www.energy.gov/EM 1 Waste Isolation Pilot Plant Update J.R. Stroble, CBFO For the Northern New Mexico Citizens Advisory Board January 27, 2016

Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 1

Waste Isolation Pilot Plant

Update

J.R. Stroble, CBFO

For the

Northern New Mexico Citizens Advisory Board

January 27, 2016

Page 2: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 2

Corrective Actions

The DOE TRU Waste Complex has implemented several changes since the 2014 radiological release incident at WIPP. Based on the Accident Investigation Report and subsequent evaluations, DOE has implemented several Corrective Actions that will prevent such incidents from occurring throughout the Life Cycle of WIPP.

Five organizations have implemented changes:1. EM-HQ2. EM-LA and NA-LA3. LANS4. CBFO5. NWP

WIPP Readiness Activities

Page 3: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 3

WIPP Readiness Activities

Road to Recovery:

• New Baseline Schedule and Budget

• Install and Test Interim and Supplemental Ventilation Systems

• Perform Procedures Without Actual Waste and Continue Training

• Complete Operational Readiness Reviews

• Resume waste emplacement

Page 4: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 4

WIPP Readiness Activities

New Integrated Performance Measurement Baseline (PMB) Approved by CBFO in January 2016• PMB integrates recovery activities with base activities at the site,

including capital asset projects.

• Identifies critical path activities

• Projects date for authorization to proceed with waste emplacement in December 2016

Page 5: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 5

WIPP Readiness Activities

DisposalCircuit

MiningCircuit

NorthCircuit

HEPASalt

Hoist

Air

Intake

Hoist

Ex

isti

ng

Ex

ha

us

t S

ha

ft

U/G FansW

as

te

Sh

aft

Wa

ste

Ho

ist

PVS pushes & pulls

total flow to 540K cfm

(283K cfm HEPA

filtered)

New Safety Significant Filtration

System at Existing Exhaust Shaft

Ne

w E

xh

au

st

Sh

aft

New Exhaust

w/ Discharge

Downwind

Critical Decision (CD) – 1• Approved: DOE HQ – Dec. 2015• Operation: 2021

Permanent Ventilation System (PVS)

Page 6: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 6

Interim and Supplemental Ventilation Systems

IVSRequired to resume waste disposal operationsMarch/April 2016

SVSPlans are to use SVS during mining operations, following waste emplacement commencement

WIPP Readiness Activities

Page 7: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 7

New Documented Safety Analysis (DSA)

- New DOE Standard for DSA’s- Approximately 120 SMP procedures revised- Implementation and training

WIPP Readiness Activities

Page 8: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 8

Contractor and DOE Operational Readiness Reviews

- A performance-based examination of facilities, equipment, personnel and procedures

- Ensure WIPP will be operated safely – within approved safety envelope

WIPP Readiness Activities

Page 9: Waste Isolation Pilot Plant Update - Energy.gov...(PMB) Approved by CBFO in January 2016 • PMB integrates recovery activities with base activities at the site, including capital

www.energy.gov/EM 9

• QUESTIONS?