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

01 0901(503) 109024S WDNW-1183 14 1.610 DCE No MP 4.28 MP 5.89 7,865,268 21-09

I-90/Lacey V Murrow Bridge - Anchor Cable Replacement

Several anchor cables on the Lacey V Murrow floating bridge have reached the end of their service life. This project will replace select anchor cables in order to maintain the operating integrity of the bridge.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 NHFP 7,275,367 0 148,483 7,423,850

Project Totals 7,275,367 0 148,483 7,423,850

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 7,423,850 0 0 0 0

Totals 7,423,850 0 0 0 0

Page 30

Page 30: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside September 28, 2021

County:

Agency: WSDOT - NW

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 116717C WDNW-2053 04 1.630 CE No MP 17.95 MP 19.58 18,000,000 21-09

SR 167/SR 516 to S 277th St - Southbound Auxiliary Lane

Construct an auxiliary lane on SR 167 in the southbound direction between SR 516 and S 277th Street to mitigate changing traffic patterns along the corridor.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 0 0 557,948 557,948

CN 2022 0 0 950,293 950,293

CN 2023 0 0 4,241,758 4,241,758

CN 2024 0 0 7,500,000 7,500,000

Project Totals 0 0 13,249,999 13,249,999

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 557,948 950,293 4,241,758 7,500,000 0

Totals 557,948 950,293 4,241,758 7,500,000 0

Federal Funds State Funds Local Funds Total

Agency Totals for WSDOT - NW 7,680,789 8,920,714 13,530,708 30,132,211

Page 31

Page 31: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: Quad-Co RTPO N Inside Y Outside September 28, 2021

County: Adams

Agency: Othello

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

04 WA-12892 28 0.030 CE No 40' North of Scootney Street 40' South of Scootney Street 450,000 21-09

14th Avenue and Scootney Street Pedestrian Improvements

Curb extensions, lane width reduction, road reconfiguration pavement markings for parking lane, ADA curb ramp retrofits, pedestrian hybrid beacon, pedestrian-scale lighting

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 0 SRTS 46,500 3,500 50,000

CN 2022 0 SRTS 372,000 28,000 400,000

Project Totals 0 418,500 31,500 450,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 0 400,000 0 0 0

Totals 50,000 400,000 0 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Othello 0 418,500 31,500 450,000

Page 32

Page 32: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: RTC N Inside Y Outside September 28, 2021

County: Skamania

Agency: Skamania Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

07 WA-14018 11 0.010 DCE Yes Buck Creek Bridge Buck Creek Bridge 534,900 21-09

Buck Creek Bridge

Repair scour critical Buck Creek Bridge

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 STP(BR) 20,000 0 3,122 23,122

RW 2021 0 0 1,000 1,000

CN 2022 STP(BR) 510,778 0 0 510,778

Project Totals 530,778 0 4,122 534,900

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 23,122 0 0 0 0

RW 1,000 0 0 0 0

CN 0 510,778 0 0 0

Totals 24,122 510,778 0 0 0

Page 33

Page 33: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: RTC N Inside Y Outside September 28, 2021

County: Skamania

Agency: Skamania Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

05 000S(545) WA-12656 21 0.000 DCE No Countywide Countywide 472,800 21-09

Guardrail and Signage Project

Install/upgrade guardrail. Install/upgrade signing, sign post reflectors, and guideposts/delineators. Projects includes associated ADA and utility work as needed.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

CN 2021 HSIP 406,200 0 0 406,200

Project Totals 406,200 0 0 406,200

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 406,200 0 0 0 0

Totals 406,200 0 0 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Skamania Co. 936,978 0 4,122 941,100

Page 34

Page 34: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13882 05 3.220 CE Yes Various Various 6,176,000 21-09

29th / Washington / Monroe

Maintenance grind and overlay, pavement repair, crack seal, upgrade ADA ramps.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 NHPP 392,000 0 98,000 490,000

RW 2022 NHPP 40,000 0 10,000 50,000

CN 2023 NHPP 4,509,000 0 1,127,000 5,636,000

Project Totals 4,941,000 0 1,235,000 6,176,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 398,000 92,000 0 0

RW 0 25,000 25,000 0 0

CN 0 0 5,000,000 636,000 0

Totals 0 423,000 5,117,000 636,000 0

Page 35

Page 35: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

07 WA-13878 28 CE No Various Various 844,276 21-09

Bemiss Elementary Walk Route Improvements

Construct sidewalk along Liberty Ave. from Lee St. to Cook St. Construct curb extensions and crossing improvements at Liberty Ave./Cook St. Install lighting and RRFB at Crestline St./Courtland Ave. intersection.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 0 SRTS 59,803 10,553 70,356

CN 2023 0 SRTS 657,832 116,088 773,920

Project Totals 0 717,635 126,641 844,276

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 70,356 0 0 0

CN 0 0 773,920 0 0

Totals 0 70,356 773,920 0 0

Page 36

Page 36: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

04 WA-11841 28 1.000 CE Yes Northwest Blvd Garland Ave 2,489,869 21-09

Driscoll/Alberta/Cochran Sidewalk Infill and Finch Elem Walk Route

Sidewalk infill generally along both sides of the roadway. Transit stop improvements as appropriate. Marked crosswalk including illumination, median islands, RRFB and reconfigure roadway at NW Blvd. ADA ramp retrofits, sidewalk with curb and buffer separation, standard bike lanes and curb extensions.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 TAP(UL) 130,000 0 65,665 195,665

PE 2022 0 SRTS 55,433 9,783 65,216

RW 2022 0 0 80,000 80,000

CN 2023 TAP(UL) 575,200 0 308,387 883,587

CN 2023 CMAQ 335,525 0 179,888 515,413

CN 2023 0 SRTS 637,490 112,498 749,988

Project Totals 1,040,725 692,923 756,221 2,489,869

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 200,000 60,881 0 0

RW 0 80,000 0 0 0

CN 0 0 2,148,988 0 0

Totals 0 280,000 2,209,869 0 0

Page 37

Page 37: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13876 28 0.280 CE No Carlisle at Greene Carlisle at Freya 1,420,957 21-09

Greene/Carlisle Crosswalk Improvements

Install Pedestrian Hybrid Beacon and related crosswalk improvements at Greene/Carlisle. Construct path along the north side of Carlisle from Greene St. to Ralph St. Construct sidewalks and ADA ramps along Carlisle from Ralph St. to Freya St.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 0 Ped/Bike Program 116,260 12,918 129,178

CN 2023 0 Ped/Bike Program 1,162,601 129,178 1,291,779

Project Totals 0 1,278,861 142,096 1,420,957

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 129,178 0 0 0

CN 0 0 1,291,779 0 0

Totals 0 129,178 1,291,779 0 0

Page 38

Page 38: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13883 14 0.320 CE No south bridge approach north bridge approach 4,457,200 21-09

Maple Street Bridge Deck Repair

Bridge deck surface and joint repair.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 STP(BR) 725,735 0 113,265 839,000

CN 2024 STP(BR) 3,618,200 0 0 3,618,200

Project Totals 4,343,935 0 113,265 4,457,200

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 200,000 339,000 300,000 0

CN 0 0 0 3,000,000 618,200

Totals 0 200,000 339,000 3,300,000 618,200

Page 39

Page 39: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13880 05 2.400 CE Yes Various Various 4,558,000 21-09

Market / Monroe / 29th

Maintenance grind and overlay, pavement repair, crack seal and ADA ramp upgrades.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 NHPP 106,691 0 26,580 133,271

PE 2022 NHFP 182,309 0 45,420 227,729

RW 2022 NHPP 14,767 0 3,692 18,459

RW 2022 NHFP 25,233 0 6,308 31,541

CN 2023 NHPP 1,224,542 0 306,413 1,530,955

CN 2023 NHFP 2,092,458 0 523,587 2,616,045

Project Totals 3,646,000 0 912,000 4,558,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 300,000 61,000 0 0

RW 0 25,000 25,000 0 0

CN 0 0 3,500,000 647,000 0

Totals 0 325,000 3,586,000 647,000 0

Page 40

Page 40: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project

Func Project Imp Length Environmental Cls Number PIN STIP ID Type Type

03 WA-13879 21 CE

Nevada/Joseph Pedestrian Hybrid Beacon

Install a pedestrian hybrid beacon, ADA ramps and crosswalk improvements.

RW Required

Yes

Begin Termini

N/A

End Termini

N/A

Total Est. Cost of Project

570,620

STIP Amend. No.

21-09

Funding

Phase PE

Start Date 2022

Federal Fund Code Federal Funds

0 State Fund Code

SRTS State Funds

56,337 Local Funds

9,942 Total

66,279

RW 2022 0 SRTS 36,040 6,360 42,400

CN 2023 0 SRTS 392,650 69,291 461,941

Project Totals 0 485,027 85,593 570,620

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 66,279 0 0 0

RW 0 10,000 32,400 0 0

CN

Totals

0

0

0

76,279

461,941

494,341

0

0

0

0

Page 41

Page 41: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

04 WA-13877 28 0.640 CE No Cook St. Market St. 1,535,660 21-09

Shaw Middle School - Garland Ave. Pathway

Construct a shared-use path, curb extensions and ADA ramps along the north side of Garland Ave. from Cook St. to Market St. Construct a shared-use path along Regal St. from Garland Ave. to Rich Ave.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 SRTS 111,684 0 27,921 139,605

CN 2023 SRTS 1,116,844 0 279,211 1,396,055

Project Totals 1,228,528 0 307,132 1,535,660

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 139,605 0 0 0

CN 0 0 1,396,055 0 0

Totals 0 139,605 1,396,055 0 0

Page 42

Page 42: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13887 14 CE No Various Various 4,994,280 21-09

Washington St. South, Washington St. North Channel and Stevens St. Bridge Deck Repair

Bridge deck and joint repair.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2022 STP(BR) 564,646 0 375,354 940,000

CN 2024 STP(BR) 2,435,354 0 1,618,926 4,054,280

Project Totals 3,000,000 0 1,994,280 4,994,280

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 240,000 500,000 200,000 0

CN 0 0 0 4,054,280 0

Totals 0 240,000 500,000 4,254,280 0

Federal Funds State Funds Local Funds Total

Agency Totals for Spokane 18,200,188 3,174,446 5,672,228 27,046,862

Page 43

Page 43: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane Co.

Func Cls

03

Project Number PIN STIP ID

WA-13972

Imp Type

05

Total Project Length

0.630

Environmental Type

CE

RW Required

No

Begin Termini

Wall St MP 1.21

End Termini

US 395 MP 1.84

Total Est. Cost of Project

590,000

STIP Amend. No.

21-09

Country Homes Blvd Preservation

Grind and inlay two north bound drive lanes

Funding

Phase PE

Start Date 2022

Federal Fund Code NHPP

Federal Funds

49,000 State Fund Code State Funds

0 Local Funds

12,000 Total

61,000

CN 2022 NHPP 423,000 0 106,000 529,000

Project Totals 472,000 0 118,000 590,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 61,000 0 0 0

CN

Totals

0

0

529,000

590,000

0

0

0

0

0

0

Page 44

Page 44: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane Co.

Total Project Total Est. STIP

Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.

03 WA-13826 04 1.560 CE Yes MP 0.25 MP 1.81 2,664,000 21-09

Harvard Road Reconstruction

Full-depth roadway reconstruction.

Funding

Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total

PE 2021 NHPP 239,000 0 37,000 276,000

CN 2023 NHPP 2,066,000 0 322,000 2,388,000

Project Totals 2,305,000 0 359,000 2,664,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 276,000 0 0 0 0

CN 0 0 2,388,000 0 0

Totals 276,000 0 2,388,000 0 0

Federal Funds State Funds Local Funds Total

Agency Totals for Spokane Co. 2,777,000 0 477,000 3,254,000

Page 45

Page 45: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside September 28, 2021

County: Spokane

Agency: Spokane Transit

Total Project

Func Project Imp Length Environmental RW Begin Cls Number PIN STIP ID Type Type Required Termini

00 WA-13866 23 CE No N/A

Battery Electric Bus Purchases for Fixed Route Fleet Electrification

Purchase up to ten new, battery electric buses which will replace diesel buses that have exceeded the minimum useful life.

End Termini

N/A

Total Est. Cost of Project

11,815,000

STIP Amend. No.

21-09

Funding

Phase ALL

Start Date 2022

Federal Fund Code 5339(c)

Federal Funds

6,380,100 State Fund Code State Funds

0 Local Funds

5,434,900 Total

11,815,000

Project Totals 6,380,100 0 5,434,900 11,815,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL

Totals

0

0

11,815,000

11,815,000

0

0

0

0

0

0

Agency Totals for Spokane Transit

Federal Funds

6,380,100 State Funds

0 Local Funds

5,434,900 Total

11,815,000

Page 46

Page 46: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

(Project Funds to Nearest Dollar)

MPO/RTPO: WWV Y Inside N Outside September 28, 2021

County: Walla Walla

Agency: Walla Walla

Total Project

Func Project Imp Length Environmental RW Begin End Cls Number PIN STIP ID Type Type Required Termini Termini

03 7198(003) WA-11548 04 0.360 CE Yes Colville Street 5th Avenue

Poplar Street - Colville to 5th

Reconstruct to convert an undivided four-lane roadway segment into a three-lane segment, allowing for the addition of bicycle and pedestrian facilities; pedestrian crossing, signal upgrades and replace water main.

Total Est. Cost of Project

5,507,650

STIP Amend. No.

21-09

Funding

Phase PE

Start Date 2021

Federal Fund Code STP(US)

Federal Funds

198,661 State Fund Code State Funds

0 Local Funds

375,757 Total

574,418

PE 2021 HIP(US) 126,339 0 19,718 146,057

RW 2021 0 0 130,000 130,000

CN 2022 0 OTHER 1,232,216 410,739 1,642,955

CN 2022 HSIP 1,250,000 0 350,225 1,600,225

CN 2024 STP(US) 998,615 0 415,380 1,413,995

Project Totals 2,573,615 1,232,216 1,701,819 5,507,650

Page 47

Page 47: Washington State S. T. I. P. 2021 to 2024 (Project Funds

Washington State S. T. I. P.

2021 to 2024

MPO/RTPO: WWV

County: Walla Walla

Agency: Walla Walla

Expenditure Schedule

Phase

PE

RW

CN

Totals

Y Inside

1st

720,475

130,000

0

850,475

(Project Funds to Nearest Dollar)

N Outside

2nd

0

0

1,600,225

1,600,225

3rd

0

0

0

0

4th

0

0

1,413,995

1,413,995

September 28, 2021

5th & 6th

0

0

0

0

Agency Totals for Walla Walla

Federal Funds

2,573,615 State Funds

1,232,216 Local Funds

1,701,819 Total

5,507,650

Page 48